PROPOSED WASTEWATER TREATMENT SYSTEM FOR

THE BLUE WAVE HOTEL, ARUGAMBE.


1
st
stage
UAFF reactor (100 Cu.m )
Material:-

MATERIAL
UNIT RATE
Rs.Cts.
AMOUNT
Rs.Cts.
1 Brick (8"x4"x2") 9300 Nos 10.00 93,000.00
2 Cement 130 bags 930.00 120,900.00
3 River Sand 6 cubs 10,000.00 60,000.00
4 Metal 3 cubs 7,500.00 22,500.00
5 Impermo Cement 50 Kg 125.00 6,250.00
6 Copper Tube 2 L.ft 300.00 600.00
7 6 P.V.C Pipes (600 Gauge) 1 Length 4,000.00 4,000.00
8 6 P.V.C "L" Bow (600 Gauge) 2 Nos 1,500.00 3,000.00
9 6 P.V.C "T" Joint (600 Gauge) 1 Nos 2,200.00 2,200.00
10 1" P.V.C. Joint Sockets 25 Nos 40.00 1,000.00
11 1 P.V.C Pipes 50 Length 200.00 10,000.00
12 3 P.V.C Pipes (Down Pipe) 16 Length 450.00 7,200.00
13 12 mm Tor Steel 36 Length 710.00 25,560.00
14 10 mm Tor Steel 123 Length 510.00 62,730.00
15 1"x1" Steel Mesh 5.5 Nos(Roll) 6,000.00 33,000.00
16 1/4" Tor Steel 105 Kg 150.00 15,750.00
17 1 " concrete nails 3 Kg 300.00 900.00
18 1" concrete nails 3 Kg 300.00 900.00
19 Binding 40 Kg 190.00 7,600.00
20 Air tight chemical 75 Kg 900.00 67,500.00
21 Polythene (Medium gauge ) 15 Kg 110.00 1,650.00
22 Mamotees 2 Nos 400.00 800.00
23 Shovels 2 Nos 550.00 1,100.00
24 18 steel bucket 4 Nos 300.00 1,200.00
25 1 GI Pipes( Light duty) 1 Length 3,000.00 3,000.00
26 GI Pipes( Light duty) 2 Length 1,000.00 2,000.00
27 6 Paint brush 2 Nos 700.00 1,400.00
28 Wheel barrow 1 Nos 3,000.00 3,000.00
29 Excavation and Back filling Item Allow Sum 25,000.00
30 Wood for Form Work Item Allow Sum 20,000.00

Sub Total 603,740.00
Consultancy, Construction & fabrication

1.1. Construction of UAFF reactor
with consultancy = 350,000.00


1.2. Supplying fabrication and fixing of bacteria
growing media = 540,000.00
______________
Sub Total 01 = 1, 493,740.00




PROPOSED WASTEWATER TREATMENT SYSTEM FOR
2
nd
stage
Facultative
Material:-

MATERIAL
1 Brick (8"x4"x2")
2 Cement
3 River Sand
4 Metal
5 Rubble
6 Impermo Cement
7 4 P.V.C Pipes (400 Gauge)
8 4 P.V.C "L" Bow (400 Gauge)
9 1" P.V.C. Joint Sockets
10 1 P.V.C Pipes
11 3 P.V.C Pipes (Down Pipe)
12 12 mm Tor Steel
13 10 mm Tor Steel
14 " Steel
15 Binding
16 Air tight chemical
17 Polythene (Medium gauge )
18 Wood for Form Work
19 Excavation and Back filling


Consultancy, Construction & fabrication

2.1. Construction of Facultative Bacterial
tanks with consultancy

2.2. Supplying fabrication and fixing of bacteria
growing media









PROPOSED WASTEWATER TREATMENT SYSTEM FOR
THE BLUE WAVE HOTEL, ARUGAMBE.

Facultative Bacterial tanks and Sand Filter
MATERIAL
UNIT
RATE
Rs.Cts.
11800 Nos 10.00
168 bags 930.00
8.5 cubs 10,000.00
5 cubs 7,500.00
1 cubs 6,000.00
45 Kg 125.00
4 P.V.C Pipes (400 Gauge) 3 Length 950.00
4 P.V.C "L" Bow (400 Gauge) 6 Nos 450.00
1" P.V.C. Joint Sockets 41 Nos 40.00
82 Length 200.00
3 P.V.C Pipes (Down Pipe) 23 Length 450.00
85 Length 750.00
186 Length 510.00
170 Kg 150.00
30 Kg 190.00
50 Kg 900.00
Polythene (Medium gauge ) 25 Kg 110.00
Item Allow Sum
Excavation and Back filling Item Allow Sum

sub total
y, Construction & fabrication
2.1. Construction of Facultative Bacterial
with consultancy = 30
2. Supplying fabrication and fixing of bacteria
growing media = 500
_____________
Sub Total 02 = 1,524
______________
Total = 3,018
____________
Contingencies 5% = 1
__________
Grand Total Rs. = 3,169
==========
PROPOSED WASTEWATER TREATMENT SYSTEM FOR
RATE
Rs.Cts.
AMOUNT
Rs.Cts.
10.00 118,000.00
930.00 156,240.00
10,000.00 85,000.00
7,500.00 37,500.00
6,000.00 6,000.00
125.00 5,625.00
950.00 2,850.00
450.00 2,700.00
40.00 1,640.00
200.00 16,400.00
450.00 10,350.00
750.00 63,750.00
510.00 94,860.00
150.00 25,500.00
190.00 5,700.00
900.00 45,000.00
110.00 2,750.00
20,000.00
25,000.00

724,865.00

300,000.00
2. Supplying fabrication and fixing of bacteria
500,000.00
____________
524,865.00
_____________
018,605.00
______________
50,930.00
___________
69,535.00
==========