Vous êtes sur la page 1sur 3

Report for CS RAB Failure due to DL Power Congestion

and Improved by canging DLAL!"S#I$C% "FF


Parameter
Detail Analysis&
In 'eteor R(C on 'osaic pro)ect CS RAB get bad of * Site+ So to
improve DLAL!"#SI$C% "FF parameter canged and due to cange,,
CS RAB get "-.
/.* Failures Reason Analysis
Analyse te counter related to CS RABs and it is found tat many call are failing on
counter & ,, Number of Failed CS RAB Establishments for Cell (DL Power
Congestion) (none) !n " #arti$ular Cell %% Balliguille &ill'"
$is counter means tat tere is DL power congestion in te downlin0.
Pre -PI attaced attaced for refernece of Balligullie %ill 1*
Cluster Name Start time Call
Setu#
Su$$ess
Rate(CS)
Number of
Failed CS RAB
Establishments
for Cell (DL
Power
Congestion)
(none)
BallyguileHill_MMC_F1_1 11/28/2012 18:00 98.02% 44
BallyguileHill_MMC_F2_1 11/28/2012 19:00 97.17% 3
BallyguileHill_MMC_F1_1 11/28/2012 19:00 96.37% 17
BallyguileHill_MMC_F2_1 11/28/2012 20:00 97.00% 2
BallyguileHill_MMC_F1_1 11/28/2012 20:00 96.87% 14
BallyguileHill_MMC_F2_1 11/28/2012 21:00 96.99% 3
BallyguileHill_MMC_F1_1 11/28/2012 21:00 96.37% 13
BallyguileHill_MMC_F1_1 11/28/2012 22:00 98.00% 1
BallyguileHill_MMC_F1_1 11/28/2012 23:00 99.48% 2
/.2 Action $a0en to Improve&
(o )m#ro*e DL Power $ongestion%% " #arameter related to CAC Algorithm is
$hanged+
,a-e DL CAC Algorithm Swit$h %%%% !FF %%%from%%% Algorithm First state
DESCR)P()!N !F PARA,E(ER+
*. In "FF condition & DL CAC algoritm is disable.
2. In Algoritm First condition& $e load factor prediction is "(.
If Algoritm first applied tan after reacing load factor+ new calls are re)ected. #ile if
we disable it tan it can ta0e new call. #e ma0e it "FF most of te time at te time of
more load on site+ wile Algoritm First is used wen we ave more sites nearby and
reacing certain load3tresold+ it can transfer calls to near by B$S
/.4 *.4 .P) Anal/sed & -PI analysed after cange and Improvement found &
-PI A$$AC%5D for refernece&
Cluster Name Start time Call Setu#
Su$$ess
Rate(CS)
Number of Failed
CS RAB
Establishments
for Cell (DL
Power
Congestion)
(none)
BallyguileHill_MMC_F1
_1
11/30/2012
18:00
99.42% 0
BallyguileHill_MMC_F1
_2
11/30/2012
18:00
100.00% 0
BallyguileHill_MMC_F1
_1
11/30/2012
19:00
99.65% 0
BallyguileHill_MMC_F1
_2
11/30/2012
19:00
100.00% 0
BallyguileHill_MMC_F1
_1
11/30/2012
20:00
99.75% 0
BallyguileHill_MMC_F1
_2
11/30/2012
20:00
100.00% 0
BallyguileHill_MMC_F1
_1
11/30/2012
21:00
99.04% 0
BallyguileHill_MMC_F1
_2
11/30/2012
21:00
100.00% 0
BallyguileHill_MMC_F1
_1
11/30/2012
22:00
99.60% 0
BallyguileHill_MMC_F1
_2
11/30/2012
22:00
100.00% 0
BallyguileHill_MMC_F1
_1
11/30/2012
23:00
99.58% 0
BallyguileHill_MMC_F1
_2
11/30/2012
23:00
100.00% 0
"01 DL Power $ongestion #roblem get resol*ed after $hanging this #arameter

Vous aimerez peut-être aussi