1. GENERAL
1.1. SCOPE
1.1.1. This specification covers the minimum requirement of preparation of detail shop
drawings and the fabrication, inspection and testing of shop fabricated piping required
for the industrial plants. All work shall be done in accordance with applicable standards
as listed herein unless otherwise stated. Sound engineering practices shall be followed
in the absence of specified standards or specifications subject to Owner prior approval.
All required equipment, devices, tools, materials and labors for any construction work,
test and inspection shall be provided by Construction Contractor.
1.1.2. Jacketed piping, tubing systems, orifice runs; lined or coated metals and
fabrication by methods other than threading, welding and flanging are not within the
scope of this specification.
1.1.3. Fabrication of piping subject to the requirements of the ASME Boiler and pressure
vessel code, Section I power boilers is not covered in this specification.
1.1.4. SI unit shall be applied except nominal size of pipe and nozzle shall be in inches
and flange rating shall be in pounds. BEDD shall also be considered.
1.2. CODES AND STANDARDS - Piping Shop Fabrication Specification
Process Piping ASME B31.3
Unified Inch Screw Threads ASME B1.1
Pipe Threads, General Purpose (Inch) ASME B1.20.1
Pipe Flanges and Flanged Fittings NPS 1/2Through NPS 24 ASME B16.5
Factory-Made Wrought Steel Butt welding Fittings ASME B16.9
Forged Steel Fittings, Socket Welding and Treaded ASME B16.11
Butt Welding Ends ASME B16.25
Square and Hex Nuts (Inch Series) ASME B18.2.2
Welded and Seamless Wrought Steel Pipe ASME B36.10
Stainless Steel Pipe ASME B36.19
Wrought Stainless Steel Butt Welding Fittings MSS-SP-43
For other applicable standards refer to piping material specification.
1.3. RELATED ENGINEERING & CONSTRUCTION SPECIFICATION - Piping Shop
Fabrication Specification
The following related engineering and construction specifications are applied as
supplement of this specification.
A. Piping Material
B. Piping Fabrication and Erection
C. Construction Work for Piping
D. Pressure Test of Piping System
E. Cleaning of Pipe Lines
F. Welding Procedure for Piping
G. Welder Qualification Test
H. Inspection & Test of Piping Construction
I. Piping hanging & support
J. Marking and Color Coding
2. RESPONSIBILITIES - Piping Shop Fabrication Specification
2.1. Fabrication Shop Engineering shall be responsible for Quality control (Welding &
Inspection), Inventory control (Piping & Instrument Bulk Material), Schedule of
Production and Quality Assurance plan on behalf of the Fabricator.
2.2. Fabrication Shop Superintendent shall be responsible for All manufacturing
activities on behalf of the Fabricator.
3. DRAWINGS (SHOP SPOOL DRAWINGS) - Piping Shop Fabrication Specification
3.1. The shop fabricator (Fabrication Shop Engineering) shall prepare the necessary
detail shop spool drawings for fabrication from piping drawings onsite under Shop
Engineers direction. Shop spool drawings must show the detail field welds, spool
number, materials, dimensions, fabrication details and the applicable code and
procedures.
Shop spool drawings must identify all equipment, lines or spools connecting to that
spool. The arrangement or isometric drawing must be shown as a reference.
3.2. All piping drawings is dimensioned and shown in normal assembly and operating
position. When specifically required, thermal expansion requirements and cold springing
will be shown on drawings. Cold Spring (CS) and Pre Spring (PS) are indicated on the
spools with the amount added or deducted. This amount is added or deducted from the
dimension and the pipe shall be fabricated to the dimension.
3.3. Pipe detail pieces shall be fabricated in accordance with the piece marks shown on
the drawings, unless otherwise required for handling and/or shipping. Changes from
the piece mark arrangement shown on the drawings shall require approval of
Consultant.
3.4. Preparation of isometric drawings by the shop fabricator is not required.
3.5. Piping drawings show the limits of field run piping and the locations of any field
welds required between spool pieces. The shop fabricator is not to supply or fabricate
that portion of the field runs.
3.6. Spool piece numbers will consist of the isometric line number followed by suffix
letters A,B,C, etc.
3.7. Except for ring joint flanges, dimensions are to the centerline of pipe and the
contact face of flanges.
This includes the contact face of male and female tongue and groove flanges.
Ring joint flanges are dimensioned to the centerline of pipe and to the extreme face of
flange and not to the contact surface of the groove.
3.8. The Shop Fabricator (Fabrication Shop Engineering) shall verify all spool drawings
and list of materials for accuracy and compliance with the project specifications.
1) Quantity of materials correct for the spool
2) Description of materials correct per project specification
3) Pipe cut lengths
4) All weld numbered for identification on the shop spool drawings and its document
concerned
4. EXTENT OF SHOP FABRICATION - Piping Shop Fabrication Specification
4.1. SIZE
Two inches nominal bore and larger is shop fabricated, except for straight runs which
are field run. Piping less than two inch nominal bore is field run in principle.
4.2. BRANCHES
Shop fabricated spools are to include appropriate fittings or stubs for field fabricated
branch connections. Branches larger than 1 are to extend to the first flange or field
weld point as indicated on the shop spool drawings or as required for reasonable piece
size.
Where reinforcement pads are required at branch connections which are to be field
welded they must be fabricated by the shop Fabricator and tack welded to the "stub in"
spool for shipment. A vent/tale hole is to be drilled in each reinforcement pad or
reinforcement pad section.
4.3. ATTACHMENTS - Piping Shop Fabrication Specification
Attachments, such as supports, braces, lugs and T bars are to be field installed. Where
pipe fabrications require pre or post weld heat treatment than such attachments shall
be on pads or stubs to which the Erector can weld; pads or stubs shall be installed by
the fabricator and receive the appropriate heat treatment.
4.4. DUMMY LEGS - Piping Shop Fabrication Specification
Dummy legs are to be installed in the shop.
4.5. FIELD RUNS
Field runs are designated on piping drawings by the Fabricator. Usually the piping on
the pipe racks, pipe sleepers & etc. shall be installed in Field directly.
5. MATERIALS - Piping Shop Fabrication Specification
5.1. All material shall be as described in the piping material specification. The piping
drawing and Line Designation Table will identify the particular classification which is
applicable.
5.2. A complete Material Purchase Description Listing should be requested from and
furnished by Consultant. This listing is complete description of the items and will
supplement the abbreviated description in the Piping Material Specification.
5.3. All materials shall be new and Color coded according to Marking of piping material
before issuing materials.
5.4. Elbows shall be long radius (centerline radius = 1.5 times nominal diameter).
6. FABRICATION - Piping Shop Fabrication Specification
6.1. CODES
Fabrication shall be in accordance with an American National Standard, Chemical Plant
and Petroleum Refinery Piping, ASME B31.3.
Any exceptions will be noted on the Piping Drawings of Piping Material Specifications.
For other requirements refer to para. 4 & para. 3.9
6.2. WELDING - Piping Shop Fabrication Specification
6.2.1. Welding procedures and Welders/Welding operators shall be qualified in
accordance with Welding Procedure for Piping and Welder Qualification Test.
6.2.2. The design of weld joint, welding bevel and reinforcement, shall be in accordance
with ASME B31.3.
6.2.3. Prior to welding, the welding groove and adjacent base metal shall be cleaned
inside and outside of all scale, rust, oxides, paints, oils, or other materials that may
affect the welding.
6.2.4. The ends of piping components to be joined by welding shall be aligned as
accurately as practicable within the tolerances of diameter, wall thickness, etc. Where
the misalignment exceeds 1.6 mm, the ID of the pipe extending internally shall be
trimmed with the angle of the bevel not to exceed 30 degree.
However, this trimming shall not result in a piping component wall thickness less than
the design thickness plus corrosion allowance.
6.2.5. Alignment shall be preserved during welding by tack welds, spaced as required,
but with at least one tack weld in each quadrant.
Tack welds shall be of the same quality and material as the complete weld and shall be
thoroughly fused with the weld beads. Otherwise they shall be removed during the
welding operation.
6.2.6. The use of backing rings or strips is not permitted in the welding of girth or
longitudinal joints.
6.2.7. The acceptance criteria for all welding imperfection i.e., incomplete penetration,
lack of fusion internal porosity, inclusion, undercut, roughness, concavity,
reinforcement, protrusion & etc. shall be in accordance with table K341.3.2 of ASME
B31.3 (Latest Edition).
6.2.8. On large diameter lines, where practicable, weld metal shall be deposited from
both sides (double welded).
6.2.9. Prior to depositing each weld layer, the previous weld shall be thoroughly
cleaned to remove all oxide, scale, slag, flux, or defects. Grinding or chipping may be
required to correct the defects. Peening shall not be used to close cavities in the weld
metal.
6.2.10. Longitudinal seams shall be located to clear openings and attachments where
practicable, and shall be staggered a minimum of 5t or 50 mm whichever is less in
adjoining courses. Where necessary to add outside structural attachment to pipe across
longitudinal seam weld, omit attachment weld where crossing seam weld and notch out
attachment.
6.2.11. The fabricator shall bevel, or otherwise prepare joint ends that are to be field
welded.
6.2.12. Alloy welding electrodes (filler metal) shall be of the same approximate analysis
as piping material being welded.
6.3. BRANCH CONNECTIONS
6.3.1. The type of branch connection shall be as specified in the particular piping class
of the Piping Material Specifications.
6.3.2. Nozzle joints may be either "set in" or "set on" type and shall be prepared to
provide full penetration welds or a quality equal to the girth welds in the same piping
system.
For severe cyclic conditions and reciprocating compressors nozzle joints shall be set in
type per paragraph 306. 5.2 of ASME B31.3.
6.3.3. The fabricator shall check all welded nozzles in accordance with ASME B31.3 and
provide reinforcement where necessary.
6.4. REINFORCING PADS - Piping Shop Fabrication Specification
Reinforcing pads shall not be installed except when specified on spool drawings. Pad
material shall be the same as the pipe material unless otherwise approved by
Consultant. Drawings will specify size and pad thickness. It is preferable to have pad
shapes similar, but pad size may be altered, provided equivalent that the cross
sectional area is maintained and code requirements are met. Each pad or each piece, if
the pad is made from more than one piece, shall have a 3-5 mm vent hole provided (at
the side and not at the crotch) in the pad. In fitting pads to curvature of pipe there
shall no where be a gap greater than 3.0 mm. Pad thickness shown on spool drawings
are nominal. Mill tolerances are allowed per code.
6.5. MITER ELBOWS - Piping Shop Fabrication Specification
Miter elbows are to be used only when permitted by the piping specifications and shall
be according to para.306.3 in ASME B31.3 in principle.
6.6. BENDING - Piping Shop Fabrication Specification
6.6.1. Only seamless pipe shall be used for bends.
6.6.2. The radius of bends shall be as specified on piping drawings.
6.6.3. Hot bend is not permitted.
6.6.4. Cold bends shall be limited to NPS1 and smaller for C.S & low alloy steel and NPS
and smaller for stainless steel.
6.6.5. The fabricator may substitute the next heavier weight of pipe, if necessary, to
produce satisfactory bends.
6.6.6. Bends shall be substantially free of buckles, with no buckle being deeper than
1% of pipe outside diameter.
6.6.7. The difference between the maximum and minimum outside diameters at any
cross section along the axis of pipe bend shall not exceed 8% and 3% of the normal
outside diameter for internal and external pressure, respectively.
6.6.8. When bends are trimmed close to the tangent point for field welding, the open
ends shall be carefully squared up and prepared for welding.
6.7. THREADING - Piping Shop Fabrication Specification
Threads shall conform in quality and workmanship to the American National Standard
for Pipe Threads, ASME B1.20.1 latest issue. Threading shall be done after bending or
heat treatment if possible. Threads shall be clean and full cut, concentric with outside of
pipe and protected against damage by any subsequent fabricating operations. Threads
cut before bending or heat treatment shall be protected with Hi Temp Silicone Paint.
All threaded connections must be gauge checked or chased after welding or heat
treating. Openings for thermo wells and other inserts are to be drilled through the
connections and be free from obstruction.
6.8. DIMENSIONAL TOLERANCES OF COMPLETED DETAILS - Piping Shop Fabrication
Specification
These tolerances apply to inline items and connections for other lines. These tolerances
can be exceeded on items such as vents, drains, dummy supports, temperature and
pressure connections, where the deviation will not affect another spool.
Below mentioned tolerances are not cumulative.
6.8.1. Straight length or offset bends with raised face or lap joint flanges.
Face to face of flanges or laps. 3.2 mm
6.8.2. Straight lengths or offset bends with RTJ or tongue and groove flanges.
Face to face of flanges 2.4 mm
6.8.3. Straight length or offset bends with beveled ends
End to end 4.8 mm
6.8.4. Flanged branches with raised face or lap joint flanges
Center of header to face of flange or lap 3.2 mm
Maximum lateral offset 1.6 mm
6.8.5. Flanged branches with RTJ or tongue and groove flanges
Center of header to face of flange 2.4 mm
Maximum lateral offset 1.6 mm
6.8.6. Beveled end branches
Center of header to end of bevel 3.2 mm
Maximum lateral offset 1.6 mm
6.8.7. U bends and offsets
Center to center 3.2 mm
6.8.8. In fitting reinforcing pads to the curvature of the pipe the maximum allowable
gap shall be less than 3.2 mm.
6.8.9. Flange faces must be square with the pipe. The tolerance measured across the
outside diameter of the gasket surface with a level and thickness gage shall be within
the following:
Up to 4" 0.8 mm
6" to 8" 1.6 mm
10" 2.4 mm
12" and up 3.2 mm
6.8.10. Flange bolt holes shall be oriented as follows, unless otherwise indicated on
spool drawings:
A. Flange face vertical bolt holes to straddle against vertical centerlines.
B. Flange face horizontal bolt holes to straddle against north south centerlines.
CAUTION : The fabricator shall insure that this information is transferred to the shop
drawings.
6.8.11. Orifice flanges shall be installed with the taps in the exact orientation shown on
the spool drawings. The sections of pipe to which the orifice flanges are attached may
be standard mill run pipe, but shall be choice selected pieces and shall be round,
smooth and free from blisters and scale. The interior of the pipe, at welds, shall be
ground smooth in the shop. Field welds will be kept at a maximum distance back from
the face of the orifice flange to the first weld. Orifice flanges are to be drilled and
tapped for jackscrews, where no other provision has been made for spreading flanges.
6.8.12. Slip on flanges, when specified in piping material specification shall be welded
inside and outside. There shall be a distance from the face of the flange to the pipe end
equal to the pipe wall thickness plus.
If slip-on flanges are single welded, the weld shall be at the hub.
(See Fig. 328.5.2B (1) of ASME B31.3)
6.9. LICENSOR REQUIREMENT FOR CATALYST SERVICE - Piping Shop Fabrication
Specification
Licensor requirement for catalyst service (BCDX class) shall be considered as
attachment #2.
7. TESTING - Piping Shop Fabrication Specification
7.1. A general hydrostatic test of individual shop fabricated spool is not required except
when specified by Owner.
7.2. In special cases when a test in the shop is necessary, the requirements will be
stated on the piping drawings.
7.3. The test pressures and holding time shall be as specified on the Line Designation
Table, and may be referred to Inspection & Test of piping construction and/or Pressure
test of piping system.
7.4. All defective welds shall be chipped or ground out and re-welded for the
satisfaction of the requirements.
7.5. Field tests of completed piping systems will be made. The cost of repairing leaky
shop welds will be back charged to the fabricator.
7.6. Any appreciable amount of re-welding after checking and/or testing will require
detail to be rechecked for fabrication dimensional tolerance.
7.7. Materials which required post weld heat treatment shall be given a Brinell hardness
test after PWHT and the Hardness must be below the maximum specified for the
material in table 331.1.1 of ASME B31.3. and in accordance with para.331.1.7 of ASME
B31.3.
8. EXAMINATION AND INSPECTION & CLEANING
8.1. EXAMINATION - Piping Shop Fabrication Specification
8.1.1. The fabricator shall examine all welds per Inspection & Test of piping
construction which shows the type and extent of the required examination for the
different piping systems.
8.1.2. R1 The Consultant and/or Owners Inspector may specify further examination in
any category where he feels it is necessary.
8.1.3. The intent of these examinations is to provide the examiner and the Inspector
with reasonable assurance that the requirements of ASME B31.3 and the engineering
design have been met.
8.1.4. Where examination reveals a failure to meet design or code requirements the
Construction Contractor must make such repairs as are necessary to meet the design or
code requirements.
If cracks are detected, the complete weld must be removed, re prepared and re welded.
8.1.5. All costs incurred in repairing defective or rejected work and all consequential
heat treatment and additional examination costs are to be borne by the Construction
Contractor.
8.2. INSPECTION AND RECORDS - Piping Shop Fabrication Specification
8.2.1. Inspection as defined by ASME B31.3 will be performed by Consultant or a
Consultant authorized inspector. Such authorized inspector may reject any material,
procedure or work which, in his opinion alone, fails to meet the requirements of
applicable codes, specifications, procedures, drawings, purchase orders or contract.
8.2.2. Where inspection reveals a failure to meet design or code requirements the
Fabricator must make such repairs as are necessary to meet the design or code
requirements.
8.2.3. All costs incurred in repairing defective or rejected work and all consequential
heat treatment and additional examination costs are to be borne by the Fabricator.
8.2.4. The following records, fully identified with the specific material or part of the
piping represented, must be available for reference or examination by the authorized
inspector. On job completion, they must be collated, indexed and bound, and forwarded
to Consultant.
A. Certificates attesting that all the quality control requirements of the applicable code
and of the engineering design have been met.
B. Pyrometer charts and records of heat treatment.
C. Radiographic films.
D. Results of magnetic particle and fluid penetrant examinations.
E Charts or other records of hydrostatic, pneumatic and Brinell hardness tests.
F. Results of any other supplemental types of examination, test or analysis specified.
G. Welding procedure qualifications and their qualification test results.
H. Welders/Welding Operators qualification test results.
I. Others. (i.e., Inspection Reports, MTC (material test certificate) and etc.)
8.3. CLEANING - Piping Shop Fabrication Specification
For general requirement refer to.
9. PAINTING - Piping Shop Fabrication Specification
Shop painting of pipe spools, if required, is the subject of a painting specification.
10. PREPARATION FOR TRANSPORTATION - Piping Shop Fabrication Specification
Shop fabricated pipe is sectionalized to fit into a box 12.0m x 3.0m x 3.0m in
accordance with Attachment 1; Shipping length.
When heat treated pipe of this size cannot be contained within the furnace, the
fabricator shall inform Consultant of the maximum size.
10.1. INSPECTION AND RECORDS
10.1.1. Before pipe spools are transported from the fabricating shop, the following
preparation and protection shall be carried out:
Flanged Ends:
Coat flange faces with a grease type rust preventive, and cover faces with plywood,
hardboard, steel or equivalent covers securely wired or bolted to the flange proper on
at least four bolt holes. All ferrous flange facings shall be coated with anti rust
material.
Beveled and Plain Ends:
Provide heavy gauge plastic cover completely sealing the opening and protecting the
pipe ends (or Consultant approved alternate).
Threaded Ends:
Provide plastic or metal plugs for female threads, and plastic caps for male threads.
Machined Surfaces:
Coat with a grease type rust preventive and provide securely fastened wooden or metal
covers.
Socket Weld Ends:
Provide a plastic plug.
Note: Ring type joint flanges shall have groove packed with grease prior to attaching
flange protective covers.
10.1.2. The inside of each fabricated pipe spools shall be thoroughly cleaned of all
welding spatter or icicles, sand, scale, or other foreign debris.
10.1.3. Small pieces shall be boxed or wired together to avoid loss in transit.
10.1.4. Loading and handling shall be done with reasonable care and details braced
where required to prevent damage during transit.
10.1.5. Piece Marking shall be considered for each spools.
10.1.6. Spools are to be identified by their line number and spool suffix, which shall be
painted or stenciled as characters at least 50 mm high. The size of character shall be
suitable with size of the pipes. Painted numbers shall be located, and repeated as
necessary, in such a manner that any spool may be easily identified without turning or
lifting it.
10.1.7. Stamping of piece mark numbers on carbon steel pipe with steel die low stress
stamps is permitted if done lightly and carefully, so as to minimize notch effect and so
that the marking will not cause cracks or reduce the wall thickness below the minimum
allowed. Stamping of alloy pipe and stainless steel is not permitted without Consultant's
approval. Waterproof paint or paint protected with a clear waterproof varnish shall be
used on alloy pipe and stainless steel.
10.1.8. The welders identification symbol shall be marked adjacent to each weld. Metal
stamping of carbon steel pipe per para. 10.6.2 is permissible. On alloy pipe the
marking shall be as per para. 10.6.2.
10.1.9. Heat numbers shall be transferred onto spools and onto spool drawings.
Weld identification symbols to be added to spool drawing.
10.1.10. The paint for marking shall be non-zinc type to prevent zinc contamination.
11. TRANSPORTATION - Piping Shop Fabrication Specification
11.1. All transportation of fabricated pipe spools shall include with the packing list a
complete listing of the spools being shipped.
11.2. Fabricated pipe spools shall bead-equally blocked, strapped or otherwise held in
position during shipment and shall be further separated by dunnage as may be
necessary to prevent damage.
12. QUALITY ASSURANCE PLAN FOR SPOOL FABRICATION - Piping Shop Fabrication
Specification
12.1. The fabricator shall prepare the quality assurance plan for spool fabrication in
accordance with the project specification and the code concerned.
The plan shall be discussed and agreed by Consultant and/or Owner before application.
12.2. The Quality Assurance Plan shall include followings and How to control it.
12.2.1. Pre-Fabrication Stage
1) Receipt of Materials
2) Identification and Color coding
3) Store of Materials
4) Qualification of Welding Procedure
5) Welder and/or Welding operator Qualification
6) NDT procedure and Qualification
7) Surface cleaning Application of primer
12.2.2. Fabrication Stage
1) Checking Materials as per Piping class and Material Identification
2) Cutting and Edge preparation
3) Fit-up and Dimensional Checking
4) Preheat and Inter-pass Temperature
5) Verification of Welding filler material
6) Reinforcement
7) Non-Destructive Examination procedure
8) Visual and Dimension Measurements
9) Heat Treating
10) Repair procedure for Defective joints
11) Painting and Identification
12) Code Stamping (where required)
12.2.3. Inspection and Test Plan
1) The Fabricators Q.C. Engineer shall prepare the Inspection & Test Plan to assure
that all activities for spool fabrication are satisfactorily performed in accordance with
the Project specification and the contract. ITP shall be submitted to Owner for approval.
2) The minimum requirement for each activities shall be verified with Inspection and/or
Test results and confirmation made by Owner.
3) All activities for Inspection & Test shall be witnessed by the Fabricators Q.C.
engineer, and Consultant and/or Owners representative shall witness the Inspections
that have stipulated as Hold Points in accordance with the Project specification and
mutual agreement among the Fabricator, Consultant and Owner.
4) No work can proceed beyond the operation stipulated as Hold Point until
Consultant and/or Owner has witnessed the Hold Point operation and has indicated
his approval by initialing and dating on the Inspection report prepared by the
Fabricator.
12.3. DOCUMENTATION AND MATERIAL TRACE ABILITY - Piping Shop Fabrication
Specification
12.3.1. All activities for quality assurance shall be performed and controlled as verified
by documentation.
12.3.2. All piping materials used for spool fabrication shall be identified and
documented as traceable.
12.3.3. The heat no. and Material Test Certificate (MTC) of all piping bulk material
supplied by manufacturer shall be recorded and filed for the material trace ability.
12.3.4. The application of the Fabricators in-house Q.A. procedure and formats may be
allowed to assure the quality control, The procedure and formats, however, shall be
agreed by Consultant before application.
13. INFORMATION SOURCES - Piping Shop Fabrication Specification
The following documents will be issued to the Fabricator:
13.1. Piping Material Specification showing the pipe, valve, flange, fitting, branch
connection, and other specific materials requirements for piping services.
The specification includes the individual piping material classifications.
Branch reinforcements to be in accordance with unless otherwise specified on isometric
drawings.
13.2. Piping drawings that may be orthographic arrangements and/or line isometrics.
These drawings show routing, controlling dimensions, component parts, attachments,
piping classifications and identification number for each line.
13.3. Isometric Listing - Piping Shop Fabrication Specification
13.4. Line Designation tables showing line design pressures and temperatures.
13.5. Supplementary tables of wall thickness showing wall thickness and branch
reinforcement requirements where piping specifications indicate that individual
calculations are required.
13.6. Standard and other drawings and specifications stating typical and specific
requirements relating to pipe spool fabrication.
13.7. Material listing for all pipes, fittings and flanges required for fabricating spools.
13.8. Project calendar showing the relationship between project week numbers and
actual dates.
Piping Shop Fabrication Specification - Attachment 1:
SHOP FABRICATED PIPE SHIPPING LENGTHS

- See more at: http://www.inspection-for-industry.com/piping-shop-fabrication-
specification.html#sthash.CwvPiBCH.dpuf

Vous aimerez peut-être aussi