JOB SAFETY ANALYSIS WORKSHEETS
JOB SAFETY ANALYSIS DATE PERMIT NO:
JOB Running air compressor machine
WORK TEAM Pipe Fitter
SEQUENCE OF BASIC JOB STEPS POTENTIAL ACCIDENTS OR HAZARDS RECOMMENDED SAFE JOB PROCEDURES
1. Check diesel and M-oil Diesel fumes. Scalding / burns. l!a"s check from up!ind. Make sure engine has
cooled off. #se hand glo$es.
%. &urn on ignition ke". '(plosion. )igh noise from running machine. Standb" fire e(tinguisher at the $icinit" of the
machine. *ear ear protector.
+. Put machine into the desired load. Mo$ing parts. 'nsure all mo$ing parts are fitted !ith guards.
,. -pen compressor air $al$e. ir leakage. )ose connection dislodges. 'nsure there is a complete rubber seal at
connections and secured b" !ire pins. Do not
stand directl" in front of hose connections .
gauges.
WHAT TO CHECK AND NOT LIMITED TO WITH REFERENCE TO APPENDIX 1 & 2 OF THE JOB SAFETY ANALYSIS SECTION OF MOGP MANUAL
EXPERIENCE YES NO YES NO
)a$e "ou done this /ob before0 /
re "ou kno!ledgeable !ith the /ob to be
performed0
/
)a$e "ou referred to technical dra!ing/$endor
procedure/SSP0
/ 1s super$ision/e(perienced assistance re2uired0 /
PPE YES NO YES NO
)ard hat0 / *ork $est0 /
Safet" 3lasses0 / pron0 /
Safet" shoes0 / 3oggle0 /
'ar plugs0 / Face shield0 /
Right t"pe of glo$es0 / Respirator" protection0 /
Safet" harness0 /
POTENTIAL HAZARDS YES NO YES NO
Slipper" floor0 / &rapped pressure0 /
Congested area0 / Pressuri4ed e2uipment/$essel ha4ard0 /
&ripping0 / Fire/e(plosion ha4ards0 /
TML MANAGING OPERATIONS WITH GENERAL PROCEDURES Rev. 0
Talisman Malaysia Limited
HS&E Section
Job Safety Analysis
Doc. No: PM3-HSE-GEN-PR-F-00!
Re"ision: 0
Date: J#ne $00%
Pa&e: A''en(i) 3
-$erhead !ork0 / 'scape route0 /
*orking at height0 / Shock/electricit"/static0 /
Scaffolding0 / 5reaker rack out0 /
Secure ladder0 / 6al$e isolation0 /
)ea$" load0 / 3uard rotating e2uipment0 /
)ammer strikes0 / Po!er tools ha4ards0 /
Pinch/trap finger7 hand0 / )igh noise area7 double ear protection0 /
5ack in/ur" ha4ard0 / Spark/hot slag0 /
S!inging ob/ect0 / 5urn 8heat/chemical90 /
Falling ob/ect0 / :ear radioacti$e materials/sources0 /
-thers closeb"0 / 'n$ironmental spill0 /
Sharp ob/ect0 / )ose connection0 /
'"e in/ur"0 / *ind"0 /
3rating/deck opening0 / Dust"0 /
5locked drains0 /
Prepared b";<<<<<<.. << Re$ie!ed b"; <<<<<<<<<<.. Closed out; =========================