Vous êtes sur la page 1sur 32

HIMACHAL PRADESH STATE ELECTRICITY BOARD LTD.

*A State Govt.Undertaking*
NO.HPSEB:GED/PF/B.L. Sharma /2013Dated:To
The Superintending Engineer,
Operation Circle,
HPSEB Ltd. Mandi.
Sub: Sir,

Tour Diary/Tour Programme .


Jai Hind.
Enclosed please find herewith the tour diary/tour programme

(in triplicate) in respect of Er.B.L.Sharma, Addl.Superintending Engineer


month of 1/2014 for necessary approval at your end please.
DA/As above.

Yours faithfully,

Sr.Executive Engineer,
Electrical Division,
HPSEB Ltd. Gohar.

for the

HIMACHAL PRADESH STATE ELECTRICITY BOARD


NO.HPSEB:GED/EA-II-1/2010Dated:To
The Superintending Engineer,
Operation Circle,
HPSEBL,Mandi.
Sub: Sir,

Earned leave application.


Jai Hind.
The earned leave application in respect of Er.T.S.Verma,Assistant

Engineer,Electrical Sub-Division,HPSEB Ltd.Pandoh is sent herewith in duplicate duly


recommended for necessary sanction at your end please.
DA/As above.
(Er.A.K.Khanotia)
Sr.Executive Engineer,
Electrical Division,
HPSEB: Gohar.

HIMACHAL PRADESH STATE ELECTRICITY BOARD LTD.


*A State Govt.Undertaking*
NO.HPSEB: GED/ PF/B.L.Sharma/2014Dated:To
The Superintending Engineer,
Operation Circle,
HPSEB, Ltd Mandi.
Sub: -

T.A Bills.

Sir,
Jai Hind
Enclosed please find herewith the T.A Bills for the month of 11/2013 &
along with Tour Programm/ Tour Diary in respect of under signed for taking further
necessary action at your end please.
DA/As above.

Yours faithfully,
(Er.B.L.Sharma)
Addl.Superintending Engineer,
Electrical Division,
HPSEB Ltd. Gohar.

HIMACHAL PRADESH STATE ELECTRICITY BOARD LTD.


*A State Govt.Undertaking*
NO.HPSEB: GED/ PF-BLS/Sr.Xen/2013Dated:To
The Superintending Engineer,
Operation Circle,
HPSEB, Ltd Gohar.
Sub: -

Medical Bill.
Enclosed please find herewith the Medicle Bill amounting to Rs. 2160/-

(Rs. Two Thousand One Hundred Sixty) in respect of undersigned for taking further
necessary action at your end please.

DA/As above.
Yours faithfully,
Sr.Executive Engineer,
Electrical Division,
HPSEB Ltd. Gohar.

TOUR PROGRAMM IN RESPECT OF ER.B.L.SHARMA, SR.EXECUTIVE


ENGINEER, ELECTRICAL DIVISION, HPSEBL, GOHAR FOR THE MONTH OF
3/2013
Date.
From.
To.
Mode of
Purpose of journey.
journey.
4.3.2013.
Gohar
Mandi,Bijni Local & HP 32 BTo attend Meeting in DC office and to
9001
arrange material from Bijni store.
9.00 A.M Back 5.30 P.M
5.3.2013

Gohar

9.00
A.M
7.3.2013

Gohar

6.00 A.M

9.3.2013

Gohar

8.00 A.M
12.3.2013

Gohar

11.30 A.M
15.3.2013

Gohar

8.00 A.M
16.3.2013

Gohar

9.00 A.M
18.3.2013

Gohar

8.00 A.M
21.3.2013

Gohar

11.00 A.M
28.3.2013

Gohar

9.00 A.M
29.3.2013

Gohar

1.00 P.M
31.3.2013

Gohar

7.30 A.M

Mandi Local & Back


via Pandoh Thalout
4.00 P.M
Shimla Local &
Back 7.30 P.M.

---do---

Dadour,S/Nagar
Local & Back
4.00 P.M
Janjehli Shilibagi
Local & Back 8.30
P.M
Pandoh Saroa, Local
& Back 3.00 P.M

---do---

Mandi Local & Back


5.30 P.M.

---do---

Meeting in circle office on KPIs.

Shiva Badar, Thalout


Balichowki Local &
Back 3.00 P.M.
Bagsaid Local &
Back 6.00 P.M.

---do---

Inspection of work at various sites

---do---

Inspection of work at various sites

Mandi Bijni Local &


Back via Pandoh
Saroa 3.30 P.M.

---do---

Pandoh Local & Back


8.30 P.M.

---do---

Meeting on RGGVY
Scheme/observation and arrangement
of material & inspection of work at
Saroa.
Inspection of work Kaligarh LWSS
stage II

Jawalapur Local &


Back via Nerchowk
9.00 P.M.

---do---

---do---

---do-----do---

Opening of Turn Key tenders in circle


office and inspection of work at
Pandoh Thalout.
In connection with submission of
scheme for 33 KV line Gohar-Pandoh
in RGGVY cell & to discuss the court
cases with Standing Council in High
Court Shimla
To attend the visit of Honble Chief
Minister.
Inspection of work under
Elect.Section Shilibagi & to see the
site for Deol S/Stn.
Inspection of work at Kaligarh Bara
LWSS stage-I.

Public meeting of Honble Minister of


Health & Revenue.

Er.B.L.Sharma)
Sr.Executive Engineer,
Electrical Division,
HPSEB Ltd. Gohar.

TOUR DIARY IN RESPECT OF ER.B.L.SHARMA, SR.EXECUTIVE ENGINEER,


ELECTRICAL DIVISION, HPSEBL, GOHAR FOR THE MONTH OF 3/2013
Date.
From.
To.
Mode of
Purpose of journey.
journey.
4.3.2013.
Gohar
Mandi,Bijni Local & HP 32 BTo attend Meeting in DC office and to
Back
9001
arrange material from Bijni store.
5.3.2013

Gohar

Mandi Local & Back


via Pandoh Thalout

---do---

Opening of Turn Key tenders in circle


office and inspection of work at
Pandoh Thalout.
In connection with submission of
scheme for 33 KV line Gohar-Pandoh
in RGGVY cell & to discuss the court
cases with Standing Council in High
Court Shimla
To attend the visit of Honble Chief
Minister.

7.3.2013

Gohar

Shimla Local &


Back.

---do---

9.3.2013

Gohar

Dadour,S/Nagar
Local & Back

---do---

12.3.2013

Gohar

Janjehli Shilibagi
Local & Back

---do---

15.3.2013

Gohar

Pandoh Saroa, Local


& Back

---do---

16.3.2013

Gohar

Mandi Local & Back

---do---

Meeting in circle office on KPIs.

18.3.2013

Gohar

---do---

Inspection of work at various sites

21.3.2013

Gohar

Shiva Badar, Thalout


Balichowki Local &
Back
Bagsaid Local &
Back

---do---

Inspection of work at various sites

28.3.2013

Gohar

Mandi Bijni Local &


Back via Pandoh
Saroa

---do---

29.3.2013

Gohar

Pandoh Local & Back

---do---

Meeting on RGGVY
Scheme/observation and arrangement
of material & inspection of work at
Saroa.
Inspection of work Kaligarh LWSS
stage II

31.3.2013

Gohar

Jawalapur Local &


Back via Nerchowk

---do---

Inspection of work under


Elect.Section Shilibagi & to see the
site for Deol S/Stn.
Inspection of work at Kaligarh Bara
LWSS stage-I.

Public meeting of Honble Minister of


Health & Revenue.

Er.B.L.Sharma)
Sr.Executive Engineer,
Electrical Division,
HPSEB Ltd. Gohar.

Date.
1.4.2013.

3.4.2013

6.4.2013

8.4.2013

TOUR PROGRAMM IN RESPECT OF ER.B.L.SHARMA, SR.EXECUTIVE


ENGINEER, ELECTRICAL DIVISION, HPSEBL, GOHAR FOR THE MONTH OF
4/2013
From.
To.
Mode of
Purpose of journey.
journey.
Gohar
Mandi, Local &
HP 32 BTo attend Meeting in DC office on 20
9001
Point programme.
9.00 A.M Back via Pandoh
4.00 P.M
Gohar
Janjehli Local &
---do--In connection with the providing street
Back 7.30 P.M
light at Janjehli and inspection of
11.00
S/Stn. at Thunag.
A.M
Gohar
Pandoh Local &
---do--Inspection of work at Pandoh & 33
Back
3.00
P.M.
KV S/Stn. Pandoh.
8.30 A.M
Gohar

8.00 A.M
17.4.2013

Gohar

1.00 P.M
18.4.2013

Gohar

9.00 A.M
21.4.2013

Gohar

9.00 A.M
24.4.2013

Gohar

9.00 A.M
26.4.2013

Gohar

9.00 A.M
29.4.2013

Gohar

9.00 A.M
30.4.2013

Gohar

8.00 A.M

Nerchowk Baggi
Local & Back
3.00 P.M
Saroa Local & Back
via Pandoh 9.00 P.M

---do---

Mandi & back via


Ghatta Baggi 3.30
P.M.
Kansa Chowk
Mandi& Back 6.30
P.M.
Mandi Local & Back
via Pandoh 5.00 P.M.

---do---

S/Nagar, Mandi
Pandoh Local & Back
7.00 P.M.
Mandi, Local
Bijni,Pandoh Back
Gohar via Mandi
6.00 P.M
Thachi Local & back
3.00 P.M

---do---

Office work in circle office &


inspection of work at Pandoh S/Stn.

---do---

To open RGGVY Franchisee tenders


in circle office & urgent office work at
Pandoh.

---do---

Inspection of work at Thachi & store.

---do---

---do-----do---

Inspection of work at Baggi


S/Division 33/22 KV S/Stn. Baggi &
repair of Veh.at Nerchowk.
Inspection of work at Caligarh Bara
& other SOP works at Pandoh at 33/11
KV S/Stn. Pandoh.
Meeting in Circle office and
inspection of work at Ghatta Section
& ESD Baggi.
Arrangements of DG Set for CMS
Meeting at Kansa Chowk &
arrangement of supply in the area.
Meeting on KPI.

Er.B.L.Sharma)
Sr.Executive Engineer,
Electrical Division,
HPSEB Ltd. Gohar.

TOUR DIARY IN RESPECT OF ER.B.L.SHARMA, SR.EXECUTIVE ENGINEER,


ELECTRICAL DIVISION, HPSEBL, GOHAR FOR THE MONTH OF 4/2013
Date.
From.
To.
Mode of
Purpose of journey.
journey.
1.4.2013.
Gohar
Mandi, Local &
HP 32 BTo attend Meeting in DC office on 20
Back via Pandoh
9001
Point programme.
3.4.2013

Gohar

Janjehli Local &


Back

---do---

6.4.2013

Gohar

Pandoh Local &


Back

---do---

8.4.2013

Gohar

Nerchowk Baggi
Local & Back

---do---

17.4.2013

Gohar

Saroa Local & Back


via Pandoh

---do---

18.4.2013

Gohar

Mandi & back via


Ghatta Baggi

---do---

21.4.2013

Gohar

Kansa Chowk
Mandi& Back

---do---

24.4.2013

Gohar

Mandi Local & Back


via Pandoh

---do---

26.4.2013

Gohar

S/Nagar, Mandi
Pandoh Local & Back

---do---

Office work in circle office &


inspection of work at Pandoh S/Stn.

29.4.2013

Gohar

---do---

30.4.2013

Gohar

Mandi, Local
Bijni,Pandoh Back
Gohar via Mandi
Thachi Local & back

To open RGGVY Franchisee tenders


in circle office & urgent office work at
Pandoh.
Inspection of work at Thachi & store.

---do---

In connection with the providing street


light at Janjehli and inspection of
S/Stn. at Thunag.
Inspection of work at Pandoh & 33
KV S/Stn. Pandoh.
Inspection of work at Baggi
S/Division 33/22 KV S/Stn. Baggi &
repair of Veh.at Nerchowk.
Inspection of work at Caligarh Bara
& other SOP works at Pandoh at 33/11
KV S/Stn. Pandoh.
Meeting in Circle office and
inspection of work at Ghatta Section
& ESD Baggi.
Arrangements of DG Set for CMS
Meeting at Kansa Chowk &
arrangement of supply in the area.
Meeting on KPI.

Er.B.L.Sharma)
Sr.Executive Engineer,
Electrical Division,
HPSEB Ltd. Gohar.

HIMACHAL PRADESH STATE ELECTRICITY BOARD LTD.


*A State Govt.Undertaking*
NO.HPSEB: GED/ PF/B.L.Sharma/2013Dated:To
The Superintending Engineer,
Operation Circle,
HPSEB, Ltd Mandi.
Sub: -

Sanction for JBJ.

Ref: -

Chief Engineer (Op), Central Zone, HPSEBL Mandi order


No.CEOCZ/ MM-107/2012-1838-42 dated 13.5.2013.

Sir,
Jai Hind
In continuation to this office letter No. HPSEB:GED/
PF/B.L.Sharma / 2013-2294 dated 20.6.2013 please arrange to convey the approval
of competent authority for the Journey Beyond Jurisdiction performed by me in the
interest of Boards work as per the orders under reference:Date

From

2.6.2013

Gohar
7.00 A.M

3.6.2013

Delhi
7.00 A.M

To
Delhi & Halt
9.00 P.M

Mode of Journey Purpose of Journey


By bus

For inspection of material in


the premises of M/S APE
Power Ltd. Calcutta

Calcutta
11.30 AM
& Halt upto
6.6.2013

By Air.
(to be claimed by
entitled class
the train)
By Air
(to be clamed by
entilled class of the
train)

6.6.2013

Calcutta
4.30 P.M

Delhi & Halt


8.30 P.M
Halt upto
8.6.2013

8.6.2013

Delhi
9.00 P.M

Gohar on
9.6.2013
9.30 A.M

By Bus

---do-Back to H/Otr.

---do--Er.B.L.Sharma)
Sr.Executive Engineer,
Electrical Division,
HPSEB Ltd. Gohar.

TOUR PROGRAMM IN RESPECT OF ER.B.L.SHARMA, SR.EXECUTIVE


ENGINEER, ELECTRICAL DIVISION, HPSEBL, GOHAR FOR THE MONTH OF
5/2013
Date.
From.
To.
Mode of
Purpose of journey.
journey.
1.5.2013.
Gohar
Mandi, Local &
HP 32 BMeeting in circle office on RGGVY
9001
franchisee & other work.
11.00 A.M Back 7.00 P.M
6.5.2013

Gohar

9.00
A.M
4.5.2013

Gohar

11.00 A.M
13.5.2013

Gohar

9.00 A.M
16.5.2013

Gohar

8.30 A.M
22.5.2013

Gohar

5.00 A.M
24.4.2013

Gohar

11.00 A.M
27.5.2013

Gohar

9.00 A.M
29.4.2013

Gohar

11.00 A.M
30.5.2013

Gohar

5.00 A.M

Mandi, Local &


back via Ghatta
Rajgarh 5.30 P.M
Mandi, Bijni &
Back via Pandoh
6.30 P.M.

---do---

Janjehli Local &


Back
4.00 P.M
Janjehli Local &
Back
3.30 P.M
Shimla Local & back
8.30 P.M.

---do---

---do---

Meeting in RGGVY cell on closing of


Scheme Plan XII.

Pandoh Local & Back


via Pandoh 7.00 P.M.

---do---

Inspection of work at Pandoh S/Stn.


Local & back.

Mandi Bijni Pandoh


Local & Back 6.00
P.M.
Mandi, Bijni, Local
& back 7.00 P.M

---do---

Meeting on KPI in the office of


Superintending Engineer (Op) Mandi.

---do---

Meeting in circle office on closing of


RGGVY Scheme.

Shimla Local & back


9.00 P.M

---do---

Meeting on closing of RGGVY


Scheme in RGGVY Cell

---do---

---do---

Meeting in circle office regarding


revenue Capex Plan and inspection of
work at Baggi Sub-Division.
To attend circle office in connection
with RGGVY Scheme and
arrangement of material and
inspection of work at Pandoh
Inspection of work at Janjehli Building
of Sub Division and office work in
Elect.Section Thunag Bagsaid.
Inspection of work S/L work and 33
KV S/Stn. at Thunag.

Er.B.L.Sharma)
Sr.Executive Engineer,
Electrical Division,
HPSEB Ltd. Gohar.

ELECTION DUTY

Date.
31.5.2013

TOUR PROGRAMM IN RESPECT OF ER.B.L.SHARMA, SR.EXECUTIVE


ENGINEER, ELECTRICAL DIVISION, HPSEBL, GOHAR FOR THE MONTH
OF 5/2013
From.
To.
Mode of
Purpose of journey.
journey.
Gohar
Balichowki Local &
HP 32 BVideo Survillance Public meeting at
9001
Balichowki.
12.15 P.M Back 9.30 P.M

ELECTION DUTY

Date.
31.5.2013

TOUR PROGRAMM IN RESPECT OF ER.B.L.SHARMA, SR.EXECUTIVE


ENGINEER, ELECTRICAL DIVISION, HPSEBL, GOHAR FOR THE MONTH
OF 6/2013
From.
To.
Mode of
Purpose of journey.
journey.
Gohar
Balichowki Local &
HP 32 BVideo Survillance Public meeting at
Back
9.30
P.M
9001
Balichowki.
12.15 P.M

TOUR DIARY IN RESPECT OF ER.B.L.SHARMA, SR.EXECUTIVE ENGINEER,


ELECTRICAL DIVISION, HPSEBL, GOHAR FOR THE MONTH OF 5/2013
Date.
From.
To.
Mode of
Purpose of journey.
journey.
1.5.2013.
Gohar
Mandi, Local &
HP 32 BMeeting in circle office on RGGVY
Back
9001
franchisee & other work.
6.5.2013

Gohar

Mandi, Local &


back via Ghatta
Rajgarh
Mandi, Bijni &
Back via Pandoh

---do---

4.5.2013

Gohar

13.5.2013

Gohar

Janjehli Local &


Back

---do---

16.5.2013

Gohar

Janjehli Local &


Back

---do---

22.5.2013

Gohar

Shimla Local & back

---do---

Meeting in RGGVY cell on closing of


Scheme Plan XII.

24.4.2013

Gohar

Pandoh Local & Back


via Pandoh

---do---

Inspection of work at Pandoh S/Stn.


Local & back.

27.5.2013

Gohar

Mandi Bijni Pandoh


Local & Back

---do---

Meeting on KPI in the office of


Superintending Engineer (Op) Mandi.

29.4.2013

Gohar

Mandi, Bijni, Local


& back

---do---

Meeting in circle office on closing of


RGGVY Scheme.

30.5.2013

Gohar

Shimla Local & back

---do---

Meeting on closing of RGGVY


Scheme in RGGVY Cell

---do---

Meeting in circle office regarding


revenue Capex Plan and inspection of
work at Baggi Sub-Division.
To attend circle office in connection
with RGGVY Scheme and
arrangement of material and
inspection of work at Pandoh
Inspection of work at Janjehli Building
of Sub Division and office work in
Elect.Section Thunag Bagsaid.
Inspection of work S/L work and 33
KV S/Stn. at Thunag.

Er.B.L.Sharma)
Sr.Executive Engineer,
Electrical Division,
HPSEB Ltd. Gohar.

HIMACHAL PRADESH STATE ELECTRICITY BOARD LTD.


*A State Govt.Undertaking*
NO.HPSEB: GED/ PF/B.L.Sharma/2013Dated:-

To
The Superintending Engineer,
Operation Circle,
HPSEB, Ltd Mandi.
Sub: -

Sanction for Journey Beyond Jurisdiction.

Ref: -

Your office letter No.HPSEBL/OCM/MM-107/2013-4122-27 dated


4.7.2013.

Sir,
Jai Hind
In compliance to above referred letter I have performed the following
journeys in the intrest of Boards work for which necessary sanction may be obtained
and conveyed to this office please:Date

From

To

Mode
Journey

of Purpose of Journey

15.7.2013

Gohar
9.00 Chandigarh
By Bus.
A.M
Delhi/Gurgaun 11.30 By Shatabdi Train/
Chandigarh
P.M
by Bus

To carryout the inspection


of material in the factory
complex of M/S Dynamic
16.7.2013 Gurgaun 6.00 Jaipur & Halt upto By
Shatabdi cables Pvt. Ltd Jaipur for
cables against APDRPA.M
17.7.13
Train
18.7.2013 Jaipur
5.50 Gurgaun/Delhi
By Shatabdi bus Project at Kullu.

P.M
19.7.2013 Delhi
P.M

10.30 P.M
8.00 Gohar 10.30 A.M By Bus.
on 20.7.2013

Thanking You,

Yours faithfully,
.
Er.B.L.Sharma)
Sr.Executive Engineer,
Electrical Division,
HPSEB Ltd. Gohar.

TOUR PROGRAMM IN RESPECT OF ER.B.L.SHARMA, SR.EXECUTIVE


ENGINEER, ELECTRICAL DIVISION, HPSEBL, GOHAR FOR THE MONTH OF
6/2013
Date.
From.
To.
Mode of
Purpose of journey.
journey.
3.6.2013.
Gohar
Bijni, Local & Back
HP 32 BTo arrange material from T & C and
inspection of work at 33/11 KV S/Stn.
11.30 A.M via Pandoh 7.00 P.M 9001
Pandoh.
13.6.2013
Gohar
Shimla Local &
---do--Personal hearing to Padam Singh in
Back 11.30 P.M
the Office of Dir.(Per.) in compliance
10.30
to order of Honble High Court.
A.M
22.6.2013
Gohar
Sundernagar Local & ---do--To arrange transformer Cond. from
back
via
Mandi
&
Sundernagar & Meeting in SE (Op)
8.00 A.M
Pandoh 3.30 P.M.
Circle RGGVY Closing data &
Inspection of work at Pandoh S/Stn.
25.6.2013
Gohar
Baggi, Ghatta Pandoh ---do--Inspection of damaged transformer at
Ghatta and to check problem at 6
11.00 A.M Local & Back
7.00 P.M
pole structure at Pandoh.
28.6.2013
Gohar
Pandoh, Thalout
---do--Inspection of work S/Stn. Pandoh,
Thalout and Electrification works at
11.00 A.M Jawalapur, Local &
Back via Mandi
Jawalapur.
8.30 P.M
30.6.2013
Gohar
Thalout Local &
---do--Inspection of work at Thalout and
back
6.00
P.M.
Pandoh for problem at 4 pole
9.00 A.M
Structure.

Er.B.L.Sharma)
Sr.Executive Engineer,
Electrical Division,
HPSEB Ltd. Gohar.

TOUR PROGRAMM IN RESPECT OF ER.B.L.SHARMA, SR.EXECUTIVE


ENGINEER, ELECTRICAL DIVISION, HPSEBL, GOHAR FOR THE MONTH OF
7/2013
Date.
From.
To.
Mode of
Purpose of journey.
journey.
2.7.2013
Gohar
Killing Local &
HP 32 BInspection of RGGVY work at Killing
9001
and Silhan Panchayat of Chachiot
9.00 A.M Back via Rajwari
Baggi 4.00 P.M
Block.
7.7.2013
Gohar
Baggi Ghatta Rajgarh ---do--Meeting with Honble Minister for E
Chunahan
&T and Inspection of work at Ghatta,
9.00
Sundernagar
Local
&
Chunahan and Sub Division.
A.M
Back 7.00 P.M
8.7.2013
Gohar
Mandi Local & back ---do--Approval of GTP for S/Stn.
equipment and inspection of work at
11.00 A.M via Pandoh 6.00 P.M
Pandoh S/Stn.
13.7.2013
Gohar
Jawalapur Local &
---do--Inspection of work R/R of Rottan
poles, L.T extension works & R/M
11.00 A.M Back via Mandi
7.00 P.M
works.
24.7.2013
Gohar
Pandoh, Mandi &
---do--To settle the dispute of wrong billing
under ESD-Pandoh.
11.00 A.M back via S/Nagar
8.00 P.M
25.7.2013
Gohar
Sundernagar Baggi,
---do--To settle the issue of transformer of
Ghatta Local & back
consumers from ED-Sundernagar to
1.00 P.M
8.30 P.M.
ED-Gohar.
30.7.2013
Gohar
Thachi Local &
---do--Inspection of work at Thachi, SOP to
LWSS works at Thachi and other R/R
11.00 A.M back 8.30 P.M.
works.

Er.B.L.Sharma)
Sr.Executive Engineer,
Electrical Division,
HPSEB Ltd. Gohar.

TOUR DIARY IN RESPECT OF ER.B.L.SHARMA, SR.EXECUTIVE ENGINEER,


ELECTRICAL DIVISION, HPSEBL, GOHAR FOR THE MONTH OF 7/2013
Date.
From.
To.
Mode of
Purpose of journey.
journey.
2.7.2013
Gohar
Killing Local &
HP 32 BInspection of RGGVY work at Killing
Back via Rajwari
9001
and Silhan Panchayat of Chachiot
Baggi
Block.
7.7.2013
Gohar
Baggi Ghatta Rajgarh ---do--Meeting with Honble Minister for E
Chunahan
&T and Inspection of work at Ghatta,
Sundernagar Local &
Chunahan and Sub Division.
Back
8.7.2013
Gohar
Mandi Local & back ---do--Approval of GTP for S/Stn.
via Pandoh
equipment and inspection of work at
Pandoh S/Stn.
13.7.2013
Gohar
Jawalapur Local &
---do--Inspection of work R/R of Rottan
Back via Mandi
poles, L.T extension works & R/M
works.
24.7.2013
Gohar
Pandoh, Mandi &
---do--To settle the dispute of wrong billing
back via S/Nagar
under ESD-Pandoh.
25.7.2013

Gohar

Sundernagar Baggi,
Ghatta Local & back

---do---

30.7.2013

Gohar

Thachi Local &


back

---do---

To settle the issue of transformer of


consumers from ED-Sundernagar to
ED-Gohar.
Inspection of work at Thachi, SOP to
LWSS works at Thachi and other R/R
works.

Er.B.L.Sharma)
Sr.Executive Engineer,
Electrical Division,
HPSEB Ltd. Gohar.

ELECTION DUTY

Date.
11.6.2013

17.6.2013

19.6.2013

TOUR PROGRAMM IN RESPECT OF ER.B.L.SHARMA, SR.EXECUTIVE


ENGINEER, ELECTRICAL DIVISION, HPSEBL, GOHAR FOR THE MONTH
OF 6/2013.
From.
To.
Mode of
Purpose of journey.
journey.
Gohar
Devdhar, Janjehli,
HP 32 BVideo Survillance for Expanditure
monitoring.
8.00 A.M Dheaus Kalaru Local 9001
& Back 9.30 P.M
Gohar
Thunag Local &
---do-------do-----9.00 A.M Back 5.30 P.M
Gohar
11.00 A.M

Chhattari Local &


back 9.00 P.M.

---do----

------do------

Er.B.L.Sharma)
Sr.Executive Engineer,
Electrical Division,
HPSEB Ltd. Gohar.

ELECTION DUTY

Date.
11.6.2013

17.6.2013

19.6.2013

TOUR DIARY IN RESPECT OF ER.B.L.SHARMA, SR.EXECUTIVE


ENGINEER, ELECTRICAL DIVISION, HPSEBL, GOHAR FOR THE MONTH
OF 6/2013.
From.
To.
Mode of
Purpose of journey.
journey.
Gohar
Devdhar, Janjehli,
HP 32 BVideo Survillance for Expanditure
Dheaus Kalaru Local 9001
monitoring.
& Back
Gohar
Thunag Local &
---do-------do-----Back
Gohar

Chhattari Local &


back

---do----

------do------

Er.B.L.Sharma)
Sr.Executive Engineer,
Electrical Division,
HPSEB Ltd. Gohar.

Date.
1.8.2013

3.8.2013

6.8.2013

8.8.2013

12.8.2013

TOUR PROGRAMM IN RESPECT OF ER.B.L.SHARMA, SR.EXECUTIVE


ENGINEER, ELECTRICAL DIVISION, HPSEBL, GOHAR FOR THE MONTH OF
8/2013
From.
To.
Mode of
Purpose of journey.
journey.
Gohar
Sundernagar Baggi
HP 32 BInspection of work at Ghatta & Baggi
Local Ghatta & back
9001
section arrangement of material from
1.00 P.M
8.30 P.M
Sundernagar.
Gohar
Janjehli Shillibagi
---Do--- Inspection of work at Janjehli (Civil
works) and other works at Shillibagi
11.00 A.M Local & back 9.00
P.M
Gohar
Mandi Local & back
---Do--In connection with RGGVY closure
via
Pandoh
7.00
P.M
proposal and Inspection of work at
11.00 A.M
Pandoh S/Stn.
Gohar
Thalout Local &
---Do--Inspection of work at Thalout,
Gurahan & S/Stn. Pandoh.
11.00 A.M Back 8.30 P.M
Gohar

11.00 A.M
16.8.2013

Gohar

11.00 A.M
17.8.2013

Gohar

11.00 A.M
26.8.2013

Gohar

10.30 A.M
27.8.2013
30.8.2013

Gohar
11.00 A.M
Gohar
11.00 A.M

Mandi Local & back


8.00 P.M

---Do---

Approval of CTP for equipment to be


installed at Thalout.

Mandi local & back


via Pandoh 7.00 P.M

---Do---

Mandi Local & back


via Sundernagar 6.30
P.M
Mandi & Back via
Sundernagar 8.00
P.M
Thalout Panjain local
& back 7.00 P.M

---Do---

Meeting with Superintending Engineer


/Accounts Officer regarding approval
of GTP for Thalout S/Stn.
Meeting with Superintending Engineer
/Accounts Officer regarding approval
of GTP for Thalout S/Stn.
Meeting in circle office on closing of
RGGVY Scheme.

---Do---

Inspection of damaged Trasfarmer as


Panjain &33/11KV S/Stn Thalout.

Janjehli local & back


8.00 P.M

---Do---

Inspection of S/L work at Janjehli &


S/Stn. Thunag.

---Do---

Er.B.L.Sharma)
Sr.Executive Engineer,
Electrical Division,
HPSEB Ltd. Gohar.

HIMACHAL PRADESH STATE ELECTRICITY BOARD LTD.


*A State Govt.Undertaking*
NO.HPSEB: GED/ PF/B.L.Sharma/2013Dated:To
The Superintending Engineer,
Operation Circle,
HPSEB, Ltd Mandi.
Sub: 9/2013. .

Journey Beyond Jurisdiction-sanction thereof for the month of

Ref: -

Chief Engineer office letter No.HPSEBL/CEOCZ/MM-107/2013-146677-80 dated 6.9.2013.

Sir,
Jai Hind
Please arrange to accord the sanction for following Journey Beyond
Jurisdiction performed by me in the interest of Boards work.
Date

From

To

7.10.2013

Gohar

Delhi/ & Halt

8.10.2013

Delhi

Badodra & Halt

9.10.2013
10.10.2013

Badodra
Delhi

Delhi & Halt


Gohar

Mode
Journey
By bus

of Purpose of Journey

By air (to be
claimed by
Train)
----do---By train/by bus

Stage inspection of 2
Nos 6.30MVA 33/11 KV
Power Transformer at
Diamond Transformers
at Badodra.
Back to H/Qtr.
-----do-------do----

The inspection has been completed and report submitted to your office
and other concerned please.
Er.B.L.Sharma)
Addl. Superintending Engineer,
Electrical Division,
HPSEB Ltd. Gohar.

HIMACHAL PRADESH STATE ELECTRICITY BOARD LTD.


*A State Govt.Undertaking*
NO.HPSEB: GED/ PF/B.L.Sharma/2013Dated:To
The Superintending Engineer,
Operation Circle,
HPSEB, Ltd Mandi.
Sub: -

Journey Beyond Jurisdiction-sanction thereof for the month of


10/2013. .

Ref: -

Chief Engineer office letter No.HPSEBL/CEOCZ/MM-107/2013-147241-44 dated 18.9.2013.

Sir,
Jai Hind
Please arrange to accord the sanction for following Journey Beyond
Jurisdiction performed by me in the interest of Boards work.
Date

From

To

7.10.2013

Gohar

Delhi/ & Halt

8.10.2013

Delhi

Badodra & Halt

9.10.2013
10.10.2013

Badodra
Delhi

Delhi & Halt


Gohar

Mode
Journey
By bus

of Purpose of Journey

By air (to be
claimed
by
Train)
----do---By train/by bus

Stage inspection of 2
Nos 6.30MVA 33/11 KV
Power Transformer at
Diamond Transformers
at Badodra.
Back to H/Qtr.
-----do-------do----

The inspection has been completed and report submitted to your office
and other concerned please.
Er.B.L.Sharma)
Addl. Superintending Engineer,
Electrical Division,
HPSEB Ltd. Gohar.

Date.
2.9.2013

3.9.2013

5.9.2013

6.9.2013

TOUR PROGRAMM IN RESPECT OF ER.B.L.SHARMA, SR.EXECUTIVE


ENGINEER, ELECTRICAL DIVISION, HPSEBL, GOHAR FOR THE MONTH OF
9/2013
From.
To.
Mode of
Purpose of journey.
journey.
Gohar
Thalout Local &
HP 32 BInspection of Residential/nonresidential
back via Mandi Baggi 9001
Quarters, S/Stn. and to meet RE Larji at
1.00 P.M
8.30 P.M
Thalout for Residental accommodation.
Gohar
Mandi, Bijni Local &
---Do--- Approval of GTP for Pandoh S/Stn. and
arrangement of material.
11.00 A.M Back via Sundernagar
and Nerchowk 9.00
P.M
Gohar
Thalout Local &
---Do--To check metering arrangement at
Thalout and arrangement of quarters for
11.00 A.M Back via Mandi 7.30
P.M
staff at Thalout.
Gohar
Mandi Local & Back ---Do--Approval of GTP for Pandoh and
Thalout, Meeting in DC office.
9.00 A.M 6.00 P.M

11.9.2013

Gohar

11.00 A.M
12.9.2013

Gohar

9.00 A.M
24.9.2013

Gohar

10.30 A.M
26.9.2013

Gohar

11.00 A.M
27.9.2013

Gohar

10.00 A.M
28.9.2013

Gohar

9.00 A.M
30.9.2013.

Gohar

2.00 P.M

Janjehli Local & back


8.30 P.M

---Do---

Inspection at 33/22 KV S/Stn. and office


Building at Janjehli.

Mandi local & back


6.30 P.M

---Do---

Meeting on RGGVY Closing Data.

Saroa Local & back


via Mandi 7.30 P.M

---Do---

To attend the visit of Smt. Pratibha Singh


Ji Hnble Member Parliament.

Thalout Local &


Back via Nerchowk
7.00 P.M
Mandi & Back 6.00
P.M

---Do---

To resolve the issue of accommodation


with RE Larji and Inspection of work at
Thalout.
To attend Zila Parishad Meeting

Mandi Pandoh Local


& Back 5.00 P.M

---Do---

To attend KPI Meetings in Circle office


Mandi.

Mandi Local & Back


9.30 P.M

---Do---

To Submit the closing data of RGGVY


Scheme.

---Do---

Er.B.L.Sharma)
Addl. Superintending Engineer,
Electrical Division,
HPSEB Ltd. Gohar.

Date.
2.9.2013

3.9.2013

5.9.2013

6.9.2013

TOUR DIARY IN RESPECT OF ER.B.L.SHARMA, SR.EXECUTIVE ENGINEER,


ELECTRICAL DIVISION, HPSEBL, GOHAR FOR THE MONTH OF 9/2013
From.
To.
Mode of
Purpose of journey.
journey.
Gohar
Thalout Local &
HP 32 BInspection of Residential/nonresidential
back via Mandi Baggi 9001
Quarters, S/Stn. and to meet RE Larji at
Thalout for Residental accommodation.
Gohar
Mandi, Bijni Local &
---Do--- Approval of GTP for Pandoh S/Stn. and
Back via Sundernagar
arrangement of material.
and Nerchowk
Gohar
Thalout Local &
---Do--To check metering arrangement at
Back via Mandi
Thalout and arrangement of quarters for
staff at Thalout.
Gohar
Mandi Local & Back ---Do--Approval of GTP for Pandoh and
6.00 P.M
Thalout, Meeting in DC office.

11.9.2013

Gohar

Janjehli Local & back

---Do---

Inspection at 33/22 KV S/Stn. and office


Building at Janjehli.

12.9.2013

Gohar

Mandi local & back

---Do---

Meeting on RGGVY Closing Data.

24.9.2013

Gohar

Saroa Local & back


via Mandi

---Do---

To attend the visit of Smt. Pratibha Singh


Ji Hnble Member Parliament.

26.9.2013

Gohar

Thalout Local &


Back via Nerchowk

---Do---

27.9.2013

Gohar

Mandi & Back

---Do---

To resolve the issue of accommodation


with RE Larji and Inspection of work at
Thalout.
To attend Zila Parishad Meeting

28.9.2013

Gohar

Mandi Pandoh Local


& Back

---Do---

To attend KPI Meetings in Circle office


Mandi.

30.9.2013.

Gohar

Mandi Local & Back

---Do---

To Submit the closing data of RGGVY


Scheme.

(Er.B.L.Sharma)
Addl. Superintending Engineer,
Electrical Division,
HPSEB Ltd. Gohar.

TOUR PROGRAMM IN RESPECT OF ER.B.L.SHARMA, SR.EXECUTIVE


ENGINEER, ELECTRICAL DIVISION, HPSEBL, GOHAR FOR THE MONTH OF
10/2013
Date.
From.
To.
Mode of
Purpose of journey.
journey.
3.10.2013
Gohar
Janjehli Local & back HP 32 BTo attend Public Meeting of Member
9001
Parliament Smt.Pratibha Singh Ji &
9.00 A.M 7.30 P.M
Inspection of work at Janjehli.
5.10.2013
Gohar
Thachi Local & back
---Do--- Inspection of I&PH works and other R/R
works.
11.30 A.M 9.30 P.M
14.10.2013

Gohar

9.00 A.M
15.10.2013

Gohar

8.00 A.M
21.10.2013

Gohar

9.00 A.M
22.10.2013

Gohar

9.00 A.M
23.10.2013

Gohar

9.00 A.M
25.10.2013

Gohar

8.00 A.M
28.10.2013

Gohar

9.00 A.M

Mandi Local & Back


via S/Nagar 6.00 P.M

---Do---

Shalla,Moviseri,
Baggi Local & back
5.30 P.M
Rajwari Sethal Local
S/Nagar & back 3.30
P.M
Ghatta,Nerchowk
Local & back via
S/Nagar 3.30 P.M
S/Nagar Mandi Local
& back 6.00 P.M

---Do---

Bagsaid Thunag
Local & back 3.00
P.M
Mandi Bijni Pandoh
Local & back 7.30
P.M

To attend meeting in Circle office on


RGGVY Closing and formulation of
RGGVY Scheme XII Plan.
To attend visit of Honble Chief Minister.

---Do---

Inspection of work L.T extension work &


proposal for Sethal S/Stn.

---Do---

Inspection of work at Ghatta & repair of


vehicle at Nerchowk.

---Do---

For compilation of RGGVY Closure data.

---Do---

Inspection of work and S/Stn.

---Do---

Meeting in circle office on closure of


RGGVY Scheme and Inspection of work
at Pandoh.

Er.B.L.Sharma)
Addl. Superintending Engineer,
Electrical Division,
HPSEB Ltd. Gohar.

TOUR DIARY IN RESPECT OF ER.B.L.SHARMA, SR.EXECUTIVE ENGINEER,


ELECTRICAL DIVISION, HPSEBL, GOHAR FOR THE MONTH OF 10/2013
Date.
From.
To.
Mode of
Purpose of journey.
journey.
3.10.2013
Gohar
Janjehli Local & back HP 32 BTo attend Public Meeting of Member
9001
Parliament Smt.Pratibha Singh Ji &
Inspection of work at Janjehli.
5.10.2013
Gohar
Thachi Local & back
---Do--- Inspection of I&PH works and other R/R
works.
14.10.2013

Gohar

Mandi Local & Back


via S/Nagar

---Do---

To attend meeting in Circle office on


RGGVY Closing and formulation of
RGGVY Scheme XII Plan.
To attend visit of Honble Chief Minister.

15.10.2013

Gohar

Shalla,Moviseri,
Baggi Local & back

---Do---

21.10.2013

Gohar

Rajwari Sethal Local


S/Nagar & back

---Do---

Inspection of work L.T extension work &


proposal for Sethal S/Stn.

22.10.2013

Gohar

---Do---

Inspection of work at Ghatta & repair of


vehicle at Nerchowk.

23.10.2013

Gohar

Ghatta,Nerchowk
Local & back via
S/Nagar
S/Nagar Mandi Local
& back

---Do---

For compilation of RGGVY Closure data.

25.10.2013

Gohar

Bagsaid Thunag
Local & back

---Do---

Inspection of work and S/Stn.

28.10.2013

Gohar

Mandi Bijni Pandoh


Local & back

---Do---

Meeting in circle office on closure of


RGGVY Scheme and Inspection of work
at Pandoh.

Er.B.L.Sharma)
Addl. Superintending Engineer,
Electrical Division,
HPSEB Ltd. Gohar.

HIMACHAL PRADESH STATE ELECTRICITY BOARD LTD.


*A State Govt.Undertaking*
NO.HPSEB: GED/ PF/B.L.Sharma/2013Dated:To
The Superintending Engineer,
Operation Circle,
HPSEB, Ltd Mandi.
Sub: -

Sanction of JBJ .

Ref: -

Chief Engineer office letter No.HPSEBL/CEOCZ/MM-107/2013-148720-21 dated 26.10.2013.

Sir,

Please refer to above, further endorsement of your office vide


No.HPSEBL/OCM/Estt-JBJ/2013-9565 dated 16.11.2013, in this regard, it is
intimated that a halt at Gurgaun/Delhi was made to explore the
repair/procurement of Master Trip relays for 33 KV Sub-Station Baggi and
Thalout. In addition, the accounts of Payments and further liabilities were
compiled with RGGVY contractor at their head office in Delhi.
This is for your kind information and necessary action please.
(Er.B.L.Sharma)
Addl. Superintending Engineer,
Electrical Division,
HPSEB Ltd. Gohar.
Copy to the Chief Engineer,(Op) Central Zone, HPSEBL Mandi with ref. to above
please.
(Er.B.L.Sharma)
Addl. Superintending Engineer,
Electrical Division,
HPSEB Ltd. Gohar.

TOUR PROGRAMM IN RESPECT OF ER.B.L.SHARMA, SR.EXECUTIVE


ENGINEER, ELECTRICAL DIVISION, HPSEBL, GOHAR FOR THE MONTH OF
11/2013
Date.
From.
To.
Mode of
Purpose of journey.
journey.
2.11.2013
Gohar
Thachi Local & back HP 32 BInspection of work at Thachi and
9001
Surrounding area.
11.00 A.M via Mandi 8.30 P.M
6.11.2013

Gohar
11.00 A.M

11.11.2013

Gohar

10.00 A.M
12.11.2013

Gohar

Jawalapur Thalout
Local & back via
Mandi 7.30 P.M
Mandi bijni Local &
back via Pandoh 8.00
P.M
Shimla local & halt

---Do---

---Do---

---Do---

1.30 P.M
13.11.2013

Shimla
5.30 P.M

Gohar local 11.00


P.M P.M

---Do---

15.11.2013

Gohar

Sundernagar Mandi
Pandoh & back 7.30
P.M
Thalout Local and
back via Ner chowk
6.00 P.M
Mandi,Bijni Local
S/Nagar Locdal &
back 7.30 P.M
M& T Division
Sundernagar Bijni
Local & back via
Pandoh 8.00 P.M
Rajwari S/Nagar
Local and back 4.00
P.M
Mandi Bijni Pandoh
Thalout Local and
Back 7.00 P.M
Mandi,Local & back
8.30 P.M

---Do---

11.00 A.M
16.11.2013

Gohar

11.30 A.M
19.11.2013

Gohar

11.00 A.M
22.11.2013

Gohar

11.00 A.M
26.11.2013

Gohar

9.00 A.M
28.11.2013

Gohar

9.00 A.M
30.11.2013

Gohar

1.00 P.M

Inspection of work SOP to LWSS, 33 KV


S/Stn.at Thalout and Elect.Section
Pandoh.
Meeting in circle office on RGGVY
closure and preparation/Submission of
scheme 12th Plan.
In connection with courts
cases/Suvbmission of documents,meeting
with S/Counsel.
Attended RGGVY in connection with
closure data of RGGVY Scheme and
legal cell regarding court cases & back to
H/Qtr.
Inspection of work on 33KV line R/R of
poles and 33 kv S/Stn. at Pandoh.

---Do---

Inspection of work at Thalout &


S/Division Pandoh.

---Do---

For making arrangement of MRI,


software, leads etc.

---Do---

Arrangements of MRI ,repaired


transformers and other material.

----Do--

Visit of Honble Revenue Minister &


arrangements of transformers.

---Do--

KPI Meeting , inspection of work at


Thalout & Pandoh.

--do---

Meeting in circle office in connection


with closure of RGGVY Scheme.

Er.B.L.Sharma)
Addl. Superintending Engineer,
Electrical Division,
HPSEB Ltd. Gohar.

TOUR DIARY IN RESPECT OF ER.B.L.SHARMA, SR.EXECUTIVE ENGINEER,


ELECTRICAL DIVISION, HPSEBL, GOHAR FOR THE MONTH OF 11/2013
Date.
From.
To.
Mode of
Purpose of journey.
journey.
2.11.2013
Gohar
Thachi Local & back HP 32 BInspection of work at Thachi and
via Mandi
9001
Surrounding area.
6.11.2013

Gohar

Jawalapur Thalout
Local & back via
Mandi
Mandi bijni Local &
back via Pandoh

---Do---

11.11.2013

Gohar

12.11.2013

Gohar

Shimla local & halt

---Do---

13.11.2013

Shimla

Gohar local

---Do---

15.11.2013

Gohar

Sundernagar Mandi
Pandoh & back

---Do---

16.11.2013

Gohar

Thalout Local and


back via Ner chowk

---Do---

Inspection of work at Thalout &


S/Division Pandoh.

19.11.2013

Gohar

---Do---

For making arrangement of MRI,


software, leads etc.

22.11.2013

Gohar

---Do---

Arrangements of MRI ,repaired


transformers and other material.

26.11.2013

Gohar

Mandi,Bijni Local
S/Nagar Locdal &
back
M& T Division
Sundernagar Bijni
Local & back via
Pandoh
Rajwari S/Nagar
Local and back

----Do--

Visit of Honble Revenue Minister &


arrangements of transformers.

28.11.2013

Gohar

---Do--

KPI Meeting , inspection of work at


Thalout & Pandoh.

30.11.2013

Gohar

Mandi Bijni Pandoh


Thalout Local and
Back
Mandi, Local & back

--do---

Meeting in circle office in connection


with closure of RGGVY Scheme.

---Do---

Inspection of work SOP to LWSS, 33 KV


S/Stn.at Thalout and Elect.Section
Pandoh.
Meeting in circle office on RGGVY
closure and preparation/Submission of
scheme 12th Plan.
In connection with courts
cases/Suvbmission of documents,meeting
with S/Counsel.
Attended RGGVY in connection with
closure data of RGGVY Scheme and
legal cell regarding court cases & back to
H/Qtr.
Inspection of work on 33KV line R/R of
poles and 33 kv S/Stn. at Pandoh.

Er.B.L.Sharma)
Addl. Superintending Engineer,
Electrical Division,
HPSEB Ltd. Gohar.

TOUR PROGRAMM IN RESPECT OF ER.B.L.SHARMA, SR.EXECUTIVE


ENGINEER, ELECTRICAL DIVISION, HPSEBL, GOHAR FOR THE MONTH OF
12/2013
Date.
From.
To.
Mode of
Purpose of journey.
journey.
6.12.2013
Gohar
Mandi Local & back
HP 32 BIn connection with Distt.Grievance
9001
committee meeting.
9.00 A.M 5.30 P.M
9.12.2013

Gohar
11.00 A.M

16.12.2013

Gohar

11.00 A.M
18.12.2013

Gohar

9.00 A.M
27.12.2013

Shimla
8.00 A.M

31.12.2013

Gohar

11.00 A.M

Janjehli, Bhatkidhar
Local & back 8.30
P.M
Mandi, Pandoh Local
and back via S/Nagar
Baggi 7.30 P.M
Mandi, Thalout Local
& Back via Ner
chowk & Baggi 6.30
P.M.
Joginder Nagar via
Mandi Local & Back
via S/Nagar and
Chunahan S/Stn.
6.30 P.M
Bijni Mandi, Baggi
Local Lohara & back
7.00 P.M

---Do---

---Do---

---Do---

Inspection of work.

Inspection of work of Providing SOP to


JNV and to settle the dispute with
H.P.Police deptt.
Inspection of 33/11 KV S/Stn. Thalout by
Chief Engineer (G)

---Do---

Circle level Meeting on KPI

---Do---

Inspection of work at Rajgarh, Lohara


and to arrange material from Mandi store.

Er.B.L.Sharma)
Addl. Superintending Engineer,
Electrical Division,
HPSEB Ltd. Gohar.

TOUR DIARY IN RESPECT OF ER.B.L.SHARMA, SR.EXECUTIVE ENGINEER,


ELECTRICAL DIVISION, HPSEBL, GOHAR FOR THE MONTH OF 12/2013
Date.
From.
To.
Mode of
Purpose of journey.
journey.
6.12.2013
Gohar
Mandi Local & back
HP 32 BIn connection with Distt.Grievance
9001
committee meeting.
9.12.2013

Gohar

Janjehli, Bhatkidhar
Local & back

16.12.2013

Gohar

18.12.2013

Gohar

27.12.2013

Shimla

31.12.2013

Gohar

Mandi, Pandoh Local


and back via S/Nagar
Baggi
Mandi, Thalout Local
& Back via Ner
chowk & Baggi
Joginder Nagar via
Mandi Local & Back
via S/Nagar and
Chunahan S/Stn.
Bijni Mandi, Baggi
Local Lohara & back

---Do---

---Do---

---Do---

Inspection of work.

Inspection of work of Providing SOP to


JNV and to settle the dispute with
H.P.Police deptt.
Inspection of 33/11 KV S/Stn. Thalout by
Chief Engineer (G)

---Do---

Circle level Meeting on KPI

---Do---

Inspection of work at Rajgarh, Lohara


and to arrange material from Mandi store.

Er.B.L.Sharma)
Addl. Superintending Engineer,
Electrical Division,
HPSEB Ltd. Gohar.

TOUR PROGRAMM IN RESPECT OF ER.B.L.SHARMA, ADDL.SUPERINTENDING


ENGINEER, ELECTRICAL DIVISION, HPSEBL, GOHAR FOR THE MONTH OF
1/2014
Date.
From.
To.
Mode of
Purpose of journey.
journey.
4.1.2013
Gohar
Mandi Local & back
HP 32 BMeeting in Circle office on Capax Plan
9001
and arrangement of material.
11.00 A.M 6.30 P.M
10.1.2014

Gohar
8.00 A.M

16.1.2014

Gohar

1.00 P.M
17.1.2014

Gohar

1.00 P.M
23.1.2014

Gohar
11.00 A.M

24.1.2014

Gohar

9.00 A.M
29.1.2014

Gohar

1.00 P.M

Thunag,Janjehli
Local & back 2.30
P.M
Baggi Chunahan
Sethal Local & Back
8.30 P.M
Chail- Chowk,
Pandoh Local &
back 8.30 P.M.
Mandi, Thalout Local
and Back 9.00 P.M
Mandi,Bijni Local &
back via Pandoh 6.30
P.M
Thalout Local &
Back via Mandi 8.30
P.M

---Do---

Inspection of work Building and other


capital & maintenance works.

---Do---

Inspection of work S/Stn. and other


capital & maintenance works.

---Do---

Inspection of work S/Stn. and other


capital & maintenance works.

---Do---

Inspection of work installation of new HT


Panels at 33/11 KV S/Stn. Thalout.

---Do---

KPI Meeting in Circle office &


arrangement of material.

---Do---

To check the installation of HT Panels


and LT at 33/11 KV S/Stn. Thalout
arrangement of material

Er.B.L.Sharma)
Addl. Superintending Engineer,
Electrical Division,
HPSEB Ltd. Gohar.

TOUR DIARY IN RESPECT OF ER.B.L.SHARMA, ADDL.SUPERINTENDING


ENGINEER, ELECTRICAL DIVISION, HPSEBL, GOHAR FOR THE MONTH OF
1/2014
Date.
From.
To.
Mode of
Purpose of journey.
journey.
4.1.2013
Gohar
Mandi Local & back
HP 32 BMeeting in Circle office on Capax Plan
9001
and arrangement of material.
10.1.2014

Gohar

Thunag,Janjehli
Local & back

---Do---

Inspection of work Building and other


capital & maintenance works.

16.1.2014

Gohar

Baggi Chunahan
Sethal Local & Back

---Do---

Inspection of work S/Stn. and other


capital & maintenance works.

17.1.2014

Gohar

---Do---

Inspection of work S/Stn. and other


capital & maintenance works.

23.1.2014

Gohar

Chail- Chowk,
Pandoh Local &
back
Mandi, Thalout Local
and Back

---Do---

Inspection of work installation of new HT


Panels at 33/11 KV S/Stn. Thalout.

24.1.2014

Gohar

Mandi,Bijni Local &


back via Pandoh

---Do---

KPI Meeting in Circle office &


arrangement of material.

29.1.2014

Gohar

Thalout Local &


Back via Mandi

---Do---

To check the installation of HT Panels


and LT at 33/11 KV S/Stn. Thalout
arrangement of material

Er.B.L.Sharma)
Addl. Superintending Engineer,
Electrical Division,
HPSEB Ltd. Gohar

Vous aimerez peut-être aussi