Completion of Tower 2B
Subtotal 380 295 29 25J AN12A 11APR13 -139 95,090,246.00
Project Milestones
T2TX.ML.01 Project start date 0 0 100 25J AN12A 0.00
T2TX.ML.02 Receival of Drawings from LAND 0 0 0 08MAY12 151 0.00
T2TX.ML.03 Receival of Material Submittal 0 0 0 15MAY12 145 0.00
T2TX.ML.04 Elevators final finish 0 0 0 24FEB13 -99 0.00
T2TX.ML.05 Testing & Commissioning 0 0 0 22NOV12 -19 0.00
T2TX.ML.06 Project Handing over 0 0 0 11APR13 -139 0.00
Priliminaries
T2TX.PR.01 Start of project (Site Handover) 0 0 100 25J AN12A 0.00
T2TX.PR.02 Mobilization 5 0 100 25J AN12A 28J AN12A 5,150,000.00
Drawings & Procurement
Drawings
T2T8.DR.01 Receival of Drawings from LAND 20 5 75 01FEB12A 08MAY12 151 0.00
Procurement
Material Submittals
Architectural
Marbles & tiles
T28.MSA.01 Submittal marble and tiles 4 0 100 29J AN12A 02FEB12A 0.00
T28.MSA.02 Approval marble and tiles 7 0 100 02FEB12A 09FEB12A 0.00
Wardrobes
T28.MSA.18 Submittal Wardrobes 4 0 100 15FEB12A 19FEB12A 0.00
T28.MSA.19 Approval Wardrobes 7 0 100 20FEB12A 27FEB12A 0.00
Kitchen Cabinet
T28.MSA.20 Submittal Kitchen Cabinet 4 0 100 15FEB12A 19FEB12A 0.00
T28.MSA.21 Approval Kitchen Cabinet 7 0 100 20FEB12A 27FEB12A 0.00
Epoxy Paint
T28.MSA.03 Submittal Epoxy Paint 4 0 100 02FEB12A 07FEB12A 0.00
T28.MSA.04 Approval Epoxy Paint 7 0 100 07FEB12A 19FEB12A 0.00
Aluminium door ,Window,Louver
T28.MSA.05 Submittal aluminum door, 4 0 100 02FEB12A 06FEB12A 0.00
T28.MSA.06 Approval aluminum door, window, 7 0 100 06FEB12A 15FEB12A 0.00
Roofing Tile
T28.MSA.08 Submittal roofing tiles 4 0 100 11FEB12A 23FEB12A 0.00
T28.MSA.09 Approval roofing tiles 7 0 100 02FEB12A 09FEB12A 0.00
2012 2013
J FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR A
Project start date
Receival of Drawings from LAND
Receival of Material Submittal Docs from LAND
Elevators final finish
Testing & Commissioning
Project Handing over
Start of project (Site Handover)
Mobilization
Receival of Drawings from LAND
Submittal marble and tiles
Approval marble and tiles
Submittal Wardrobes
Approval Wardrobes
Submittal Kitchen Cabinet
Approval Kitchen Cabinet
Submittal Epoxy Paint
Approval Epoxy Paint
Submittal aluminum door, window, louver
Approval aluminum door, window, louver
Submittal roofing tiles
Approval roofing tiles
Primavera Systems, Inc.
Start Date 25J AN12
Finish Date 11APR13
Data Date 22MAY12
Run Date 03J UN12 14:16
Early Bar
Progress Bar
Critical Activity
T02B
UNITED DEVELOPMENT CO(UDC)
Gen Contr:ACC
Sub-Contr:Trivalley Ligments J V
Completion of Tower 2B
All
Sheet 1 of 32
Date Revision Checked Approved
Sheet 2 of 32
Activity
ID
Activity
Description
Orig
Dur
Rem
Dur
% Early
Start
Early
Finish
Total
Float
Budgeted
Cost
Gypsum boards & Other ceiling boards
T28.MSA.10 Submittal gypsm & other ceiling 4 0 100 01FEB12A 05FEB12A 0.00
T28.MSA.11 Approval gypsm & other ceiling 7 0 100 05FEB12A 13FEB12A 0.00
Paints
T28.MSA.12 Submittal Paints 4 0 100 11FEB12A 15FEB12A 0.00
T28.MSA.13 Approval Paints 7 0 100 02FEB12A 09FEB12A 0.00
Steel & Wood Doors
T28.MSA.14 Submittal steel & Wood doors 4 0 100 29J AN12A 02FEB12A 0.00
T28.MSA.15 Approval steel & Wood doors 7 0 100 02FEB12A 09FEB12A 0.00
Railings
T28.MSA.16 Submittal railings 4 0 100 01FEB12A 05FEB12A 0.00
T28.MSA.17 Approval railings 7 0 100 05FEB12A 11FEB12A 0.00
Electrical
Light Fittings
T28.MSE.05 Submittal Light Fittings 4 4 0 03MAY12 07MAY12 86 0.00
T28.MSE.06 Approval Light Fittings 7 7 0 08MAY12 15MAY12 86 0.00
Wiring accessaries & cables
T28.MSE.07 Submittal Wiring Accessaries & 4 0 90 23FEB12A 02MAY12 93 0.00
T28.MSE.08 Approval Wiring Accessaries & 7 1 90 28FEB12A 03MAY12 93 0.00
Earthing Systems & Lighting Protection
T28.MSE.13 Submittal Earthing systems & 4 0 100 09FEB12A 06MAR12A 0.00
T28.MSE.14 Approval Earthing systems & 7 0 100 13FEB12A 10MAR12A 0.00
MCC, EMDB,EMCC & VFD
T28.MSE.15 Submittal MCC, EMDB & VFD 4 0 100 01FEB12A 01MAR12A 0.00
T28.MSE.16 Approval MCC, EMDB & VFD 7 0 100 07FEB12A 05MAR12A 0.00
BMS
T28.MSE.17 Submittal BMS 4 0 100 18FEB12A 15MAR12A 0.00
T28.MSE.18 Approval BMS 7 7 0 03MAY12 10MAY12 61 0.00
CCTV,Central Battery,Lighting control
T28.MSE.22 Receival CCTV, Central battery, 7 7 0 03MAY12 10MAY12 53 0.00
Audio Visual
T28.MSE.24 Receival Audio visual system 7 7 0 03MAY12 10MAY12 53 0.00
HVAC
Chilled water pipes
T28.MSH.01 Submittal Chilled water pipes 4 0 100 01FEB12A 19FEB12A 0.00
T28.MSH.02 Approval Chilled water pipes 7 0 100 20FEB12A 27FEB12A 0.00
Ducts & Accessaries
T28.MSH.03 Submittal Ducts & accessaries 4 0 100 01FEB12A 05FEB12A 0.00
T28.MSH.04 Approval Ducts & accessaries 7 0 100 06FEB12A 18FEB12A 0.00
CW Pumps
T28.MSH.06 Receival of CW Pumps from 7 7 0 03MAY12 10MAY12 55 0.00
HVAC Machinaries
T28.MSH.07 Submittal HVAC Machinaries 4 0 100 01FEB12A 05FEB12A 0.00
T28.MSH.09 Approval HVAC Machinaries 7 0 100 06FEB12A 18FEB12A 0.00
Exhaust & Vent fan
T28.MSH.10 Receival of exhaust & Vent fan 7 7 0 03MAY12 10MAY12 61 0.00
2012 2013
J FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR A
Submittal gypsm & other ceiling boards
Approval gypsm & other ceiling boards
Submittal Paints
Approval Paints
Submittal steel & Wood doors
Approval steel & Wood doors
Submittal railings
Approval railings
Submittal Light Fittings
Approval Light Fittings
Submittal Wiring Accessaries & Cables
Approval Wiring Accessaries & Cables
Submittal Earthing systems & lighting protection
Approval Earthing systems & lighting protection
Submittal MCC, EMDB & VFD
Approval MCC, EMDB & VFD
Submittal BMS
Approval BMS
Receival CCTV, Central battery, Lighitng contro
Receival Audio visual system from LAND
Submittal Chilled water pipes
Approval Chilled water pipes
Submittal Ducts & accessaries
Approval Ducts & accessaries
Receival of CW Pumps from LAND
Submittal HVAC Machinaries
Approval HVAC Machinaries
Receival of exhaust & Vent fan from LAND
Sheet 2 of 32
Sheet 3 of 32
Activity
ID
Activity
Description
Orig
Dur
Rem
Dur
% Early
Start
Early
Finish
Total
Float
Budgeted
Cost
Plumbing & Drainage
Pipes & Fittings
T28.MSP.01 Submittal pipes & Fittings 4 0 100 01FEB12A 19FEB12A 0.00
T28.MSP.02 Approval pipes & Fittings 7 0 100 20FEB12A 27FEB12A 0.00
Sanitary Fixture
T28.MSP.03 Submittal sanitary fixture 4 0 100 01FEB12A 19FEB12A 0.00
T28.MSP.04 Approval sanitary fixture 7 0 100 20FEB12A 27FEB12A 0.00
Drainage system
T28.MSP.05 Submittal drainage system 4 0 100 01FEB12A 19FEB12A 0.00
T28.MSP.06 Approval drainage system 7 0 100 20FEB12A 27FEB12A 0.00
Fire Fighting
FF Pipes & Accessaries
T28.MSF.01 Submittal FF Pipes & Accessaries 4 0 100 01FEB12A 19FEB12A 0.00
T28.MSF.02 Approval FF Pipes & Accessaries 7 0 100 20FEB12A 27FEB12A 0.00
FF Pumps
T28.MSF.03 Submittal FF Pumps 4 0 100 01FEB12A 19FEB12A 0.00
T28.MSF.04 Approval FF Pumps 7 0 100 20FEB12A 27FEB12A 0.00
Submittal D Generator
T28.MSF.05 Submittal D Generator 4 0 100 01FEB12A 19FEB12A 0.00
T28.MSF.06 Approval D Generator 7 0 100 20FEB12A 27FEB12A 0.00
Procurement
Architectural
Marbles & tiles
T2T8.PO.01 Placing Purchase order 0 0 100 01MAR12A 0.00
T2T8.PO.02 Procurement 50 15 70 01MAR12A 20MAY12 59 0.00
T2T8.PO.03 Delivary on site 0 0 0 20MAY12 59 0.00
Wardrobes
T2T8.PO.25 Placing Purchase order 0 0 100 07MAR12A 0.00
T2T8.PO.26 Procurement by LAND 20 18 10 07MAR12A 23MAY12 76 0.00
T2T8.PO.27 Delivary on site 0 0 0 23MAY12 76 0.00
Kitchen Cabinets
T2T8.PO.28 Placing Purchase order 0 0 100 07MAR12A 0.00
T2T8.PO.29 Procurement by LAND 20 18 10 07MAR12A 23MAY12 76 0.00
T2T8.PO.30 Delivary on site 0 0 0 23MAY12 76 0.00
Epoxy Paint
T2T8.PO.04 Placing Purchase order 0 0 0 03MAY12 82 0.00
T2T8.PO.05 Procurement 4 4 0 03MAY12 07MAY12 82 0.00
T2T8.PO.06 Delivary on site 0 0 0 07MAY12 82 0.00
Aluminium door ,Window,Louver
T2T8.PO.07 Placing Purchase order 0 0 100 12FEB12A 0.00
T2T8.PO.08 Procurement 50 13 75 12FEB12A 17MAY12 79 0.00
T2T8.PO.09 Delivary on site 0 0 0 17MAY12 79 0.00
Roofing Tile
T2T8.PO.10 Placing Purchase order 0 0 100 23FEB12A 0.00
T2T8.PO.11 Procurement 50 0 100 23FEB12A 08MAR12A 0.00
T2T8.PO.12 Delivary on site 0 0 100 08MAR12A 0.00
2012 2013
J FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR A
Submittal pipes & Fittings
Approval pipes & Fittings
Submittal sanitary fixture
Approval sanitary fixture
Submittal drainage system
Approval drainage system
Submittal FF Pipes & Accessaries
Approval FF Pipes & Accessaries
Submittal FF Pumps
Approval FF Pumps
Submittal D Generator
Approval D Generator
Placing Purchase order
Procurement
Delivary on site
Placing Purchase order
Procurement by LAND
Delivary on site
Placing Purchase order
Procurement by LAND
Delivary on site
Placing Purchase order
Procurement
Delivary on site
Placing Purchase order
Procurement
Delivary on site
Placing Purchase order
Procurement
Delivary on site
Sheet 3 of 32
Sheet 4 of 32
Activity
ID
Activity
Description
Orig
Dur
Rem
Dur
% Early
Start
Early
Finish
Total
Float
Budgeted
Cost
Gypsum boards & Other ceiling boards
T2T8.PO.13 Placing Purchase order 0 0 100 23FEB12A 0.00
T2T8.PO.14 Procurement 50 0 100 23FEB12A 08MAR12A 0.00
T2T8.PO.15 Delivary on site 0 0 100 08MAR12A 0.00
Paints
T2T8.PO.16 Placing Purchase order 0 0 0 03MAY12 81 0.00
T2T8.PO.17 Procurement 5 5 0 03MAY12 08MAY12 81 0.00
T2T8.PO.18 Delivary on site 0 0 0 08MAY12 81 0.00
Steel & Wood Doors
T2T8.PO.19 Placing Purchase order 0 0 100 01MAR12A 0.00
T2T8.PO.20 Procurement 20 12 40 01MAR12A 16MAY12 68 0.00
T2T8.PO.21 Delivary on site 0 0 0 16MAY12 68 0.00
Railings
T2T8.PO.22 Placing Purchase order 0 0 100 08FEB12A 0.00
T2T8.PO.23 Procurement 50 0 100 08FEB12A 01MAR12A 0.00
T2T8.PO.24 Delivary on site 0 0 100 01MAR12A 0.00
Electrical
Light Fittings
T28.POE.07 Placing Purchase order 0 0 100 01MAR12A 0.00
T28.POE.08 Procurement 25 5 80 05MAR12A 21MAY12 86 0.00
T28.POE.09 Delivary on site 0 0 0 21MAY12 86 0.00
Wiring accessaries & cables
T28.POE.10 Placing Purchase order 0 0 100 05MAR12A 0.00
T28.POE.11 Procurement 30 3 90 05MAR12A 07MAY12 93 0.00
T28.POE.12 Delivary on site 0 0 0 07MAY12 93 0.00
MV Panel
T28.POE.13 Placing Purchase order 0 0 0 03MAY12 78 0.00
T28.POE.14 Modification works 20 20 0 03MAY12 26MAY12 78 0.00
T28.POE.15 Delivary on site 0 0 0 26MAY12 78 0.00
Earthing Systems & Lighting Protection
T28.POE.19 Placing Purchase order 0 0 100 03MAR12A 0.00
T28.POE.20 Procurement 30 15 50 03MAR12A 20MAY12 82 0.00
T28.POE.21 Delivary on site 0 0 0 20MAY12 82 0.00
MCC, EMDB,EMCC & VFD
T28.POE.22 Placing Purchase order 0 0 100 08MAR12A 0.00
T28.POE.23 Procurement 30 15 50 08MAR12A 20MAY12 87 0.00
T28.POE.24 Delivary on site 0 0 0 20MAY12 87 0.00
BMS
T28.POE.25 Placing Purchase order 0 0 0 12MAY12 61 0.00
T28.POE.26 Procurement 30 30 0 12MAY12 14J UN12 61 0.00
T28.POE.27 Delivary on site 0 0 0 14J UN12 61 0.00
CCTV,Central Battery,Lighting control
T28.POE.31 Placing Purchase order 0 0 0 12MAY12 53 0.00
T28.POE.32 Procurement 30 30 0 12MAY12 14J UN12 53 0.00
T28.POE.33 Delivary on site 0 0 0 14J UN12 53 0.00
2012 2013
J FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR A
Placing Purchase order
Procurement
Delivary on site
Placing Purchase order
Procurement
Delivary on site
Placing Purchase order
Procurement
Delivary on site
Placing Purchase order
Procurement
Delivary on site
Placing Purchase order
Procurement
Delivary on site
Placing Purchase order
Procurement
Delivary on site
Placing Purchase order
Modification works
Delivary on site
Placing Purchase order
Procurement
Delivary on site
Placing Purchase order
Procurement
Delivary on site
Placing Purchase order
Procurement
Delivary on site
Placing Purchase order
Procurement
Delivary on site
Sheet 4 of 32
Sheet 5 of 32
Activity
ID
Activity
Description
Orig
Dur
Rem
Dur
% Early
Start
Early
Finish
Total
Float
Budgeted
Cost
Audio Visual
T28.POE.34 Placing Purchase order 0 0 0 12MAY12 53 0.00
T28.POE.35 Procurement 30 30 0 12MAY12 14J UN12 53 0.00
T28.POE.36 Delivary on site 0 0 0 14J UN12 53 0.00
HVAC
Chilled water pipes
T28.POH.01 Placing Purchase order 0 0 100 28FEB12A 0.00
T28.POH.02 Procurement 50 0 100 28FEB12A 14MAR12A 0.00
T28.POH.03 Delivary on site 0 0 100 14MAR12A 0.00
Ducts & Accessaries
T28.POH.04 Placing Purchase order 0 0 100 01MAR12A 0.00
T28.POH.05 Procurement 30 9 70 01MAR12A 13MAY12 64 0.00
T28.POH.06 Delivary on site 0 0 0 13MAY12 64 0.00
CW Pumps
T28.POH.07 Placing Purchase order 0 0 0 12MAY12 55 0.00
T28.POH.08 Procurement 30 30 0 12MAY12 14J UN12 55 0.00
T28.POH.09 Delivary on site 0 0 0 14J UN12 55 0.00
HVAC Machinaries
T28.POH.10 Placing Purchase order 0 0 100 28FEB12A 0.00
T28.POH.11 Procurement 50 0 100 28FEB12A 12MAR12A 0.00
T28.POH.12 Delivary on site 0 0 100 12MAR12A 0.00
Exhaust & Vent fan
T28.POH.13 Placing Purchase order 0 0 0 12MAY12 61 0.00
T28.POH.14 Procurement 30 30 0 12MAY12 14J UN12 61 0.00
T28.POH.15 Delivary on site 0 0 0 14J UN12 61 0.00
Plumbing & Drainage
Pipes & Fittings
T28.POP.01 Placing Purchase order 0 0 100 28FEB12A 0.00
T28.POP.02 Procurement 50 0 100 28FEB12A 14MAR12A 0.00
T28.POP.03 Delivary on site 0 0 100 14MAR12A 0.00
Sanitary Fixture
T28.POP.04 Placing Purchase order 0 0 100 28FEB12A 0.00
T28.POP.05 Procurement 50 0 100 28FEB12A 14MAR12A 0.00
T28.POP.06 Delivary on site 0 0 100 14MAR12A 0.00
Drainage system
T28.POP.07 Placing Purchase order 0 0 100 28FEB12A 0.00
T28.POP.08 Procurement 50 0 100 28FEB12A 14MAR12A 0.00
T28.POP.09 Delivary on site 0 0 100 14MAR12A 0.00
Fire Fighting
FF Pipes & Accessaries
T28.POF.01 Placing Purchase order 0 0 100 28FEB12A 0.00
T28.POF.02 Procurement 15 4 75 28FEB12A 07MAY12 65 0.00
T28.POF.03 Delivary on site 0 0 0 07MAY12 65 0.00
FF Pumps(To be repaired,Action by LAND)
T28.POF.04 Placing Purchase order 0 0 0 03MAY12 30 0.00
T28.POF.05 Procurement 50 50 0 03MAY12 30J UN12 30 0.00
2012 2013
J FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR A
Placing Purchase order
Procurement
Delivary on site
Placing Purchase order
Procurement
Delivary on site
Placing Purchase order
Procurement
Delivary on site
Placing Purchase order
Procurement
Delivary on site
Placing Purchase order
Procurement
Delivary on site
Placing Purchase order
Procurement
Delivary on site
Placing Purchase order
Procurement
Delivary on site
Placing Purchase order
Procurement
Delivary on site
Placing Purchase order
Procurement
Delivary on site
Placing Purchase order
Procurement
Delivary on site
Placing Purchase order
Procurement
Sheet 5 of 32
Sheet 6 of 32
Activity
ID
Activity
Description
Orig
Dur
Rem
Dur
% Early
Start
Early
Finish
Total
Float
Budgeted
Cost
T28.POF.06 Delivary on site 0 0 0 30J UN12 30 0.00
Submittal D Generator
T28.POF.07 Placing Purchase order 0 0 100 28FEB12A 0.00
T28.POF.08 Procurement 50 0 100 28FEB12A 14MAR12A 0.00
T28.POF.09 Delivary on site 0 0 100 14MAR12A 0.00
Construction
Podium (Level 1-4)
Parking (P1)
Architectural
T28.P1A.01 Masonry walls 4 1 80 23FEB12A 16MAY12 66 5,232.32
T28.P1A.02 Plastering 6 2 60 29FEB12A 19MAY12 66 105,050.00
T28.P1A.03 Door,windows & Carpentry joinary 6 6 0 20MAY12 26MAY12 74 242,695.39
T28.P1A.04 Glass & Glazing works 20 20 0 16MAY12 07J UN12 69 18,930.99
T28.P1A.06 Ceiling gypsum / metal lobby 10 10 0 29MAY12 09J UN12 66 113,309.93
T28.P1A.07 Floor tiles & Wall Tiles 10 10 0 21MAY12 31MAY12 81 113,616.83
T28.P1A.08 Floor epoxy paint 10 10 0 21MAY12 31MAY12 81 28,178.70
T28.P1A.09 Marble & granite 8 8 0 21MAY12 29MAY12 79 113,309.93
T28.P1A.10 Road works for Parking area 22 22 0 17MAY12 11J UN12 72 294,313.80
T28.P1A.12 Painting 1st coat 6 5 10 05MAY12A 03J UN12 69 28,178.70
T28.P1A.14 Aluminium Doors ,Windows & 8 8 0 24MAY12 02J UN12 74 84,337.19
T28.P1A.15 GRC Installation 12 4 70 06MAR12A 03J UN12 79 153,442.71
T28.P1A.16 Painting final Coat 6 6 0 09J UN12 14J UN12 69 28,178.70
Electrical
T28.P1E.01 Electrical 1st fix 8 3 65 08FEB12A 06MAY12 15 86,329.12
T28.P1E.02 Data & Light power 1st fix 8 8 0 07MAY12 15MAY12 83 86,329.12
T28.P1E.03 Audio visual, BMS,PA & CCTV 12 8 30 05MAY12A 24J UN12 57 86,329.12
T28.P1E.04 Electrical 2nd fix 4 1 65 29FEB12A 21MAY12 82 86,329.12
T28.P1E.05 Install MV panel 6 6 0 27MAY12 02J UN12 78 86,329.12
T28.P1E.06 BMS & Home automation 1st fix 4 4 0 18J UN12 21J UN12 59 86,329.12
T28.P1E.07 Data & Light power 2nd fix 8 8 0 20MAY12 28MAY12 80 86,329.12
T28.P1E.08 FInal MV Panel termination 4 4 0 03J UN12 06J UN12 78 86,329.12
T28.P1E.09 Electrical final fix 6 6 0 04J UN12 10J UN12 75 86,329.12
T28.P1E.10 BMS & Fire alarm final fix 2 1 30 05MAY12A 23J UN12 59 86,329.12
T28.P1E.11 Data & Light power final fix 8 8 0 23J UN12 01J UL12 59 86,329.12
T28.P1E.12 Audio visual, BMS,PA & CCTV 4 4 0 25J UN12 28J UN12 57 86,329.12
HVAC
T28.P1H.01 Installation of A/C Ducts & 7 7 0 20MAY12 27MAY12 66 179,837.26
T28.P1H.03 Install AHU FCU 8 8 0 20MAY12 28MAY12 66 359,673.73
T28.P1H.04 Install CW pumps 7 7 0 16J UN12 23J UN12 55 179,837.26
T28.P1H.05 Install grills & Diffusers 8 8 0 16J UN12 24J UN12 61 179,837.26
T28.P1H.06 Install CW Machinaries 7 7 0 24J UN12 01J UL12 55 179,837.26
Plumbing & Drainage
T28.P1P.01 Installation of Drainage pipes 10 2 85 05MAR12A 05MAY12 52 40,151.49
2012 2013
J FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR A
Delivary on site
Placing Purchase order
Procurement
Delivary on site
Masonry walls
Plastering
Door,windows & Carpentry joinary works
Glass & Glazing works
Ceiling gypsum / metal lobby
Floor tiles & Wall Tiles
Floor epoxy paint
Marble & granite
Road works for Parking area
Painting 1st coat
Aluminium Doors ,Windows & Metal works
GRC Installation
Painting final Coat
Electrical 1st fix
Data & Light power 1st fix
Audio visual, BMS,PA & CCTV 1st fix
Electrical 2nd fix
Install MV panel
BMS & Home automation 1st fix
Data & Light power 2nd fix
FInal MV Panel termination
Electrical final fix
BMS & Fire alarm final fix
Data & Light power final fix
Audio visual, BMS,PA & CCTV final fix
Installation of A/C Ducts & Connections
Install AHU FCU
Install CW pumps
Install grills & Diffusers
Install CW Machinaries
Installation of Drainage pipes
Sheet 6 of 32
Sheet 7 of 32
Activity
ID
Activity
Description
Orig
Dur
Rem
Dur
% Early
Start
Early
Finish
Total
Float
Budgeted
Cost
T28.P1P.02 Plumbing 1st fix 8 6 20 03MAY12A 09MAY12 71 40,151.49
T28.P1P.03 Plumbing 2nd Fix 6 6 0 20MAY12 26MAY12 79 40,151.49
T28.P1P.04 Connection to pumps 8 8 0 04J UN12 12J UN12 71 0.00
T28.P1P.05 Plumbing Final Fix 10 10 0 04J UN12 14J UN12 71 40,151.49
Fire Fighting & Fire Alarm
T28.P1F.01 Fire pipe install 7 7 0 08MAY12 15MAY12 66 129,174.75
T28.P1F.02 Install Fire pumps 8 8 0 01J UL12 09J UL12 30 129,174.75
T28.P1F.03 Connection to pump 10 10 0 10J UL12 21J UL12 38 129,174.75
T28.P1F.04 Install DG Set 8 8 0 10J UL12 18J UL12 30 129,174.75
T28.P1F.05 Final fix fire alarm 10 10 0 19J UL12 30J UL12 30 129,174.75
Testing floor services
T28.P1T.01 Testing & Commissioning Parking 10 10 0 31J UL12 11AUG12 30 0.00
Parking (P2)
Architectural
T28.P2A.01 Masonry walls 4 0 90 22FEB12A 16MAY12 76 5,232.41
T28.P2A.02 Plastering 6 3 55 01MAR12A 20MAY12 76 113,309.93
T28.P2A.03 Door,windows & Carpentry joinary 6 6 0 17MAY12 23MAY12 76 244,090.32
T28.P2A.04 Glass & Glazing works 20 20 0 17MAY12 09J UN12 88 18,930.99
T28.P2A.06 Ceiling gypsum / metal lobby 10 10 0 17MAY12 28MAY12 76 113,309.93
T28.P2A.07 Floor tiles & Wall Tiles 10 10 0 21MAY12 31MAY12 81 113,309.93
T28.P2A.08 Floor epoxy paint 10 10 0 21MAY12 31MAY12 81 28,178.70
T28.P2A.09 Marble & granite 8 8 0 21MAY12 29MAY12 81 113,309.93
T28.P2A.12 Painting 1st coat 6 6 0 17MAY12 23MAY12 78 28,178.70
T28.P2A.14 Aluminium Doors ,Windows & 8 8 0 22MAY12 30MAY12 76 84,337.19
T28.P2A.15 GRC Installation 12 2 80 08MAR12A 22MAY12 89 153,442.71
T28.P2A.16 Painting final Coat 6 6 0 31MAY12 06J UN12 76 28,178.70
Electrical
T28.P2E.01 Electrical 1st fix 8 4 50 08FEB12A 10MAY12 15 172,657.87
T28.P2E.02 Electrical 2nd fix 4 2 50 29FEB12A 22MAY12 85 172,657.87
T28.P2E.03 Data & Light power 1st fix 8 6 30 10MAR12A 13MAY12 85 86,329.12
T28.P2E.04 BMS & Home automation 1st fix 4 4 0 16J UN12 19J UN12 61 86,329.12
T28.P2E.05 Audio visual, BMS,PA & CCTV 12 8 30 10MAR12A 24J UN12 57 86,329.12
T28.P2E.06 Data & Light power 2nd fix 8 8 0 21MAY12 29MAY12 79 86,329.12
T28.P2E.08 Electrical final fix 6 6 0 27MAY12 02J UN12 82 86,329.12
T28.P2E.10 BMS & Fire alarm final fix 2 1 30 05MAY12A 20J UN12 61 86,329.12
T28.P2E.11 Data & Light power final fix 8 8 0 20J UN12 28J UN12 61 86,329.12
T28.P2E.12 Audio visual, BMS,PA & CCTV 4 4 0 25J UN12 28J UN12 57 86,329.12
HVAC
T28.P2H.01 Installation of A/C Ducts & 7 6 20 12MAR12A 20MAY12 77 179,837.26
T28.P2H.03 Install AHU FCU 8 2 75 15MAR12A 15MAY12 77 359,673.73
T28.P2H.05 Install grills & Diffusers 8 8 0 16J UN12 24J UN12 61 179,837.26
T28.P2H.06 Install CW Machinaries 7 7 0 16J UN12 23J UN12 62 359,673.73
Plumbing & Drainage
T28.P2P.01 Installation of Drainage pipes 10 2 80 18MAR12A 07MAY12 52 40,151.49
2012 2013
J FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR A
Plumbing 1st fix
Plumbing 2nd Fix
Connection to pumps
Plumbing Final Fix
Fire pipe install
Install Fire pumps
Connection to pump
Install DG Set
Final fix fire alarm
Testing & Commissioning Parking 1
Masonry walls
Plastering
Door,windows & Carpentry joinary works
Glass & Glazing works
Ceiling gypsum / metal lobby
Floor tiles & Wall Tiles
Floor epoxy paint
Marble & granite
Painting 1st coat
Aluminium Doors ,Windows & Metal works
GRC Installation
Painting final Coat
Electrical 1st fix
Electrical 2nd fix
Data & Light power 1st fix
BMS & Home automation 1st fix
Audio visual, BMS,PA & CCTV 1st fix
Data & Light power 2nd fix
Electrical final fix
BMS & Fire alarm final fix
Data & Light power final fix
Audio visual, BMS,PA & CCTV final fix
Installation of A/C Ducts & Connections
Install AHU FCU
Install grills & Diffusers
Install CW Machinaries
Installation of Drainage pipes
Sheet 7 of 32
Sheet 8 of 32
Activity
ID
Activity
Description
Orig
Dur
Rem
Dur
% Early
Start
Early
Finish
Total
Float
Budgeted
Cost
T28.P2P.02 Plumbing 1st fix 8 8 0 08MAY12 16MAY12 76 40,151.49
T28.P2P.03 Plumbing 2nd Fix 6 6 0 17MAY12 23MAY12 79 40,151.49
T28.P2P.05 Plumbing Final Fix 10 10 0 24MAY12 04J UN12 78 40,151.49
Fire Fighting & Fire Alarm
T28.P2F.01 Fire pipe install 7 5 25 28FEB12A 13MAY12 79 258,348.98
Testing floor services
T28.P2T.01 Testing & Commissioning Parking 10 10 0 01J UL12 11J UL12 56 0.00
Parking (P3)
Architectural
T28.P3A.01 Masonry walls 4 1 80 28MAR12A 20MAY12 73 5,232.41
T28.P3A.02 Plastering 6 4 30 02APR12A 24MAY12 73 113,309.93
T28.P3A.03 Door,windows & Carpentry joinary 6 6 0 21MAY12 27MAY12 73 244,090.32
T28.P3A.04 Glass & Glazing works 20 20 0 20MAY12 11J UN12 90 18,930.99
T28.P3A.06 Ceiling gypsum / metal lobby 10 10 0 21MAY12 31MAY12 73 113,309.93
T28.P3A.07 Floor tiles & Wall Tiles 10 10 0 26MAY12 05J UN12 77 113,309.93
T28.P3A.08 Floor epoxy paint 10 10 0 26MAY12 05J UN12 77 28,178.70
T28.P3A.09 Marble & granite 8 8 0 26MAY12 03J UN12 77 113,309.93
T28.P3A.12 Painting 1st coat 6 6 0 21MAY12 27MAY12 79 28,178.70
T28.P3A.14 Aluminium Doors ,Windows & 8 8 0 26MAY12 03J UN12 73 84,337.19
T28.P3A.15 GRC Installation 12 2 80 08MAR12A 27MAY12 85 153,442.71
T28.P3A.16 Painting final Coat 6 6 0 04J UN12 10J UN12 73 28,178.70
Electrical
T28.P3E.01 Electrical 1st fix 8 4 45 08FEB12A 15MAY12 15 172,657.87
T28.P3E.02 Electrical 2nd fix 4 2 40 29FEB12A 27MAY12 81 172,657.87
T28.P3E.03 Data & Light power 1st fix 8 6 30 28MAR12A 17MAY12 81 86,329.12
T28.P3E.04 BMS & Home automation 1st fix 4 4 0 16J UN12 19J UN12 61 86,329.12
T28.P3E.05 Audio visual, BMS,PA & CCTV 12 8 30 10MAR12A 24J UN12 57 86,329.12
T28.P3E.06 Data & Light power 2nd fix 8 8 0 26MAY12 03J UN12 75 86,329.12
T28.P3E.08 Electrical final fix 6 6 0 28MAY12 03J UN12 81 86,329.12
T28.P3E.10 BMS & Fire alarm final fix 2 1 30 05MAY12A 20J UN12 61 86,329.12
T28.P3E.11 Data & Light power final fix 8 8 0 20J UN12 28J UN12 61 86,329.12
T28.P3E.12 Audio visual, BMS,PA & CCTV 4 4 0 25J UN12 28J UN12 57 86,329.12
HVAC
T28.P3H.01 Installation of A/C Ducts & 7 6 20 10MAR12A 20MAY12 77 179,837.26
T28.P3H.03 Install AHU FCU 8 2 75 19MAR12A 15MAY12 77 359,673.73
T28.P3H.05 Install grills & Diffusers 8 8 0 16J UN12 24J UN12 61 179,837.26
T28.P3H.06 Install CW Machinaries 7 7 0 16J UN12 23J UN12 62 179,837.26
Plumbing & Drainage
T28.P3P.01 Installation of Drainage pipes 10 2 80 20MAR12A 09MAY12 52 40,151.49
T28.P3P.02 Plumbing 1st fix 8 8 0 10MAY12 19MAY12 73 40,151.49
T28.P3P.03 Plumbing 2nd Fix 6 6 0 20MAY12 26MAY12 77 40,151.49
T28.P3P.05 Plumbing Final Fix 10 10 0 26MAY12 05J UN12 77 40,151.49
Fire Fighting & Fire Alarm
T28.P3F.01 Fire pipe install 7 5 30 28FEB12A 13MAY12 78 387,523.48
2012 2013
J FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR A
Plumbing 1st fix
Plumbing 2nd Fix
Plumbing Final Fix
Fire pipe install
Testing & Commissioning Parking 2
Masonry walls
Plastering
Door,windows & Carpentry joinary works
Glass & Glazing works
Ceiling gypsum / metal lobby
Floor tiles & Wall Tiles
Floor epoxy paint
Marble & granite
Painting 1st coat
Aluminium Doors ,Windows & Metal works
GRC Installation
Painting final Coat
Electrical 1st fix
Electrical 2nd fix
Data & Light power 1st fix
BMS & Home automation 1st fix
Audio visual, BMS,PA & CCTV 1st fix
Data & Light power 2nd fix
Electrical final fix
BMS & Fire alarm final fix
Data & Light power final fix
Audio visual, BMS,PA & CCTV final fix
Installation of A/C Ducts & Connections
Install AHU FCU
Install grills & Diffusers
Install CW Machinaries
Installation of Drainage pipes
Plumbing 1st fix
Plumbing 2nd Fix
Plumbing Final Fix
Fire pipe install
Sheet 8 of 32
Sheet 9 of 32
Activity
ID
Activity
Description
Orig
Dur
Rem
Dur
% Early
Start
Early
Finish
Total
Float
Budgeted
Cost
Testing floor services
T28.P3T.01 Testing & Commissioning Parking 10 10 0 01J UL12 11J UL12 56 0.00
Parking (P4)
Architectural
T28.P4A.01 Masonry walls 4 1 80 01APR12A 22MAY12 71 5,232.41
T28.P4A.02 Plastering 6 4 40 23MAY12 27MAY12 71 113,309.93
T28.P4A.03 Door,windows & Carpentry joinary 6 6 0 23MAY12 29MAY12 71 244,090.32
T28.P4A.04 Glass & Glazing works 12 12 0 22MAY12 04J UN12 87 18,930.99
T28.P4A.06 Ceiling gypsum / metal lobby 10 10 0 23MAY12 03J UN12 71 113,309.93
T28.P4A.07 Floor tiles & Wall Tiles 10 10 0 23MAY12 03J UN12 79 113,309.93
T28.P4A.08 Floor epoxy paint 10 10 0 23MAY12 03J UN12 79 28,178.70
T28.P4A.09 Marble & granite 8 8 0 23MAY12 31MAY12 79 113,309.93
T28.P4A.12 Painting 1st coat 6 6 0 23MAY12 29MAY12 77 28,178.70
T28.P4A.14 Aluminium Doors ,Windows & 8 8 0 28MAY12 05J UN12 71 84,337.19
T28.P4A.15 GRC Installation 12 3 75 03MAR12A 26MAY12 86 153,442.71
T28.P4A.16 Painting final Coat 6 6 0 06J UN12 12J UN12 71 28,178.70
Electrical
T28.P4E.01 Electrical 1st fix 8 4 45 08FEB12A 20MAY12 15 172,657.87
T28.P4E.02 Electrical 2nd fix 4 2 40 29FEB12A 29MAY12 80 172,657.87
T28.P4E.03 Data & Light power 1st fix 8 6 30 01MAR12A 22MAY12 78 86,329.12
T28.P4E.04 BMS & Home automation 1st fix 4 4 0 18J UN12 21J UN12 60 86,329.12
T28.P4E.05 Audio visual, BMS,PA & CCTV 12 12 0 16J UN12 28J UN12 54 86,329.12
T28.P4E.06 Data & Light power 2nd fix 8 8 0 28MAY12 05J UN12 74 86,329.12
T28.P4E.08 Electrical final fix 6 6 0 30MAY12 05J UN12 80 86,329.12
T28.P4E.10 BMS & Fire alarm final fix 2 1 40 01MAY12A 23J UN12 60 86,329.12
T28.P4E.11 Data & Light power final fix 8 8 0 23J UN12 01J UL12 60 86,329.12
T28.P4E.12 Audio visual, BMS,PA & CCTV 4 3 30 08MAR12A 02J UL12 54 86,329.12
HVAC
T28.P4H.01 Installation of A/C Ducts & 7 2 70 05MAR12A 15MAY12 77 179,837.26
T28.P4H.03 Install AHU FCU 8 2 75 11MAR12A 15MAY12 77 359,673.73
T28.P4H.05 Install grills & Diffusers 8 8 0 16J UN12 24J UN12 61 179,837.26
T28.P4H.06 Install CW Machinaries 7 7 0 16J UN12 23J UN12 62 179,837.26
Plumbing & Drainage
T28.P4P.01 Installation of Drainage pipes 10 2 80 10MAR12A 12MAY12 52 40,151.49
T28.P4P.02 Plumbing 1st fix 8 8 0 13MAY12 21MAY12 71 40,151.49
T28.P4P.03 Plumbing 2nd Fix 6 6 0 22MAY12 28MAY12 75 40,151.49
T28.P4P.05 Plumbing Final Fix 10 10 0 28MAY12 07J UN12 75 40,151.49
Fire Fighting & Fire Alarm
T28.P4F.01 Fire pipe install 7 5 30 28FEB12A 13MAY12 78 387,523.48
Testing floor services
T28.P4T.01 Testing & Commissioning Parking 10 10 0 03J UL12 14J UL12 54 0.00
Mezzanine Floor
Architectural
T28.MZA.01 Masonry walls 4 1 85 01APR12A 26MAY12 67 5,232.41
2012 2013
J FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR A
Testing & Commissioning Parking 3
Masonry walls
Plastering
Door,windows & Carpentry joinary works
Glass & Glazing works
Ceiling gypsum / metal lobby
Floor tiles & Wall Tiles
Floor epoxy paint
Marble & granite
Painting 1st coat
Aluminium Doors ,Windows & Metal works
GRC Installation
Painting final Coat
Electrical 1st fix
Electrical 2nd fix
Data & Light power 1st fix
BMS & Home automation 1st fix
Audio visual, BMS,PA & CCTV 1st fix
Data & Light power 2nd fix
Electrical final fix
BMS & Fire alarm final fix
Data & Light power final fix
Audio visual, BMS,PA & CCTV final fix
Installation of A/C Ducts & Connections
Install AHU FCU
Install grills & Diffusers
Install CW Machinaries
Installation of Drainage pipes
Plumbing 1st fix
Plumbing 2nd Fix
Plumbing Final Fix
Fire pipe install
Testing & Commissioning Parking 4
Masonry walls
Sheet 9 of 32
Sheet 10 of 32
Activity
ID
Activity
Description
Orig
Dur
Rem
Dur
% Early
Start
Early
Finish
Total
Float
Budgeted
Cost
T28.MZA.02 Plastering 6 2 60 27MAY12 28MAY12 72 113,309.93
T28.MZA.03 Door,windows & Carpentry joinary 6 6 0 29MAY12 04J UN12 78 244,090.32
T28.MZA.04 Glass & Glazing works 14 14 0 26MAY12 10J UN12 67 18,930.99
T28.MZA.06 Ceiling gypsum / metal lobby 10 10 0 16MAY12 27MAY12 79 113,309.93
T28.MZA.07 Floor tiles & Wall Tiles 10 10 0 29MAY12 09J UN12 74 113,309.93
T28.MZA.08 Floor epoxy paint 10 10 0 29MAY12 09J UN12 74 28,178.70
T28.MZA.09 Marble & granite 8 8 0 29MAY12 06J UN12 74 113,309.93
T28.MZA.12 Painting 1st coat 6 6 0 16MAY12 22MAY12 79 28,178.70
T28.MZA.14 Aluminium Doors ,Windows & 8 8 0 29MAY12 06J UN12 78 84,337.19
T28.MZA.15 GRC Installation 12 4 65 05MAY12A 02J UN12 80 153,442.71
T28.MZA.16 Painting final Coat 6 6 0 11J UN12 17J UN12 67 28,178.70
Electrical
T28.MZE.01 Electrical 1st fix 8 4 45 08FEB12A 24MAY12 15 172,657.87
T28.MZE.02 Electrical 2nd fix 4 2 45 29FEB12A 30MAY12 78 172,657.87
T28.MZE.03 Data & Light power 1st fix 8 5 40 05MAR12A 26MAY12 74 86,329.12
T28.MZE.04 BMS & Home automation 1st fix 4 4 0 16J UN12 19J UN12 61 86,329.12
T28.MZE.05 Audio visual, BMS,PA & CCTV 12 7 40 10MAR12A 23J UN12 58 86,329.12
T28.MZE.06 Data & Light power 2nd fix 8 8 0 29MAY12 06J UN12 72 86,329.12
T28.MZE.08 Electrical final fix 6 6 0 31MAY12 06J UN12 78 86,329.12
T28.MZE.10 BMS & Fire alarm final fix 2 1 40 05MAY12A 20J UN12 61 86,329.12
T28.MZE.11 Data & Light power final fix 8 8 0 20J UN12 28J UN12 61 86,329.12
T28.MZE.12 Audio visual, BMS,PA & CCTV 4 4 0 24J UN12 27J UN12 58 86,329.12
HVAC
T28.MZH.01 Installation of A/C Ducts & 7 1 80 08MAR12A 14MAY12 79 359,673.73
T28.MZH.03 Install AHU FCU 8 2 75 10MAR12A 15MAY12 79 359,673.73
T28.MZH.05 Install grills & Diffusers 8 8 0 16J UN12 24J UN12 61 179,837.26
T28.MZH.06 Install CW Machinaries 7 7 0 16J UN12 23J UN12 62 179,837.26
Plumbing & Drainage
T28.MZP.01 Installation of Drainage pipes 10 2 80 22MAR12A 14MAY12 52 40,151.49
T28.MZP.02 Plumbing 1st fix 8 8 0 15MAY12 23MAY12 68 40,151.49
T28.MZP.03 Plumbing 2nd Fix 6 6 0 24MAY12 30MAY12 73 40,151.49
T28.MZP.05 Plumbing Final Fix 10 10 0 30MAY12 10J UN12 73 40,151.49
Fire Fighting & Fire Alarm
T28.MZF.01 Fire pipe install 7 5 30 20MAR12A 13MAY12 77 387,523.48
Testing floor services
T28.MZT.01 Testing & Commissioning 10 10 0 01J UL12 11J UL12 56 0.00
Aminity Floor
Swimming Pool
T2.AMSW.01 Refurbishment works 75 75 0 03MAY12 29J UL12 -49 266,618.30
T2.AMSW.02 Plumbing & Drainage 40 40 0 07J UL12 21AUG12 -49 0.00
T2.AMSW.03 Water Proofing 30 30 0 22AUG12 25SEP12 -49 0.00
T2.AMSW.04 Tiling 20 20 0 26SEP12 18OCT12 -49 0.00
2012 2013
J FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR A
Plastering
Door,windows & Carpentry joinary works
Glass & Glazing works
Ceiling gypsum / metal lobby
Floor tiles & Wall Tiles
Floor epoxy paint
Marble & granite
Painting 1st coat
Aluminium Doors ,Windows & Metal works
GRC Installation
Painting final Coat
Electrical 1st fix
Electrical 2nd fix
Data & Light power 1st fix
BMS & Home automation 1st fix
Audio visual, BMS,PA & CCTV 1st fix
Data & Light power 2nd fix
Electrical final fix
BMS & Fire alarm final fix
Data & Light power final fix
Audio visual, BMS,PA & CCTV final fix
Installation of A/C Ducts & Connections
Install AHU FCU
Install grills & Diffusers
Install CW Machinaries
Installation of Drainage pipes
Plumbing 1st fix
Plumbing 2nd Fix
Plumbing Final Fix
Fire pipe install
Testing & Commissioning Mezzanine fLOOR
Refurbishment works
Plumbing & Drainage
Water Proofing
Tiling
Sheet 10 of 32
Sheet 11 of 32
Activity
ID
Activity
Description
Orig
Dur
Rem
Dur
% Early
Start
Early
Finish
Total
Float
Budgeted
Cost
T2.AMSW.05 Pool Fixtures 10 10 0 20OCT12 30OCT12 -49 0.00
Architectural
T28.AMA.01 Masonry walls 4 1 80 28FEB12A 28MAY12 53 5,232.41
T28.AMA.02 Plastering 6 2 75 01APR12A 30MAY12 70 113,309.93
T28.AMA.03 Door,windows & Carpentry joinary 6 3 50 01APR12A 31MAY12 70 244,090.32
T28.AMA.04 Glass & Glazing works 12 11 10 02APR12A 09J UN12 68 18,930.99
T28.AMA.05 Steel Structural Works 20 20 0 28MAY12 19J UN12 53 26,259.63
T28.AMA.06 Ceiling gypsum / metal lobby 10 9 10 03APR12A 28MAY12 76 113,309.93
T28.AMA.07 Floor tiles & Wall Tiles 10 10 0 31MAY12 11J UN12 72 113,309.93
T28.AMA.08 Floor epoxy paint 10 10 0 09J UN12 19J UN12 71 28,178.70
T28.AMA.09 Marble & granite 8 8 0 31MAY12 09J UN12 72 113,309.93
T28.AMA.11 Garbage Chutes 12 12 0 20J UN12 03J UL12 53 193,545.38
T28.AMA.12 Painting 1st coat 6 6 0 19MAY12 24MAY12 77 28,178.70
T28.AMA.14 Aluminium Doors ,Windows & 8 8 0 29MAY12 06J UN12 70 84,337.19
T28.AMA.15 GRC Installation 12 6 50 05MAY12A 09J UN12 74 153,442.71
T28.AMA.16 Painting final Coat 6 6 0 10J UN12 16J UN12 68 28,178.70
T28.AMA.26 Water proofing for Landscape & 12 12 0 26MAY12 07J UN12 71 0.00
Electrical
T28.AME.01 Electrical 1st fix 8 2 75 08FEB12A 27MAY12 15 172,657.87
T28.AME.02 Electrical 2nd fix 4 2 55 29FEB12A 02J UN12 76 172,657.87
T28.AME.03 Data & Light power 1st fix 8 4 45 05MAR12A 29MAY12 74 86,329.12
T28.AME.04 BMS & Home automation 1st fix 4 4 0 16J UN12 19J UN12 61 86,329.12
T28.AME.05 Audio visual, BMS,PA & CCTV 12 8 30 10MAR12A 24J UN12 57 86,329.12
T28.AME.06 Data & Light power 2nd fix 8 5 35 05MAY12A 05J UN12 73 86,329.12
T28.AME.08 Electrical final fix 6 6 0 03J UN12 09J UN12 76 86,329.12
T28.AME.10 BMS & Fire alarm final fix 2 1 30 05MAY12A 20J UN12 61 86,329.12
T28.AME.11 Data & Light power final fix 8 8 0 20J UN12 28J UN12 61 86,329.12
T28.AME.12 Audio visual, BMS,PA & CCTV 4 4 0 25J UN12 28J UN12 57 86,329.12
HVAC
T28.AMH.01 Installation of A/C Ducts & 7 3 60 09MAR12A 17MAY12 76 179,837.26
T28.AMH.03 Install AHU FCU 8 3 65 14MAR12A 17MAY12 76 359,673.73
T28.AMH.05 Install grills & Diffusers 8 8 0 16J UN12 24J UN12 61 179,837.26
T28.AMH.06 Install CW Machinaries 7 7 0 16J UN12 23J UN12 62 179,837.26
Plumbing & Drainage
T28.AMP.01 Installation of Drainage pipes 10 2 80 03MAR12A 16MAY12 52 40,151.49
T28.AMP.02 Plumbing 1st fix 8 2 80 12MAR12A 19MAY12 60 40,151.49
T28.AMP.03 Plumbing 2nd Fix 6 1 80 01APR12A 20MAY12 82 40,151.49
T28.AMP.05 Plumbing Final Fix 10 10 0 26MAY12 05J UN12 77 40,151.49
Fire Fighting & Fire Alarm
T28.AMF.01 Fire pipe install 7 5 30 01APR12A 13MAY12 65 387,523.48
Testing floor services
T28.AMT.01 Testing & Commissioning Aminity 10 10 0 31OCT12 11NOV12 -49 0.00
2012 2013
J FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR A
Pool Fixtures
Masonry walls
Plastering
Door,windows & Carpentry joinary works
Glass & Glazing works
Steel Structural Works
Ceiling gypsum / metal lobby
Floor tiles & Wall Tiles
Floor epoxy paint
Marble & granite
Garbage Chutes
Painting 1st coat
Aluminium Doors ,Windows & Metal works
GRC Installation
Painting final Coat
Water proofing for Landscape & wet areas
Electrical 1st fix
Electrical 2nd fix
Data & Light power 1st fix
BMS & Home automation 1st fix
Audio visual, BMS,PA & CCTV 1st fix
Data & Light power 2nd fix
Electrical final fix
BMS & Fire alarm final fix
Data & Light power final fix
Audio visual, BMS,PA & CCTV final fix
Installation of A/C Ducts & Connections
Install AHU FCU
Install grills & Diffusers
Install CW Machinaries
Installation of Drainage pipes
Plumbing 1st fix
Plumbing 2nd Fix
Plumbing Final Fix
Fire pipe install
Testing & Commissioning Aminity Floor
Sheet 11 of 32
Sheet 12 of 32
Activity
ID
Activity
Description
Orig
Dur
Rem
Dur
% Early
Start
Early
Finish
Total
Float
Budgeted
Cost
Tower (Level 1-18)
Tower Level 1
Architectural
T28.L1A.01 Masonry walls 4 1 85 28MAR12A 30MAY12 60 3,244.62
T28.L1A.02 Plastering 6 5 10 15MAY12A 05J UN12 60 96,725.26
T28.L1A.03 Door,windows & Carpentry joinary 6 2 70 03MAR12A 07J UN12 66 440,817.99
T28.L1A.04 Glass & Glazing works 20 8 60 02APR12A 07J UN12 77 13,591.84
T28.L1A.06 Ceiling gypsum / metal lobby 10 8 20 10MAR12A 30MAY12 60 96,725.26
T28.L1A.07 0Floor tiles & Wall Tiles 10 10 0 31MAY12 11J UN12 60 96,726.55
T28.L1A.08 Floor epoxy paint 10 10 0 06J UN12 17J UN12 67 8,434.10
T28.L1A.09 Marble & granite 8 7 10 06J UN12 13J UN12 67 96,725.26
T28.L1A.12 Painting 1st coat 6 6 0 22MAY12 28MAY12 78 8,434.10
T28.L1A.13 Wardrobes & Kitchen Cabinets 12 12 0 12J UN12 25J UN12 60 0.00
T28.L1A.14 Aluminium Doors ,Windows & 8 5 40 05MAY12A 11J UN12 66 73,920.33
T28.L1A.15 GRC Installation 12 6 50 05MAY12A 12J UN12 71 202,222.15
T28.L1A.16 Painting final Coat 6 6 0 12J UN12 18J UN12 66 8,434.10
Electrical
T28.L1E.01 Electrical 1st fix 8 2 75 08FEB12A 29MAY12 15 155,656.20
T28.L1E.02 Electrical 2nd fix 4 2 60 29FEB12A 07J UN12 72 155,656.20
T28.L1E.03 Data & Light power 1st fix 8 2 80 05MAR12A 29MAY12 77 77,828.09
T28.L1E.04 BMS & Home automation 1st fix 4 3 20 06MAR12A 18J UN12 63 86,329.12
T28.L1E.05 Audio visual, BMS,PA & CCTV 12 5 60 19MAR12A 20J UN12 61 86,329.12
T28.L1E.06 Data & Light power 2nd fix 8 2 75 22MAR12A 07J UN12 72 77,828.09
T28.L1E.08 Electrical final fix 6 6 0 09J UN12 14J UN12 72 77,828.09
T28.L1E.10 BMS & Fire alarm final fix 2 2 0 19J UN12 20J UN12 63 77,828.09
T28.L1E.11 Data & Light power final fix 8 7 10 30MAR12A 26J UN12 63 77,828.09
T28.L1E.12 Audio visual, BMS,PA & CCTV 4 3 20 05MAY12A 24J UN12 61 77,828.09
HVAC
T28.L1H.01 Installation of A/C Ducts & 7 1 80 04MAR12A 21MAY12 60 188,827.95
T28.L1H.03 Install AHU FCU 8 1 90 12MAR12A 22MAY12 60 188,827.95
T28.L1H.05 Install grills & Diffusers 8 8 0 16J UN12 24J UN12 61 94,413.97
T28.L1H.06 Install CW Machinaries 7 7 0 16J UN12 23J UN12 62 94,413.97
Plumbing & Drainage
T28.L1P.01 Installation of Drainage pipes 10 0 100 01MAR12A 04APR12A 74,065.34
T28.L1P.02 Plumbing 1st fix 8 2 80 27FEB12A 19MAY12 69 74,065.34
T28.L1P.03 Plumbing 2nd Fix 6 1 80 01MAR12A 20MAY12 82 74,065.34
T28.L1P.05 Plumbing Final Fix 10 10 0 23MAY12 03J UN12 79 74,065.34
Fire Fighting & Fire Alarm
T28.L1F.01 Fire pipe install 7 1 80 28FEB12A 08MAY12 101 50,939.58
Testing floor services
T28.L1T.01 Testing & Commissioning Level 1 10 10 0 01J UL12 11J UL12 56 0.00
Tower Level 2
Architectural
T28.L2A.01 Masonry walls 4 1 85 01APR12A 02J UN12 60 3,244.62
2012 2013
J FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR A
Masonry walls
Plastering
Door,windows & Carpentry joinary works
Glass & Glazing works
Ceiling gypsum / metal lobby
0Floor tiles & Wall Tiles
Floor epoxy paint
Marble & granite
Painting 1st coat
Wardrobes & Kitchen Cabinets
Aluminium Doors ,Windows & Metal works
GRC Installation
Painting final Coat
Electrical 1st fix
Electrical 2nd fix
Data & Light power 1st fix
BMS & Home automation 1st fix
Audio visual, BMS,PA & CCTV 1st fix
Data & Light power 2nd fix
Electrical final fix
BMS & Fire alarm final fix
Data & Light power final fix
Audio visual, BMS,PA & CCTV final fix
Installation of A/C Ducts & Connections
Install AHU FCU
Install grills & Diffusers
Install CW Machinaries
Installation of Drainage pipes
Plumbing 1st fix
Plumbing 2nd Fix
Plumbing Final Fix
Fire pipe install
Testing & Commissioning Level 1
Masonry walls
Sheet 12 of 32
Sheet 13 of 32
Activity
ID
Activity
Description
Orig
Dur
Rem
Dur
% Early
Start
Early
Finish
Total
Float
Budgeted
Cost
T28.L2A.02 Plastering 6 5 10 10MAY12A 07J UN12 60 96,725.26
T28.L2A.04 Marble & granite 8 7 10 10MAY12A 16J UN12 60 96,725.26
T28.L2A.05 Ceiling gypsum / metal lobby 10 8 20 01MAR12A 17J UN12 60 96,725.26
T28.L2A.06 Floor tiles & Wall Tiles 10 9 10 10MAY12A 18J UN12 60 96,726.55
T28.L2A.07 Aluminium Doors ,Windows & 8 5 40 05MAY12A 13J UN12 64 73,920.33
T28.L2A.08 Painting 1st coat 6 5 10 05MAY12A 13J UN12 60 8,434.10
T28.L2A.09 Glass & Glazing works 20 13 35 03APR12A 16J UN12 63 13,591.84
T28.L2A.10 Door,windows & Carpentry joinary 6 2 70 02MAR12A 10J UN12 64 440,817.99
T28.L2A.11 Floor epoxy paint 10 10 0 09J UN12 19J UN12 65 8,434.10
T28.L2A.12 GRC Installation 12 5 60 05MAY12A 21J UN12 63 202,222.15
T28.L2A.13 Wardrobes & Kitchen Cabinets 12 11 10 05MAY12A 25J UN12 60 0.00
T28.L2A.14 Painting final Coat 6 6 0 14J UN12 20J UN12 64 8,434.10
Electrical
T28.L2E.01 Electrical 1st fix 8 2 80 08FEB12A 31MAY12 15 155,656.20
T28.L2E.02 Electrical 2nd fix 4 1 70 29FEB12A 09J UN12 70 155,656.20
T28.L2E.03 Data & Light power 1st fix 8 3 60 05MAR12A 02J UN12 74 77,828.09
T28.L2E.04 Data & Light power 2nd fix 8 2 75 01MAR12A 10J UN12 69 77,828.09
T28.L2E.05 Audio visual, BMS,PA & CCTV 12 5 60 06MAR12A 20J UN12 60 86,329.12
T28.L2E.06 Electrical final fix 6 6 0 14J UN12 20J UN12 66 77,828.09
T28.L2E.07 BMS & Home automation 1st fix 4 4 10 10MAR12A 19J UN12 61 86,329.12
T28.L2E.08 BMS & Fire alarm final fix 2 2 0 20J UN12 21J UN12 61 77,828.09
T28.L2E.09 Data & Light power final fix 8 7 10 01APR12A 27J UN12 61 77,828.09
T28.L2E.10 Audio visual, BMS,PA & CCTV 4 4 0 21J UN12 25J UN12 60 77,828.09
HVAC
T28.L2H.01 Installation of A/C Ducts & 7 1 80 04MAR12A 23MAY12 71 188,827.95
T28.L2H.02 Install AHU FCU 8 2 75 12MAR12A 26MAY12 71 188,827.95
T28.L2H.03 Install grills & Diffusers 8 7 10 07MAY12A 25J UN12 60 94,413.97
T28.L2H.04 Install CW Machinaries 7 7 0 16J UN12 23J UN12 62 94,413.97
Plumbing & Drainage
T28.L2P.01 Plumbing 1st fix 8 1 90 27FEB12A 17MAY12 72 74,065.34
T28.L2P.02 0Installation of Drainage pipes 10 0 100 02FEB12A 28MAR12A 74,065.34
T28.L2P.03 Plumbing 2nd Fix 6 1 90 01MAR12A 09J UN12 65 74,065.34
T28.L2P.04 Plumbing Final Fix 10 10 0 14J UN12 25J UN12 60 74,065.34
Fire Fighting & Fire Alarm
T28.L2F.01 Fire pipe install 7 1 80 28FEB12A 08MAY12 80 50,939.58
Testing floor services
T28.L2T.01 Testing & Commissioning Level 2 10 10 0 01J UL12 11J UL12 56 0.00
Tower Level 3
Architectural
T28.L3A.01 Masonry walls 4 1 85 30MAR12A 04J UN12 55 3,244.62
T28.L3A.02 Plastering 6 5 10 09MAY12A 10J UN12 58 96,725.26
T28.L3A.04 Marble & granite 8 7 10 05MAY12A 18J UN12 60 96,725.26
T28.L3A.05 Ceiling gypsum / metal lobby 10 8 20 01MAR12A 19J UN12 58 96,725.26
T28.L3A.06 Floor tiles & Wall Tiles 10 9 10 05MAY12A 20J UN12 60 96,726.55
2012 2013
J FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR A
Plastering
Marble & granite
Ceiling gypsum / metal lobby
Floor tiles & Wall Tiles
Aluminium Doors ,Windows & Metal works
Painting 1st coat
Glass & Glazing works
Door,windows & Carpentry joinary works
Floor epoxy paint
GRC Installation
Wardrobes & Kitchen Cabinets
Painting final Coat
Electrical 1st fix
Electrical 2nd fix
Data & Light power 1st fix
Data & Light power 2nd fix
Audio visual, BMS,PA & CCTV 1st fix
Electrical final fix
BMS & Home automation 1st fix
BMS & Fire alarm final fix
Data & Light power final fix
Audio visual, BMS,PA & CCTV final fix
Installation of A/C Ducts & Connections
Install AHU FCU
Install grills & Diffusers
Install CW Machinaries
Plumbing 1st fix
0Installation of Drainage pipes
Plumbing 2nd Fix
Plumbing Final Fix
Fire pipe install
Testing & Commissioning Level 2
Masonry walls
Plastering
Marble & granite
Ceiling gypsum / metal lobby
Floor tiles & Wall Tiles
Sheet 13 of 32
Sheet 14 of 32
Activity
ID
Activity
Description
Orig
Dur
Rem
Dur
% Early
Start
Early
Finish
Total
Float
Budgeted
Cost
T28.L3A.07 Aluminium Doors ,Windows & 8 7 10 05MAY12A 18J UN12 60 73,920.33
T28.L3A.08 Painting 1st coat 6 5 10 05MAY12A 16J UN12 58 8,434.10
T28.L3A.09 Glass & Glazing works 20 18 10 03APR12A 24J UN12 55 13,591.84
T28.L3A.10 Door,windows & Carpentry joinary 6 2 60 10MAR12A 12J UN12 60 440,817.99
T28.L3A.11 Floor epoxy paint 10 10 0 11J UN12 21J UN12 63 8,434.10
T28.L3A.12 GRC Installation 12 6 50 05MAY12A 01J UL12 55 202,222.15
T28.L3A.13 Wardrobes & Kitchen Cabinets 12 11 10 05MAY12A 25J UN12 60 0.00
T28.L3A.14 Painting final Coat 6 6 0 19J UN12 25J UN12 60 8,434.10
Electrical
T28.L3E.01 Electrical 1st fix 8 2 80 08FEB12A 03J UN12 15 155,656.20
T28.L3E.02 Electrical 2nd fix 4 1 75 29FEB12A 11J UN12 68 155,656.20
T28.L3E.03 Data & Light power 1st fix 8 2 80 05MAR12A 03J UN12 72 77,828.09
T28.L3E.04 Data & Light power 2nd fix 8 2 80 10MAR12A 12J UN12 67 77,828.09
T28.L3E.05 Audio visual, BMS,PA & CCTV 12 5 60 19MAR12A 20J UN12 60 86,329.12
T28.L3E.06 Electrical final fix 6 6 0 17J UN12 23J UN12 64 77,828.09
T28.L3E.07 BMS & Home automation 1st fix 4 4 10 01APR12A 19J UN12 61 86,329.12
T28.L3E.08 BMS & Fire alarm final fix 2 1 30 07MAY12A 20J UN12 61 77,828.09
T28.L3E.09 Data & Light power final fix 8 7 10 07MAY12A 27J UN12 61 77,828.09
T28.L3E.10 Audio visual, BMS,PA & CCTV 4 4 0 21J UN12 25J UN12 60 77,828.09
HVAC
T28.L3H.01 Installation of A/C Ducts & 7 1 80 04MAR12A 26MAY12 74 188,827.95
T28.L3H.02 Install AHU FCU 8 2 75 12MAR12A 28MAY12 74 188,827.95
T28.L3H.03 Install grills & Diffusers 8 7 10 05APR12A 27J UN12 58 94,413.97
T28.L3H.04 Install CW Machinaries 7 7 0 16J UN12 23J UN12 62 94,413.97
Plumbing & Drainage
T28.L3P.01 Plumbing 1st fix 8 1 90 27FEB12A 17MAY12 74 74,065.34
T28.L3P.02 Installation of Drainage pipes 10 0 100 29FEB12A 28MAR12A 74,065.34
T28.L3P.03 Plumbing 2nd Fix 6 1 90 31MAR12A 19MAY12 83 74,065.34
T28.L3P.04 Plumbing Final Fix 10 10 0 17J UN12 27J UN12 58 74,065.34
Fire Fighting & Fire Alarm
T28.L3F.01 Fire pipe install 7 1 80 28FEB12A 08MAY12 77 50,939.58
Testing floor services
T28.L3T.01 Testing & Commissioning Level 3 10 10 0 02J UL12 12J UL12 55 0.00
Tower Level 4
Architectural
T28.L4A.01 Masonry walls 4 1 85 28MAR12A 06J UN12 56 3,244.62
T28.L4A.02 Plastering 6 5 10 05MAY12A 12J UN12 56 96,725.26
T28.L4A.04 Marble & granite 8 7 10 06MAY12A 20J UN12 56 96,725.26
T28.L4A.05 Ceiling gypsum / metal lobby 10 8 20 01MAR12A 16J UN12 60 96,725.26
T28.L4A.06 Floor tiles & Wall Tiles 10 10 0 13J UN12 24J UN12 56 96,726.55
T28.L4A.07 Aluminium Doors ,Windows & 8 8 0 13J UN12 21J UN12 57 73,920.33
T28.L4A.08 Painting 1st coat 6 6 0 07J UN12 13J UN12 60 8,434.10
T28.L4A.09 Glass & Glazing works 20 18 10 03APR12A 26J UN12 71 13,591.84
T28.L4A.10 Door,windows & Carpentry joinary 6 2 60 14MAR12A 14J UN12 57 440,817.99
2012 2013
J FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR A
Aluminium Doors ,Windows & Metal works
Painting 1st coat
Glass & Glazing works
Door,windows & Carpentry joinary works
Floor epoxy paint
GRC Installation
Wardrobes & Kitchen Cabinets
Painting final Coat
Electrical 1st fix
Electrical 2nd fix
Data & Light power 1st fix
Data & Light power 2nd fix
Audio visual, BMS,PA & CCTV 1st fix
Electrical final fix
BMS & Home automation 1st fix
BMS & Fire alarm final fix
Data & Light power final fix
Audio visual, BMS,PA & CCTV final fix
Installation of A/C Ducts & Connections
Install AHU FCU
Install grills & Diffusers
Install CW Machinaries
Plumbing 1st fix
Installation of Drainage pipes
Plumbing 2nd Fix
Plumbing Final Fix
Fire pipe install
Testing & Commissioning Level 3
Masonry walls
Plastering
Marble & granite
Ceiling gypsum / metal lobby
Floor tiles & Wall Tiles
Aluminium Doors ,Windows & Metal works
Painting 1st coat
Glass & Glazing works
Door,windows & Carpentry joinary works
Sheet 14 of 32
Sheet 15 of 32
Activity
ID
Activity
Description
Orig
Dur
Rem
Dur
% Early
Start
Early
Finish
Total
Float
Budgeted
Cost
T28.L4A.11 Floor epoxy paint 10 10 0 13J UN12 24J UN12 61 8,434.10
T28.L4A.12 GRC Installation 12 6 50 05MAY12A 19J UN12 65 202,222.15
T28.L4A.13 Wardrobes & Kitchen Cabinets 12 12 0 17J UN12 30J UN12 56 0.00
T28.L4A.14 Painting final Coat 6 6 0 23J UN12 28J UN12 57 8,434.10
Electrical
T28.L4E.01 Electrical 1st fix 8 2 80 08FEB12A 05J UN12 15 155,656.20
T28.L4E.02 Electrical 2nd fix 4 1 75 29FEB12A 13J UN12 66 155,656.20
T28.L4E.03 Data & Light power 1st fix 8 2 80 05MAR12A 07J UN12 68 77,828.09
T28.L4E.04 Data & Light power 2nd fix 8 2 80 10MAR12A 14J UN12 65 77,828.09
T28.L4E.05 Audio visual, BMS,PA & CCTV 12 5 60 05MAR12A 20J UN12 60 86,329.12
T28.L4E.06 Electrical final fix 6 6 0 14J UN12 20J UN12 66 77,828.09
T28.L4E.07 BMS & Home automation 1st fix 4 4 10 01APR12A 19J UN12 61 86,329.12
T28.L4E.08 BMS & Fire alarm final fix 2 2 0 20J UN12 21J UN12 61 77,828.09
T28.L4E.09 Data & Light power final fix 8 8 0 20J UN12 28J UN12 61 77,828.09
T28.L4E.10 Audio visual, BMS,PA & CCTV 4 4 0 21J UN12 25J UN12 60 77,828.09
HVAC
T28.L4H.01 Installation of A/C Ducts & 7 1 80 04MAR12A 28MAY12 71 188,827.95
T28.L4H.02 Install AHU FCU 8 2 75 12MAR12A 30MAY12 71 188,827.95
T28.L4H.03 Install grills & Diffusers 8 8 0 17J UN12 25J UN12 60 94,413.97
T28.L4H.04 Install CW Machinaries 7 7 0 16J UN12 23J UN12 62 94,413.97
Plumbing & Drainage
T28.L4P.01 Plumbing 1st fix 8 1 90 27FEB12A 17MAY12 72 74,065.34
T28.L4P.02 Installation of Drainage pipes 10 0 100 15FEB12A 25APR12A 74,065.34
T28.L4P.03 Plumbing 2nd Fix 6 1 90 06MAR12A 19MAY12 83 74,065.34
T28.L4P.04 Plumbing Final Fix 10 10 0 14J UN12 25J UN12 60 74,065.34
Fire Fighting & Fire Alarm
T28.L4F.01 Fire pipe install 7 1 80 28FEB12A 17MAY12 72 50,939.58
Testing floor services
T28.L4T.01 Testing & Commissioning Level 4 10 10 0 01J UL12 11J UL12 56 0.00
Tower Level 5
Architectural
T28.L5A.01 Masonry walls 4 1 80 01APR12A 09J UN12 55 3,244.62
T28.L5A.02 Plastering 6 5 10 10J UN12A 14J UN12 55 96,725.26
T28.L5A.04 Marble & granite 8 7 10 07MAY12A 17J UN12 57 96,725.26
T28.L5A.05 Ceiling gypsum / metal lobby 10 10 5 04APR12A 20J UN12 56 96,725.26
T28.L5A.06 Floor tiles & Wall Tiles 10 10 0 10J UN12 20J UN12 57 96,726.55
T28.L5A.07 Aluminium Doors ,Windows & 8 8 0 16J UN12 24J UN12 55 73,920.33
T28.L5A.08 Painting 1st coat 6 6 0 10J UN12 16J UN12 58 8,434.10
T28.L5A.09 Glass & Glazing works 20 18 10 03APR12A 28J UN12 69 13,591.84
T28.L5A.10 Door,windows & Carpentry joinary 6 2 60 02APR12A 17J UN12 55 440,817.99
T28.L5A.11 Floor epoxy paint 10 10 0 10J UN12 20J UN12 64 8,434.10
T28.L5A.12 GRC Installation 12 6 50 05MAY12A 16J UN12 68 202,222.15
T28.L5A.13 Wardrobes & Kitchen Cabinets 12 12 0 16J UN12 28J UN12 57 0.00
T28.L5A.14 Painting final Coat 6 6 0 25J UN12 01J UL12 55 8,434.10
2012 2013
J FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR A
Floor epoxy paint
GRC Installation
Wardrobes & Kitchen Cabinets
Painting final Coat
Electrical 1st fix
Electrical 2nd fix
Data & Light power 1st fix
Data & Light power 2nd fix
Audio visual, BMS,PA & CCTV 1st fix
Electrical final fix
BMS & Home automation 1st fix
BMS & Fire alarm final fix
Data & Light power final fix
Audio visual, BMS,PA & CCTV final fix
Installation of A/C Ducts & Connections
Install AHU FCU
Install grills & Diffusers
Install CW Machinaries
Plumbing 1st fix
Installation of Drainage pipes
Plumbing 2nd Fix
Plumbing Final Fix
Fire pipe install
Testing & Commissioning Level 4
Masonry walls
Plastering
Marble & granite
Ceiling gypsum / metal lobby
Floor tiles & Wall Tiles
Aluminium Doors ,Windows & Metal works
Painting 1st coat
Glass & Glazing works
Door,windows & Carpentry joinary works
Floor epoxy paint
GRC Installation
Wardrobes & Kitchen Cabinets
Painting final Coat
Sheet 15 of 32
Sheet 16 of 32
Activity
ID
Activity
Description
Orig
Dur
Rem
Dur
% Early
Start
Early
Finish
Total
Float
Budgeted
Cost
Electrical
T28.L5E.01 Electrical 1st fix 8 2 80 08FEB12A 07J UN12 15 155,656.20
T28.L5E.02 Electrical 2nd fix 4 1 75 29FEB12A 16J UN12 64 155,656.20
T28.L5E.03 Data & Light power 1st fix 8 3 60 05MAR12A 11J UN12 66 77,828.09
T28.L5E.04 Data & Light power 2nd fix 8 2 80 08MAR12A 17J UN12 63 77,828.09
T28.L5E.05 Audio visual, BMS,PA & CCTV 12 5 60 03MAR12A 20J UN12 60 86,329.12
T28.L5E.06 Electrical final fix 6 6 0 17J UN12 23J UN12 64 77,828.09
T28.L5E.07 BMS & Home automation 1st fix 4 4 10 22MAR12A 19J UN12 61 86,329.12
T28.L5E.08 BMS & Fire alarm final fix 2 1 30 05MAY12A 20J UN12 61 77,828.09
T28.L5E.09 Data & Light power final fix 8 8 0 20J UN12 28J UN12 61 77,828.09
T28.L5E.10 Audio visual, BMS,PA & CCTV 4 4 0 21J UN12 25J UN12 60 77,828.09
HVAC
T28.L5H.01 Installation of A/C Ducts & 7 1 80 04MAR12A 30MAY12 62 188,827.95
T28.L5H.02 Install AHU FCU 8 2 75 12MAR12A 02J UN12 62 188,827.95
T28.L5H.03 Install grills & Diffusers 8 8 0 21J UN12 30J UN12 56 94,413.97
T28.L5H.04 Install CW Machinaries 7 7 0 16J UN12 23J UN12 62 94,413.97
Plumbing & Drainage
T28.L5P.01 Plumbing 1st fix 8 1 90 27FEB12A 17MAY12 78 74,065.34
T28.L5P.02 Installation of Drainage pipes 10 0 100 22FEB12A 29MAR12A 74,065.34
T28.L5P.03 Plumbing 2nd Fix 6 1 90 08MAR12A 19MAY12 83 74,065.34
T28.L5P.04 Plumbing Final Fix 10 10 0 17J UN12 27J UN12 58 74,065.34
Fire Fighting & Fire Alarm
T28.L5F.01 Fire pipe install 7 1 80 01MAR12A 17MAY12 73 50,939.58
Testing floor services
T28.L5T.01 Testing & Commissioning Level 5 10 10 0 02J UL12 12J UL12 55 0.00
Tower Level 6
Architectural
T28.L6A.01 Masonry walls 4 1 80 02APR12A 11J UN12 54 3,244.62
T28.L6A.02 Plastering 6 5 10 10MAY12A 11J UN12 54 96,725.26
T28.L6A.04 Marble & granite 8 7 10 05MAY12A 13J UN12 60 96,725.26
T28.L6A.05 Ceiling gypsum / metal lobby 10 10 5 05APR12A 23J UN12 54 96,725.26
T28.L6A.06 Floor tiles & Wall Tiles 10 10 0 06J UN12 17J UN12 60 96,726.55
T28.L6A.07 Aluminium Doors ,Windows & 8 8 0 12J UN12 20J UN12 58 73,920.33
T28.L6A.08 Painting 1st coat 6 6 0 12J UN12 18J UN12 56 8,434.10
T28.L6A.09 Glass & Glazing works 20 19 5 05APR12A 02J UL12 62 13,591.84
T28.L6A.10 Door,windows & Carpentry joinary 6 3 50 03APR12A 14J UN12 58 440,817.99
T28.L6A.11 Floor epoxy paint 10 10 0 06J UN12 17J UN12 67 8,434.10
T28.L6A.12 GRC Installation 12 11 10 05MAY12A 24J UN12 61 202,222.15
T28.L6A.13 Wardrobes & Kitchen Cabinets 12 12 0 12J UN12 25J UN12 60 0.00
T28.L6A.14 Painting final Coat 6 6 0 21J UN12 27J UN12 58 8,434.10
Electrical
T28.L6E.01 Electrical 1st fix 8 2 80 08FEB12A 10J UN12 15 155,656.20
T28.L6E.02 Electrical 2nd fix 4 1 75 29FEB12A 12J UN12 67 155,656.20
T28.L6E.03 Data & Light power 1st fix 8 2 80 18FEB12A 12J UN12 64 77,828.09
2012 2013
J FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR A
Electrical 1st fix
Electrical 2nd fix
Data & Light power 1st fix
Data & Light power 2nd fix
Audio visual, BMS,PA & CCTV 1st fix
Electrical final fix
BMS & Home automation 1st fix
BMS & Fire alarm final fix
Data & Light power final fix
Audio visual, BMS,PA & CCTV final fix
Installation of A/C Ducts & Connections
Install AHU FCU
Install grills & Diffusers
Install CW Machinaries
Plumbing 1st fix
Installation of Drainage pipes
Plumbing 2nd Fix
Plumbing Final Fix
Fire pipe install
Testing & Commissioning Level 5
Masonry walls
Plastering
Marble & granite
Ceiling gypsum / metal lobby
Floor tiles & Wall Tiles
Aluminium Doors ,Windows & Metal works
Painting 1st coat
Glass & Glazing works
Door,windows & Carpentry joinary works
Floor epoxy paint
GRC Installation
Wardrobes & Kitchen Cabinets
Painting final Coat
Electrical 1st fix
Electrical 2nd fix
Data & Light power 1st fix
Sheet 16 of 32
Sheet 17 of 32
Activity
ID
Activity
Description
Orig
Dur
Rem
Dur
% Early
Start
Early
Finish
Total
Float
Budgeted
Cost
T28.L6E.04 Data & Light power 2nd fix 8 2 75 15MAR12A 14J UN12 65 77,828.09
T28.L6E.05 Audio visual, BMS,PA & CCTV 12 5 60 15MAR12A 20J UN12 60 86,329.12
T28.L6E.06 Electrical final fix 6 6 0 19J UN12 25J UN12 62 77,828.09
T28.L6E.07 BMS & Home automation 1st fix 4 4 10 01APR12A 19J UN12 61 86,329.12
T28.L6E.08 BMS & Fire alarm final fix 2 1 30 08MAY12A 20J UN12 61 77,828.09
T28.L6E.09 Data & Light power final fix 8 8 0 20J UN12 28J UN12 61 77,828.09
T28.L6E.10 Audio visual, BMS,PA & CCTV 4 4 0 21J UN12 25J UN12 60 77,828.09
HVAC
T28.L6H.01 Installation of A/C Ducts & 7 1 80 01MAR12A 27MAY12 65 188,827.95
T28.L6H.02 Install AHU FCU 8 2 75 12MAR12A 29MAY12 65 188,827.95
T28.L6H.03 Install grills & Diffusers 8 8 0 24J UN12 02J UL12 54 94,413.97
T28.L6H.04 Install CW Machinaries 7 7 0 16J UN12 23J UN12 62 94,413.97
Plumbing & Drainage
T28.L6P.01 Plumbing 1st fix 8 1 90 13MAR12A 17MAY12 79 74,065.34
T28.L6P.02 Installation of Drainage pipes 10 0 100 02FEB12A 29MAR12A 74,065.34
T28.L6P.03 Plumbing 2nd Fix 6 1 90 14MAR12A 19MAY12 83 74,065.34
T28.L6P.04 Plumbing Final Fix 10 10 0 19J UN12 30J UN12 56 74,065.34
Fire Fighting & Fire Alarm
T28.L6F.01 Fire pipe install 7 4 50 14MAR12A 21MAY12 71 50,939.58
Testing floor services
T28.L6T.01 Testing & Commissioning Level 6 10 10 0 03J UL12 14J UL12 54 0.00
Tower Level 7
Architectural
T28.L7A.01 Masonry walls 4 1 80 28MAR12A 13J UN12 52 3,244.62
T28.L7A.02 Plastering 6 5 10 05MAY12A 18J UN12 48 96,725.26
T28.L7A.04 Marble & granite 8 7 10 08MAY12A 26J UN12 49 96,725.26
T28.L7A.05 Ceiling gypsum / metal lobby 10 10 5 08MAY12A 30J UN12 48 96,725.26
T28.L7A.06 Floor tiles & Wall Tiles 10 10 0 19J UN12 30J UN12 49 96,726.55
T28.L7A.07 Aluminium Doors ,Windows & 8 8 0 19J UN12 27J UN12 60 73,920.33
T28.L7A.08 Painting 1st coat 6 6 0 19J UN12 25J UN12 50 8,434.10
T28.L7A.09 Glass & Glazing works 20 19 5 05APR12A 04J UL12 60 13,591.84
T28.L7A.10 Door,windows & Carpentry joinary 6 4 40 02APR12A 23J UN12 60 440,817.99
T28.L7A.11 Floor epoxy paint 10 10 0 19J UN12 30J UN12 56 8,434.10
T28.L7A.12 GRC Installation 12 11 10 08MAY12A 01J UL12 55 202,223.55
T28.L7A.13 Wardrobes & Kitchen Cabinets 12 12 0 25J UN12 08J UL12 49 0.00
T28.L7A.14 Painting final Coat 6 6 0 26J UN12 02J UL12 54 8,434.10
Electrical
T28.L7E.01 Electrical 1st fix 8 2 80 08FEB12A 12J UN12 15 155,656.20
T28.L7E.02 Electrical 2nd fix 4 1 80 29FEB12A 19J UN12 61 155,656.20
T28.L7E.03 Data & Light power 1st fix 8 3 60 16FEB12A 16J UN12 61 77,828.09
T28.L7E.04 Data & Light power 2nd fix 8 2 75 10MAR12A 20J UN12 60 77,828.09
T28.L7E.05 Audio visual, BMS,PA & CCTV 12 6 50 08MAR12A 21J UN12 59 86,329.12
T28.L7E.06 Electrical final fix 6 6 0 26J UN12 02J UL12 56 77,828.09
T28.L7E.07 BMS & Home automation 1st fix 4 4 10 01APR12A 19J UN12 61 86,329.12
2012 2013
J FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR A
Data & Light power 2nd fix
Audio visual, BMS,PA & CCTV 1st fix
Electrical final fix
BMS & Home automation 1st fix
BMS & Fire alarm final fix
Data & Light power final fix
Audio visual, BMS,PA & CCTV final fix
Installation of A/C Ducts & Connections
Install AHU FCU
Install grills & Diffusers
Install CW Machinaries
Plumbing 1st fix
Installation of Drainage pipes
Plumbing 2nd Fix
Plumbing Final Fix
Fire pipe install
Testing & Commissioning Level 6
Masonry walls
Plastering
Marble & granite
Ceiling gypsum / metal lobby
Floor tiles & Wall Tiles
Aluminium Doors ,Windows & Metal works
Painting 1st coat
Glass & Glazing works
Door,windows & Carpentry joinary works
Floor epoxy paint
GRC Installation
Wardrobes & Kitchen Cabinets
Painting final Coat
Electrical 1st fix
Electrical 2nd fix
Data & Light power 1st fix
Data & Light power 2nd fix
Audio visual, BMS,PA & CCTV 1st fix
Electrical final fix
BMS & Home automation 1st fix
Sheet 17 of 32
Sheet 18 of 32
Activity
ID
Activity
Description
Orig
Dur
Rem
Dur
% Early
Start
Early
Finish
Total
Float
Budgeted
Cost
T28.L7E.08 BMS & Fire alarm final fix 2 1 30 05MAY12A 26J UN12 56 77,828.09
T28.L7E.09 Data & Light power final fix 8 8 0 26J UN12 04J UL12 56 77,828.09
T28.L7E.10 Audio visual, BMS,PA & CCTV 4 4 0 26J UN12 30J UN12 56 77,828.09
HVAC
T28.L7H.01 Installation of A/C Ducts & 7 1 80 01MAR12A 03J UN12 59 188,827.95
T28.L7H.02 Install AHU FCU 8 2 75 07MAR12A 05J UN12 59 188,827.95
T28.L7H.03 Install grills & Diffusers 8 8 0 01J UL12 09J UL12 48 94,413.97
T28.L7H.04 Install CW Machinaries 7 7 0 16J UN12 23J UN12 62 94,413.97
Plumbing & Drainage
T28.L7P.01 Plumbing 1st fix 8 1 90 05MAR12A 17MAY12 74 74,065.34
T28.L7P.02 Installation of Drainage pipes 10 0 100 01FEB12A 21MAR12A 74,065.34
T28.L7P.03 Plumbing 2nd Fix 6 1 90 14MAR12A 19MAY12 83 74,065.34
T28.L7P.04 Plumbing Final Fix 10 10 0 26J UN12 07J UL12 50 74,065.34
Fire Fighting & Fire Alarm
T28.L7F.01 Fire pipe install 7 4 50 22MAR12A 21MAY12 71 50,939.58
Testing floor services
T28.L7T.01 Testing & Commissioning Level 7 10 10 0 10J UL12 21J UL12 48 0.00
Tower Level 8
Architectural
T28.L8A.01 Masonry walls 4 1 80 26MAR12A 16J UN12 43 3,244.62
T28.L8A.02 Plastering 6 4 35 01APR12A 19J UN12 39 96,725.26
T28.L8A.04 Marble & granite 8 7 10 05MAY12A 23J UN12 52 96,725.26
T28.L8A.05 Ceiling gypsum / metal lobby 10 10 5 09MAY12A 01J UL12 39 96,725.26
T28.L8A.06 Floor tiles & Wall Tiles 10 10 0 16J UN12 26J UN12 52 96,726.55
T28.L8A.07 Aluminium Doors ,Windows & 8 8 0 20J UN12 28J UN12 51 73,920.33
T28.L8A.08 Painting 1st coat 6 6 0 02J UL12 08J UL12 39 8,434.10
T28.L8A.09 Glass & Glazing works 20 19 5 05APR12A 07J UL12 58 13,591.84
T28.L8A.10 Door,windows & Carpentry joinary 6 4 40 01APR12A 24J UN12 51 440,817.99
T28.L8A.11 Floor epoxy paint 10 10 0 16J UN12 26J UN12 59 8,434.10
T28.L8A.12 GRC Installation 12 11 10 05MAY12A 28J UN12 57 202,222.15
T28.L8A.13 Wardrobes & Kitchen Cabinets 12 12 0 21J UN12 04J UL12 52 0.00
T28.L8A.14 Painting final Coat 6 6 0 09J UL12 15J UL12 43 8,434.10
Electrical
T28.L8E.01 Electrical 1st fix 8 2 75 08FEB12A 14J UN12 15 155,656.20
T28.L8E.02 Electrical 2nd fix 4 1 75 29FEB12A 20J UN12 60 155,656.20
T28.L8E.03 Data & Light power 1st fix 8 2 80 08FEB12A 17J UN12 59 77,828.09
T28.L8E.04 Data & Light power 2nd fix 8 2 75 23MAR12A 21J UN12 59 77,828.09
T28.L8E.05 Audio visual, BMS,PA & CCTV 12 6 50 19MAR12A 21J UN12 59 86,329.12
T28.L8E.06 Electrical final fix 6 6 0 09J UL12 15J UL12 45 77,828.09
T28.L8E.07 BMS & Home automation 1st fix 4 4 10 22MAR12A 19J UN12 61 86,329.12
T28.L8E.08 BMS & Fire alarm final fix 2 1 30 05MAY12A 09J UL12 45 77,828.09
T28.L8E.09 Data & Light power final fix 8 8 0 09J UL12 17J UL12 45 77,828.09
T28.L8E.10 Audio visual, BMS,PA & CCTV 4 4 0 09J UL12 12J UL12 45 77,828.09
2012 2013
J FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR A
BMS & Fire alarm final fix
Data & Light power final fix
Audio visual, BMS,PA & CCTV final fix
Installation of A/C Ducts & Connections
Install AHU FCU
Install grills & Diffusers
Install CW Machinaries
Plumbing 1st fix
Installation of Drainage pipes
Plumbing 2nd Fix
Plumbing Final Fix
Fire pipe install
Testing & Commissioning Level 7
Masonry walls
Plastering
Marble & granite
Ceiling gypsum / metal lobby
Floor tiles & Wall Tiles
Aluminium Doors ,Windows & Metal works
Painting 1st coat
Glass & Glazing works
Door,windows & Carpentry joinary works
Floor epoxy paint
GRC Installation
Wardrobes & Kitchen Cabinets
Painting final Coat
Electrical 1st fix
Electrical 2nd fix
Data & Light power 1st fix
Data & Light power 2nd fix
Audio visual, BMS,PA & CCTV 1st fix
Electrical final fix
BMS & Home automation 1st fix
BMS & Fire alarm final fix
Data & Light power final fix
Audio visual, BMS,PA & CCTV final fix
Sheet 18 of 32
Sheet 19 of 32
Activity
ID
Activity
Description
Orig
Dur
Rem
Dur
% Early
Start
Early
Finish
Total
Float
Budgeted
Cost
HVAC
T28.L8H.01 Installation of A/C Ducts & 7 1 80 07MAR12A 04J UN12 50 188,827.95
T28.L8H.02 Install AHU FCU 8 2 75 10MAR12A 06J UN12 50 188,827.95
T28.L8H.03 Install grills & Diffusers 8 8 0 02J UL12 10J UL12 47 94,413.97
T28.L8H.04 Install CW Machinaries 7 7 0 16J UN12 23J UN12 62 94,413.97
Plumbing & Drainage
T28.L8P.01 Plumbing 1st fix 8 1 90 17MAR12A 17MAY12 72 74,065.34
T28.L8P.02 Installation of Drainage pipes 10 0 100 16FEB12A 17MAR12A 74,065.34
T28.L8P.03 Plumbing 2nd Fix 6 1 90 01APR12A 19MAY12 83 74,065.34
T28.L8P.04 Plumbing Final Fix 10 10 0 09J UL12 19J UL12 39 74,065.34
Fire Fighting & Fire Alarm
T28.L8F.01 Fire pipe install 7 4 50 10MAR12A 21MAY12 64 50,939.58
Testing floor services
T28.L8T.01 Testing & Commissioning Level 8 10 10 0 21J UL12 31J UL12 39 0.00
Tower Level 9
Architectural
T28.L9A.01 Masonry walls 4 1 80 28MAR12A 18J UN12 48 3,244.62
T28.L9A.02 Plastering 6 4 35 02APR12A 23J UN12 48 96,725.26
T28.L9A.04 Marble & granite 8 7 10 08MAY12A 01J UL12 51 96,725.26
T28.L9A.05 Ceiling gypsum / metal lobby 10 10 5 05MAY12A 16J UN12 51 96,725.26
T28.L9A.06 Floor tiles & Wall Tiles 10 10 0 17J UN12 27J UN12 51 96,726.55
T28.L9A.07 Aluminium Doors ,Windows & 8 8 0 24J UN12 02J UL12 48 73,920.33
T28.L9A.08 Painting 1st coat 6 6 0 17J UN12 23J UN12 52 8,434.10
T28.L9A.09 Glass & Glazing works 20 20 0 18J UN12 10J UL12 56 13,591.84
T28.L9A.10 Door,windows & Carpentry joinary 6 4 30 04APR12A 27J UN12 48 440,817.99
T28.L9A.11 Floor epoxy paint 10 10 0 24J UN12 04J UL12 52 8,434.10
T28.L9A.12 GRC Installation 12 11 10 05MAY12A 05J UL12 51 202,222.15
T28.L9A.13 Wardrobes & Kitchen Cabinets 12 12 0 23J UN12 05J UL12 51 0.00
T28.L9A.14 Painting final Coat 6 6 0 03J UL12 09J UL12 48 8,434.10
Electrical
T28.L9E.01 Electrical 1st fix 8 2 75 08FEB12A 17J UN12 15 155,656.20
T28.L9E.02 Electrical 2nd fix 4 1 75 29FEB12A 24J UN12 57 155,656.20
T28.L9E.03 Data & Light power 1st fix 8 2 80 16FEB12A 19J UN12 57 77,828.09
T28.L9E.04 Data & Light power 2nd fix 8 2 75 08MAR12A 25J UN12 56 77,828.09
T28.L9E.05 Audio visual, BMS,PA & CCTV 12 6 50 19MAR12A 24J UN12 57 86,329.12
T28.L9E.06 Electrical final fix 6 6 0 25J UN12 01J UL12 57 77,828.09
T28.L9E.07 BMS & Home automation 1st fix 4 4 10 01APR12A 21J UN12 59 86,329.12
T28.L9E.08 BMS & Fire alarm final fix 2 1 30 05MAY12A 25J UN12 57 77,828.09
T28.L9E.09 Data & Light power final fix 8 8 0 26J UN12 04J UL12 56 77,828.09
T28.L9E.10 Audio visual, BMS,PA & CCTV 4 4 0 26J UN12 30J UN12 56 77,828.09
HVAC
T28.L9H.01 Installation of A/C Ducts & 7 1 80 01MAR12A 07J UN12 51 188,827.95
T28.L9H.02 Install AHU FCU 8 2 75 08MAR12A 10J UN12 51 188,827.95
T28.L9H.03 Install grills & Diffusers 8 8 0 17J UN12 25J UN12 60 94,413.97
2012 2013
J FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR A
Installation of A/C Ducts & Connections
Install AHU FCU
Install grills & Diffusers
Install CW Machinaries
Plumbing 1st fix
Installation of Drainage pipes
Plumbing 2nd Fix
Plumbing Final Fix
Fire pipe install
Testing & Commissioning Level 8
Masonry walls
Plastering
Marble & granite
Ceiling gypsum / metal lobby
Floor tiles & Wall Tiles
Aluminium Doors ,Windows & Metal works
Painting 1st coat
Glass & Glazing works
Door,windows & Carpentry joinary works
Floor epoxy paint
GRC Installation
Wardrobes & Kitchen Cabinets
Painting final Coat
Electrical 1st fix
Electrical 2nd fix
Data & Light power 1st fix
Data & Light power 2nd fix
Audio visual, BMS,PA & CCTV 1st fix
Electrical final fix
BMS & Home automation 1st fix
BMS & Fire alarm final fix
Data & Light power final fix
Audio visual, BMS,PA & CCTV final fix
Installation of A/C Ducts & Connections
Install AHU FCU
Install grills & Diffusers
Sheet 19 of 32
Sheet 20 of 32
Activity
ID
Activity
Description
Orig
Dur
Rem
Dur
% Early
Start
Early
Finish
Total
Float
Budgeted
Cost
T28.L9H.04 Install CW Machinaries 7 7 0 16J UN12 23J UN12 62 94,413.97
Plumbing & Drainage
T28.L9P.01 Plumbing 1st fix 8 1 90 15MAR12A 17MAY12 74 74,065.34
T28.L9P.02 Installation of Drainage pipes 10 0 100 09FEB12A 29MAR12A 74,065.34
T28.L9P.03 Plumbing 2nd Fix 6 1 90 22MAR12A 19MAY12 83 74,065.34
T28.L9P.04 Plumbing Final Fix 10 10 0 24J UN12 04J UL12 52 74,065.34
Fire Fighting & Fire Alarm
T28.L9F.01 Fire pipe install 7 4 45 17MAR12A 21MAY12 71 50,939.58
Testing floor services
T29.L9T.01 Testing & Commissioning Level 9 10 10 0 10J UL12 21J UL12 48 0.00
Tower Level 10
Architectural
T2.L10A.01 Masonry walls 4 1 80 29MAR12A 20J UN12 33 3,244.62
T2.L10A.02 Plastering 6 4 35 04APR12A 25J UN12 33 96,725.26
T2.L10A.04 Marble & granite 8 8 5 10MAY12A 04J UL12 49 96,725.26
T2.L10A.05 Ceiling gypsum / metal lobby 10 10 5 05MAY12A 07J UL12 33 96,725.26
T2.L10A.06 Floor tiles & Wall Tiles 10 10 0 08J UL12 18J UL12 33 96,726.55
T2.L10A.07 Aluminium Doors ,Windows & 8 8 0 26J UN12 04J UL12 46 73,920.33
T2.L10A.08 Painting 1st coat 6 6 0 08J UL12 14J UL12 34 8,434.10
T2.L10A.09 Glass & Glazing works 20 20 0 20J UN12 12J UL12 54 13,591.84
T2.L10A.10 Door,windows & Carpentry joinary 6 5 20 02APR12A 01J UL12 46 440,817.99
T2.L10A.11 Floor epoxy paint 10 10 0 26J UN12 07J UL12 50 8,434.10
T2.L10A.12 GRC Installation 12 11 10 05MAY12A 08J UL12 49 202,222.15
T2.L10A.13 Wardrobes & Kitchen Cabinets 12 12 0 14J UL12 26J UL12 33 0.00
T2.L10A.14 Painting final Coat 6 6 0 15J UL12 21J UL12 38 8,434.10
Electrical
T2.L10E.01 Electrical 1st fix 8 2 75 08FEB12A 19J UN12 15 155,656.20
T2.L10E.02 Electrical 2nd fix 4 1 75 29FEB12A 26J UN12 55 155,656.20
T2.L10E.03 Data & Light power 1st fix 8 2 80 22FEB12A 21J UN12 55 77,828.09
T2.L10E.04 Data & Light power 2nd fix 8 2 75 10MAR12A 27J UN12 54 77,828.09
T2.L10E.05 Audio visual, BMS,PA & CCTV 12 6 50 07MAR12A 26J UN12 55 86,329.12
T2.L10E.06 Electrical final fix 6 6 0 15J UL12 21J UL12 40 77,828.09
T2.L10E.07 BMS & Home automation 1st fix 4 4 10 17MAR12A 24J UN12 57 86,329.12
T2.L10E.08 BMS & Fire alarm final fix 2 1 30 05MAY12A 15J UL12 40 77,828.09
T2.L10E.09 Data & Light power final fix 8 8 0 15J UL12 23J UL12 40 77,828.09
T2.L10E.10 Audio visual, BMS,PA & CCTV 4 4 0 15J UL12 18J UL12 40 77,828.09
HVAC
T2.L10H.01 Installation of A/C Ducts & 7 1 80 01MAR12A 10J UN12 44 188,827.95
T2.L10H.02 Install AHU FCU 8 2 75 15MAR12A 12J UN12 44 188,827.95
T2.L10H.03 Install grills & Diffusers 8 8 0 08J UL12 16J UL12 42 94,413.97
T2.L10H.04 Install CW Machinaries 7 7 0 16J UN12 23J UN12 62 94,413.97
Plumbing & Drainage
T2.L10P.01 Plumbing 1st fix 8 1 90 01MAR12A 17MAY12 66 74,065.34
T2.L10P.02 Installation of Drainage pipes 10 0 100 02FEB12A 21MAR12A 74,065.34
2012 2013
J FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR A
Install CW Machinaries
Plumbing 1st fix
Installation of Drainage pipes
Plumbing 2nd Fix
Plumbing Final Fix
Fire pipe install
Testing & Commissioning Level 9
Masonry walls
Plastering
Marble & granite
Ceiling gypsum / metal lobby
Floor tiles & Wall Tiles
Aluminium Doors ,Windows & Metal works
Painting 1st coat
Glass & Glazing works
Door,windows & Carpentry joinary works
Floor epoxy paint
GRC Installation
Wardrobes & Kitchen Cabinets
Painting final Coat
Electrical 1st fix
Electrical 2nd fix
Data & Light power 1st fix
Data & Light power 2nd fix
Audio visual, BMS,PA & CCTV 1st fix
Electrical final fix
BMS & Home automation 1st fix
BMS & Fire alarm final fix
Data & Light power final fix
Audio visual, BMS,PA & CCTV final fix
Installation of A/C Ducts & Connections
Install AHU FCU
Install grills & Diffusers
Install CW Machinaries
Plumbing 1st fix
Installation of Drainage pipes
Sheet 20 of 32
Sheet 21 of 32
Activity
ID
Activity
Description
Orig
Dur
Rem
Dur
% Early
Start
Early
Finish
Total
Float
Budgeted
Cost
T2.L10P.03 Plumbing 2nd Fix 6 1 80 10MAR12A 19MAY12 83 74,065.34
T2.L10P.04 Plumbing Final Fix 10 10 0 15J UL12 25J UL12 34 74,065.34
Fire Fighting & Fire Alarm
T2.L10F.01 Fire pipe install 7 4 50 01MAR12A 21MAY12 58 50,939.58
Testing floor services
T2.L10T.01 Testing & Commissioning Level 10 10 0 28J UL12 07AUG12 33 0.00
Tower Level 11
Architectural
T2.L11A.01 Masonry walls 4 1 80 28MAR12A 23J UN12 31 3,244.62
T2.L11A.02 Plastering 6 4 35 02APR12A 27J UN12 31 96,725.26
T2.L11A.04 Marble & granite 8 8 5 10MAY12A 07J UL12 47 96,725.26
T2.L11A.05 Ceiling gypsum / metal lobby 10 10 5 05MAY12A 09J UL12 31 96,725.26
T2.L11A.06 Floor tiles & Wall Tiles 10 10 0 10J UL12 21J UL12 31 96,726.55
T2.L11A.07 Aluminium Doors ,Windows & 8 8 0 28J UN12 07J UL12 44 73,920.33
T2.L11A.08 Painting 1st coat 6 6 0 10J UL12 16J UL12 32 8,434.10
T2.L11A.09 Glass & Glazing works 20 20 0 24J UN12 16J UL12 51 13,591.84
T2.L11A.10 Door,windows & Carpentry joinary 6 4 30 04APR12A 02J UL12 44 440,817.99
T2.L11A.11 Floor epoxy paint 10 10 0 28J UN12 09J UL12 48 8,434.10
T2.L11A.12 GRC Installation 12 11 10 05MAY12A 10J UL12 47 202,223.55
T2.L11A.13 Wardrobes & Kitchen Cabinets 12 12 0 16J UL12 29J UL12 31 0.00
T2.L11A.14 Painting final Coat 6 6 0 17J UL12 23J UL12 36 8,434.10
Electrical
T2.L11E.01 Electrical 1st fix 8 2 75 08FEB12A 21J UN12 15 155,656.20
T2.L11E.02 Electrical 2nd fix 4 1 75 29FEB12A 28J UN12 53 155,656.20
T2.L11E.03 Data & Light power 1st fix 8 2 80 08FEB12A 24J UN12 53 77,828.09
T2.L11E.04 Data & Light power 2nd fix 8 2 75 22MAR12A 30J UN12 52 77,828.09
T2.L11E.05 Audio visual, BMS,PA & CCTV 12 6 50 01MAR12A 28J UN12 53 86,329.12
T2.L11E.06 Electrical final fix 6 6 0 17J UL12 23J UL12 38 77,828.09
T2.L11E.07 BMS & Home automation 1st fix 4 4 10 08MAR12A 26J UN12 55 86,329.12
T2.L11E.08 BMS & Fire alarm final fix 2 1 30 05MAY12A 17J UL12 38 77,828.09
T2.L11E.09 Data & Light power final fix 8 8 0 17J UL12 25J UL12 38 77,828.09
T2.L11E.10 Audio visual, BMS,PA & CCTV 4 4 0 17J UL12 21J UL12 38 77,828.09
HVAC
T2.L11H.01 Installation of A/C Ducts & 7 1 80 01MAR12A 12J UN12 42 188,827.95
T2.L11H.02 Install AHU FCU 8 2 75 15MAR12A 14J UN12 42 188,827.95
T2.L11H.03 Install grills & Diffusers 8 8 0 10J UL12 18J UL12 40 94,413.97
T2.L11H.04 Install CW Machinaries 7 7 0 16J UN12 23J UN12 62 94,413.97
Plumbing & Drainage
T2.L11P.01 Plumbing 1st fix 8 1 90 01MAR12A 17MAY12 66 74,065.34
T2.L11P.02 Installation of Drainage pipes 10 0 100 08FEB12A 28MAR12A 74,065.34
T2.L11P.03 Plumbing 2nd Fix 6 2 65 29MAR12A 20MAY12 83 74,065.34
T2.L11P.04 Plumbing Final Fix 10 10 0 17J UL12 28J UL12 32 74,065.34
Fire Fighting & Fire Alarm
T2.L11F.01 Fire pipe install 7 4 50 26MAR12A 21MAY12 58 50,939.58
2012 2013
J FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR A
Plumbing 2nd Fix
Plumbing Final Fix
Fire pipe install
Testing & Commissioning Level 10
Masonry walls
Plastering
Marble & granite
Ceiling gypsum / metal lobby
Floor tiles & Wall Tiles
Aluminium Doors ,Windows & Metal works
Painting 1st coat
Glass & Glazing works
Door,windows & Carpentry joinary works
Floor epoxy paint
GRC Installation
Wardrobes & Kitchen Cabinets
Painting final Coat
Electrical 1st fix
Electrical 2nd fix
Data & Light power 1st fix
Data & Light power 2nd fix
Audio visual, BMS,PA & CCTV 1st fix
Electrical final fix
BMS & Home automation 1st fix
BMS & Fire alarm final fix
Data & Light power final fix
Audio visual, BMS,PA & CCTV final fix
Installation of A/C Ducts & Connections
Install AHU FCU
Install grills & Diffusers
Install CW Machinaries
Plumbing 1st fix
Installation of Drainage pipes
Plumbing 2nd Fix
Plumbing Final Fix
Fire pipe install
Sheet 21 of 32
Sheet 22 of 32
Activity
ID
Activity
Description
Orig
Dur
Rem
Dur
% Early
Start
Early
Finish
Total
Float
Budgeted
Cost
Testing floor services
T2.L11T.01 Testing & Commissioning Level 10 10 0 30J UL12 09AUG12 31 0.00
Tower Level 12
Architectural
T2.L12A.01 Masonry walls 4 1 70 29FEB12A 25J UN12 29 3,244.62
T2.L12A.02 Plastering 6 4 35 03MAR12A 30J UN12 29 96,725.26
T2.L12A.04 Marble & granite 8 8 5 10MAY12A 09J UL12 45 96,725.26
T2.L12A.05 Ceiling gypsum / metal lobby 10 10 5 06MAY12A 11J UL12 29 96,725.26
T2.L12A.06 Floor tiles & Wall Tiles 10 10 0 12J UL12 23J UL12 29 96,726.55
T2.L12A.07 Aluminium Doors ,Windows & 8 8 0 01J UL12 09J UL12 42 73,920.33
T2.L12A.08 Painting 1st coat 6 6 0 12J UL12 18J UL12 30 8,434.10
T2.L12A.09 Glass & Glazing works 20 20 0 25J UN12 17J UL12 50 13,591.84
T2.L12A.10 Door,windows & Carpentry joinary 6 5 15 01APR12A 05J UL12 42 440,817.99
T2.L12A.11 Floor epoxy paint 10 10 0 01J UL12 11J UL12 46 8,434.10
T2.L12A.12 0GRC Installation 12 11 10 05MAY12A 12J UL12 45 202,223.55
T2.L12A.13 Wardrobes & Kitchen Cabinets 12 12 0 18J UL12 31J UL12 29 0.00
T2.L12A.14 Painting final Coat 6 6 0 19J UL12 25J UL12 34 8,434.10
Electrical
T2.L12E.01 Electrical 1st fix 8 2 75 08FEB12A 24J UN12 15 155,656.20
T2.L12E.02 Electrical 2nd fix 4 1 75 29FEB12A 01J UL12 51 155,656.20
T2.L12E.03 Data & Light power 1st fix 8 3 60 10MAR12A 27J UN12 51 77,828.09
T2.L12E.04 Data & Light power 2nd fix 8 2 70 17MAR12A 02J UL12 50 77,828.09
T2.L12E.05 Audio visual, BMS,PA & CCTV 12 6 50 10MAR12A 01J UL12 51 86,329.12
T2.L12E.06 Electrical final fix 6 6 0 19J UL12 25J UL12 36 77,828.09
T2.L12E.07 BMS & Home automation 1st fix 4 4 10 22MAR12A 28J UN12 53 86,329.12
T2.L12E.08 BMS & Fire alarm final fix 2 2 0 19J UL12 21J UL12 36 77,828.09
T2.L12E.09 Data & Light power final fix 8 8 0 19J UL12 28J UL12 36 77,828.09
T2.L12E.10 Audio visual, BMS,PA & CCTV 4 4 0 19J UL12 23J UL12 36 77,828.09
HVAC
T2.L12H.01 Installation of A/C Ducts & 7 1 80 10MAR12A 14J UN12 40 188,827.95
T2.L12H.02 Install AHU FCU 8 2 75 21MAR12A 17J UN12 40 188,827.95
T2.L12H.03 Install grills & Diffusers 8 8 0 12J UL12 21J UL12 38 94,413.97
T2.L12H.04 Install CW Machinaries 7 7 0 16J UN12 23J UN12 62 94,413.97
Plumbing & Drainage
T2.L12P.01 Plumbing 1st fix 8 1 90 10MAR12A 17MAY12 61 74,065.34
T2.L12P.02 Installation of Drainage pipes 10 0 100 09FEB12A 21MAR12A 74,065.34
T2.L12P.03 Plumbing 2nd Fix 6 2 65 28MAR12A 20MAY12 83 74,065.34
T2.L12P.04 Plumbing Final Fix 10 10 0 19J UL12 30J UL12 30 74,065.34
Fire Fighting & Fire Alarm
T2.L12F.01 Fire pipe install 7 2 70 01MAR12A 19MAY12 60 50,939.58
Testing floor services
T2.L12T.01 Testing & Commissioning Level 10 10 0 01AUG12 12AUG12 29 0.00
2012 2013
J FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR A
Testing & Commissioning Level 11
Masonry walls
Plastering
Marble & granite
Ceiling gypsum / metal lobby
Floor tiles & Wall Tiles
Aluminium Doors ,Windows & Metal works
Painting 1st coat
Glass & Glazing works
Door,windows & Carpentry joinary works
Floor epoxy paint
0GRC Installation
Wardrobes & Kitchen Cabinets
Painting final Coat
Electrical 1st fix
Electrical 2nd fix
Data & Light power 1st fix
Data & Light power 2nd fix
Audio visual, BMS,PA & CCTV 1st fix
Electrical final fix
BMS & Home automation 1st fix
BMS & Fire alarm final fix
Data & Light power final fix
Audio visual, BMS,PA & CCTV final fix
Installation of A/C Ducts & Connections
Install AHU FCU
Install grills & Diffusers
Install CW Machinaries
Plumbing 1st fix
Installation of Drainage pipes
Plumbing 2nd Fix
Plumbing Final Fix
Fire pipe install
Testing & Commissioning Level 12
Sheet 22 of 32
Sheet 23 of 32
Activity
ID
Activity
Description
Orig
Dur
Rem
Dur
% Early
Start
Early
Finish
Total
Float
Budgeted
Cost
Tower Level 13
Architectural
T2.L13A.01 Masonry walls 4 1 70 27FEB12A 27J UN12 27 3,244.62
T2.L13A.02 Plastering 6 4 35 03MAR12A 02J UL12 27 96,725.26
T2.L13A.04 Marble & granite 8 8 5 10MAY12A 11J UL12 43 96,725.26
T2.L13A.05 Ceiling gypsum / metal lobby 10 10 5 06MAY12A 14J UL12 27 96,725.26
T2.L13A.06 Floor tiles & Wall Tiles 10 10 0 15J UL12 25J UL12 27 96,726.55
T2.L13A.07 Aluminium Doors ,Windows & 8 8 0 03J UL12 11J UL12 40 73,920.33
T2.L13A.08 Painting 1st coat 6 6 0 15J UL12 21J UL12 28 8,434.10
T2.L13A.09 Glass & Glazing works 20 20 0 27J UN12 19J UL12 48 13,591.84
T2.L13A.10 Door,windows & Carpentry joinary 6 5 10 02APR12A 08J UL12 40 440,817.99
T2.L13A.11 Floor epoxy paint 10 10 0 03J UL12 14J UL12 44 8,434.10
T2.L13A.12 GRC Installation 12 11 10 03J UL12 15J UL12 43 202,223.55
T2.L13A.13 Wardrobes & Kitchen Cabinets 12 12 0 21J UL12 02AUG12 27 0.00
T2.L13A.14 Painting final Coat 6 6 0 22J UL12 28J UL12 32 8,434.10
Electrical
T2.L13E.01 Electrical 1st fix 8 2 75 08FEB12A 26J UN12 15 155,656.20
T2.L13E.02 Electrical 2nd fix 4 1 75 29FEB12A 03J UL12 49 155,656.20
T2.L13E.03 Data & Light power 1st fix 8 5 40 22FEB12A 02J UL12 48 77,828.09
T2.L13E.04 Data & Light power 2nd fix 8 2 70 03MAR12A 04J UL12 48 77,828.09
T2.L13E.05 Audio visual, BMS,PA & CCTV 12 5 60 12MAR12A 02J UL12 50 86,329.12
T2.L13E.06 Electrical final fix 6 6 0 22J UL12 28J UL12 34 77,828.09
T2.L13E.07 BMS & Home automation 1st fix 4 4 10 01APR12A 01J UL12 51 86,329.12
T2.L13E.08 BMS & Fire alarm final fix 2 2 0 22J UL12 23J UL12 34 77,828.09
T2.L13E.09 Data & Light power final fix 8 8 0 22J UL12 30J UL12 34 77,828.09
T2.L13E.10 Audio visual, BMS,PA & CCTV 4 4 0 22J UL12 25J UL12 34 77,828.09
HVAC
T2.L13H.01 Installation of A/C Ducts & 7 1 80 01MAR12A 17J UN12 38 188,827.95
T2.L13H.02 Install AHU FCU 8 2 75 10MAR12A 19J UN12 38 188,827.95
T2.L13H.03 Install grills & Diffusers 8 8 0 15J UL12 23J UL12 36 94,413.97
T2.L13H.04 Install CW Machinaries 7 7 0 18J UN12 25J UN12 60 94,413.97
Plumbing & Drainage
T2.L13P.01 Plumbing 1st fix 8 1 90 01MAR12A 17MAY12 66 74,065.34
T2.L13P.02 Installation of Drainage pipes 10 0 100 02FEB12A 22MAR12A 74,065.34
T2.L13P.03 Plumbing 2nd Fix 6 2 65 10MAR12A 20MAY12 83 74,065.34
T2.L13P.04 Plumbing Final Fix 10 10 0 22J UL12 01AUG12 28 74,065.34
Fire Fighting & Fire Alarm
T2.L13F.01 Fire pipe install 7 2 70 03MAR12A 19MAY12 60 50,939.58
Testing floor services
T2.L13T.01 Testing & Commissioning Level 10 10 0 04AUG12 14AUG12 27 0.00
Tower Level 14
Architectural
T2.L14A.01 Masonry walls 4 1 70 27FEB12A 30J UN12 25 3,244.62
T2.L14A.02 Plastering 6 4 35 04MAR12A 04J UL12 25 96,725.26
2012 2013
J FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR A
Masonry walls
Plastering
Marble & granite
Ceiling gypsum / metal lobby
Floor tiles & Wall Tiles
Aluminium Doors ,Windows & Metal works
Painting 1st coat
Glass & Glazing works
Door,windows & Carpentry joinary works
Floor epoxy paint
GRC Installation
Wardrobes & Kitchen Cabinets
Painting final Coat
Electrical 1st fix
Electrical 2nd fix
Data & Light power 1st fix
Data & Light power 2nd fix
Audio visual, BMS,PA & CCTV 1st fix
Electrical final fix
BMS & Home automation 1st fix
BMS & Fire alarm final fix
Data & Light power final fix
Audio visual, BMS,PA & CCTV final fix
Installation of A/C Ducts & Connections
Install AHU FCU
Install grills & Diffusers
Install CW Machinaries
Plumbing 1st fix
Installation of Drainage pipes
Plumbing 2nd Fix
Plumbing Final Fix
Fire pipe install
Testing & Commissioning Level 13
Masonry walls
Plastering
Sheet 23 of 32
Sheet 24 of 32
Activity
ID
Activity
Description
Orig
Dur
Rem
Dur
% Early
Start
Early
Finish
Total
Float
Budgeted
Cost
T2.L14A.04 Marble & granite 8 8 5 10MAY12A 14J UL12 41 96,725.26
T2.L14A.05 Ceiling gypsum / metal lobby 10 10 5 04MAY12A 16J UL12 25 96,725.26
T2.L14A.06 Floor tiles & Wall Tiles 10 10 0 17J UL12 28J UL12 25 96,726.55
T2.L14A.07 Aluminium Doors ,Windows & 8 8 0 05J UL12 14J UL12 38 73,920.33
T2.L14A.08 Painting 1st coat 6 6 0 17J UL12 23J UL12 26 8,434.10
T2.L14A.09 Glass & Glazing works 20 20 0 30J UN12 22J UL12 46 13,591.84
T2.L14A.10 Door,windows & Carpentry joinary 6 5 10 01APR12A 10J UL12 38 440,817.99
T2.L14A.11 Floor epoxy paint 10 10 0 05J UL12 16J UL12 42 8,434.10
T2.L14A.12 GRC Installation 12 11 10 05J UL12 17J UL12 41 202,222.15
T2.L14A.13 Wardrobes & Kitchen Cabinets 12 12 0 23J UL12 05AUG12 25 0.00
T2.L14A.14 Painting final Coat 6 6 0 24J UL12 30J UL12 30 8,434.10
Electrical
T2.L14E.01 Electrical 1st fix 8 2 70 08FEB12A 28J UN12 15 155,656.20
T2.L14E.02 Electrical 2nd fix 4 1 70 29FEB12A 05J UL12 47 155,656.20
T2.L14E.03 Data & Light power 1st fix 8 6 30 16FEB12A 05J UL12 43 77,828.09
T2.L14E.04 Data & Light power 2nd fix 8 4 45 29MAR12A 10J UL12 43 77,828.09
T2.L14E.05 Audio visual, BMS,PA & CCTV 12 6 50 01MAR12A 05J UL12 47 86,329.12
T2.L14E.06 Electrical final fix 6 6 0 24J UL12 30J UL12 32 77,828.09
T2.L14E.07 BMS & Home automation 1st fix 4 4 10 05MAR12A 03J UL12 49 86,329.12
T2.L14E.08 BMS & Fire alarm final fix 2 2 0 24J UL12 25J UL12 32 77,828.09
T2.L14E.09 Data & Light power final fix 8 8 0 24J UL12 01AUG12 32 77,828.09
T2.L14E.10 Audio visual, BMS,PA & CCTV 4 4 0 24J UL12 28J UL12 32 77,828.09
HVAC
T2.L14H.01 Installation of A/C Ducts & 7 2 70 28FEB12A 20J UN12 33 188,827.95
T2.L14H.02 Install AHU FCU 8 4 55 03MAR12A 25J UN12 33 188,827.95
T2.L14H.03 Install grills & Diffusers 8 8 0 17J UL12 25J UL12 34 94,413.97
T2.L14H.04 Install CW Machinaries 7 7 0 21J UN12 28J UN12 57 94,413.97
Plumbing & Drainage
T2.L14P.01 Plumbing 1st fix 8 1 90 08MAR12A 17MAY12 66 74,065.34
T2.L14P.02 Installation of Drainage pipes 10 0 100 02FEB12A 28MAR12A 74,065.34
T2.L14P.03 Plumbing 2nd Fix 6 2 65 28MAR12A 20MAY12 83 74,065.34
T2.L14P.04 Plumbing Final Fix 10 10 0 24J UL12 04AUG12 26 74,065.34
Fire Fighting & Fire Alarm
T2.L14F.01 Fire pipe install 7 2 70 20MAR12A 19MAY12 60 50,939.58
Testing floor services
T2.L14T.01 Testing & Commissioning Level 10 10 0 06AUG12 16AUG12 25 0.00
Tower Level 15
Architectural
T2.L15A.01 Masonry walls 4 1 70 23FEB12A 02J UL12 23 3,244.62
T2.L15A.02 Plastering 6 4 35 03MAR12A 07J UL12 23 96,725.26
T2.L15A.04 Marble & granite 8 8 5 05MAY12A 16J UL12 39 96,725.26
T2.L15A.05 Ceiling gypsum / metal lobby 10 10 5 08MAY12A 18J UL12 23 96,725.26
T2.L15A.06 Floor tiles & Wall Tiles 10 10 0 19J UL12 30J UL12 23 96,726.55
T2.L15A.07 Aluminium Doors ,Windows & 8 8 0 08J UL12 16J UL12 36 73,920.33
2012 2013
J FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR A
Marble & granite
Ceiling gypsum / metal lobby
Floor tiles & Wall Tiles
Aluminium Doors ,Windows & Metal works
Painting 1st coat
Glass & Glazing works
Door,windows & Carpentry joinary works
Floor epoxy paint
GRC Installation
Wardrobes & Kitchen Cabinets
Painting final Coat
Electrical 1st fix
Electrical 2nd fix
Data & Light power 1st fix
Data & Light power 2nd fix
Audio visual, BMS,PA & CCTV 1st fix
Electrical final fix
BMS & Home automation 1st fix
BMS & Fire alarm final fix
Data & Light power final fix
Audio visual, BMS,PA & CCTV final fix
Installation of A/C Ducts & Connections
Install AHU FCU
Install grills & Diffusers
Install CW Machinaries
Plumbing 1st fix
Installation of Drainage pipes
Plumbing 2nd Fix
Plumbing Final Fix
Fire pipe install
Testing & Commissioning Level 14
Masonry walls
Plastering
Marble & granite
Ceiling gypsum / metal lobby
Floor tiles & Wall Tiles
Aluminium Doors ,Windows & Metal works
Sheet 24 of 32
Sheet 25 of 32
Activity
ID
Activity
Description
Orig
Dur
Rem
Dur
% Early
Start
Early
Finish
Total
Float
Budgeted
Cost
T2.L15A.08 Painting 1st coat 6 6 0 08J UL12 14J UL12 34 8,434.10
T2.L15A.09 Glass & Glazing works 20 20 0 02J UL12 24J UL12 44 13,591.84
T2.L15A.10 Door,windows & Carpentry joinary 6 5 20 02APR12A 12J UL12 36 440,817.99
T2.L15A.11 Floor epoxy paint 10 10 0 08J UL12 18J UL12 40 8,434.10
T2.L15A.12 GRC Installation 12 11 10 08J UL12 19J UL12 39 202,223.55
T2.L15A.13 Wardrobes & Kitchen Cabinets 12 12 0 25J UL12 07AUG12 23 0.00
T2.L15A.14 Painting final Coat 6 6 0 17J UL12 23J UL12 36 8,434.10
Electrical
T2.L15E.01 Electrical 1st fix 8 2 70 08FEB12A 01J UL12 15 155,656.20
T2.L15E.02 Electrical 2nd fix 4 1 70 29FEB12A 08J UL12 45 155,656.20
T2.L15E.03 Data & Light power 1st fix 8 6 30 28FEB12A 08J UL12 41 77,828.09
T2.L15E.04 Data & Light power 2nd fix 8 4 45 27MAR12A 12J UL12 41 77,828.09
T2.L15E.05 Audio visual, BMS,PA & CCTV 12 6 50 05MAR12A 08J UL12 45 86,329.12
T2.L15E.06 Electrical final fix 6 6 0 15J UL12 21J UL12 40 77,828.09
T2.L15E.07 BMS & Home automation 1st fix 4 4 10 12MAR12A 05J UL12 47 86,329.12
T2.L15E.08 BMS & Fire alarm final fix 2 2 0 15J UL12 16J UL12 40 77,828.09
T2.L15E.09 Data & Light power final fix 8 8 0 15J UL12 23J UL12 40 77,828.09
T2.L15E.10 Audio visual, BMS,PA & CCTV 4 4 0 15J UL12 18J UL12 40 77,828.09
HVAC
T2.L15H.01 Installation of A/C Ducts & 7 2 70 01MAR12A 23J UN12 31 188,827.95
T2.L15H.02 Install AHU FCU 8 4 55 10MAR12A 27J UN12 31 188,827.95
T2.L15H.03 Install grills & Diffusers 8 8 0 19J UL12 28J UL12 32 94,413.97
T2.L15H.04 Install CW Machinaries 7 7 0 24J UN12 01J UL12 55 94,413.97
Plumbing & Drainage
T2.L15P.01 Plumbing 1st fix 8 1 90 07MAR12A 17MAY12 66 74,065.34
T2.L15P.02 Installation of Drainage pipes 10 0 100 16FEB12A 28MAR12A 74,065.34
T2.L15P.03 Plumbing 2nd Fix 6 2 65 11MAR12A 20MAY12 83 74,065.34
T2.L15P.04 Plumbing Final Fix 10 10 0 15J UL12 25J UL12 34 74,065.34
Fire Fighting & Fire Alarm
T2.L15F.01 Fire pipe install 7 2 70 28MAR12A 19MAY12 60 50,939.58
Testing floor services
T2.L15T.01 Testing & Commissioning Level 10 10 0 08AUG12 19AUG12 23 0.00
Tower Level 16
Architectural
T2.L16A.01 Masonry walls 4 1 70 24FEB12A 04J UL12 31 3,244.62
T2.L16A.02 Plastering 6 4 35 03MAR12A 09J UL12 31 96,725.26
T2.L16A.04 Marble & granite 8 8 5 10MAY12A 18J UL12 31 96,725.26
T2.L16A.05 Ceiling gypsum / metal lobby 10 10 0 05J UL12 16J UL12 34 96,725.26
T2.L16A.06 Floor tiles & Wall Tiles 10 10 0 10J UL12 21J UL12 31 96,726.55
T2.L16A.07 Aluminium Doors ,Windows & 8 8 0 10J UL12 18J UL12 34 73,920.33
T2.L16A.08 Painting 1st coat 6 6 0 05J UL12 11J UL12 36 8,434.10
T2.L16A.09 Glass & Glazing works 20 20 0 04J UL12 26J UL12 42 13,591.84
T2.L16A.10 Door,windows & Carpentry joinary 6 5 10 02APR12A 15J UL12 34 440,817.99
T2.L16A.11 Floor epoxy paint 10 10 0 10J UL12 21J UL12 38 8,434.10
2012 2013
J FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR A
Painting 1st coat
Glass & Glazing works
Door,windows & Carpentry joinary works
Floor epoxy paint
GRC Installation
Wardrobes & Kitchen Cabinets
Painting final Coat
Electrical 1st fix
Electrical 2nd fix
Data & Light power 1st fix
Data & Light power 2nd fix
Audio visual, BMS,PA & CCTV 1st fix
Electrical final fix
BMS & Home automation 1st fix
BMS & Fire alarm final fix
Data & Light power final fix
Audio visual, BMS,PA & CCTV final fix
Installation of A/C Ducts & Connections
Install AHU FCU
Install grills & Diffusers
Install CW Machinaries
Plumbing 1st fix
Installation of Drainage pipes
Plumbing 2nd Fix
Plumbing Final Fix
Fire pipe install
Testing & Commissioning Level 15
Masonry walls
Plastering
Marble & granite
Ceiling gypsum / metal lobby
Floor tiles & Wall Tiles
Aluminium Doors ,Windows & Metal works
Painting 1st coat
Glass & Glazing works
Door,windows & Carpentry joinary works
Floor epoxy paint
Sheet 25 of 32
Sheet 26 of 32
Activity
ID
Activity
Description
Orig
Dur
Rem
Dur
% Early
Start
Early
Finish
Total
Float
Budgeted
Cost
T2.L16A.12 GRC Installation 12 11 10 10J UL12 22J UL12 37 202,223.55
T2.L16A.13 Wardrobes & Kitchen Cabinets 12 12 0 16J UL12 29J UL12 31 0.00
T2.L16A.14 Painting final Coat 6 6 0 19J UL12 25J UL12 34 8,434.10
Electrical
T2.L16E.01 Electrical 1st fix 8 2 70 08FEB12A 03J UL12 15 155,656.20
T2.L16E.02 Electrical 2nd fix 4 1 70 01APR12A 10J UL12 43 155,656.20
T2.L16E.03 Data & Light power 1st fix 8 6 30 21FEB12A 10J UL12 39 77,828.09
T2.L16E.04 Data & Light power 2nd fix 8 4 45 07MAR12A 15J UL12 39 77,828.09
T2.L16E.05 Audio visual, BMS,PA & CCTV 12 6 50 01MAR12A 10J UL12 43 86,329.12
T2.L16E.06 Electrical final fix 6 6 0 12J UL12 18J UL12 42 77,828.09
T2.L16E.07 BMS & Home automation 1st fix 4 4 10 06MAR12A 08J UL12 45 86,329.12
T2.L16E.08 BMS & Fire alarm final fix 2 2 0 12J UL12 14J UL12 42 77,828.09
T2.L16E.09 Data & Light power final fix 8 8 0 16J UL12 24J UL12 39 77,828.09
T2.L16E.10 Audio visual, BMS,PA & CCTV 4 4 0 16J UL12 19J UL12 39 77,828.09
HVAC
T2.L16H.01 Installation of A/C Ducts & 7 2 70 01MAR12A 25J UN12 43 188,827.95
T2.L16H.02 Install AHU FCU 8 4 55 14MAR12A 30J UN12 43 188,827.95
T2.L16H.03 Install grills & Diffusers 8 8 0 17J UL12 25J UL12 34 94,413.97
T2.L16H.04 Install CW Machinaries 7 7 0 26J UN12 03J UL12 53 94,413.97
Plumbing & Drainage
T2.L16P.01 Plumbing 1st fix 8 1 90 06MAR12A 17MAY12 76 74,065.34
T2.L16P.02 Installation of Drainage pipes 10 0 100 15FEB12A 28MAR12A 74,065.34
T2.L16P.03 Plumbing 2nd Fix 6 2 65 24MAR12A 20MAY12 83 74,065.34
T2.L16P.04 Plumbing Final Fix 10 10 0 12J UL12 23J UL12 36 74,065.34
Fire Fighting & Fire Alarm
T2.L16F.01 Fire pipe install 7 4 40 10MAR12A 21MAY12 68 50,939.58
Testing floor services
T2.L16T.01 Testing & Commissioning Level 10 10 0 30J UL12 09AUG12 31 0.00
Tower Level 17
Architectural
T2.L17A.01 Masonry walls 4 1 70 25FEB12A 04J UL12 25 3,244.62
T2.L17A.02 Plastering 6 2 75 03MAR12A 07J UL12 25 96,725.26
T2.L17A.04 Marble & granite 8 8 5 15MAY12A 16J UL12 39 96,725.26
T2.L17A.05 Ceiling gypsum / metal lobby 10 10 0 05J UL12 16J UL12 25 96,725.26
T2.L17A.06 Floor tiles & Wall Tiles 10 10 0 17J UL12 28J UL12 25 96,726.55
T2.L17A.07 Aluminium Doors ,Windows & 8 8 0 08J UL12 16J UL12 36 73,920.33
T2.L17A.08 Painting 1st coat 6 6 0 05J UL12 11J UL12 36 8,434.10
T2.L17A.09 Glass & Glazing works 20 20 0 04J UL12 26J UL12 42 13,591.84
T2.L17A.10 Door,windows & Carpentry joinary 6 5 10 03APR12A 12J UL12 36 440,817.99
T2.L17A.11 Floor epoxy paint 10 10 0 08J UL12 18J UL12 40 8,434.10
T2.L17A.12 GRC Installation 12 11 10 05MAY12A 19J UL12 39 202,223.55
T2.L17A.13 Wardrobes & Kitchen Cabinets 12 12 0 23J UL12 05AUG12 25 0.00
T2.L17A.14 Painting final Coat 6 6 0 17J UL12 23J UL12 36 8,434.10
2012 2013
J FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR A
GRC Installation
Wardrobes & Kitchen Cabinets
Painting final Coat
Electrical 1st fix
Electrical 2nd fix
Data & Light power 1st fix
Data & Light power 2nd fix
Audio visual, BMS,PA & CCTV 1st fix
Electrical final fix
BMS & Home automation 1st fix
BMS & Fire alarm final fix
Data & Light power final fix
Audio visual, BMS,PA & CCTV final fix
Installation of A/C Ducts & Connections
Install AHU FCU
Install grills & Diffusers
Install CW Machinaries
Plumbing 1st fix
Installation of Drainage pipes
Plumbing 2nd Fix
Plumbing Final Fix
Fire pipe install
Testing & Commissioning Level 16
Masonry walls
Plastering
Marble & granite
Ceiling gypsum / metal lobby
Floor tiles & Wall Tiles
Aluminium Doors ,Windows & Metal works
Painting 1st coat
Glass & Glazing works
Door,windows & Carpentry joinary works
Floor epoxy paint
GRC Installation
Wardrobes & Kitchen Cabinets
Painting final Coat
Sheet 26 of 32
Sheet 27 of 32
Activity
ID
Activity
Description
Orig
Dur
Rem
Dur
% Early
Start
Early
Finish
Total
Float
Budgeted
Cost
Electrical
T2.L17E.01 Electrical 1st fix 8 2 70 08FEB12A 03J UL12 15 155,656.20
T2.L17E.02 Electrical 2nd fix 4 1 70 20MAR12A 08J UL12 45 155,656.20
T2.L17E.03 Data & Light power 1st fix 8 5 35 22FEB12A 09J UL12 40 77,828.09
T2.L17E.04 Data & Light power 2nd fix 8 4 45 20MAR12A 14J UL12 40 77,828.09
T2.L17E.05 Audio visual, BMS,PA & CCTV 12 6 50 03MAR12A 10J UL12 43 86,329.12
T2.L17E.06 Electrical final fix 6 6 0 12J UL12 18J UL12 42 77,828.09
T2.L17E.07 BMS & Home automation 1st fix 4 4 10 17MAR12A 08J UL12 45 86,329.12
T2.L17E.08 BMS & Fire alarm final fix 2 2 0 12J UL12 14J UL12 42 77,828.09
T2.L17E.09 Data & Light power final fix 8 8 0 15J UL12 23J UL12 40 77,828.09
T2.L17E.10 Audio visual, BMS,PA & CCTV 4 4 0 15J UL12 18J UL12 40 77,828.09
HVAC
T2.L17H.01 Installation of A/C Ducts & 7 2 70 10MAR12A 23J UN12 31 188,827.95
T2.L17H.02 Install AHU FCU 8 4 55 18MAR12A 27J UN12 31 188,827.95
T2.L17H.03 Install grills & Diffusers 8 8 0 17J UL12 25J UL12 34 94,413.97
T2.L17H.04 Install CW Machinaries 7 7 0 24J UN12 01J UL12 55 94,413.97
Plumbing & Drainage
T2.L17P.01 Plumbing 1st fix 8 1 90 07MAR12A 17MAY12 70 74,065.34
T2.L17P.02 Installation of Drainage pipes 10 0 100 13FEB12A 21MAR12A 74,065.34
T2.L17P.03 Plumbing 2nd Fix 6 2 65 20MAR12A 20MAY12 83 74,065.34
T2.L17P.04 Plumbing Final Fix 10 10 0 12J UL12 23J UL12 36 74,065.34
Fire Fighting & Fire Alarm
T2.L17F.01 Fire pipe install 7 4 40 22MAR12A 21MAY12 62 50,939.58
Testing floor services
T2.L17T.01 Testing & Commissioning Level 10 10 0 06AUG12 16AUG12 25 0.00
Tower Level 18
Architectural
T2.L18A.01 Masonry walls 4 1 75 25FEB12A 04J UL12 25 3,244.62
T2.L18A.02 Plastering 6 2 60 03MAR12A 07J UL12 25 96,725.26
T2.L18A.04 Marble & granite 8 8 5 13MAY12A 16J UL12 38 96,725.26
T2.L18A.05 Ceiling gypsum / metal lobby 10 10 0 05J UL12 16J UL12 25 96,725.26
T2.L18A.06 Floor tiles & Wall Tiles 10 10 0 17J UL12 28J UL12 25 96,726.55
T2.L18A.07 Aluminium Doors ,Windows & 8 8 0 12J UL12 21J UL12 32 73,920.33
T2.L18A.08 Painting 1st coat 6 6 0 05J UL12 11J UL12 36 8,434.10
T2.L18A.09 Glass & Glazing works 20 20 0 04J UL12 26J UL12 41 13,591.84
T2.L18A.10 Door,windows & Carpentry joinary 6 6 0 08J UL12 14J UL12 32 440,817.99
T2.L18A.11 Floor epoxy paint 10 10 0 08J UL12 18J UL12 40 8,434.10
T2.L18A.12 GRC Installation 12 12 0 08J UL12 21J UL12 38 202,222.15
T2.L18A.13 Wardrobes & Kitchen Cabinets 12 12 0 23J UL12 05AUG12 25 0.00
T2.L18A.14 Painting final Coat 6 6 0 22J UL12 28J UL12 32 8,434.10
Electrical
T2.L18E.01 Electrical 1st fix 8 2 70 08FEB12A 03J UL12 15 155,656.20
T2.L18E.02 Electrical 2nd fix 4 1 70 17MAR12A 08J UL12 45 155,656.20
T2.L18E.03 Data & Light power 1st fix 8 5 40 01MAR12A 09J UL12 39 77,828.09
2012 2013
J FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR A
Electrical 1st fix
Electrical 2nd fix
Data & Light power 1st fix
Data & Light power 2nd fix
Audio visual, BMS,PA & CCTV 1st fix
Electrical final fix
BMS & Home automation 1st fix
BMS & Fire alarm final fix
Data & Light power final fix
Audio visual, BMS,PA & CCTV final fix
Installation of A/C Ducts & Connections
Install AHU FCU
Install grills & Diffusers
Install CW Machinaries
Plumbing 1st fix
Installation of Drainage pipes
Plumbing 2nd Fix
Plumbing Final Fix
Fire pipe install
Testing & Commissioning Level 17
Masonry walls
Plastering
Marble & granite
Ceiling gypsum / metal lobby
Floor tiles & Wall Tiles
Aluminium Doors ,Windows & Metal works
Painting 1st coat
Glass & Glazing works
Door,windows & Carpentry joinary works
Floor epoxy paint
GRC Installation
Wardrobes & Kitchen Cabinets
Painting final Coat
Electrical 1st fix
Electrical 2nd fix
Data & Light power 1st fix
Sheet 27 of 32
Sheet 28 of 32
Activity
ID
Activity
Description
Orig
Dur
Rem
Dur
% Early
Start
Early
Finish
Total
Float
Budgeted
Cost
T2.L18E.04 Data & Light power 2nd fix 8 5 40 08MAR12A 15J UL12 39 77,828.09
T2.L18E.05 Audio visual, BMS,PA & CCTV 12 6 50 03MAR12A 10J UL12 43 86,329.12
T2.L18E.06 Electrical final fix 6 6 0 12J UL12 18J UL12 42 77,828.09
T2.L18E.07 BMS & Home automation 1st fix 4 4 10 10MAR12A 08J UL12 45 86,329.12
T2.L18E.08 BMS & Fire alarm final fix 2 2 0 12J UL12 14J UL12 42 77,828.09
T2.L18E.09 Data & Light power final fix 8 8 0 16J UL12 24J UL12 39 77,828.09
T2.L18E.10 Audio visual, BMS,PA & CCTV 4 4 0 16J UL12 19J UL12 39 77,828.09
HVAC
T2.L18H.01 Installation of A/C Ducts & 7 2 70 01MAR12A 23J UN12 31 188,827.95
T2.L18H.02 Install AHU FCU 8 4 55 08MAR12A 27J UN12 31 188,827.95
T2.L18H.03 Install grills & Diffusers 8 8 0 17J UL12 25J UL12 34 94,413.97
T2.L18H.04 Install CW Machinaries 7 7 0 24J UN12 01J UL12 55 94,413.97
Plumbing & Drainage
T2.L18P.01 Plumbing 1st fix 8 1 90 01MAR12A 17MAY12 70 74,065.34
T2.L18P.02 Installation of Drainage pipes 10 0 100 01FEB12A 26MAR12A 74,065.34
T2.L18P.03 Plumbing 2nd Fix 6 2 65 15MAR12A 20MAY12 83 74,065.34
T2.L18P.04 Plumbing Final Fix 10 10 0 12J UL12 23J UL12 36 74,065.34
Fire Fighting & Fire Alarm
T2.L18F.01 Fire pipe install 7 1 80 03MAR12A 17MAY12 65 50,939.58
Testing floor services
T2.L18T.01 Testing & Commissioning Level 10 10 0 06AUG12 16AUG12 25 0.00
Pent Floors (Level 19-20)
Tower Level 19
Architectural
T2.L19A.01 Masonry walls 4 1 80 01MAR12A 05J UL12 24 3,244.62
T2.L19A.02 Plastering 6 6 0 07J UL12 12J UL12 24 96,725.26
T2.L19A.04 Marble & granite 8 8 0 07J UL12 15J UL12 31 96,725.26
T2.L19A.05 Floor tiles & Wall Tiles 10 10 0 18J UL12 29J UL12 24 96,726.55
T2.L19A.06 Aluminium Doors ,Windows & 8 8 0 18J UL12 26J UL12 27 73,920.33
T2.L19A.07 Painting 1st coat 6 6 0 07J UL12 12J UL12 35 8,434.10
T2.L19A.08 Glass & Glazing works 20 20 0 05J UL12 28J UL12 26 13,591.84
T2.L19A.09 Door,windows & Carpentry joinary 6 6 0 14J UL12 19J UL12 27 440,817.99
T2.L19A.10 Floor epoxy paint 20 20 0 07J UL12 29J UL12 31 8,434.10
T2.L19A.11 GRC Installation 12 12 0 07J UL12 19J UL12 39 202,223.55
T2.L19A.12 Wardrobes & Kitchen Cabinets 12 12 0 24J UL12 06AUG12 24 0.00
T2.L19A.13 Ceiling gypsum / metal lobby 10 10 0 07J UL12 17J UL12 24 96,725.26
T2.L19A.14 Painting final Coat 6 6 0 29J UL12 04AUG12 26 8,434.10
Electrical
T2.L19E.01 Electrical 1st fix 8 3 65 08FEB12A 04J UL12 15 155,656.20
T2.L19E.02 Electrical 2nd fix 4 2 40 05MAY12A 15J UL12 39 155,656.20
T2.L19E.03 Data & Light power 1st fix 8 7 15 04APR12A 12J UL12 33 77,828.09
T2.L19E.04 Data & Light power 2nd fix 8 8 0 14J UL12 22J UL12 33 77,828.09
T2.L19E.05 Audio visual, BMS,PA & CCTV 12 12 0 05J UL12 18J UL12 36 86,329.12
T2.L19E.06 BMS & Home automation 1st fix 4 4 0 08J UL12 11J UL12 42 86,329.12
2012 2013
J FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR A
Data & Light power 2nd fix
Audio visual, BMS,PA & CCTV 1st fix
Electrical final fix
BMS & Home automation 1st fix
BMS & Fire alarm final fix
Data & Light power final fix
Audio visual, BMS,PA & CCTV final fix
Installation of A/C Ducts & Connections
Install AHU FCU
Install grills & Diffusers
Install CW Machinaries
Plumbing 1st fix
Installation of Drainage pipes
Plumbing 2nd Fix
Plumbing Final Fix
Fire pipe install
Testing & Commissioning Level 18
Masonry walls
Plastering
Marble & granite
Floor tiles & Wall Tiles
Aluminium Doors ,Windows & Metal works
Painting 1st coat
Glass & Glazing works
Door,windows & Carpentry joinary works
Floor epoxy paint
GRC Installation
Wardrobes & Kitchen Cabinets
Ceiling gypsum / metal lobby
Painting final Coat
Electrical 1st fix
Electrical 2nd fix
Data & Light power 1st fix
Data & Light power 2nd fix
Audio visual, BMS,PA & CCTV 1st fix
BMS & Home automation 1st fix
Sheet 28 of 32
Sheet 29 of 32
Activity
ID
Activity
Description
Orig
Dur
Rem
Dur
% Early
Start
Early
Finish
Total
Float
Budgeted
Cost
T2.L19E.07 Electrical final fix 6 6 0 16J UL12 22J UL12 39 77,828.09
T2.L19E.08 BMS & Fire alarm final fix 2 2 0 16J UL12 17J UL12 39 77,828.09
T2.L19E.09 Data & Light power final fix 8 8 0 23J UL12 31J UL12 33 77,828.09
T2.L19E.10 Audio visual, BMS,PA & CCTV 4 4 0 23J UL12 26J UL12 33 77,828.09
HVAC
T2.L19H.01 Installation of A/C Ducts & 7 3 60 01MAR12A 30J UN12 28 188,827.95
T2.L19H.02 Install AHU FCU 8 4 55 08MAR12A 01J UL12 28 188,827.95
T2.L19H.03 Install CW Machinaries 7 7 0 01J UL12 08J UL12 49 94,413.97
T2.L19H.04 Install grills & Diffusers 8 8 0 18J UL12 26J UL12 33 94,413.97
Plumbing & Drainage
T2.L19P.01 Plumbing 1st fix 8 3 65 01MAR12A 20MAY12 68 74,065.34
T2.L19P.02 Installation of Drainage pipes 10 0 100 04FEB12A 28MAR12A 74,065.34
T2.L19P.03 Plumbing 2nd Fix 6 4 30 10MAR12A 24MAY12 81 74,065.34
T2.L19P.04 Plumbing Final Fix 10 10 0 14J UL12 24J UL12 35 74,065.34
Fire Fighting & Fire Alarm
T2.L19F.01 80Fire pipe install 7 1 80 01MAR12A 09MAY12 72 129,174.75
Testing floor services
T28L19T.01 Testing & Commissioning Level 10 10 0 07AUG12 18AUG12 24 0.00
Tower Level 20
Architectural
T2.L20A.01 Masonry walls 4 0 90 28FEB12A 04J UL12 26 3,244.62
T2.L20A.02 Plastering 6 6 0 05J UL12 11J UL12 28 96,725.26
T2.L20A.04 Marble & granite 8 8 0 05J UL12 14J UL12 35 96,725.26
T2.L20A.05 Floor tiles & Wall Tiles 10 10 0 05J UL12 16J UL12 35 96,726.55
T2.L20A.06 Aluminium Doors ,Windows & 8 8 0 17J UL12 25J UL12 28 73,920.33
T2.L20A.07 Painting 1st coat 6 6 0 30J UN12 05J UL12 41 8,434.10
T2.L20A.08 Glass & Glazing works 20 20 0 05J UL12 28J UL12 26 13,591.84
T2.L20A.09 Door,windows & Carpentry joinary 6 6 0 12J UL12 18J UL12 28 440,817.99
T2.L20A.10 Floor epoxy paint 10 10 0 05J UL12 16J UL12 42 8,434.10
T2.L20A.11 GRC Installation 12 12 0 05J UL12 18J UL12 40 202,223.55
T2.L20A.12 Wardrobes & Kitchen Cabinets 12 12 0 11J UL12 24J UL12 35 0.00
T2.L20A.13 Ceiling gypsum / metal lobby 10 10 0 30J UN12 10J UL12 39 96,725.26
T2.L20A.14 Painting final Coat 6 6 0 29J UL12 04AUG12 26 8,434.10
T2.L20A.22 1 1 0 03MAY12 03MAY12 155 0.00
Electrical
T2.L20E.01 Electrical 1st fix 8 3 65 08FEB12A 04J UL12 15 155,656.20
T2.L20E.02 Electrical 2nd fix 4 2 40 05MAY12A 14J UL12 40 155,656.20
T2.L20E.03 Data & Light power 1st fix 8 7 15 03APR12A 12J UL12 33 77,828.09
T2.L20E.04 Data & Light power 2nd fix 8 8 0 14J UL12 22J UL12 33 77,828.09
T2.L20E.05 Audio visual, BMS,PA & CCTV 12 12 0 05J UL12 18J UL12 36 86,329.12
T2.L20E.06 BMS & Home automation 1st fix 4 4 0 08J UL12 11J UL12 42 86,329.12
T2.L20E.07 Electrical final fix 6 6 0 15J UL12 21J UL12 40 77,828.09
T2.L20E.08 BMS & Fire alarm final fix 2 2 0 15J UL12 16J UL12 40 77,828.09
T2.L20E.09 Data & Light power final fix 8 8 0 23J UL12 31J UL12 33 77,828.09
2012 2013
J FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR A
Electrical final fix
BMS & Fire alarm final fix
Data & Light power final fix
Audio visual, BMS,PA & CCTV final fix
Installation of A/C Ducts & Connections
Install AHU FCU
Install CW Machinaries
Install grills & Diffusers
Plumbing 1st fix
Installation of Drainage pipes
Plumbing 2nd Fix
Plumbing Final Fix
80Fire pipe install
Testing & Commissioning Level 19
Masonry walls
Plastering
Marble & granite
Floor tiles & Wall Tiles
Aluminium Doors ,Windows & Metal works
Painting 1st coat
Glass & Glazing works
Door,windows & Carpentry joinary works
Floor epoxy paint
GRC Installation
Wardrobes & Kitchen Cabinets
Ceiling gypsum / metal lobby
Painting final Coat
Electrical 1st fix
Electrical 2nd fix
Data & Light power 1st fix
Data & Light power 2nd fix
Audio visual, BMS,PA & CCTV 1st fix
BMS & Home automation 1st fix
Electrical final fix
BMS & Fire alarm final fix
Data & Light power final fix
Sheet 29 of 32
Sheet 30 of 32
Activity
ID
Activity
Description
Orig
Dur
Rem
Dur
% Early
Start
Early
Finish
Total
Float
Budgeted
Cost
T2.L20E.10 Audio visual, BMS,PA & CCTV 4 4 0 23J UL12 26J UL12 33 77,828.09
HVAC
T2.L20H.01 Installation of A/C Ducts & 7 6 20 05MAY12A 02J UL12 39 188,827.95
T2.L20H.02 Install AHU FCU 8 8 0 26J UN12 04J UL12 39 188,827.95
T2.L20H.03 Install CW Machinaries 7 7 0 03J UL12 10J UL12 47 94,413.97
T2.L20H.04 Install grills & Diffusers 8 8 0 11J UL12 19J UL12 39 94,413.97
Plumbing & Drainage
T2.L20P.01 Plumbing 1st fix 8 3 65 10MAR12A 22MAY12 68 74,065.34
T2.L20P.02 Installation of Drainage pipes 10 2 80 08MAR12A 19MAY12 52 74,065.34
T2.L20P.03 Plumbing 2nd Fix 6 4 30 15MAR12A 27MAY12 79 74,065.34
T2.L20P.04 Plumbing Final Fix 10 10 0 07J UL12 17J UL12 41 74,065.34
Fire Fighting & Fire Alarm
T2.L20F.01 Fire pipe install 7 1 80 01MAR12A 08MAY12 75 129,174.75
Testing floor services
T2.L20T.01 Testing & Commissioning Level 10 10 0 05AUG12 15AUG12 26 0.00
Mechanical Room(Level 21)
Architectural
T2.L21A.07 Painting 1st coat 6 6 0 21J UL12 26J UL12 23 8,434.10
T2.L21A.11 GRC Installation 12 12 0 11J UL12 24J UL12 15 202,222.15
T2.L21A.14 Painting final Coat 6 6 0 28J UL12 02AUG12 27 8,434.10
Electrical
T2.L21E.01 Electrical 1st fix 8 8 0 02J UL12 10J UL12 15 950,938.85
T2.L21E.02 Electrical 2nd fix 4 4 0 11J UL12 15J UL12 39 93,393.72
T2.L21E.03 Data & Light power 1st fix 8 8 0 04J UL12 12J UL12 33 77,828.09
T2.L21E.04 Data & Light power 2nd fix 8 8 0 14J UL12 22J UL12 33 77,828.09
T2.L21E.06 BMS & Home automation 1st fix 4 4 0 14J UL12 17J UL12 37 86,329.12
T2.L21E.07 Electrical final fix 6 6 0 28J UL12 02AUG12 29 77,828.09
T2.L21E.08 BMS & Fire alarm final fix 2 2 0 28J UL12 29J UL12 29 77,828.09
T2.L21E.09 Data & Light power final fix 8 8 0 28J UL12 05AUG12 29 77,828.09
T2.L21E.10 Audio visual, BMS,PA & CCTV 4 4 0 28J UL12 31J UL12 29 77,828.09
HVAC
T2.L21H.01 Installation of A/C Ducts & 7 7 0 11J UL12 18J UL12 23 188,827.95
T2.L21H.02 Install AHU FCU 8 8 0 11J UL12 19J UL12 23 188,827.95
T2.L21H.03 Install CW Machinaries 7 7 0 19J UL12 26J UL12 33 94,413.97
T2.L21H.04 Install grills & Diffusers 8 8 0 21J UL12 29J UL12 31 94,413.97
Plumbing & Drainage
T2.L21P.01 Plumbing 1st fix 8 8 0 20MAY12 28MAY12 52 296,261.39
T2.L21P.02 Installation of Drainage pipes 10 10 0 08MAY12 19MAY12 52 74,065.34
T2.L21P.03 Plumbing 2nd Fix 6 6 0 29MAY12 04J UN12 69 74,065.34
T2.L21P.04 Plumbing Final Fix 10 10 0 28J UL12 07AUG12 23 74,065.34
Fire Fighting & Fire Alarm
T2.L21F.01 Fire pipe install 7 5 25 03MAR12A 22MAY12 57 213,875.13
2012 2013
J FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR A
Audio visual, BMS,PA & CCTV final fix
Installation of A/C Ducts & Connections
Install AHU FCU
Install CW Machinaries
Install grills & Diffusers
Plumbing 1st fix
Installation of Drainage pipes
Plumbing 2nd Fix
Plumbing Final Fix
Fire pipe install
Testing & Commissioning Level 20
Painting 1st coat
GRC Installation
Painting final Coat
Electrical 1st fix
Electrical 2nd fix
Data & Light power 1st fix
Data & Light power 2nd fix
BMS & Home automation 1st fix
Electrical final fix
BMS & Fire alarm final fix
Data & Light power final fix
Audio visual, BMS,PA & CCTV final fix
Installation of A/C Ducts & Connections
Install AHU FCU
Install CW Machinaries
Install grills & Diffusers
Plumbing 1st fix
Installation of Drainage pipes
Plumbing 2nd Fix
Plumbing Final Fix
Fire pipe install
Sheet 30 of 32
Sheet 31 of 32
Activity
ID
Activity
Description
Orig
Dur
Rem
Dur
% Early
Start
Early
Finish
Total
Float
Budgeted
Cost
Testing floor services
T2.L21T.01 Testing & Commissioning Level 10 10 0 08AUG12 19AUG12 23 0.00
Roof
Architectural
T2.LRFA.03 Steel Structural Works 20 20 0 18J UN12 10J UL12 15 26,259.63
T2.LRFA.05 Roofing Tiles 10 10 0 24J UN12 04J UL12 26 96,726.55
T2.LRFA.06 Aluminium Doors ,Windows & 8 8 0 19J UL12 28J UL12 26 73,920.33
T2.LRFA.07 Painting 1st coat 6 6 0 12J UL12 18J UL12 26 8,434.10
T2.LRFA.09 Door,windows & Carpentry joinary 6 6 0 05J UL12 11J UL12 26 244,090.32
T2.LRFA.14 Painting final Coat 6 6 0 29J UL12 04AUG12 26 8,434.10
T2.LRFA.19 1 1 0 03MAY12 03MAY12 155 0.00
HVAC
T2.LRFH.01 Installation of A/C Ducts & 7 7 0 12J UL12 19J UL12 31 188,827.95
T2.LRFH.02 Install AHU FCU 8 8 0 21J UL12 29J UL12 31 188,827.95
T2.LRFH.03 Install CW Machinaries 7 7 0 21J UL12 28J UL12 32 94,413.97
Testing floor services
T2.LRFT.01 Testing & Commissioning Roof 10 10 0 05AUG12 15AUG12 26 0.00
Elevators
Service Elevator
T2T8.EL.01 Modification Work by LAND 175 175 0 03MAY12 22NOV12 -139 0.00
T2T8.EL.02 Handing over for Installation 0 0 0 22NOV12 -134 0.00
T2T8.EL.05 Installation Work 75 75 0 29NOV12 24FEB13 -139 577,886.18
T2T8.EL.07 Civil Works associated with 35 35 0 20OCT12 28NOV12 -139 0.00
Passanger Elevator
T2T8.EL.03 Modification Work by LAND 105 105 0 03MAY12 02SEP12 -69 0.00
T2T8.EL.04 Handing over for Installation 0 0 0 02SEP12 -64 0.00
T2T8.EL.06 Installation Work 75 75 0 09SEP12 04DEC12 -69 577,898.05
T2T8.EL.08 Civil Works associated with 35 35 0 30J UL12 08SEP12 -69 0.00
External Works
Road Works
T2T8.RW.01 Excavation & Leveling 5 5 0 10J UL12 15J UL12 15 55,079.64
T2T8.RW.02 Fixing Of Kerb stone 6 6 0 16J UL12 22J UL12 15 55,079.64
T2T8.RW.03 Laying of Sub base course 6 6 0 23J UL12 29J UL12 15 55,079.64
T2T8.RW.04 Compaction 2 2 0 30J UL12 31J UL12 15 55,079.64
T2T8.RW.05 Laying of Base course 6 6 0 01AUG12 07AUG12 15 55,079.64
T2T8.RW.06 Compaction 2 2 0 08AUG12 09AUG12 15 55,079.64
T2T8.RW.07 Laying of Asphalt Layer 6 6 0 11AUG12 16AUG12 15 55,079.64
T2T8.RW.08 Marking & Signages 2 2 0 18AUG12 19AUG12 33 55,079.64
Soft Land scaping works
T2T8.SL.01 Excavation for Landscape work 10 10 0 18AUG12 28AUG12 15 417,637.04
T2T8.SL.02 Filling Sweet Soil 4 4 0 29AUG12 02SEP12 15 417,639.59
T2T8.SL.03 Fixing of Plants & Grass 6 6 0 03SEP12 09SEP12 15 417,637.04
2012 2013
J FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR A
Testing & Commissioning Level 21
Steel Structural Works
Roofing Tiles
Aluminium Doors ,Windows & Metal works
Painting 1st coat
Door,windows & Carpentry joinary works
Painting final Coat
Installation of A/C Ducts & Connections
Install AHU FCU
Install CW Machinaries
Testing & Commissioning Roof
Modification Work by LAND
Handing over for Installation
Installation Work
Civil Works associated with elevators
Modification Work by LAND
Handing over for Installation
Installation Work
Civil Works associated with elevators
Excavation & Leveling
Fixing Of Kerb stone
Laying of Sub base course
Compaction
Laying of Base course
Compaction
Laying of Asphalt Layer
Marking & Signages
Excavation for Landscape work
Filling Sweet Soil
Fixing of Plants & Grass
Sheet 31 of 32
Sheet 32 of 32
Activity
ID
Activity
Description
Orig
Dur
Rem
Dur
% Early
Start
Early
Finish
Total
Float
Budgeted
Cost
Testing & Commissioning
T2.TEST.01 Test & Commission 10 10 0 12NOV12 22NOV12 -49 10,462.00
T2.TEST.02 Test & Commission HVAC 10 10 0 12NOV12 22NOV12 -49 10,462.00
T2.TEST.03 Test & Commission Plumbing & 10 10 0 12NOV12 22NOV12 -49 10,462.00
T2.TEST.04 Test & Commission low current 10 10 0 12NOV12 22NOV12 -49 10,462.00
T2.TEST.05 Final test MV panel etc 10 10 0 12NOV12 22NOV12 -49 10,462.00
T2.TEST.06 Testing elevators 10 10 0 25FEB13 07MAR13 -139 10,462.00
T2.TEST.07 FInal test & Snags rectification all 30 30 0 09MAR13 11APR13 -139 11,159.47
Project Handing Over
T2T8.HO.01 Project Handing Over 0 0 0 11APR13 -139 0.00
2012 2013
J FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR A
Test & Commission eLECTRICAL
Test & Commission HVAC
Test & Commission Plumbing & drain
Test & Commission low current
Final test MV panel etc
Testing elevators
FInal test & Snags rectification all trades
Project Handing Over
Sheet 32 of 32