Vous êtes sur la page 1sur 7

A Cloud Computing Infrastructure

AUTHORS:

P.A.ABHISHEK G.NARAHARI KRISHNA


IT III YEAR IT III YEAR
V.N.R Vignana Jyothi V.N.R Vignana Jyothi
INSTITUTE OF ENGINEERING AND INSTITUTE OF ENGINEERING AND
TECHNOLOGY TECHNOLOGY
abhishekpadm@yahoo.com
Ph:919949739355 Ph:9491365521

Abstract provided to them. As Its requirements can


also met easily by an organization and
This paper gives an overview of how doesn't really need many sophisticated and
the Cloud Computing is used in the current high end technology it seems to become a
I.T Industry where there have been lots of most efficient and best solution for a well
necessity for cheaper and the most time established organization. Thus the
efficient hardware and software .I.T integration of Cloud Computing, along with
industry depends on time because every necessary software systems can be
project or any task that has to be taken up effectively used to provide much more
is time constraint and also needs less efficient as well as huge income to the
requirement of resources, the role of Indian Railways.
Cloud Computing is very much evident in
such cases . The Cloud Computing is a kind 1. Introduction
of Software as a Service kind of Concept
which makes work very much easier Indian Railways is having the world’s
eleminating the bottlenecks faced by the largest railway network. The Indian
System and Network Administrators.There Railways contribute largely in the public
have been similar ideas that have been into transport as it becomes a primary mode of
implementation such as Grid Computing transport. The leading nations have the
but needs huge Investement for its separate rail lines for the goods and for the
implementation. These are the days where passenger trains. These are things that are
organizations are moving more greener by not practiced in India. There are a large
using Data Centers that occupy less space number of the accidents that are happening
rather than Servers that need much in which many lives are lost and also in
maintenance .As Cloud Computing is one these accidents
idea that uses less space as it is all over there is a huge loss of the railway and the
network and is implemented Virtually using national property. Most of the accidents
the protocols. The basic idea of Cloud occur due to negligence, technical faults
Computing also has the advantage of non-reliable data and late
removing redundant data over the network understanding and slow or no response
because all users use a common data towards the danger signs considered small.

1
Thus there is need to develop the sensitive vibrations that are coming from the train.
Guard Rooms, Cabins, Stations, Control The vibrations that will be coming from the
Rooms and many other units. There is also train will depend on the above mentioned
need to deploy the auto-alert and auto- factors as well as the distance of the sensor
control systems from the moving train. There will be a
database for the vibrations prepared on the
2. Principle and Working basis of the ideal conditions noted by the
case study of different trains and with
As we know that most of the accidents occur distance of the train from the sensors. There
due to the collisions, negligence of the will be a software that will convert these
signals i.e. the human error, track related vibrations in such a form that they can be
problems and some as the technical errors. compared with the already existing data of
And yet there is no measures as such taken the database.many times faster than today's
for the cause. The main principle that is most powerful computers will be used here
used for the safety of the Indian Railways is to get the details of the train such as the
that whenever a train will move over the speed and exact position of the train. Thus
the GPS will work as the anti-collision
device as well. The GPS will provide the
means of the communication and input of
the data from the train to all the centers and
the other trains. If there will be any problem
on the track, bridge etc. such as the removal
of the fish plates the vibrations produced
from the train will change (they will either
get damped or will get excited which is a
noticeable change from the ideal case) the
same can be concluded or developed for the
bridges also. This change can be noted by
the means of the comparison of the data
obtained from train and the data from the
database. There will be use of the fibre optic
network from the sensors so the data can be
transferred immediately. All these things
will work in tandem and if there will be any
error then the vibrations will differ thus
through the satellite communication we can
tell the Engine Driver in advance and a
track there will be vibrations that will be preventive measure can be taken well ahead
created on the track. that are produced on of the time. The whole system depends on
the track are dependent on the speed of the the proper functioning of the 3 components
train, load or the weight of the train. These and the proposed method will even work if
vibrations travel long distances because of there will be failure of one or two
one the metal tracks and the other reason is components thus we can say that the
the connection of these tracks by means of proposed method can contribute in large
the fish plates . towards the railway safety by means of the
There will be microphones on the network of the following components
tracks such that they will constantly note the .

2
3. G.P.S (Global position System) orbit. Now a days the GPS is used to assist
the sailors in the open sea.
This is most important of the component for
the safety of the system which is mentioned.
3.2. Functions:
3.1. Principle of Working:
Navigation in the three dimensions is the
Definition: the GPS is a world wide network
primary objective of the GPS. The GPS will
radionavigation system formed from a
have a very important role in the mission of
constellation of minimum of the 24 satellites
the Railway Safety. The main function of
and their ground stations. GPS uses the
the GPS is to get the interconnectivity of the
artificial satellites to compute the position of
various points that will be mentioned in the
the receiver in terms of the four coordinates
later sections and to note the position and
that is X, Y, Z and time. Now a day the
speed of the train and respond to the signals
accuracy of the GPS systems is increased up
that are picked up by the sensors and send
to nearly the range of the 1cm to even 1mm
the signals to the Train Drivers and the
for the high cost differential carrier phase
Guards of the Train Ground Stations
survey satellites. The GPS technology
containing the network of the Cabins,
makes the use of the triangulation method
Station Masters, Control Rooms and all the
for the determination of the four
related points on the ground. Thus giving all
coordinates. The GPS contains a
the details of the train in a very much
combination of at least 24 satellites that are
understandable and visual form. The signals
moving in six of the orbital planes which are
that are picked up by the satellites will be
60 degrees equally spaced. Apart from each
then processed and checked for any kind of
other and each having a 4 number of the
the faulty situations by simply comparing
satellite in them. These are inclined at 55
the signals using the Software and the
degrees to the equatorial plane. This
DBMS mentioned later in the paper. This
arrangement makes it possible that the
will help the Drivers, Station Masters, Cabin
receiver is always in range at least 5
men and many other to operate the traffic of
satellites. There are many ground stations
the trains with ease and this will also help in
that are keeping a close watch on these
the communication of all the units
satellites. These ground stations also
(stationary and moving).
maintain the clock of the satellite and on the
earth and if necessary they can make 4. Microphone Sensors
suitable changes while the satellite is in the
This will be the most critical selection of the
unit of the network. When a train moves
there are huge amount of the vibrations or
the noises are created that are possible to get
recognized from a large distances (every one
knows the childhood game to know whether
a train is coming the children place their
ears on the tracks). Thus with the advanced
form of the microphones we can note down
these vibrations on the track.

3
3.1. Functions:

The microphones will have the purpose to


note down the vibration coming from the
track by the motion of the train. These
details will be then compared with the
vibrations from the database in accordance
to the distance of the train from the sensors.
The proposed sensor is the carbon
microphones that are generally used in the
telephones.

5. Fibre Optic Wires


These are the latest advances made for the and convert it into some graphical or some
transfer of the data and the signals with the other form that can be used to store the
speed that is nearly equal to the speed of the details of the train in the DBMS. The
light. These are required to transfer the data DBMS
that is collected from the sensors to Safety will contain many details of the vibrations
Of Indian Railways With The Networking or the signals that are observed under good
Of G.P.S., Sensors And Software Systems conditions from the various analyses done
With The D.B.M.S. there respective places on the trains according to there weight and
in the network that is needed to be distance from the sensors. The main
developed by the railways. function of the software is to compare the
vibrations that are produced by the train
5.1. Functions: with the data that is stored in the DBMS
The main function of the fibre optic network
is to transfer the data or the signals that are 7. On-board Unit with GPS and
collected from the sensors quickly to the Wireless Communications:
software analysis at the respective places in
the Network The on-board unit consists of
. communication satellite antennae, satellite
6. Software and DBMS positioning antennae, the on-board receiver
system and communication interface
Software is the programs that can perform devices, etc (shown in Figure 3). The on-
some tasks that are assigned to them. The board unit can continuously measure
DBMS is the Data Base Management different parameters, tag the data with time
System which can store a huge amount of and position information, reports irregular
the data in them. Software and the DBMS conditions.
will together work for the safety of the
railways.

6.1. Functions:

The main purpose of the software is to


convert the vibration noted by the sensors

4
8. For Cabins, Station, Guard such that the driver will come to know about
Rooms, Control Rooms & Other the track, weather, bridges and
constructional status in advance. Thus there
Important Establishments
is need of a high tech visual display screen
to tell the details required by the driver for
These mentioned establishments need a
the smooth operation of the train, Good
tremendous development in there current
communication system. This can be
status for the safety of the Railways. These
achieved by the use of the satellites of the
requirements are as follows:
GPS for the communication.
1. Need of the towers for the transfer of the
details and the communication between
other establishments, trains and the 9. Transmitter & Receiver
satellites.
2. A visual display system to show the From the standard data available the
actual position of the trains along with other frequency should be as follows:
details like visual and audio warning Main allocations 5.925 to 6.425 GHz (for
systems. uplink) & 3.700 to 4.200 GHz (for
3. Receivers and the transmitters tuned to downlink) which may change as per the
proper frequencies and in accordance to the advancements that are made and the system
network. The train driver’s cabin must be requirements. The Range of the Train’s

5
device will be 25-75 Km (as per the 5. Train Traffic Control: due to continuous
requirements and the system integration). monitoring of the trains there will be a good
train traffic control.
10. System Integration 6. Futuristic method: with this method it is
possible to make fully automatic train
After the components will be fabricated then network which may even not have the driver
these will be integrated to perform the in it.
required and proposed functions. This will
help the Indian Railways for a very
longtime. The integration of the project
proposed will such that each time the Train, 12. Implementation Problems
Guard Room, Control Room, Stations and
the satellites all will be simultaneously work There are very few of the problems
for the safety of the railways. The figure associated with the project which are:
shows the integration of the system in The implementation time is large because of
diagram the training and system integration. The cost
may seem high to some non technocrats.
There by reducing the principle costs by an
extent and quick implementation of the
technology.

13. Conclusion

The benefits and advantages of the proposed


method outnumber the problems and
disadvantages. Also this method is having
good expected results. Thus the proposal
should be considered for the most important
transport system in India and for the safety
the costliest ‘human life’ and the national
property. The project can also work for a
very large time period. Thus the integration
of GPS, sensors along with software systems
can be effectively used to provide safety as
well as huge income to the Indian Railways.
11. Expected Benefits To The
Indian Railways:

1. Railway Safety
2. Automation in the Work.
3. Reduction in the Stress Levels because of 14. Bibilography
the good equipments and machinery.
4. Time Delays: As every time the position 1. Satellite Communication by “Charles W.
of the train will be known thus there will not Bostian & Timothy Pratt”
be any time delays.

6
2. Electronic Communication Systems by
“George Kennedy & Bernard Davis”
3. www.trimble.com
4. www.discoveryindia.com
5. www.irsuggestions.org

Vous aimerez peut-être aussi