Date: 4-Mar-13

2 3 4 5 6 7 8 9 # # # # # # Sub-con Contractor YASREF


141 Train 1 1 INSPECTION OF SUPPORT FOUNDATION FOR MISC PIPE RACK 1,2, T SUPPORTS SATIP-M-001-01
SAIC-M-
2006
H H W ANTOLIN ORAYA
141 Train 1 2 INSPECTION OF HIGH STRENGH BOLT TIGHTENING STRUTURE H SATIP-M-001-01
SAIC-M-
2009
I I W ANTOLIN ORAYA
141 Train 1 3 INSPECTION OF ANCHOR BOLT TIGHTENING STR E&F,G SATIP-M-001-01
SAIC-M-
2009
I I W ANTOLIN ORAYA
141 Train 1 4 ALIGNMENT OF MISC. PIPE RACKS SATIP-M-001-01
SAIC-M-
2007
I I S ANTOLIN ORAYA
141 Train 1 5 INSPECTION OF HIGH STRENGH BOLT TIGHTENING MISC PIPE RACK SATIP-M-001-01
SAIC-M-
2009
I I W ANTOLIN ORAYA
141 Train 2 6
INSPECTION OF SUPPORT FOUNDATION FOR SULFUR COLLECTION DRUM,MISC PIPE RACK,
T SUPPORT
SATIP-M-001-01
SAIC-M-
2006
H H W ANTOLIN ORAYA
141 Train 2 7 ALIGNMENT OF STRUCTURE C,SUB PIPE RACK-2 MISC. PIPE RACKS,T SUPPORT SATIP-M-001-01
SAIC-M-
2007
I I S ANTOLIN ORAYA
141 Train 2 8 INSPECTION OF HIGH STRENGH BOLT TIGHTENING STRUTURE B,C SUB PIPE RACK-2 SATIP-M-001-01
SAIC-M-
2009
I I W ANTOLIN ORAYA
141 Train 3 9 INSPECTION OF SUPPORT FOUNDATION FOR MISC PIPE RACK 1,2, TSUPPORTS SATIP-M-001-01
SAIC-M-
2006
H H W ANTOLIN ORAYA
141 Train 3 10 ALIGNMENT OF MISC. PIPE RACKS, STR E&F SATIP-M-001-01
SAIC-M-
2007
I I S ANTOLIN ORAYA
141 Train 3 11 INSPECTION OF HIGH STRENGH BOLT TIGHTENING STRUTURE E&F SATIP-M-001-01
SAIC-M-
2009
I I W ANTOLIN ORAYA
140 12 ALIGNMENT OF STRUCTURE 140 MAIN PIPE RACK SATIP-M-001-01
SAIC-M-
2007
I I S ANTOLIN ORAYA
140 13 INSPECTION OF HIGH STRENGH BOLT TIGHTENING MAIN PIPE RACK SATIP-M-001-01
SAIC-M-
2009
I I W ANTOLIN ORAYA
142 14 ALIGNMENT OF STRUCTURE 140 MAIN PIPE RACK SATIP-M-001-01
SAIC-M-
2007
I I S ANTOLIN ORAYA
142 15 INSPECTION OF HIGH STRENGH BOLT TIGHTENING MAIN PIPE RACK SATIP-M-001-01
SAIC-M-
2009
I I W ANTOLIN ORAYA
CLEANING
140 Area
1 Internal Cleaning inspection of Piping spool SATIP L-350-01 SAIC-L-2017 H H S Karthikeyan
AG Piping 140
Area
2 Pipe pre installation inspectin SATIP L-350-01 SAIC-L-2012 H H S Karthikeyan
AG Piping 140
Area
3 Pipe laying, Pipe Spool Erection and assembly (double jointing on piperack/sleeperway) SATIP L-350-01 SAIC-L-2012 H H S Karthikeyan
CLEANING 141
Train 1
4 Internal Cleaning inspection of Piping spool SATIP L-350-01 SAIC-L-2017 H H S Karthikeyan
AG Piping 141
Train 1
5 Pipe pre installation inspectin SATIP L-350-01 SAIC-L-2012 H H W Karthikeyan
AG Piping 141
Train 1
6 Pipe laying, Pipe Spool Erection and assembly (double jointing on piperack/sleeperway) SATIP L-350-01 SAIC-L-2012 H H S Karthikeyan
CLEANING 141
Train 2
7 Internal Cleaning inspection of Piping spool SATIP L-350-01 SAIC-L-2017 H H S Karthikeyan
AG Piping 141
Train 2
8 Pipe pre installation inspectin SATIP L-350-01 SAIC-L-2012 H H S Karthikeyan
AG Piping 141
Train 2
9 Pipe laying, Pipe Spool Erection and assembly (double jointing on piperack/sleeperway) SATIP L-350-01 SAIC-L-2012 H H W Karthikeyan
CLEANING
148 Area
10 Internal Cleaning inspection of Piping spool SATIP L-350-01 SAIC-L-2017 H H S Karthikeyan
AG Piping 148
Area
11 Pipe pre installation inspectin SATIP L-350-01 SAIC-L-2012 H H S Karthikeyan
RCL Lay Down 12 Cutting & Asssembly Fitup SATIP-L-350-08 SAIC-L-2035 H H W Karthikeyan
UG Piping 140 13 Inspection of Vent Piping Installation SATIP -S-20-01 SAIC-S-2001 H H W Karthikeyan
UG Piping 140 14 Internal Cleaning inspection of Piping spool SATIP L-350-01 SAIC-L-2017 H H W Karthikeyan
UG Piping 140 15 Gravity Test of Sewer Piping SATIP -S-020-01 SATR-4001 H H H Karthikeyan
UG Piping 142 16 Inspection of Vent Piping Installation SATIP -S-20-01 SAIC-S-2001 H H W Karthikeyan
UG Piping 142 17 Internal Cleaning inspection of Piping spool SATIP L-350-01 SAIC-L-2017 H H W Karthikeyan
UG Piping 142 18 Gravity Test of Sewer Piping SATIP -S-020-01 SATR-4001 H H H Karthikeyan
RCL Lay Down 1 Prewelding Inspection SATIP-W-011-01 SAIC-W-2005 H H W VASUDEVA
RCL Lay Down 2 In Process Welding Inspection SATIP-W-011-01 SAIC-W-2006 H W S VASUDEVA
RCL Lay Down 3 Post Welding Inspection SATIP-W-011-01 SAIC-W-2007 H W W VASUDEVA
RCL Lay Down 4 In-Process Verification of Techniques & Procedure Implementation SATIP-NDE-RT-01 SAIC-RT-2006 H W W VASUDEVA
RCL Lay Down 5 Inspection of PWHT SATIP-W-011-01 SAIC-W-2004 H w W VASUDEVA
RCL Lay Down 6 AWS D1.1 Pre-Welding/In-process /Post Welding Final Inspection (pipe support) SATIP-M-001-01 SAIC-M-2012 H I W VASUDEVA
141 Train
1/2/3
7 Prewelding Inspection SATIP-W-011-01 SAIC-W-2005 H H S BALA JEE
141 Train
1/2/3
8 In Process Welding Inspection SATIP-W-011-01 SAIC-W-2006 H W W BALA JEE
141 Train
1/2/3
9 Post Welding Inspection SATIP-W-011-01 SAIC-W-2007 H W S BALA JEE
141 Train
1/2/3
10 In-Process Verification of Techniques & Procedure Implementation SATIP-NDE-RT-01 SAIC-RT-2006 H W W BALA JEE
141 Train
1/2/3
11 Inspection of PWHT SATIP-W-011-01 SAIC-W-2004 H w S BALA JEE
140 Area 12 Prewelding Inspection SATIP-W-011-01 SAIC-W-2005 H H S BALA JEE
140 Area 13 In Process Welding Inspection SATIP-W-011-01 SAIC-W-2006 H W W BALA JEE
140 Area 14 Post Welding Inspection SATIP-W-011-01 SAIC-W-2007 H W S BALA JEE
140 Area 15 In-Process Verification of Techniques & Procedure Implementation SATIP-NDE-RT-01 SAIC-RT-2006 H W W BALA JEE
140 Area 16 Inspection of PWHT SATIP-W-011-01 SAIC-W-2004 H w S BALA JEE
142 Area 17 Prewelding Inspection SATIP-W-011-01 SAIC-W-2005 H H S BALA JEE
142 Area 18 In Process Welding Inspection SATIP-W-011-01 SAIC-W-2006 H W W BALA JEE
142 Area 19 Post Welding Inspection SATIP-W-011-01 SAIC-W-2007 H W S BALA JEE
142 Area 20 In-Process Verification of Techniques & Procedure Implementation SATIP-NDE-RT-01 SAIC-RT-2006 H W W BALA JEE
142 Area 21 Inspection of PWHT SATIP-W-011-01 SAIC-W-2004 H w S BALA JEE
148 Area 22 Prewelding Inspection SATIP-W-011-01 SAIC-W-2005 H H S BALA JEE
148 Area 23 In Process Welding Inspection SATIP-W-011-01 SAIC-W-2006 H W W BALA JEE
148 Area 24 Post Welding Inspection SATIP-W-011-01 SAIC-W-2007 H W S BALA JEE
148 Area 25 In-Process Verification of Techniques & Procedure Implementation SATIP-NDE-RT-01 SAIC-RT-2006 H W W BALA JEE
148 Area 26 Inspection of PWHT SATIP-W-011-01 SAIC-W-2004 H w S BALA JEE
141-E-1010 27 AWS D1.1 Application ,Pre-Welding/In-process /Post Welding Final Inspection SATIP-M-001-01 SAIC-M-2012 H I W BALA JEE
141-E-1025 28 AWS D1.1 Application ,Pre-Welding/In-process /Post Welding Final Inspection SATIP-M-001-01 SAIC-M-2012 H I W BALA JEE
141-E-0020 29 AWS D1.1 Application ,Pre-Welding/In-process /Post Welding Final Inspection SATIP-M-001-01 SAIC-M-2012 H I W BALA JEE
141-E-0020 30 AWS D1.1 Application ,Pre-Welding/In-process /Post Welding Final Inspection SATIP-M-001-01 SAIC-M-2012 H I W BALA JEE
RCL Lay Down 1 Inspection of Surface Preparation & Prior to Application of liquid coating systems SATIP-H-100-01 SAIC-H-2027 H W S PHILIP
RCL Lay Down 2 In-Process Inspection of Primer Coat OR First Coat Application SATIP-H-100-01 SAIC-H-2028 H w S PHILIP
RCL Lay Down 3 Inspection of Primer Coat prior to top coating SATIP-H-100-01 SAIC-H-2029 H w S PHILIP
RCL Lay Down 4 In-Process Inspection of Intermediate and/or Top Coat Application SATIP-H-100-01 SAIC-H-2030 H s S PHILIP
RCL Lay Down 5 Inspection of Top coat Application SATIP-H-100-01 SAIC-H-2031 H w S PHILIP
141 A/B/C 6 Surface Preapiration inspection of repair of APCS-113A coating system SATIP-H-002-06 SAIC-H-2048 H H H PHILIP
142 A/B/C 7 DFT Testing of APCS-113A coating system SATIP-H-002-06 SAIC-H-2051 H H H PHILIP
143 A/B/C 8 Holiday Testing of APCS-113A coating system SATIP-H-002-06 SAIC-H-2016 H H H PHILIP
Painting
Welding
RCL- Piping
RCL- STRUCTURAL
DAELIM INDUSTRIAL Co. LTD
Yanbu Aramco Sinopec Refinery Project Co. (YASREF EPC-3)
Contact No : YOE-YERP-6600024370(IK)
Inspection Two (2) Weeks Look Ahead Schedule (2 March,2013 to 15 March,2013)
Discipline # Activity Description Week 1 Week 2 SATIP No. SAIC No. Inspection level Assigned QC
Date: 4-Mar-13
2 3 4 5 6 7 8 9 # # # # # # Sub-con Contractor YASREF
DAELIM INDUSTRIAL Co. LTD
Yanbu Aramco Sinopec Refinery Project Co. (YASREF EPC-3)
Contact No : YOE-YERP-6600024370(IK)
Inspection Two (2) Weeks Look Ahead Schedule (2 March,2013 to 15 March,2013)
Discipline # Activity Description Week 1 Week 2 SATIP No. SAIC No. Inspection level Assigned QC
140-E-004 A 1 Preinstallation Inspection SATIP-E-004-01 SAIC-D-2006 H W S RICAFORT
140-E-004 A 2 Equipment Alignment and Elevation Check SATIP-E-004-01 SAIC-D-2007 H w S RICAFORT
140-E-004 B 3 Preinstallation Inspection SATIP-G-005-01 SAIC-M-2006 H W S RICAFORT
140-E-004 B 4 Equipment Alignment and Elevation Check SATIP-E-004-01 SAIC-D-2007 H w S RICAFORT
140-E-004 C 5 Preinstallation Inspection SATIP-G-005-01 SAIC-M-2006 H W S RICAFORT
140-E-004 C 6 Equipment Alignment and Elevation Check SATIP-E-004-01 SAIC-D-2007 H w S RICAFORT
140-E-004 D 7 Preinstallation Inspection SATIP-G-005-01 SAIC-M-2006 H W S RICAFORT
140-E-004 D 8 Equipment Alignment and Elevation Check SATIP-E-004-01 SAIC-D-2007 H w S RICAFORT
140-E-004 E 9 Preinstallation Inspection SATIP-G-005-01 SAIC-M-2006 H W S RICAFORT
140-E-004 E 10 Equipment Alignment and Elevation Check SATIP-E-004-01 SAIC-D-2007 H w S RICAFORT
140-E-004 F 11 Preinstallation Inspection SATIP-E-004-01 SAIC-D-2006 H W S RICAFORT
140-E-004 F 12 Equipment Alignment and Elevation Check SATIP-E-004-01 SAIC-D-2007 H w S RICAFORT
140-E-004 G 13 Preinstallation Inspection SATIP-E-004-01 SAIC-D-2006 H W S RICAFORT
140-E-004 G 14 Equipment Alignment and Elevation Check SATIP-E-004-01 SAIC-D-2007 H w S RICAFORT
140-E-004 H 15 Preinstallation Inspection SATIP-G-005-01 SAIC-M-2006 H W S RICAFORT
140-E-004 H 16 Equipment Alignment and Elevation Check SATIP-E-004-01 SAIC-D-2007 H w S RICAFORT