Solution for industrial furnace and process
ABOUT COMPANY
A company d o o Zenica
The initial placement of products and services mainly related to the
customers within the BiH.
Develoment of market sales caused intensive investment in equipment and
facilities as well as human resources of the company.
Siemens SIMATIC S S
termomatik . . . was established in 1987. as a private
enterprise with an unlimited liability. A company from its establishment is engaged
in engineering, manufacturing and installation of industrail furnaces and industrial
automation.
Development of resources of the company enabled the carrying out engineering
work and for the foreign market from which we can emphasize engineering of
industrial furnaces and automation, software for programmable machines
( 5 and 7, its own system based on microcontroller),
engineering in the field of refractory and refractory lining as well as the
development and manufacture of electronic equipment and steel construction
according to the order for their own purposes.
Today company employs highly professional staff of different types specialized
for industrial furnaces, automation, measurement and control, and refractory and
collaborate with leading domestic and foreign companies.
A company is trying to adjust to current standards of quality and environment
management to ensure preconditions for the further development of the market
sales.
Business alignment to the standards of quality and environment in the field of
development of manufacture and sales of technological equipment and machinery
as well as continuosly training of human resources in the application of methods
of quality and environmental protection are guarantee for the successful
positioning of the company in the future.
We have not had trouble with suppliers in the purpose of performing our services,
and environment analysis indicates that this trend will continue in the coming
years in business. Good business relations with suppliers and their concerns for
quality is certainly facilitate the realization of our vision, mission and strategic and
business objectives. The company currently works with 60 users who are loyal to
the founding company. In the market we are recognized for quality, experience
and good business cooperation.
Products and markets
3
4
MANAGEMENT PROCESSES
M A N A G E M E N T P R O C E S S E S
M A I N P R O C E S S E S
S U P P O R T E D P R O C E S S E S
INTERNAL
AUDIT
MAINTENANCE
CONTROL
MEASURING CUSTOMER
SATISFACTION
PROCUREME
NT
CORRECTIVE AND
PREVENTIVE MEASURES
PROVIDING RESOURCES
CONTINUOUS
IMPROVEMENT
PROIZVODNJA I
UGRADNJA AL
STOLARIJE
MARKET
RESEARCH
TECHNOLOGY
DEVELOPMENT, MANUFACTURE AND SALES OF
INDUSTRIAL,TECHNOLOGICAL AND EQUIPMENT FOR
ENVIRONMENTAL PROTECTION, AS WELL AS ELEKTRICAL,
MECHANICAL AND REFRACTORY SERVICES
ASSEMBLY
5
QUALITY POLICY AND ENVIRONMENTAL MANAGEMENT
Quality policy and environmental management is defined, documented and
implemented in the company Zenica on the following principles:
- Our moto is:
;
- Our customers are in the central point of overall relations and activities, we want
to meet their requirements and exceed expectations;
- We strive to ensure the rights and environmentally friendly product with the right
price and that he finds the right time on the market;
- We establish partnerships with our suppliers based on a fair basis in the purpose
of long-term business cooperation, mutually beneficial, including the requirements
of environmental management system;
- company undertakes to persue the fulfillment of all requirements
of quality management and environment policy (policy which corresponds to the
nature, extent and impacts on the environment), and be responsible for their own
activities, products and services in all phases of the business process, thereby
preventing pollution of the environment;
- We provide continuous control of the complement system, quality and
environmental management, and training and employees motivation;
- We will take care of the conserve of natural resources and will reduce energy
consumption;
- We ensure the satisfaction of the interests of all stakeholders (customers,
owners, employees, suppliers, communities) including complying of the
obligation with applicable legal and other requirements that the organization
has signed in relation to its environmental aspects;
- With preventive and remedial measure we prevent repetition of mistakes and
the formation of new faults;
- Constantly provide a favorable environment for establishing and reviewing set
goals of quality and environment in which environmental policy is framework for
permanent installation and monitoring of the operational framework and
environmental goals;
- We provide passing, understanding and achievement of quality policy and
environmental in entire company;
- Periodically (at least annully) reviewing the adequacy of the quality policy and
environmental as well as effectiveness of applied measures, within questioning
of the quality system and environmental management by the top management
to the board for the quality and the environment.
Quality policy and environment is defined on the basis of experience from the
previous period and suggestions of carrier of business functions and agreed on
the level of the top management in accordance with vision and strategy of the
company.
All employees are familiar with the quality policy and the environment through
direct supervisors, and the same is placed on the visible places in the company,
website as well as on the advertising materials of the company, including
immediate comunity.
Constantly analyzing and redefining policies and goals of the qualiy and
environmental management provide the conditions for the continuous
improvement of quality and environmental management, and prevention
and reduction of environmental pollution.
termomatik
termomatik
A satisfied client is what we aspire to and we are recognized
by the quality
6
General
Manager
PRK
Advisor
Manager for refractory
department
Manager for electrical
department
Manager for mechanical
department
department
Human Resource
Manager
Procurement
Engineering of
refractory
Manufacture of
refractory furnace
Assembly /
disassembly
Engineering
Manufacture
Engineering
Manufacture
Sales
PRO
Technical
Manager
Training
Administration and
legal
Finance and
accounting
Assembly /
disassembly
Assembly /
disassembly
Maintenance of
refractory
Maintenance
Maintenance
FUNCTIONAL ORGANISATIONAL CHART
7
CONTACT PERSONS:
Faruk Babi
(Manager)
Amir Jaganjac
Damir Hadiulbi
Laris Babi
Samir abi
Hamed Lutvica
Maid Henjakovi
Beir Ljubuni
Anes Berberovi
(Deputy Manager)
Electrotechnical works:
Refractory works:
Mechanical works:
Measuring and regulation:
Mario Marunovi
faruk.babic@termomatik.com
amir.jaganjac@termomatik.com
damir.hadzidjulbic@termomatik.com
laris.babic@termomatik.com
samir.sabic@termomatik.com
hamed.lutvica@termomatik.com
maid.henjakovic@termomatik.com
becir.ljubuncic@termomatik.com
anes.berberovic@termomatik.com
mario.marunovic@termomatik.com
BASIC ACTIVITIES
- Industrial furnaces and automati
- Defining project tasks
- ing -technical
- Optimi ation
- Copyright monitoring
-
- Steel constructions
-
- M
ENGINEERING
PROJECT ENGINEERING
on
of the
Screen of thermo characteristics
z
Heating technique
Refractory
e
-
- Siemens SIMATIC S5, S7, PCS7 and WinCC
- ,
- Measurements and control,
-
chanical engineering
Hydraulics
- Automation
- Measurements and controls
Industrial automation
Refractory lining
PROGRAMMING SUPPORT FOR PROGRAMMABLE AUTOMATION
Z
DEVELOPMENT AND PRODUCTION
REPRESENTATIVE FOR FOREIGN COMPANIES
- Development of electronic devices for own needs
- Development of electronic devices on the basis of order
- Low-serial production of advanced electronic devices
- Low-serial production furnaces for heat treatment of plastic,
heat treatment of metals and melting of non-ferrous metal
- Furnaces, industrial
-
REALI ATION OF INVESTMENT PROJECTS IN THE
COUNTRY AND ABROAD
automation and devices for measuring and control
(SIEMENS; KROMSCHRODER)
Refractory and isolation materials (RHI)
8
REFERENCE LIST - ELECTRICAL WORKS
, Croatia
Value: 25.000
- laboration of the project
-
-
anj, B&H
Reconstruction and modernization of lime , 1997/1998
Furnace for spark plugs, 1998
Measuring station Vitez with telemetry and visualisation
in the dispatch centre in Zenica, 1999
shaft kiln
Investor: KALUN, Drni
E basic
Installation
Commissioning
Investor: ENKER, Te
Modernization of the equipment for measuring and control
- Designing
- Delivery of equipment
- Installation
- Commissioning
- Optimization
- Proving guaranteed parameters
Investor: USAID for JP VODOVOD Zenica, B&H
Value: 56.000 BAM (approx. 28.632 )
- D
- I
-
- O
- Proving guaranteed
Subcontractor to Pomak company, Split
-
LV project of overheads ports and external lighting, 1998
Investor: USAID for JP VODOVOD Zenica, B&H
- Partially engineering
- Delivery of equipment
- Installation
- Commissioning
Modernisation of equipment for measuring and control
- Designing
elivery of equipment
nstallation
Commissioning
ptimisation
parameters
9
Annealing 40 t
Investor: Steel factory , B&H
furnace
ILIJA Ilija
10
anj, B&H
Value: 33.000 BAM (approx. 16.873 )
-
Ilija
Tunnel furnace No. 1, 1999
of the Annealing Furnace 40t
Pump station Gua Gora, construction of water supply
Investor: ENKER Te
Modernisation of equipment for measuring and control
- Engineering
- Delivery of equipment
- Installation
- Commissioning
- Optimisation
- Proving guaranteed parameters
Investor: Steel factory , B&H
Value: 64.000 BAM (approx. 32.723 )
- I
- Detection parameters
Investor: KALIM, Jelah, B&H
ILIJA
-
Mud thickener, 1999
Construction of furnace for galvanisation, 1999
Reconstruction , 1999
Investor: USAID for JP VODOVOD Zenica, B&H
- Delivery of equipment
- Installation
- Commissioning
- Engineering
- Delivery of equipment
- Installation
- Commissioning
- Optimisation
- Commissioning
Investor: USAID for Municipality Travnik, B&H
- Engineering
Delivery of equipment
- Work performance on construction of water supplies,
pump station and water route
Subcontractor to Metalno company, Zenica
-
Delivery of equipment
nstallation
11
R f control of
Investor:
econstruction o furnace
for heat treatment of plates
VOEST-ALPINE Linz, Austria , 12
Reconstruction of the heating and automation
on the furnace for enameling
Reconstruction and modernisation of the automatic
control of atomizer, 2000
Reconstruction of the automatic control,
, 1999
Equipment for construction of exhausted ladles,
2000
anj, B&H
VOLKSWAGEN Vogo
- Delivery manuals for handling and maintenance
Investor: HELIOS, Banovi , B&H
Value: 18.000 BAM (approx. 9.203 )
Investor: ENKER, Te
- Designing
- Delivery of equipment
- Work performace
Investor: , , B&H
Value: 74.000 BAM (approx. 37.836 )
- Engineering
- Delivery of equipment
- Installation
i
a
Furnace for thermal treatment of MACRALON V=500l, 2000
Automation and reconstruction of Annealing furnace K-9 (60 t), 2001
Investor: TRZ HAD , Had
Value: 8.000 BAM (approx. 4.090 )
- Designing
- Engineering
- Construction
BH STEEL - Steel factory ZENICA Zenica
98 813 52 780
More then 90 % of furnace is completely new !
-
- Delivery of equipment
- nstallation
- Engineering
- Delivery of application software for PLC and OP
- Commissioning
- Detection of parameters
- Copyright supervision
I i , B&H
Project of measuring, regulation and electro motor drive
I i
I
Investor: , B&H
Value: 2 . BAM (approx. 1 . )
13
T g
-
Investor: F
, B&H
ubular reactor for testin combustion
characteristics of bio mass and coal
aculty of Mechanical
Engineering, Sarajevo
14
anj, B&H
Value: 33.600 BAM (approx. 17.179 )
-
No. , 1
10 /2002
2 200
-25-B
Tunnel furnace
Automation and reconstruction of Annealing furnace
( 0 t), 2001
Reconstruction of automation of Annealing
furnace -30-B (100 t)
Investor: ENKER Te
Modernisation of equipment for measuring and control
- Designing
- Delivery of equipment
- Engineering
- Installation
- Commissioning
- Optimisation
- Proving of guaraneed parameters
521 329 266 551
- Copyrights
67 950 34 742
-
- D
- Installation
Project of measuring, regulation and electro motor drive
I
- Commissioning
, 2002
Investor: BH STEEL - Steel factory ZENICA Zenica, B&H
Value: . BAM (approx. . )
More then 90 % of furnace is completely new !
-
- Delivery of equipment
- nstallation
- Engineering
- Delivery of application software for PLC and OP
- Commissioning
- Proving of guaranteed parameters
Investor: BH STEEL - Steel factory ZENICA Zenica, B&H
Value: . BAM (approx. . )
Designing
elivery of equipment
- Engineering
- Delivery manuals for handling and maintenance
99 30 50 786
Reconstruction of automatic controls on furnaces H-60 and H-100
I
Commissioning
Furnaces H-60 (60 t) and H-100(100t), 2002
Investor: BH STEEL - Steel factory ZENICA Zenica, B&H
Value: .3 BAM (approx. . )
- Designing
- Delivery of equipment
- nstallation
- Engineering
-
15
Press 10/2,5 MN and s
Investor: , B&H
respective manipulator
UNIS-PRETIS NIS, Vogo a-Sarajevo
16
Reconstruction of PLC equipment, sensors and hydraulic valves
press
, 2002
of SMS 25/31,5 MN and 5 MN manipulator of 250 kN
DANGO&DIENNENTHALL in the Blacksmith department
Investor: BH STEEL - Steel factory ZENICA Zenica, B&H
Value: BAM (approx. . )
- Designing
- Delivery of equipment
- Engineering
- nstallation
- Commissioning
- Parameters detection
Investor: BIMAL d.d. Br , B&H
Value: 166.411,00 BAM (approx. 85.085,00 )
- Designing
- Delivery of equipment
- Installation
- Engineering
- Commissioning
1.154.000 590 030
I
- Upgrade from SIMATIC S5-150 to S7-400
R silos tomation of transported
system in Oil rafinery, 2003
econstruction and au
Automation and reconstruction of steam
generation facilities in Oil rafinery, 2003
Automation and reconstruction of Oil rafinery, 2003
ko, Brko
Investor: BIMAL d.d. Br , B&H
Value: 83.182,00 BAM (approx. 42.530,00 )
- Designing
- Delivery of equipment
- Installation
- Engineering
- Commissioning
Investor: BIMAL d.d. Br , B&H
Value: 435.492,00 BAM (approx. 222.664,00 )
- Designing
- Delivery of equipment
- Installation
- Engineering
- Commissioning
ko, Brko
ko, Brko
17
Press Ivo Lola Ribar
Investor: PRETIS NIS, Vogoa-Sarajevo, B&H
18
Automation and reconstruction of oil supply plant
facilities in Oil rafinery, 2003
Automation and reconstruction of filtering into
vinterisatio process facilities in Oil rafinery, 2003
Investor: BIMAL d.d. Br , B&H
Value: 21.000,00 BAM (approx. 10.737,00 )
- Designing
- Delivery of equipment
- Installation
- Engineering
- Commissioning
Investor: BIMAL d.d. Br , B&H
Value: 22.402,00 BAM (approx. 11.454,00 )
- Designing
- Delivery of equipment
- Installation
- Engineering
-
ko, Brko
ko, Brko
n
Commissioning
Investor: , B&H
Value: 10.500,00 BAM (approx. 5.369,00 )
- Designing
- Delivery of equipment
- Installation
- Engineering
- Commissioning
Investor: , B&H
Value: 16.032,00 BAM (approx. 8.197,00 )
- Designing
- Delivery of equipment
- Installation
- Engineering
- Commissioning
Investor: Slavonski brod, Croatia
Value: 26.800,00
- Delivery of equipment
- Engineering
- Commissioning
Clean water supply system, 200
, 200
Reconstruction of the equipment for combustion, measurement
and regulation in the furnace for normalisation of propane-butane
bottles, 200
4
Cable factory Testing device for breakdown voltage 4
4
BOSNALIJEK, Sarajevo
KAPIS TKT, Tomislavgrad
, URO AKOVI
19
Furnace for testing fire-resistant material
Investor: PROTUPOARNI INSTITUT Sarajevo, B&H ,
20
21
ILIJA Ilija
Measuring control station for natural gas 3.000 m3/h
for the electro-steel works, 2004
milling machine 4
Investor:
Investor: Steel factory , B&H
- Designing
- Delivery of equipment
- Installation
-
Investor: BH STEEL - Steel factory ZENICA Zenica, B&H
- Delivery of equipment
- Installation
- Commissioning
BIRA , B&H
- Delivery of equipment
- Installation
- Commissioning
Commissioning
Investor:
Value: 190.000,00
- Designing
- Delivery of equipment
- nstallation
- Commissioning
- Parameters detection
Investor: , B&H
Value:25.500,00 BAM (approx. 13.038,00 )
- Delivery of equipment
- Engineering
-
- Parameters detection
Refrigeration factory - filling machine for PUR-foam, 2004
Reconstruction of automation on , 200
- refrigeration factory, Biha
VOEST-ALPINE Linz, Austria
I
FORESTER, Sarajevo
- Designing
Installation
R of controls
sheet , 200
0 , 200
econstruction on furnace for thermal treatment
of s 4
Heating furnace 10 kg/h 4
,
Friction press
Investor: PIROMETAL Brko, B&H ,
22
23
Heating furnace BH STEEL, 2004
Maintenance of electro-resistant in annealing furnace 4
epair o electro-resistant furnace
4
respective manipulator
UNIS-PRETIS NIS, Vogo
roject regulation and keeping the
IGMAN, Konjic B
delivery of heaters
of heaters
UNIS-PRETIS NIS, Vogo
Design
UNIS-PRETIS NIS, Vogo
Design
Investor: , B&H
- Delivery of burner equipment
- Installation
- P of furnace
- Commissioning
- Parameters detection
Investor: , &H
Value: 15.500,00 BAM (approx. 7.925,00 )
- Construction and
(made from KANTHAL A-1)
- Installation of the heaters
Investor: BH STEEL - Steel factory ZENICA Zenica, B&H
Value: 53.750,00 BAM (approx. 27.481,00 )
- Construction and delivery (made from KANTHAL A-1)
- Installation of material and equipment
- Project of control of maintenance of atmosphere protection
- Commissioning
Investor: , B&H
Reconstruction of PLC equipment, sensors and hydraulic valves of press
- ing
- Delivery of equipment
- Engineering
- Installation
- Commissioning
- Parameters detection
Investor: , B&H
- ing
- Delivery of equipment
- Engineering
- Installation
- Commissioning
- Parameters detection
a-Sarajevo
a-Sarajevo
a-Sarajevo
, 200
General r s n 5 in Maintenance
Department with reconstruction of 3 furnaces, installation of
equipment for work under Ar or CO atmosphere protection,
200 /2005
Press 10/2,5 MN and s, 2005
Heating furnace 1000kg/h, 2005
2
Steel Plant - Station for tundish heating
Investor: ARCELORMITTAL, Zenica, B&H
24
25
Remote control steam starting block 7
oncrete lant
utomatically controlled tubular reactor for testing
combustion characteristics of bio mass and coal, 200
nnealing chamber furnace
for of in Thermal
Power Plant Kakanj, 2005
C P , 2005
A
- 5
Laboratory furnace 20l/8kW, 2005
A , 2005
Investor: JP ELKROPRIVREDA BIH , B&H
Investor: INGRUP Donji Vakuf, B&H
Value:36.900,00 BAM (approx.18.867,00 )
Automation engineering
- Delivery of equipment
-
- Commissioning
Investor: F , B&H
Value: 35.000,00 BAM (approx. 17.895,00 )
- Designing
- Delivery of equipment
- Engineering
- Installation
- Commissioning
- Parameters detection
Investor: TMD Grada , B&H
Value: 4.000,00 BAM (approx. 2.045,00 )
- ing
- Construction
Investor: HES-HENNINGSDORF Henningsdorf, Germany
- Designing
- WinCC SCADA system
- Delivery of equipment
- Installation
- Commissioning
, Sarajevo
,
-
Installation
aculty of Mechanical Engineering,
,
Design
,
Sarajevo
ac
F , 2005 urnace for melting non-ferrous metals 25l/6.3kW
Investor: UNIVERZAL PROGRES, Visoko, B&H
Value: 6.000,00 BAM (approx. 3.068,00 )
- Designing
- Construction
- Commissioning
Sugar factory
Investor: STUDEN-AGRANA, Brko, B&H
26
27
C P , 2005
F , 200
F , 200
R 200
, 200
oncrete lant - Reconstruction
urnace for melting non-ferrous metals 30,6l/6,3kW 6
urnace for melting non-ferrous metals 180l/14kW 6
econstruction and automation of hydrogenation drives, 6
Chamber for baking varnish 6
,
- E
Installation
11.000,00 5.625,00
ADIDA, Tunis
- Delivery of equipment
- Engineering
-
- Commisioning
S-PRETIS NIS ogo a-Sarajevo
- Engineering
Investor: INGRUP Donji Vakuf, B&H
ngineering
- Delivery of equipment
-
- Commissioning
Investor: UNIVERZAL PROGRES, Visoko, B&H
- Designing
- Construction
- Engineering
Investor: UNIVERZAL PROGRES, Visoko, B&H
Value: BAM (approx. )
- Designing
- Construction
- Engineering
Investor: J
Value:51.680,00
- Designing
Installation
Investor: UNI , V , B&H
Value: 35.000,00 BAM (approx.17.895,00 )
- Designing
- Installation
- Commissioning
Recontruction and automation of level measuring
in Oil factory, 2005
ultrasonic sensors
Investor: BIMAL d.d. Br , B&H
Value: 15.486,00 BAM (approx. 7.917,00 )
- Designing
- Delivery of
- Installation
- Commissioning
ko, Brko
Coke Oven Battery Plant - Biological
waste water treatment
Investor: ARCELORMITTAL, Zenica, B&H 28
29
Furnace for control of temperature sensors, 2006
Investor: MITTAL STEEL , B&H
- ing
- Installation
- Engineering
- Commissioning
Zenica
Design
Peeling facility in Oil factory, 2006
Cable factory, Extruder 2,5", 2006
Cable factory, Machine for rough drag-out of copper, 2007
Press Ivo Lola Ribar, 2007
,
Design
,
.000,00 . ,00
- Engineering
Investor: BIMAL d.d Brko, B&H
Value: 212.704,00 BAM (approx. 108.753,00 )
- ing
- Engineering
- Installation
- Commissioning
- Parameters detection
Investor: KAPIS TKT Tomislavgrad, B&H
Value: 79.564,00 BAM (approx. 40.680,00 )
- Designing
- Delivery of equipment
- Engineering
- Installation
- Commissioning
- Parameters detection
Investor: KAPIS-TKT Tomislavgrad, B&H
Value: 350.000,00 BAM (approx. 178.952 )
- Designing
- Delivery of equipment
- Engineering
- Installation
- Commissioning
- Parameters detection
Investor: PRETIS NIS, Vogoa-Sarajevo, B&H
Value: 75 BAM (approx. 38 347 )
- Designing
- Installation
- Commissioning
,
Mobile stations for a heating of caldrons
Investor: Metalska industrija Varadin-MIV,
Varadin, Croatia
30
31
.000,00 . ,00
- Engineering
Design
,
Design
Emcotest machine for measuring hardness 2007
Pellet dryer Machine, 2007
Automatic foundry for vehicles parts, 2008
Friction press, 2008
,
Furnace for thermal treatment VPP, 2008
Investor: PRETIS NIS, Vogoa-Sarajevo, B&H
Value: 130 BAM (approx. 66 468 )
- Designing
- Installation
- Commissioning
Investor: FIS, Vitez, B&H
Value: 111.000,00 BAM (approx. 56.753,00 )
- Designing
- Engineering
- Installation
- Commissioning
Investor: CIMOS, Zenica, B&H
Value: 4.000.000,00 BAM (approx. 2.045.167,00 )
- ing
- Engineering
- Installation
- Electro equipment and automation
- Commissioning
Investor: PIROMETAL Brko, B&H
Value: 400.000,00 BAM (approx. 204.517,00 )
- ing
- Engineering
- Installation
- Commissioning
Investor: NT FORGING Novi Travnik, B&H
Value: 296.000,00 BAM (approx. 151.342,00 )
- Designing
- Delivery of equipment
- Engineering
- Installation
- Commissioning
,
Coke Oven Battery Plant - Plant for
naphtalene and ammonia
Investor: ARCELORMITTAL, Zenica, B&H 32
33
Furnace for testing fire-resistant material, 2008
Drying furnace, 2008
Steel Plant - Station for tundish heating 1,44 MW, 2008
,
- engineering
.000,00 ,00
Investor: PROTUPOARNI INSTITUT Sarajevo, B&H
Value: 606.000,00 BAM (approx. 309.843,00 )
- Designing
- Engineering
- Delivery of equipment
- Installation
- Commissioning
Investor: UNIS-PRETIS NIS Vogoa-Sarajevo, B&H
Value: 100.000,00 KM (approx. 51.129,00 )
- Designing
- Installation
- Commissioning
Investor: ARCELORMITTAL, Zenica, B&H
Value: 50 BAM (approx. 25.565 )
- Designing
- Engineering
- Installation
- Commissioning
,
Coke Oven Battery Plant-Plant for naphtalene and ammonia 2008
Coke Oven Battery Plant-Biological waste water treatment, 2008
,
,00
,00
- Engineering
Investor: ARCELORMITTAL, Zenica, B&H
Value: approx. 1.000.000
- Designing
- Engineering
- Installation
- Automation
- Commissioning
Investor: ARCELORMITTAL, Zenica, B&H
Value: approx. 750.000
- Designing
- Delivery of equipment
- Installation
- Commissioning
Automatic foundry for car parts
Investor: CIMOS, Zenica, B&H
34
35
Design
Investor: STUDEN-AGRANA, Brko, B&H
Value: 2.430.000,00 BAM (approx. 1.242.439,00 )
- ing
- Installation
- Electro equipment and automation
- Commissioning
- Parameters detection
Sugar factory, 2008
Investor: BRIGO-INVEST, Banovii, B&H
Value: 40.000,00 BAM (approx. 20.00,00 )
- ing
- Engineering
- Installation
- Delivery of equipment
- Commissioning
Design
Plant for the production of briquette, 2008
Furnaces for testing the resistance of materials, 2008
Induction melter furnaces, 2008
Mobile stations for a heating of caldrons, 2008/2009
. 0,00
Investor: NT FORGING Novi Travnik, B&H
Value: 397.000,00 BAM (approx. 202.983,00 )
- Designing
- Engineering
- Delivery of equipment
- Installation
- Commissioning
Investor: Metalska industrija Varadin-MIV, Varadin, Croatia
Value: 59.840,00
- Designing
- Engineering
- Installation
- Commissioning
Investor: Metalska industrija Varadin-MIV, Varadin, Croatia
Value: 29 35
- Designing
- Engineering
- Installation
- Commissioning
,
Retrofit f milling machine
WANDERER VC200
o
36
37
Investor: STUDEN-AGRANA, Brko, B&H
Value: 175 BAM (approx. 89.476 )
- Designing
- Engineering
- Installation
- Automation
- Commissioning
.000,00 ,00
Sugar factory, Boiler house 2008/2009 ,
Electro works in CIMOS - II phase, 2009
Protection of tanks from overloading, 2009
CIMOS - substation, 2009
Cable factory, Extruders 4,5", 2009
.000,00 00
- Engineering
Design
,
Design
,
Investor: CIMOS, Zenica, B&H
Value: 754 BAM (approx. 385.514, )
- Designing
- Delivery of equipment
- Automation
- Installation
- Commissioning
Investor: BIMAL, Brko, B&H
Value: 42.000,00 BAM (approx. 21.474,00 )
- ing
- Engineering
- Installation
- Electro equipment and automation
- Commissioning
- Parameters detection
Investor: CIMOS Zenica, B&H
Value: 668.000,00 BAM (approx. 341.543,00 )
- ing
- Engineering
- Installation
- Commissioning
Investor: KAPIS TKT Tomislavgrad, B&H
Value: 210.000,00 BAM (approx. 107.371,00 )
- Designing
- Engineering
- Delivery of equipment
- Installation
- Commissioning
- Parameters detection
General overhaul of machine for
removing slag, ArcelorMittal Zenica
38
39
Re-circulation system of technological water, 2009
Machine for wire twisting CIGARA, 2009
EMP drives and temp. measurements on 8 cells of silo, 2009/2010
Dedusting of iron mixer on Steel Plant Department, 2010
,
Investor: Cement Plant Kakanj, B&H
Value: 78.300,00 BAM (approx. 40.034,00 )
- Designing
- Engineering
- Delivery of equipment
- Installation
- Commissioning
Investor: KAPIS TKT Tomislavgrad, B&H
Value: 55.000,00 BAM (approx. 28.121,00 )
- Designing
- Engineering
- Delivery of equipment
- Installation
- Commissioning
Investor: BIMAL, Brko, B&H
Value: 78.375,00 BAM (approx. 40.073,00 )
- Designing
- Engineering
- Delivery of equipment
- Installation
- Commissioning
- Parameters detection
,
Investor: ArcelorMittal, Zenica, B&H
Value: approx. 60.000,00
- Designing
- Engineering
- Delivery of equipment
- Installation
- Commissioning
- Parameters detection
Investor: ArcelorMittal, Zenica, B&H
Value: 46.323,00
- Designing
- Delivery of equipment
- Installation
- Commissioning
Air post on the location LF and CCM in Steel Plant
Department, 2010
Installation of hydraulic and pneumatic valves,
fitting pipes and hoses, electric works
FAGOR, SPAIN 40
41
Burners and burners' armatures for air heating of the chamber
for sheet plastification, 2010
General overhaul of rotary excavator SH-630, no. 1352
P.K. ikulje - Lukavac, 2010/2011
Expansion of compressor station in BOF Steel Mill, 2011
Reconstruction of heating furnace LOI-SAAR,
capacity 1.300 kg/h, 2011
Investor: ArcelorMittal, Skopje, FYR Macedonia
Value: 109.667,00
- Designing
- Delivery of equipment
- Installation
- Commissioning
- Parameters detection
Investor:
Investor: ArcelorMittal, Zenica, B&H
Value: 150.360,00 BAM (approx. 76.877,00 )
- Designing
- Delivery of equipment
- Installation
- Commissioning
Investor: NT FORGING, Novi Travnik, B&H
Value: 82.720,00 BAM (approx. 42.294,00 )
- Designing
- Delivery of equipment
- Installation
- Commissioning
JP ELEKTROPRIVREDA BIH D.D. Sarajevo,
ZD Rudnici Kreka d.o.. Tuzla
Value: 4.450.000,00 BAM (approx. 2.275.249,00 )
- Electrical designing and engineering based on Siemens equipment,
- Video surveillance,
- Lighting,
- Installation,
- Delivery of equipment,
- Commissioning
- Parameters detection
Reconstruction and automation of Annealing
Furnace -25B in ArcelorMittal Zenica
42
43
Reconstruction of furnace for thermal treatment, 2011
System for measuring temperature inside the flowing
tunnel furnace BTU, 2011
Delivery and commissioning of the communication and control
equipment in the HE Rama, 2011
Electrical design electrical installations and automation control
of Depo 1, TE Tuzla, 2011
Investor: UNIS-TOK, Kalesija, B&H
Value: 338.800 BAM (approx. 173.226,00 )
- Designing
- Engineering
- Delivery of equipment
- Installation
- Commissioning
- Parameters detection
Investor: SELK, Kutina, Croatia
Value: approx. 20.000,00
- Designing
- Engineering
- Delivery of equipment
- Installation
- Commissioning
- Parameters detection
Subcontractor to COMEL Sarajevo
Value: 37.200,00 BAM (approx. 19.020,00 )
- Designing
- Delivery of equipment
- Installation
- Commissioning
Investor: JP ELEKTROPRIVREDA BIH D.D. Sarajevo,
Power Plant Tuzla
Value: 23.000
- Designing of automation, video surveillance, monitoring
and control based on Siemens Simatic S7
F for
Skopje, Macedonia
urnace galvanizing sheet
in ArcelorMittal
44
45
REFERENCE LIST - REFRACTORY WORKS
Reconstruction , 1999
Lime shaft kiln, 1999
Electric arc furnace 10t, 2001
of the Annealing Furnace 40T
Lime shaft kiln, 1999
Lime shaft kiln No. 1, 1999
Furnace for thermal treatment of MACRALON V=500l, 2000
Boiler Pelluchi type, 2000
Investor: Steel factory , B&H
Value: 64.000 BAM (approx. 32.723 )
Delivery of equipment
- Installation
- Commissioning
- Reconstruction of the refractory wall
- Reconstruction of the refractory wall
- Reconstruction of the refractory wall
(installed approx. 160t of material)
Investor: TRZ HAD , Had
Value: 8.000 BAM (approx. 4.090 )
- Engineering
Investor: KONJUH, ivinice
Investor: Steel factory , B&H
-
ILIJA Ilija
-
Investor: KALIM, Jelah, B&H
Investor: KALUN, Drni, Croatia
Investor: INGRAM, Srebrenik, B&H
I i , B&H
, B&H
- Engineering of hanging arch
ILIJA Ilija
Design of the project of refractory walls 10 t of electrical furnace
for casting of melt up to 25 t, monitoring of performance during lining
I i
Beaching area in ArcelorMittal Zenica
Spill transport system for ladle
46
47
Automation and reconstruction of Annealing furnace K-9 (60 t), 2001
econstruction of Annealing furnace (100 t), 2001/2002
E
Project of high temperature refractory isolation of furnace
Project of refractory walls of furnace
Delivery of refractory and high temperature isolation materials
Investor: ENKER, Teanj, B&H
- Delivery and installation of refractory material in the bell of
high-temperature chamber furnace
Investor: INGRAM, Srebrenik, B&H
Reconstruction of refractory wall on furnace No 3
-Installation of 90 t of material
- Project of high temperature refractory isolation of furnace
Project of refractory walls of the wagon of furnace
Delivery of refractory and high temperature isolation materials
Investor: BIRA, Refrigeration factory, Biha
Deliver of refractory material and reconstruction of refractory
walls of boilers 1 and 2
Investor: KONJUH, ivinice, B&H
Reconstruction of refractory wall of boiler
-Delivery of material
-Work performance
-Installation of approx. 10 t of refractory material
Investor: BH STEEL - Steel factory ZENICA Zenica, B&H
Value: 298.813 BAM (approx. 152.780 )
More then 90 % of furnace is completely new !
- ngineering
-
-
-
Investor: BH STEEL - Steel factory ZENICA Zenica, B&H
Value: 521.329 BAM (approx. 266.551 )
More then 90 % of furnace is completely new !
- Engineering
-
-
High-temperature bell furnace, 2001
Lime shaft kiln No. 3, 2001
R -25-B
Boilers No 1 & 2, 2002
Boiler Peluchi, 2002
, B&H
-
Upgrading of truck with mobile equipment
Station for testing of gas
48
49
Investor: KALUN, Drni, Croatia
- Inspection and reporting on refractory lining
condition in the furnace No. 2
Investor: ENKER, Teanj, B&H
- Deliver and installation of refractory material into two bells of
high-temperature chamber furnace
Investor: KONJUH, ivinice
- Delivery of material, work performance
- Installed around 8 t of refractory material
Investor: INGRAM, Srebrenik, B&H
Value: 22.615,00 BAM (approx. 11.562,00 )
Reconstruction of the refractory lining on furnace 1
(Nearly 125 t of refractory material installed)
Investor: Steel factory LIJA, Ilija, B&H
Value: 46.000,00 BAM (approx. 23.520,00 )
Reconstruction of the refractory lining of the wagon
and reparation of the refractory lining of furnace
- Engineering
- Delivery of refractory material
- Installation
Investor: BH STEEL, Zenica, B&H
- Engineering of refractory covering
- Delivery of material for refractory lining, approx. 100 m3
- Installation of material
- Commissioning
Investor: BH STEEL, Zenica, B&H
- Installation of material, approx. 160m3
Lime shaft kiln No. 2, 2002
High-temperature bell furnace, 2003
Chair factory - Reconstruction of refractory lining of boiler, 2003
Lime shaft kiln No. 1, 2004
Annealing furnace 40t, 2004
Tunnel furnace DANIELLI, Rolling Mill III, 2004
Electric Steel Plant, Stetting chamber, Line Chamber, 2004
, B&H
Value: 25.090,00 BAM (approx. 12.828). 2 Contracts
Hot Blast Stoves VP-4 in ArcelorMittal Zenica
50
Hot Blast Stoves VP-4
51
Investor: BH STEEL, Zenica, B&H
- Installation of material, approx. 300 t
Investor: Steel factory LIJA, Ilija, B&H
- Delivery of material for lining
- Supervision during construction
Investor: FORESTER, Sarajevo
- Engineering
UNIS-PRETIS NIS, Vogo
IGMAN, Konjic B
- Delivery of refractory material
UNIS-PRETIS NIS, Vogo
Electric Steel Plant, first lining of two bath tub of 100 t furnace, 2004
Electric Arc Furnace 10t, 2004
Heating furnace 100 kg/h, 2004
Heating furnace BH STEEL, 2004
Maintenance of electro-resistant in annealing furnace 4
epair o electro-resistant furnace
4
, B&H
Value: 25.500,00 BAM (approx. 13.038,00 )
a-Sarajevo
a-Sarajevo
Investor: , B&H
- Installation og refractory lining
Investor: , &H
Value: 15.500,00 BAM (approx. 7.925,00 )
- Engineering
Investor: BH STEEL - Steel factory ZENICA Zenica, B&H
Value: 53.750,00 BAM (approx. 27.481,00 )
- Installation of material
Investor: , B&H
- Engineering
, 200
General r s n 5 in Maintenance
Department with reconstruction of 3 furnaces, installation of
equipment for work under Ar or CO atmosphere protection,
200 /2005
Heating furnace 1000kg/h, 2005
2
Steam drying plant for drying of sampled
material such as pellets, sand, dust, etc.
52
53
Investor: KALUN, Drni, Croatia
- Reconstruction of refractory lining, approx. 110 t material
Investor: JP "ELEKTROPRIVREDA BiH" Sarajevo,
Power Plant Tuzla
Reparation of refractory lining in channels of hot gases, channels
and hopper of fire-place and collector of chimney of block 6
- Installation of approx. 70 t of material
Investor: Steel factory ILIJA, Ilija
- Delivery of material for refractory lining
- Delivery of material for covers
- Supervision during construction
aculty of Mechanical Engineering,
- Supervision during construction
Investor: JP "ELEKTROPRIVREDA BiH" Sarajevo,
Power Plant Tuzla
Reparation of refractory lining in hot gases channels and hopper of
boiler combustion in boiler 5 of block 4
- Installation of approx. 33 t of material
Lime furnace, 2005
Power Plant, Block 6, 2005
Electric Arc Furnace, 2005
utomatically controlled tubular reactor for testing
combustion characteristics of bio mass and coal, 200
Power Plant Tuzla, Block 4, Boiler 5, 2005
, B&H
Sarajevo
A
- 5
Investor: F , B&H
Value: 35.000,00 BAM (approx. 17.895,00 )
- Engineering
- Delivery of material
- Construction
F , 2005 urnace for melting non-ferrous metals 25l/6.3kW
Investor: UNIVERZAL PROGRES, Visoko, B&H
Value: 6.000,00 BAM (approx. 3.068,00 )
- Engineering
54
Deduster in foundry for car parts
Investor: CIMOS, Zenica, B&H
55
Investor: JP KANTONALNA BOLNICA, Zenica, B&H
Reparation of refractory lining of boiler
- Delivering and Installation of approx. 3 t of material
,
Engineering
- Engineering and installation of ceramic fibers in the arch of furnace
Investor: JP "ELEKTROPRIVREDA BiH" Sarajevo,
Power Plant Tuzla
Reparation of refractory lining in hot gases channels and hopper of
boiler combustion in boiler 5 of block 4
- Installation of approx. 30 t of material
Investor: GIRK KALUN, Drni, Croatia
Investor: Steel factory ILIJA, Ilija
- Delivery of material for furnace lining
- Installation of material
Investor: JP "ELEKTROPRIVREDA BiH" Sarajevo,
Power Plant Tuzla
Reparation of refractory lining in hot gases channels and hopper of
boiler combustion in boiler 5 of block 4
- Installation of approx. 50 t of material
Cantonal hospital - Boiler-room, 2005
Furnace K-9, 2006
Power Plant Tuzla, Block 4, Boiler 5, 2006
Electric Arc Furnace 10t, 2006
Power Plant Tuzla, Block 4, Boiler 5, 2006
Laboratory furnace 20l/8kW, 2005
Investor: TMD Grada , B&H
Value: 4.000,00 BAM (approx. 2.045,00 )
-
- Construction
Investor: BH STEEL - Steel factory ZENICA Zenica, B&H
ac
, B&H
Lime F , 2006 urnace
Reparation of refractory lining, approx. 90 t of material -
Lubrication DC motor drive
Costumer: NESMA Co. Saudi Arabia,
for porpose of ARAMCO Co. 56
57
11.000,00 5.625,00
S-PRETIS NIS ogo a-Sarajevo
- Engineering
- Delivering and Installation of approx. 150 t of material
Investor: Energoinvest termoaparati "E-TAT", Sarajevo, B&H
- Reconstruction of the refractory lining of the wagon
Investor: LIVTEX, Livno, B&H
Reparation of refractory lining
Investor: GIRK KALUN, Drni, Croatia
Investor: JP KANTONALNA BOLNICA, Zenica, B&H
Reparation of refractory lining of boiler
- Delivering and Installation of approx. 5,5 t of material
Investor ATB SEVER LIVNICA OKA, oka, Serbia
F , 200
, 200
urnace for melting non-ferrous metals 180l/14kW 6
Chamber for baking varnish 6
Reconstruction of refractory lining of the furnace "SALEM", 2006
Annealing furnace, 2006
Cantonal hospital - Boiler-room, 2007
Refractory lining of channel furnace IRV 70, 2007
Investor: UNIVERZAL PROGRES, Visoko, B&H
Value: BAM (approx. )
- Construction
- Engineering
Investor: UNI , V , B&H
Value: 35.000,00 BAM (approx.17.895,00 )
- Installation
- Commissioning
Investor: BH STEEL - Steel factory ZENICA Zenica, B&H

Boiler KLM 100 TPK
urnace
, 2006
Lime F , 2006
Reparation of refractory lining, approx. 98 t of material
-
-
Bag filters for dedusting of exhaust gas in
sugary rafinary STUDEN-AGRANA Brko, B&H
58
59
Investor: GIRK KALUN, Drni, Croatia
- Reparation of the bottom of furnace
Investor: JP "ELEKTROPRIVREDA BiH" Sarajevo,
Power Plant Tuzla
Reparation of refractory lining in hot gases channels and lining rear
of the boiler approx. 320 m2 and reparation of lining at the entrance
in the chimney-approx. 70 m2
-Installation of approx. 200 t of material
Investor: ArcelorMittal Zenica, B&H
Repairing of refractory lining of hot blast stoves VP-4
- Installation of approx. 3.500 t of refractory material
Investor: ArcelorMittal Zenica, B&H
Runner lining on cast house of VP-4
- Installation of approx. 650 t of refractory material
Investor: "NT FORGING" Novi Travnik, B&H
- Engineering of refractory lining
- Installation of refractory lining
- Commissioning
- Parameters detection
Furnace D-soel 14/5/94
Power Plant Tuzla, Block 5, 2007
Assembling and reconstruction of new Foundry
Hot Blast Stoves VP-4, 2008
Cast house of VP-4, 2008
Furnace for annealing - large continuous facility, 2008
, 2007
, 2008
Investor: NT-FORGING, Novi Travnik, B&H
Investor: CIMOS, Zenica, B&H
- Engineering
Lime F , 2007 urnace
Reparation of refractory lining, approx. 20 t of material -
Refractory lining of the 1.300t Mixer No.1
in ArcelorMittal Zenica
60
61
Investor: CALUCEM, Pula, Croatia
Investor: ArcelorMittal, Zenica, B&H
- Installation of approx. 600 t of refractory material
ArcelorMittal, Zenica, B&H
- Installation of approx. 660 t of refractory material
Investor: JP KANTONALNA BOLNICA, Zenica, B&H
Sanation of refractory lining of boiler
- Delivery and installation of material 4,0 t
Investor: ArcelorMittal Zenica, B&H
- Installation of ca 590 t of refractory material
Investor: JP "ELEKTROPRIVREDA BiH" Sarajevo,
Power Plant Tuzla
Reparation of refractory lining in hot gases channels
and lining of boiler 3 and 4
- Installation of approx. 100t of material
Furnace for testing fire-resistant material, 2008
, 2008
Investor: PROTUPOARNI INSTITUT Sarajevo, B&H
Value: 606.000,00 BAM (approx. 309.843,00 )
- Engineering
- Delivery of equipment and refractory material
- Installation
- Commissioning
- Parameters detection
Investor:
,
Mixer refractory lining 1.300 t, 2008
Convertor refractory lining 1 and 2
Cantonal hospital - Boiler-room, 2008
Refractory lining of 20 ladles for iron transport, 2008
Power Plant Tuzla, Block 3, 2008
Furnace refractory lining for cement casting, 2008
Installation of approx. 300 t of refractory material -
Coiling machine for cables
Investor: KAPIS TKT, Tomislavgrad
62
63
Investor: ArcelorMittal, Zenica, B&H
Investor: ArcelorMittal, Zenica, B&H
- Installation of approx. 500 t of refractory material
Investor: ArcelorMittal, Zenica, B&H
- Installation of approx. 160 t of refractory material
Investor: CIMOS TMD CASTING, Zenica, B&H
Investor: ArcelorMittal, Zenica, B&H
- Installation of approx. 2.300 t of refractory material
Investor: JP KANTONALNA BOLNICA, Zenica, B&H
Reparation of refractory lining of boiler
- Delivering and Installation of approx. 3 t of material
Investor: GIRK KALUN, Drni, Croatia
Investor: ArcelorMittal, Zenica, B&H
Investor: ArcelorMittal, Zenica, B&H
- Installation of approx. 950 t of refractory material
Annual contract for 2008: Refractory lining of ladles for
pig-iron transport
Convertor lininig 1 and 2 (regular reparation)
Reparation of runners on the casting platform VP-4, 2008
Reparation of refractory walls of Channel Induction Furnace
Annual contract for 2009: Convertor Lining
Cantonal hospital - Boiler-room, 2009
Annual contract for 2009: Refractory lining of ladles for
pig-iron transport
Annual contract for 2009: Refractory lining of ladles for hot
metal transport and charging
, 2008
, 2009
Reparation of refractory lining, approx. 250 t of material -
Lime F , 2009 urnace No.1
Refractory lining of ladles
Investor: ArcelorMittal Zenica
64
65
Investor: ArcelorMittal, Zenica, B&H
- Installation of approx. 2.000 t of refractory material
-
- Installation of approx. 900 t of refractory material
- - Installation of approx. 370 t
of refractory material
- Installation of approx. 50 t of refractory material
Investor: ArcelorMittal, Zenica, B&H
Reparation of refractory lining of boiler KO No1
- Installation of approx. 50t of refractory material
Investor: ArcelorMittal, Zenica, B&H
- Installation of approx. 175 t of refractory material
Investor:
- Project of refractory lining
- Installation of refractory materials
- Commissioning
- Parameters detection
Investor: ArcelorMittal, Zenica, B&H
- Installation of approx. 1.750 t of refractory material
-
- Installation of approx. 900 t of refractory material
- - Installation of approx. 150 t
of refractory material
- Installation of approx. 50 t of refractory material
- - Installation of approx. 450 t of
refractory material
-
- Installation of approx. 5.000 t of refractory material
Annual contracts for 2010:
Boiler - Convertor
Heating furnace 100t/h,"SALEM" Rolling Mill, 2010
Heating furnace for forging, 11,5t/day
Annual contracts for 2011:
Convertor Lining
Refractory lining of ladles for hot metal transport and charging
Runners for iron lining and slag VP-4
Convertor Lining
Refractory lining of ladles for hot metal transport and charging
Runners for iron lining and slag VP-4
Gunning of convertor and mixer
, 2010
, 2011
Refractory works in ladle in the hall of steel work
UNIS-TOK, Kalesija, B&H
-
-
-
-
Refractory lining of tuber segments and beaching runners
Refractory lining of tuber segments and beaching runners
66
Refractory lining of furnace K-25A
Investor: ArcelorMittal Zenica
67
Investor: NT FORGING
- Project of refractory lining
- Installation of refractory materials
- Commissioning
- Parameters detectionl
Investor: Steel factory ILIJA, Ilija
- Delivery of material for lining of furnace and two covers
- Installation of material into three furnaces
Heating furnace for forging 1,5 t/h
Electric Arc Furnace 10t, 2011
, B&H
, Novi Travnik, B&H
68
Refractory works on the SALEM heating furnace
100t/h in Rolling Mill Department, ArcelorMittal Zenica
69
REFERENCE LIST - MECHANICAL WORKS
Furnace for spark plugs, 1998
of the Annealing Furnace 40t
Investor: ENKER, Te
Modernization of the equipment for measuring and control
- Designing
- Delivery of equipment
- Installation
- Commissioning
- Optimization
- Parameters detection
Investor: USAID for JP VODOVOD Zenica, B&H
- Delivery of equipment
- Installation
- Commissioning
- Engineering
- Delivery of equipment
- Installation
- Commissioning
- Optimisation
Investor: Steel factory , B&H
Delivery of equipment
- Installation
- Commissioning
- Detection parameters
Investor: USAID for Primary school GOJEVII , B&H
anj, B&H
Subcontractor to Metalno company, Zenica
Investor: KALIM, Jelah, B&H
ILIJA Ilija
Reapir
-
, Municipality Fojnica
- Engineering
- Delivery of equipment
- Works
Mud thickener, 1999
Construction of furnace for galvanisation, 1999
Reconstruction , 1999
Reconstruction of boiler room and hot water network, 1999
70
General overhaul of rotary excavator SH-630
P.K. ikulje, Lukavac
71
Pump station Gua Gora, construction of water supply, 1999
Reconstruction of the heating on the furnace for enameling
Furnace for thermal treatment of MACRALON V=500l, 2000
Automation and reconstruction of Annealing furnace K-9 (60 t), 2001
Automation and reconstruction of Annealing furnace
(100 t), 2001/2002
SMS 25/31,5 MN
and 5 MN manipulator of 250 kN DANGO&DIENNENTHALL in
the Blacksmith department
Investor: USAID for Municipality Travnik, B&H
- Engineering
Delivery of equipment
- Work performance on construction of water supplies,
pump station and water route
Investor: HELIOS, Banovi , B&H
Investor: TRZ HAD , Had
Investor: Oraje Municipality, Oraje
Investor: BH STEEL - Steel factory ZENICA Zenica, B&H
Value: 298.813 BAM (approx. 152.780 )
More then 90 % of furnace is completely new !
Investor: BH STEEL - Steel factory ZENICA Zenica, B&H
Value: 521.329 BAM (approx. 266.551 )
More then 90 % of furnace is completely new !
Investor: BH STEEL - Steel factory ZENICA Zenica, B&H
Value: BAM (approx. . )
- Delivery of equipment
- Engineering
- nstallation
- Commissioning
-
I i , B&H
, B&H
- Engineering
- Mechanical Project of mantle and chimney of furnace
- Project of gas and air installation
- Delivery of equipment
- Engineering
- Mechanical Project of mantle and chimney of furnace
- Project of gas and air installation
- Delivery of equipment
1.154.000 590 030
I
, 1999
Pump station KOSTR , Water supply, 2000
-25-B
Reconstruction of hydraulic valves of press
, 2002
i
I i

General overhaul of rotary excavator SH-630


P.K. ikulje, Lukavac
72
73
Reconstruction of steam generation facilities in Oil rafinery, 2003
Reconstruction of oil supply plant facilities in Oil rafinery, 2003
Reconstruction of the equipment for combustion, measurement
and regulation in the furnace for normalisation of propane-butane
bottles, 200
Refrigeration factory - filling machine for PUR-foam, 2004
,
- refrigeration factory, Biha
Investor: BIMAL d.d. Br , B&H
Value: 83.182,00 BAM (approx. 42.530,00 )
- Delivery of equipment
- Installation
- Engineering
- Commissioning
Investor: BIMAL d.d. Br , B&H
Value: 21.000,00 BAM (approx. 10.737,00 )
- Delivery of equipment
- Installation
- Engineering
- Commissioning
Investor: Slavonski brod, Croatia
Value: 26.800,00
- Delivery of equipment
- Engineering
- Welded vessels
- Commissioning
Investor: BH STEEL - Steel factory ZENICA Zenica, B&H
- Delivery of equipment
- Installation
- Commissioning
Investor: BIRA , B&H
- Delivery of equipment for filling machine
- Installation
- Commissioning
ko, Brko
ko, Brko
4
Measuring control station for natural gas 3.000 m3/h
for the electro-steel works, 2004
URO AKOVI
Furnace for heating of model plates, 15kW
Investor: CIMOS TMD CASTING, Zenica
74
75
R of sheet , 200
0 , 200
, 200
Press 10/2,5 MN and s, 2005
econstruction furnace for thermal treatment of s 4
Heating furnace 10 kg/h 4
Heating furnace BH STEEL, 2004
Maintenance of electro-resistant in annealing furnace 4
respective manipulator
VOEST-ALPINE Linz, Austria
I
FORESTER, Sarajevo
- Designing
Installation
UNIS-PRETIS NIS, Vogo
roject regulation and keeping the
IGMAN, Konjic B
delivery of heaters
UNIS-PRETIS NIS, Vogo
Design
Investor:
Value: 190.000,00
- Delivery of equipment
- nstallation
- Commissioning
- Parameters detection
Investor: , B&H
Value:25.500,00 BAM (approx. 13.038,00 )
- Delivery of equipment
- Engineering
-
- Parameters detection
Investor: , B&H
- Delivery of burner equipment
- Installation
- P of furnace
- Commissioning
- Parameters detection
Investor: , &H
Value: 15.500,00 BAM (approx. 7.925,00 )
- Construction and
(made from KANTHAL A-1)
- Installation of the heaters
Investor: , B&H
Reconstruction of hydraulic valves of press
- ing
- Delivery of equipment
- Engineering
- Installation
- Commissioning
- Parameters detection
,
a-Sarajevo
a-Sarajevo
Remount of rotary furnace, IGMAN Konjic
76
77
Heating furnace 1000kg/h, 2005
0 , 200
A
- 5
Laboratory furnace 20l/8kW, 2005
F , 200
Heating furnace 10 kg/h 4
utomatically controlled tubular reactor for testing
combustion characteristics of bio mass and coal, 200
urnace for melting non-ferrous metals 30,6l/6,3kW 6
UNIS-PRETIS NIS, Vogo
Design
FORESTER, Sarajevo
- Designing
Installation
aculty of Mechanical Engineering,
,
Investor: , B&H
- ing
- Delivery of equipment
- Engineering
- Installation
- Commissioning
- Parameters detection
Investor: , B&H
Value:25.500,00 BAM (approx. 13.038,00 )
- Delivery of equipment
- Engineering
-
- Parameters detection
Investor: F , B&H
Value: 35.000,00 BAM (approx. 17.895,00 )
- Designing
- Delivery of equipment
- Engineering
- Installation
- Commissioning
- Parameters detection
Investor: TMD Grada , B&H
Value: 4.000,00 BAM (approx. 2.045,00 )
- Engineering
- Installation
- Commissioning
Investor: UNIVERZAL PROGRES, Visoko, B&H
- Engineering
- Construction
- Commissioning
a-Sarajevo
Sarajevo
ac
Furnace for thermal treatment VPP
Investor: NT FORGING, Novi Travnik
78
79
F , 200
, 200
Press Ivo Lola Ribar, 2007
Emcotest machine for measuring hardness 2007
Pellet dryer Machine, 2007
urnace for melting non-ferrous metals 180l/14kW 6
Chamber for baking varnish 6
Furnace for control of temperature sensors, 2006
,
11.000,00 5.625,00
S-PRETIS NIS ogo a-Sarajevo
- Engineering
Zenica
.000,00 . ,00
- Engineering
.000,00 . ,00
- Engineering
Investor: UNIVERZAL PROGRES, Visoko, B&H
Value: BAM (approx. )
- Engineering
- Installation
- Commissioning
Investor: UNI , V , B&H
Value: 35.000,00 BAM (approx.17.895,00 )
- Installation
- Commissioning
Investor: MITTAL STEEL , B&H
- Installation
- Engineering
- Commissioning
Investor: PRETIS NIS, Vogoa-Sarajevo, B&H
Value: 75 BAM (approx. 38 347 )
- Installation
- Commissioning
Investor: PRETIS NIS, Vogoa-Sarajevo, B&H
Value: 130 BAM (approx. 66 468 )
- Installation
- Commissioning
Investor: FIS, Vitez, B&H
Value: 111.000,00 BAM (approx. 56.753,00 )
- Engineering
- Installation
- Commissioning
Re-circulation system of technological water
in Cement Plant Kakanj
80
81
Friction press, 2008
Furnace for thermal treatment VPP, 2008
Furnace for testing fire-resistant material, 2008
Drying furnace, 2008
Steel Plant - Station for tundish heating 1,44 MW, 2008
Coke Oven Battery Plant-Biological waste water treatment, 2008
,
,
,
- engineering
.000,00 ,00
,00
- Engineering
Investor: PIROMETAL Brko, B&H
Value: 400.000,00 BAM (approx. 204.517,00 )
- Engineering
- Installation
- Commissioning
Investor: NT FORGING Novi Travnik, B&H
Value: 296.000,00 BAM (approx. 151.342,00 )
- Engineering
- Installation
- Commissioning
Investor: PROTUPOARNI INSTITUT Sarajevo, B&H
Value: 606.000,00 BAM (approx. 309.843,00 )
- Engineering
- Installation
- Commissioning
Investor: UNIS-PRETIS NIS Vogoa-Sarajevo, B&H
Value: 100.000,00 KM (approx. 51.129,00 )
- Installation
- Commissioning
Investor: ARCELORMITTAL, Zenica, B&H
Value: 50 BAM (approx. 25.565 )
- Engineering
- Installation
- Commissioning
Investor: ARCELORMITTAL, Zenica, B&H
Value: approx. 750.000
- Installation
- Commissioning
,
Hydraulic power unit of platform for converter
lining in ArcelorMittal Zenica
82
83
ARCELORMITTAL, Zenica, B&H
Value: approx. 70.636
Investor: CIMOS, Zenica, B&H
Value: 754 BAM (approx. 385.514, )
- Delivery of equipment
- Installation
- Commissioning
,00
- Dismantling of existing equipment
- Delivery
- Installation and supervision
- Trial work and parameterisation
- Commissioning
.000,00 00
- Engineering
Mechanical works in CIMOS - II phase, 2009
Furnaces for testing the resistance of materials, 2008
Induction melter furnaces, 2008
Mobile stations for a heating of caldrons, 2008/2009
. 0,00
Investor:
Investor: NT FORGING Novi Travnik, B&H
Value: 397.000,00 BAM (approx. 202.983,00 )
- Engineering
- Delivery of equipment
- Installation
- Commissioning
Investor: Metalska industrija Varadin-MIV, Varadin, Croatia
Value: 59.840,00
- Engineering
- Installation
- Commissioning
Investor: Metalska industrija Varadin-MIV, Varadin, Croatia
Value: 29 35
- Engineering
- Installation
- Commissioning
,
Equipment for preserving of temperature of liquid metal in
mixer in Steel Mill Department ArcelorMittal Zenica, 2009
Dedusting of iron mixer on Steel Plant
Department in ArcelorMittal Zenica
84
85
Re-circulation system of technological water, 2009
Machine for wire twisting CIGARA, 2009
,
- Engineering and attest technical documentation
- Procurement and delivery of equipment
- Installation
- Trial work
- Parameter detection
Investor: Cement Plant Kakanj, B&H
Value: 78.300,00 BAM (approx. 40.034,00 )
- Engineering
- Delivery of equipment
- Installation
- Commissioning
Investor: KAPIS TKT Tomislavgrad, B&H
Value: 55.000,00 BAM (approx. 28.121,00 )
- Designing
- Engineering
- Delivery of equipment
- Installation
- Commissioning
Investor: ArcelorMittal, Zenica, B&H
Value: 46.323,00
- Designing
- Delivery of equipment
- Installation
- Supervision
- Commissioning
Investor: ArcelorMittal, Skopje, FYR Macedonia
Value: 109.667,00
- Designing
- Delivery of equipment
- Installation
- Supervision
- Commissioning
- Parameters detection
Investor: IVEX, Usora, B&H
Value: 71.000,00 BAM (approx. 36.300,00 )
,
Air post on the location LF and CCM in Steel Plant
Department, 2010
Burners and burners' armatures for air heating of the chamber
for sheet plastification, 2010
Upgrading of truck with mobile equipment,
Station for testing of gas, 2010
Administrative office and workshop
86
87
JP "ELEKTROPRIVREDA BiH" Sarajevo,
Power
Construction of the system for emergency oil evacuation
Turbo unit of blocks 5. and 6. TE KAKANJ KAKANJ
General overhaul of rotary excavator SH-630, no. 1352
P.K. ikulje - Lukavac, 2010/2011
Reconstruction of heating furnace LOI-SAAR,
capacity 1.300 kg/h, 2011
Expansion of compressor station in BOF Steel Mill, 2011
Reconstruction of furnace for thermal treatment, 2011
, 2010
-Procurement and delivery of equipment
-Installation and Supervision
- Commissioning
JP ELEKTROPRIVREDA BIH D.D. Sarajevo,
ZD Rudnici Kreka d.o.. Tuzla
Value: 4.450.000,00 BAM (approx. 2.275.249,00 )
- Dismantling of existing equipment
- Procurement and delivery of equipment
- Installation and Supervision
- Parameters detection and Commissioning
- Dismantling of existing equipment
- Procurement and delivery of equipment
- Installation and Supervision
- Commissioning
- Mechanical engineering
- Procurement and delivery of equipment
- Installation and Supervision
- Parameters detection and Commissioning
- Revision of project documentation
Investor: UNIS-TOK, Kalesija, B&H
Value: 338.800 BAM (approx. 173.226,00 )
- Engineering, control and running furnace
- Procurement and delivery of equipment
- Installation and Supervision
- Trial work
- Parameters detection and Commissioning
Investor:
Plant Kakanj, B&H
Value: 94.716,00 BAM (approx. 48.427,00 )
Investor:
Investor: NT FORGING, Novi Travnik, B&H
Value: 82.720,00 BAM (approx. 42.294,00 )
Investor: ArcelorMittal, Zenica, B&H
Value: 150.360,00 BAM (approx. 76.877,00 )
,
Copyright by termomatik
LOCATION OF COMPANY
Ltd Zenica
42, Juraja Neidharta Street
72000 Zenica, B&H
phone: +387 32 44 88 10
fax: +387 32 32 44 88 27
web site: www.termomatik.com
e-mail: info@termomatik.com