to maintain the matching of the of the column end faces and to achieve vertically well within the tolerance limit C!"UM# $%$CT&!#
'erticality is single most important factor
and is given top priority
The ma(imum column verticality is )*mm.
!nce the column erection is over up to the
full height cross beams are placed securely over the column which supports the main boiler C!"UM# $%$CT&!#
&n order to carry out this +ob special
erection tool like cranes with e(tra long boom to carry heavy loads at that height are used.
,fter cross beam erection- entire structure
is ade.uately braced to achieve sufficient strength. C!"UM# $%$CT&!#
%!ESS&!E %'!#
3( 'd)antage and *ea+ness o, "onstruction -ethod Descri.tion /#y.e ,dvantage Weakness Moduli/ation 0 Concurrence Moduli/ation 0 Concurrence Construction Methods Construction Methods Many years of e(perience and 1now2ow To utili/e standard data 03ata base %eduction design M02 Curtailment of 404 materials %eduction manufacturing0installation cost "ong time for completion $arlier completion through Moduli/ation 0Concurrence Construction
Competitive time for completion &ncreasing $.uipment 0 Construction "abor Cost "ong duration for 404 design and Complicated design &ncreasing Module temporary material and 404 materials 5about 6*7 8 2igh risk of safety accident due to lots of works at the high elevation "ay down ,rea need for preass9y at site Typical Construction Method Typical Construction Method
2( "o0.arison o, "onstruction -ethods #y.ical "onstruction -ethod #y.ical "onstruction -ethod -oduli1ation / "oncurrence -oduli1ation / "oncurrence "onstruction -ethods "onstruction -ethods :oiler installation after completion of 404 installation Concurrent construction of 404 and :oiler Unit "ifting and installation 4ite assembly of :oiler e.uipment ;round assembly < =*7- ,ssembly after installation < >*7 Using ordinary construction lifting device 4eparate installation of 404 ?Tier @ 6 Tier with :ottomUp method Core Arame- 4ubsidiary 404 and :oiler installation at the same time "ifting after Moduli/tion on the ground- $rection Using special "ifting device < 2ydraulic +ack to be able to lift Module B)-6**TonsC Planning and scheduling for concurrent construction se.uence Planning 404 Moduli/ation on the ground 4ite assembly of :oiler e.uipment ;round assembly < )*7- ,ssembly after installation < D*7
660MW x 2 Units 660MW x 2 Units Moduli/ation 0 ConcurrenceConstruction Methods Typical Construction Method Boiler weight Boiler weight Main Proper 5,643tons Main Proper 5,643tons 15.5 Momth 15.5 Momth Dration Dration !"#" at site$%iring& !"#" at site$%iring& "#" ',1'1tons "#" ',1'1tons (6m x 41m x 41m (6m x 41m x 41m ) x W x D ) x W x D 560MW x 2 Units 560MW x 2 Units Boiler weight Boiler weight Main Proper 5,103tons Main Proper 5,103tons 1''0.0(.16$1''2.0*.14 1''0.0(.16$1''2.0*.14 !25 M& !25 M& Dration Dration !"#" at site$%iring& !"#" at site$%iring& "#" 5,200tons "#" 5,200tons (6m x 3(m x 42m (6m x 3(m x 42m ) x W x D ) x W x D Compare to Main Erection Process