Vous êtes sur la page 1sur 23

SHF - Enhancing hydropower plants Grenoble, April 9-11, 2014

HYDROELECTRIC POWER PLANTS


AUTOMATION USING IEC 61850:

EXPERIENCES AND IMPROVEMENTS FOR
THE USER
Erik San Telmo, Esther Alonso (Ingeteam Power Technology S.A.)
Page n
SHF Enhancing hydroelectric power plants , 9-11 April Grenoble 2
INDEX
IEC 61850
INTRODUCTION
MOTIVATION
TO USE
ENGINEERING
PROCESS
ADVANTAGES
NAMING
INTEGRATION
TIMESTAMPS
SEQ. OF
EVENTS
WIRING
CONCLUSIONS
1. IEC 61850 principles
Page n
SHF Enhancing hydroelectric power plants , 9-11 April Grenoble 4
IEC 61850 Principles and evolution
Distributed Energy
Resources
Hydro Wind
Substations
IEC 61850
Devices
Protective
relays
SCADA
HMI
Logic
Controllers
Remote
Terminal
Units
Meters
Inverters
IEC
61850
Common
information
model
Standard
communication
mechanisms
EVOLUTION
Page n
SHF Enhancing hydroelectric power plants , 9-11 April Grenoble 5
IEC 61850 Motivation to use IEC 61850 in Hydro automation
User
requirements
Technology
available
Timestamps
Event list on
comms failures
INGESYS IC3
PLC
INGESYS IT
SCADA HMI
INGEPAC
Protective relay
Page n
SHF Enhancing hydroelectric power plants , 9-11 April Grenoble 6
IEC 61850 architecture
RTU
IC3
Group
controller
IC3
Auxiliar services
and general set-
points
SCADA HMI
(RTU)
Generator
Protective
relay
Transformer
Protective
relay
CONTROL + REGULATION
PROTECTION
IEC 61850 network
MONITORING AND TELECONTROL
Page n
SHF Enhancing hydroelectric power plants , 9-11 April Grenoble 7
IEC 61850 engineering process
Engineering
process
1.
IEC 61850
Modeling
2.
Protection
integration
3.
System
configuration
4.
SCADA
configuration
5.
Logic controller
programming
6.
Validation
and testing
Page n
SHF Enhancing hydroelectric power plants , 9-11 April Grenoble 8
Step 1 Logic controllers IEC 61850 modeling
Identify
information
exchanged
Select IEC
61850
information
objects
Create IEC
61850
configuration
file
IEC
61850-7-4
SPRS
Pressure
supervision
XCBR
Circuit breaker
MMXU
Measurements
IEC 61850-7-410
Hydro specific
KPMP
Pump
KVLV
Valve
HSEQ
Sequencer
Group
controller ICD
file
(XML standard
format)
IEC 61850 defines
a virtual
information model
of the hydro
power plant
components using
Logical Nodes.
Plant
controller ICD
file
(XML standard
format)
* ICD: IED(Intelligent Device) Capability Description
Page n
SHF Enhancing hydroelectric power plants , 9-11 April Grenoble 9
Step 2 Integration of protective relays
Group
controller
ICD file
Plant
controller
ICD file
Generator
Protection
ICD file
Transformer
Protection
ICD file
Provided by
manufacturer
Engineered
according
to utility
requirements
Hydro power
plant complete
virtual
information
model
SCD file
* SCD: System Configuration Description
Page n
SHF Enhancing hydroelectric power plants , 9-11 April Grenoble 10
Step 3 System configuration Data interchanges
Gen.
Prot.
Transf.
Prot.
Group
Controller
Group
Controller 2
Group
Controller 1
Plant
Controller
SCADA HMI
Page n
SHF Enhancing hydroelectric power plants , 9-11 April Grenoble 11
Step 4 SCADA Configuration
SCADA
Configuration
KPMP
Logical node for
Pump information
Each IEC 61850 logical node defines a set of standard
data points for status information, commands or/and
settings.
SCADA manufacturers can define component libraries
with predefined objects that use the standard IEC
61850 data information.
Page n
SHF Enhancing hydroelectric power plants , 9-11 April Grenoble 12
Step 5 Programmable Logic Controller programming
DI/DO
AI/AO
IEC 61131
POUs
IEC 61850
WRAPPER
IEC 61850 model
binding to 61131
information
IEC 61850
Server
KVLV
SPRS
XCBR
KPMP
HSEQ
2. Advantages for the user
Page n
SHF Enhancing hydroelectric power plants , 9-11 April Grenoble 14
Advantages of using IEC 61850
1. Standard naming and format
2. Integration of protective relays
3. Sequence of events
4. Time stamping of data
5. Wiring reduction
Page n
SHF Enhancing hydroelectric power plants , 9-11 April Grenoble 15
1. Standard naming and format
Utility A
Utility B
Puissance
ActivePower
Utility C Pot Activa
FLOAT32 (W)
INT16 (kW)
FLOAT32 (MW)
MMXU
TotW
MV structure
name type
mag.f FLOAT32
q Quality
t Timestamp
units.SIUnit Enumeration
units.multiplier Enumeration
range Enumeration
Each utility or system
integrator defines the
information name and
format.
Conversions are needed.
The standard defines the
name and the format of each
data point
Means Measurements
Means Total active power
Time reduction.
Page n
SHF Enhancing hydroelectric power plants , 9-11 April Grenoble 16
2. Integration of protection devices
FROM THE IEC 61850
INTERFACE ALL RELAYS
LOOK EQUAL.
Time reduction.
IED xxx
LDXXX
PIOC
PTOC
Op
PXXX
Op
Op
All protection function
logical nodes start with
P
The Trip is always Op
Connect the trip
information with the
PLC and done

INTEGRATED !!!
Page n
SHF Enhancing hydroelectric power plants , 9-11 April Grenoble 17
3. Sequence of events
MODBUS Basic polling:
If communication link is broken, sequence of events is lost.
BRCB: buffered report control block
MODBUS special register for events
MODBUS current values
IEC 61850 includes a native Buffered Reporting mechanism.
The server stores events in case of communication lost. All IEC servers behave the same way.
Cyclic transmission of current values and
registers for events
Spontaneous transmission
Better functionality.
Page n
SHF Enhancing hydroelectric power plants , 9-11 April Grenoble 18
4. Time-stamping
Digital inputs with
1ms resolution
IEC 61131 data
change with TASK
cycle resolution
Digital inputs with
1ms resolution
Trips with 1ms
resolution
More detailed
sequence of events.
Events not related to
scan cycle period
name type
stVal BOOLEAN
q Quality
t Timestamp
Better functionality.
Page n
SHF Enhancing hydroelectric power plants , 9-11 April Grenoble 19
5. Wiring reduction GOOSE Generic Object Oriented System Event
GOOSE
repetition
should arrive
here
Event !!
Fast repetition
mechanism
few ms
GOOSE lost
detection
Aggregation: an Ethernet cable transports several digital signals in 1 GOOSE message.
Wire and communication failure detection.

t
More security and cost reduction.
3. Conclusions
Page n
SHF Enhancing hydroelectric power plants , 9-11 April Grenoble 21
CONCLUSIONS
Our experience in engineering time
Modbus
Modbus MULTIVENDOR
FIRST IEC 61850
IEC 61850
IEC 61850 MULTIVENDOR
Page n
SHF Enhancing hydroelectric power plants , 9-11 April Grenoble 22
CONCLUSIONS
IEC 61850 is a valid solution for hydro power plant automation.

- First 2 IEC 61850 projects required big effort.

- Better in functionality.

- More efficient in multivendor projects.

- We use it depending on the user requirement and the devices to integrate.

- More than 10 IEC 61850 hydro projects mainly in Spain.

Thank You