Vous êtes sur la page 1sur 34

PRESUPUESTO PARA CASA HABITACION

ARQ. MINAYA VAZQUEZ CANDELARIO MIGUEL


ALUMNOS: SULLIVAN DAYAN PERAZA ALAYOLA
DOMINGUEZ ALBORES EZEQUIEL H.
GRUPO: MQ4
28 DE MAYO DE 2014
Contenido
PLANO CASA HABITACIN .......................................................................................................................... 2
RESUMEN ........................................................................................................................................................ 3
PRESUPUESTO ............................................................................................................................................... 4
INSUMOS ......................................................................................................................................................... 9
MATRICES ..................................................................................................................................................... 16






PLANO CASA HABITACIN
RESUMEN
PARTIDA CONCEPTO IMPORTE

A01 TRABAJOS PRELIMINARES 6 928.87

A02 CIMENTACIN 37 486.51


A03 DRENAJES
10 328.87


A04 INSTALACIN HIDROSANITARIA
20 494.17


A05 MUROS, CASTILLO Y COLUMNAS
48 125.45


A06 LOSAS 42 933.16



A07 AZOTEAS 21 224.05


A08 ALBAILERA
34 420.71


A09 CARPINTERA
20 060.11


A10 ALUMINIO Y CRISTAL
6 082.84


A11 INSTALACIN ELCTRICA
6 902.52


A12 ACABADOS EN PLAFONES Y
MUROS
29 866.60


A13 ACABADOS EN PISOS Y
ESPECIALES
8 011.07


A14 MUEBLES SANITARIOS
4 784.68


A15 CISTERNA
33 183.50

A16 TERMINACIN DE OBRA 1 818.34
TOTAL GENERAL 332 651.29



PRESUPUESTO







VIVIENDA UNIFAMILIAR






PRESUPUESTO DE LA OBRA

Cdigo
Concepto Unidad Cantidad P. Unitario Importe %
A01
TRABAJOS PRELIMINARES.

Despalme de 20 cms. de espesor de capa vegetal a
maquina, incluye. mano de obra, herramienta, equipo M2 70.78 $15.56 $1,101.34 1.46%
DESPALME20
y todo lo necesario para su correcta ejecucin.
Trazo y nivelacion con equipo topogrfico,
estableciendo ejes de referencia y bancos de nivel,
M2 70.78 $5.59 $395.66 0.53%

incluye: materiales, mano de obra, equipo y
TZO1001
herramienta. (Mayor a 1000 m2)

Acarreo de material producto de la limpieza fina y

CMAFOL gruesa de la obra
M3 21.23 $255.81 $5,431.87 7.22%

Total:
TRABAJOS PRELIMINARES. $6,928.87


A02
CIMENTACION

Excavacin de cepa, por medios manuales de -2.01 a
-4.00 m, en material tipo I, zona B, incluye: mano de M3 28.30 $257.07 $7,275.08 9.67%
ECM24IB
obra, equipo y herramienta
Compactacin del fondo de la excavacin por medios
M2 35.37 $13.09 $462.99 0.62%
COMPMO
manuales, incluye: afine y nivelacin.
Cimiento de piedra braza de 60 cm. de base por 60 cm. de
antura y 30 cm. de corona, incluye: trazo,
excavacin, plantilla, relleno con material producto de M 21.22 $568.71 $12,068.03 16.04%
la excavacin y retiro del material excedente fuera de
CIMPB6060
la obra.


Cadena de 15x20 cm. de concreto hecho en obra de
F'c=200 kg/cm2, acabado comn, armado con 4
varillas de 3/8" y estribos del No.2 a cada 20 cm.,
M 58.95 $221.05 $13,030.90 17.32%

incluye: materiales, acarreos, cortes, desperdicios,
traslapes, amarres, cimbrado, coldado, descimbrado, mano de
obra, equipo y herramienta.
D152043
Impermeabilizacin para desplante de muros hasta de 20 cm.
de ancho a base de capas de imperfest E
alternadas con polietileno 800, incluye, materiales,
M 58.95 $45.41 $2,676.92 3.56%

IMPDM20
mano de obra, equipo y herramienta.

Relleno con mterial producto de la excavacin,
compactado a maquina al 90% proctor, adicionando M3 7.07 $58.00 $410.06 0.55%
REMPEC
agua, incluye: mano de obra, equipo y herramienta.
Acarreo en carretilla de material producto de la
excavacin y/o demolicin estaciones subsecuentes M3 31.83 $49.09 $1,562.53 2.08%
CACES
de 20 m, incluye: mano de obra y herramienta.
Total:
CIMENTACION $37,486.51


A03
DRENAJES
Excavacin de cepa, por medios manuales de -2.01 a
-4.00 m, en material tipo I, zona A, incluye: mano de M3 12.00 $230.87 $2,770.44 3.68%
ECM24IA
obra, equipo y herramienta
Cama de arena de 10 cm. de espesor por 60 cm. de
ancho para asentar tubera, incluye: materiales, M 12.00 $20.93 $251.16 0.33%
CAMA02
acarreos, mano de obra, equipo y heramienta.
Tuberia de 15 cm. de dimetro de concreto simple,
asentado con mortero cemento arena 1:4, incluye:
materiales, acarreos, trazo, nivelacin, junteo,
M 12.00 $136.32 $1,635.84 2.17%

TCS15
pruebas, mano de obra, equipo y heramienta

Relleno con grava controlada, compactada con rodillo
vibratorio al 90% proctor, adicionando agua, incluye: M3 2.88 $205.98 $593.22 0.79%
REGCR
mano de obra, equipo y herramienta.
Excavacin de cepa, por medios manuales de 0 a -
2.00 m, en material tipo I, zona A, incluye: mano de M3 1.51 $130.90 $197.66 0.26%
ECM02IA
obra, equipo y herramienta

Registro de 0.40x0.60x0.80 m. de muros de tabique
rojo recocido, asentado con mezcla cemento arena
1:5, con aplanado pulido en el interior, con tapa de 5
cm. de espesor de concreto de F'c=150 kg/cm2, con
PZA 3.00 $1,361.58 $4,084.74 5.43%

marco y contramarco comercial, piso de 8 cm. de
espesor de concreto de F'c=150 kg/cm2, incluye:
materiales, acarreos, excavacin, mano de obra,
equipo y herramienta.
RS468
Acarreo en carretilla 1a estacin de 20 m., de material
producto de la demolicin y/o excavacin, incluye: M3/E 9.12 $87.26 $795.81 1.06%
CAC1E
mano de obra, equipo y herramienta.
Total:
DRENAJES $10,328.87


A04
INSTALACION HIDROSANITARIA

Salida hidrosanitaria utilizando tuberia de cobre y de
pvc , incluye: conexiones, valvulas materiales, de
consumo, desperdicios, pruebas, mano de obra,
SAL 9.00 $2,277.13 $20,494.17 27.24%

SALHSPVC
equipo y herramienta.

Total:
INSTALACION HIDROSANITARIA $20,494.17

A05
MUROS, CASTILLOS Y COLUMNAS

Muro de 6 cm. de espesor (capuchino) de tabique rojo
recocido, asentado con mezcla cemento arena
1:5 acabado comn, incluye: materiales, mano de
M2 114.04 $247.88 $28,268.24 25.18%

obra, equipo y herramienta.
MTR06

Castillo de 15x20 cm. de concreto hecho en obra de
F'c=250 kg/cm2, acabado comn, armado con 6
varillas de 3/8" y estribos del No.2 a cada 10 cm.,
M 52.00 $293.65 $15,269.80 13.60%

incluye: materiales, acarreos, cortes, desperdicios,
traslapes, amarres, cimbrado, coldado, descimbrado,
mano de obra, equipo y herramienta.
CA1520610

Cadena de 15x20 cm. de concreto hecho en obra de
F'c=200 kg/cm2, acabado comn, armado con 4
varillas de 3/8" y estribos del No.2 a cada 20 cm.,
incluye: materiales, acarreos, cortes, desperdicios,
M 20.75 $221.08 $4,587.41 4.09%

traslapes, amarres, cimbrado, coldado, descimbrado,
mano de obra, equipo y herramienta.
D152043
Total:
MUROS, CASTILLOS Y COLUMNAS $48,125.45

A06
LOSAS
CADENA M 58.95 $32.99 $1,944.76 1.73%
CADENA1

ARMEX 15-20-4 M 58.95 $45.30 $2,670.44 2.38%
ARMEX15204
Losa de 20 cms. a base de vigueta y bovedilla para
un claro maximo de 4.75 m, con viguetas colocadas a
cada 75 cms, con bovedilla de concreto de 16 cm.,
con capa de compresion de 4 cms. de espesor
M2 61.06 $580.60 $35,451.44 31.57%

armado con malla electrosoldada 6x6-10/10, acabado
pulido integral, incluye: cimbrado, descimbrado, ,
bombeo, colado, vibrado, mano de obra, equipo y
LOSVB20-E45 herramienta.
Trabe de 15x45 cms. de concreto premezclado de
F'c= 250 kg/cm2, armado con 5 varillas del No.5, 5
varillas del No. 4, estribos y grapas del No. 2 a cada M 4.00 $716.63 $2,866.52 2.55%
15 cms. cabado comun, incluye: cimbrado,
T005
descimbra, mano de obra, equipo y herramienta.

Total:
LOSAS $42,933.16


A07
AZOTEA

Relleno de 10 cm.de espesor promedio, de tezontle
en azotea, incluye: materiales, acareos, elevacin, M2 6.11 $39.29 $240.06 0.21%
mano de obra, equipo y herramienta.
RTZ10

Entortado de 4 cm. de espesor a base de mezcla
cemento-cal-arena en proporcin 1:1:8, incluye: trazo,
M2 61.06 $84.28 $5,146.14 4.58%

nivelacion, acarreos, elevacin, mano de obra, equipo
y herramienta.
ENT4118
Impermeabilizacin a base de una impregnacin de
microprimer y dos capas de microseal 2F alternadas
con una malla de festerflex, una capa de arena
cernida y como acabado final una aplicacin de M2 30.30 $123.65 $3,746.60 3.34%
festerblanc color blanco, incluye: materiales,
acarreos, elevacin, desperdicio, mano de obra,
IMPMICROV1 equipo y herramienta.
Enladrillado en azotea asentado con mezcla cemento
arena en proporcin 1:5, incluye: lechada, mano de M2 61.06 $174.75 $10,670.24 9.50%
obra, equipo y herramienta.
ENLADRI
Chaflan de 15 cm. de mezcla cemento-arena 1:5,
incluye: materiales, acarreos, mano de obra, equipo y M 4.66 $71.13 $331.47 0.30%
CHAF15 herramienta
COLADERA BRONCE 10x10 PZA 1.00 $77.58 $77.58 0.07%
106-215-10
301-022-ECO-
TINACO ECOPLUS MARCA REX DE 750 LTS PZA 1.00 $1,011.96 $1,011.96 0.90%

Total:
AZOTEA $21,224.05



A08
ALBAILERIA
Aplanado acabado fino en muros de planta baja, con
mezcla cemento arena 1:5, para volumenes mayores,
incluye: materiales, mano de obra, equipo y
M2 114.00 $118.59 $13,519.26 22.32%

APLF15PBV
herramienta.
Compactacin del fondo de la excavacin por medios

COMPMO
manuales, incluye: afine y nivelacin.
M2 61.06 $13.10 $799.89 1.32%

Afine, nivelacin y compactacin del fondo de la
excavacin con bailarina, incluye: materiales, mano M2 61.06 $21.02 $1,283.48 2.12%
COMBAI
de obra, equipo y herramienta.
Piso de 6 cms. de espesor de concreto de F'c= 150
kg/cm2, con colorante integral S.M.A., acabado
M2 61.06 $308.19 $18,818.08 31.07%

martelinado, incluye: materiales, mano de obra,
PCCC
equipo y herramienta.

Total:
ALBAILERIA $34,420.71


A09
CARPINTERIA
4535-1
PUERTA DE 0.55x1.20 INSTITUC. ACERO INOX. PZA 1.00 $1,963.83 $1,963.83 3.24%

PTAPFA
PUERTA PREFABRICADA DE ALUMINIO DE .90X2 PZA 5.00 $1,237.22 $6,186.10 10.21%

Closet de 1.8 m. por 2.4 m, de altura y 0.65 m. de
ancho, dos puertas corredizas, con bastidor a base
peinazos de 32x32 mm de madera de pino de 1a, a
cada 30 cms., en ambos sentidos, forradas con
triplay de pino de 6 mm, por ambas caras, con, 4
PZA 2.00 $5,955.09 $11,910.18 19.67%

entrepaos, fabricados a base de triplay de pino de
1a. de 16 mm, acabado con barniz natural, Incluye:
materiales, acarreos, cortes, desperdicios, armado, riel,
carretillas, herrajes, mano de obra, equipo,
herramienta y limpieza,
CLOSETPE182
Total:
CARPINTERIA $20,060.11


A10
ALUMINIO Y CRISTAL

Ventana de 0.60 x 0.60 m. fija a base de perfiles de
aluminio duranidik linea bolsa de 2"x1.25" con cristal
filtrasol gris de 6 mm, incluye: materiales, cortes, PZA 5.00 $541.13 $2,705.65 4.47%
herrajes, fijacin, sellado con silicon, mano de obra,
VED0606BF
equipo y herramienta.
Ventana de 1.50x1.20 m. de aluminio prefabricada,
con cristal claro de 3 mm., incluye: materiales, mano PZA 3.00 $1,125.73 $3,377.19 5.58%
V1512
de obra, equipo y heramienta.
Total:
ALUMINIO Y CRISTAL $6,082.84

A11
INST ELECTRICA

Salida elctrica para alumbrado a base de poliducto de
lnea econmica, con una caja cuadrada
galvanizada de 13 y una caja chalupa galvanizada, SAL 8.00 $392.04 $3,136.32 3.71%
incluye: un codo, soquet de baquelita, apagador y
SALP04
placa


Salida elctrica para alumbrado a base de poliducto de
13 mm., con un desarrollo de 4 m, con cable thw
cal. 12 lnea econmica, con una caja cuadrada
SAL 8.00 $392.04 $3,136.32 3.71%

galvanizada de 13 y una caja chalupa galvanizada,
incluye: un codo, soquet de baquelita, apagador y
placa
SALP04
QO24L70 ( )
CENTRO DE CARGA QO24L70 1 FASE, 3 HILOS PZA 1.00 $557.69 $557.69 0.66%

MUFA38
MUFA DE 38 MM. PZA 1.00 $72.19 $72.19 0.09%

Total:
INST ELECTRICA $6,902.52


A12
ACABADOS PLAFONES Y MUROS
Tirol planchado en muros a base de cemento blanco-
cal-cero fino, para volumenes mayores, incluye: M2 61.06 $46.48 $2,838.07 3.36%
TIROLPV
andamios, mano de obra, equipo y herramienta.
Aplanado acabado repellado sobre muros, con
mezcla cemento arena 1:5, en planta baja, incluye: M2 114.04 $118.59 $13,524.00 15.99%
APLR15PB
materiales, mano de obra, equipo y herramienta.
Pintura vinilica en muros marca Comex Durex a dos
manos, incluye: aplicacin de sellador, materiales,
M2 289.13 $44.67 $12,915.44 15.27%

preparacin de la superficie, mano de obra, equipo,
PVMDUR
herramienta y andamios.

310-102-11-11
AZULEJO 11X11 LISO 1ra. AGUACATE M2 4.49 $131.20 $589.09 0.70%

Total:
ACABADOS PLAFONES Y MUROS $29,866.60


A13
ACABADOS EN PISO Y ESPECIALES
310-102-11-11
AZULEJO 11X11 LISO 1ra. AGUACATE M2 61.06 $131.20 $8,011.07 9.47%
Total:
ACABADOS EN PISO Y ESPECIALES $8,011.07

A14
MUEBLES SANITARIOS
Lavabo Modelo Ovalin chico, color blanco, incluye:

ISL2
materiales, mano de obra, instalacin y pruebas.
PZA 1.00 $1,185.73 $1,185.73 1.40%

Lavadero de concreto con color, incluye: mano de
PZA 1.00 $1,310.91 $1,310.91 1.55%
LAVADERO1
obra, equipo y herramienta.
304-300-0
CESPOL S/C ECON P/LAV PZA 1.00 $43.60 $43.60 0.05%
105-300-88-4
REGADERA AJUSTABLE COLOR NGO PZA 1.00 $54.59 $54.59 0.06%
303-234-75T-

38
LLAVE GLOBO 38 mm COLLINGNON PZA 1.00 $276.87 $276.87 0.33%

100-051-1206
ACCESORIOS DE 6 PZAS MOD 1206 PAQ 1.00 $726.47 $726.47 0.86%

ESPEJO L.ECO GIG 40X60 NATURAL PZA 1.00 $114.42 $114.42 0.14%
305-055-GI-
300-044-G-10S
CALENTADOR SEMI 40 LT 6040 L. DORAD PZA 1.00 $890.28 $890.28 1.05%
101-003-46LB
MEZCLADORA P/LAV 4" C/MLS LEBARON 4 PZA 1.00 $181.81 $181.81 0.22%

MUEBLES SANITARIOS $4,784.68
Total:

A15
CISTERNA

Cisterna de 8 m3 de capacidad de 2.25x2.25x1.60 m, a
base de muros y losa de concreto de 12 cm. de espesor,
armado con varilla de 3/8" a cada 20 cms.
en ambos sentidos, incluye: trazo, excavacin, carga
y acarreo de material sobrante fuera de la obra, PZA 1.00 $32,446.55 $32,446.55 38.37%
plantilla, armado, cimbrado, descimbrado, colado,
vibrado, relleno, carcamo, aplanado interior acabado
pulido, escalera marina, tapa registro de lmina y
limpieza.
CIST10
Acarreo en carretilla de material producto de la
excavacin y/o demolicin estaciones subsecuentes M3 15.00 $49.13 $736.95 0.87%
CACES
de 20 m, incluye: mano de obra y herramienta.
Total:
CISTERNA $33,183.50


A16
TERMINACION DE OBRA
Limpieza fina de la obra para entrega, para
volumenes mayores, incluye: materiales, mano de M2 70.78 $14.04 $993.75 1.18%
LFINAV
obra, equipo y herramienta.
Limpieza gruesa durante la obra, para volumenes
mayores, incluye: mano de obra, equipo y M2 70.78 $11.65 $824.59 0.98%
LGRUESAV herramienta.
Total:
TERMINACION DE OBRA $1,818.34



INSUMOS




LISTADO DE INSUMOS QUE INTERVIENEN EN LA INTEGRACIN DE LA PROPUESTA


Cdigo Concepto Unidad Fecha Cantidad Precio Importe %Incidencia
1 MATERIALES
001-001-1-13T TUBO COBRE T/M 13 mm x 1 mt NACOBR TRM 01-Ago-2008 4.7250 $285.48 $1,348.89 2.28%
001-001-1-19T TUBO COBRE T/M 19 mm x 1 mt NACOBR TRM 01-Ago-2008 3.1500 $454.18 $1,430.67 2.42%
001-001-1-25T TUBO COBRE T/M 25 mm x 1 mt NACOBR TRM 01-Ago-2008 1.2600 $674.77 $850.21 1.44%
002-001-12-
TEE CaC RED. 19X19X13 mm. NACOBRE PZA 01-Ago-2008 9.0000 $31.14 $280.26 0.47%

191913
002-001-12-
TEE CaC RED. 25X25X19 mm. NACOBRE PZA 01-Ago-2008 4.5000 $73.62 $331.29 0.56%
252519
002-001-1-9013 CODO CaC 90x13 mm. NACOBRE PZA 01-Ago-2008 18.0000 $4.02 $72.36 0.12%
002-001-1-9019 CODO CaC 90x19 mm. NACOBRE PZA 01-Ago-2008 9.0000 $8.89 $80.01 0.14%
002-001-1-9025 CODO CaC 90x25 mm. NACOBRE PZA 01-Ago-2008 4.5000 $23.88 $107.46 0.18%
002-001-4-9013 CODO CaF R/INT 13X90 mm. NACOBRE PZA 01-Ago-2008 1.8000 $23.36 $42.05 0.07%
041-001-15-50T TUBO PVC E/L 50mm x 1 mto SANIT DUR TRM 01-Ago-2008 3.1500 $88.70 $279.41 0.47%
041-001-15-94T TUBO PVC E/L 100mm x 1 mto SANIT DU TRM 01-Ago-2008 2.3625 $242.49 $572.88 0.97%
042-001-A-11-94 TEE SENCILLA DUR 100 mm. SANIT PZA 01-Ago-2008 2.5714 $36.37 $93.52 0.16%
042-001-A-1-
CODO PVC DUR 45GX 100 mm. SANIT PZA 01-Ago-2008 13.5000 $24.18 $326.43 0.55%

4594
042-001-A-30-94 YEE DOBLE 100x100 mm. DUR SANIT PZA 01-Ago-2008 2.5714 $220.97 $568.21 0.96%
042-001-E-1-
CODO PVC SANIT 87.5X50 DUR. CEMENTA PZA 01-Ago-2008 6.7500 $1.83 $12.35 0.02%
9050
1. ALAMBRE RECOCIDO KG 01-Ago-2008 11.7900 $16.26 $191.71 0.32%
106-001-94 COLADERA PVC DUR 100 mm. SANIT PZA 01-Ago-2008 2.2500 $31.33 $70.49 0.12%
2. ALAMBRON KG 01-Ago-2008 68.3820 $13.91 $951.19 1.61%
3. VARILLA DE 3/8" 9.5 MM KG 01-Ago-2008 155.1100 $12.81 $1,986.96 3.36%
303-003-702-13 VALV. COMPUERTA 125 LBS. 702-13 mm PZA 01-Ago-2008 1.3500 $265.71 $358.71 0.61%
303-003-702-19 VALV. COMPUERTA 125 LBS 702-19 mm PZA 01-Ago-2008 4.0500 $257.82 $1,044.17 1.77%
360-210-15-4 ROLLO LIJA 25 RLL 01-Ago-2008 0.1800 $178.62 $32.15 0.05%
360-211-16-6 PASTA PARA SOLDAR SILER 500 grs PZA 01-Ago-2008 1.8000 $32.79 $59.02 0.10%
360-211-17-26 BOTE PEGAMENTO SILER 225 grs ESPEC PZA 01-Ago-2008 4.5000 $41.51 $186.80 0.32%
360-211-17-40 LIMPIADOR SILER 500 ml PZA 01-Ago-2008 1.5548 $27.83 $43.27 0.07%
360-213-18-6 CARRETE SOLD. 95 X 5 ZETA PZA 01-Ago-2008 0.9000 $113.98 $102.58 0.17%
360-214-18-12 CARRETE SOLD. 50 X 50 OMEGA PZA 01-Ago-2008 1.3491 $79.80 $107.66 0.18%
AGUA AGUA ( MANEJO) M3 01-Ago-2008 2.7354 $16.36 $44.75 0.08%
ARENA ARENA M3 01-Ago-2008 4.9125 $125.00 $614.06 1.04%
BARROTE BARROTE DE PINO DE 3a DE 1.5"x3.5"x8.25' PZA 01-Ago-2008 4.0300 $30.45 $122.71 0.21%
CAL CALHIDRA TON 01-Ago-2008 0.0184 $1,100.00 $20.24 0.03%
CEMENTOG CEMENTO GRIS TON 01-Ago-2008 1.7722 $1,450.00 $2,569.71 4.35%
CLAVOS CLAVOS DE 2 A 4 " KG 01-Ago-2008 9.9250 $19.00 $188.58 0.32%
DIESEL DIESEL LTO 01-Ago-2008 8.8425 $6.26 $55.35 0.09%
DUELA DUELA DE PINO DE 3a DE 3/4"x3.5"x8.25'' PZA 01-Ago-2008 31.3150 $21.00 $657.62 1.11%
GRAVA GRAVA M3 01-Ago-2008 1.9043 $130.00 $247.56 0.42%
GRAVAC GRAVA CONTROLADA M3 01-Ago-2008 2.8800 $105.00 $302.40 0.51%
IMPERFEST IMPERFEST ACRILICO 19L 01-Ago-2008 0.9196 $1,450.00 $1,333.45 2.26%
MAHILO HILO CAAMO PZA 01-Ago-2008 0.0920 $12.04 $1.11
MARCO MARCO Y CONTRAMARCO COMERCIAL PZA 01-Ago-2008 3.0000 $97.15 $291.45 0.49%
MATUB15
TUBO DE CONCRETO SIMPLE DE 15 CM.
M 01-Ago-2008 12.0000 $42.00 $504.00 0.85%
DE DIA
PIEDRAB PIEDRA BRAZA M3 01-Ago-2008 7.4482 $116.87 $870.47 1.47%
POLIETILEN80 POLIETILENO 800 (ROLLO DE 0.40x100 M) 100M 01-Ago-2008 0.2948 $708.54 $208.84 0.35%
POLIN POLIN DE PINO DE 3a DE 3.5"x3."x8.25'' PZA 01-Ago-2008 9.9250 $50.40 $500.22 0.85%
TABIQUE TABIQUE ROJO RECOCIDO MIL 01-Ago-2008 0.4200 $1,402.38 $589.00 1.00%
Total: MATERIALES $20,652.23



2 MANO DE OBRA
MO011 PEON JOR 01-Ago-2008 57.1252 $251.11 $14,344.72 24.27%
MO021 AYUDANTE GENERAL JOR 26-Nov-2008 2.6132 $213.98 $559.16 0.95%
MO031 AYUDANTE ESPECIALIZADO JOR 26-Nov-2008 9.7921 $230.69 $2,258.94 3.82%
MO041 OFICIAL ALBAIL JOR 01-Ago-2008 14.0262 $441.59 $6,193.85 10.48%
MO064 OFICIAL COLOCADOR JOR 01-Ago-2008 0.7369 $476.11 $350.83 0.59%
MO082 CABO DE OFICIOS JOR 26-Nov-2008 5.9321 $483.77 $2,869.75 4.86%
MO083 OFICIAL PLOMERO JOR 01-Ago-2008 9.4737 $500.43 $4,740.92 8.02%
MO092 TOPOGRAFO JOR 01-Ago-2008 0.1592 $580.67 $92.45 0.16%
MO094 SOBRESTANTE JOR 01-Ago-2008 0.9474 $577.27 $546.89 0.93%
Total: MANO DE OBRA $31,957.51



3 EQUIPO Y HERRAMIENTA
%MO1 HERRAMIENTA MENOR % 01-Ago-2008 $961.03 1.63%
EQBAILAR BAILARINA DE 4.5 HP HOR 09-Dic-2008 2.2281 $57.48 $128.07 0.22%
EQCAMION CAMION DE VOLTEO DE 7 M3 HOR 09-Dic-2008 13.2483 $299.04 $3,961.77 6.70%
EQD6R
TRACTOR DE ORUGAS CAT D6R 165 HP,
HOR 09-Dic-2008 0.8494 $633.27 $537.87 0.91%
18000
EQMOTO MOTONIVELADORA CAT. 120H, DE 140 HP HOR 09-Dic-2008 0.8608 $578.14 $497.68 0.84%
EQREV
REVOLVEDORA P/CONCRETO DE 1 SACO 8
HOR 09-Dic-2008 1.4806 $53.16 $78.71 0.13%

DE HP
EQRVIBRA
RODILLO VIBRATORIO WACKER DE 1/2
HOR 09-Dic-2008 0.4800 $62.38 $29.94 0.05%

TON
EQTRAN EQUIPO DE TOPOGRAFIA HOR 09-Dic-2008 3.6800 $6.70 $24.66 0.04%
EQVAP VIBROCOMPACTADOR VAP 70 HOR 09-Dic-2008 0.2946 $346.06 $101.94 0.17%
Total: EQUIPO Y HERRAMIENTA $6,321.67



5 SUBCONTRATOS
PLAN0001 MAQUILA DE PLANO PZA 01-Ago-2008 0.1132 $1,500.00 $169.83 0.29%
Total: SUBCONTRATOS $169.83

LISTADO DE INSUMOS QUE INTERVIENEN EN LA INTEGRACIN DE LA PROPUESTA
Cdigo Concepto Unidad Fecha Cantidad Precio Importe %Incidencia
1 MATERIALES
1. ALAMBRE RECOCIDO KG 01-Ago-2008 22.6765 $16.26 $368.72 0.42%
106-215-10 COLADERA BRONCE 10x10 PZA 08-Ene-2008 1.0000 $60.94 $60.94 0.07%
2. ALAMBRON KG 01-Ago-2008 116.6300 $13.91 $1,622.32 1.84%
3. VARILLA DE 3/8" 9.5 MM KG 01-Ago-2008 256.7500 $12.81 $3,288.97 3.73%
301-022-ECO-
TINACO ECOPLUS MARCA REX DE 750 LTS PZA 08-Ene-2008 1.0000 $794.91 $794.91 0.90%

750
4. VARILLA DE 1/2" 12.7 MM KG 01-Ago-2008 21.4000 $12.81 $274.13 0.31%
5. VARILLA DE 5/8" 15.9 MM KG 01-Ago-2008 33.4000 $12.69 $423.85 0.48%
661010 MALLA ELECTROSOLDADADA 6x6/10-10 M2 01-Ago-2008 67.1660 $15.00 $1,007.49 1.14%
AGUA AGUA ( MANEJO) M3 01-Ago-2008 3.3327 $16.36 $54.52 0.06%
ARENA ARENA M3 01-Ago-2008 9.6514 $125.00 $1,206.43 1.37%
ARMEX15204 ARMEX 15-20-4 M 08-Ene-2008 58.9500 $35.58 $2,097.44 2.38%
BARROTE BARROTE DE PINO DE 3a DE 1.5"x3.5"x8.25' PZA 01-Ago-2008 2.0000 $30.45 $60.90 0.07%
BOVEDILLA16 BOVEDILLA DE 16X20X63 CM PZA 01-Ago-2008 457.9500 $11.00 $5,037.45 5.71%
CADENA1 CADENA M 08-Ene-2008 58.9500 $25.91 $1,527.39 1.73%
CAL CALHIDRA TON 01-Ago-2008 0.3664 $1,100.00 $403.00 0.46%
CEMENTOG CEMENTO GRIS TON 01-Ago-2008 2.8139 $1,450.00 $4,080.22 4.63%
CLAVOS CLAVOS DE 2 A 4 " KG 01-Ago-2008 14.1280 $19.00 $268.43 0.30%
CP12
CONCRETO PREM. C-1, F'c=250 KG/CM2,
M3 01-Ago-2008 2.7795 $1,349.09 $3,749.74 4.25%
NOR
CP60
BOMBEO C/BOMBA EST.DE 00 A 15 M.
M3 01-Ago-2008 2.5035 $112.19 $280.86 0.32%
VERTICA
CP76
REVENIMIENTO DE 18+-3.5 PARA
M3 01-Ago-2008 2.5035 $112.19 $280.86 0.32%

BOMBEABLES
DIESEL DIESEL LTO 01-Ago-2008 4.3125 $6.26 $27.00 0.03%
DUELA DUELA DE PINO DE 3a DE 3/4"x3.5"x8.25'' PZA 01-Ago-2008 71.5870 $21.00 $1,503.33 1.70%
FESTERB19 FESTERBLANC BLANCO 19L 01-Ago-2008 0.2909 $1,630.31 $474.22 0.54%
FESTERF100 FESTERFLEX 1.10x10 M 100M2 01-Ago-2008 0.3333 $498.55 $166.17 0.19%
GRAVA GRAVA M3 01-Ago-2008 1.4300 $130.00 $185.91 0.21%
LADRILLO LADRILLO RECOCIDO MIL 01-Ago-2008 2.3203 $1,117.84 $2,593.70 2.94%
MACOM MUESTREO DE CONCRETO PZA 01-Ago-2008 0.4071 $252.21 $102.67 0.12%
MICROPRIM19 MICROPRIMER 19L 01-Ago-2008 0.3984 $338.25 $134.77 0.15%
MICROSEAL19 MICROSEAL No. 2F 19L 01-Ago-2008 3.1876 $413.58 $1,318.31 1.49%
POLIN POLIN DE PINO DE 3a DE 3.5"x3."x8.25'' PZA 01-Ago-2008 8.1810 $50.40 $412.32 0.47%
TABIQUE TABIQUE ROJO RECOCIDO MIL 01-Ago-2008 3.8774 $1,402.38 $5,437.53 6.17%
TEZONTLE TEZONTLE 20 MM M3 01-Ago-2008 0.6721 $180.00 $120.98 0.14%
VIGUETA475 VIGUETA PARA LOSA CLARO 4.75 M. MAX M 01-Ago-2008 91.5900 $133.13 $12,193.38 13.82%
Total: MATERIALES $51,558.86

2 MANO DE OBRA
MO011 PEON JOR 01-Ago-2008 43.3363 $251.11 $10,882.19 12.34%
MO021 AYUDANTE GENERAL JOR 01-Ago-2008 4.5227 $273.55 $1,237.19 1.40%
MO041 OFICIAL ALBAIL JOR 01-Ago-2008 41.4083 $441.59 $18,285.48 20.73%
MO051 OFICIAL FIERRERO JOR 01-Ago-2008 0.8459 $466.13 $394.30 0.45%
MO052 OFICIAL CARPINTERO DE O. NEGRA JOR 01-Ago-2008 2.4631 $490.65 $1,208.54 1.37%
MO064 OFICIAL COLOCADOR JOR 01-Ago-2008 1.0100 $476.11 $480.87 0.55%
MO082 CABO DE OFICIOS JOR 01-Ago-2008 4.7040 $486.16 $2,286.88 2.59%
Total: MANO DE OBRA $34,775.45



3 EQUIPO Y HERRAMIENTA
%MO1 HERRAMIENTA MENOR % 01-Ago-2008 $1,044.06
1.18%
%MO2 ANDAMIOS % 01-Ago-2008 $705.04
0.80%
EQREV REVOLVEDORA P/CONCRETO DE 1 SACO HOR 09-Dic-2008 1.1172 $53.16 $59.39
0.07%
8
DE HP
EQVIB VIBRADOR PARA CONCRETO HOR 09-Dic-2008 1.2212 $46.41 $56.68
0.06%
Total: EQUIPO Y HERRAMIENTA $1,865.17



LISTADO DE INSUMOS QUE INTERVIENEN EN LA INTEGRACION DE LA PROPUESTA
Cdigo Concepto Unidad Fecha Cantidad Precio Importe %Incidencia
1 MATERIALES
4535-1
PUERTA DE 0.55x1.20 INSTITUC. ACERO
PZA 08-Ene-2008 1.0000 $1,542.62 $1,542.62 3.24%
INOX
6370D JUNQUILLO RECTO DURANODIC PZA 01-Ago-2008 0.5500 $80.99 $44.54 0.09%
9074D ESCALONADO DE 11/2" DURANODIC PZA 01-Ago-2008 0.5500 $157.49 $86.62 0.18%
9083D BOLSA DE 2" DURANODIC PZA 01-Ago-2008 2.2000 $304.55 $670.01 1.41%
AGUA AGUA ( MANEJO) M3 01-Ago-2008 2.5983 $16.36 $42.51 0.09%
AGUARRAS AGUARRAS LT 01-Ago-2008 1.5730 $16.16 $25.42 0.05%
ARENA ARENA M3 01-Ago-2008 6.2497 $125.00 $781.21 1.64%
BARNIZ BARNIZ LT 01-Ago-2008 4.7667 $44.17 $210.54 0.44%
BRIDAPC2
BRIDA P/TUBO DE 1" DE DIAM. P/CLOSET
JGO 01-Ago-2008 2.0000 $7.15 $14.30 0.03%

ECO
CARRETILLAPC CARRETILLA P/PUERTA DE CLOSET
PZA 01-Ago-2008 8.0000 $10.75 $86.00 0.18%

2 ECONOMICA
CEMENTOG CEMENTO GRIS TON 01-Ago-2008 2.5458 $1,450.00 $3,691.44 7.76%
CHAPAM CHAPA DE MADERA M2 01-Ago-2008 1.1040 $105.18 $116.12 0.24%
CLAVOSSC CLAVOS SIN CABEZA KG 01-Ago-2008 1.4609 $31.30 $45.73 0.10%
DUELA DUELA DE PINO DE 3a DE 3/4"x3.5"x8.25'' PZA 01-Ago-2008 7.3272 $21.00 $153.87 0.32%
FS06 CRISTAL FILTRASOL DE 6 MM AL CORTE M2 01-Ago-2008 2.0000 $278.53 $557.06 1.17%
GA32 COLOR PARA CEMENTO KG 01-Ago-2008 61.0600 $45.95 $2,805.71 5.90%
GM305 RESISTOL 850 DE 1 LT LT 01-Ago-2008 2.4200 $65.00 $157.30 0.33%
GRAVA GRAVA M3 01-Ago-2008 2.4619 $130.00 $320.05 0.67%
LIJA LIJA PZA 01-Ago-2008 8.2000 $3.60 $29.52 0.06%
PIJA PIJA PZA 01-Ago-2008 120.0000 $0.53 $63.60 0.13%
PINO1 MADERA DE PINO DE 1a PT 01-Ago-2008 50.4347 $21.03 $1,060.64 2.23%
PTAPFA
PUERTA PREFABRICADA DE ALUMINIO
PZA 08-Ene-2008 5.0000 $971.85 $4,859.25 10.21%
DE .90X2
RIELAPC2
RIEL DE ALUMINIO DE 3.00 M. P/CLOSET
PZA 01-Ago-2008 2.0000 $104.19 $208.38 0.44%
ECO
SILICON SILICON CAR 01-Ago-2008 2.6667 $49.94 $133.17 0.28%
TAQUETE TAQUETE PZA 01-Ago-2008 68.0000 $0.38 $25.84 0.05%
TRIPLAYP16 TRIPLAY DE PINO DE 16 MM PZA 01-Ago-2008 2.1083 $304.50 $641.99 1.35%
TRIPLAYP6 TRIPLAY DE PINO DE 6 MM PZA 01-Ago-2008 8.0000 $189.00 $1,512.00 3.18%
TUBOPC1 TUBO CROMADO DE 1" DE DIAM. DE 3 M. PZA 01-Ago-2008 2.0000 $89.39 $178.78 0.38%
VA1512 VENTANA DE ALUMINIO DE 1.50X1.20 PZA 01-Ago-2008 3.0000 $711.26 $2,133.78 4.49%
VINIL VINIL M 01-Ago-2008 12.0000 $2.54 $30.48 0.06%
Total: MATERIALES $22,228.48



2 MANO DE OBRA
MO011 PEON JOR 01-Ago-2008 34.3487 $251.11 $8,625.31 18.13%
MO021 AYUDANTE GENERAL JOR 01-Ago-2008 2.8554 $273.55 $781.10 1.64%
MO031 AYUDANTE ESPECIALIZADO JOR 01-Ago-2008 5.6003 $297.24 $1,664.63 3.50%
MO041 OFICIAL ALBAIL JOR 01-Ago-2008 15.7713 $441.59 $6,964.43 14.64%
MO065 OFICIAL BARNIZADOR JOR 01-Ago-2008 1.3333 $428.50 $571.33 1.20%
MO066 OFICIAL VIDRIERO JOR 01-Ago-2008 0.2500 $428.50 $107.13 0.23%
MO071 OFICIAL CARPINTERO DE O. BLANCA JOR 01-Ago-2008 4.6003 $499.62 $2,298.40 4.83%
MO081 OFICIAL ALUMINIERO JOR 01-Ago-2008 1.0000 $500.43 $500.43 1.05%
MO082 CABO DE OFICIOS JOR 01-Ago-2008 4.2262 $486.16 $2,054.59 4.32%
Total: MANO DE OBRA $23,567.35



3 EQUIPO Y HERRAMIENTA
%MO1 HERRAMIENTA MENOR % 01-Ago-2008 $706.37 1.48%
%MO2 ANDAMIOS % 01-Ago-2008 $383.78 0.81%
EQBAILAR BAILARINA DE 4.5 HP HOR 09-Dic-2008 10.1970 $57.48 $586.12 1.23%
EQREV
REVOLVEDORA P/CONCRETO DE 1 SACO 8
HOR 09-Dic-2008 1.9234 $53.16 $102.25 0.21%

DE HP
Total: EQUIPO Y HERRAMIENTA $1,778.52



LISTADO DE INSUMOS QUE INTERVIENEN EN LA INTEGRACION DE LA PROPUESTA
Cdigo Concepto Unidad Fecha Cantidad Precio Importe %Incidencia
1 MATERIALES
%MO3 MATERIALES MENORES % 01-Ago-2008 $69.18 0.10%
1. ALAMBRE RECOCIDO KG 01-Ago-2008 16.2780 $16.26 $264.68 0.40%
100-051-1206 ACCESORIOS DE 6 PZAS MOD 1206 PAQ 08-Ene-2008 1.0000 $570.65 $570.65 0.86%
101-003-46LB MEZCLADORA P/LAV 4" C/MLS LEBARON 4 PZA 08-Ene-2008 1.0000 $142.81 $142.81 0.22%
105-300-88-4 REGADERA AJUSTABLE COLOR NGO PZA 08-Ene-2008 1.0000 $42.89 $42.89 0.06%
201-032-124-001 LAVABO OVALYN CHI.BLANCO PZA 01-Ago-2008 1.0000 $614.85 $614.85 0.93%
3. VARILLA DE 3/8" 9.5 MM KG 01-Ago-2008 198.6936 $12.81 $2,545.27 3.83%
300-044-G-10S CALENTADOR SEMI 40 LT 6040 L. DORAD PZA 08-Ene-2008 1.0000 $699.32 $699.32 1.05%
303-234-75T-38 LLAVE GLOBO 38 mm COLLINGNON PZA 08-Ene-2008 1.0000 $217.49 $217.49 0.33%
304-034-10PF CESPOL P/FREG P.V.C. FLEX 10PF PZA 01-Ago-2008 1.0000 $47.83 $47.83 0.07%
304-300-0 CESPOL S/C ECON P/LAV PZA 08-Ene-2008 1.0000 $34.25 $34.25 0.05%
305-055-GI-4060 ESPEJO L.ECO GIG 40X60 NATURAL PZA 08-Ene-2008 1.0000 $89.88 $89.88 0.14%
310-102-11-11 AZULEJO 11X11 LISO 1ra. AGUACATE M2 08-Ene-2008 65.5500 $103.06 $6,755.58 10.17%
7018 SOLDADURA ELECTRODO 7018 KG 01-Ago-2008 0.4250 $37.56 $15.96 0.02%
AA1281 SOCKET BAQ SENC CAFE PZA. 01-Ago-2008 16.0000 $2.89 $46.24 0.07%
AGUA AGUA ( MANEJO) M3 01-Ago-2008 3.4734 $16.36 $56.82 0.09%
ARENA ARENA M3 01-Ago-2008 7.0301 $125.00 $878.76 1.32%
BARROTE BARROTE DE PINO DE 3a DE 1.5"x3.5"x8.25' PZA 01-Ago-2008 18.8350 $30.45 $573.53 0.86%
BISAGRAT BISAGRA TUBULAR PZA 01-Ago-2008 2.0000 $5.67 $11.34 0.02%
CAL CALHIDRA TON 01-Ago-2008 0.0290 $1,100.00 $31.90 0.05%
CEMENTOB CEMENTO BLANCO TON 01-Ago-2008 0.1099 $3,420.00 $375.89 0.57%
CEMENTOG CEMENTO GRIS TON 01-Ago-2008 2.9567 $1,450.00 $4,287.16 6.45%
CINTA CINTA DE AISLAR PLASTICA PZA 01-Ago-2008 1.6000 $9.71 $15.54 0.02%
CLAVOS CLAVOS DE 2 A 4 " KG 01-Ago-2008 8.0400 $19.00 $152.76 0.23%
CO05
PINTURA VINILICA DUREX MASTER 14-00
LT 01-Ago-2008 115.6520 $24.34 $2,814.97 4.24%
BCO
CO08
PRIMARIO ANTICORROSIVO No.2, 89-97
LT 01-Ago-2008 0.5500 $41.85 $23.02 0.03%

BLANC
CO11 SELLADOR VINILICO 5x1 CLASICO LT 01-Ago-2008 28.9130 $24.29 $702.30 1.06%
DC0996I CABLE THW 12 NEG CAJA 01-Ago-2008 2.0160 $405.30 $817.08 1.23%
DIESEL DIESEL LTO 01-Ago-2008 11.3010 $6.26 $70.74 0.11%
DUELA DUELA DE PINO DE 3a DE 3/4"x3.5"x8.25'' PZA 01-Ago-2008 42.4396 $21.00 $891.23 1.34%
FB001 ANGULO DE FIER.1/8" x 3/4" TON 01-Ago-2008 0.0150 $16,278.00 $244.17 0.37%
FB044 REDONDO DE FIER. DE 3/4" TON 01-Ago-2008 0.0112 $16,278.66 $182.32 0.27%
FB084 LAMINA NEGRA CAL. 10 Y 12 TON 01-Ago-2008 0.0120 $22,000.00 $264.00 0.40%
FB105 PLACA A-36 DE 8'' DE 3/8 A 2" TON 01-Ago-2008 0.0165 $15,300.00 $252.45 0.38%
GA03
BLOCK DE CONCRETO PESADO DE
PZA 01-Ago-2008 13.0000 $6.09 $79.17 0.12%



1 MATERIALES
14x20x40
GA33 ESCALERILLA CAL. 12 M 01-Ago-2008 2.6000 $3.78 $9.83 0.01%
GRAVA GRAVA M3 01-Ago-2008 2.3206 $130.00 $301.68 0.45%
LAVADEROC LAVADERO DE CONCRETO PZA 01-Ago-2008 1.0000 $445.20 $445.20 0.67%
LIGAT LIGA TIROL LT 01-Ago-2008 15.2650 $18.04 $275.38 0.41%
MAHILO HILO CAAMO PZA 01-Ago-2008 0.0122 $12.04 $0.15
MARESINA RESINA ACRILICA BTE 01-Ago-2008 0.5000 $45.75 $22.88 0.03%
MUFA38 MUFA DE 38 MM. PZA 08-Ene-2008 1.0000 $56.70 $56.70 0.09%
PIJA PIJA PZA 01-Ago-2008 64.0000 $0.53 $33.92 0.05%
PMARMOL POLVO DE MARMOL TON 01-Ago-2008 0.5862 $525.00 $307.74 0.46%
POLIN POLIN DE PINO DE 3a DE 3.5"x3."x8.25'' PZA 01-Ago-2008 8.5460 $50.40 $430.72 0.65%
QO24L70 ( )
CENTRO DE CARGA QO24L70 1 FASE, 3
PZA 08-Ene-2008 1.0000 $438.08 $438.08 0.66%
HILOS
RA1140 PLA AL ANOD DOR 1U PZA. 01-Ago-2008 16.0000 $24.51 $392.16 0.59%
RD0100 INT SENC PZA. 01-Ago-2008 16.0000 $20.35 $325.60 0.49%
TA3850 TAPA CUAD 75X 75MM 13MM GALV PZA. 01-Ago-2008 16.0000 $1.61 $25.76 0.04%
TAQUETE TAQUETE PZA 01-Ago-2008 32.0000 $0.38 $12.16 0.02%
THINNER THINNER STANDARD LT 01-Ago-2008 0.5500 $12.00 $6.60 0.01%
TT3366 POLIDUCTO NEG 13MM MTS. 01-Ago-2008 70.4000 $2.37 $166.85 0.25%
TT3817 CHALUPA 50X 90MM 13MM GALV PZA. 01-Ago-2008 16.0000 $5.00 $80.00 0.12%
TT3827 CAJA CUAD 75X 75MM 13MM GALV PZA. 01-Ago-2008 16.0000 $5.28 $84.48 0.13%
TT9901 CURVA POLIDUCTO 13 MM PZA 01-Ago-2008 16.0000 $1.85 $29.60 0.04%
Total: MATERIALES $28,327.52



2 MANO DE OBRA
MO011 PEON JOR 01-Ago-2008 34.0770 $251.11 $8,557.07 12.88%
MO021 AYUDANTE GENERAL JOR 01-Ago-2008 18.6927 $273.55 $5,113.40 7.70%
MO031 AYUDANTE ESPECIALIZADO JOR 01-Ago-2008 5.5125 $297.24 $1,638.54 2.47%
MO041 OFICIAL ALBAIL JOR 01-Ago-2008 15.9441 $441.59 $7,040.74 10.60%
MO051 OFICIAL FIERRERO JOR 01-Ago-2008 0.9250 $466.13 $431.17 0.65%
MO052 OFICIAL CARPINTERO DE O. NEGRA JOR 01-Ago-2008 3.7670 $490.65 $1,848.28 2.78%
MO053 OFICIAL PINTOR JOR 01-Ago-2008 8.0314 $441.59 $3,546.58 5.34%
MO062 OFICIAL YESERO JOR 01-Ago-2008 1.5265 $428.81 $654.58 0.99%
MO082 CABO DE OFICIOS JOR 01-Ago-2008 5.0900 $486.16 $2,474.57 3.73%
MO083 OFICIAL PLOMERO JOR 01-Ago-2008 0.3958 $500.43 $198.09 0.30%
MO084 OFICIAL ELECTRICISTA JOR 01-Ago-2008 3.2000 $499.35 $1,597.92 2.41%
MO091 OFICIAL SOLDADOR JOR 01-Ago-2008 0.9583 $583.41 $559.10 0.84%
MO094 SOBRESTANTE JOR 01-Ago-2008 0.4554 $577.27 $262.90 0.40%
Total: MANO DE OBRA $33,922.94



3 EQUIPO Y HERRAMIENTA
%MO1 HERRAMIENTA MENOR % 01-Ago-2008 $1,030.79 1.55%
%MO2 ANDAMIOS % 01-Ago-2008 $961.37 1.45%
EQBAILAR BAILARINA DE 4.5 HP HOR 09-Dic-2008 5.7450 $57.48 $330.22 0.50%
EQCAMION CAMION DE VOLTEO DE 7 M3 HOR 09-Dic-2008 5.2198 $299.04 $1,560.93 2.35%
EQECORTE EQUIPO DE CORTE OXI-ACETILENO HOR 09-Dic-2008 0.3000 $377.68 $113.30 0.17%
EQPLAN PLANTA DE SOLDAR MILLER HOR 09-Dic-2008 2.0500 $5.72 $11.73 0.02%
EQREV REVOLVEDORA P/CONCRETO DE 1 SACO HOR 09-Dic-2008 1.8350 $53.16 $97.55 0.15%
8
DE HP
EQVIB VIBRADOR PARA CONCRETO HOR 09-Dic-2008 1.5900 $46.41 $73.79 0.11%
Total: EQUIPO Y HERRAMIENTA $4,179.68

















































MATRICES



Cdigo Concepto Unidad Rendimiento Cantidad
Partida: Anlisis No.: 10
Anlisis:
DESPALME20 M2 70.78

Despalme de 20 cms. de espesor de capa vegetal a maquina, incluye. mano de obra, herramienta, equipo y todo lo necesario para
su correcta
ejecucin.
EQUIPO Y HERRAMIENTA
EQMOTO MOTONIVELADORA CAT. 120 H DE 140 HP HOR 125.00 0.0080
EQD6R TRACTOR DE ORUGAS CAT D6R 165 HP, 18000 KG HOR 83.33 0.0120



Partida: Anlisis No.: 20
Anlisis:
TZO1001 M2 70.78

Trazo y nivelacion con equipo topogrfico, estableciendo ejes de referencia y bancos de nivel, incluye: materiales, mano de obra,
equipo y
herramienta. (Mayor a 1000
m2)
MATERIALES
CAL CALHIDRA TON 0.0002
DUELA DUELA DE PINO DE 3a DE 3/4"x3.5"x8.25'' PZA 0.0200
MAHILO HILO CAAMO PZA 0.0010
3. VARILLA DE 3/8" 9.5 MM KG 0.0200
MANO DE OBRA
MO092 TOPOGRAFO JOR 800.00 800.0000
MO031 AYUDANTE ESPECIALIZADO JOR 400.00 400.0000
EQUIPO Y HERRAMIENTA
EQTRAN EQUIPO DE TOPOGRAFIA HOR 25.00 25.0000
%MO1 HERRAMIENTA MENOR % 0.0300
BASICOS
100.
CONCRETO DE F'c=100 KG/CM2. HECHO EN OBRA,
M3 0.0005

T.M.A=19 MM, RESISTENCIA NORMAL
SUBCONTRATOS
PLAN0001 MAQUILA DE PLANO PZA 0.0010



Partida: Anlisis No.: 30
Anlisis:
CMAFOL M3 21.23

Acarreo de material producto de la limpieza fina y gruesa de la obra
MANO DE OBRA
1P CUADRILLA No 1 (1 PEON) JOR 6.00 6.0000
EQUIPO Y HERRAMIENTA
EQCAMION CAMION DE VOLTEO DE 7 M3 HOR 2.00 2.0000
%MO1 HERRAMIENTA MENOR % 0.0300



Partida: Anlisis No.: 10
Anlisis:
ECM24IB M3 28.30
Excavacin de cepa, por medios manuales de -2.01 a -4.00 m, en material tipo I, zona B, incluye: mano de obra, equipo y
herramienta
MATERIALES
BARROTE BARROTE DE PINO DE 3a DE 1.5"x3.5"x8.25'' PZA 0.1000
CLAVOS CLAVOS DE 2 A 4 " KG 0.1000
POLIN POLIN DE PINO DE 3a DE 3.5"x3."x8.25'' PZA 0.1000
MANO DE OBRA
1P CUADRILLA No 1 (1 PEON) JOR 2.50 2.5000
2P CUADRILLA No 2 (2 PEONES) JOR 9.00 9.0000
EQUIPO Y HERRAMIENTA
%MO1 HERRAMIENTA MENOR % 0.0300



Partida: Anlisis No.: 20
Anlisis:
COMPMO M2 35.37

Compactacin del fondo de la excavacin por medios manuales, incluye: afine y nivelacin.
MANO DE OBRA
1P CUADRILLA No 1 (1 PEON) JOR 30.00 30.0000
EQUIPO Y HERRAMIENTA
%MO1 HERRAMIENTA MENOR % 0.0300



Partida: Anlisis No.: 30
Anlisis:
CIMPB6060 M 21.22

Cimiento de piedra braza de 60 cm. de base por 60 cm. de antura y 30 cm. de corona, incluye: trazo, excavacin, plantilla, relleno
con material
producto de la excavacin y retiro del material excedente fuera de la obra.
BASICOS
CP663
Cimiento de piedra braza de 0.60 m. de altura por 0.60 m. de
M 1.0000

base y corona de 0.30 m., asentada con mortero cemento arena
1:4, acabado comn, incluye: materiales, acarreos, cortes,
desperdicios, mano de obra, equipo y herramienta.
ECM02IIA
Excavacin de cepa, por medios manuales de 0 a -2.00 m, en
M3 0.5200

material tipo II, zona A, incluye: mano de obra, equipo y
herramienta
PLANH5
Plantilla de 5 cm. de espesor de concreto hecho en obra de F'c=
M2 0.8000

100 kg/cm2.
REMPEB
Relleno con material producto de la excavacin, compactado con
M3 0.2100

bailarina al 90% proctor, adicionando agua, incluye: mano de
obra, equipo y herramienta.
CMAFO
Acarreo en camin de material producto de la excavacin y/o
M3 0.3100

demolicin fuera de la obra, incluye: carga manual, equipo y
herramienta.
TZO500
Trazo y nivelacion con equipo topogrfico, estableciendo ejes de
M2 1.0000

referencia y bancos de nivel, incluye: materiales, mano de obra,
equipo y herramienta. (Hasta 500 m2)



Partida: Anlisis No.: 40
Anlisis:
D152043 M 58.95
Cadena de 15x20 cm. de concreto hecho en obra de F'c=200 kg/cm2, acabado comn, armado con 4 varillas de 3/8" y estribos del No.2 a cada 20
cm., incluye: materiales, acarreos, cortes, desperdicios, traslapes, amarres, cimbrado, coldado, descimbrado, mano de obra, equipo y
herramienta.
MATERIALES
DUELA DUELA DE PINO DE 3a DE 3/4"x3.5"x8.25'' PZA 0.5000
POLIN POLIN DE PINO DE 3a DE 3.5"x3."x8.25'' PZA 0.1000
CLAVOS CLAVOS DE 2 A 4 " KG 0.1000
1. ALAMBRE RECOCIDO KG 0.2000
DIESEL DIESEL LTO 0.1500
3. VARILLA DE 3/8" 9.5 MM KG 2.6000
2. ALAMBRON KG 1.1600
MANO DE OBRA
1A1P CUADRILLA No 5 (1 ALBAIL+1 PEON) JOR 10.00 10.0000
EQUIPO Y HERRAMIENTA
%MO1 HERRAMIENTA MENOR % 0.0300
BASICOS
200.
CONCRETO DE F'c=200 KG/CM2, HECHO EN OBRA, T.M.A.=
M3 0.0310

19 MM, RESISTENCIA NORMAL


Partida: Anlisis No.: 50
Anlisis:
IMPDM20 M 58.95

Impermeabilizacin para desplante de muros hasta de 20 cm. de ancho a base de capas de imperfest E alternadas con polietileno
800, incluye,
materiales, mano de obra, equipo y herramienta.
MATERIALES
POLIETILEN80 POLIETILENO 800 (ROLLO DE 0.40x100 M) 100M 0.0050
IMPERFEST IMPERFEST ACRILICO 19L 0.0156
MANO DE OBRA
1CO1A CUADRILLA No 12 (1 COLOCADOR + AY.) JOR 80.00 80.0000
EQUIPO Y HERRAMIENTA
%MO1 HERRAMIENTA MENOR % 0.0300



Partida: A02 Anlisis No.: 60
Anlisis:
REMPEC M3 7.07

Relleno con mterial producto de la excavacin, compactado a maquina al 90% proctor, adicionando agua, incluye: mano de obra,
equipo y
herramienta.
MATERIALES
AGUA AGUA ( MANEJO) M3 0.1000
MANO DE OBRA
1A CUADRILLA No 3 (1 AYUDANTE GENERAL) JOR 50.00 50.0000
EQUIPO Y HERRAMIENTA
EQMOTO MOTONIVELADORA CAT. 120 H DE 140 HP HOR 24.00 24.0000
EQVAP VIBROCOMPACTADOR VAP 70 HOR 24.00 24.0000
%MO1 HERRAMIENTA MENOR % 0.0300



Partida: Anlisis No.: 70
Anlisis:
CACES M3 31.83

Acarreo en carretilla de material producto de la excavacin y/o demolicin estaciones subsecuentes de 20 m, incluye: mano de obra y herramienta.
MANO DE OBRA
1P CUADRILLA No 1 (1 PEON) JOR 8.00 8.0000
EQUIPO Y HERRAMIENTA
%MO1 HERRAMIENTA MENOR % 0.0300



Partida: Anlisis No.: 10
Anlisis:
ECM24IA M3 12.00
Excavacin de cepa, por medios manuales de -2.01 a -4.00 m, en material tipo I, zona A, incluye: mano de obra, equipo y
herramienta
MATERIALES
POLIN POLIN DE PINO DE 3a DE 3.5"x3."x8.25'' PZA 0.1000
BARROTE BARROTE DE PINO DE 3a DE 1.5"x3.5"x8.25'' PZA 0.1000
CLAVOS CLAVOS DE 2 A 4 " KG 0.1000
MANO DE OBRA
1P CUADRILLA No 1 (1 PEON) JOR 3.00 3.0000
2P CUADRILLA No 2 (2 PEONES) JOR 9.00 9.0000
EQUIPO Y HERRAMIENTA
%MO1 HERRAMIENTA MENOR % 0.0300



Partida: Anlisis No.: 20
Anlisis:
CAMA02 M 12.00

Cama de arena de 10 cm. de espesor por 60 cm. de ancho para asentar tubera, incluye: materiales, acarreos, mano de obra,
equipo y heramienta.
MATERIALES
ARENA ARENA M3 0.0660
MANO DE OBRA
1A CUADRILLA No 3 (1 AYUDANTE GENERAL) JOR 33.00 33.0000
EQUIPO Y HERRAMIENTA
%MO1 HERRAMIENTA MENOR % 0.0300



Partida: Anlisis No.: 30
Anlisis:
TCS15 M 12.00

Tuberia de 15 cm. de dimetro de concreto simple, asentado con mortero cemento arena 1:4, incluye: materiales, acarreos, trazo, nivelacin, junteo,
pruebas, mano de obra, equipo y heramienta.
MATERIALES
MATUB15 TUBO DE CONCRETO SIMPLE DE 15 CM. DE DIA M 1.0000
MANO DE OBRA
1A1P CUADRILLA No 5 (1 ALBAIL+1 PEON) JOR 12.00 12.0000
EQUIPO Y HERRAMIENTA
%MO1 HERRAMIENTA MENOR % 0.0300
BASICOS
1:4 MORTERO CEMENTO ARENA 1:4 M3 0.0020



Partida: Anlisis No.: 40
Anlisis:
REGCR M3 2.88
Relleno con grava controlada, compactada con rodillo vibratorio al 90% proctor, adicionando agua, incluye: mano de obra, equipo y
herramienta.
MATERIALES
AGUA AGUA ( MANEJO) M3 0.0830
GRAVAC GRAVA CONTROLADA M3 1.0000
MANO DE OBRA
1A CUADRILLA No 3 (1 AYUDANTE GENERAL) JOR 6.00 6.0000
EQUIPO Y HERRAMIENTA
%MO1 HERRAMIENTA MENOR % 0.0300
EQRVIBRA RODILLO VIBRATORIO WACKER DE 1/2 TON HOR 6.00 6.0000



Partida: Anlisis No.: 50
Anlisis:
ECM02IA M3 1.51

Excavacin de cepa, por medios manuales de 0 a -2.00 m, en material tipo I, zona A, incluye: mano de obra, equipo y herramienta
MANO DE OBRA
1P CUADRILLA No 1 (1 PEON) JOR 3.00 3.0000
EQUIPO Y HERRAMIENTA
%MO1 HERRAMIENTA MENOR % 0.0300



Partida: Anlisis No.: 60
Anlisis:
RS468 PZA 3.00
Registro de 0.40x0.60x0.80 m. de muros de tabique rojo recocido, asentado con mezcla cemento arena 1:5, con aplanado pulido en el interior, con
tapa de 5 cm. de espesor de concreto de F'c=150 kg/cm2, con marco y contramarco comercial, piso de 8 cm. de espesor de concreto de F'c=150
kg/cm2, incluye: materiales, acarreos, excavacin, mano de obra, equipo y herramienta.
MATERIALES
TABIQUE TABIQUE ROJO RECOCIDO MIL 0.1400
BASICOS
1:5 MORTERO CEMENTO ARENA 1:5 M3 0.1200
MATERIALES
MARCO MARCO Y CONTRAMARCO COMERCIAL PZA 1.0000
BASICOS
150.
CONCRETO DE F'c=150 KG/CM2, HECHO EN OBRA, T.M.A.=
M3 0.0740

19 MM, RESISTENCIA NORMAL
MANO DE OBRA
1A1P CUADRILLA No 5 (1 ALBAIL+1 PEON) JOR 1.20 1.2000
EQUIPO Y HERRAMIENTA
%MO1 HERRAMIENTA MENOR % 0.0300



Partida: Anlisis No.: 70
Anlisis:
CAC1E M3/E 9.12

Acarreo en carretilla 1a estacin de 20 m., de material producto de la demolicin y/o excavacin, incluye: mano de obra, equipo y
herramienta.
MANO DE OBRA
1P CUADRILLA No 1 (1 PEON) JOR 4.50 4.5000
EQUIPO Y HERRAMIENTA
%MO1 HERRAMIENTA MENOR % 0.0300



Partida: Anlisis No.: 10
Anlisis:
SALHSPVC SAL 9.00

Salida hidrosanitaria utilizando tuberia de cobre y de pvc , incluye: conexiones, valvulas materiales, de consumo, desperdicios,
pruebas, mano
deobra, equipo y herramienta.
MATERIALES
001-001-1-13T TUBO COBRE T/M 13 mm x 1 mt NACOBR TRM 0.5250
001-001-1-19T TUBO COBRE T/M 19 mm x 1 mt NACOBR TRM 0.3500
001-001-1-25T TUBO COBRE T/M 25 mm x 1 mt NACOBR TRM 0.1400
002-001-12-191913 TEE CaC RED. 19X19X13 mm. NACOBRE PZA 1.0000
002-001-12-252519 TEE CaC RED. 25X25X19 mm. NACOBRE PZA 0.5000
002-001-1-9013 CODO CaC 90x13 mm. NACOBRE PZA 2.0000
002-001-1-9019 CODO CaC 90x19 mm. NACOBRE PZA 1.0000
002-001-1-9025 CODO CaC 90x25 mm. NACOBRE PZA 0.5000
002-001-4-9013 CODO CaF R/INT 13X90 mm. NACOBRE PZA 0.2000
041-001-15-50T TUBO PVC E/L 50mm x 1 mto SANIT DUR TRM 0.3500
042-001-E-1-9050 CODO PVC SANIT 87.5X50 DUR. CEMENTA PZA 0.7500
106-001-94 COLADERA PVC DUR 100 mm. SANIT PZA 0.2500
303-003-702-13 VALV. COMPUERTA 125 LBS. 702-13 mm PZA 0.1500
303-003-702-19 VALV. COMPUERTA 125 LBS 702-19 mm PZA 0.4500
360-210-15-4 ROLLO LIJA 25 RLL 0.0200
360-211-16-6 PASTA PARA SOLDAR SILER 500 grs PZA 0.2000
360-211-17-26 BOTE PEGAMENTO SILER 225 grs ESPEC PZA 0.5000
360-211-17-40 LIMPIADOR SILER 500 ml PZA 0.1728
360-213-18-6 CARRETE SOLD. 95 X 5 ZETA PZA 0.1000
360-214-18-12 CARRETE SOLD. 50 X 50 OMEGA PZA 0.1499
041-001-15-94T TUBO PVC E/L 100mm x 1 mto SANIT DU TRM 0.2625
042-001-A-1-4594 CODO PVC DUR 45GX 100 mm. SANIT PZA 1.5000
042-001-A-11-94 TEE SENCILLA DUR 100 mm. SANIT PZA 0.2857
042-001-A-30-94 YEE DOBLE 100x100 mm. DUR SANIT PZA 0.2857
DIRECTOR GENERAL ING. JORGE DAVALOS
MANO DE OBRA
1P1E CUADRILLA No 20 (1 PLOMERO+ 1 AY.ESP.) JOR 0.95 0.9500
EQUIPO Y HERRAMIENTA
%MO1 HERRAMIENTA MENOR % 0.0300



ANALISIS DE PRECIOS
UNITARIOS
Cdigo Concepto Unidad Rendimiento Cantidad
Partida: Anlisis No.: 10
Anlisis:
MTR06 M2 114.04

Muro de 6 cm. de espesor (capuchino) de tabique rojo recocido, asentado con mezcla cemento arena 1:5 acabado comn, incluye:
materiales,
mano de obra, equipo y
herramienta.
MATERIALES
TABIQUE TABIQUE ROJO RECOCIDO MIL 0.0340
BASICOS
1:5 MORTERO CEMENTO ARENA 1:5 M3 0.0200
MANO DE OBRA
1A1P CUADRILLA No 5 (1 ALBAIL+1 PEON) JOR 6.00 6.0000
EQUIPO Y HERRAMIENTA
%MO1 HERRAMIENTA MENOR % 0.0300
%MO2 ANDAMIOS % 0.0500



Partida: Anlisis No.: 20
Anlisis:
CA1520610 M 52.00
Castillo de 15x20 cm. de concreto hecho en obra de F'c=250 kg/cm2, acabado comn, armado con 6 varillas de 3/8" y estribos del No.2 a cada 10
cm., incluye: materiales, acarreos, cortes, desperdicios, traslapes, amarres, cimbrado, coldado, descimbrado, mano de obra, equipo
y herramienta.
MATERIALES
3. VARILLA DE 3/8" 9.5 MM KG 3.9000
2. ALAMBRON KG 1.6000
1. ALAMBRE RECOCIDO KG 0.3000
CLAVOS CLAVOS DE 2 A 4 " KG 0.1500
DUELA DUELA DE PINO DE 3a DE 3/4"x3.5"x8.25'' PZA 0.7500
MANO DE OBRA
1A1P CUADRILLA No 5 (1 ALBAIL+1 PEON) JOR 7.00 7.0000
EQUIPO Y HERRAMIENTA
%MO1 HERRAMIENTA MENOR % 0.0300
BASICOS
200.
CONCRETO DE F'c=200 KG/CM2, HECHO EN OBRA, T.M.A.=
M3 0.0306

19 MM, RESISTENCIA NORMAL



Partida: Anlisis No.: 30
Anlisis:
D152043 M 20.75

Cadena de 15x20 cm. de concreto hecho en obra de F'c=200 kg/cm2, acabado comn, armado con 4 varillas de 3/8" y estribos del No.2 a cada 20
cm., incluye: materiales, acarreos, cortes, desperdicios, traslapes, amarres, cimbrado, coldado, descimbrado, mano de obra, equipo
y herramienta.
MATERIALES
DUELA DUELA DE PINO DE 3a DE 3/4"x3.5"x8.25'' PZA 0.5000
POLIN POLIN DE PINO DE 3a DE 3.5"x3."x8.25'' PZA 0.1000
CLAVOS CLAVOS DE 2 A 4 " KG 0.1000
1. ALAMBRE RECOCIDO KG 0.2000
DIESEL DIESEL LTO 0.1500
3. VARILLA DE 3/8" 9.5 MM KG 2.6000
2. ALAMBRON KG 1.1600
MANO DE OBRA
1A1P CUADRILLA No 5 (1 ALBAIL+1 PEON) JOR 10.00 10.0000
EQUIPO Y HERRAMIENTA
%MO1 HERRAMIENTA MENOR % 0.0300
BASICOS
200.
CONCRETO DE F'c=200 KG/CM2, HECHO EN OBRA, T.M.A.=
M3 0.0310

19 MM, RESISTENCIA NORMAL



Partida: Anlisis No.: 30
Anlisis:
LOSVB20-E45 M2 61.06

Losa de 20 cms. a base de vigueta y bovedilla para un claro maximo de 4.75 m, con viguetas colocadas a cada 75 cms, con
bovedilla de concreto
de 16 cm., con capa de compresion de 4 cms. de espesor armado con malla electrosoldada 6x6-10/10, acabado pulido integral,
incluye: cimbrado,
descimbrado, , bombeo, colado, vibrado, mano de obra, equipo y herramienta.
MATERIALES
VIGUETA475 VIGUETA PARA LOSA CLARO 4.75 M. MAX M 1.5000
BOVEDILLA16 BOVEDILLA DE 16X20X63 CM PZA 7.5000
POLIN POLIN DE PINO DE 3a DE 3.5"x3."x8.25'' PZA 0.1000
DUELA DUELA DE PINO DE 3a DE 3/4"x3.5"x8.25'' PZA 0.2000
CLAVOS CLAVOS DE 2 A 4 " KG 0.0500
CP12 CONCRETO PREM. C-1, F'c=250 KG/CM2, NORMAL M3 0.0410
AGUA AGUA ( MANEJO) M3 0.0100
MACOM MUESTREO DE CONCRETO PZA 150.0000
CP76 REVENIMIENTO DE 18+-3.5 PARA BOMBEABLES M3 0.0410
CP60 BOMBEO C/BOMBA EST.DE 00 A 15 M. VERTICAL M3 0.0410
661010 MALLA ELECTROSOLDADADA 6x6/10-10 M2 1.1000
1. ALAMBRE RECOCIDO KG 0.0250
MANO DE OBRA
1A1P CUADRILLA No 5 (1 ALBAIL+1 PEON) JOR 35.00 35.0000
1C1A CUADRILLA No 7 (1 CARP. O.N. + AYUDANTE) JOR 30.00 30.0000
1A1P CUADRILLA No 5 (1 ALBAIL+1 PEON) JOR 50.00 50.0000
1A5P CUADRILLA No 22 (1 ALBAIL + 5 PEONES) JOR 300.00 300.0000
1F1A CUADRILLA No 6 (1 FIERRERO + 1 AYUDANTE) JOR 100.00 100.0000
EQUIPO Y HERRAMIENTA
%MO1 HERRAMIENTA MENOR % 0.0300
EQVIB VIBRADOR PARA CONCRETO HOR 50.00 50.0000



Partida: Anlisis No.: 40
Anlisis:
T005 M 4.00

Trabe de 15x45 cms. de concreto premezclado de F'c= 250 kg/cm2, armado con 5 varillas del No.5, 5 varillas del No. 4, estribos y grapas del No. 2
a cada 15 cms. acabado comun, incluye: cimbrado, descimbra, mano de obra, equipo y
herramienta.
MATERIALES
CP12 CONCRETO PREM. C-1, F'c=250 KG/CM2, NORMAL M3 0.0690
5. VARILLA DE 5/8" 15.9 MM KG 8.3500
4. VARILLA DE 1/2" 12.7 MM KG 5.3500
2. ALAMBRON KG 2.3400
1. ALAMBRE RECOCIDO KG 0.3500
DUELA DUELA DE PINO DE 3a DE 3/4"x3.5"x8.25'' PZA 2.5000
BARROTE BARROTE DE PINO DE 3a DE 1.5"x3.5"x8.25'' PZA 0.5000
CLAVOS CLAVOS DE 2 A 4 " KG 0.3000
DIESEL DIESEL LTO 0.3000
MANO DE OBRA
1C1A CUADRILLA No 7 (1 CARP. O.N. + AYUDANTE) JOR 9.35 9.3500
1F1A CUADRILLA No 6 (1 FIERRERO + 1 AYUDANTE) JOR 17.00 17.0000
1A5P CUADRILLA No 22 (1 ALBAIL + 5 PEONES) JOR 43.00 43.0000
EQUIPO Y HERRAMIENTA
%MO1 HERRAMIENTA MENOR % 0.0300



Partida: Anlisis No.: 10
Anlisis:
RTZ10 M2 6.11
Relleno de 10 cm.de espesor promedio, de tezontle en azotea, incluye: materiales, acareos, elevacin, mano de obra, equipo y
herramienta.
MATERIALES
TEZONTLE TEZONTLE 20 MM M3 0.1100
MANO DE OBRA
1A CUADRILLA No 3 (1 AYUDANTE GENERAL) JOR 30.00 30.0000
EQUIPO Y HERRAMIENTA
%MO1 HERRAMIENTA MENOR % 0.0300



Partida: Anlisis No.: 20
Anlisis:
ENT4118 M2 61.06

Entortado de 4 cm. de espesor a base de mezcla cemento-cal-arena en proporcin 1:1:8, incluye: trazo, nivelacion, acarreos,
elevacin, mano de
obra, equipo y herramienta.
MANO DE OBRA
1A1P CUADRILLA No 5 (1 ALBAIL+1 PEON) JOR 20.00 20.0000
EQUIPO Y HERRAMIENTA
%MO1 HERRAMIENTA MENOR % 0.0300
BASICOS
1:1:8 MORTERO CEMENTO-CAL- ARENA 1:1:8 M3 0.0500



Partida: Anlisis No.: 30
Anlisis:
IMPMICROV1 M2 30.30

Impermeabilizacin a base de una impregnacin de microprimer y dos capas de microseal 2F alternadas con una malla de
festerflex, una capa de
arena cernida y como acabado final una aplicacin de festerblanc color blanco, incluye: materiales, acarreos, elevacin, desperdicio, mano de obra,
equipo y herramienta.
MATERIALES
MICROPRIM19 MICROPRIMER 19L 0.0132
MICROSEAL19 MICROSEAL No. 2F 19L 0.1052
FESTERF100 FESTERFLEX 1.00x100 M 100M2 0.0110
ARENA ARENA M3 0.0050
FESTERB19 FESTERBLANC BLANCO 19L 0.0096
MANO DE OBRA
1CO1A CUADRILLA No 12 (1 COLOCADOR + AY.) JOR 30.00 30.0000
EQUIPO Y HERRAMIENTA
%MO1 HERRAMIENTA MENOR % 0.0300



Partida: Anlisis No.: 40
Anlisis:
ENLADRI M2 61.06

Enladrillado en azotea asentado con mezcla cemento arena en proporcin 1:5, incluye: lechada, mano de obra, equipo y
herramienta.
MATERIALES
LADRILLO LADRILLO RECOCIDO MIL 0.0380
CEMENTOG CEMENTO GRIS TON 0.0010
MANO DE OBRA
1A1P CUADRILLA No 5 (1 ALBAIL+1 PEON) JOR 10.00 10.0000
EQUIPO Y HERRAMIENTA
%MO1 HERRAMIENTA MENOR % 0.0300
BASICOS
1:5 MORTERO CEMENTO ARENA 1:5 M3 0.0250



Partida: A03 Anlisis No.: 50
Anlisis:
CHAF15 M 4.66
Chaflan de 15 cm. de mezcla cemento-arena 1:5, incluye: materiales, acarreos, mano de obra, equipo y
herramienta
BASICOS
1:5 MORTERO CEMENTO ARENA 1:5 M3 0.0120
MANO DE OBRA
1A1P CUADRILLA No 5 (1 ALBAIL+1 PEON) JOR 16.00 16.0000
EQUIPO Y HERRAMIENTA
%MO1 HERRAMIENTA MENOR % 0.0300



ANALISIS DE PRECIOS
UNITARIOS
Cdigo Concepto Unidad Rendimiento Cantidad
Partida: Anlisis No.: 10
Anlisis:
APLF15PBV M2 114.00

Aplanado acabado fino en muros de planta baja, con mezcla cemento arena 1:5, para volumenes mayores, incluye: materiales,
mano de obra,
equipo y herramienta.
MANO DE OBRA
1A1P CUADRILLA No 5 (1 ALBAIL+1 PEON) JOR 11.00 11.0000
EQUIPO Y HERRAMIENTA
%MO1 HERRAMIENTA MENOR % 0.0300
%MO2 ANDAMIOS % 0.0500
BASICOS
1:5 MORTERO CEMENTO ARENA 1:5 M3 0.0300



Partida: Anlisis No.: 20
Anlisis:
COMPMO M2 61.06

Compactacin del fondo de la excavacin por medios manuales, incluye: afine y nivelacin.
MANO DE OBRA
1P CUADRILLA No 1 (1 PEON) JOR 30.00 30.0000
EQUIPO Y HERRAMIENTA
%MO1 HERRAMIENTA MENOR % 0.0300



Partida: Anlisis No.: 30
Anlisis:
COMBAI M2 61.06

Afine, nivelacin y compactacin del fondo de la excavacin con bailarina, incluye: materiales, mano de obra, equipo y herramienta.
MANO DE OBRA
1A CUADRILLA No 3 (1 AYUDANTE GENERAL) JOR 48.00 48.0000
EQUIPO Y HERRAMIENTA
EQBAILAR BAILARINA DE 4.5 HP HOR 5.99 0.1670
%MO1 HERRAMIENTA MENOR % 0.0300



Partida: Anlisis No.: 40
Anlisis:
PCCC M2 61.06

Piso de 6 cms. de espesor de concreto de F'c= 150 kg/cm2, con colorante integral S.M.A., acabado martelinado, incluye: materiales, mano de obra,
equipo y herramienta.
MATERIALES
DUELA DUELA DE PINO DE 3a DE 3/4"x3.5"x8.25'' PZA 0.1200
AGUA AGUA ( MANEJO) M3 0.0100
CEMENTOG CEMENTO GRIS TON 0.0020
GA32 COLOR PARA CEMENTO KG 1.0000
MANO DE OBRA
1A1P CUADRILLA No 5 (1 ALBAIL+1 PEON) JOR 12.00 12.0000
1P CUADRILLA No 1 (1 PEON) JOR 4.00 4.0000
EQUIPO Y HERRAMIENTA
%MO1 HERRAMIENTA MENOR % 0.0300
BASICOS
150.
CONCRETO DE F'c=150 KG/CM2, HECHO EN OBRA, T.M.A.=
M3 0.0630

19 MM, RESISTENCIA NORMAL



Partida: Anlisis No.: 40
Anlisis:
CLOSETPE1824 PZA 2.00

Closet de 1.8 m. por 2.4 m, de altura y 0.65 m. de ancho, dos puertas corredizas, con bastidor a base peinazos de 32x32 mm de madera de pino de
1a, a cada 30 cms., en ambos sentidos, forradas con triplay de pino de 6 mm, por ambas caras, con, 4 entrepaos, fabricados a base de triplay de
pino de 1a. de 16 mm, acabado con barniz natural, Incluye: materiales, acarreos, cortes, desperdicios, armado, riel, carretillas, herrajes, mano de
obra, equipo, herramienta y
limpieza,
MATERIALES
TRIPLAYP6 TRIPLAY DE PINO DE 6 MM PZA 4.0000
PINO1 MADERA DE PINO DE 1a PT 25.2173
CHAPAM CHAPA DE MADERA M2 0.5520
TRIPLAYP16 TRIPLAY DE PINO DE 16 MM PZA 1.0542
BARNIZ BARNIZ LT 2.3833
AGUARRAS AGUARRAS LT 0.7865
GM305 RESISTOL 850 DE 1 LT LT 1.2100
RIELAPC2 RIEL DE ALUMINIO DE 3.00 M. P/CLOSET ECONOMICO PZA 1.0000
CARRETILLAPC2 CARRETILLA P/PUERTA DE CLOSET ECONOMICA PZA 4.0000
TUBOPC1 TUBO CROMADO DE 1" DE DIAM. DE 3 M. PZA 1.0000
BRIDAPC2 BRIDA P/TUBO DE 1" DE DIAM. P/CLOSET ECONOMICA JGO 1.0000
PIJA PIJA PZA 20.0000
TAQUETE TAQUETE PZA 14.0000
CLAVOSSC CLAVOS SIN CABEZA KG 0.7304
LIJA LIJA PZA 4.1000
MANO DE OBRA
1C1E CUADRILLA No 15 (1 CARP. O. B.+AY. ESP.) JOR 0.43 0.4348
1B1A CUADRILLA No 13 (1 BARNIZADOR + AYUD.) JOR 1.50 1.5000
EQUIPO Y HERRAMIENTA
%MO1 HERRAMIENTA MENOR % 0.0300



Partida: Anlisis No.: 10
Anlisis:
VED0606BF PZA 5.00

Ventana de 0.60 x 0.60 m. fija a base de perfiles de aluminio duranidik linea bolsa de 2"x1.25" con cristal filtrasol gris de 6 mm,
incluye: materiales,
cortes, herrajes, fijacin, sellado con silicon, mano de obra, equipo y herramienta.
MATERIALES
9083D BOLSA DE 2" DURANODIC PZA 0.4400
9074D ESCALONADO DE 11/2" DURANODIC PZA 0.1100
PIJA PIJA PZA 16.0000
TAQUETE TAQUETE PZA 8.0000
FS06 CRISTAL FILTRASOL DE 6 MM AL CORTE M2 0.4000
VINIL VINIL M 2.4000
SILICON SILICON CAR 0.2000
6370D JUNQUILLO RECTO DURANODIC PZA 0.1100
MANO DE OBRA
1A1E CUADRILLA No 16 (1 ALUMINIERO + AY.ESP.) JOR 10.00 10.0000
1V1A CUADRILLA No 14 (1 VIDRIERO + AYUDANTE) JOR 20.00 20.0000
EQUIPO Y HERRAMIENTA
%MO1 HERRAMIENTA MENOR % 0.0300



Partida: Anlisis No.: 20
Anlisis:
V1512 PZA 3.00

Ventana de 1.50x1.20 m. de aluminio prefabricada, con cristal claro de 3 mm., incluye: materiales, mano de obra, equipo y
heramienta.
MATERIALES
VA1512 VENTANA DE ALUMINIO DE 1.50X1.20 PZA 1.0000
SILICON SILICON CAR 1.8000
MANO DE OBRA
1A1E CUADRILLA No 16 (1 ALUMINIERO + AY.ESP.) JOR 6.00 6.0000
EQUIPO Y HERRAMIENTA
%MO1 HERRAMIENTA MENOR % 0.0300


ANALISIS DE PRECIOS
UNITARIOS
Cdigo Concepto Unidad Rendimiento Cantidad
Partida: Anlisis No.: 10
Anlisis:
SALP04 SAL 8.00

Salida elctrica para alumbrado a base de poliducto de 13 mm., con un desarrollo de 4 m, con cable thw cal. 12 lnea econmica, con
una caja
cuadrada galvanizada de 13 y una caja chalupa galvanizada, incluye: un codo, soquet de baquelita, apagador y
placa


MATERIALES
TT3366 POLIDUCTO NEG 13MM MTS. 4.4000
TT3827 CAJA CUAD 75X 75MM 13MM GALV PZA. 1.0000
TT3817 CHALUPA 50X 90MM 13MM GALV PZA. 1.0000
TT9901 CURVA POLIDUCTO 13 MM PZA 1.0000
DC0996I CABLE THW 12 NEG CAJA 0.1260
CINTA CINTA DE AISLAR PLASTICA PZA 0.1000
AA1281 SOCKET BAQ SENC CAFE PZA. 1.0000
RA1140 PLA AL ANOD DOR 1U PZA. 1.0000
RD0100 INT SENC PZA. 1.0000
TA3850 TAPA CUAD 75X 75MM 13MM GALV PZA. 1.0000
PIJA PIJA PZA 4.0000
TAQUETE TAQUETE PZA 2.0000
MANO DE OBRA
1E1E CUADRILLA No 19 (1 ELECTRIC.+AY.ESP) JOR 5.00 5.0000
EQUIPO Y HERRAMIENTA
%MO1 HERRAMIENTA MENOR % 0.0300
%MO2 ANDAMIOS % 0.0300



Partida: Anlisis No.: 20
Anlisis:
SALP04 SAL 8.00

Salida elctrica para alumbrado a base de poliducto de 13 mm., con un desarrollo de 4 m, con cable thw cal. 12 lnea econmica, con
una caja
cuadrada galvanizada de 13 y una caja chalupa galvanizada, incluye: un codo, soquet de baquelita, apagador y
placa


MATERIALES
TT3366 POLIDUCTO NEG 13MM MTS. 4.4000
TT3827 CAJA CUAD 75X 75MM 13MM GALV PZA. 1.0000
TT3817 CHALUPA 50X 90MM 13MM GALV PZA. 1.0000
TT9901 CURVA POLIDUCTO 13 MM PZA 1.0000
DC0996I CABLE THW 12 NEG CAJA 0.1260
CINTA CINTA DE AISLAR PLASTICA PZA 0.1000
AA1281 SOCKET BAQ SENC CAFE PZA. 1.0000
RA1140 PLA AL ANOD DOR 1U PZA. 1.0000
RD0100 INT SENC PZA. 1.0000
TA3850 TAPA CUAD 75X 75MM 13MM GALV PZA. 1.0000
PIJA PIJA PZA 4.0000
TAQUETE TAQUETE PZA 2.0000
MANO DE OBRA
1E1E CUADRILLA No 19 (1 ELECTRIC.+AY.ESP) JOR 5.00 5.0000
EQUIPO Y HERRAMIENTA
%MO1 HERRAMIENTA MENOR % 0.0300
%MO2 ANDAMIOS % 0.0300



Partida:
Anlisis:
Tirol planchado en muros a base de cemento blanco-cal-cero fino, para volumenes mayores, incluye: andamios, mano de obra,
equipo y
herramienta.
MATERIALES
LIGAT
MANO DE OBRA
1Y1A
EQUIPO Y HERRAMIENTA Anlisis No.: 10
%MO1 TIROLPV M2 61.06
%MO2
BASICOS
CCPM
LIGA TIROL LT 4.0000

CUADRILLA No 10 (1 YESERO + AYUDANTE) JOR 40.00 40.0000

HERRAMIENTA MENOR % 0.0300
ANDAMIOS % 0.0500

MEZCLA CAL-CEMENTO B.-POLVO DE MARMOL M3 0.0060



Partida:
Anlisis:
Aplanado acabado repellado sobre muros, con mezcla cemento arena 1:5, en planta baja, incluye: materiales, mano de obra,
equipo y herramienta.
BASICOS
1:5
MANO DE OBRA
1A1P
EQUIPO Y HERRAMIENTA
%MO1 Anlisis No.: 20
%MO2 APLR15PB M2 114.04


MORTERO CEMENTO ARENA 1:5 M3 0.0300

CUADRILLA No 5 (1 ALBAIL+1 PEON) JOR 11.00 11.0000

HERRAMIENTA MENOR % 0.0300
ANDAMIOS % 0.0500



Partida:
Anlisis:
Pintura vinilica en muros marca Comex Durex a dos manos, incluye: aplicacin de sellador, materiales, preparacin de la superficie,
mano de obra,
equipo, herramienta y
andamios.

CO05
CO11
MANO DE OBRA
1P1A Anlisis No.: 30
EQUIPO Y HERRAMIENTA PVMDUR M2 289.13
%MO1
%MO2

PINTURA VINILICA DUREX MASTER 14-00 BCO Y COLS. LT 0.4000
REG.
SELLADOR VINILICO 5x1 CLASICO LT 0.1000

CUADRILLA No 8 (1 PINTOR + AYUDANTE) JOR 36.00 36.0000

HERRAMIENTA MENOR % 0.0300
ANDAMIOS % 0.0500



Partida:
Anlisis:
Lavabo Modelo Ovalin chico, color blanco, incluye: materiales, mano de obra, instalacin y
pruebas.
MATERIALES
MARESINA
201-032-124-001
MANO DE OBRA
1P1E
EQUIPO Y HERRAMIENTA Anlisis No.: 20
%MO1 ISL2 PZA 1.00


RESINA ACRILICA BTE 0.5000
LAVABO OVALYN CHI.BLANCO PZA 1.0000

CUADRILLA No 20 (1 PLOMERO+ 1 AY.ESP.) JOR 3.00 3.0000

HERRAMIENTA MENOR % 0.0300



Partida:
Anlisis:
Lavadero de concreto con color, incluye: mano de obra, equipo y herramienta.
MATERIALES
GA03
GA33
LAVADEROC
304-034-10PF
MANO DE OBRA Anlisis No.: 30
1A1P LAVADERO1 PZA 1.00
1P1E
EQUIPO Y HERRAMIENTA
%MO1 BLOCK DE CONCRETO PESADO DE 14x20x40 PZA 13.0000
BASICOS ESCALERILLA CAL. 12 M 2.6000
1:5 LAVADERO DE CONCRETO PZA 1.0000
CESPOL P/FREG P.V.C. FLEX 10PF PZA 1.0000

CUADRILLA No 5 (1 ALBAIL+1 PEON) JOR 2.00 2.0000
CUADRILLA No 20 (1 PLOMERO+ 1 AY.ESP.) JOR 16.00 16.0000

HERRAMIENTA MENOR % 0.0300

MORTERO CEMENTO ARENA 1:5 M3 0.0160



Partida:
Anlisis:
Cisterna de 8 m3 de capacidad de 2.25x2.25x1.60 m, a base de muros y losa de concreto de 12 cm. de espesor, armado con varilla de 3/8" a cada
20 cms. en ambos sentidos, incluye: trazo, excavacin, carga y acarreo de material sobrante fuera de la obra, plantilla, armado,
cimbrado,
descimbrado, colado, vibrado, relleno, carcamo, aplanado interior acabado pulido, escalera marina, tapa registro de lmina y
limpieza.


BASICOS
TZOM Anlisis No.: 10
CIST10 PZA 1.00

EAM02IIA


PLANH5

ACERC3
Trazo y nivelacin manual para establecer ejes, banco de nivel y
M2 12.1800

referencias, incluye: materiales, mano de obra, equipo y
herramienta.
CIMEM
Excavacin a cielo abierto, por medios manuales de 0 a -2.00 m,
M3 22.7800

en material tipo II, zona A, incluye: mano de obra, equipo y
herramienta
CIMEL
Plantilla de 5 cm. de espesor de concreto hecho en obra de F'c=
M2 8.2400

100 kg/cm2.
Acero de refuerzo en cimentacion del No. 3, de Fy=4200 TON 0.1850
kg/cm2,
CEH250
incluye: materiales, acarreos, cortes, desperdicios, habilitado,
amarres, mano de obra, equipo y herramienta.
Cimbra acabado comn en muros, a base de madera de pino de
M2 32.6100

REMPEB
3a., incluye: materiales, acarreos, cortes, desperdicios, habilitado,
CMAFO
3a., incluye: materiales, acarreos, cortes, desperdicios, habilitado,
cimbrado, descimbra, mano de obra, equipo y herramienta.
Concreto en estructura, hecho en obra de F'c=250 kg/cm2,
M3 3.1800

TAPAC1
incluye: acarreos, colado, vibrado, mano de obra, equipo y
herramienta.
Relleno con material producto de la excavacin, compactado con
M3 11.4900

bailarina al 90% proctor, adicionando agua, incluye: mano de
ESCM1
obra, equipo y herramienta.
Acarreo en camin de material producto de la excavacin y/o
M3 11.2800

demolicin fuera de la obra, incluye: carga manual, equipo y
herramienta.
APLPM
Tapa para cisterna de 0.60x0.60 m, a base de lmina de fierro
PZA 1.0000

cal. 10, con marco y contramarco de 3/16x1 1/2", acabado con
pintura de esmalte, incluye: herrajes, materiales, soldadura, mano
de obra, equipo y herramienta.
DIRECTOR GENERAL ING.
Escaln para escalera marina con desarrollo de 0.70 m, a base
PZA 5.0000

JORGE DAVALOS
Partida:
de redondo de 3/4" de dimetro, soldado a placa de acero de 3/8"
Anlisis: de 0.10x0.10m, ahogada en concreto, incluye: anclaje, soldadura,
Acarreo en carretilla de material
producto de la excavacin y/o
demolicin estaciones pintura anticorrosiva, mano de obra, equipo y herramienta.
subsecuentes de 20 m, incluye:
mano de obra y herramienta.
MANO DE OBRA
Aplanado acabado pulido en muros, con mezcla cemento arena
M2 24.5300

1P
1:4, incluye: materiales, mano de obra, equipo y herramienta.
EQUIPO Y HERRAMIENTA
%MO1

Anlisis No.: 20
CACES M3 15.00


CUADRILLA No 1 (1 PEON) JOR 8.00 8.0000

HERRAMIENTA MENOR % 0.0300



Partida:
Anlisis:
Limpieza fina de la obra para entrega, para volumenes mayores, incluye: materiales, mano de obra, equipo y
herramienta.
MATERIALES
%MO3
MANO DE OBRA
1A
EQUIPO Y HERRAMIENTA
%MO1 Anlisis No.: 10
LFINAV M2 70.78


MATERIALES MENORES % 0.1000

CUADRILLA No 3 (1 AYUDANTE GENERAL) JOR 33.00 33.0000

HERRAMIENTA MENOR % 0.0300



Partida:
Anlisis:
Limpieza gruesa durante la obra, para volumenes mayores, incluye: mano de obra, equipo y
herramienta.
MANO DE OBRA
1P
EQUIPO Y HERRAMIENTA
EQCAMION
%MO1
Anlisis No.: 20
LGRUESAV M2 70.78


CUADRILLA No 1 (1 PEON) JOR 50.00 50.0000

CAMION DE VOLTEO DE 7 M3 HOR 100.00 0.0100
HERRAMIENTA MENOR % 0.0300