New Double Garage

for

Mr Joe Bloggs
Happy Customer Lane
Boston
Lincolnshire


at:


Happy Customer Lane
Boston
Lincolnshire

ST Portess & Son, Shorts Corner, Boston, Lincolnshire, PE22 7EA. Tel: 01205 750358, Fax: 01205 750358,
VAT No: 310927971

Page 2





Mr Joe Bloggs
Happy Customer Lane
Boston
Lincolnshire


Site address:
Happy Customer Lane
Boston
Lincolnshire


Wednesday, 15 July 2009

Dear Mr Joe Bloggs,

Subject: Garage

Thank you for your valued enquiry and instructions to quote for the above project.

We are pleased to attach the following estimate as requested. Should you have any
questions regarding this estimate, please do not hesitate to contact us.

Considerations:

This estimate is based on the specification described herein. Any changes to drawings
or specification would be treated as a variation and may be subject to an agreed price
adjustment.

This estimate is valid for a period of 28 days from date of issue.

We trust that we have interpreted your requirements correctly as every effort has been
made to accurately estimate your project.

We look forward to hearing from you.

Yours sincerely





ST Portess & Son
ST Portess & Son, Shorts Corner, Boston, Lincolnshire, PE22 7EA. Tel: 01205 750358 or 07990887380, Fax:
01205 750358, E-mail: info@stportess.co.uk, VAT No: 310927971

Page 3
Commencement

Preparation of site and commencement of all building works.



Plant

Garage
Site Strip (Reduce dig)

Removal of spoil from site 20 Tonne Tipper & Driver inc. Land Fill Tax 0.34 20
Tonne
Dumper to assist with site clearance 3 Tonne Dumper 1 Week

Total Cost Excluding VAT 263.93


Foundations

Excavate for foundations using mechanical plant (if required) and
cast foundations. Please note that the Building Control Officer will
inspect the foundation prior to concreting and may require changes
to the foundation depth and construction. Variations for additional
excavation, trench support and concrete etc. will incur additional
costs.



Material

Garage
Brick and Block Cavity Wall (Brick and block
walls)

Structural concrete R'mix Concrete GEN 1 50 - 70mm slump 6m3 (Allowance 80) 0.81 m

Brick and Block Cavity Wall (Brick and block
wall, rear)

Structural concrete R'mix Concrete GEN 1 50 - 70mm slump 6m3 (Allowance 80) 0.81 m

Brick and Block Cavity Wall (brick and block
wall, side)

Structural concrete R'mix Concrete GEN 1 50 - 70mm slump 6m3 (Allowance 80) 1.6 m


Labour


Garage
Brick and Block Cavity Wall (Brick and block
walls)

Additional tasks to include Excavate trench,
Remove spoil from site, Prepare bottom of trench,
Lay structural concrete, Place cavity fill
Groundworker 3 Hours

Brick and Block Cavity Wall (Brick and block
wall, rear)

Additional tasks to include Excavate trench,
Remove spoil from site, Prepare bottom of trench,
Lay structural concrete, Place cavity fill
Groundworker 3 Hours

Brick and Block Cavity Wall (brick and block
wall, side)

Excavate trench Groundworker 2 Hours
Prepare bottom of trench Groundworker 2 Hours
Place cavity fill Groundworker 1 Hours
Additional tasks to include Remove spoil from site,
Lay structural concrete
Groundworker 2 Hours
ST Portess & Son, Shorts Corner, Boston, Lincolnshire, PE22 7EA. Tel: 01205 750358 or 07990887380, Fax:
01205 750358, E-mail: info@stportess.co.uk, VAT No: 310927971

Page 4


Plant


Garage
Brick and Block Cavity Wall (Brick and block
walls)

Plant to remove excavated spoil from site 20 Tonne Tipper & Driver inc. Land Fill Tax 0.34 20
Tonne

Brick and Block Cavity Wall (Brick and block
wall, rear)

Plant to remove excavated spoil from site 20 Tonne Tipper & Driver inc. Land Fill Tax 0.34 20
Tonne

Brick and Block Cavity Wall (brick and block
wall, side)

Plant for excavation of trench JCB 3CX Excavator & Driver (8hr. day) 0.39 Day
Plant to remove excavated spoil from site 20 Tonne Tipper & Driver inc. Land Fill Tax 0.68 20
Tonne

Total Cost Excluding VAT 913.99


Footings

Construct brick and block footings off prepared foundations.



Material

Garage
Brick and Block Cavity Wall (Brick and block
walls)

Cavity Fill R'mix Concrete GEN 1, 125mm slump 2-3 m3 (Allowance 85) 0.07 m
Trench Blocks Trench Block 440 x 215 x 275mm 1.4 m
Blockwork to Inner leaf below dpc Solid Dense Concrete Block 7N 440 x 215 x 100mm 2.7 m
Blockwork to outer leaf below dpc Solid Dense Concrete Block 7N 440 x 215 x 100mm 1.4 m
Bricks below splash course Facing Bricks - Provisional (Allowance 0.40 each) 27 Each
Bricks for use in splash course Engineering Brick - Class A Blue 65mm 54 Each
Sand below dpc in brickwork Building Sand Bulk Bag 0.06 Each
Sand below dpc in blockwork Building Sand Bulk Bag 0.06 Each
Sand below dpc in trench blocks Building Sand Bulk Bag 0.04 Each
Cement below dpc in brickwork Blue Circle Mastercrete Original Cement 25kg Bag 0.66 Each
Cement below dpc in blockwork Blue Circle Mastercrete Original Cement 25kg Bag 0.63 Each
Cement below dpc in trench blocks Blue Circle Mastercrete Original Cement 25kg Bag 0.42 Each

Brick and Block Cavity Wall (Brick and block
wall, rear)

Cavity Fill R'mix Concrete GEN 1, 125mm slump 2-3 m3 (Allowance 85) 0.07 m
Trench Blocks Trench Block 440 x 215 x 275mm 1.4 m
Blockwork to Inner leaf below dpc Solid Dense Concrete Block 7N 440 x 215 x 100mm 2.7 m
Blockwork to outer leaf below dpc Solid Dense Concrete Block 7N 440 x 215 x 100mm 1.4 m
Bricks below splash course Facing Bricks - Provisional (Allowance 0.40 each) 27 Each
Bricks for use in splash course Engineering Brick - Class A Blue 65mm 54 Each
Sand below dpc in brickwork Building Sand Bulk Bag 0.06 Each
Sand below dpc in blockwork Building Sand Bulk Bag 0.06 Each
Sand below dpc in trench blocks Building Sand Bulk Bag 0.04 Each
Cement below dpc in brickwork Blue Circle Mastercrete Original Cement 25kg Bag 0.66 Each
Cement below dpc in blockwork Blue Circle Mastercrete Original Cement 25kg Bag 0.63 Each
Cement below dpc in trench blocks Blue Circle Mastercrete Original Cement 25kg Bag 0.42 Each

Brick and Block Cavity Wall (brick and block
wall, side)

Cavity Fill R'mix Concrete GEN 1, 125mm slump 2-3 m3 (Allowance 85) 0.14 m
Trench Blocks Trench Block 440 x 215 x 275mm 2.7 m
Blockwork to Inner leaf below dpc Solid Dense Concrete Block 7N 440 x 215 x 100mm 5.4 m
Blockwork to outer leaf below dpc Solid Dense Concrete Block 7N 440 x 215 x 100mm 2.7 m
Bricks below splash course Facing Bricks - Provisional (Allowance 0.40 each) 54 Each
Bricks for use in splash course Engineering Brick - Class A Blue 65mm 108 Each
Sand below dpc in brickwork Building Sand Bulk Bag 0.11 Each
Sand below dpc in blockwork Building Sand Bulk Bag 0.11 Each
ST Portess & Son, Shorts Corner, Boston, Lincolnshire, PE22 7EA. Tel: 01205 750358 or 07990887380, Fax:
01205 750358, E-mail: info@stportess.co.uk, VAT No: 310927971

Page 5
Sand below dpc in trench blocks Building Sand Bulk Bag 0.07 Each
Cement below dpc in brickwork Blue Circle Mastercrete Original Cement 25kg Bag 1.3 Each
Cement below dpc in blockwork Blue Circle Mastercrete Original Cement 25kg Bag 1.3 Each
Cement below dpc in trench blocks Blue Circle Mastercrete Original Cement 25kg Bag 0.84 Each


Labour


Garage
Brick and Block Cavity Wall (Brick and block
walls)

Backfill trench Groundworker 2 Hours
Lay Trench Blocks 2 Bricklayers and Mate 1 Hours
Lay blockwork to inner leaf below dpc 2 Bricklayers and Mate 1 Hours
Lay blockwork to outer leaf below dpc 2 Bricklayers and Mate 1 Hours
Lay bricks for use in splash course 2 Bricklayers and Mate 1 Hours
Additional tasks to include Lay bricks below splash
course
2 Bricklayers and Mate 1 Hours

Brick and Block Cavity Wall (Brick and block
wall, rear)

Backfill trench Groundworker 2 Hours
Lay Trench Blocks 2 Bricklayers and Mate 1 Hours
Lay blockwork to inner leaf below dpc 2 Bricklayers and Mate 1 Hours
Lay blockwork to outer leaf below dpc 2 Bricklayers and Mate 1 Hours
Lay bricks for use in splash course 2 Bricklayers and Mate 1 Hours
Additional tasks to include Lay bricks below splash
course
2 Bricklayers and Mate 1 Hours

Brick and Block Cavity Wall (brick and block
wall, side)

Backfill trench Groundworker 3 Hours
Lay Trench Blocks 2 Bricklayers and Mate 1 Hours
Lay blockwork to inner leaf below dpc 2 Bricklayers and Mate 2 Hours
Lay blockwork to outer leaf below dpc 2 Bricklayers and Mate 1 Hours
Lay bricks below splash course 2 Bricklayers and Mate 1 Hours
Lay bricks for use in splash course 2 Bricklayers and Mate 1 Hours

Total Cost Excluding VAT 1,246.43


Oversite and slabbing

Lay and compact subbase on reduced levels and form concrete
slab.



Material

Garage
Garage Slab (Floor slab)

Sub-base to concrete slab Sub Base MOT Type 1 Bulk Bag 10 Each
Sand blinding to slab Building Sand Bulk Bag 1.7 Each
Concrete in slab R'mix Concrete RC 30, 50mm slump 6m3 (Allowance 75) 3.8 m
DPM to concrete slab Polythene DPM Blue 300mu 4 x 25m PIFA (27.6kg) 0.42 Each


Labour


Garage
Garage Slab (Floor slab)
Place and compact sub-base to slab Groundworker and Labourer 3 Hours
Lay sand blinding Groundworker and Labourer 2 Hours
Lay DPM to slab Groundworker and Labourer 1 Hours
Place and compact concrete slab Groundworker and Labourer 3 Hours
Float finish to concrete slab Groundworker and Labourer 3 Hours


Plant


Garage
Garage Slab (Floor slab)
ST Portess & Son, Shorts Corner, Boston, Lincolnshire, PE22 7EA. Tel: 01205 750358 or 07990887380, Fax:
01205 750358, E-mail: info@stportess.co.uk, VAT No: 310927971

Page 6
Excavator for preparation of slab JCB 3CX Excavator & Driver (8hr. day) 0.5 Day
Plant delivery and collection Delivery (10 to 15 Miles) 4 Each

Total Cost Excluding VAT 1,488.83


Erect Scaffold

Erect scaffolding on site to provide access for our contractors. No
allowance has been made to adapt the scaffolding for clients or
their own contractors' requirements.



Subcontract Work

Garage
Scaffolding (Scaffold)

Scaffold budget Scaffolding contractor 525 Unit


Subcontract Work


Garage
Scaffolding (Scaffold)
Allowance for sundry costs Sundry Costs 50 Each

Total Cost Excluding VAT 632.50


Brickwork Shell

Construct facing brick in sand/cement mortar, leaving all joints with
recessed finish. All openings around windows, doors etc. to be
provided with vertical damp proof courses where required. Internal
leaf to be formed in blockwork.



Material

Garage
Double Garage Door (Vertical Slat Garage Door)

Garage Door Frame Softwood Garage Door Frame 4270 x 1981mm 1 Each
External/Combination lintel Steel Lintel 100mm Cavity 4800mm (Garage) 1 Each

Garage Pedestrian Door
Door frame External Softwood Door Frame 838 x 1981 Open in 1 Each
External/Combination lintel Steel Lintel 50 Cavity x 1200mm 1 Each

Brick and Block Cavity Wall (Brick and block
walls)

Bricks above dpc less openings Facing Bricks - Provisional (Allowance 0.40 each) 353 Each
Blocks above dpc less openings Insulation Block Standard 440 x 215 x 100mm 5.9 m
Brick ties Brickwork Tie DD140 Type 4 225mm 26 Each
DPC to brickwork Pitch Polymer DPC 100mm x 20m 0.3 Each
DPC to blockwork Pitch Polymer DPC 100mm x 20m 0.3 Each
Sand above dpc in brickwork Building Sand Bulk Bag 0.26 Each
Sand above dpc in blockwork Building Sand Bulk Bag 0.08 Each
Cement above dpc in brickwork Blue Circle Mastercrete Original Cement 25kg Bag 1.5 Each
Cement above dpc in blockwork Blue Circle Mastercrete Original Cement 25kg Bag 0.49 Each

Brick and Block Cavity Wall (Brick and block
wall, rear)

Bricks above dpc less openings Facing Bricks - Provisional (Allowance 0.40 each) 773 Each
ST Portess & Son, Shorts Corner, Boston, Lincolnshire, PE22 7EA. Tel: 01205 750358 or 07990887380, Fax:
01205 750358, E-mail: info@stportess.co.uk, VAT No: 310927971

Page 7
Blocks above dpc less openings Insulation Block Standard 440 x 215 x 100mm 13 m
Brick ties Brickwork Tie DD140 Type 4 225mm 47 Each
DPC to brickwork Pitch Polymer DPC 100mm x 20m 0.3 Each
DPC to blockwork Pitch Polymer DPC 100mm x 20m 0.3 Each
Sand above dpc in brickwork Building Sand Bulk Bag 0.58 Each
Sand above dpc in blockwork Building Sand Bulk Bag 0.19 Each
Cement above dpc in brickwork Blue Circle Mastercrete Original Cement 25kg Bag 3.3 Each
Cement above dpc in blockwork Blue Circle Mastercrete Original Cement 25kg Bag 1.1 Each

Brick and Block Cavity Wall (brick and block
wall, side)

Bricks above dpc less openings Facing Bricks - Provisional (Allowance 0.40 each) 1800 Each
Blocks above dpc less openings Insulation Block Standard 440 x 215 x 100mm 30 m
Brick ties Brickwork Tie DD140 Type 4 225mm 106 Each
DPC to brickwork Pitch Polymer DPC 100mm x 20m 0.6 Each
DPC to blockwork Pitch Polymer DPC 100mm x 20m 0.6 Each
Sand above dpc in brickwork Building Sand Bulk Bag 1.4 Each
Sand above dpc in blockwork Building Sand Bulk Bag 0.43 Each
Cement above dpc in brickwork Blue Circle Mastercrete Original Cement 25kg Bag 7.7 Each
Cement above dpc in blockwork Blue Circle Mastercrete Original Cement 25kg Bag 2.5 Each


Labour


Garage
Double Garage Door (Vertical Slat Garage Door)
Form opening Bricklayer 2 Hours
Fix external lintel 2 Bricklayers and Mate 1 Hours
Make door frame Joiner 2 Hours
Additional tasks to include Fix preformed cavity
tray
Bricklayer 1 Hours

Garage Pedestrian Door
Form opening Bricklayer 1 Hours
Additional tasks to include Fix external lintel Bricklayer 1 Hours

Brick and Block Cavity Wall (Brick and block
walls)

Lay bricks above dpc less openings 2 Bricklayers and Mate 3 Hours
Lay blocks above dpc less openings 2 Bricklayers and Mate 2 Hours

Brick and Block Cavity Wall (Brick and block
wall, rear)

Lay bricks above dpc less openings 2 Bricklayers and Mate 7 Hours
Lay blocks above dpc less openings 2 Bricklayers and Mate 4 Hours

Brick and Block Cavity Wall (brick and block
wall, side)

Lay bricks above dpc less openings 2 Bricklayers and Mate 15 Hours
Lay blocks above dpc less openings 2 Bricklayers and Mate 8 Hours

Total Cost Excluding VAT 5,274.43


ST Portess & Son, Shorts Corner, Boston, Lincolnshire, PE22 7EA. Tel: 01205 750358 or 07990887380, Fax:
01205 750358, E-mail: info@stportess.co.uk, VAT No: 310927971

Page 8

Roof Structure

Form roof structure including any fascias and bargeboards and
associated guttering as described.



Material

Garage
Apex Truss Roof (Roof)

Noggings between roof joists Sawn Softwood Kiln Dried Treated 47.0 x 50mm 33 Metre
Apex truss roof rafters To be defined 11 Unit
Truss Clips Truss Clip 50mm 22 Each
Apex roof gable Ladder Rafters Sawn Dry Graded Structural Softwood Treated 47.0 x 125mm 36 Metre
Gable ladder noggings Sawn Softwood Kiln Dried Treated 47.0 x 50mm 11 Metre
Soffit carriers Sawn Batten Treated 25.0 x 38mm 6 Metre
Wall plate Sawn Dry Graded Structural Softwood Treated 75.0 x 100mm 13 Metre
Diagonal bracing Sawn Dry Graded Structural Softwood Treated 25.0 x 100mm 20 Metre
Longitudinal bracing Sawn Dry Graded Structural Softwood Treated 25.0 x 100mm 22 Metre
Apex bracing Sawn Dry Graded Structural Softwood Treated 25.0 x 100mm 5.5 Metre
Roof structure fixings (allowance) Round Wire Nails Bright 100mm x 25kg 0.57 Box
Eaves fascia White 175mm Square Fascia x 16mm x 5.0M 2.6 Each
Bargeboard White 175mm Square Fascia x 16mm x 5.0M 3.6 Each
Bargeboard fixings White plastic top Nail 40mm - 10G 0.89 Each
Wallplate straps Lateral Restraint Strap 30 x 5 x 1200mm bent at 150mmm 6 Each
Gable straps at joist level Lateral Restraint Strap 30 x 5 x 1200mm bent at 150mmm 4 Each
Gable straps at verge level Lateral Restraint Strap 30 x 5 x 1600mm bent at 100mmm 8 Each
Gable soffits (side 1) White 400mm PVC Board x 9mm x 5.0M 0.85 Each
Gable soffits (side 2) White 400mm PVC Board x 9mm x 5.0M 0.85 Each
Eaves soffitts (side 1) White 400mm PVC Board x 9mm x 5.0M 0.64 Each
Eaves soffitts (side 2) White 400mm PVC Board x 9mm x 5.0M 0.64 Each
Soffit fixings White plastic top Nail 40mm - 10G 1.2 Each
Gutter Half Round Gutter 4m x 112mm 3.3 Each
Down pipe Half Round Downpipe 4m x 68mm 1.3 Each
Stop ends Half Round Gutter Stop End External 112mm 4 Each
Gutter unions Half Round Gutter Union Bracket 112mm 4 Each
Gutter clips Half Round Gutter Support Bracket 112mm 14 Each
Gutter outlet Half Round Gutter Running Outlet 112mm 2 Each
Down pipe unions Half Round Downpipe Connector 68mm 2 Each
Down pipe clips Half Round Downpipe Saddle Bracket 68mm 6 Each
Swan necks Half Round Downpipe Bend 67.5 deg 68mm 4 Each
Primer for bargeboard and fascia Undercoat White 5 Litre 0.15 Each
Primer for soffits Undercoat White 5 Litre 0.18 Each


Labour


Garage
Apex Truss Roof (Roof)
Fix noggings between roof joists Joiner 5 Hours
Fix apex roof truss rafters Joiner + Mate 5 Hours
Fix apex roof gable ladder rafters Joiner + Mate 3 Hours
Fix gable ladder noggings Joiner 2 Hours
Fix soffit carriers Joiner 1 Hours
Fix wall plate Joiner 2 Hours
Fix diagonal bracing Joiner + Mate 2 Hours
Fix longitudinal bracing Joiner + Mate 2 Hours
Fix eaves fascia Joiner + Mate 2 Hours
Fix bargeboard Joiner + Mate 2 Hours
Fix wallplate straps Joiner 1 Hours
Fix gable straps at joist level Joiner 1 Hours
Fix gable straps at verge level Joiner 2 Hours
Fix gutter Joiner 3 Hours
Fix down Pipe Joiner 1 Hours
Fix gable soffits (side1 ) Joiner 2 Hours
Fix gable soffits (side 2) Joiner 2 Hours
Fix eaves soffitts (side 1) Joiner 1 Hours
Fix eaves soffitts (side 2) Joiner 1 Hours
Prepare bargeboard and fascia for painting Joiner 2 Hours
Prime bargeboard and fascia Joiner 2 Hours
Prime soffits Joiner 2 Hours
Additional tasks to include Fix apex bracing Joiner + Mate 1 Hours

ST Portess & Son, Shorts Corner, Boston, Lincolnshire, PE22 7EA. Tel: 01205 750358 or 07990887380, Fax:
01205 750358, E-mail: info@stportess.co.uk, VAT No: 310927971

Page 9
Total Cost Excluding VAT 2,135.12


Roof Tiling

Lay roof covering.



Material

Garage
Apex Truss Roof (Roof)

Lathe Sawn Batten Treated 25.0 x 38mm 603 Metre
Lathe nails Round Wire Nails Galvanised 65mm x 25kg 0.42 Box
Roofing felt Breather Membrane 700 1.5 x 50 m 0.84 Each
Tiles Plain Clay Tile (60 per m2) (Allowance 0.70 each) 3412 Each
Tile Nails Round Wire Nails Galvanised 65mm x 25kg 0.09 Box
Ridge tile Half Round Clay Ridge (300mm) (Allowance 12 each) 22 Each
Eaves tiles Clay Eaves Tile (Allowance 0.90) 87 Each
Top tiles Clay Eaves Tile (Allowance 0.90) 87 Each
Verge tiles Clay Tile & Half (Allowance 1.40 each) 87 Each
Tile undercloak 1 Cement Soffit Strip 2400 x 150 x 4.5mm 3.6 Each
Tile undercloak 2 Cement Soffit Strip 2400 x 150 x 4.5mm 3.6 Each
Sand pointing/bedding to ridge Building Sand Bulk Bag 0.07 Each
Sand pointing/bedding to verge Building Sand Bulk Bag 0.17 Each
Cement in pointing/bedding to ridge Blue Circle Mastercrete Original Cement 25kg Bag 0.75 Each
Cement pointing/bedding to verge Blue Circle Mastercrete Original Cement 25kg Bag 2 Each


Labour


Garage
Apex Truss Roof (Roof)
Fix tiles, felt and lathe. 3 Roof tilers + mate 21 Hours
Fix top tiles Roof tiler 1 Hours
Fix verge tiles Roof tiler 1 Hours
Fix ridge tile Roof tiler + mate 1 Hours
Additional tasks to include Fix eaves tiles, Fix tile
undercloak 1, Fix tile undercloak 2
Roof tiler 2 Hours

Total Cost Excluding VAT 5,385.95


Joinery 1st Fix

Form carcassing and first fix timbers.



Material

Garage
Double Garage Door (Vertical Slat Garage Door)

Door frame fixings to sides Hammer in Fixing 8mm x 100mm (12 Bag) 0.5 Pack
Door frame fixings to top and bottom Wood Screws Steel CSK Twin Thread 10 x 3 inch (100 box) 0.14 Box

Garage Pedestrian Door
Door frame fixings to sides Hammer in Fixing 8mm x 100mm (12 Bag) 0.5 Pack


ST Portess & Son, Shorts Corner, Boston, Lincolnshire, PE22 7EA. Tel: 01205 750358 or 07990887380, Fax:
01205 750358, E-mail: info@stportess.co.uk, VAT No: 310927971

Page 10
Labour


Garage
Double Garage Door (Vertical Slat Garage Door)
Fix door frame Joiner 2 Hours

Garage Pedestrian Door
Additional tasks to include Fix door frame Joiner 1 Hours

Total Cost Excluding VAT 42.04


Internal Decoration

Apply decoration. (Note that a basic paint specification has been
used for the purposes of estimating the building works. However,
colours and finishes may be changed by agreement in writing.)



Material

Garage
Double Garage Door (Vertical Slat Garage Door)

Primer for door frame internally Undercoat White 5 Litre 0.04 Each
Undercoat for door frame internally Undercoat White 5 Litre 0.04 Each
Paint for door frame internally Gloss Brilliant White 5 Litre 0.04 Each

Garage Pedestrian Door
Primer for door frame internally Undercoat White 5 Litre 0.03 Each
Undercoat for door frame internally Undercoat White 5 Litre 0.03 Each
Paint for door frame internally Gloss Brilliant White 5 Litre 0.03 Each
Primer for door internally Undercoat White 5 Litre 0.05 Each
Undercoat for door internally Undercoat White 5 Litre 0.05 Each
Paint for door internally Gloss Brilliant White 5 Litre 0.05 Each


Labour


Garage
Double Garage Door (Vertical Slat Garage Door)
Additional tasks to include Prepare interior of door
frame for decoration, Apply primer to door frame
internally, Apply undercoat to door frame internally,
Apply paint to door frame internally
Decorator 3 Hours

Garage Pedestrian Door
Additional tasks to include Prepare interior of door
frame for decoration, Apply primer to door frame
internally, Apply undercoat to door frame internally,
Apply paint to door frame internally, Prepare int. of
door for primer or paint, Apply primer to interior of
door, Apply undercoat to interior of door, Apply
gloss to interior of door
Decorator 3 Hours

Total Cost Excluding VAT 89.50


External Decoration

Apply decoration. (Note that a basic paint specification has been
used for the purposes of estimating the building works. However,
colours and finishes may be changed by agreement in writing.)


ST Portess & Son, Shorts Corner, Boston, Lincolnshire, PE22 7EA. Tel: 01205 750358 or 07990887380, Fax:
01205 750358, E-mail: info@stportess.co.uk, VAT No: 310927971

Page 11

Material

Garage
Double Garage Door (Vertical Slat Garage Door)

Sealant Silicone Sealant White 0.31 Litre 0.39 Each
Primer for door frame externally Undercoat White 5 Litre 0.04 Each
Undercoat for door frame externally Undercoat White 5 Litre 0.04 Each
Paint for door frame externally Gloss Brilliant White 5 Litre 0.04 Each
Undercoat for door externally Undercoat White 5 Litre 0.27 Each
Paint for door externally Gloss Brilliant White 5 Litre 0.27 Each

Garage Pedestrian Door
Sealant Silicone Sealant White 0.31 Litre 0.18 Each
Primer for door frame externally Undercoat White 5 Litre 0.03 Each
Undercoat for door frame externally Undercoat White 5 Litre 0.03 Each
Paint for door frame externally Gloss Brilliant White 5 Litre 0.03 Each
Primer for door externally Undercoat White 5 Litre 0.05 Each
Undercoat for door externally Undercoat White 5 Litre 0.05 Each
Paint for door externally Gloss Brilliant White 5 Litre 0.05 Each
Primer for external cill Outdoor Varnish Clear Gloss 750ml 0.02 Each
Undercoat/varnish for external cill Outdoor Varnish Clear Gloss 750ml 0.02 Each
Paint/varnish for external cill Outdoor Varnish Clear Gloss 750ml 0.02 Each

Apex Truss Roof (Roof)
Undercoat for bargeboard and fascia Undercoat White 5 Litre 0.15 Each
Paint for bargeboard and fascia Gloss Brilliant White 5 Litre 0.15 Each
Undercoat for soffits Undercoat White 5 Litre 0.18 Each
Paint for soffits Gloss Brilliant White 5 Litre 0.18 Each


Labour


Garage
Double Garage Door (Vertical Slat Garage Door)
Prepare exterior of door for painting Decorator 2 Hours
Apply undercoat to exterior of door Decorator 2 Hours
Apply gloss to exterior of door Decorator 2 Hours
Additional tasks to include Apply sealant Joiner 1 Hours
Additional tasks to include Prepare exterior of door
frame for decoration, Apply primer to door frame
externally, Apply undercoat to door frame
externally, Apply paint to door frame externally
Decorator 3 Hours

Garage Pedestrian Door
Additional tasks to include Apply sealant Joiner 1 Hours
Additional tasks to include Prepare exterior of door
frame for decoration, Apply primer to door frame
externally, Apply undercoat to door frame
externally, Apply paint to door frame externally,
Prepare exterior of door for painting, Apply primer
to exterior of door, Apply undercoat to exterior of
door, Apply gloss to exterior of door, Prepare
external cill for decoration, Apply primer to
external cill, Apply undercoat/varnish to external
cill, Apply paint/varnish to external cill
Decorator 3 Hours

Apex Truss Roof (Roof)
Undercoat bargeboard and fascia Decorator 2 Hours
Paint bargeboard and fascia Decorator 2 Hours
Prepare soffits for painting Joiner 2 Hours
Undercoat soffits Decorator 2 Hours
Paint soffits Decorator 2 Hours

Total Cost Excluding VAT 362.82


Joinery 2nd Fix

Fix doors and windows, fixtures and fittings.


ST Portess & Son, Shorts Corner, Boston, Lincolnshire, PE22 7EA. Tel: 01205 750358 or 07990887380, Fax:
01205 750358, E-mail: info@stportess.co.uk, VAT No: 310927971

Page 12

Material

Garage
Double Garage Door (Vertical Slat Garage Door)

Garage Door Double Garage Door 4267 x 1981mm (Allowance 1350) 1 Each

Garage Pedestrian Door
Door KXT Back Door Softwood 3 Panel 6 Pane D&G 838 x 1981mm 1 Each
Door furniture Georgian Brass 5 Lever BS Exterior Door Pack 1 Each
Hinges Butt Hinge Brassed 102mm 1.5 Pair
Safety Glass Toughened Sealed Units for KXT Door 1 Each


Labour


Garage
Double Garage Door (Vertical Slat Garage Door)
Hang door Joiner 6 Hours

Garage Pedestrian Door
Hang door Joiner 3 Hours
Fix door furniture Joiner 2 Hours
Fix glazing Joiner 1 Hours

Total Cost Excluding VAT 2,241.67


Completion

Completion of all building works.



Labour

Garage
Garage Pedestrian Door

Return to ease door Joiner 1 Hours

Total Cost Excluding VAT 18.70




Total Cost Excluding VAT 20,095.92
Total VAT 3,014.39
Total Cost Including VAT 23,110.31
ST Portess & Son, Shorts Corner, Boston, Lincolnshire, PE22 7EA. Tel: 01205 750358 or 07990887380, Fax:
01205 750358, E-mail: info@stportess.co.uk, VAT No: 310927971

Page 13
Acceptance of Estimate/Variation

Reference: Garage (Estimate dated Wednesday, 15 July 2009)

Mr Joe Bloggs
Happy Customer Lane
Boston
Lincolnshire


Site address:
Happy Customer Lane
Boston
Lincolnshire


Please carry out the building works itemised in the Estimate defined above, dated
Wednesday, 15 July 2009 to the value of:


Total Cost Excluding VAT 20,095.92
Total VAT 3,014.39
Total Cost Including VAT 23,110.31


Signed Mr Joe Bloggs .
Date //20..

Signed on behalf of ST Portess & Son .
Date //20..

ST Portess & Son, Shorts Corner, Boston, Lincolnshire, PE22 7EA. Tel: 01205 750358 or 07990887380, Fax:
01205 750358, E-mail: info@stportess.co.uk, VAT No: 310927971

Page 14

Vous aimerez peut-être aussi