Name of the Concessionaire Name of Independent Consultant Name of the EPC Contractor Name of the EPC Sub-Contractor Sample Ref. No. : Location : Mix : Bitumen Grade Plant Weight of Bowl W : Weight of Bowl + Sample WS : Weight of Sample (g) W1 = WS-W : Initial weight of Filter paper (g) W2 : Final weight of Filter paper (g) W3 : Increase in weight of Filter paper (g) W4= (W3-W2) : Weight of Aggregate after extraction (g) W5 : Weight of Bitumen (g) W6= (W1-W5-W4) : Percentage of Bitumen (%) =(W6/W1)*100 : Total weight of sample (g)= (W5+W4): Seive Size (mm) Weight Retained (g) % Retained % Cumulative retained % Passing JMF Specification Limits Remarks __________________ Technician : Four Laning of Indore - Khalghat section of NH-3 in MP on BOT : National Highways Authority of India : Oriental Pathways (Indore) Pvt. Ltd. : Sheladia Associate Inc.- Feedback JV : Oriental Structural Engineers Pvt. Ltd. : LEIGHTON - OSE JV _______________ Material Engineer _________________ Laboratory Manager Date of Sampling Date of Testing Laying Chainage BINDER CONTENT : : : : : Leighton - OSE JV Indore - Khalghat Highway Sample Ref. No. : Location : Mix : Bitumen Grade Plant Weight of Bowl W : Weight of Bowl + Sample WS : Weight of Sample (g) W1 = WS-W : Initial weight of Filter paper (g) W2 : Final weight of Filter paper (g) W3 : Increase in weight of Filter paper (g) W4= (W3-W2) : Weight of Aggregate after extraction (g) W5 : Weight of Bitumen (g) W6= (W1-W5-W4) : Percentage of Bitumen (%) =(W6/W1)*100 : Total weight of sample (g)= (W5+W4): Seive Size (mm) Weight Retained (g) % Retained % Cumulative retained % Passing JMF Specification Limits Remarks __________________ Technician BINDER CONTENT _______________ Material Engineer _________________ Laboratory Manager Date of Sampling Date of Testing Laying Chainage : : : : : Kamala Kunj, Durga Nagar Corner, Hukuma Kheri, A.B. Road, Near Rajendra Nagar Police Station, Indore - 452009 Leighton - OSE JV Indore - Khalghat Highway Kamala Kunj, Durga Nagar Corner, Hukuma Kheri, A.B. Road, Near Rajendra Nagar Police Station, Indore - 452009 Leighton - OSE JV Indore - Khalghat Highway Ref. no. : Date of Testing : Source of Materials : Area of Tray (m 2 ) : Sample Type : Sample Location : Sl.No. Initial Wt. (A) in Kg Final Wt. (B) in Kg Wt. of Bitumen (C=B-A) in Kg Rate of Spray (D= (C/Area of Tray) in Kg/10m 2 Average __________________ Contractor's Representative RATE OF SPRAY (PRIME COAT) _______________ _________________ PMC IC Name of the Project Name of the Employer Name of the Name of Independent Name of the EPC Name of the EPC Sub- Contractor Ref. no. : Date of Testing : Source of Materials : Area of Tray (m 2 ) : Sample Type : Sample Location : Sl.No. Initial Wt. (A) in Kg Final Wt. (B) in Kg Wt. of Bitumen (C=B-A) in Kg Rate of Spray (D= (C/Area of Tray) in Kg/10m 2 Average __________________ Technician _______________ _________________ Material Engineer Laboratory Manager : National Highways Authority of India : Oriental Pathways (Indore) Pvt. Ltd. : Sheladia Associate Inc.- Feedback JV : Oriental Structural Engineers Pvt. Ltd. : LEIGHTON - OSE JV RATE OF SPRAY (PRIME COAT) : Four Laning of Indore - Khalghat section of NH-3 in MP on BOT Name of the Project Name of the Employer Name of the Name of Independent Name of the EPC Name of the EPC Sub- Contractor Ref. no. : Date of Testing : Source of Materials : Area of Tray (m 2 ) : Sample Type : Sample Location : Sl.No. Initial Wt. (A) in Kg Final Wt. (B) in Kg Wt. of Bitumen (C=B-A) in Kg Rate of Spray (D= (C/Area of Tray) x 10) in Kg/m 2 Average __________________ Technician _______________ _________________ Material Engineer Laboratory Manager : National Highways Authority of India : Oriental Pathways (Indore) Pvt. Ltd. : Sheladia Associate Inc.- Feedback JV : Oriental Structural Engineers Pvt. Ltd. : LEIGHTON - OSE JV RATE OF SPRAY (Tack COAT) : Four Laning of Indore - Khalghat section of NH-3 in MP on BOT Lieghton - OSE JV Indore - Khalghat Highway Ref. No. : Date of Testing : Sample Type : Area of Tray (m 2 ) : Sample Location : Chainage Initial Wt. (A) in Kg Final Wt. (B) in Kg Wt. of Rate of Spray (C=B-A) in Kg Rate of Spray (D= (C/Area of Tray) in Kg/m 2 Average Contractor's Representative RATE OF SPRAY ( .. ) PMC IC Sample Ref. No. Sampling Date : Location Testing Date : Source of Material Material For Seive Size (mm) Weight Retained (g) % Retained % Cumulative retained % Passing JMF Specification Limits Name of the Project Name of the Employer : Four Laning of Indore - Khalghat section of NH-3 in MP on BOT : National Highways Authority of India Name of the EPC Contractor Name of the EPC Sub-Contractor : Oriental Structural Engineers Pvt. Ltd. : LEIGHTON - OSE JV Name of the Concessionaire Name of Independent Consultant : Oriental Pathways (Indore) Pvt. Ltd. : Sheladia Associate Inc.- Feedback JV _____________________ Laboratory Manager __________________ Technician ___________________ Material Engineer : : : : : : JMF Limit Spec. Limit Technician Material Engineer Laboratory Manager Fraction Sieve Size (mm) % Used Sieve Size (mm) Material For Sample Ref. No. Date of Sampling Description of Sample Date of Testing Source of Material BLENDING OF INDIVIDUAL AGGREGATES FOR ASPHALTIC LAYERS Name of Independent Consultant : Sheladia Associate Inc.- Feedback JV Name of the EPC Contractor : Oriental Structural Engineers Pvt. Ltd. Name of the EPC Sub-Contractor : LEIGHTON - OSE JV Name of the Project : Four Laning of Indore - Khalghat section of NH-3 in MP on BOT Name of the Employer : National Highways Authority of India Name of the Concessionaire : Oriental Pathways (Indore) Pvt. Ltd. : Oriental Structural Sample Ref. No. : Date Sampled : Location : Date Tested : Description of Sample : Laid Chainage : Sp.Gr. of Asp. Cem. (Gsa) : Penetration Grade : 1 2 3 1 Sample Height, mm - - - 2 Wt. of Sample in Air, g 3 Wt.of SSD Sample in Air, g 4 Wt. of Sample in Water, g 5 Bulk Volume, cc 6 Bulk Density(Gmb), g/cc 7 Asp. Cem, by Wt. of Mix, % 8 Bulk Sp.G. Aggregate(Gsb) 9 Effective Sp.G. Aggregate(Gse) 10 Max Sp.G. Aggregate(Gmm) 100/((Pa/Gse)+(Pb/sp of Bitu.) 11 Vol. of Voids(VIM), % 100 - (100*Gmb)/Gmm 12 Voids in Mineral Aggr.(VMA), % 100 - (Ps*Gmb)/Gsb 13 Voids Filled w/ Asp.(VFB), % 100(VMA-VIM)/VMA 14 Stability ( Measured), kg 15 Correl. Ratio, 16 Stability (Adjusted), kg 17 Loss of Stability, % 18 Flow, mm 19 Rigidity Ratio 20 Swell, % Name of Independent Consultant Name of the EPC Contractor Name of the Project Name of the Employer SAMPLE SET I Average Specifications Name of the EPC Sub-Contractor : Four Laning of Indore - Khalghat section of NH-3 in MP on BOT : National Highways Authority of India : Oriental Pathways (Indore) Pvt. Ltd. : Sheladia Associate Inc.- Feedback JV : LEIGHTON - OSE JV Name of the Concessionaire _________________ Technician Laboratory Manager _______________ Material Engineer __________________ HOT - MIX DATA BY THE MARSHALL METHOD Asphalt Institute MS - 2, ASTM D 1559 SI.No
Leighton - OSE JV Indore - Khalghat Highway Sample Ref. No. : Date Sampled : Location : Date Tested : Description of Sample : Laid Chainage : Sp.Gr. of Asp. Cem. (Gsa) : Penetration Grade : 1 2 3 1 Sample Height, mm - - - 2 Wt. of Sample in Air, g 3 Wt.of SSD Sample in Air, g 4 Wt. of Sample in Water, g 5 Bulk Volume, cc 6 Bulk Density(Gmb), g/cc 7 Asp. Cem, by Wt. of Mix, % 8 Bulk Sp.G. Aggregate(Gsb) 9 Effective Sp.G. Aggregate(Gse) 10 Max Sp.G. Aggregate(Gmm) 100/((Pa/Gse)+(Pb/sp of Bitu.) 11 Vol. of Voids(VIM), % 100 - (100*Gmb)/Gmm 12 Voids in Mineral Aggr.(VMA), % 100 - (Ps*Gmb)/Gsb 13 Voids Filled w/ Asp.(VFB), % 100(VMA-VIM)/VMA 14 Stability ( Measured), kg 15 Correl. Ratio, 16 Stability (Adjusted), kg 17 Loss of Stability, % 18 Flow, mm 19 Rigidity Ratio 20 Swell, % Technician Laboratory Manager _______________ Material Engineer __________________ _________________ HOT - MIX DATA BY THE MARSHALL METHOD Asphalt Institute MS - 2, ASTM D 1559 SI.No SAMPLE SET I Average Specifications
Kamala Kunj, Durga Nagar Corner, Hukuma Kheri, A.B. Road, Near Rajendra Nagar Police Station, Indore - 452009 : : : : : : : : Sl. No. Chainage Offset from PCL (m) Height (mm) Weight in air (g) Weight in water (g) SSD wt. (g) Vol. (cc) Field Density % Compaction Sampling Date Testing Date COMPACTION TEST BY CORE CUTTING METHOD Sample Ref. no. _________________ For IC _______________ For PMC Laid Date Location Layer _________________ For Contractor Lab. Density Required Compaction Leighton - OSE JV Indore - Khalghat Highway Sample Ref. No. Date of Sampling : Location Date of Testing : Source Bitumen Grade Rate of heating : Time ( Min. ) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Observation : Ball No.1 Ball No.2 Temprature at which sample touches bottom plate Remark's Contractor's Representative PMC IC Temperature in centegrade Test Property Sample No. 1 Mean Value SOFTENING POINT TEST ( IS : 1205-1978 ) : : : : Leighton - OSE JV Indore - Khalghat Highway Sample Ref. No. Date of Sampling Location Date of Testing Source Bitumen Grade Pouring Temp. Period of cooling in air Room Temp. Period of cooling in water bath Actual test Temp. Readings Penetrometer dial reading Test 1 Test 2 Test 3 Test 4 Test 5 Mean Value (i) Initial (ii) Final Penetration value ( mm ) Remark's Contractor's Representative PMC IC PENETRATION TEST ( IS : 1203-1978 ) Sample No. : : : : : : : : : Leighton - OSE JV Indore - Khalghat Highway Sample Ref. No. Date of Sampling : Location Date of Testing : Source Bitumen Grade a = Mass of the specific gravity bottle, b = Mass of the specific gravity bottle filled with distilled water. c = Mass of the specific gravity bottle about half filled with the material. d = Mass of the specific gravity bottle about half filled with the material and the rest with distilled water, e = Mass of the specific gravity bottle completely filled with the material. c-a (b-a) - (d-c) e-a (b-a) Remark's Contractor's Representative PMC IC Specific Gravity Test for Bitumen ( IS : 1202-1978 ) (A) Specific gravity ( solids and semisolids ) = (B) Specific gravity ( Liquids ) = : : : : Leighton - OSE JV Indore - Khalghat Highway Sample Ref. No. Date of Sampling : Location Date of Testing : Source Bitumen Grade Pouring Temp. Period of cooling in air Room Temp. Period of cooling in water bath Actual test Temp. Readings Penetrometer dial reading Test 1 Test 2 Test 3 Mean Value (i) Initial (ii) Final Penetration value ( mm ) Remark's PENETRATION TEST ( IS : 1203-1978 ) Sample No. : : : : : : : : : Leighton - OSE JV Indore - Khalghat Highway Sample Ref. No. Date of Sampling : Location Date of Testing : Source Bitumen Grade Rate of heating : Time ( Min. ) 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Observation : Ball No.1 Ball No.2 Temprature at which sample touches bottom plate Remark's Test Property Sample No. 1 Mean Value SOFTENING POINT TEST ( IS : 1205-1978 ) Temperature in centegrade : : : : Leighton - OSE JV Indore - Khalghat Highway Ref No. Date of Sampling Location Date of Testing Material Description Sampled By Source of Material Sr. No. Sample - 1 Sample - 2 Average 1 2 3 4 5 6 GRADATION AFTER EXTRACTION Total Weight of mix after extraction,in gm Seive Size (mm) Weight Retained (gm) % Retained % Cumulative retained % Passing PMC IC Description Weight of mix before extraction,in gm Weight of filtter paper before extraction,in gm Weight of mix after extraction,in gm Bitumen content by weight of mix ( % ) Specification Limits Weight of filtter paper after extraction,in gm Difference in gm ( filtter Paper ) Contractor's Representative BITUMEN EXTRACTION TEST AND SIEVE ANALYSIS ( ASTM - D - 2172 ) : : : : : : : Leighton - OSE JV Indore - Khalghat Highway Ref. No. Proving Ring Constant ( Kg ) Location Specific Gravity of Bitumen ( Gb ) No. of Blows Bulk Specific Gravity of Aggregate ( Gsb ) Type of Mix Effective Specific Gravity of Aggregate ( Gse ) Test No. Bitumen Content by wt. of Mix Wt. in Air ( gm ) Wt. in Water ( gm ) SSD Wt. Water Bulk Volume ( cc ) Bulk Density ( gm/cc ) Max. Theo. Sp. Gr. ( Gmm ) Air Voids ( Va ) % Voids in Min. Agg. ( VMA ) Voids filled with Bitumen ( VFB ) % Flow ( mm ) Pb W1 W2 W3 V Gmb= W1/V 100/((100- Pb)/Gse)+ (Pb/Gb) 100(Gmm- Gmb)/Gm m 100-Gmb (100- Pb)/Gsb 100 (VMA- Va)/VMA Reading Load (Kg) Correction Factor Correction Load (kn) MARSHALL STABILITY MARSHAL TEST FOR D.B.M / B.C. ( Detailed Mix Design ) ( ASTMD - 1559 ) Total Average ; Average ; Average ; Average ; Average ; Average ; : : : : : : : : Contractor's Rep. PMC IC Leighton - OSE JV Indore - Khalghat Highway Ref. No. Proving Ring Constant ( Kg ) Location Specific Gravity of Bitumen ( Gb ) No. of Blows Bulk Specific Gravity of Aggregate ( Gsb ) Type of Mix Effective Specific Gravity of Aggregate ( Gse ) Test No. Bitumen Content by wt. of Mix Wt. in Air ( gm ) Wt. in Water ( gm ) SSD Wt. Water Bulk Volume ( cc ) Bulk Density ( gm/cc ) Max. Theo. Sp. Gr. ( Gmm ) Air Voids ( Va ) % Voids in Min. Agg. ( VMA ) Voids filled with Bitumen ( VFB ) % Flow ( mm ) Marshall Quotient Pb W1 W2 W3 V Gmb= W1/V 100/((100- Pb)/Gse)+ (Pb/Gb) 100(Gmm- Gmb)/Gm m 100-Gmb (100- Pb)/Gsb 100 (VMA- Va)/VMA Reading Load (Kg) Correction Factor Correction Load (kn) MARSHALL STABILITY MARSHAL TEST FOR D.B.M / B.C. ( Detailed Mix Design ) Total Average ; Average ; Average ; Average ; Average ; Average ; : : : : : : : : Leighton - OSE JV Indore - Khalghat Highway MAKE : CAPACITY : DATE OF CALIBRATION : Load Applied in Kg Loading Reading Unloading Reading Variation in ( % ) Remarks CALIBRATION OF HOT MIX PLANT : : : : Leighton - OSE JV Indore - Khalghat Highway MAKE : CAPACITY : DATE OF CALIBRATION : Load Applied in Kg Loading Reading Unloading Reading Variation in ( % ) Remarks CALIBRATION OF HOT MIX PLANT : : : : Leighton - OSE JV Indore - Khalghat Highway MAKE : CAPACITY : DATE OF CALIBRATION : Load Applied in Kg Loading Reading Unloading Reading Variation in ( % ) Remarks CALIBRATION OF HOT MIX PLANT : : : :
(Doi 10.1002/9781119013228.Ch1) Kassapoglou, Christos - Modeling the Effect of Damage in Composite Structures (Simplified Approaches) Damage in Composite Structures- Notch Sensiti