Rev. Date
Calculation title: C30 Stepped Channel Design - CH. 350.00-375.00 Serial no: XXX
Project manager: Chris Parsons No. of sheets: 4
This is a Mandatory Form Calculation title sheet
Project title: PGS 4169 Diftah to Shis Road and Tunnel/DPK 65 Project code: 204819.EE
Status: Created by: VG
Schematic Preliminary Date: 10-Apr-14
1 Self-check and approval 3B
Comparison with similar
proven designs and approval
Tender
Other (state) DETAILED DESIGN
Verified by:
Final for Construction Date:
2 Review and approval 4
External check and internal
approval
Yes:
Levels of verification: Approved by:
No:
Program(s): MS Excel
Detailed check and approval
Other verification as stated in
the Management Plan
AutoCAD
Date:
Computer analysis:
Contents (continue on calculation sheet if necessary)

3A
Alternative calculations and
approval
Hardware: AESJ2TV5Y1

NB: Calculations should state or refer to design input data and methodology
CONTENTS AMENDMENT RECORD
Sheet(s) Description Created Verified Approved
Path:
\\sharj3-fs-01\TBG\Highways\PGS 400(0) SERIES - ROADS\PGS 4401 - 4500\PGS 4434 - Shis Interchnage to Khorfakkan Road & Tunnels\4 Calcs and Tech
Data\Detailed Design\Drainage\65 - calcs
Rev 1 (07/2012) PRISM - CALCULATION TITLE SHEET
File Name: CalStepped channel-US of C17.xlsx
A CH2M HILL COMPANY A CH2M HILL COMPANY
C
A
c
Introduction
Hydrology
20 year m
3
/s l/min
30 year m
3
/s l/min
50 year m
3
/s l/min
Stepped Channel Design
TGN 27
The required input parameters are as follows: See Figure 4 (Sheet no.3)
l/min
o
m
m
m
m
m
Average Air Concentration, C
e
channel gradient
o
C
e
=
Darcy's Friction Factor of Aerated Flow, f
e
f
e
=
Aerated flow depth, Y
90
D design channel depth m
Y
90
= m
Calculation sheet
Calculation title: Stepped Channel Design
Created by: VG
Project code: 204819.EE
Date: 4/10/2014
Serial no:
xxx
24.4 1,462,200
The hydraulic design of this stepped channelis based on the design procedure detailed in
the GEO Technical Guidance Note No. 27 (TGN 27) from the Geotechnical Engineering
Office, Civil Engineering and Development Department, The Government of the Hong
Kong Special Administrative Region.
Revision: 0
References/results
At Chainage 350.00, there is a steep gradient between C30 Wadi and the Culvert C1/7
upstream. This calculation is to design the stepped channel to convey storm flows from the
chainage 350.00 of C30 wadi to the Culvert C1/7 upstream.
C30 Wadi conveys flow from catchments C27, C28, C29, C31 & C32 and the adjacent
road surface runoff . Peak flows generated in the catchment are as follows
19.76 1,185,600
Subject: C30 Stepped Channel upstream of Culvert C1/7
Verified by: Sheet no: 1
Date:
21.8 1,308,600
DD_updated hydrology.xlsx
Average air concentration is correlated with channel gradient as follows:
Ce = 0.9 sin for 20 45
or Ce = 0.3265 sin + 0.4055 for 45 < 65
27
0.42
It is recommended to use f = 1.0 as
an order of magnitude of the friction
factor.
0.620
Reference/TGN/Hydraulic
Design of Stepped
Channels on Slopes
Q
req
required channel capacity
channel gradient
L channel length
D design channel depth
W design channel width
h design channel step height
l design channel step length
1,185,600
27
27.3
2.70
2.50
1.00
2.00
2.7
2.395
Rev 1 (06/2012) PRISM - Calculation Sheet (Excel)
A CH2M HILL COMPANY
( )
)
`

+ =
e e
e
e
C C
C
f f
1
51 . 0
628 . 0 tanh 1 5 . 0
C
A
c
Equivalent non-aerated flow depth, d
o
d
o
= m
Hydraulic Diamater of Equivalent Non-aerated flow, D
H
A
W
= m
2
P
W
= m
D
H
= m
Equivalent non-aerated flow velocity, V
o
V
o
= m/s
Channel capacity, Q
Q = m
3
/s
Q < Q
req
OK Channel size is adequate
Verification of flow regimne
Discharge per unit channel width, q
w
q
w
= m
2
/s q
w
< 2m
2
/s Not OK
Critical flow depth for the given q
w
, d
c
d
c
= m
Critical flow depth for the onset of skimming flow, (d
c
)
onset
(d
c
)
onset
= m d
c
> (d
c
)
onset
OK
Minimum channel length
Minimum L/h ratio to develop uniform aerated flow
d
c
/h =
=
= m OK
Calculation sheet
Calculation title: Stepped Channel Design
Created by: VG
Project code: 204819.EE
Date: 4/10/2014
Serial no:
xxx
7.90
1.85
0.825
No catchpit d/s of steps; it will
directly discharge to Culvert
Subject: C30 Stepped Channel upstream of Culvert C1/7
Verified by: Sheet no: 2
Date: Revision: 0
1.401
3.502
5.302
2.642
6.21
21.75
References/results
Rev 1 (06/2012) PRISM - Calculation Sheet (Excel)
Lmin 16.60
1.854
L/h 16.6041
A CH2M HILL COMPANY A CH2M HILL COMPANY
C
A
c
Drawings
Design of the stepped cascade for wadi south is detailed on the following drawings
204819/652301/P0 - Plan and Elevation
204819/652201/P0 - Profile
204819/652302/P0 - Cross-sections
Calculation sheet
Calculation title: Stepped Channel Design
Created by: VG
Project code: 204819.EE
Date: 4/10/2014
Serial no:
xxx
References/results
Rev 1 (06/2012) PRISM - Calculation Sheet (Excel)
Subject: C30 Stepped Channel upstream of Culvert C1/7
Verified by: Sheet no: 3
Date: Revision: 0
\\Sharj3-fs-01\CAD\TBG\Highways\03 Sharjah\PGS 400(0) Series - Roads\FCSKKD-
Shis to KFK Rd & TU\204819\DRAINAGE\65
A CH2M HILL COMPANY
A CH2M HILL COMPANY
A CH2M HILL COMPANY
Minimum L/h ratio to develop Uniform Aerated flow
L/h 20 25 30 35 40 45 50
10 0.731 0.745 0.743 0.729 0.702 0.664 0.616
20 1.398 1.424 1.421 1.393 1.342 1.269 1.178
30 2.042 2.08 2.076 2.035 1.96 1.855 1.721
50 3.292 3.354 3.348 3.281 3.16 2.99 2.775
75 4.81 4.9 4.891 4.794 4.617 4.368 4.054
100 6.294 6.413 6.4 6.273 6.042 5.717 5.306
Channel gradient, (degrees)
d
c
/h
55 60 65
0.559 0.495 0.423
1.07 0.946 0.809
1.563 1.382 1.182
2.52 2.228 1.906
3.681 3.255 2.784
4.817 4.26 3.644
Channel gradient, (degrees)