Test Route:
Osogbo
Optimization Report
Ericsson Nigeria
16th July 2014.
All rights reserved
West
Test Route:
Contents
1. INTRODUCTION................................................................................................................................ 3
2. FINDINGS AND RECOMMENDATIONS:.....................................................................................3
2.1.1 TEST ROUTE OVERVIEW:.....................................................................................................3
3.1
GSM BAND (SHORT CALL)..................................................................................................4
3.1.1 MS1 RXLEV PLOT:.................................................................................................................4
3.1.2 MS1 RXQUAL PLOT:..............................................................................................................5
3.1.3 MS1 SQI PLOT:....................................................................................................................... 5
3.2
WCDMA BAND (IDLE)...........................................................................................................6
3.2.1 MS1 RSCP PLOT:................................................................................................................... 6
3.2.2 MS1 EC/NO PLOT:.................................................................................................................. 6
4.1
2G NETWORK EVENTS.........................................................................................................7
4.2
DT KPI SUMMARY.................................................................................................................. 8
5.0
2G ANALYSIS........................................................................................................................... 8
5.1 BAD PATCHES................................................................................................................................... 9
5.2 BLOCKED CALL.............................................................................................................................. 10
5.3 DROPPED CALLS........................................................................................................................... 11
6.0
3G ANALYSIS......................................................................................................................... 12
6.1
BAD PATCHES........................................................................................................................ 13
7.0
2G ACTION SUMMARY........................................................................................................17
8.0
3G ACTION SUMMARY........................................................................................................17
9.0
CONCLUSION......................................................................................................................... 18
1. Introduction
Page 2 of 13
West
Test Route:
The drive test route covers Osogbo and was driven 4 th July 2014, it covers 130.91KM and
the analysis follows immediately.
In this report, each MS performance is described according to different operators RF
measurements;
MS1 Airtel
MS2 - MTN
MS3 Globacom
MS4 Etisalat.
A grid of square length 1000m is used in this report.
3.1
West
Test Route:
West
Test Route:
3.2
West
Test Route:
4.1
Division:
West
Test Route:
2G Network Events
Event Name
Blocked Call
Call Attempt
Call End
Call Established
Call Setup
Cell Reselection
Dropped Call
Handover
Handover Failure
Location Area Update
Location Area Update
Failure
4.2
Airt
el
MT
N
GL
O
Etisal
at
0
85
81
85
85
25
4
301
9
33
1
57
50
56
56
54
6
189
5
32
6
61
50
55
55
233
0
8
2
17
1
61
60
60
60
71
0
199
3
11
DT KPI Summary
KPI (2G)
Airt
el
100
4.71
97.1
0
MTN
GLO
Etisal
at
98.2
5
10.7
1
96.9
2
90.1
6
98.36
0.00
80.0
0
0.00
98.51
Page 7 of 13
West
Test Route:
94.7
5
91.3
9
96.9
1
89.4
2
83.1
1
80.8
3
96.14
94.70
5.0 2G ANALYSIS
BAD PATCHES
West
Test Route:
Cell: OS0486A
Causes: Interference
Recommendations: Retune frequency Between OS0486 (ARFCN_BCCH112), OS0047A (ARFCN_
BCCH 113) and OS0002C (ARFCN_ BCCH112) with respect to neighbors
West
Test Route:
Cell: LG795A
Causes: Call dragging due to high handover margin
Recommendations: Optimize handover margin_Time between LG0795 and LG0097A
6.0 3G ANALYSIS
6.1 BAD PATCHES
Page 10 of 13
West
Test Route:
Page 11 of 13
West
Test Route:
SITE ID
Action
Owner
Time
Stat
Page 12 of 13
West
Test Route:
POINT
PC2
New site
required
OS0486A
OS0002C
LG795A
DC4
OS0003C
Line
us
Mahmou
d
TB
Ope
n
Mahmou
d
26/07/20
14
Ope
n
Mahmou
d
26/07/20
14
Ope
n
Mahmou
d
26/07/20
14
Ope
n
Opeyem
i
26/07/20
14
Ope
n
SITE ID
Action
Owner
Time
Line
Stat
us
New site
Mahmou
d
TBD
Ope
n
Swap sector
Opeyem
i
26/07/20
14
Ope
n
New site
Mahmou
d
TBD
Ope
n
New site
Mahmou
d
TBD
Ope
n
8.0 Conclusion
The 2G and 3G network coverage and quality within the town is good
The netowrk coverage and quality will be improved if the above
recommendations are implemented.
Page 13 of 13