Académique Documents
Professionnel Documents
Culture Documents
Issued
Review
KPC Approved
METHOD STATEMENTS
1.1 Cable pulling
QGX/20/00/EL/TS
/NA/003
QGX/20/00/EL/TS
/NA/003
QGX/20/00/EL/TS
/NA/003
QGX/20/00/EL/TS
/NA/003
Continuity
QGX/20/00/EL/TS
/NA/003 & 051
1.5.2
QGX/20/00/EL/TS
/NA/003 & 051
1.5.3
Earthing continuity
QGX/20/00/EL/TS
/NA/003 & 051
1.5.4
QGX/20/00/EL/TS
/NA/003 & 051
PERSONNEL QUALIFICATION
INSTALLATION INSPECTION
QGX/20/00/EL/TS
/NA/003
& vendors spec.
QGX/20/00/EL/TS
/NA/003
& vendors spec.
QGX/20/00/EL/TS
/NA/003
& vendors spec.
QGX/20/00/EL/TS
/NA/003
QGX/20/00/EL/TS
/NA/003
& vendors spec.
QGX/20/00/IN/TS/
NA/019
Applicable
drawings
QGX/20/00/EL/TS
/NA/003 &
applicable
drawings
5.1.3
Sand bedding
5.1.4
Cleanliness
5.1.5
5.1.6
5.1.7
5.1.8
5.1.9
Cable marking
5.1.10
Bending radius
5.1.11
5.1.12
5.1.13
Sleeve sealing
5.1.14
Sand backfilling
5.1.15
Warning device
5.1.16
Backfilling completion
5.1.17
5.1.18
QGX/20/00/EL/TS
/NA/003
N/A
QGX/20/00/EL/TS
/NA/003 &
applicable
drawings
QGX/20/00/EL/TS
/NA/003 &
applicable
drawings
QGX/20/00/EL/TS
/NA/003
QGX/20/00/EL/TS
/NA/003
QGX/20/00/EL/TS
/NA/003 &
applicable
drawings
QGX/20/00/EL/TS
/NA/003
QGX/20/00/EL/TS
/NA/003 &
vendors
instructions
manufacturers
instructions
QGX/20/00/EL/TS
/NA/003 &
vendors
instructions
QGX/20/00/EL/TS
/NA/003 &
applicable
drawings
QGX/20/00/EL/TS
/NA/003 &
applicable
drawings
QGX/20/00/EL/TS
/NA/003 &
applicable
drawings
QGX/20/00/EL/TS
/NA/003 &
applicable
drawings
QGX/20/00/EL/TS
/NA/003 &
applicable
drawings
5.2.2
5.2.3
QGX/20/00/EL/TS
/NA/003 &
applicable
drawings
QGX/20/00/EL/TS
/NA/003 &
applicable
drawings
QGX/20/00/EL/TS
/NA/003
5.2.4
5.2.5
5.2.6
5.2.7
5.2.8
5.2.8.a
Cable connections in JB
5.2.8.b
JB support
5.2.8.c
JB earthing
5.2.8.d
JB number
5.2.8.e
QGX/20/00/EL/TS
/NA/003 &
applicable
drawings
QGX/20/00/EL/TS
/NA/003 &
applicable
drawings
QGX/20/00/EL/TS
/NA/003 &
applicable
drawings
Applicable
drawings
QGX/20/00/EL/TS
/NA/003 &
applicable
drawings
Applicable
drawings
Applicable
drawings
QGX/20/00/EL/TS
/NA/003 & 051
QGX/20/00/EL/TS
/NA/003 & 051
Applicable
drawings
QGX/20/00/EL/TS
/NA/003 &
applicable
drawings
QGX/20/00/EL/TS
/NA/003 &
applicable
drawings
QGX/20/00/EL/TS
/NA/003 &
applicable
drawings
Applicable
drawings
Applicable
drawings
QGX/20/00/EL/TS
/NA/003 & 051
QGX/20/00/EL/TS
/NA/003 & 051
QGX/20/00/EL/TS
/NA/003 & 051
POWER TRANSFORMERS
8.1 Installation & layout check
8.2 Equipment check
8.3 Insulating resistance check
Applicable
drawings
Applicable
drawings
QGX/20/00/EL/TS
/NA/003 & 051
QGX/20/00/EL/TS
/NA/003 & 051
QGX/20/00/EL/TS
/NA/003 & 051
ELECTRICAL MOTORS
9.1 Equipment check
9.2 Insulating resistance test
9.3 Spin test
9.4 No-load test
10
Applicable
drawings
QGX/20/00/EL/TS
/NA/003 & 051
QGX/20/00/EL/TS
/NA/003 & 051
QGX/20/00/EL/TS
/NA/003 & 051
QGX/20/00/EL/TS
/NA/003 &
QGX/20/91/EL/TS
/NA/042
QGX/20/00/EL/TS
/NA/003,
QGX/20/91/EL/TS
/NA/042 &
vendors
instructions
QGX/20/00/EL/TS
/NA/003,
QGX/20/91/EL/TS
/NA/042 &
vendors
instructions
QGX/20/00/EL/TS
/NA/003,
QGX/20/91/EL/TS
/NA/042 &
vendors
instructions
QGX/20/00/EL/TS
/NA/003 & 051
QGX/20/91/EL/TS
/NA/042
LIGHTING SYSTEM
Applicable
drawings
Applicable
drawings
QGX/20/00/EL/TS
/NA/003 & 051
QGX/20/00/EL/TS
/NA/003 & 051
QGX/20/00/EL/TS
/NA/003 & 051
LIGHTENING SYSTEM
Applicable
drawings
HEAT TRACING
Applicable
drawings
Applicable
drawings
QGX/20/00/EL/TS
/NA/042
QGX/20/00/EL/TS
/NA/042
Key
Date
Print Name
Date
Print Name
Dat