Bidder shall provide the Project Execution Plan describing in general how the work is going to be executed in a step by step from Notification to Proceed, its preparation and up to the completion of the work by defining also the objective of its step. he project execution plan shall cover also the project scope, overall organi!ation, resource planning and mobili!ation, construction execution method, work process, "E#, $uality, engineering work %if any&, project monitoring ' controlling, contract administration, documentation, ( ' communication plan, security plan, local content including plan to maximi!ing utili!ation of the local )iau manpower, work acceptance and project close out. 3.2. Project Organization Bidder shall provide the specific detail of Project *rgani!ation +hart and +,s- of key personnel. he organi!ation chart shall cover all spectrums of activities reporting relationship that reflect the same level of detail for each section of the organi!ation up to the supervisor level, the minimum function and lead that should be available are Project .anager, +onstruction /ead0#uperintendent, /ead Project +ontrol, /ead $10$+, /ead "E#, Project #upport ' 1dministration /ead. Bidder shall submit +.,. of personnel for the entire senior and up to the supervisor level and also Bidder is re2uired to submit the role and responsibility for each position. Bidder is reminded that the project team and recourses for this work shall be independent and separate from the current existing bidder organi!ation in executing the work under the ripatra34luor. 3.3. Construction Plan 5.5.6. Bidder shall provide its narrative construction execution plan in detail and to be developed specific for this work that covers all activities from the early start of the work to completion and close out, Bidder shall also describe in detail how Bidder will optimi!e the progress and productivity during the execution of this work considering the re2uested tight schedule. Bidder shall also describe how to inventory the e2uipments and materials prior to be dismantled from abandoned facility and a large amount of dismantling activities re2uired to be performed without compromising the "E# and 2uality. his proposal shall also explain how to handle % including loading,unloading and transport & the scrap materials, insulation material waste and or other materials to the +*.P1N7 junk yard. 5.5.8. Bidder shall submit its manpower planning and mobili!ation plan for the work with time line in the form of tabulation and histogram chart and divided also into various categories of bidder manpower classifications. 5.5.5. Bidder shall submit its e2uipment planning and mobili!ation plan for the work with time line in the form of tabulation and histogram chart and divided also into various categories of bidder e2uipment types. Bidder shall also submit the specification and technical data of all the e2uipments to be mobili!ed for the work. 5.5.9. Bidders shall specify and demonstrate all the e2uipment owned currently by Bidder that is re2uired for the work and will be mobili!ed for this work. Bidder shall also specify its sources in detail for the balance of e2uipment re2uired to be mobili!ed for the work including plan for purchase if any. 5.5.:. Bidder shall submit its schedule for this work in detail in the form of bar chart from the preparation to completion and project close out, the schedule shall also clearly identify period where resources is fully mobili!ed. Bidder is also re2uested to present its working schedule in the form of net work diagram where the critical path of the work is clearly identified and shown. 5 5.;. Bidder is re2uested to provide the detailed three months look ahead schedule for this work and also identify achievements that will be made by Bidder in the first three months. 5.5.<. Bidder shall demonstrate and provide explanation on its capability to accept and react on scope changes by also defining back up resources available to Bidder. 3.4. Subcontracting Plan 5.9.6. Bidder shall submit its plan in the case that Bidder is planning to subcontract a portion of the work by defining the scope to be subcontracted, potential bidders- subcontractor data, credentials and the method by bidder in 2ualifying this potential subcontractor. 5.9.8. Bidder is also re2uested to provide information in detail of any similar project performed by Bidder either current or past that is similar in nature and si!e. 5.9.5. Bidder shall specify its plan to maximi!ing the use of the local )iau resources up to even subcontracting portions of the work to the local community if any. 3.5. HES Plan Bidder shall provide "E# Plan that compies to +*N)1+*)0+*.P1N7 re2uirements described on Exhibit E. 3.. !"#!C Plan Bidder shall $10$+ that complies to +*N)1+*)0+*.P1N7 re2uirements described on Exhibit 4. 3.$. Project Control Plan. Bidder shall provide Project +ontrol Plan that complies to +*N)1+*)0+*.P1N7 re2uirements described on Exhibit =. 3.%. Project Su&&ort Bidder is to provide the detailed (, communication and security plan for the work including coordination with local =*(, Police and community. Bidder shall also provide it support offices plan. including plan for the engineering work % if any& to support the project.