The document is a material take-off for pipeline laying works for the construction of a 50MLD transmission and distribution pipeline in Zamboanga City West Cost Area. It lists the quantities, units, unit costs and total costs of various pipe sizes and specifications needed for the project, including 700mm, 600mm and 350mm diameter pipes made of spirally welded steel, ductile iron or cement mortar lined steel. The take-off was prepared by Edito M. Bautista Jr. of the Planning & Development Section and submitted to the Engineering Department.
The document is a material take-off for pipeline laying works for the construction of a 50MLD transmission and distribution pipeline in Zamboanga City West Cost Area. It lists the quantities, units, unit costs and total costs of various pipe sizes and specifications needed for the project, including 700mm, 600mm and 350mm diameter pipes made of spirally welded steel, ductile iron or cement mortar lined steel. The take-off was prepared by Edito M. Bautista Jr. of the Planning & Development Section and submitted to the Engineering Department.
The document is a material take-off for pipeline laying works for the construction of a 50MLD transmission and distribution pipeline in Zamboanga City West Cost Area. It lists the quantities, units, unit costs and total costs of various pipe sizes and specifications needed for the project, including 700mm, 600mm and 350mm diameter pipes made of spirally welded steel, ductile iron or cement mortar lined steel. The take-off was prepared by Edito M. Bautista Jr. of the Planning & Development Section and submitted to the Engineering Department.
a. 3,173.00 pcs. 61,271.00 b. 463.00 pcs. 53,089.00 c. 179.00 pcs. 26323 Prepared By: Submitted By: Noted By: EDITO M. BAUTISTA, JR. OIC, Planning & Development Section Republic of the Philippines ZAMBOANGA CITY WATER DISTRICT Pilar Street, Zamboanga City MATERIAL TAKE OFF FOR PIPELAYING WORKS 700mm x 6.00m Epoxy Lined & Coal Tar Enamel Coated Spirally Welded Steel Pipe, Bell & Spigot Name & Specification EFREN C. SALVACION OIC, Engineering Department MARLI P. ACOSTA- DE FIESTA OIC, Planning & Design Division CONSTRUCTION OF 50MLD TRANSMISSION AND DISTRIBUTION PIPELINE / ZAMBOANGA CITY WEST COST AREA 600mm x 6.00m Epoxy Lined & Coal Tar Enamel Coated Spirally Welded Steel Pipe, Bell & Spigot 350mm x 6.00m Epoxy Lined & Coal Tar Enamel Coated Spirally Welded Steel Pipe, Bell & Spigot Total Cost 194,412,883.00 24,580,207.00 4,711,817.00 Republic of the Philippines ZAMBOANGA CITY WATER DISTRICT Pilar Street, Zamboanga City MATERIAL TAKE OFF FOR PIPELAYING WORKS EFREN C. SALVACION OIC, Engineering Department CONSTRUCTION OF 50MLD TRANSMISSION AND DISTRIBUTION PIPELINE / ZAMBOANGA CITY WEST COST AREA PROJECT / LOCATION: Quantity Unit Unit Cost a. 3,173.00 pcs. 61,271.00 b. 463.00 pcs. 53,089.00 c. 179.00 pcs. 26323 Prepared By: Submitted By: Noted By: EDITO M. BAUTISTA, JR. OIC, Planning & Development Section Name & Specification Republic of the Philippines ZAMBOANGA CITY WATER DISTRICT Pilar Street, Zamboanga City CONSTRUCTION OF 50MLD TRANSMISSION AND DISTRIBUTION PIPELINE / ZAMBOANGA CITY WEST COST AREA MATERIAL TAKE OFF FOR PIPELAYING WORKS OIC, Planning & Design Division OIC, Engineering Department 700mm x 6.00m D.I. Pipe, Flexible Push-on Jointswith Rubber Gasket, ISO 2531 Standards, Class K9 600mm x 6.00m D.I. Pipe, Flexible Push-on Jointswith Rubber Gasket, ISO 2531 Standards, Class K9 350mm x 6.00m D.I. Pipe, Flexible Push-on Jointswith Rubber Gasket, ISO 2531 Standards, Class K9 MARLI P. ACOSTA- DE FIESTA EFREN C. SALVACION Total Cost 194,412,883.00 24,580,207.00 4,711,817.00 Republic of the Philippines ZAMBOANGA CITY WATER DISTRICT Pilar Street, Zamboanga City CONSTRUCTION OF 50MLD TRANSMISSION AND DISTRIBUTION PIPELINE / ZAMBOANGA CITY WEST COST AREA MATERIAL TAKE OFF FOR PIPELAYING WORKS OIC, Engineering Department EFREN C. SALVACION PROJECT / LOCATION: Quantity Unit Unit Cost a. 2,380.00 pcs. 61,271.00 b. 347.00 pcs. 53,089.00 c. 179.00 pcs. 26323 Prepared By: Submitted By: Noted By: EDITO M. BAUTISTA, JR. OIC, Planning & Development Section OIC, Planning & Design Division OIC, Engineering Department 700mm x 8.00m Spirally Welded Steel Pipe, in accordance w/ AWWA C200, Slip On Ends, Internal & External Cement Mortar in accordance w/ AWWA C205 600mm x 8.00m Spirally Welded Steel Pipe, in accordance w/ AWWA C200, Slip On Ends, Internal & External Cement Mortar in accordance w/ AWWA C205 350mm x 8.00m Spirally Welded Steel Pipe, in accordance w/ AWWA C200, Slip On Ends, Internal & External Cement Mortar in accordance w/ AWWA C205 MARLI P. ACOSTA- DE FIESTA EFREN C. SALVACION Name & Specification Republic of the Philippines ZAMBOANGA CITY WATER DISTRICT Pilar Street, Zamboanga City CONSTRUCTION OF 50MLD TRANSMISSION AND DISTRIBUTION PIPELINE / ZAMBOANGA CITY WEST COST AREA MATERIAL TAKE OFF FOR PIPELAYING WORKS Total Cost 145,824,980.00 18,421,883.00 4,711,817.00 OIC, Engineering Department EFREN C. SALVACION Republic of the Philippines ZAMBOANGA CITY WATER DISTRICT Pilar Street, Zamboanga City CONSTRUCTION OF 50MLD TRANSMISSION AND DISTRIBUTION PIPELINE / ZAMBOANGA CITY WEST COST AREA MATERIAL TAKE OFF FOR PIPELAYING WORKS