ELECTRICAL DRAFTING CHECK LIST FOR GENERAL ALARM SYSTEM

Page 1 of 2
DRAWING TITLE: DRAWING No.: REV. No.
PROJECT No.: DRAFTSMAN NAME:
ITEM DESCRIPTION YES NO REMARKS
1 GENERAL
1.1 Have you familiarise with the drawing workscope?
2 PREPARATION OF THE DRAWING
2.1 Engineer's / SD's briefing given ? ---
a)on compliance to contract specification, section:-
b)on compliance to Classification Body, section:-
c)on compliance to Authority Rule, section:-
d)on using ex-stock material, document no:-
e)on preliminary B.O.M, document no:-
f)on owner-approved vendors' list
g)on type of cable to be used(e.g. fire resistant, flame retardant)
h)on which area to use armoured or non-armour cable
i)on the basic concept (with owner or vendor sketches if any)
2.2 Is the drawing size correct ? (A0, A1, or A3 )
2.3 Check drawing title & number as per PPS ?
2.4 Check owner drawing number ? (If any)
2.5 Are you using the project drawing title format ?
2.6 Is the background from other section latest ?
Name of the source of information:-
2.7 Has all unnecessary details being removed from the background ?
2.8 Has the line work for the background been lightened ? (Only emphasise on electrical system)
2.9 Have you include the key plan ? (Vessel fwd arrow to be indicated)
2.10 Are you doing the standardise way of drawing presentation ?
Is the cost code number added ?
2.11 Is vendor information available ?
Have compile equipment data/specification and attach to this check list ?
Have prepare a list of equipment information which is not available and attach to this check list ?
3 ELECTRICAL EQUIPMENT SELECTION
3.1 Have you check correct frequency, rated voltage and current (amp) used ?
3.2 Are the selected equipment suit the hazardous area requirements ?
Is the explosion-proof equipment c/w approved classification body certificate ?
3.3 Are the selected equipment comply to that area ingress protection (IP) requirements ?
3.4 Are the selected equipment completely assembled ?
3.5 Are the selected equipment cable entry size suit this project cable/gland size ?
3.6 Have you check the material requirements, e.g. SS316, GRP & etc ?
3.7 Have you check the mounting type, e.g. surface, flush & etc ?
Refer KFELS standard document for guidance & suitability
3.8 Is the selected battery charger fully capable of charging the battery and at the same time have
sufficient capacity to operate the system ?
Is the charger interlock with the room exhaust fan. Check for class requirement if applicable.
3.9 Is the selected battery capacity meets classification body requirements ? (Or 8hrs. minimum)
Is fiberglass tray with rack or fiberglass battery box provided ?
3.10 Is the selected bell:-
a)gong red in colour ?
b)vibrating type with small operating current ?
c)provided with two cable entry
3.11 Is the selected flashing light red in colour ?
Engineer to ensure correct colour scheme. Note:- according to SOLAS it's green colour
4 PREPARING THE ARRANGEMENT & SCHEMATIC
4.1 Are all information presented clearly and legible ? (Lettering height 2.5mm minimum)
4.2 Are all outgoing cable tagging according to KFELS method ?
4.3 Is the charger(power) incoming cable tagged as per respective source drawing cable number?
4.4 Are all equipment tagging according to KFELS method & also the same item number as in
purchase specification document ?
4.5 Is the symbols and standardisation practise ?
4.6 Are contact makers provided in :-
a)wheelhouse for self propelled vessel
Continue on page 2 FILE NAME:- Echeck10
ELECTRICAL DRAFTING CHECK LIST FOR GENERAL ALARM SYSTEM
Page 2 of 2
Continue from page 1
ITEM DESCRIPTION YES NO REMARKS
b)radio room
c)jacking control room
d)tool pusher room
e)switchboard room
f)drillfloor (driller's cabin)
g)others check contract specification for any
4.7 Are flashing lights provided in high noise area e.g. engine room, mud pump room & etc ?
For large area, is it provided with two flashing lights and bells placed diagonally ?
4.8 Is one branch circuit connected with a maximum of five bells and on one deck level only?
4.9 Is the general alarm control panel located inside the radio room ?
Otherwise an indicator (same colour as flashing light) is to be provided instead of bell.
4.10 To indicate "PCM" in "Revision Column" of the drawing if PCM have been issued.
5 INTERFERENCE CHECK
5.1 Is the electrical equipment spacing check for:-
a)accessibility
b)comply to contract specification
c)comply to classification body
Checking should also take into consideration:-
a)bulkhead girders/stiffeners
b)miscellaneous working platforms
c)handrails
d)insulation thickness
e)manhole
f)head room (refer outfitting section)
g)ladder position (especially the vertical type)
h)space clearance below a hatch opening
i)equipment coaming/drip pan position
j)door swing position
k)below trolley beam for equipment removal space
l)shelving
6 CABLE SIZING
6.1 Is the power supply cable conductor size for #14AWG or 2.5mm minimum ?
6.2 Refer this project cable ampacity table to select cable size ?
6.3 Is the armoured or non-armour cable clearly indicated in drawing ?
6.4 Are cables connected to battery short-circuit proof and non-armour type ?
6.5 Is the charger/battery/control panel connection sequence concept correct ?
a)charger to battery, this cable is size to the charging current of the charger and the load
requirement of the control panel.
b)battery to control panel, this cable is size to the load requirement of the control panel.
6.6 Have you considered voltage drop ? Not more than:-
a)1% for battery cable
b)3% total for bells and flashing lights cable connected to a branch circuit
(Engineer to provide/ensure correct calculation formula)
6.7 24VDC system cable size usually is very large, have you check that the control panel or junction
box cater for:-
a)correct cable entry size
b)sufficient space for wire to bend/terminate
c)correct terminal size with respect to the selected cable
Has the vendor (GA control panel) being informed of the incoming/outgoing cable sizes ?
7 FINAL CHECK
7.1 Have you estimate & input cable length in the database ?
7.2 Have you input the material quantity in the purchase specification (or B.O.M) database ?
7.3 Check general notes content ?
7.4 Are reference drawings used and indicated in this drawing ?
7.5 Have you save this drawing file in the network ?
FILE NAME:- Echeck10

DWG START DATE: DWG FINISH DATE:

CHECKED BY:
CHECKING DATE: LEAD ENGINEER COUNTER-SIGN: