Vous êtes sur la page 1sur 22

Centro De Computo De UNI-FIM

HVAC Load Analysis





for



Facultad De Ingenieria Mecanica
Universidad _Nacional De Ingenieria
Rimac
Prepared By:
IT Ecosystem SAC
Refrigeracion Y Aire Acondicionado
sbado, 07 de diciembre de 2013
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development Centro De Computo De UNI-FIM
College Station, TX 77845 Page 2

General Project Data Input

General Project Information
Project file name: CCFIM-UNI - MN374-A.CH8
Project title: Centro De Computo De UNI-FIM
Project date: lunes, 02 de diciembre de 2013
Weather reference city: LIMA, PERU
Client name: Facultad De Ingenieria Mecanica
Client address: Universidad _Nacional De Ingenieria
Client city: Rimac
Company name: Refrigeracion Y Aire Acondicionado
Company representative: IT Ecosystem SAC


Barometric pressure: 29.876 in.Hg.
Altitude: 42 feet
Latitude: -12 Degrees
Mean daily temperature range: 11.5 Degrees
Starting & ending time for HVAC load calculations: 7am - 10pm
Number of unique rooms in this project: 2



Building Default Values
Calculations performed: Both heating and cooling loads
Lighting requirements: 1.00 Watts per square foot
Equipment requirements: 0.50 Watts per square foot
People sensible load multiplier: 250 Btuh per person
People latent load multiplier: 200 Btuh per person
Room sensible safety factor: 10 %
Room latent safety factor: 10 %
Room heating safety factor: 10 %
People diversity factor: 90 %
Lighting profile number: 0
Equipment profile number: 0
People profile number: 1
Building default ceiling height: 10.00 feet
Building default wall height: 8.00 feet



Internal Operating Load Profiles (C = 100)
hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
1 5 5 5 5 5 5 10 C C C C 90 90 90 C C C 70 80 80 80 80 10 10
2 5 5 5 5 5 5 C C C C C C C C C C C C C C C C 5 5
3 5 5 5 5 5 5 75 C C C 80 80 80 C C C C 80 80 80 80 30 5 5
4 5 5 5 5 5 5 5 C C C C C C C C C C C C C C C 5 5
5 C C C C C C C C C C C C C C C C C C C C C C C C
6 C C C C C C C C C C C C C C C C C C C C C C C C
7 C C C C C C C C C C C C C C C C C C C C C C C C
8 C C C C C C C C C C C C C C C C C C C C C C C C
9 C C C C C C C C C C C C C C C C C C C C C C C C
10 C C C C C C C C C C C C C C C C C C C C C C C C
C:\ ...\CCFIM-UNI - MN374-A.CH8 sbado, 07 de diciembre de 2013, 07:38 a.m.
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development Centro De Computo De UNI-FIM
College Station, TX 77845 Page 3

General Project Data Input (cont'd)

Building-Level Design Conditions

Design
Month
Outdoor
Dry Bulb
Outdoor
Wet Bulb
Indoor
Rel.Hum
Indoor
Dry Bulb
Grains
Diff
In/Outdoor
Correction

February 86 77 75% 75 28.11 -2
January 84 74 75% 75 12.76 -4
March 85 76 75% 75 23.39 -3
Winter 58 75


Master Roofs
Roof
No.
ASHRAE
Roof#
Roof
U-Fac
Dark
Color
Susp.
Ceil

1 3 0.126 Yes Yes
Roof #1 Description: 8 inch lightweight concrete, 1/2 inch slag, 3/4 inch felt & membrane, dark color, suspended ceiling.
2 6 0.146 Yes Yes
Roof #2 Description: 6" lightweight concrete, 25 lb./sq.ft., dark color with suspended accoustical tile ceiling.




Master Walls
Wall
No.
ASHRAE
Group
Wall
U-Fac
Wall
Color

1 D 0.281 D
Wall #1 Description: 4 inch face brick, 1 inch air space, 4 inch tile, dark color
2 G 1.124 M
Wall #2 Description: Metal wall, no insulation or finish
3 G 0.070 L
Wall #3 Description: Self-closing double door, metal, heavy construction, light color.




Master Partitions
Partition
No.
Partition
U-Factor
Cool
T-D
Heat
T-D

1 0.355 0 0
Partition #1 Description: 8 inch concrete block partition wall, adjoining shipping and receiving area




Master Glass
Glass
No.
Summer
U-Factor
Winter
U-Factor
Glass
Shd.Coef.
Interior
Shading
Interior
Shd.Coef

1 0.900 0.910 0.700 2 0.000
Glass #1 Description: 1/4" single-pane window, low e, heat-absorbing pattern, insulated metal frame, no int shading
2 0.470 0.380 0.730 2 0.000
Glass #2 Description: 1/4 inch double pane window,1/2 inch air space, heat abs, e=0.4, 4 ft.h x 6 ft. w, no internal shade




Master Shading Devices
Shade
No.
Dist
Horiz
Overh
Projects
Dist
Beyond
Right
W.Edge
Dist
Beyond
Left
W.Edge
Dist
Overh
Above
Wind
Dist
Right
Fin
Proj
Dist
R-Fin
Beyond
W.Edge
Ht
Of
Right
Fin
Dist
Left
Fin
Proj
Dist
L-Fin
Beyond
W.Edge
Ht
Of
Left
Fin

1 6.00 2.00 2.00 2.00 0.00 0.00 0.00 0.00 0.00 0.00
Shading Device #1 Description: Aluminum store-front overhang, 6' projection with 2' extra width on both sides of window
C:\ ...\CCFIM-UNI - MN374-A.CH8 sbado, 07 de diciembre de 2013, 07:38 a.m.
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development Centro De Computo De UNI-FIM
College Station, TX 77845 Page 4

Air Handler Input

Air Handler Number 1 Input Data

Name: Tecer Piso
Terminal type: Constant Volume
Method for CV Sum of Peaks
Supply fan type: Draw-thru fan
Calculations performed: Both heating and cooling loads
Excess supply air: Reserve
Occurrences: 1
People profile number: 1
Lighting profile number: 0
Equipment profile number: 0
Exhaust may not exceed supply air: No
Leaving heating coil temp (deg.F): 95.0
Leaving cooling coil temp (deg.F): 55.0
Cooling coil CFM 0
Misc. Btuh gain - supply side: 0
Misc. Btuh gain - return side: 0
Combined fan & motor efficiency: 65
Static pressure across fan (in.wg.): 0.00
Summer supply duct temp rise (deg.F): 1.000
Summer return duct temp rise (deg.F): 0.750
Winter supply duct temp drop (deg.F): 2.000
Winter return duct temp drop (deg.F): 1.000
Chilled water temp difference (deg.F): 10.000
Hot water temp difference (deg.F): 20.000
Cooling ventilation: 0.7 Direct
Cooling infiltration: 0 AC/Hr
Heating ventilation: 10 CFM/Pr
Heating infiltration: 0 AC/Hr
Pretreated outside air: none
Pretreated air Summer DB (deg.F): 0
Pretreated air Summer WB (deg.F): 0
Pretreated air Winter DB (deg.F): 0


Design
Month
Outdoor
Dry Bulb
Outdoor
Wet Bulb
Indoor
Rel.Hum
Indoor
Dry Bulb
Grains
Diff
In/Outdoor
Correction

February 86 77 75% 75 28.11 -2
January 84 74 75% 75 12.76 -4
March 85 76 75% 75 23.39 -3
Winter 58 75

C:\ ...\CCFIM-UNI - MN374-A.CH8 sbado, 07 de diciembre de 2013, 07:38 a.m.
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development Centro De Computo De UNI-FIM
College Station, TX 77845 Page 5

Room Input

Room 1: Aula A (391.6 sq.ft) (Zone 1)

Air Handler number: 1 Room occurrences: 1
Room length: (feet) 22.00 Room width (feet): 17.80
Lighting Watts: 20 Equipment Watts: 196
Number of people in room: 15 People profile number: 1
Lighting profile number: 0 Equipment profile number: 0
Ceiling height (feet): 9.50 Heating safety factor (%): 10
Sensible safety factor (%): 10 Latent safety factor (%): 10
Sensible heat per person (Btuh): 250 Latent heat per person (Btuh): 200
Cooling ventilation method: Direct Cooling ventilation value: 0.700
Cooling infiltration method: AC/Hr Cooling infiltration value: 0.000
Heating ventilation method: CFM/Pr Heating ventilation value: 10.000
Heating infiltration method: AC/Hr Heating infiltration value: 0.000
Winter exhaust air CFM: 0 Summer exhaust air CFM: 0
Minimum supply CFM: 0 Latent Btuh equipment load: 0
Ceil. exposed to plenum (sq.ft): 392 Exposed floor slab perimeter (ft): 0
Both heating and cooling loads are calculated for this room.

Roof Type ASHRAE# U-Factor Dark Length Width Area Susp.Ceil

1 1 3 0.126 Yes 22.00 17.80 391.6 Yes

Part Type U-Factor Cool TD Heat TD Height Width Area

3 1 0.355 0.000 0.000 8.00 22.00 176.0

Wall Type ASHRAE# U-Factor Color Height Width Area Direction

1 1 D 0.281 D 8.00 22.00 176.0 NW
2 1 D 0.281 D 8.00 17.80 142.4 SE


Room 2: Aula B (391.6 sq.ft) (Zone 1)

Air Handler number: 1 Room occurrences: 1
Room length: (feet) 22.00 Room width (feet): 17.80
Lighting Watts: 17 Equipment Watts: 196
Number of people in room: 15 People profile number: 1
Lighting profile number: 0 Equipment profile number: 0
Ceiling height (feet): 9.50 Heating safety factor (%): 10
Sensible safety factor (%): 10 Latent safety factor (%): 10
Sensible heat per person (Btuh): 250 Latent heat per person (Btuh): 200
Cooling ventilation method: Direct Cooling ventilation value: 0.700
Cooling infiltration method: AC/Hr Cooling infiltration value: 0.000
Heating ventilation method: CFM/Pr Heating ventilation value: 10.000
Heating infiltration method: AC/Hr Heating infiltration value: 0.000
Winter exhaust air CFM: 0 Summer exhaust air CFM: 0
Minimum supply CFM: 0 Latent Btuh equipment load: 0
Ceil. exposed to plenum (sq.ft): 392 Exposed floor slab perimeter (ft): 0
Both heating and cooling loads are calculated for this room.

Roof Type ASHRAE# U-Factor Dark Length Width Area Susp.Ceil

1 1 3 0.126 Yes 22.00 17.80 391.6 Yes

Wall Type ASHRAE# U-Factor Color Height Width Area Direction

1 1 D 0.281 D 8.00 22.00 176.0 NW
2 1 D 0.281 D 8.00 17.80 142.4 SW
3 1 D 0.281 D 8.00 22.00 176.0 SE

C:\ ...\CCFIM-UNI - MN374-A.CH8 sbado, 07 de diciembre de 2013, 07:38 a.m.
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development Centro De Computo De UNI-FIM
College Station, TX 77845 Page 6

Plenum Input

Plenum Number 1 Input Data

Air Handler Number: 1
Plenum active: No
Percent of light load to rooms: 100
Floor u-factor (Btuh/Sq.ft-F): 0.000
Watts of equipment: 0
Summer plenum-room temp. difference (deg.F): 0
Winter plenum-room temp. difference (deg.F): 0

C:\ ...\CCFIM-UNI - MN374-A.CH8 sbado, 07 de diciembre de 2013, 07:38 a.m.
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development Centro De Computo De UNI-FIM
College Station, TX 77845 Page 7

Building Summary Loads
Building peaks in February at 5pm.

Bldg Load
Descriptions
Area
Quan
Sen
Loss
%Tot
Loss
Lat
Gain
Sen
Gain
Net
Gain
%Net
Gain
Roof 783 1,845 14.60 0 6,812 6,812 20.46
Wall 813 4,271 33.80 0 5,288 5,288 15.88
Glass 0 0 0.00 0 0 0 0.00
Floor Slab 0 0 0.00 0 0 0 0.00


Skin Loads 6,116 48.41 0 12,100 12,100 36.34


Lighting 37 0 0.00 0 139 139 0.42
Equipment 392 0 0.00 0 1,470 1,470 4.41
Pool Latent 0 0 0.00 0 0 0 0.00
People 27 0 0.00 5,940 7,425 13,365 40.14
Partition 176 0 0.00 0 0 0 0.00
Cool. Pret. 0 0 0.00 0 0 0 0.00
Heat. Pret. 0 0 0.00 0 0 0 0.00
Cool. Vent. 1 0 0.00 14 8 22 0.07
Heat. Vent. 300 5,500 43.53 0 0 0 0.00
Cool. Infil. 0 0 0.00 0 0 0 0.00
Heat. Infil. 0 0 0.00 0 0 0 0.00
Draw-Thru Fan 0 0 0.00 0 470 470 1.41
Blow-Thru Fan 0 0 0.00 0 0 0 0.00
Reserve Cap. 0 0 0.00 0 823 823 2.47
Reheat Cap. 0 0 0.00 0 0 0 0.00
Supply Duct 0 680 5.38 0 2,803 2,803 8.42
Return Duct 0 340 2.69 0 2,102 2,102 6.31
Misc. Supply 0 0 0.00 0 0 0 0.00
Misc. Return 0 0 0.00 0 0 0 0.00


Building Totals 12,635 100.00 5,954 27,338 33,293 100.00





Building
Summary
Sen
Loss
%Tot
Loss
Lat
Gain
Sen
Gain
Net
Gain
%Net
Gain
Ventilation 5,500 43.53 14 8 22 0.07
Infiltration 0 0.00 0 0 0 0.00
Pretreated Air 0 0.00 0 0 0 0.00
Room Loads 6,116 48.41 5,940 21,956 27,896 83.79
Plenum Loads 0 0.00 0 0 0 0.00
Fan/Duct/Misc Loads 1,019 8.07 0 5,375 5,375 16.14


Building Totals 12,635 100.00 5,954 27,338 33,293 100.00




Check Figures
Total Building Supply Air (based on a 9 TD): 2,552 CFM
Total Building Vent. Air (0.03% of Supply): 1 CFM


Total Conditioned Air Space: 783 Sq.ft
Supply Air Per Unit Area: 3.2587 CFM/Sq.ft
Area Per Cooling Capacity: 282.3 Sq.ft/Ton
Cooling Capacity Per Area: 0.0035 Tons/Sq.ft
Heating Capacity Per Area: 16.13 Btuh/Sq.ft


Total Heating Required With Outside Air: 12,635 Btuh
Total Cooling Required With Outside Air: 2.77 Tons


C:\ ...\CCFIM-UNI - MN374-A.CH8 sbado, 07 de diciembre de 2013, 07:38 a.m.
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development Centro De Computo De UNI-FIM
College Station, TX 77845 Page 8

Building Summary Loads (Z)
Building peaks in February at 5pm.

Bldg Load
Descriptions
Area
Quan
Sen
Loss
%Tot
Loss
Lat
Gain
Sen
Gain
Net
Gain
%Net
Gain
Roof 783 1,845 14.60 0 6,812 6,812 20.46
Wall 813 4,271 33.80 0 5,288 5,288 15.88
Glass 0 0 0.00 0 0 0 0.00
Floor Slab 0 0 0.00 0 0 0 0.00


Skin Loads 6,116 48.41 0 12,100 12,100 36.34


Lighting 37 0 0.00 0 139 139 0.42
Equipment 392 0 0.00 0 1,470 1,470 4.41
Pool Latent 0 0 0.00 0 0 0 0.00
People 27 0 0.00 5,940 7,425 13,365 40.14
Partition 176 0 0.00 0 0 0 0.00
Cool. Pret. 0 0 0.00 0 0 0 0.00
Heat. Pret. 0 0 0.00 0 0 0 0.00
Cool. Vent. 1 0 0.00 14 8 22 0.07
Heat. Vent. 300 5,500 43.53 0 0 0 0.00
Cool. Infil. 0 0 0.00 0 0 0 0.00
Heat. Infil. 0 0 0.00 0 0 0 0.00
Draw-Thru Fan 0 0 0.00 0 470 470 1.41
Blow-Thru Fan 0 0 0.00 0 0 0 0.00
Reserve Cap. 0 0 0.00 0 823 823 2.47
Reheat Cap. 0 0 0.00 0 0 0 0.00
Supply Duct 0 680 5.38 0 2,803 2,803 8.42
Return Duct 0 340 2.69 0 2,102 2,102 6.31
Misc. Supply 0 0 0.00 0 0 0 0.00
Misc. Return 0 0 0.00 0 0 0 0.00


Building Totals 12,635 100.00 5,954 27,338 33,293 100.00





Building
Summary
Sen
Loss
%Tot
Loss
Lat
Gain
Sen
Gain
Net
Gain
%Net
Gain
Ventilation 5,500 43.53 14 8 22 0.07
Infiltration 0 0.00 0 0 0 0.00
Pretreated Air 0 0.00 0 0 0 0.00
Room Loads 6,116 48.41 5,940 21,956 27,896 83.79
Plenum Loads 0 0.00 0 0 0 0.00
Fan/Duct/Misc Loads 1,019 8.07 0 5,375 5,375 16.14


Building Totals 12,635 100.00 5,954 27,338 33,293 100.00




Check Figures
Total Building Supply Air (based on a 9 TD): 2,552 CFM
Total Building Vent. Air (0.03% of Supply): 1 CFM


Total Conditioned Air Space: 783 Sq.ft
Supply Air Per Unit Area: 3.2587 CFM/Sq.ft
Area Per Cooling Capacity: 282.3 Sq.ft/Ton
Cooling Capacity Per Area: 0.0035 Tons/Sq.ft
Heating Capacity Per Area: 16.13 Btuh/Sq.ft


Total Heating Required With Outside Air: 12,635 Btuh
Total Cooling Required With Outside Air: 2.77 Tons


C:\ ...\CCFIM-UNI - MN374-A.CH8 sbado, 07 de diciembre de 2013, 07:38 a.m.
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development Centro De Computo De UNI-FIM
College Station, TX 77845 Page 9

Air Handler #1 - Tecer Piso - Summary Loads

Rm
No

Description
Room Peak Time
Area
People
Volume
Htg.Loss
Htg.CFM
CFM/Sqft
Sen.Gain
Clg.CFM
CFM/Sqft
Lat.Gain
S.Exh
W.Exh
Htg.O.A.
Req.CFM
Act.CFM
Clg.O.A.
Req.CFM
Act.CFM


1 Aula A
5pm February
392
15
3,720
2,596
134
0.34
10,499
1,220
3.12
3,300
0
0
10/P
150
127
Direct
0
0
Runout duct size: 8 in. h x 4in. w, Diffusers: 10, CFM/runout: 122, Velocity: 549.2 ft/min, Pressure drop: 0.111 in.wg./100ft



2 Aula B
5pm February
392
15
3,720
3,521
181
0.46
11,459
1,332
3.40
3,300
0
0
10/P
150
173
Direct
0
0
Runout duct size: 8 in. h x 4in. w, Diffusers: 11, CFM/runout: 121, Velocity: 544.9 ft/min, Pressure drop: 0.109 in.wg./100ft


Room Peak Totals:
Total Rooms: 2
Unique Rooms: 2
783
30
7,440
6,116
315
0.40
21,958
2,553
3.26
6,600
0
0
300
300
1
1
Main trunk duct size: 25 in. h x 17in. w, Velocity: 864.8 ft/min, Pressure drop: 0.066 in.wg./100ft
C:\ ...\CCFIM-UNI - MN374-A.CH8 sbado, 07 de diciembre de 2013, 07:38 a.m.
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development Centro De Computo De UNI-FIM
College Station, TX 77845 Page 10

Air Handler #1 - Tecer Piso - Total Load Summary
Air Handler Description: Tecer Piso Constant Volume - Sum of Peaks
Supply Air Fan: Draw-Thru with program estimated horsepower of 0.19 HP
Fan Input: 65% motor and fan efficiency with 0 in. water across the fan
Sensible Heat Ratio: 0.81 --- This system occurs 1 time(s) in the building. ---


Air System Peak Time: 5pm in February.
Outdoor Conditions: Clg: 85 DB, 77 WB, 127.85 grains, Htg: 58 DB
Indoor Conditions: Clg: 75 DB, 75% RH, Htg: 75 DB


Summer: Ventilation controls outside air, ----- Winter: Ventilation controls outside air.


Room Space sensible loss: 6,116 Btuh
Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 5,500 Btuh 300 CFM
Supply Duct sensible loss: 680 Btuh
Return Duct sensible loss: 340 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 12,635 Btuh


Heating Supply Air: 6,796 / (.998 X 1.08 X 20) = 315 CFM
Winter Vent Outside Air (95.2% of supply) = 300 CFM


Room space sensible gain: 21,133 Btuh
Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 470 Btuh
Supply duct sensible gain: 2,803 Btuh
Reserve sensible gain: 823 Btuh
Total sensible gain on supply side of coil: 25,229 Btuh


Cooling Supply Air: 25,229 / (.998 X 1.1 X 9) = 2,552 CFM
Summer Vent Outside Air (0.0% of supply) = 1 CFM


Return duct sensible gain: 2,102 Btuh
Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 8 Btuh 1 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: 2,110 Btuh
Total sensible gain on air handling system: 27,338 Btuh


Room space latent gain: 5,940 Btuh
Infiltration latent gain: 0 Btuh
Outside air latent gain: 14 Btuh
Total latent gain on air handling system: 5,954 Btuh
Total system sensible and latent gain: 33,293 Btuh


Check Figures
Total Air Handler Supply Air (based on a 9 TD): 2,552 CFM
Total Air Handler Vent. Air (0.03% of Supply): 1 CFM


Total Conditioned Air Space: 783 Sq.ft
Supply Air Per Unit Area: 3.2587 CFM/Sq.ft
Area Per Cooling Capacity: 282.3 Sq.ft/Ton
Cooling Capacity Per Area: 0.0035 Tons/Sq.ft
Heating Capacity Per Area: 16.13 Btuh/Sq.ft


Total Heating Required With Outside Air: 12,635 Btuh
Total Cooling Required With Outside Air: 2.77 Tons


C:\ ...\CCFIM-UNI - MN374-A.CH8 sbado, 07 de diciembre de 2013, 07:38 a.m.
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development Centro De Computo De UNI-FIM
College Station, TX 77845 Page 11

Air Handler #1 - Tecer Piso - Summary Loads for Zones (Z)

Zn
No

Description
Zone Peak Time
Area
People
Volume
Htg.Loss
Htg.CFM
CFM/Sqft
Sen.Gain
Clg.CFM
CFM/Sqft
Lat.Gain
S.Exh
W.Exh
Htg.O.A.
Req.CFM
Act.CFM
Clg.O.A.
Req.CFM
Act.CFM


1 Zone 1
5pm February
783
30
7,440
6,116
315
0.40
21,958
2,553
3.26
6,600
0
0
n/a
300
300
n/a
1
1
Runout duct size: 8 in. h x 4in. w, Diffusers: 21, CFM/runout: 122, Velocity: 547.0 ft/min, Pressure drop: 0.110 in.wg./100ft
Trunk duct feeding zone: 25 in. h x 17in. w, Velocity: 864.9 ft/min, Pressure drop: 0.067 in.wg./100ft


Zone Peak Totals:
Total Zones: 1
783
30
7,440
6,116
315
0.40
21,958
2,553
3.26
6,600
0
0
300
300
1
1
Main trunk duct size: 25 in. h x 17in. w, Velocity: 864.8 ft/min, Pressure drop: 0.066 in.wg./100ft
C:\ ...\CCFIM-UNI - MN374-A.CH8 sbado, 07 de diciembre de 2013, 07:38 a.m.
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development Centro De Computo De UNI-FIM
College Station, TX 77845 Page 12

Air Handler #1 - Tecer Piso - Summary Loads for Rooms (Z)

Rm
No

Description
Zone Peak Time
Area
People
Volume
Htg.Loss
Htg.CFM
CFM/Sqft
Sen.Gain
Clg.CFM
CFM/Sqft
Lat.Gain
S.Exh
W.Exh
Htg.O.A.
Req.CFM
Act.CFM
Clg.O.A.
Req.CFM
Act.CFM


1 Aula A
5pm February
392
15
3,720
2,596
134
0.34
10,499
1,220
3.12
3,300
0
0
10/P
150
127
Direct
0
0
Runout duct size: 8 in. h x 4in. w, Diffusers: 10, CFM/runout: 122, Velocity: 549.2 ft/min, Pressure drop: 0.111 in.wg./100ft



2 Aula B
5pm February
392
15
3,720
3,521
181
0.46
11,459
1,332
3.40
3,300
0
0
10/P
150
173
Direct
0
0
Runout duct size: 8 in. h x 4in. w, Diffusers: 11, CFM/runout: 121, Velocity: 544.9 ft/min, Pressure drop: 0.109 in.wg./100ft


Room Peak Totals:
Total Rooms: 2
783
30
7,440
6,116
315
0.40
21,958
2,553
3.26
6,600
0
0
300
300
1
1
Main trunk duct size: 25 in. h x 17in. w, Velocity: 864.8 ft/min, Pressure drop: 0.066 in.wg./100ft
C:\ ...\CCFIM-UNI - MN374-A.CH8 sbado, 07 de diciembre de 2013, 07:38 a.m.
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development Centro De Computo De UNI-FIM
College Station, TX 77845 Page 13

Air Handler #1 - Tecer Piso - Total Load Summary (Z)
Air Handler Description: Tecer Piso Constant Volume - Sum of Peaks
Supply Air Fan: Draw-Thru with program estimated horsepower of 0.19 HP
Fan Input: 65% motor and fan efficiency with 0 in. water across the fan
Sensible Heat Ratio: 0.81 --- This system occurs 1 time(s) in the building. ---


Air System Peak Time: 5pm in February.
Outdoor Conditions: Clg: 85 DB, 77 WB, 127.85 grains, Htg: 58 DB
Indoor Conditions: Clg: 75 DB, 75% RH, Htg: 75 DB


Summer: Ventilation controls outside air, ----- Winter: Ventilation controls outside air.


Room Space sensible loss: 6,116 Btuh
Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 5,500 Btuh 300 CFM
Supply Duct sensible loss: 680 Btuh
Return Duct sensible loss: 340 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 12,635 Btuh


Heating Supply Air: 6,796 / (.998 X 1.08 X 20) = 315 CFM
Winter Vent Outside Air (95.2% of supply) = 300 CFM


Room space sensible gain: 21,133 Btuh
Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 470 Btuh
Supply duct sensible gain: 2,803 Btuh
Reserve sensible gain: 823 Btuh
Total sensible gain on supply side of coil: 25,229 Btuh


Cooling Supply Air: 25,229 / (.998 X 1.1 X 9) = 2,552 CFM
Summer Vent Outside Air (0.0% of supply) = 1 CFM


Return duct sensible gain: 2,102 Btuh
Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 8 Btuh 1 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: 2,110 Btuh
Total sensible gain on air handling system: 27,338 Btuh


Room space latent gain: 5,940 Btuh
Infiltration latent gain: 0 Btuh
Outside air latent gain: 14 Btuh
Total latent gain on air handling system: 5,954 Btuh
Total system sensible and latent gain: 33,293 Btuh


Check Figures
Total Air Handler Supply Air (based on a 9 TD): 2,552 CFM
Total Air Handler Vent. Air (0.03% of Supply): 1 CFM


Total Conditioned Air Space: 783 Sq.ft
Supply Air Per Unit Area: 3.2587 CFM/Sq.ft
Area Per Cooling Capacity: 282.3 Sq.ft/Ton
Cooling Capacity Per Area: 0.0035 Tons/Sq.ft
Heating Capacity Per Area: 16.13 Btuh/Sq.ft


Total Heating Required With Outside Air: 12,635 Btuh
Total Cooling Required With Outside Air: 2.77 Tons


C:\ ...\CCFIM-UNI - MN374-A.CH8 sbado, 07 de diciembre de 2013, 07:38 a.m.
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development Centro De Computo De UNI-FIM
College Station, TX 77845 Page 14

Zone Detailed Loads (At Zone Peak Times)

Load
Description
Unit
Quan
-SC-
CFAC
CLTD
SHGF
U.Fac
-CLF-
Sen.
Gain
Lat.
Gain
Htg.
Mult.
Htg.
Loss

Room 1-Aula A - Air Handler 1 (Tecer Piso), Zone 1 peaks (sensible) in February at 5pm.

Roof-1-3-Susp.C-D 392 1.00 62.8 0.126 3,096 2.142 839
Wall-1-NW-D-D 176 1 21.3 0.281 1,051 4.777 841
Wall-2-SE-D-D 142 1 22.8 0.281 910 4.777 680
Partition-3-1 176 0/0 0.355 0 0.000 0
Lights-Prof=0 20 1.000 69
Equipment-Prof=0 196 1.000 668 0
People-Prof=1 15.0 1.000 3,750 3,000


Sub-total 9,545 3,000 2,360
Safety factors: +10%
---------
+10%
---------
+10%
---------
Total w/ safety factors: 10,499 3,300 2,596



Room 2-Aula B - Air Handler 1 (Tecer Piso), Zone 1 peaks (sensible) in February at 5pm.

Roof-1-3-Susp.C-D 392 1.00 62.8 0.126 3,096 2.142 839
Wall-1-NW-D-D 176 1 21.3 0.281 1,051 4.777 841
Wall-2-SW-D-D 142 1 16.8 0.281 670 4.777 680
Wall-3-SE-D-D 176 1 22.8 0.281 1,125 4.777 841
Lights-Prof=0 17 1.000 57
Equipment-Prof=0 196 1.000 668 0
People-Prof=1 15.0 1.000 3,750 3,000


Sub-total 10,417 3,000 3,201
Safety factors: +10%
---------
+10%
---------
+10%
---------
Total w/ safety factors: 11,459 3,300 3,521
C:\ ...\CCFIM-UNI - MN374-A.CH8 sbado, 07 de diciembre de 2013, 07:38 a.m.
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development Centro De Computo De UNI-FIM
College Station, TX 77845 Page 15

Room Detailed Loads (At Room Peak Times)

Load
Description
Unit
Quan
-SC-
CFAC
CLTD
SHGF
U.Fac
-CLF-
Sen.
Gain
Lat.
Gain
Htg.
Mult.
Htg.
Loss

Room 1-Aula A peaks (sensible) in February at 5pm, Air Handler 1 (Tecer Piso), Zone 1, 22.0 x 17.8,
Construction Type: 8 (Medium)

Roof-1-3-Susp.C-D 392 1.00 62.8 0.126 3,096 2.142 839
Wall-1-NW-D-D 176 1 21.3 0.281 1,051 4.777 841
Wall-2-SE-D-D 142 1 22.8 0.281 910 4.777 680
Partition-3-1 176 0/0 0.355 0 0.000 0
Lights-Prof=0 20 1.000 69
Equipment-Prof=0 196 1.000 668 0
People-Prof=1 15.0 1.000 3,750 3,000


Sub-total 9,545 3,000 2,360
Safety factors: +10%
---------
+10%
---------
+10%
---------
Total w/ safety factors: 10,499 3,300 2,596




Lighting Cooling Loads

Item
Name Quantity
Quantity
Type
Special
Allowance
Factor
Space
Fraction
Occur-
rences
Usage
Factor
Load
(Btuh)
Fluorescent, (1) 18 in.,
T12 lamp, Mag-Std
ballast
15 watts 1.27 1 1 1 65
High Pressure Sodium,
(1) 200 W lamp,
HID ballast
1 watts 1.25 1 1 1 4

Total 69



Room 2-Aula B peaks (sensible) in February at 5pm, Air Handler 1 (Tecer Piso), Zone 1, 22.0 x 17.8,
Construction Type: 6 (Light)

Roof-1-3-Susp.C-D 392 1.00 62.8 0.126 3,096 2.142 839
Wall-1-NW-D-D 176 1 21.3 0.281 1,051 4.777 841
Wall-2-SW-D-D 142 1 16.8 0.281 670 4.777 680
Wall-3-SE-D-D 176 1 22.8 0.281 1,125 4.777 841
Lights-Prof=0 17 1.000 57
Equipment-Prof=0 196 1.000 668 0
People-Prof=1 15.0 1.000 3,750 3,000


Sub-total 10,417 3,000 3,201
Safety factors: +10%
---------
+10%
---------
+10%
---------
Total w/ safety factors: 11,459 3,300 3,521




Lighting Cooling Loads

Item
Name Quantity
Quantity
Type
Special
Allowance
Factor
Space
Fraction
Occur-
rences
Usage
Factor
Load
(Btuh)
Fluorescent, (1) 18 in.,
T12 lamp, Mag-Std
ballast
12 watts 1.27 1 1 1 52
High Pressure Sodium,
(1) 100 W lamp,
HID ballast
1 watts 1.38 1 1 1 5

C:\ ...\CCFIM-UNI - MN374-A.CH8 sbado, 07 de diciembre de 2013, 07:38 a.m.
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development Centro De Computo De UNI-FIM
College Station, TX 77845 Page 16

Room Detailed Loads (At Room Peak Times) (cont'd)

Item
Name Quantity
Quantity
Type
Special
Allowance
Factor
Space
Fraction
Occur-
rences
Usage
Factor
Load
(Btuh)
Total 57
C:\ ...\CCFIM-UNI - MN374-A.CH8 sbado, 07 de diciembre de 2013, 07:38 a.m.
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development Centro De Computo De UNI-FIM
College Station, TX 77845 Page 17

Air System #1 (Tecer Piso) Psychrometric Analysis

System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 94.409 66.000
Draw-Thru Fan 470 0.168 47
Misc Load on Supply Side 0 0.000 0 0.000 0
Supply Air Duct 2,803 1.000 284
Room Loads 5,940 3.428 21,133 7.539 2,138
Sensible Reserve 823 0.294 83


Room Condition 5,940 97.837 25,229 75.000 2,552
Return Air Duct 2,102 0.750
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000 0 0.000
Vent Air 1 CFM 14 0.008 8 0.003
Blow-Thru Fan 0 0.000


Entering Coil Condition 5,954 97.845 27,338 75.753 2,552




General Psychrometric Equations Used In Analysis:
PR =(Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.998 x 1.10 x 2,552 x ( 75.8 - 66.0 ) = 27,338 Btuh
TLH = 0.998 x 0.68 x 2,552 x ( 97.8 - 94.4 ) = 5,954 Btuh
----------
SUM = 33,292 Btuh
GTH = 0.998 x 4.50 x 2,552 x ( 33.5 - 30.5 ) = 33,674 Btuh
Total System Load = 33,293 Btuh


Chilled and Hot Water Flow Rates and Steam Requirement
Cooling GPM = 33,674 / ( 10.00 x 500 ) = 6.7 GPM
Heating GPM = 12,635 / ( 20.00 x 500 ) = 1.3 GPM
Steam Req. = 12,635 / 970 = 13.0 lb./hr



Entering Cooling Coil Conditions Entering Heating Coil Conditions
Dry bulb temperature: 75.75 Dry bulb temperature: 58.77
Wet bulb temperature: 69.40
Relative humidity: 73.15
Enthalpy: 33.48 Btu/lbm


Leaving Cooling Coil Conditions Leaving Heating Coil Conditions
Dry bulb temperature: 66.00 Dry bulb temperature: 95.00
Wet bulb temperature: 65.68
Relative humidity: 98.39
Enthalpy: 30.55 Btu/lbm
C:\ ...\CCFIM-UNI - MN374-A.CH8 sbado, 07 de diciembre de 2013, 07:38 a.m.
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development Centro De Computo De UNI-FIM
College Station, TX 77845 Page 18

Air System #1 (Tecer Piso) Psychrometric Analysis (Z)

System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 94.409 66.000
Draw-Thru Fan 470 0.168 47
Misc Load on Supply Side 0 0.000 0 0.000 0
Supply Air Duct 2,803 1.000 284
Room Loads 5,940 3.428 21,133 7.539 2,138
Sensible Reserve 823 0.294 83


Room Condition 5,940 97.837 25,229 75.000 2,552
Return Air Duct 2,102 0.750
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000 0 0.000
Vent Air 1 CFM 14 0.008 8 0.003
Blow-Thru Fan 0 0.000


Entering Coil Condition 5,954 97.845 27,338 75.753 2,552




General Psychrometric Equations Used In Analysis:
PR =(Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.998 x 1.10 x 2,552 x ( 75.8 - 66.0 ) = 27,338 Btuh
TLH = 0.998 x 0.68 x 2,552 x ( 97.8 - 94.4 ) = 5,954 Btuh
----------
SUM = 33,292 Btuh
GTH = 0.998 x 4.50 x 2,552 x ( 33.5 - 30.5 ) = 33,674 Btuh
Total System Load = 33,293 Btuh


Chilled and Hot Water Flow Rates and Steam Requirement
Cooling GPM = 33,674 / ( 10.00 x 500 ) = 6.7 GPM
Heating GPM = 12,635 / ( 20.00 x 500 ) = 1.3 GPM
Steam Req. = 12,635 / 970 = 13.0 lb./hr



Entering Cooling Coil Conditions Entering Heating Coil Conditions
Dry bulb temperature: 75.75 Dry bulb temperature: 58.77
Wet bulb temperature: 69.40
Relative humidity: 73.15
Enthalpy: 33.48 Btu/lbm


Leaving Cooling Coil Conditions Leaving Heating Coil Conditions
Dry bulb temperature: 66.00 Dry bulb temperature: 95.00
Wet bulb temperature: 65.68
Relative humidity: 98.39
Enthalpy: 30.55 Btu/lbm
C:\ ...\CCFIM-UNI - MN374-A.CH8 sbado, 07 de diciembre de 2013, 07:38 a.m.
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development Centro De Computo De UNI-FIM
College Station, TX 77845 Page 19

Air System #1 (Tecer Piso) Psychrometric Chart
RC Room Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain MR Return Side Miscellaneous Gain
PRE Pretreated Air Condition HRV Heat Recovery Ventilator Condition
MIX Mixed Air Condition RML Return Miscellaneous Latent Gain
C:\ ...\CCFIM-UNI - MN374-A.CH8 sbado, 07 de diciembre de 2013, 07:38 a.m.
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development Centro De Computo De UNI-FIM
College Station, TX 77845 Page 20

Air System #1 (Tecer Piso) Psychrometric Chart (Z)
RC Room Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain MR Return Side Miscellaneous Gain
PRE Pretreated Air Condition HRV Heat Recovery Ventilator Condition
MIX Mixed Air Condition RML Return Miscellaneous Latent Gain
C:\ ...\CCFIM-UNI - MN374-A.CH8 sbado, 07 de diciembre de 2013, 07:38 a.m.
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development Centro De Computo De UNI-FIM
College Station, TX 77845 Page 21

Room #1 - Aula A - Pie Charts
Room #1 peaks in February at 5pm
Room #1
Net Gain
13,799
Btuh
Roof - 24.68%
Wall - 15.63%
Lighting - 0.55%
Equipment - 5.33%
People - 53.81%
Room #1
Loss 2,596
Btuh
Roof - 35.55%
Wall - 64.45%
C:\ ...\CCFIM-UNI - MN374-A.CH8 sbado, 07 de diciembre de 2013, 07:38 a.m.
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development Centro De Computo De UNI-FIM
College Station, TX 77845 Page 22

Room #2 - Aula B - Pie Charts
Room #2 peaks in February at 5pm
Room #2
Net Gain
14,759
Btuh
Roof - 23.08%
Wall - 21.21%
Lighting - 0.42%
Equipment - 4.98%
People - 50.31%
Room #2
Loss 3,521
Btuh
Roof - 26.21%
Wall - 73.79%
C:\ ...\CCFIM-UNI - MN374-A.CH8 sbado, 07 de diciembre de 2013, 07:38 a.m.