Vous êtes sur la page 1sur 18

balonas projectos

balonas & menano


jose de barros aguiar - selected works HEALTHCARE PROJECTS
2000 -2014
REFERENCE
PROJECTS
S. Joo General Hospital - Psychiatric Department - Portugal
S. Joo General Hospital - Cardiothoracic Surgery Unit - Portugal
S. Joo General Hospital - Infectious-Contagious Unit - Portugal
S. Joo General Hospital - Pulmonology & Bronchology Unit - Portugal
S. Joo General Hospital - Hemodialysis Unit - Portugal
S. Joo General Hospital - Autopsies Unit - Portugal
S. Joo General Hospital - Emergency Room - Portugal
Cuf Hospital - Intensive Care Unit - Portugal
Braga University Hospital - Portugal
Todos-Os-Santos University Hospital - Portugal
Hussein Dey Maternity Hospital - Algeria
National Cardiology Institut - Algeria
Baba Hassan Pediatric Hospital - Algeria
S. Joo General Hospital - Hemodialysis unit and labs - Portugal
Espirito Santo Hospital - Portugal
Luanda University Hospital - Angola
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
Client

Contractor
Gross Building Area


Investment

Porto, Portugal
Refurbishment & Extension
Completed Work
The projects main objective was the modernization
of the second most important Portuguese hospital,
built in the 40s of the twentieth century and never
before subject of an integrated and coherent global
intervention.
The collection of refurbishment works done
corresponds to a general gross area of 14,900 m2 and
an overall cost of US$ 73M and has beneted the below
listed departments:
Psychiatric department
Cardiothoracic Surgery Unit (9000m2)
Infectious-Contagious Unit
Pulmonology & Bronchology Unit
Hemodialysis Unit
Fertility Unit
Gynecology Unit
Genito-urinary medicine Unit
Nephrology Unit
Neurology Unit (3000m2)
Intensive Care Unit
Burns Unit (2400m2)

Hospital S. Joo / Ministry of Health - Portugal
Several

S. JOO HOSPITAL
PSYCHIATRIC DEP.
01
Client

Contractor
Gross Building Area


Investment

Porto, Portugal
Refurbishment & Extension
Completed Work
S. JOO HOSPITAL
CARDIOTHORACIC
SURGERY UNIT
02
The projects main objective was the modernization
of the second most important Portuguese hospital,
built in the 40s of the twentieth century and never
before subject of an integrated and coherent global
intervention.
The collection of refurbishment works done
corresponds to a general gross area of 14,900 m2 and
an overall cost of US$ 73M and has beneted the below
listed departments:
Psychiatric department
Cardiothoracic Surgery Unit (9000m2)
Infectious-Contagious Unit
Pulmonology & Bronchology Unit
Hemodialysis Unit
Fertility Unit
Gynecology Unit
Genito-urinary medicine Unit
Nephrology Unit
Neurology Unit (3000m2)
Intensive Care Unit
Burns Unit (2400m2)

Hospital S. Joo / Ministry of Health - Portugal
Several

Client

Contractor
Gross Building Area


Investment

Porto, Portugal
Refurbishment
Completed Work
S. JOO HOSPITAL
INFECTIOUS-
CONTAGIOUS UNIT
03
The projects main objective was the modernization
of the second most important Portuguese hospital,
built in the 40s of the twentieth century and never
before subject of an integrated and coherent global
intervention.
The collection of refurbishment works done
corresponds to a general gross area of 14,900 m2 and
an overall cost of US$ 73M and has beneted the below
listed departments:
Psychiatric department
Cardiothoracic Surgery Unit (9000m2)
Infectious-Contagious Unit
Pulmonology & Bronchology Unit
Hemodialysis Unit
Fertility Unit
Gynecology Unit
Genito-urinary medicine Unit
Nephrology Unit
Neurology Unit (3000m2)
Intensive Care Unit
Burns Unit (2400m2)

Hospital S. Joo / Ministry of Health - Portugal
Several

Client

Contractor
Gross Building Area


Investment

Porto, Portugal
Refurbishment & Extension
Completed Work
S. JOO HOSPITAL
PULMONOLOGY
& BRONCHOLOGY
UNIT
04
The projects main objective was the modernization
of the second most important Portuguese hospital,
built in the 40s of the twentieth century and never
before subject of an integrated and coherent global
intervention.
The collection of refurbishment works done
corresponds to a general gross area of 14,900 m2 and
an overall cost of US$ 73M and has beneted the below
listed departments:
Psychiatric department
Cardiothoracic Surgery Unit (9000m2)
Infectious-Contagious Unit
Pulmonology & Bronchology Unit
Hemodialysis Unit
Fertility Unit
Gynecology Unit
Genito-urinary medicine Unit
Nephrology Unit
Neurology Unit (3000m2)
Intensive Care Unit
Burns Unit (2400m2)

Hospital S. Joo / Ministry of Health - Portugal
Several

Client

Contractor
Gross Building Area


Investment

Porto, Portugal
Refurbishment & Extension
Completed Work
S. JOO HOSPITAL
HEMODIALYSIS
UNIT
05
The projects main objective was the modernization
of the second most important Portuguese hospital,
built in the 40s of the twentieth century and never
before subject of an integrated and coherent global
intervention.
The collection of refurbishment works done
corresponds to a general gross area of 14,900 m2 and
an overall cost of US$ 73M and has beneted the below
listed departments:
Psychiatric department
Cardiothoracic Surgery Unit (9000m2)
Infectious-Contagious Unit
Pulmonology & Bronchology Unit
Hemodialysis Unit
Fertility Unit
Gynecology Unit
Genito-urinary medicine Unit
Nephrology Unit
Neurology Unit (3000m2)
Intensive Care Unit
Burns Unit (2400m2)

Hospital S. Joo / Ministry of Health - Portugal
Several

Client

Contractor
Gross Building Area


Investment

Porto, Portugal
Completed Work
S. JOO HOSPITAL
AUTOPSIES
UNIT
06
The Autopsy Unit is a standalone building, built
from scratch, constructed to supply shortages that
the hospital had at pathology medical and scientic
support, including high risk interventions.
This building allows a totally isolated service from
the outside conditions.
The brick walls on the outside combined with the
sobriety of the facades, ensures better integration into
the surrounding green area and limits the impact of the
new built volume within the hospital complex.

Hospital S. Joo / Ministry of Health - Portugal
Ladario

Client

Contractor
Gross Building Area


Investment

Porto, Portugal
Refurbishment
Completed Work
S. JOO HOSPITAL
EMERGENCY
ROOM
07
Increasing capacity and adjusting the Accident &
Emergency Department to work within the Manchester
protocol were the projects main assumptions.
All the existing emergency facilities had to be
demolished to make way for the new unit.
A new building was built, with an updated
architectural language and a layout suitable for the
present requirements.

Hospital S. Joo / Ministry of Health - Portugal
LADARIO

Client

Contractor
Gross Building Area


Investment

Lisbon, Portugal
Refurbishment
Completed Work
The refurbishment of the ICU (intensive care unit)
of Cuf Infante Santo Hospital in Lisbon, developed
for Jos de Mello Sade, included an increase of the
number of beds from 9 to 12 beds, of which two are in
isolated rooms (grade 4) and one in phisical isolation.
The refurbishment was condicionated by the existing
stucture, risers and a small height of the ceiling. The
objective was the total refurbishment of this unit, with
515m2, including all the infrastructures, inceasing the
confort of the pacient and the working conditions of the
staff.
This project was developed, from concept to
construction drawings, in 6 weeks and the construction
work took one month.

Hospital Cuf / Jos De Mello Sade
Ataguia

400 m2

1M
CUF HOSPITAL
INTENSIVE CARE
UNIT
08
Client

Contractor
Gross Building Area


Investment

Braga, Portugal
Completed Work
Built under the PPP program, the new Braga
Hospital has total capacity of 707 beds and a gross
building area of 138.372 m2. The University hospital
is organised in clusters, each one connected to its
technological area.
It is the biggest portuguese hospital built under the
PPP program, and it is fully funtional since June 2011.

Escala Braga / Jos De Mello Sade

Somague, Edifer, MSF

138.372 m2

180M
BRAGA
UNIVERSITY
HOSPITAL
09
Client

Contractor
Gross Building Area


Investment
Lisbon, Portugal
International competition promoted by the
Healthcare Ministry for the design and construction
of the new 789 bed Central Hospital in Lisbon, with
241,500m2 of building gross area.
Scheme design of a high-tech unit with innovative
healthcare systems and a vast medical and diagnostic
area.
The project includes a research and teaching unit
and features a modular structure, allowing future
expansion, and is based on a cluster concept,
grouping each medical specialty in different areas or
oors keeping them horizontally connected, easily
segregating the different circuits and building entrances
Inpatient wards - 594 beds
Psychiatric wards - 37 beds
Intensive a Intermediate Care - 158 beds
Operation theatres - 22 units
Outpatient assistance rooms - 168
Delivery rooms - 8
Day care hospital - 83

ARS LVT / Ministrio of Healtyh - Portugal /
International Competitive Bidding
Somague

241.500 m2

280M
TODOS-OS-SANTOS
UNIVERSITY
HOSPITAL
10
* Projecto elaborado em parceria com: PMC Arquitectos
Client

Contractor
Gross Building Area


Investment
Alger, Algeria
International Public Competition for an 150 beds
maternity
The building was designed as to incorporate the
following Guiding Lines: Minimization of Environmental
Impact; Coordination and Integration of Education
and Investigation Activities; Flexibility and Future
Adaptation; Circulation and ow differentiation; High
levels habitability and comfort
HUSSEIN DEY
MATERNITY
Direction de la Sant et de la Population de la
Wilaya dAlgers / International Competition
NA
16.900 m2
NA
11
Client

Contractor
Gross Building Area


Investment
Alger, Algeria
Scheme design of a new end-of the line unit, with
31.300m2, with the mission to provide specialized
research and treatments.
Located in Dely Brahim-Chraga in Algiers, the bid
is based on the implementation of systems that ensure
the compliance of the dened principles, namely the
principle of rigor, the principle of efciency and that of
wellness, while allowing a great exibility and future
adaptability.
The metric and modular system adopted has
made possible the proposal of an optimised and cost-
controlled construction that nevertheless reects
the leading edge technology nature that lies behind
an equipment of this nature with a coherent and
contemporary image where one recognises common
thread that integrates all the diversity of adopted
solutions.
We want that the National Institute of Cardiology
constitutes itself as A Place in the City.
NATIONAL
CARDIOLOGY
INSTITUT
Direction de la Sant et de la Population de la
Wilaya dAlgers / International Competition
NA

31.300 m2
NA
12
Client

Contractor
Gross Building Area


Investment
Draria, Algeria
International competition for the design of a new
225 bed Pediatric Hospital in Baba Hassen, Algiers.
With a gross area of 35,954 m2, the building was
designed as to incorporate the following Guiding Lines:
Minimization of Environmental Impact; Coordination
and Integration of Education and Investigation
Activities; Flexibility and Future Adaptation; Circulation
and ow differentiation; High levels habitability and
comfort, and the Integration of the pediatric hospital in
the national Health Care network.
BABA HASSAM
PEDIATRIC
HOSPITAL
Walaya Baba Hassan / International Competition
NA

36.000 m2

NA
13
Client

Contractor
Gross Building Area


Investment
Porto, Portugal
Scheme design developed under the international
competition for the design of a new hemodialysis and
laboratory unit for the S. Joo General Hospital, Oporto,
Portugal.
The main concepts under the development of this
project were the integration of the expansion project in
the built environment, managing internal and external
circuits in order to provide adequate circulation for
staff, patients, caregivers, dirty/ clean material and
respond to the exibility criteria needed for a Hospital
building.
The quality of the built space and the users welfare,
prioritizing aspects like the acoustic, thermal, visual
and indoor environment comfort was also one of the
main goals.
S. JOO HOSPITAL
HEMODIALYSIS
UNIT & LAB
Hospital S. Joo / Ministry of Health - Portugal /
International Competition
NA

20.000 m2

NA
14
Client

Contractor
Gross Building Area


Investment
vora, Portugal
International public competition for the new
Esprito Santo Hospital in vora with 68.000m2 of total
gross area.
The new facility, with 351 beds of which 43 belong to
intermediate and intensive care, will integrate a number
of medical specialties, such as Vascular Surgery, Neuro
Surgery and Oncology.
This new unit will be available to 150 thousand
patients of the vora district and will also reach a
inuence area of 440 thousand patients of all Alentejo
region.
Our project is dened by a group of distinct
buildings, related to different medical specialties,
connected by a single corridor. This conguration
allows different relationships between buildings and the
surrounding landscape, increasing solar orientation,
functional and ows seggregation and claries patient
waynding.
ESPIRITO SANTO
HOSPITAL
Hospital Espirito Santo / International Competition
NA
68.000 m2
NA
* Projecto elaborado em parceria com: PMC Arquitectos
15
Client

Contractor
Gross Building Area


Investment
Luanda, Angola
Scheme design developed under the international
competition for the design of a new University Hospital
in Luanda.
With a capacity of 230 beds and an overall building
area of about 70.000 square meters, will be located in
the municipality of Camama, Luanda,.
The design of the hospital building was based on
clear guiding principles, which are at the root of its
primary functional structure, being applied transversely
to the project. These principles are:
Comfort for the users;
Ease of use;
Clear separation between areas of outpatient
internal service;
Proximity between the areas of diagnostic and
ambulatory visits;
Segregation between circulations of service and
internal and external sick patients and visitors;
Proximity to areas of teaching;
Natural Light;
Flexibility;
Sustainability.
LUANDA
UNIVERSITY
HOSPITAL
Banco Atlntico de Angola/ International Competition
NA
70.000 m2
NA
16

Vous aimerez peut-être aussi