In order to attract foreign and local for setting up of Industries Balochistan, which on one hand create job
opportunities and on the other increase the revenue towards national exchequer the Department of Industries is
striving to establish Industrial Estate all over Balochistan and for this purpose the following Industrial Estates
with possible basic infrastructure have been established.

I. Quetta Industrial and Trading Estate, Quetta.
II. Industrial Estate at Dera Murad Jamali.
III. Lasbela Industrial Estate.
IV. Hub Industrial and Trading Estate.
V. Gwadar Industrial Estate.
VI. Marble City Gaddani.
VII. Winder Industrial Estate.

Beside above land has been earmarked for the establishment of some Mini Industrial Estates in the following
Districts.

I. Mini Industrial Estate Loralai.
II. Mini Industrial Estate Khuzdar.
III. Mini Industrial Estate Bostan.
IV. Mini Industrial Estate Kalat.
Organizational Structure



Name of officers Designation Date of Posting
Mr. Khaleeq Nazar Kiyani Secretary 08-10-2012
Mr. Zakir Hussain Additional Secretary 27-08-2008
Mr. Akeel Ahmed Additional Secretary

Mr. Khalil Ahmed Deputy Secretary 23-10-2008
Mr. Ali Ahmed Durrani Section Officer 24-08-2009
Mr. Abdul Rehman Section Officer 19-12-2006
Mr. Amanullah Kakar Section Officer 15-02-2008
Mr. Ahmed Jan Section Officer 09-04-2009
Development Project

NON DEVELOPMENT BUDGET 2009-10
QA-4407 Administration Secretariat 12,710,390/-
QA-4408 Directorate of Industries 40,111,080/-
QA-4409 Small Industries 40,117,150/-

PSDP 2009-10

Project ID Project Name
Estimated
Cost
Allocation
2009-10
Ongoing


Z
2004.0757
Marble City at Gaddani Industrial Estate (LIEDA) 50.000 7.000

Project ID Project Name
Estimated
Cost
Allocation
2009-10


Provision of Infrastructure in Quetta Industrial & Trading Estate
(Phase-II). QITE is 19 KM away from Quetta City on Eastern by Pass.
174.25



Provision of Infrastructure in Quetta Industrial & Trading Estate
Quetta (QITE) Phase-IV.
Rs: 126.93



Establishment of Mini Industrial Estate Khuzdar on 50 Acres. The site
is situated on Khuzdar Shahdad Kot Road apposite Air Port Khuzdar.
Rs: 126.93



Expansion/Improvement of Industrial Estate DM Jamali, DM Jamali is
located about 300 KM from Quetta in Nasirabad District.
Rs:
156.195


Establishment of Bostan Industrial Estate (Phase-I) An area of 1000
acres have been allotted. PC-I has been prepared on 200 acres-Bostan
Town is located about 45 KM from Quetta in Pishin District.
Rs:
400.410


Onyx/Marble Processing Unit at Dalbandin, District Dalbandin
Rs:
400.410


Water Supply scheme for Hub Industrial & Trading Estate PhaseII.
Rs:
400.410



Directorate
The Directorate of Industries, Balochistan consists of two wings.
Industries Wing.
Small Industries Wing.
Trading estate
Established in 1985-86 on an area of 700 acres.

Major Industrial Units established are Floor Mills, Ghee Mills, Beverages, Steel Mills,
Cement Factories, Marble Factories, Packaging.

The Estate is facing problems like shortage of water, low gas pressure, repair of existing
roads and sewerage. The case regarding payment of dues to contractor is subjudice and
the development work is held up in the Estate.

FINANCIAL PROGRESS OF QUETTA INDUSTRIAL & TRADING ESTATE
(Phase-I)

Estimated Cost. (As per original PC-I) 72.460 million

Revised PC-I cost (Aug:2002) 94.950 million

Expenditure upto 30.06.2006 68.780 million

Provision during Financial year,2005-2006 6.346 million

Financial year,2005-2006 Funds utilized
2005-2006
Nil (Due to Court Cases)

Funds Allocated during 2006-07 Nil (Due to Court Cases)

Funds Allocated during 2007-2008 Nil (Due to Court Cases)

Funds Allocated for the year 2008-2009 Nil (Due to Court Cases)
Expenditure


YEAR ALLOCATION EXPENDITURE
1987-88 Rs. 5.166 Million Rs.3.203 Million
1988-89 Rs. 2.00 Million Rs. 2.148 Million
1998-90 Rs. 3.806 Million Rs.3.246 Million
1990-91 Rs. 3.281 Million Rs. 3.181 Million
1991-92 Rs. 8.500 Million Rs. 8.697 Million
1992-93 Rs. 16.800 Million Rs. 18.637 Million
1993-94 Out of Sale Proceed of plots Rs. 7.559 Million
1994-95 Out of Sale Proceed of plots Rs. 1.355 Million
1995-96 Out of Sale Proceed of plots Rs. 1.786 Million
1996-97 Out of Sale Proceed of plots Rs. 0.284 Million
1997-98 Out of Sale Proceed of plots Rs. 4.000 Million
1998-99 Out of Sale Proceed of plots Rs. 3.300 Million
2003-04 Rs. 10.000 Million Rs. 9.720 Million
2004-05 Rs. 1.654 Million Rs. 1.654 Million
2005-06 Rs. 6.346 Million Nil
2006-2007 Nil Nil
Total Rs. 57.553 Million Rs. 68.780 Million
DepartmentProject
NON DEVELOPMENT BUDGET 2009-10
QA-4407 Administration Secretariat 12,710,390/-
QA-4408 Directorate of Industries 40,111,080/-
QA-4409 Small Industries 40,117,150/-

PSDP 2009-10

Project
ID
Project Name
Estimated
Cost
Allocation
2009-10
Ongoing


Z
2004.0757
Marble City at Gaddani Industrial Estate (LIEDA) 50.000 7.000

Project
ID
Project Name
Estimated
Cost
Allocation
2009-10


Provision of Infrastructure in Quetta Industrial & Trading
Estate (Phase-II). QITE is 19 KM away from Quetta City
on Eastern by Pass.
174.25



Provision of Infrastructure in Quetta Industrial & Trading
Estate Quetta (QITE) Phase-IV.
Rs: 126.93



Establishment of Mini Industrial Estate Khuzdar on 50
Acres. The site is situated on Khuzdar Shahdad Kot Road
apposite Air Port Khuzdar.
Rs: 126.93



Expansion/Improvement of Industrial Estate DM Jamali,
DM Jamali is located about 300 KM from Quetta in
Nasirabad District.
Rs:
156.195


Establishment of Bostan Industrial Estate (Phase-I) An
area of 1000 acres have been allotted. PC-I has been
prepared on 200 acres-Bostan Town is located about 45
KM from Quetta in Pishin District.
Rs:
400.410


Onyx/Marble Processing Unit at Dalbandin, District
Dalbandin
Rs:
400.410


Water Supply scheme for Hub Industrial & Trading Estate
PhaseII.
Rs:
400.410



Water


TUBEWELLS DISCHARGE PER DAY
Tubewell No.1 27,000 gallons ( out of order)
Tubewell No.2 24,000 gallons
Tubewell No.3 21,000 gallons
Tubewell No.4 Not yet completed by contractor

Total 45,000 gallons

WATER NEEDED FOR FACTORIES
44 Units Operative 75,000 gallons
60 Units Under construction 30,000 gallons
Total 105,000 gallons
Shortages are met by extra running of Tube wells.

WATER REQUIREMENTS OF THE Q.I.T.E.
The present water network is not enough for the existing industrial units. We need to install at least 4 new tube-wells to meet
the present and near future requirements.
Dera murad Jamali
-
-
INDUSTRIAL ESTATE DERA MURAD JAMALI

Location of Estate Quetta-Jacobabed Road
at 5 Km from D.M.
Jamali.

Total area of the Estate 100 Acres

No of Plots Size A-B & C 238

Year of Establishment 1987-88

No of allotted plots 226

PSDP Scheme No. 2004.0786 million

Allocation for 2007-08 8.135 million

Allocation for 2008-2009 PSDP 200 million

Upto date Expenditure 3.844

Total Industrial Units 07 Nos

Functional Units 05 Nos

Non Functional Units 02 Nos

FINANCIAL PROGRESS OF INDUSTRIAL ESTATE DERA MURAD JAMALI

Estimated Cost. (As per original PC-I 44.899 million

Revised PC-I Cost prepared by C&W Department
(2004)
104.925 million

Expenditure upto 30.6.2007 17.587 million

Approved Phase-I (2004) 20.135 million

Funds released during 2004-2005 3.000 million

Financial year,2005-2006 5.000 million

Financial Year, 2006-2007 4.000 million

Financial year 2007-2008 4.067 million

Financial year 2008-2009 200.000 million
Lasbella
Established in 1979 on an area of 1290 acres.
The Industrial Units set up with foreign and local investors are Textile, Plastic Industries,
Pharmaceutical and Medicine, Chemical and dyeing, Ghee and Vegetable, Paper
Industry, Marble Industries, Engineering Industries, Oil and Lubricant, Concrete
recasting, RCC Pipe and Sanitary, Iron and Steel, Hardware, Printing and Packaging
Industries.
Twenty (20) sick /closed industrial units have been revived.
More than 100 Industrial Units set up at Hub Industrial and Trading Estate have provided
Thousands of direct and indirect job opportunities to the local people.
Winder


Established in 1990 over an area of 230 acres.
Twenty (20) Industrial Units set up include Audio and Video, Chemical Industry, Polypropylene Bags, Engineering,
Textile and Electronic Home appliances.
Electricity and Water are available while the provision of gas is expected in due course.

Uthal
Established in 1976 covering an area of 2585 acres.
Electricity is available however, extension of Gas line from Hub to Uthal is under
process.
The industrial units set up are mainly Motorcycle assembling plants, Plastic and other
industries.

UTHAL INDUSTRIAL ESTATE (PHASE-II) ZERO POINT
Established in 2005 on an area of 1000 acre.
Facilities like shingle roads water and electricity are available.
Extension of Gas line from Hub to Uthal has been approved by the President of Pakistan
during his visit last year.
The work is in progress.
Proposed
BOSTAN
PASNI
KHUZDAR
TURBAT
In the meeting in P&D Department held on 5th July 2008 all above proposed Industrial Estates
approved in principal.
The development work on above industrial estates will be started after allocation of funds in
PSDP.
New Industrial Estate
BRIEF ON
GWADAR INDUSTRIAL ESTTE DEVELOPMENT AUTHORITY
The Government of Balochistan developing an industrial estate in Gwadar to meet the demand
for industrial plots in the port city which is expected to have substantial potential for industrial
investment in view of the opportunities offered by the establishment of deep sea port and
construction of major highways linking Gwadar with Karachi, Quetta, Iran and Central Asian
countries. There are also plans to extend railway to Gwadar.

THE PROJECT
LOCATION of the project is 40 km from Gwadar city on Makran Coastal Highway. Overall
3000 acres of land south of the Makran Coastal Highway, has been earmarked for development
in three phases of 1000 acres each.

POTENTIAL FOR GWADAR INDUSTRIAL ESTATE:
1.1 Gwadar deep sea port is the biggest catalyst for providing initiative for the industrial
development. Besides, a number of important infrastructure projects have been undertaken or
planned in Gwadar to make this city attractive for the investment in industrial development.
Some of these projects are:

Makran Coastal Highway has been completed by National Highway Authority, which has
substantially reduced the distance between Karachi and Gwadar. Besides, it brings Gwadar into
national mainstream. This highway acts as a catalyst for development of Makran coastal region.

Gwadar Ratto Dero Road work on Khuzdar-Ratto Dero Section is in progress to connect
Gwadar with northern parts of the country.

Gwadar Panjgur Road work on this vital land link has been on going.

Remodeling of Akra Kaur Dam has been planned to augment water supply to Gwadar.
Moreover, Mirani Dam will also provide additional water to Gwadar.

Construction of 132 KV transmission line from Turbat to Gwadar is Being executed by WAPDA
to use power supply from Iran.

A rail link is to connect Gwadar to Quetta also planned. The construction of a new international
airport is being taken up near Gwadar Industrial Estate, for the operation of wide body jet
aircrafts.

PLANNING AND DESIGN SERVICE
Topographical survey and detailed planning, engineering design of roads and utilities of 2000
acres has been completed.

Topographical Survey and detailed planning of third Phase of 1000 acres is in process.
Boiler
Annual inspection of each boiler is mandatory.
The position of boilers installed and registered under the boiler Act, 1923 and Boilers &
Pressure Vessels Safety Ordinance, 2002 are as follows.

Total No. of Boilers registered in Balochistan 216 Nos
Boilers installed in public sector 51 Nos
Boilers installed in Private sector 165 Nos

INSPECTION OF BOILERS FEE
Inspection fee is charged depending upon the size of the Boilers / heating surface of the boiler
and ranges from Rs. 1800 to Rs. 30,000.
Small Industires


THE SMALL INDUSTRIES CONSISTS OF:
Administration Branch.
Audit and Accounts Branch.
Marketing and development Branch.
Sales and Purchase Branch.
Estate Branch.

SMALL INDUSTRIAL ESTATE SIRKI ROAD, QUETTA
Small Industries Estate established 1961-62
Total area of Estate 43.5acres
Annual Budget of Estate 4,991,400

DEVELOPED PLOTS
Total plots in Estate 131 Nos
Measuring 20000sq ft each 26
Measuring 10000sq ft each 55
Measuring 5000sq ft each 50
Total Industries 63
No of Industries not functioning 06
Small Industires


THE SMALL INDUSTRIES CONSISTS OF:
Administration Branch.
Audit and Accounts Branch.
Marketing and development Branch.
Sales and Purchase Branch.
Estate Branch.

SMALL INDUSTRIAL ESTATE SIRKI ROAD, QUETTA
Small Industries Estate established 1961-62
Total area of Estate 43.5acres
Annual Budget of Estate 4,991,400

DEVELOPED PLOTS
Total plots in Estate 131 Nos
Measuring 20000sq ft each 26
Measuring 10000sq ft each 55
Measuring 5000sq ft each 50
Total Industries 63
No of Industries not functioning 06
Training Center
Carpet Centers 29
Handicrafts Development Centers 4
Leather Embroidery Centers 2
Knitting/Tailoring Centers 3
Embroidery Centers 3
Cotton Handloom Centers 1
Setup
QUETTA DISTRICT
Zonal Office

Carpet Center, Sariab Road
Service Center

Carpet Embroidery Center, Killi Kabir
Carpet Teachers Training Institute

Carpet Embroidery Center, Killi Deba
Sales Shop

Carpet Embroidery Center, Killi Shabo
Industrial Estate

Carpet Embroidery Center, Killi Sheikhan
Carpet Embroidery Center, Killi Sirki

Tailoring Cutting Center, Mariabad
Carpet Center, Alamdar Road

Tailoring Cutting Center, Kaikabad Road
Carpet Embroidery Center, Killi Kachi Baig

Handicrafts Development Center
Carpet Center, Mariabad

Cotton Handloom Center
Carpet Center, Brewery Road


MASTUNG DISTRICT
Carpet Center

KHUZDAR DISTRICT
Zonal Office
Carpet Center
Handicrafts Development Center

LASBELA DISTRICT
Carpet Center Uthal

TURBAT DISTRICT
Leather Embroidery Center

KHARAN DISTRICT
Carpet Center Kharan
Embroidery Center, Sarawan

Embroidery Center, Jangal Juda Kalat
(Kharan)
Embroidery Center, Totazai

SIBI DISTRICT
Zonal Office Sibi
Carpet Center Sibi
Leather Embroidery Center, Lehri

PISHIN DISTRICT
Carpet Center Pishin
Carpet Center Chaman

CHAGHI DISTRICT
Carpet Center Nushki
Carpet Center Dalbandin

LORALAI DISTRICT
Zonal Office Loralai
Carpet Center
Handicrafts Development Center

ZHOB DISTRICT
Carpet Center Zhob

KOHLU DISTRICT
Carpet Center Kohlu
Carpet Center Mewand

KALAT DISTRICT
Carpet Center
Handicraft Development Center

NASIRABAD DISTRICT
Carpet Center, Dera Allah Yar
Carpet, Usta Muhammad

ZIARAT DISTRICT
Carpet Center, Zandra

DERA BUGTI DISTRICT
Carpet Center

KARACHI
Chiltan Sales Shop
Joint Venture

A Joint venture in the field of wood Work was established in 1980 In the name of Trans Balochistan Enterprises. 51% Share of
Government of Balochistan and 49% of Private Partner is involved. Year-wise / annual detail of profit deposited in the Account
of Small Industries Wing is as under:
1981-85 Nil
1986 Rs. 30,735
1987 Rs. 241,161
1988 Rs. 500,000
1989 Rs. 237,317
1990 Rs. 350,000
1991 Rs. 428,106
1992 Rs. 567,418
1993 Rs.1,360,323
1994 Rs. 459,172
1995 Rs. 300,000
1996 Rs. 541,506
1997 Rs. 228,745
1998 Rs. 800,000
1999 Rs. 242,700
2000-02 Rs. Nil
2003 Rs. 1,000,000
2004-05 Rs. 946,043
2005 Rs. 1,082,751
2006 Rs. 1,219,761
2006 Rs. 3,585,140
2007 Rs. 1,819,964

Total Rs. 17,623,160
Marble City Gadani
Established in 2004 on an area covering 600 acres of land. The infrastructure facilities like roads
electricity water supply and Telecommunication have been provided. Ten (10) units are in
production. Four (4) units are near completion. Seventy Eight (78) units are under construction.
Plots are available on deferred payment for Marble /Granite Mine owners to establish Ware
Houses.
Printing & Stationary


Name of the Department Printing & Stationery Department
Balochistan, Quetta.

Location Block # 9 Civil Secretariat, Quetta.

Area of concentration Whole of the province

Head of the Department Controller (B-18)

Sanctioned strength B-16 and above [4]
B-15 and below [84]

State of vehicles One Mazda Coaster T-3500 Model
1993.

State of Machinery &
equipments
Printing machines [8]
Binding machines [5]
Plate making machine [1]
Air conditioners [1]
Computers [4]
Typewriters [5]

CAPACITY

Installed capacity 1.5 million print impressions annually

Utilized capacity 2 million print impressions annually

Cause of shortfall Sufficient funds are not available for purchase of paper / raw
material.

RECEIPT
YEAR TARGET ACTUAL
2007-2008 70, 77,000/- 78, 85,000/-

Budget allocation for the year 2008-2009
Rs. 1, 81,26670/-
Proposed
This Department proposes: 10 years Tax Holidays (which may be implemented in all and new
industrial and Mini industrial estates upto 2017). Exemption from Sales Tax. Exemption from
Import / Customs Duty. Loan on soft terms for the procurement of machinery, raw material, and
as working capital, be provided to investors only after they have completed the construction of
the factory building. Law and Order situation: Special attention is required to build the
confidence of investors.
Objectives
Objectives:
Gwadar Industrial Estate will be developed for Small and Medium Enterprises (SME) mostly
based on value added industries. No large manufacturing industries would be expected,, except
those feasible on imported raw materials, with final product to exported. The major areas of
business will be: import and export, construction, transportation, shipping, clearing and
forwarding, warehousing, building material, value

Added processing, textile and leather made-up garments, repackaging and trans-shipment.

The Master Plan will accommodate the following industries:

WAREHOUSES
FLOUR MILLS
GARMENT INDUSTRIES
GHEE MILL & LUBRICANTS INDUSTRIES
TEXTILE INDUSTRIES
ENGINEERING UNITS
CHEMICAL IDNSUTRIES
PHARMACEUTICAL
FURNITURE IDNUSTRIES
LEATHER MANUFACTURING INDUSTRIES
CONSTRUCTION & BRICK MANUFACTURING FACTORIES
RICE MILLS
MARBLE FACTORY
PLASTIC & GLASS INDUSTIES
FISHERIES PACKING & COLD STORAGE
ICE FACTORIES
STEEL MILLS & MANUFACTURING FACTORIES
AUTO PARTS INDUSTRIES
INFORMATION TECHNOLOGY
COMPRESS NATURAL GAS EQUIPMENT
PAPER IDNUSTRY
MASALA INDUSTRY
SEA FOOD INDUSTRY SEA FOOD INDUSTRY
AIR CONDITIONER
WEAVING INDUSTRY
ELECTRICAL IDNSUTRY
COMPUTER ASSEMBLING PARTS MANUFACTORURING
FOOD BREAD FACTORY
JEWELRY MANUFACTURING
POTTERY & ANTIQUE FURNITURE
PRINTING UNIT
DIAPER PLANT
PRINTING PACKAGING
ADVERTISING
HARDWARE PRODUCT & LOCKS & PADLOCK
DYING INDUSTRY
WALEN INDUSTRY
PETROL FILLING SERVICE STAITON
MINERAL WATER PLANT
PHARMACEUTICAL PRODUCT
WEARING INDUSTRY
WOVEN GARMENTS
POULTRY FEEDS
BACKED FOOD INDUSTRY
TRADE & AGRICULTURE
CARPET WEAVING
PETRO WAX
PVC PIPES INDUSTRY
CONFECTIONARY
TOY MANUFACTURING
MINERAL INDUSTRY
SPINNING INDUSTRY
POTTERY & ANTIQUE FURNITURE
ADVERTISING

Besides, plots for warehousing, construction related facilities would also be provided. Supporting
facilities such as truck and bus terminals, civic center, exhibition ground, commercial areas,
hospital, vocational training center and other public amenities will also be provided. The plan
provides for all the infrastructure services including roads, water supply and sewerage network,
electrification and storm water drainage, The provision is also being made for desalination plant
and sewage treatment plant with water recycling facilities for the irrigation of green areas.

A special feature of the plan will be the construction of flatted factories for providing fully
serviced spaces for small enterprises. Provisional will also be made for industrial workers
housing in constructed low-income flats.

MANAGEMENT:
For development of Gwadar Industrial Estate, an autonomous body Gwadar Industrial Estate
Development Authority (GIEDA) has been established by the Government of Balochistan, which
is headed by its Chairman, the Secretary Industries & Commerce, Balochistan while other
Directors of the board include Secretary Finance, Balochistan, Director Industries, Balochistan
and Managing Director GIEDA. This will provide substantial executive and financial authority
to GIEDA and facilitate accelerated development.

TOWN PLANNING:
The detailed planning on 2000 acres of land has been completed. A service road has been
provided parallel to the Coastal Highway just outside the ROW of the Highway. A large part of
the Coastal Highway frontage has been reserved for commercial and institutional uses. Two
major road, 200 ft and 250 ft wide, have been provided as the main entries to the Estate. A full-
fledged civic center has been provided which will be eventually in the center of 3000 acre site.

Industrial plots have an area of one, two and five acres, which have been allotted individually or
in combination. Commercial plots are generally 1000 and 200 sq yds.

GUEST HOUSE:
A building for GIE Guest House had been designed and completed on a strategic location in the
GIE. The Gust House has one VIP suite, 4 bedrooms and lounge, conference room and dinning
hall. Finishing specifications have also been upgraded. Total covered area is 5800 sft and plot
area is 5000 sq yds. The building along with external works, landscaping, and boundary wall has
been completed. The Guest House was inaugurated by the Chief Minister, Balochistan. Another
2.0 acres plot of land adjacent to the Guest House plot has been earmarked for GIE to be
developed as a park and ancillary services.

DESALINATION PLANT:
A 2.0 MGD desalination plant is proposed to be installed in the Gwadar Industrial Estate. The
plant is being installed by BDA on behalf of GIEDA. Another desalination plant with a capacity
of 0.2 MGD is also made execution, which will act as standby and will be in operation very
soon.

GRID STATION:
The 7-Acre site for the Grid Station allocated The Grid Station has been completed by WAPDA.
A substation to use the power supply from Grid Staiton nd provides low voltage supply to
GIEDA is being constructed.

EARLY ROAD WORKS:
The road construction work on important major roads had started. Construction of early road
works including two major roads 250 ft and 200 ft wide, respectively, 150 wide internal spine
and 60 ft wide service roads parallel to the Makran Coastal Highway had been made execution.

MONUMENT:
A modern designed monument to signify the entrance to the Gwadar Industrial Estate has been
completed.

STREET LIGHTING:
Street lighting on 200 ft wide major road and one road parallel to the coastal highway of the
Estate has been completed.

LEVELLING AND DRESSING:
In the view of broken nature of land, land leveling and dressing of 738 Acres area in the first
phase of GIE is completed and the allottees have started to take the possession of the land.

REMAINING WORKS:
The design of remaining Internal Roads, Water Supply and Sewerage has been prepared by the
Consultants. The tendering and award of work will be taken up as per Inflow of cash with
Gwadar Industrial Estate. The PC-I form for the remaining roadwork has been submitted to
Planning & Development Department for approval, which is awaited.