Vous êtes sur la page 1sur 43

2G BTS Installation Guide Line

Outdoor/Indoor
200214-ed1
WWW.Alcatel-Lucent.com
Alcatel, Lucent, Alcatel-Lucent and the Alcatel-Lucent logo are trademarks of Alcatel-Lucent. All other
trademarks are the property of their respective oners.
!he information presented is su"#ect to change ithout notice. Alcatel-Lucent assumes no responsi"ility for
inaccuracies contained herein.
$opyright % 201&Alcatel-Lucent
'dition 1.0
(tatus) *eleased
WWW.Alcatel-Lucent.com
All rights reserved
+assing on and copying of this document,
,se and communication of its contents is not permitted
Without ritten authori-ation from Alcatel-Lucent
All rights reserved.
+assing on and copying of this document,
use and communication of its contents is not permitted
ithout ritten authori-ation from Alcatel-Lucent.
!a"le .f $ontents
1.Preliminary Information .....5
2.Scope ....5
3.Reference ....5
4.Document Change History ....6
5 General Information
5.1 Hardware Description .7
5.1.1 Rack Configuration 7
5.1.2 Weight and Dimensions 8
5.2 Final State 9
6 Installing the Rack
6.1 Rack Unpacking 10
6.2 Reversing the Rack Door (If Necessary On Site) .10
6.3 Positioning the Rack ..11
6.4 OPTION: Fixing on Concrete Floor..11
&
$.+/*012! % 2012 AL$A!'L-L,$'3!. ALL *012!( *'('*4'5.
AL$A!'L-L,$'3! 603!'*3AL +*.+*0'!A*/ 6 ,(' +,*(,A3! !. $.7+A3/ 03(!*,$!0.3
6.4 OPTION: Fixing on Concrete Floor..11
6.4.1 Drilling the Concrete .11
6.4.2 Fixing to the Concrete Floor 12
6.5 OPTION : Fixing to the Raised Floor .12
5.5.1 Drilling the Raised Floor 12
5.5.2 Fixing to the Raised Floor .13
6.6 OPTION : Fixing to the Wall .13
5.6.1 Wall Drilling .13
5.6.2 Fixing to the Wall 14
6.7 Preparing the Site Cable Tray and the Metal Sheath ...14
7 Installing the Power Supply Cables
7.1 General Cabling View 15
7.2 Installing the Cables in the Cable Tray 16
7.3 Protective Earth Cable ...16
7.4 Rack Side Power Cable Connections .17
7.5 Site Side Power Cable Connections (48 V) ..18
7.6 Power Supply Testing 19
8 Installing the PCM Cables
8.1 Installing Cable in Cable Tray ..20
8.2 Rack Side Connection .20
8.2.1 Prepare the PCM Cables ...20
8.2.2 Connect the Cables to the Rack ..21
8.2.3 L907/ 4 120 - Ohm Cable (Alcatel-Lucent Kits) .21
8.2.4 FLEX3 / 4 - 75 Ohm Coaxial Cable (Alcatel-Lucent Kits) ....22
9 Installing the Antenna Jumpers
9.1 Antenna General Scheme ..23
9.2 Connection to the Feeder Termination ..24
9.3 Connection to the BTS Rack ..24
10 Installing the Alarm Cables (Options)
10.1 Installing the Cables (Option) ...25
10.2 Rack Side Connection ..26
11 Installing the Synchronization Cables (Option)
4
$.+/*012! % 2012 AL$A!'L-L,$'3!. ALL *012!( *'('*4'5.
AL$A!'L-L,$'3! 603!'*3AL +*.+*0'!A*/ 6 ,(' +,*(,A3! !. $.7+A3/ 03(!*,$!0.3
11 Installing the Synchronization Cables (Option)
11.1 Configuration of Cabling ...28
11.2 Installation 29
12 Finishing Installation
12.1 Finishing Installation of the Metallic Sheath .29
12.2 Finishing 31
Appendix: Installation Pictures ..32
Appendix : Abbreviations 37
WWW.Alcatel-Lucent.com
1. Preliminary Information
General information
The product specification and/or performance levels contained in this document are for
information purposes only and are subject to change without notice. They do not
represent any obligation on the part of Alcatel-Lucent.
Service Personnel Skill
Service Personnel must have an adequate technical background on telecommunications
and in particular on the equipment subject of this handbook.
An adequate background is required to properly install, operate and maintain
equipment. The fact of merely reading this handbook is considered as not enough.
Safety recommendation
The safety recommendations here below must be considered to avoid injuries on persons
and/or damage to the equipment:
Service Personnel
Installation and service must be carried out by authorized persons having appropriate
technical training and experience necessary to be aware of hazardous operations during
installation and service, so as to prevent any personal injury or danger to
other persons, as well as prevent damaging the equipment.
Access to the Equipment
Access to the Equipment in use must be restricted to Service Personnel only.
Safety Rules
WWW.Alcatel-Lucent.com
All rights reserved
+assing on and copying of this document,
,se and communication of its contents is not permitted
Without ritten authori-ation from Alcatel-Lucent
Safety Rules
Recommended safety rules are indicated in part (5-Safety , EMC, EMF, ESD Norms
and Equipment Labelling). Local safety regulations must be used if mandatory. Safety
instructions in this handbook should be used in addition to the local safety
regulations. In case of conflict between safety instructions stated in this manual and
those indicated in local regulations, mandatory local norms will prevail. Should not
local regulations be mandatory, then safety rules stated in this manual will prevail.
2. Scope
This Document aims to describe the hardware of 2G (9100 BTS DC Indoor Evolution)
3. Reference
Alcatel -Lucent 9100 BTS Evolution installation manual in MBO cabinet
8
WWW.Alcatel-Lucent.com
4. Document Change History
Edition Number Reason and description of change Affected Page Effective date
0.1 Draft edition All 02-02-2014
1.0 First edition of document formally revised All 20-02-2014
WWW.Alcatel-Lucent.com
All rights reserved
+assing on and copying of this document,
,se and communication of its contents is not permitted
Without ritten authori-ation from Alcatel-Lucent
9
5.1 Hardware Description
5.1.1 Rack on!i"uration
:
$.+/*012! % 2012 AL$A!'L-L,$'3!. ALL *012!( *'('*4'5.
AL$A!'L-L,$'3! 603!'*3AL +*.+*0'!A*/ 6 ,(' +,*(,A3! !. $.7+A3/ 03(!*,$!0.3
Figure 1: Example of Mini DC Indoor 9100 BTS (Left and Medi DC 9100 BTS (!ig"t
5.1.2 #ei"$t and Di%ensions
;
$.+/*012! % 2012 AL$A!'L-L,$'3!. ALL *012!( *'('*4'5.
AL$A!'L-L,$'3! 603!'*3AL +*.+*0'!A*/ 6 ,(' +,*(,A3! !. $.7+A3/ 03(!*,$!0.3
5.2 &inal State
!he rack is ready for commissioning
!he rack is not poered up.
<
$.+/*012! % 2012 AL$A!'L-L,$'3!. ALL *012!( *'('*4'5.
AL$A!'L-L,$'3! 603!'*3AL +*.+*0'!A*/ 6 ,(' +,*(,A3! !. $.7+A3/ 03(!*,$!0.3
Figure #: Example of DC Indoor BTS En$ironment
' Installin" t$e Rack
'.1 Rack (npackin"
)rocedure* ,npack the rack
$heck the delivery
4erify the type of rack and serial num"er of the rack
*eport any damage to the e=uipment on the carrier delivery note.
'.2 Re+ersin" t$e Rack Door ,I! -ecessar. On Site/
1
0
$.+/*012! % 2012 AL$A!'L-L,$'3!. ALL *012!( *'('*4'5.
AL$A!'L-L,$'3! 603!'*3AL +*.+*0'!A*/ 6 ,(' +,*(,A3! !. $.7+A3/ 03(!*,$!0.3
)rocedure* *emove the door >1? ith its hinges >2? >(ee @igure %?
*emove the to "ars >4?, >9? and the part >&?
*everse the latch >8? and fiA the to "ars >4?, >9? in the right place
@iA the door to the left side of the rack
$onnect the earth link to the door and to the top left of the rack
*emove the reversed la"elling >no Alcatel-Lucent la"els? >(ee @igure %?
*emove the orange line la"el.
'.0 )ositionin" t$e Rack
)rocedure* 7ark out the rackBs position on the floor
+osition the rack
Ad#ust the height of the feet ith a 20 mm open-ended rench
Level the rack.
'.1 O)TIO-* &i2in" on oncrete &loor
'.1.1 Drillin" t$e oncrete &loor
1
1
$.+/*012! % 2012 AL$A!'L-L,$'3!. ALL *012!( *'('*4'5.
AL$A!'L-L,$'3! 603!'*3AL +*.+*0'!A*/ 6 ,(' +,*(,A3! !. $.7+A3/ 03(!*,$!0.3
'.1.1 Drillin" t$e oncrete &loor
'.1.2 &i2in" to t$e oncrete &loor
)rocedure* @iA the "rackets to the fet of the rack
+osition the plugs in the holes in the concrete floor
0nsert the cres ith ashers in the plugs
+osition the rack and tighten the scres into the ground
1
2
$.+/*012! % 2012 AL$A!'L-L,$'3!. ALL *012!( *'('*4'5.
AL$A!'L-L,$'3! 603!'*3AL +*.+*0'!A*/ 6 ,(' +,*(,A3! !. $.7+A3/ 03(!*,$!0.3
+osition the rack and tighten the scres into the ground
'.5 O)TIO- * &i2in" to t$e Raised &loor
'.5.1 Drillin" t$e Raised &loor
)rocedure* 7ark the tile ith the template >(ee @igure &?
5rill the tile 10 mm
7ark the floor ith the template
5rill the tile ; mm.
'.5.2 &i2in" to t$e Raised &loor
)rocedure* 0nsert the eApanding plug < in the concrete floor >(ee @igure 1#?
(cre in threaded rod 9 ith asher ; and nut :
(cre coupling nut 8 as the figure shos
1
&
$.+/*012! % 2012 AL$A!'L-L,$'3!. ALL *012!( *'('*4'5.
AL$A!'L-L,$'3! 603!'*3AL +*.+*0'!A*/ 6 ,(' +,*(,A3! !. $.7+A3/ 03(!*,$!0.3
(cre coupling nut 8 as the figure shos
(cre in scre 1 ith asher 2
+osition "racket &.
'.' O)TIO- * &i2in" to t$e #all
'.'.1 #all Drillin"
'.'.2 &i2in" to t$e #all
)rocedure* @iA the to front
feet of the e=uipment
ith "rackets as descri"ed
for concrete floor.
@iA the C!( to the all
"y the to holes >1? at the
top of the rack.
1
4
$.+/*012! % 2012 AL$A!'L-L,$'3!. ALL *012!( *'('*4'5.
AL$A!'L-L,$'3! 603!'*3AL +*.+*0'!A*/ 6 ,(' +,*(,A3! !. $.7+A3/ 03(!*,$!0.3
'.3 )reparin" t$e Site a4le Tra. and t$e 5etal S$eat$
)rocedure* 7ake a cut-out in the ca"le ay for the ca"les ith metal sheath >(ee @igure 1'?
7ake a cut-out in the ca"le ay for the antenna #umpers
'dge the cut-outs ith edge protection
@iA provisory the metal sheath to the ca"le ay >(ee @igure 1(?.
3 Installin" t$e )ower Suppl. a4les
3.1 General a4lin" 6iew
1
8
$.+/*012! % 2012 AL$A!'L-L,$'3!. ALL *012!( *'('*4'5.
AL$A!'L-L,$'3! 603!'*3AL +*.+*0'!A*/ 6 ,(' +,*(,A3! !. $.7+A3/ 03(!*,$!0.3
3.2 Installin" t$e a4les in t$e a4le Tra.
0nstall yelloD green ca"le
0nstall poer ca"le
Attach ca"le
$ut the ca"le at good length
$rimp a ire terminal)Ter%inals on t$e rack side)
135 ) ; mm
CA! A ) 9 mm
CA! C ) 9 mm
CA!*'! ) 9 mm
Ter%inals on t$e power 4o2 )
depending on site
1
9
$.+/*012! % 2012 AL$A!'L-L,$'3!. ALL *012!( *'('*4'5.
AL$A!'L-L,$'3! 603!'*3AL +*.+*0'!A*/ 6 ,(' +,*(,A3! !. $.7+A3/ 03(!*,$!0.3
3.0 )rotecti+e 7art$ a4le onnection
$rimp an adapted ire terminal at site eAtremity
$onnect the protective earth ca"le to the site earth plate
+ass the ca"les to the metal sheath
$onnect earth ca"le at rackBs top
$rimp a ; mm ire terminal at C!( eAtremity of earth ca"le
$onnect the 135 ca"le to the stud top rack on the rack >7;?
+ass the 135 ca"le through the metal sheath
$rimp an 7; ire terminal on the 135 ca"le
@it a ru""er sleeve on the ire terminal
$onnect the 135 ca"le to the stud of the C!( >(ee (tep 2?
At the site side, cut the ca"le and crimp a ire terminal on the 135 ca"le >diameter depending
on site? >(ee (tep &?
@it a ru""er sleeve on the ire terminal
$onnect the 135 ca"le to the site earth plate >(ee (tep 9?.
3.1 Rack Side )ower a4le onnections
1
:
$.+/*012! % 2012 AL$A!'L-L,$'3!. ALL *012!( *'('*4'5.
AL$A!'L-L,$'3! 603!'*3AL +*.+*0'!A*/ 6 ,(' +,*(,A3! !. $.7+A3/ 03(!*,$!0.3
)rocedure* +ass the 4; 4 poer ca"les through the metal sheath
*emove the ru""er caps from the poer supply terminals on the rack
+ass the ca"les into the ru""er caps >(ee Steps 1 to 1?
$rimp 79 terminals on the ca"les
@it a ru""er sleeve on the ire terminal
$onnect the 4; 4 ca"les to the studs of the C!()
Clack insulated conductor to the 0 4 terminal
Clue insulated conductor to the - 4; 4 terminal
@it the ru""er caps on the poer terminals.
3.5 Site Side )ower a4le onnections ,18 6/
1
;
$.+/*012! % 2012 AL$A!'L-L,$'3!. ALL *012!( *'('*4'5.
AL$A!'L-L,$'3! 603!'*3AL +*.+*0'!A*/ 6 ,(' +,*(,A3! !. $.7+A3/ 03(!*,$!0.3
)rocedure* .n the site side, cut the 4; 4 ca"les and crimp on a lug >diameter depending on site?
@it a ru""er sleeve on the terminal lug
$onnect the 4; 4 ca"le to the site "reakers
La"el the 4; 4 ca"les and the site poer "oA.
3.' )ower Suppl. Testin"
)rocedure* $heck that all the rack "reakers are sitched off
At the rack, test for short circuit "eteen 0 4 and - 4; 4
At poer "oA, sitch on the fuse "reakers >(ee @igure #0?
1
<
$.+/*012! % 2012 AL$A!'L-L,$'3!. ALL *012!( *'('*4'5.
AL$A!'L-L,$'3! 603!'*3AL +*.+*0'!A*/ 6 ,(' +,*(,A3! !. $.7+A3/ 03(!*,$!0.3
At poer "oA, sitch on the fuse "reakers >(ee @igure #0?
At the rack, test the voltage polarity >(ee @igure #0?
At the poer "oA, sitch off the fuse "reakers
8.1 Installin" a4le in a4le Tra.
0nstall ca"les in +$7 compartment of ca"le tray
Attach ca"les ith plastic ca"le ties
La"el the ca"les ith la"els supplied
+ass the +$7 ca"les through the metal sheath.
)rocedure* Se)tion 1*& for
the num"er of +$7 ca"les
to install
+erform steps 1 to 4.
2
0
$.+/*012! % 2012 AL$A!'L-L,$'3!. ALL *012!( *'('*4'5.
AL$A!'L-L,$'3! 603!'*3AL +*.+*0'!A*/ 6 ,(' +,*(,A3! !. $.7+A3/ 03(!*,$!0.3
+erform steps 1 to 4.
8.2 Rack Side onnection
8.2.1 )repare t$e )5 a4les
)rocedure* *emove 2 cm of outer insulation near the metal sheath fiAing point on each +$7 ca"le >(ee
@igure #1?
+repare the ca"le termination
@it a ru""er sleeve >4? >(ee @igure ##?
La"el the ca"les >(ee @igure ##?.
8.2.2 onnect t$e a4les to t$e Rack
2
1
$.+/*012! % 2012 AL$A!'L-L,$'3!. ALL *012!( *'('*4'5.
AL$A!'L-L,$'3! 603!'*3AL +*.+*0'!A*/ 6 ,(' +,*(,A3! !. $.7+A3/ 03(!*,$!0.3
8.2.0 L9:3/ 1 12: ; O$% a4le ,<lcatel;Lucent =its/
.nly one ca"le is used to carry A"is1 and A"is2 signals.
2igh level signals must "e in the same =uad.
)rocedure* *emove the lightning protection "lock >2 in @igure 22?
2
2
$.+/*012! % 2012 AL$A!'L-L,$'3!. ALL *012!( *'('*4'5.
AL$A!'L-L,$'3! 603!'*3AL +*.+*0'!A*/ 6 ,(' +,*(,A3! !. $.7+A3/ 03(!*,$!0.3
)rocedure* *emove the lightning protection "lock >2 in @igure 22?
0nsert the ires in the terminal "lock >1 in @igure 22?>to avoid cutting pro"lems os short
circuits, take the ire ith the first hand and insert it ith the other hand?
@it the lightning protection "lock
!ie the ca"les to the rack >ith adhesive tie "locks?.
8.2.1 &L7>0 / 1 ; 35 O$% oa2ial a4le ,<lcatel;Lucent =its/
)rocedure* *emove the lightning protection "lock >2 in @igure 22?
0nsert the ires in the terminal "lock >1 in @igure 22?
@it the lightning protection "lock
!ie the ca"les to the rack >ith adhesive tie "locks?.
@it (+27 :8 - ohm adapters to su" - 5 connectors >positions 4 and 8 in @igure 22?
9 Installin" t$e <ntenna ?u%pers
9.1 <ntenna General Sc$e%e
2
&
$.+/*012! % 2012 AL$A!'L-L,$'3!. ALL *012!( *'('*4'5.
AL$A!'L-L,$'3! 603!'*3AL +*.+*0'!A*/ 6 ,(' +,*(,A3! !. $.7+A3/ 03(!*,$!0.3
9.2 onnection to t$e &eeder Ter%ination
0f the feeders are not la"eled)
0nform the customer
5o not connect the #umpers
$omplete the $$L
2
4
$.+/*012! % 2012 AL$A!'L-L,$'3!. ALL *012!( *'('*4'5.
AL$A!'L-L,$'3! 603!'*3AL +*.+*0'!A*/ 6 ,(' +,*(,A3! !. $.7+A3/ 03(!*,$!0.3
)rocedure* *efer to Information !e+uired (Se)tion 1*&1 for ca"le connections
La"el the antenna #umpers at each end >(ee @igure #,?
$onnect the antenna #umpers to the feeders >(ee @igure #&?.
9.0 onnection to t$e BTS Rack
)rocedure* Lead the #umpers through the cut-outs in the ca"le tray
'nsure that hte "ending radius of each ca"le is at least & cm
,se the plastic ties to "undle the ca"les together
!ighten ith special tightening tool >(ee !ools catalogue?.
1: Installin" t$e <lar% a4les ,Options/
1:.1 Installin" t$e a4les ,Option/
2
8
$.+/*012! % 2012 AL$A!'L-L,$'3!. ALL *012!( *'('*4'5.
AL$A!'L-L,$'3! 603!'*3AL +*.+*0'!A*/ 6 ,(' +,*(,A3! !. $.7+A3/ 03(!*,$!0.3
1?. 0nstall the alarm ca"les in special compartment of ca"le tray >(ee Information !e+uired
(Se)tion 1*& for the num"er of alarms to "e installed?
2?. Attach ca"les ith plastic ca"le ties
&?. La"el the ca"les
4?. +ass the alarm ca"les through the metal sheath
8?. @it a ru""er sleeve on ire terminations.
1:.2 Rack Side onnection
2
9
$.+/*012! % 2012 AL$A!'L-L,$'3!. ALL *012!( *'('*4'5.
AL$A!'L-L,$'3! 603!'*3AL +*.+*0'!A*/ 6 ,(' +,*(,A3! !. $.7+A3/ 03(!*,$!0.3
)rocedure* *efer to Information !e+uired (Se)tion 1*& in )"apter 1 for t"e )a-le connections
and the =uantity of alarms to "e connected.
@rom the end of the sheathing, "undle the ca"les together and attach them ith
ca"le ties.
@it a ru""er sleeve on ire terminations
0nsert the ires into the connectors)
$onnector >1? E input alarms 1 to ; >(ee @igures .# and ..
2
:
$.+/*012! % 2012 AL$A!'L-L,$'3!. ALL *012!( *'('*4'5.
AL$A!'L-L,$'3! 603!'*3AL +*.+*0'!A*/ 6 ,(' +,*(,A3! !. $.7+A3/ 03(!*,$!0.3
$onnector >1? E input alarms 1 to ; >(ee @igures .# and ..
$onnector >2? E input alarms < to 19
$onnector >&? E input alarms 1: to 24
$onnector >4? E output alarms >not used?
!ie the ca"les to the rack
11 Installin" t$e S.nc$roni@ation a4les ,Option/
11 .1 on!i"uration o! a4lin"
2
;
$.+/*012! % 2012 AL$A!'L-L,$'3!. ALL *012!( *'('*4'5.
AL$A!'L-L,$'3! 603!'*3AL +*.+*0'!A*/ 6 ,(' +,*(,A3! !. $.7+A3/ 03(!*,$!0.3
11.2 Installation
)rocedure* $hoose the right configuration >(ee @igures .' to .,
*un the synchroni-ation ca"les in the site ca"le tray
+ass the ca"les through the metal sheath
La"el the ca"les ith la"els supplied
$onnect ca"les to sockets 1, 2, & in the connection area >(ee @igure .&
2
<
$.+/*012! % 2012 AL$A!'L-L,$'3!. ALL *012!( *'('*4'5.
AL$A!'L-L,$'3! 603!'*3AL +*.+*0'!A*/ 6 ,(' +,*(,A3! !. $.7+A3/ 03(!*,$!0.3
$onnect ca"les to sockets 1, 2, & in the connection area >(ee @igure .&
@asten the connectors ith knurled scres
$onnect the ca"les to the site C!(s >F1?.
>F1? With 12 - C!( use +art 1: volume 1: $55 document
12 &inis$in" Installation
12.1 &inis$in" Installation o! t$e 5etallic S$eat$
&
0
$.+/*012! % 2012 AL$A!'L-L,$'3!. ALL *012!( *'('*4'5.
AL$A!'L-L,$'3! 603!'*3AL +*.+*0'!A*/ 6 ,(' +,*(,A3! !. $.7+A3/ 03(!*,$!0.3
)rocedure* (tretch the metallic sheath "eteen the vertical cutout in the ca"le tray
and the C!( rack >(ee @igure .9*
@iA the metallic sheath to the ca"le tray ith one stove scre >(ee @igure .9*
$ut the metallic sheath to the right length >F1?.
@iA a lug to the metallic sheath if necessary.
$onnect the metallic sheath tot he rack >(ee @igure '0*
!ighten the stripped +$7 ca"le shielding to the sheath using the metallic tie.
rap provided in the kit >(ee @igure '0**
12.2 &inis$in"
)rocedure* AffiA the G C!( (!A!0.3 G and G 3 G la"els to the door of the C!(
&
1
$.+/*012! % 2012 AL$A!'L-L,$'3!. ALL *012!( *'('*4'5.
AL$A!'L-L,$'3! 603!'*3AL +*.+*0'!A*/ 6 ,(' +,*(,A3! !. $.7+A3/ 03(!*,$!0.3
)rocedure* AffiA the G C!( (!A!0.3 G and G 3 G la"els to the door of the C!(
$lear aay packaging
Leave the site tidy
Leave the C!( door key
$lean the site.
Pictorial Elaboration:
&
2
$.+/*012! % 2012 AL$A!'L-L,$'3!. ALL *012!( *'('*4'5.
AL$A!'L-L,$'3! 603!'*3AL +*.+*0'!A*/ 6 ,(' +,*(,A3! !. $.7+A3/ 03(!*,$!0.3
&
&
$.+/*012! % 2012 AL$A!'L-L,$'3!. ALL *012!( *'('*4'5.
AL$A!'L-L,$'3! 603!'*3AL +*.+*0'!A*/ 6 ,(' +,*(,A3! !. $.7+A3/ 03(!*,$!0.3
&
4
$.+/*012! % 2012 AL$A!'L-L,$'3!. ALL *012!( *'('*4'5.
AL$A!'L-L,$'3! 603!'*3AL +*.+*0'!A*/ 6 ,(' +,*(,A3! !. $.7+A3/ 03(!*,$!0.3
&
8
$.+/*012! % 2012 AL$A!'L-L,$'3!. ALL *012!( *'('*4'5.
AL$A!'L-L,$'3! 603!'*3AL +*.+*0'!A*/ 6 ,(' +,*(,A3! !. $.7+A3/ 03(!*,$!0.3
&
9
$.+/*012! % 2012 AL$A!'L-L,$'3!. ALL *012!( *'('*4'5.
AL$A!'L-L,$'3! 603!'*3AL +*.+*0'!A*/ 6 ,(' +,*(,A3! !. $.7+A3/ 03(!*,$!0.3
&
:
$.+/*012! % 2012 AL$A!'L-L,$'3!. ALL *012!( *'('*4'5.
AL$A!'L-L,$'3! 603!'*3AL +*.+*0'!A*/ 6 ,(' +,*(,A3! !. $.7+A3/ 03(!*,$!0.3
&
;
$.+/*012! % 2012 AL$A!'L-L,$'3!. ALL *012!( *'('*4'5.
AL$A!'L-L,$'3! 603!'*3AL +*.+*0'!A*/ 6 ,(' +,*(,A3! !. $.7+A3/ 03(!*,$!0.3
&
<
$.+/*012! % 2012 AL$A!'L-L,$'3!. ALL *012!( *'('*4'5.
AL$A!'L-L,$'3! 603!'*3AL +*.+*0'!A*/ 6 ,(' +,*(,A3! !. $.7+A3/ 03(!*,$!0.3
4
0
$.+/*012! % 2012 AL$A!'L-L,$'3!. ALL *012!( *'('*4'5.
AL$A!'L-L,$'3! 603!'*3AL +*.+*0'!A*/ 6 ,(' +,*(,A3! !. $.7+A3/ 03(!*,$!0.3
4
1
$.+/*012! % 2012 AL$A!'L-L,$'3!. ALL *012!( *'('*4'5.
AL$A!'L-L,$'3! 603!'*3AL +*.+*0'!A*/ 6 ,(' +,*(,A3! !. $.7+A3/ 03(!*,$!0.3
<ppendi2 * <44re+iations
Abis Link between BTS and BSC
BSC Base Station Controller
BSS Base Station Subsystem
BTS Base Transceiver Station
CCL Completion Check List
CEL Premise inspection form
DC Direct Current
DD Di!ital Distribution rame
4
2
$.+/*012! % 2012 AL$A!'L-L,$'3!. ALL *012!( *'('*4'5.
AL$A!'L-L,$'3! 603!'*3AL +*.+*0'!A*/ 6 ,(' +,*(,A3! !. $.7+A3/ 03(!*,$!0.3
DD Di!ital Distribution rame
"D ailure "eport
#$D #round %earth&
#S' #lobal System for 'obile communication
(TL)P"* Procedure Technical and support information
(* (nstruction *peration
'*DE' '*Dulator ) DE'odulator
PC' Pulse Code 'odulation
WWW.Alcatel-Lucent.com WWW.Alcatel-Lucent.com
All rights reserved
+assing on and copying of this document,
,se and communication of its contents is not permitted
Without ritten authori-ation from Alcatel-Lucent

Vous aimerez peut-être aussi