Vous êtes sur la page 1sur 15

Think PRIDE

We at TOSUNG VIETNAM E&C COMPANY


take pride in earning customer trust and pride
TOSUNG VIETNAM
E&C COMPANY
Tosung Vietnam Engineering & Construction Vietnam Co., Ltd
#92-94-96, Phan Khiem Ich, Hung Gia 2, Tan Phong Ward, District 7, Ho Chi Minh City
T. 08-5410-6788 / 08-5410-6790, T. +82-63-211-8141
Tosung Civil Engineering and Construction Co., Ltd.
#800, Girindae-ro, Deokjin-gu, Jeonju-si, Jeonbuk, Korea
T. +82-63-222-8141, F. +82-63-222-8138
Keumto Construction Co., Ltd.
#362-28, Eseonamro, Eseo-myun, Wanju, Korea
T. +82-63-236-8141, F. +82-63-236-8138
Taean Engineering and Construction Co., Ltd.
#800, Girindae-ro, Deokjin-gu, Jeonju-si, Jeonbuk, Korea
T. +82-63-222-8141, F. +82-63-222-8138
Totop Engineering and Construction Co., Ltd.
#362-28, Eseonamro, Eseo-myun, Wanju, Korea
T. +82-63-236-8141, F. +82-63-236-8138
Think PRIDE
We at TOSUNG VIETNAM E&C take pride
in earning customer trust and pride
02 / 03
BREATHE LIFE
INTO LAND OF
COLDNESS
TOSUNG VIETNAM E&C COMPANY has been continuing its steady growth on the basis of outstanding
individuals and technical skills in all business areas, such as architecture/housing, civil engineering, power
generation/environment, and plant, etc. since its establishment in 2001.
Particularly, through its effort for the strengthening of competitive power, it is consolidating market
dominance all the more in the sector of its core business, and TOSUNG VIETNAM E&C COMPANY
will also vigorously move towards the best on the basis of innovative thinking for a
human, technology, customer satisfaction and resolute practice.
TOSUNG VIETNAM E&C COMPANY
CONTENTS
TOSUNG E&C HISTORY / 04
TOSUNG E&C INTRODUCTION / 06
TOSUNG E&C EXPERIENCE / 08
KEUMTO INTRODUCTION / 14
KEUMTO MAIN FIELD / 16
TOTOP E&C
EQUIPMENT LIST / 24
TOSUNG INTRODUCTION / 26
TOSUNG EQUIPMENT LIST / 28
TOSUNG MAIN FIELD / 30
TAEAN INTRODUCTION / 40
TAEAN MAIN FIELD / 44
2014
2008
2009
2007
Dung Quat Refnery
5B Project
(June 2006 ~ May 2007)
New Dong Nai Bridge Project
(June 2008 ~ May 2009)
Gemadept International
Port Project
(Apr 2007~ Aug 2008)
2006
THINK PRIDE
WE AT TOSUNG VIETNAM E&C TAKE
PRIDE IN EARNING CUSTOMER TRUST
AND PRIDE
TOSUNG VIETNAM E&C COMPANY to increase the competitiveness of the
construction industry, possess a certified quality assurance system in
accordance with ISO 9001.
Also, We would like to extend my sincerest gratitude to our customers
unstinting interest and love towards TOSUNG VIETNAM E&C COMPANY
and we hereby promise you to devote to management with utmost priority
in customers value.
TOSUNG VIETNAM E&C COMPANY
Think PRIDE
We at TOSUNG VIETNAM E&C take pride
in earning customer trust and pride
04 / 05
Binh Loi Bridge Project
(June 2008 ~ Present)
TOSUNG E&C VIETNAM COMPANY
Think PRIDE
We at TOSUNG VIETNAM E&C take pride
in earning customer trust and pride
06 / 07
ROAD & EARTH & WORK &
TEMPORARY STRUCTURE
TOSUNG VIETNAM E&C is promising quality & safety
construction on the basis of rich experience in soil
improvement method of soft ground.
As a result, TOSUNG VIETNAM E&C was able to exert
itself to secure self-competitiveness, and with its excellent
technical team, all staff members of TOSUNG E&C will make
their utmost efforts to make this company into a specialized
construction company which executes safety construction,
not to mention the high quality required by construction
business circles.
UNDERGROUND SPACES
As a solid foundation guarantees standing the test of time,
so foundation work, which strengthen the basis, is the most
important in making a solid building.
TOSUNG VIETNAM E&C has been establishing itself as a
responsible construction company of a solid foundation
and also stable construction company in possession of
technical skills based on faith and reliability for a lengthy period
of time.
MARITIME WORK
TOSUNG VIETNAM E&C is doing its best while possessing the
equipment for R.C.D, which is a core method of maritime
construction, and striving for the research on construction and
technology; in addition, this company is constructing eco-
friendly structures by maximizing the strong points of the
existing know-how, together with introduction of new
technologies.
TOSUNG VIETNAM
E&C COMPANY
TOSUNG VIETNAM E&C is our pride to contribute to the balanced development of the
nation and the development of the national economy where TOSUNG VIETNAM E&C
has successfully completed numerous Infrastructure projects. With extensive experience
and superior construction abilities, we will continue to expand the sphere of life on the
ground, underground and even in VIETNAM.
TOSUNG KEUMTO
TOSUNG VIETNAM E&C
TAEAN TOTOP
TOSUNG VIETNAM E&C COMPANY
Think PRIDE
We at TOSUNG VIETNAM E&C take pride
in earning customer trust and pride
08 / 09
Binh Loi Bridge Project
1. Investor : GS E&C
2. Duration : June 2008 ~ Present
3. Details of Works
In charge of : Sub-Contractor
Work Description : Bored Piling Works
Test Piles : 2 nos (O-cell Test)
Total Quantity : 404 piles
D2000mm : 60 piles (under the River)
D1500mm : 344 piles (on the Land)
Depth : 70 ~ 80 m
Geological Condition : Sand & Soil
New Dong Nai Bridge Project
1. Investor : CC1
2. Duration : June 2008 ~ May 2009
3. Details of Works
In charge of : Main-Contractor in Consortium
Work Description : Bored Piling Works
Total Quantity : 114 piles
D1,500mm : 64 piles (under the River)
D1,000mm : 50 piles (on the Land)
Depth : 23 ~ 25 m (Hard Rock : 8m)
Geological Condition : Sand/Soil & Hard Rock
PROJECT EXPERIENCE
IN VIETNAM
TOSUNG VIETNAM E&C COMPANY
Think PRIDE
We at TOSUNG VIETNAM E&C take
pride in earning customer trust and pride
10 / 11
Dung Quat Refnery 5B Project
1. Investor : Vietnam Oil and Gas
CorporationPetro Vietnam
2. Duration : June 2006 ~ May 2007
3. Details of Works
In charge of : Subcontractor
Work Description : Bored Piling Works
Total Quantity : 120 piles
D1,000mm : 120 piles (under the Seawater)
Depth : 30 ~ 40m (Hard Rock : 8m)
Geological Condition : Sand/ Soil & Hard Rock
Gemadept International
Port Project
1. Investor : Gemadept Corporation
2. Duration : Apr 2007~ Aug 2008
3. Details of Works
In charge of : Main-Contractor
Work Description : Bored Piling Works
Total Quantity : 242 piles
D1,000mm : 242 piles (under the Seawater)
Depth : 35 ~ 40m (Hard Rock : 4m)
Geological Condition : Sand/Soil & Hard Rock
PROJECT EXPERIENCE
IN VIETNAM
TOSUNG VIETNAM E&C COMPANY
Think PRIDE
We at TOSUNG VIETNAM E&C take pride
in earning customer trust and pride
12 / 13

Construction of road in
Eseo Wanju Korea
(Mar. 2012 ~ May. 2013)
TOSUNG VIETNAM E&C COMPANY
Think PRIDE
We at TOSUNG VIETNAM E&C take pride
in earning customer trust and pride
14 / 15
KEUMTO
CONSTRUCTION
COMPANY
KEUMTO is sincerely promising to be born again as the acknowledged company which
keeps pace with the era of globalization by maximizing the advanced technical skills
of high degree and know-how until KEUMTO becomes a representative constructor of
bridge, port, and pier.
ROADS & BRIDGES
Roads and bridges are the basic infrastructure for the development and prosperity of
a nation and life itself is developed through the construction of road networks.
Since its establishment, KEUMTO has participated In numerous public and privately
funded infrastructure projects to construct roads and bridges for the balanced
development of the nation and to contribute to the national economy.
KEUMTOwill focus on the construction of the worlds best roads and bridges through
continuous technological development.
UNDERGROUND SPACES
KEUMTO will improve its technical skills using the latest equipment and
construction method, and continuously pursue its superiority through its time-
honored skilled ability and structure technique. KEUMTO-pursued idea is to supply
the best structure to its customers.
HARBORS & DREDGING
KEUMTO sincerely promises to endeavor to make those, who plan to develop the
pier & port project development, and to promote supply business, get a fruitful
outcome and satisfaction.
HISTORY
Mar. 2001 :
Gained the Civil Construction
Business (the 11- 0466th)
Aug. 2001 :
Established the Corporation
(Dongkwang Construction Co.,
Ltd.)
Oct. 2001 :
Moved the location of main
ofce (#342-1, Hapgang-ri, Inje-
eup, Inje-gun)
Aug. 2005 :
Increased the accounts
ofMutual Beneft Association
(35 accounts)
Moved the location of main
ofce (#1517-8, Joyang-dong,
Sokcho-si)
Feb. 2008 :
Changed the ofce name
(Chungil Construction Co., Ltd.)
Jun. 2009 :
Changed the ofce name (Gana
Combined Construction Co., Ltd.)
Jul. 2009:
Moved the location of main
ofce (#4-1 2F, Seokwoo-ri,
Gasan-myeon, Chilgok-gun)
Sep. 2009 :
Moved the location of main
ofce (#80-3, Samchung-ri,
Woekwan-eup, Chilgok-gun)
Apr. 2012 :
Moved the location of main
ofce (#362-28, Eseonamro,
Eseo-myun, Wanju, Korea)
Changed the ofce name
(Keumto Civil Engineering and
Construction Co., Ltd.)

Think PRIDE
We at TOSUNG VIETNAM E&C take
pride in earning customer trust and pride
MAIN FIELD
16 / 17
<Russia to Kuril Islands feld>
TOSUNG VIETNAM E&C COMPANY
TOSUNG VIETNAM E&C COMPANY
Think PRIDE
We at TOSUNG VIETNAM E&C take pride
in earning customer trust and pride
18 / 19
TOSUNG VIETNAM E&C COMPANY
Think PRIDE
We at TOSUNG VIETNAM E&C take pride
in earning customer trust and pride
20 / 21
TOSUNG VIETNAM E&C COMPANY
Think PRIDE
We at TOSUNG VIETNAM E&C COMPANY take
pride in earning customer trust and pride
22 / 23
TOSUNG VIETNAM E&C COMPANY
Think PRIDE
We at TOSUNG VIETNAM E&C COMPANY take
pride in earning customer trust and pride
24 / 25
TOTOP E&C
Our TOTOP E&C has played a part in
Korea maritime development project, and earnestly
pledges to faithfully keep our promises with our clients
through the lease on competitive maritime &
construction equipment.
<Tosung No.3>
<Tosung No.1>
<Batching Plant>
<Forklift Truck>
<Tosung No.2>
BEST TECHNOLOGY
BEST EQUIPMENT
TOSUNG VIETNAM E&C COMPANY
Think PRIDE
We at TOSUNG VIETNAM E&C COMPANY take
pride in earning customer trust and pride 26 / 27
TOSUNG
CONSTRUCTION
COMPANY
It is our pride to contribute to the balanced development of the nation and the
development of the national economy where TOSEUNG Construction Co., Ltd.
has successfully completed numerous Infrastructure projects. With extensive experience
and superior construction abilities, we will continue to expand the sphere of life on the
ground, underground and even in the sea.
EARTH WORK & TEMPORARY STRUCTURE
TOSUNG Construction Co., Ltd. is promising quality & safety construction on the basis
of rich experience in soil improvement method of soft ground. As a result, TOSUNG
was able to exert itself to secure self-competitiveness, and with its excellent technical
team, all staff members of TOSUNG will make their utmost efforts to make this
company into a specialized construction company which executes safety construction,
not to mention the high quality required by construction business circles.
PILE DRIVING
As a solid foundation guarantees standing the test of time, so foundation work, which
strengthen the basis, is the most important in making a solid building. TOSEUNG
Construction Co., Ltd. has been establishing itself as a responsible construction
company of a solid foundation and also stable construction company in possession of
technical skills based on faith and reliability for a lengthy period of time.
MARITIME WORK
TOSUNG Construction Co., Ltd. is doing its best while possessing the equipment for
R.C.D, which is a core method of maritime construction, and striving for the research
on construction and technology; in addition, this company is constructing eco-friendly
structures by maximizing the strong points of the existing know-how, together with
introduction of new technologies.
HISTORY
Jan. 2006 :
Received Songdo Construction Co., Ltd.
Jan. 2006 :
Changed into TS Ground Construction Co., Ltd.
Jan. 2006 :
Established main company in Jeonju
(#779-4, Junghwasan-dong, Wansan-gu, Jeonju-si)
Jun. 2006 :
Changed the location of Main ofce in Jeonju
(#53-12, Galsan-ri, Eseo-myeon, Wanju-gun, Jeonbuk)
May. 2009 :
Changed the name into TO SUNG Civil Engineering
and Construction Co., Ltd.
May. 2010 :
Changed the location of Main ofce in Jeonju
(#800, Girindae-ro, Deokjin-gu, Jeonju-si, Jeonbuk, Korea)
Jun. 2012 :
Boring grouting obtain a business license
Aug. 2012 :
Asbestos abatement and removal working obtain
a business license

TOSUNG VIETNAM E&C COMPANY


Think PRIDE
We at TOSUNG VIETNAM E&C COMPANY take
pride in earning customer trust and pride
28 / 29
EQUIPMENT LIST
TOSUNG CONSTRUCTION COMPANY
TOSEUNG Construction Co., Ltd. is in possession of the state-of-the-art equipment while
promoting construction quality through the introduction of the new construction method and
reinterpretation of the existing method, and going forward as a front-runner of the advanced
construction feld through the realization of the shortening of the construction time.
APE600
_
Vibratory Driver/Extractor
SPECIFICATIONS DATA
APE400
_
Tandem Vibratory Driver/Extractor
SPECIFICATIONS DATA
Eccentric moment 30,000 kg- cm / 26,000 in- lbs
Frequency(variable) 400~1500 vpm
Driving force 7384 kN / 830 tons
Amplitude with Quad
Clamps
(dynamic wt : 40,000 lbs) 30mm / 1.2 in
Maximum line pull 4,448 kN / 500 Us tons
Suspended Weight with 15
foot caisson beam Clamps
47,200 kg / 104,000 lbs
Length 3 m / 10 ft
Width throat 3 m / 10 ft
Width at widest point 3 m / 10 ft
Height with 15 beam and
four clamps
3.7 m / 12 ft
Hydraulic Hose
Length(Standard)
45 m / 150 ft
Eccentric moment 23,000 kg- cm / 20,000 in- lbs
Frequency(variable) 400 ~ 1400 vpm
Driving force 3203 kN / 556 tons
Amplitude with 15 Dual
Clamps
(dynamic wt : 30,000 lbs) 34mm / 1.34 in
Amplitude with 15 Quad
Clamps
(dynamic wt : 36,000 lbs) 29mm / 1.12 in
Maximum line pull 379.2 mt / 418 Us tons
Suspended Weight with 15
Wuad Clamp System and
150 Hoses
30,385kg / 67,000 lbs
Length 430 cm / 170 in
Width throat 90 cm / 36 in
Width at widest point 90 cm / 36 in
Height with 11 beam and
clamps
244 cm / 96 in
Height with 15 Quad
Clamp System
280 cm / 110 in
Hydraulic Hose
Length(Standard)
45 m / 150 m

Vous aimerez peut-être aussi