Académique Documents
Professionnel Documents
Culture Documents
Career Objectives
I have worked with very reputed multinational contractors,
consultants and project managers in the UAE and Pakistan for
construction works. Land Surveying inclusive of site construction, and
procedures to establish survey control, Survey of boundaries, such as
heavy RCC works, pilling works, Oil and Gas Refineries, pipelines and
slip forms for high rise buildings, post tension work etc.
Coordinating with Construction Managers, supervision teams and
ensures that all necessary information is available prior to
commencement of works.
1. Personal details
Nationality: PAKISTANI
2. Education:
University/institution Type of study (full time, Date Date
(please include country) Degree/diploma name part time, placement year,
flexible study)
started completed
BOARD OF INTERMEDIATE
SECONDARY EDUCATION
INTERMEDIATE
ABBOTTABAD N.W.F.P (HSSC)
PAKISTAN
GOVERNAMENT
POLYTECNIC INSITUATE
DIPLOMA IN
HARIPUR HAZARA SURVEY
PAKISTAN
VITAL COMPUTER TRAINGING Office Automation
INSTITUTE &Auto cad
EXPERIENCE
UNITED ARAB EMIRATES
RESPONSIBILITIES:
Piling setting out and as built, Topographical survey site wide.
Core wall setting out and as built.
Markings of grids.
Layouts of the footings, walls, columns,
Checking of the civil works.
Prepare survey report.
Coordinate inspection and testing with the consultant.
RESPONSIBILITIES:
Civil works, underground piping
Structural steel pipe rack Equipment Foundations
Building and Earth works,
Under ground cable Duct bank work.
Tank Foundation Visal foundations & as built.
Paving slope underground concrete work
Supervision implementation of civil and survey work.
2003TO 2004
RESPONSIBILITIES:
Piling setting out and as built, Topographical survey site wide.
Column and raft setting out and as built.
Marking Grid Line and Leveling site wide.
Prepare material request.
Checking of the civil works.
Surveying (setting out beams slabs water features ……
EXPERIENCE
PAKISTAN
RESPONSIBILITIES:
Topographical survey site wide.
Setting out and Level Work at Spillway Intake and,
Equipment control building.
Marking Grid Line and Leveling.
Coordinate inspection and testing with the consultant.
INSTRUMENT USED: