Académique Documents
Professionnel Documents
Culture Documents
CLIENTE:
OBRA:
REA:
LOCAL:
DATA:
TABATINGA AM
Maro de 2009
ITEM
1.
1.1
1.1.1
1.1.1.1
Fonte
02210.8.1.1
1.1.2
1.2
1.2.1
1.2.1.1
1.2.1.2
1.2.1.3
2.
2.1
2.2.1
2.2.2.1
2.2.3
2.2.3.2
2.2
2.2.1
REV.:01
CPU
CPU
CPU
CPU
CPU
02220.8.4.1
un
QUANT.
Custo Unitrio
(R$) c/ BDI
14.00
59.15
828.10
un
un
cj
1.00
1.00
1.00
975.00
5,021.07
4,550.00
975.00
5,021.07
4,550.00
cj
1.00
4,550.00
4,550.00
cj
1.00
1,940.91
1,940.91
DEMOLIES
DEMOLIO de concreto armado com utilizao de martelo rompedor (Caixa de
Escada externa)
m3
8.00
306.43
2,451.46
DESPESAS LEGAIS
Taxas e Seguros
ART DA OBRA
ALVAR DE CONSTRUO, HABITE-SE e Corpo de Bombeiros
SEGURO (risco engenharia / sade / responsabilidade civil)
SERVIOS PRELIMINARES
INSTALAES PROVISRIAS
Canteiro de Obra
Instalao de canteiro (aproveitamento de edificao existente);
Potees e Sinalizao
PLACA de identificao da obra -padrao -Governo -4,00x3,00m (PGR) e
2.3
2.3.1
2.3.2
14515.8.1.1
CPU
m3
un
90.35
12.00
5.10
242.67
460.41
2,912.00
2.4
2.4.1
02595.8.1.1
LOCAO DA OBRA
LOCAO da obra, execuo de gabarito
m2
22.50
5.17
116.42
2.5
2.5.1
2.5.2
MOBILIZACAO E DESMOBILIZACAO
0,5% (v.total) Mobilizao
0,5% (v.total) Desmobilizao
un
un
1.00
1.00
3,711.15
3,711.15
3,711.15
3,711.15
m
m3
m3
m3
M3
32.00
4.00
4.00
3.10
1.70
26.36
556.62
61.43
26.36
21.09
843.65
2,226.48
245.70
81.73
35.86
m2
m2
90.00
90.00
55.67
23.91
5,009.94
2,151.63
m3
m3
5.83
5.83
574.05
112.33
3,346.73
654.90
kg
kg
kg
kg
99.10
34.30
71.90
284.10
10.17
6.93
7.93
8.66
1,007.45
237.66
570.17
2,459.74
kg
1,625.00
13.33
21,653.13
m2
260.00
31.15
8,098.48
m2
80.00
123.70
9,895.60
m2
20.00
89.49
1,789.84
m2
80.00
56.65
4,532.32
m2
8.48
466.07
3,952.24
m3
m3
m2
m2
m2
0.18
152.00
150.00
319.95
25.00
1,396.51
19.62
3.91
5.33
10.66
251.37
2,981.78
586.95
1,705.33
3
3.1
3.1.1
3.1.1.1
3.1.1.2
3.1.1.3
3.1.1.4
3.1.1.5
CPU
SINAPI
SINAPI
02315.8.1.9
02315.8.7.1
3.2
3.2.1
3.2.1.1
03110.8.2.7
3.2.1.2
3.2.2
3.2.2.1
3.2.2.2
3.2.3
3.2.3.1
3.2.3.2
3.2.3.3
3.2.3.4
3.3
3.3.1
3.3.1.1
4.
4.1
4.1.1
4.1.2
4.1.3
4.1.4
4.1.5
4.1.6
4.1.7
4.1.8
4.1.9
4.1.10
4.2
FUNDAES E ESTRUTURAS
FUNDAES DIRETA
Lastro
ESTACA trado diametro 400mm estimadas com 4,0m profundidade (08p)
CONCRETO estrutural virado em betoneira, fck 20 MPa
TRANSPORTE, lanamento, adensamento e acabamento do concreto em
ESCAVAO MANUAL de vala em solo de 1 categoria (profundidade: at 2 m)
REATERRO MANUAL de vala apiloado
ESTRUTURA DE CONCRETO
Formas
FRMA com chapa compensada resinada, e=12 mm, para pilares/vigas/lajes,
incluso contraventamentos/escoramentos com pontaletes 7,5 x 7,5 cm, 3
03140.8.2.1 ESCORAMENTO METLICO para vigas de edificao com p direito entre 2,00 e
3,20 m
Concreto
CONCRETO estrutural virado em betoneira, fck 25 MPa
SINAPI
TRANSPORTE, lanamento, adensamento e acabamento do concreto em estrutura
SINAPI
Armadura
03210.8.1.6 ARMADURA de ao, CA-60, dimetro 5,0 mm, corte e dobra na obra
03210.8.1.10 ARMADURA de ao, CA-50, corte e dobra na obra- 6,3mm
03210.8.1.11 ARMADURA de ao, CA-50, corte e dobra na obra - 8,0mm
03210.8.1.12 ARMADURA de ao, CA-50, corte e dobra na obra - 10mm
05125.8.1.1
ESTRUTURA METLICA
Escadas
ESTRUTURA de ao para escada
ARQUITETURA
PAREDES
04211.8.2.3 ALVENARIA de vedao com blocos cermico furados 9 x 19 x 19 cm (furos
horizontais), espessura da parede 9 cm, juntas de 12 mm com argamassa mista de
cimento, cal hidratada e areia sem peneirar trao 1:2:8 - espessura final da parede
04840.8.5.2 PAREDE DE GESSO acartonado dupla interna, espessura final 125 mm, p-direito
mximo 3,75 m
04840.8.5.3 PAREDE DE GESSO acartonado para parede interna em local mido, espessura
final 100 mm, p-direito mximo 3,15 m
07210.8.1.3 ISOLAMENTO TRMICO de parede interna empregando painel semi-rgido de
fibra de vidro, e=5 cm, fixado com arame e tela
ALVENARIA de vedao com bloco de vidro 8 x 20 x 20 cm, espessura da parede
CPU
6 cm, juntas de 6 mm com argamassa mista de cimento e areia sem peneirar trao
1:3
VERGA
RETA moldada no local com frma de madeira considerando 5
SINAPI
reaproveitamentos, concreto armado fck = 13,5 MPa, controle tipo "B"
DEMOLIO de alvenaria de tijolo comum, sem reaproveitamento
SINAPI
DEMOLIO de revestimento com argamassa
SINAPI
02220.8.11.1 DEMOLIO de piso cermico
02220.8.11.2 DEMOLIO de piso cermico inclusive retirada da camada de regularizao
sobre lastro de concreto
ESQUADRIAS
Pgina 1 de 94
266.49
PLANILHA ORAMENTRIA
MINISTERIO PUBLICO FEDERAL - PROCURADORIA GERAL DA
REFORMA
DA SEDE DA PROCURADORIA EM TABATINGA - AM
REPBLICA
CLIENTE:
OBRA:
REA:
LOCAL:
DATA:
TABATINGA AM
Maro de 2009
ITEM
4.2.1
4.2.1.1
SINAPI
4.2.1.2
SINAPI
4.2.1.3
SINAPI
4.2.1.4
CPU
4.2.1.5
CPU
4.2.2
4.2.2.1
CPU
4.2.2.2
SINAPI
4.2.2.3
08520.8.1.4
4.2.2.4
SINAPI
4.2.2.5
CPU
4.2.3
4.2.3.1
REV.:01
un
Esquadrias de Madeira
PORTA interna de madeira, colocao e acabamento , de uma folha com batente,
guarnio e ferragem, 0,90 x 2,10 m
PORTA interna de madeira, colocao e acabamento , de uma folha com batente,
guarnio e ferragem, 0,60 x 2,10 m
PORTA interna de madeira, colocao e acabamento , de uma folha com batente,
guarnio e ferragem, 0,70 x 2,10 m
PORTA de compensado, interna, colocao e acabamento liso prova dgua,
com batente, para sanitrio e vestirio, 0,90 x 1,90 m-PM4
PORTA de compensado, interna, colocao e acabamento liso prova dgua,
com batente, para sanitrio e vestirio, 0,60 x 1,90 m- PM5
Esquadria de Alumnio
Porta de alumnio em veneziana- EA-2 (0,70x2,10) m
ESQUADRIA de alumnio tipo veneziana colocao e acabamento , correr,
contramarcos - EA1/EA1A (01p de 5,23x2,0m;01p 1,76x2,0m)
JANELA de alumnio sob encomenda, colocao e acabamento , maxim-ar,
contramarcos EA3/EA9 (01p de 1,67x1,19m;02p 0,91x0,50m)
JANELA de alumnio sob encomenda, colocao e acabamento , basculante,
contramarcos - EA4 (13ps de 0,60x0,40m)
JANELA de alumnio sob encomenda, colocao e acabamento , de correr,
contramarcos EA11 1,50x1,30m
4.3
4.3.1
4.3.2
08830.8.1.2
SINAPI
4.4
4.4.1
07410.8.3.1
4.4.2
4.4.3
4.4.4
4.4.5
07620.8.2.6
CPU
05125.8.5.1
CPU
4.5
4.5.1
4.5.1.1
4.5.1.2
02710.8.6.2
SINAPI
4.5.1.3
4.5.1.6
4.5.1.7
4.5.1.8
4.5.1.9
4.5.1.10
CPU
CPU
CPU
09655.8.6.1
09640.8.7.1
09606.8.3.1
4.5.2
4.5.2.1
4.5.2.5
Revestimentos de Parede
09705.8.12.4 CHAPISCO para parede interna ou externa com argamassa de cimento e areia
sem peneirar trao 1:3, e=5 mm
REBOCO PAULISTA TRAO 1:2:8 CIMENTO, CAL E AREIA ESP.=25MM
CPU
Revestimento ELIANE Victorio Gelo 33x45cm
CPU
09720.8.3.1 LAMINADO melamnico para revestimento interno, fixado com cola base de
neoprene, e=1,3 mm
Revestimento ELIANE Victorio Gelo 33x45cm, inclusive rejuntamento
CPU
4.5.3
4.5.3.1
09500.8.8.4
4.5.3.2
CPU
4.5.4
4.5.4.1
4.5.4.2
09906.8.2.1
SINAPI
COBERTURA
COBERTURA com telha termoacstica , perfil trapezoidal, e=30 mm, altura 70 mm,
largura til 1000 mm e largura nominal 1056 mm
RUFO de chapa de ao galvanizado n 26 desenvolvimento 33 cm
DESMONTAGEM da cobertura existente
ESTRUTURA de ao para cobertura, conforme projeto
CAPEAMENTO DE platibanda - Chapim em concreto pr-moldado l= 15cm
REVESTIMENTOS
Revestimentos de Piso
LASTRO DE CONCRETO (contra-piso) , incluindo preparo de caixa, e = 5 cm
PISO CIMENTADO com argamassa de cimento e areia sem peneirar, trao 1:3,
com impermeabilizante, e = 1,5 cm - com mo-de-obra empreitada
CERMICA Eliane victria gelo 45x45cm
CERMICA Eliane victria alpe 45x45cm
CERMICA Eliane Mithos Arthemis Bone 50x50cm (AC)
PLACA vinlica 30x30 cm, e=2 mm, fixada com cola base de neoprene
CARPETE DE MADEIRA estruturado (piso flutuante), inclusive colocao e
acabamento
REJUNTAMENTO
DE PISO cermico com argamassa pr-fabricada, espessura da
junta: 6 mm
Revestimentos de Forro
FORRO DE GESSO acartonado fixo, monoltico, aparafusado em perfis metlicos
espaados a 0,60m, suspensos por pendurais rgidos regulveis, espaados a
cada 1,00 m (espessura: 12,5 mm)
Tabica em gesso
Pintura
EMASSAMENTO de parede com massa acrlica com duas demos, para pintura
PINTURA COM TINTA LTEX ACRLICA em paredeinterna/forro, com duas
demos, sem massa corrida
REVESTIMENTO texturizado em parede externa de alta camada, aplicado com rolo
SINAPI
09115.8.14.1 PINTURA COM VERNIZ em esquadria de madeira, com trs demos
JATEAMENTO em estrutura de ao carbono ao metal branco (SSPC-SP5)
SINAPI
09906.8.4.1 APLICAO de primer epxi em estrutura de ao carbono com uma demo, e=25
micra, com trincha - (ESCADA)
TRATAMENTO anticorrosivo para grades de ferro
CPU
PINTURA automotiva em grades de ferro com duas demos
CPU
IMPERMEABILIZAO / TRATAMENTO
Pgina 2 de 94
24.00
332.06
7,969.42
un
9.00
242.10
2,178.89
un
4.00
279.89
1,119.56
un
1.00
617.49
617.49
un
2.00
530.76
1,061.53
un
2.00
792.32
1,584.64
m2
13.98
322.37
4,506.79
m2
4.85
507.56
2,461.66
m2
3.12
402.69
1,256.39
m2
1.95
520.00
1,014.00
m2
m2
13.77
8.80
755.39
426.08
10,401.73
3,749.46
m2
26.00
221.57
5,760.70
m2
14.20
332.38
4,719.85
m2
8.00
199.73
1,597.86
m2
m
m2
m2
m
109.00
26.00
109.00
109.00
20.00
125.61
26.77
11.57
139.92
48.74
13,691.05
695.94
1,261.13
15,251.17
974.90
m2
367.62
23.78
8,740.90
m2
m2
m2
m2
m2
m2
37.25
31.00
25.00
241.00
30.00
40.62
21.03
74.26
74.26
190.44
52.03
97.07
783.52
2,302.15
1,856.57
45,896.63
1,560.78
3,943.02
m2
297.00
2.73
812.16
m2
m2
m2
520.00
520.00
39.78
3.73
22.79
68.69
1,940.12
11,849.05
2,732.67
m2
m2
38.66
49.92
39.40
66.35
1,523.32
3,312.10
m2
380.00
39.40
180.00
14.54
14,973.14
2,617.99
m2
1,295.00
8.79
11,380.46
m2
m2
m2
m2
1,295.00
493.00
148.00
35.00
6.80
11.18
11.60
7.11
8,804.71
5,511.74
1,716.21
248.89
m2
m2
m2
79.00
26.00
26.00
6.60
14.26
21.11
521.72
370.86
548.95
com
CPU
4.6
un
com
4.2.4
4.2.4.1
4.5.4.8
4.5.4.9
com
4.2.3.2
4.5.4.4
4.5.4.5
4.5.4.6
4.5.4.7
Custo Unitrio
(R$) c/ BDI
com
Esquadria de Vidro
08820.8.2.13 PORTA de vidro temperado esp. 10mm inclusive ferragens - VT01/VT02 (01p
1,40X2,10m; 01p 4,53x2,50m)
BOX em vidro (CHUVEIRO)
CPU
4.5.2.2
4.5.2.3
4.5.2.4
QUANT.
PLANILHA ORAMENTRIA
MINISTERIO PUBLICO FEDERAL - PROCURADORIA GERAL DA
REFORMA
DA SEDE DA PROCURADORIA EM TABATINGA - AM
REPBLICA
CLIENTE:
OBRA:
REA:
LOCAL:
DATA:
TABATINGA AM
Maro de 2009
REV.:01
ITEM
4.6.1
07120.8.3.1
4.6.2
07110.8.6.1
4.6.3
07110.8.2.1
4.6.4
4.6.6
SINAPI
SINAPI
4.7
4.7.1
4.7.1.1
4.7.1.2
4.7.1.3
4.7.1.4
4.7.2
4.7.2.1
4.7.2.2
4.8
4.8.1
4.8.1.1
CPU
4.8.1.2
4.8.1.3
4.8.1.4
15410.8.14.3
SINAPI
CPU
4.8.1.5
4.8.1.6
4.8.1.7
15410.8.3.2
15410.8.23.1
SINAPI
4.8.1.8
4.8.1.9
CPU
CPU
un
QUANT.
Custo Unitrio
(R$) c/ BDI
m2
54.50
12.36
673.78
m2
24.55
39.87
978.83
m2
m2
m2
33.30
203.00
21.20
64.32
8.05
41.37
2,141.99
1,633.54
876.96
m
m
m
64.21
203.00
57.00
23.04
25.16
9.24
1,479.48
5,106.99
526.85
26.00
8.55
222.40
8.00
68.98
551.86
10.00
44.36
443.60
un
un
un
1.00
2.00
8.00
780.07
345.46
224.17
780.07
690.92
1,793.38
un
un
un
1.00
10.00
1.00
758.12
383.53
522.21
758.12
3,835.26
522.21
un
un
1.00
2.00
222.48
354.19
222.48
708.37
un
un
un
3.00
1.00
3.00
244.00
149.49
96.01
732.01
149.49
288.02
un
1.00
237.11
237.11
un
un
1.00
1.00
603.46
399.36
603.46
399.36
un
1.00
423.54
423.54
un
1.00
603.54
603.54
un
4.00
258.24
1,032.97
un
2.00
511.96
1,023.92
4.8.1.21 10640.8.3.1
4.8.1.22 15480.8.6.1
EQUIPAMENTOS E ACESSRIOS
Louas, Metais, Acessrios e Tampos
LAVATRIO com coluna suspensa, L51+CS1V, branco, Linha conforto da Deca,
Completo (Vlvula, Sifo, Torneira Eletronica, Engate etc)
LAVATRIO de loua , sem coluna, com torneira de presso e acessrios
LAVATRIO de loua de embutir (cuba) , com torneira de presso e acessrios
BACIA convencional P51 (branco 01)com assento termofixo , linha conforto da
Deca, completa (Assento e acessrios)
BACIA de loua com caixa acoplada, com tampa e acessrios
TANQUE de loua com coluna com acessrios - exceto torneira
CUBA de ao inoxidvel simples, dimenses 400x340x125 mm, c/ acessorios
exceto torneira
Cuba de ao inox 300x150 CR 30 da Mekal, c/ acessrios exceto torneira
Torneira de mesa bica mvel com arejador articulvel. 1167 C53 cromada linha
Vogue da Deca
Torneira para tanque, acabamento cromada para mangueira 1130 C da Deca
TORNEIRA de presso metlica para uso geral 1130 bruta Deca
VLVULA de descarga metlica com registro acoplado e canopla 32 mm (1 1/4")
ou 40 mm (1 1/2")
BARRA DE APOIO PARA DEFICIENTES FSICOS LINHA CONFORTO , DECA OU
EQUIVALENTE REF.2310 - 80CM
BAR - Barra de apoio, 60cm,Cod.2310 Deca ou equivalente
BARRA DE APOIO para lavatrio de loua, para portadores de deficincia fsica,
comprimento 60 cm, largura 45 cm
Bancada (2,40x0,60)m, em mrmore branco especial polido, 20mm - cozinha conforme projeto
Bancada (0,87x0,42)m, em mrmore branco especial polido, 20mm - wc, sute
procurador - conforme projeto
Bancada (2,10x0,55)m, em mrmore branco especial polido, 20mm - copas
procurador - conforme projeto
Bancada (1,86x0,42)m, em mrmore branco especial polido, 20mm - lavatrio de
apoio, lav. procurador e banheiros - conforme projeto
DIVISRIA sanitria de granito e=3 cm assentada com argamassa, no trao 1:3
CHUVEIRO eltrico automtico , 220 V - 5400 W
un
m2
un
4.00
12.00
4.00
391.85
431.73
132.07
1,567.40
5,180.76
528.27
4.9
4.9.1
4.9.2
m2
m2
535.00
535.00
0.51
11.77
272.93
6,295.46
m
m
m
m
un
un
un
un
un
un
un
un
un
un
un
un
un
un
un
un
un
6.00
18.00
15.00
252.00
2.00
2.00
4.00
79.00
49.00
1.00
2.00
40.00
1.00
5.00
4.00
3.00
2.00
5.00
18.00
40.00
6.00
13.57
10.56
7.44
4.43
7.45
6.92
4.94
4.02
5.54
11.93
7.41
4.64
5.36
10.83
8.75
13.40
7.09
3.48
2.65
2.46
2.35
81.43
190.01
111.54
1,117.12
14.90
13.83
19.76
317.34
271.36
11.93
14.82
185.64
5.36
54.15
35.00
40.21
14.17
17.42
47.74
98.28
14.12
4.8.1.10 CPU
4.8.1.11 15410.8.27.2
4.8.1.13 15110.8.3.1
4.8.1.14 10820.8.10.3
4.8.1.15 CPU
4.8.1.16 15007.8.1.1
4.8.1.17 CPU
4.8.1.18 CPU
4.8.1.19 CPU
4.8.1.20 CPU
02915.8.3.1
CPU
5
5.1
5.1.1
5.1.2
5.1.3
5.1.4
5.1.5
5.1.6
5.1.7
5.1.8
5.1.9
5.1.10
5.1.11
5.1.12
5.1.13
5.1.14
5.1.15
5.1.16
5.1.17
5.1.18
5.1.19
5.1.20
5.1.21
15142.8.23.5
SINAPI
SINAPI
SINAPI
SINAPI
SINAPI
15142.8.11.4
15142.8.11.3
15142.8.12.2
SINAPI
15142.8.19.4
SINAPI
15142.8.25.4
SINAPI
15142.8.17.3
15142.8.17.6
15142.8.15.6
15142.8.15.4
15142.8.15.3
15142.8.31.2
15142.8.31.1
GUA FRIA
TUBO de PVC soldvel, sem conexes 50 mm
TUBO de PVC soldvel, sem conexes 40 mm
TUBO de PVC soldvel, sem conexes 32 mm
TUBO de PVC soldvel, sem conexes 25 mm
JOELHO 90 soldvel de PVC marrom 50 mm
JOELHO 90 soldvel de PVC marrom 40 mm
JOELHO 90 soldvel de PVC marrom 32 mm
JOELHO 90 soldvel de PVC marrom 25 mm
JOELHO 90 soldvel/rosca de PVC marrom 25 mm x 1/2"
T 90 soldvel de PVC marrom 40 mm
T 90 soldvel de PVC marrom 32 mm
T 90 soldvel de PVC marrom 25 mm
BUCHA de reduo soldvel de PVC marrom, curta, 50 mm x 40 mm
T 90 de reduo soldvel de PVC marrom 40 x 32 mm
T 90 de reduo soldvel de PVC marrom 32 x 25 mm
T 90 de reduo soldvel de PVC marrom 50 x 25 mm
LUVA soldvel de PVC marrom 50 mm
LUVA soldvel de PVC marrom 32 mm
LUVA soldvel de PVC marrom 25 mm
ADAPTADOR soldvel de PVC marrom 25 mm x3/4"
ADAPTADOR soldvel de PVC marrom 20 mm x 1/2"
Pgina 3 de 94
PLANILHA ORAMENTRIA
MINISTERIO PUBLICO FEDERAL - PROCURADORIA GERAL DA
REFORMA
DA SEDE DA PROCURADORIA EM TABATINGA - AM
REPBLICA
CLIENTE:
OBRA:
REA:
LOCAL:
DATA:
TABATINGA AM
Maro de 2009
ITEM
5.1.22
5.1.23
5.1.25
5.1.26
5.1.27
5.1.28
5.1.29
5.1.30
5.1.31
5.1.32
5.1.33
5.1.34
5.1.35
5.1.36
5.1.37
5.1.38
5.1.39
5.1.40
5.1.41
5.1.42
5.1.43
5.1.44
5.1.45
5.1.46
5.1.47
5.1.48
5.1.49
5.1.50
5.1.51
REV.:01
5.2
un
un
un
un
un
un
un
un
un
un
un
un
un
un
un
un
un
4.00
1.00
1.00
5.00
2.00
4.00
20.00
1.00
2.00
4.00
1.00
2.00
1.00
1.00
5.00
1.00
1.00
Custo Unitrio
(R$) c/ BDI
16.38
13.48
86.66
38.09
53.29
78.23
57.41
1,532.55
986.02
69.03
38.47
48.83
57.20
1,040.00
3.73
5.23
4.62
un
un
un
un
un
un
un
un
un
un
un
1.00
15.00
5.00
12.00
9.00
2.00
49.00
2.00
2.00
2.00
2.00
24.82
4.71
9.02
8.99
9.19
9.32
2.09
6.96
9.15
7.25
11.38
24.82
70.66
45.08
107.89
82.67
18.63
102.36
13.92
18.31
14.50
22.76
37.00
9.75
360.64
m
m
m
m
un
un
un
un
un
un
un
un
un
un
un
un
un
un
un
un
un
un
un
un
m
un
186.00
36.00
112.00
30.00
8.00
34.00
10.00
12.00
12.00
1.00
20.00
18.00
8.00
3.00
1.00
12.00
2.00
14.00
2.00
14.00
13.00
2.00
3.00
5.00
7.00
1.00
18.53
13.60
11.21
6.80
27.14
6.85
5.86
7.56
27.55
14.29
7.20
6.01
24.15
9.72
19.40
19.34
8.74
9.84
7.57
5.19
48.46
19.79
306.71
13.86
5.42
1,040.00
3,445.65
489.53
1,255.07
203.97
217.15
232.93
58.63
90.69
330.56
14.29
144.04
108.11
193.23
29.17
19.40
232.13
17.47
137.77
15.13
72.62
630.03
39.57
920.13
69.29
37.91
1,040.00
un
un
9.00
15.00
231.42
148.71
2,082.82
un
1.00
1,837.20
un
1.00
2,734.19
2.00
1,479.69
m2
m3
m2
m3
m3
un
un
un
un
un
un
un
un
un
12.50
13.00
36.00
11.40
2.60
2.00
17.00
6.00
3.00
7.00
1.00
2.00
16.00
10.00
9.89
29.65
9.88
26.65
149.06
6.61
18.06
13.78
11.64
17.70
26.22
21.13
14.00
8.46
un
QUANT.
ESGOTO SANITRIO
5.2.1
5.2.2
5.2.3
5.2.4
5.2.5
5.2.6
5.2.7
5.2.8
5.2.9
5.2.10
5.2.11
5.2.12
5.2.13
5.2.14
5.2.15
5.2.16
5.2.17
5.2.18
5.2.19
5.2.20
5.2.21
5.2.22
5.2.23
5.2.24
5.2.25
5.2.26
5.2.27
15152.8.22.4
SINAPI
15152.8.22.2
SINAPI
SINAPI
SINAPI
SINAPI
CPU
SINAPI
15152.8.8.3
SINAPI
SINAPI
15152.8.19.1
15152.8.10.1
SINAPI
SINAPI
SINAPI
SINAPI
SINAPI
SINAPI
15155.8.1.3
15155.8.5.1
15155.8.6.1
07725.8.1.2
CPU
CPU
02620.8.1.5
5.2.28
CPU
5.2.29
CPU
5.2.30
CPU
5.2.31
CPU
5.2.32
5.2.33
5.2.34
5.2.35
5.2.36
5.2.37
5.2.38
5.2.39
5.2.40
5.2.41
5.2.42
5.2.43
5.2.44
5.2.45
02220.8.9.1
02315.8.1.10
02315.8.8.2
02315.8.7.1
02720.8.5.1
15152.8.7.2
15152.8.9.4
15152.8.9.3
15153.8.4.2
15152.8.8.4
15152.8.20.4
15152.8.20.3
15152.8.20.2
CPU
Pgina 4 de 94
2,230.72
1,837.20
2,734.19
2,959.38
123.66
385.49
355.68
303.81
387.55
13.23
307.01
82.69
34.93
123.87
26.22
42.27
223.94
84.58
PLANILHA ORAMENTRIA
MINISTERIO PUBLICO FEDERAL - PROCURADORIA GERAL DA
REFORMA
DA SEDE DA PROCURADORIA EM TABATINGA - AM
REPBLICA
CLIENTE:
OBRA:
REA:
LOCAL:
DATA:
TABATINGA AM
Maro de 2009
ITEM
5.2.46
5.2.47
5.2.48
5.2.49
5.2.50
5.2.51
5.2.52
5.2.53
5.2.54
5.2.55
REV.:01
un
un
5.00
9.00
Custo Unitrio
(R$) c/ BDI
4.74
120.34
un
un
un
un
un
un
2.00
2.00
6.00
1.00
20.00
12.00
90.44
120.34
19.57
19.06
18.17
16.79
180.87
240.67
117.41
19.06
363.38
201.43
46.00
7.23
332.36
3.00
7.23
21.68
un
QUANT.
6
6.1
6.1.1
6.1.1.1
6.1.1.2
6.1.1.3
6.1.1.4
6.1.1.7
6.1.1.8
6.1.1.9
6.1.1.10
CPU
16131.8.3.34
16131.8.2.18
15500.8.1.20
16132.8.2.9
16132.8.4.9
CPU
16137.8.1.10
cj
m
un
un
m
un
cj
un
1.00
4.00
2.00
5.00
70.00
6.00
1.00
5.00
434.51
45.54
35.78
183.51
50.83
38.11
4,160.00
965.99
434.51
182.16
71.55
917.54
3,558.19
228.65
4,160.00
4,829.96
6.1.2
6.1.2.1
6.1.2.2
6.1.2.3
6.1.2.4
6.1.2.5
6.1.2.6
6.1.2.7
6.1.2.9
6.1.2.10
CPU
CPU
CPU
CPU
CPU
CPU
CPU
CPU
CPU
Quadros / equipamentos
FORNECIMENTO E Montagem QGBT, complet
FORNECIMENTO E Montagem QFL-TE, completo
FORNECIMENTO E Montagem QTU, completo
FORNECIMENTO E Montagem QFL - 1P, completo
FORNEICMENTO E Montagem QTU- 1P, completo
FORNEICMENTO E Montagem QF- BOMBAS, completo
NO BREAK (UPS)- 15KVA-220/110V - AUTONOMIA 10MIN - conforme projeto
QUADRO ELETRICO automatizado para duas bombas
FORNECIMENTO E Montagem QTU-TE, completo
cj
cj
cj
cj
cj
cj
cj
un
cj
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2,731.47
3,093.58
4,085.12
2,833.58
1,392.56
1,262.56
21,844.52
1,262.56
1,392.56
2,731.47
3,093.58
4,085.12
2,833.58
1,392.56
1,262.56
21,844.52
1,262.56
1,392.56
6.1.3
6.1.3.1
6.1.3.2
6.1.3.3
6.1.3.4
6.1.3.5
6.1.3.6
6.1.3.10
6.1.3.11
6.1.3.13
6.1.3.14
6.1.3.15
6.1.3.18
6.1.3.19
6.1.3.22
6.1.3.23
6.1.3.25
6.1.3.26
6.1.3.27
6.1.3.29
6.1.3.30
6.1.3.31
6.1.3.32
6.1.3.33
CPU
CPU
CPU
CPU
CPU
CPU
16131.8.3.2
16131.8.3.3
16131.8.3.5
16131.8.2.2
16131.8.2.3
16131.8.5.2
16131.8.5.3
16131.8.1.3
16131.8.1.4
16131.8.1.6
16136.8.3.1
16136.8.3.2
CPU
16135.8.1.37
CPU
CPU
16135.8.1.28
Infraestrutura
ELETROCALHA Perfurada 200x50mm
CURVA 90 vertical 200x50 mm
T 90 horizontal 200x50 mm
TERMINAL para Eletrocalha 200x50mm
EMENDA Interna "U" 200x50
SADA de eletroc. Aba 50mm p/ tubo 3/4" a 11/2"
ELETRODUTO de ao galvanizado pesado 25 mm (3/4")
ELETRODUTO de ao galvanizado pesado 32 mm (1")
ELETRODUTO de ao galvanizado pesado 40 mm (11/2")
CURVA 90 de ao galvanizado pesado, 25 mm (3/4")
CURVA 90 de ao galvanizado pesado, 32 mm (1")
LUVA de ao galvanizado pesado para eletroduto, 25 mm (3/4")
LUVA de ao galvanizado pesado para eletroduto, 32 mm (1")
BUCHA COM ARRUELA em zamak para eletroduto , 20 mm (3/4")
BUCHA COM ARRUELA em zamak para eletroduto , 25 mm (1")
BUCHA COM ARRUELA em zamak para eletroduto , 40 mm (1 1/2")
CAIXA DE LIGAO estampada em chapa de ao , retangular, dimenses 4 x 2"
CAIXA DE LIGAO estampada em chapa de ao , quadrada, dimenses 4 x 4"
ELETRODUTO flexvel com alma de ao e revestimento em PVC- Tipo Sealtubo
CONDULETE 4x2" tipo LL em alumnio fundido p/ 3/4"
CONDULETE 4x2" tipo TB em alumnio fundido p/ 3/4"
CONDULETE 4x2" tipo B em alumnio fundido p/ 3/4"
CONDULETE 4x2" tipo T em alumnio fundido p/ 3/4"
m
un
un
un
un
un
m
m
m
un
un
un
un
un
cj
cj
un
un
m
un
un
un
un
33.00
4.00
2.00
4.00
12.00
42.00
600.00
12.00
6.00
70.00
1.00
240.00
2.00
290.00
4.00
2.00
237.00
69.00
4.00
9.00
3.00
6.00
31.00
72.18
28.48
47.01
15.86
11.05
4.07
16.68
24.97
28.16
6.90
9.04
2.35
2.81
0.81
1.09
2.29
3.82
5.02
4.72
19.66
22.28
22.34
22.08
2,382.07
113.90
94.02
63.45
132.63
171.12
10,007.40
299.68
168.95
483.21
9.04
564.72
5.62
233.74
4.37
4.58
905.81
346.24
18.87
176.90
66.83
134.05
684.54
6.1.4
6.1.4.1
6.1.4.2
6.1.4.3
6.1.4.4
6.1.4.5
6.1.4.6
6.1.4.7
6.1.4.8
6.1.4.9
6.1.4.10
16120.8.2.2
16120.8.2.3
16120.8.1.22
16120.8.1.23
16120.8.1.30
CPU
16120.8.1.42
16120.8.1.43
16120.8.1.10
CPU
Cabos e Fios
FIO ISOLADO de PVC seo 2,5 mm - 750 V - 70C
FIO ISOLADO de PVC seo 4 mm - 750 V - 70C
FIO ISOLADO de PVC seo 6 mm - 0,6/1KV
FIO ISOLADO de PVC seo 10mm - 0,6/1KV
CABO ISOLADO em PVC seo 120 mm - 0,6/1kV - 70C
CABO cobre n #16mm
CABO ISOLADO de PVC seo 16 mm - 750 V - 70C
CABO ISOLADO de PVC seo 25 mm - 750 V - 70C
CABO ISOLADO de PVC seo 70 mm - 750 V - 70C
CABO ISOLADO multipolar PP com 03 veias de #1,5mm2
m
m
m
m
m
m
m
m
m
m
4,000.00
400.00
300.00
35.00
300.00
12.00
14.00
60.00
75.00
100.00
2.98
3.73
5.42
7.11
55.84
18.84
10.11
10.67
34.42
2.45
11,908.00
1,492.40
1,626.30
248.81
16,753.46
226.04
141.59
640.46
2,581.72
245.23
6.1.5
6.1.5.1
CPU
cj
55.00
206.53
11,358.92
6.1.5.2
CPU
cj
14.00
161.97
2,267.57
6.1.5.3
CPU
cj
17.00
168.10
2,857.66
cj
2.00
81.21
162.42
6.1.5.4
CPU
Luminrias
LUMINRIA DE embutir em aluminio, pintura eletrostatica branca, refletor com
aletas em aluminio de alto brilho com02 lamp. Fluor. Tubular 36W c/ reator
eletronico de AFP - completa
LUMINRIA circular de embutir, corpo em alumnio, pintado na cor branca, e
refletor em alumnio anodizado multifacetado de alto brilho, com difusor em vidro
temperado, com 1 lmpada PL de 26W completa,
LUMINRIA tipo Blokito , autonoma, com duas lampadas PL de 9w, dotada de
bateria selada 12V/4AA, autonomia minima de 2 hs.
ARANDELA DE sobrepor, corpo e grade em ferro fundido pintado na cor cinza
martelado, com difusor em vidro transparente frisado, com lmpada incandescente
Pgina 5 de 94
PLANILHA ORAMENTRIA
MINISTERIO PUBLICO FEDERAL - PROCURADORIA GERAL DA
REFORMA
DA SEDE DA PROCURADORIA EM TABATINGA - AM
REPBLICA
CLIENTE:
OBRA:
REA:
LOCAL:
DATA:
TABATINGA AM
Maro de 2009
ITEM
6.1.5.5
CPU
6.1.6
6.1.6.1
6.1.6.2
6.1.6.3
6.1.6.4
16143.8.2.9
16143.8.2.8
16143.8.2.1
16143.8.3.1
6.1.6.5
6.1.6.6
6.1.6.7
6.1.6.8
6.1.6.9
6.1.6.10
6.1.6.11
16143.8.2.3
16143.8.6.1
16143.8.6.1
16143.8.5.2
CPU
CPU
CPU
6.1.7
6.1.7.1
6.1.7.2
6.1.7.3
6.1.7.4
6.1.7.5
6.1.7.6
6.1.7.7
un
cj
5.00
124.60
623.01
cj
cj
cj
38.00
22.00
4.00
12.39
17.64
20.90
470.78
388.10
83.62
cj
cj
cj
cj
cj
cj
cj
cj
2.00
1.00
34.00
111.00
6.00
1.00
145.00
17.00
22.83
29.89
30.78
30.78
3.09
29.88
16.44
17.55
45.66
29.89
1,046.66
3,417.02
18.56
29.88
2,384.15
298.31
m
un
un
cj
cj
m3
m3
102.00
15.00
15.00
12.00
1.00
12.00
12.00
23.29
183.51
52.05
70.97
391.99
29.65
26.65
2,375.42
2,752.62
780.82
851.60
391.99
355.84
319.80
un
un
un
un
1.00
6.00
6.00
1.00
3,607.50
286.00
127.40
312.00
3,607.50
1,716.00
764.40
312.00
un
1.00
325.00
325.00
un
1.00
325.00
325.00
un
1.00
65.00
65.00
un
1.00
3.90
3.90
un
un
un
2.00
1.00
3.00
19.50
1,950.00
78.00
39.00
1,950.00
234.00
m
un
un
un
un
un
un
m
un
un
cj
un
45.00
4.00
2.00
6.00
6.00
18.00
20.00
70.00
10.00
32.00
50.00
75.00
72.18
28.48
32.92
47.01
15.86
11.05
5.41
7.63
4.43
1.77
3.82
1.09
3,248.27
113.90
65.84
282.05
95.18
198.95
108.26
534.17
44.33
56.58
191.10
81.90
un
9.00
15.64
140.75
un
cj
cj
cj
un
un
un
1.00
37.00
16.00
2.00
75.00
16.00
3.00
44.29
3.09
3.09
3.09
5.11
3.65
347.52
44.29
114.48
49.50
6.19
383.18
58.36
1,042.55
un
un
1.00
3.00
620.83
183.51
620.83
550.52
m
m
m
m
1,259.00
50.00
254.00
30.00
1.94
1.70
3.65
2.82
2,438.68
85.23
927.20
84.63
un
un
un
un
m
un
un
m
1.00
75.00
6.00
75.00
230.00
50.00
80.00
30.00
1,560.00
3.90
156.00
5.85
24.97
9.04
2.81
28.74
1,560.00
292.50
936.00
438.75
5,743.79
451.75
224.64
862.29
Interruptores/Tomadas/Comandos
INTERRUPTOR , uma tecla simples 10 A - 250 V, com espelho completo
INTERRUPTOR , uma tecla paralelo 10 A - 250 V, com espelho completo
INTERRUPTOR , duas teclas simples 10 A - 250 V, com espelho completo
INTERRUPTOR E TOMADA , duas teclas simples e uma tomada dois plos 10 A 250 V, com espelho completo
INTERRUPTOR , duas teclas paralelo 10 A - 250 V, com espelho completo
TOMADA dois plos mais terra 20 A - 250 V, na cor vermelha, com espelho
TOMADA dois plos mais terra 20 A - 250 V, na cor preta, com espelho completo
PLACA (ESPELHO) PARA CAIXA , dimenses 4 x 2"
INTERRUPTOR , uma tecla Four- way 10 A - 250 V, com espelho completo
ADAPTADOR de tomada trs pinos- bipolar c/ terra,conforme NBR 14136/2002
TOMADA para ligao de bloco autnomo na cor branca, com espelho completa
QUANT.
Custo Unitrio
(R$) c/ BDI
6.2 a 6.3
6.2
6.2.1
6.2.1.1
CPU
6.2.1.2
6.2.1.3
6.2.1.4
6.2.1.5
CPU
CPU
CPU
CPU
6.2.1.6
CPU
6.2.1.7
CPU
6.2.1.8
CPU
6.2.1.9
CPU
6.2.1.10
6.2.1.11
6.2.2
6.2.2.1
6.2.2.2
6.2.2.3
6.2.2.4
6.2.2.5
6.2.2.6
6.2.2.7
6.2.2.8
6.2.2.9
6.2.2.10
6.2.2.11
6.2.2.12
6.2.2.13
REV.:01
CPU
CPU
CPU
CPU
CPU
CPU
CPU
CPU
CPU
16132.8.1.3
16132.8.4.3
16132.8.5.3
16136.8.3.1
16131.8.1.4
16136.8.2.1
6.2.2.14 16136.8.2.3
6.2.2.15
6.2.2.16
6.2.2.17
6.2.2.18
6.2.2.19
6.2.2.20
6.2.2.21
16143.8.5.2
16143.8.5.2
16143.8.5.2
16143.8.10.2
6.2.2.22
6.2.3
6.2.3.1
6.2.3.2
6.2.3.3
6.2.3.4
6.2.4
6.2.4.1
6.2.4.2
6.2.4.3
6.2.4.4
6.2.4.5
6.2.4.6
6.2.4.7
6.2.4.8
15500.8.1.20
16137.8.1.30
16136.8.4.7
16120.8.4.2
CPU
CPU
16120.8.3.62
CPU
CPU
CPU
CPU
16131.8.3.3
16131.8.2.2
16131.8.5.3
16132.8.1.8
Pgina 6 de 94
PLANILHA ORAMENTRIA
MINISTERIO PUBLICO FEDERAL - PROCURADORIA GERAL DA
REFORMA
DA SEDE DA PROCURADORIA EM TABATINGA - AM
REPBLICA
CLIENTE:
OBRA:
REA:
LOCAL:
DATA:
TABATINGA AM
Maro de 2009
REV.:01
ITEM
6.2.4.9
6.2.4.10
6.2.4.11
6.2.4.12
6.2.4.13
6.2.4.14
16132.8.4.8
16132.8.5.8
16131.8.1.8
16143.8.5.2
CPU
16715.8.2.2
6.3
6.3.1
6.3.1.1
6.3.1.3
6.3.1.5
6.3.1.6
6.3.1.7
6.3.1.8
16131.8.3.30
16131.8.2.14
16135.8.1.37
16135.8.1.28
16120.8.3.2
16136.8.2.5
6.3.2.1
CPU
6.3.2.2
6.3.2.3
6.3.2.4
6.3.2.5
6.3.2.6
CPU
CPU
16132.8.1.3
16132.8.4.3
16136.8.2.5
6.3.2.7
6.3.2.8
6.3.2.9
6.3.2.10
6.3.2.11
6.3.2.12
CPU
CPU
16131.8.3.3
16131.8.2.3
16131.8.5.3
16131.8.1.4
7
7.1
7.1.1
CPU
7.1.4
7.1.5
7.1.6
7.1.7
7.1.8
7.1.9
AR CONDICIONADO /CLIMATIZAO
Equipamentos e Acessrios
FORNECIMENTO e montagem com procedimento de vcuo nas linhas, adio
carga de gs refrigerante, testes e demais servios, conforme manual
fabricante de unidades condicionadoras tipo Air-Split -Hy wall - individuais FORNECIMENTO e montagem com procedimento de vcuo nas linhas, adio
CPU
carga de gs refrigerante, testes e demais servios, conforme manual
fabricante de unidades condicionadoras tipo Air-Split -Hy wall - individuais FORNECIMENTO e montagem com procedimento de vcuo nas linhas, adio
CPU
carga de gs refrigerante, testes e demais servios, conforme manual
fabricante de unidades condicionadoras tipo Air-Split -Hy wall - individuais SUPORTE completo para unidades condensadoras
CPU
15142.8.22.3 TUBO de PVC soldvel, com conexes 25 mm
TUBULAO DE cobre isolada 1/2"
CPU
TUBULAO DE cobre isolada 3/8"
CPU
TUBULAO DE cobre isolada 5/8"
CPU
CABO PP 3x2,5mm2
CPU
8
8.1
8.1.1
8.1.2
8.1.3
8.1.4
8.1.5
8.1.6
13970.8.1.2
13960.8.1.1
CPU
CPU
16530.8.1.1
09690.8.1.1
9
9.2
9.2.1
9.2.2
CPU
01740.8.1.1
SERVIOS COMPLEMENTARES
Limpeza de Obra
LIMPEZA permanente
LIMPEZA geral da edificao
7.1.3
10
2.00
9.00
2.00
9.00
4.00
30.00
Custo Unitrio
(R$) c/ BDI
22.96
12.71
8.32
3.09
12.74
3.61
m
un
un
un
m
67.00
4.00
8.00
3.00
390.00
12.56
5.68
19.66
22.09
2.59
un
1.00
79.94
79.94
un
un
cj
un
cj
m
un
un
un
m
un
un
un
m
un
un
un
un
12.00
1.00
5.00
19.00
16.00
6.00
1.00
5.00
2.00
100.00
8.00
33.00
9.00
214.00
10.00
1.00
1.00
1.00
28.18
5,460.00
183.51
2.81
1.09
28.16
23.78
5.11
2.29
7.63
4.43
1.77
1.09
2.98
767.00
494.00
1,105.00
351.00
338.21
5,460.00
917.54
53.35
17.47
168.95
23.78
25.55
4.58
763.10
35.46
58.34
9.83
637.08
7,670.00
494.00
1,105.00
351.00
un
m
un
m
un
1.00
124.00
17.00
9.00
2.00
2,561.00
19.50
15.60
7.63
4.43
2,561.00
2,418.00
265.20
68.68
8.87
un
un
m
m
un
un
un
2.00
1.00
12.00
6.00
1.00
5.00
2.00
79.94
188.50
4.00
24.97
9.04
2.81
1.09
159.87
188.50
48.02
149.84
9.04
14.04
2.18
un
9.00
2,840.50
25,564.50
un
3.00
3,438.50
10,315.50
un
un
m
m
m
m
m
1.00
13.00
32.00
35.00
26.00
5.00
28.00
5,083.00
123.50
11.54
34.16
47.27
51.61
4.00
5,083.00
1,605.50
369.41
1,195.60
1,229.10
258.05
112.04
un
un
un
un
un
m
5.00
1.00
27.00
1.00
16.00
37.00
164.98
481.65
15.60
62.40
188.40
3.54
824.92
481.65
421.20
62.40
3,014.34
130.83
ms
m2
6.00
600.00
725.01
4.62
4,350.06
2,769.00
QUANT.
841.39
22.72
157.25
66.26
1,008.93
6.3.2
7.1.2
un
un
un
un
m
m
un
Pgina 7 de 94
de
do
de
do
de
do
PLANILHA ORAMENTRIA
MINISTERIO PUBLICO FEDERAL - PROCURADORIA GERAL DA
REFORMA
DA SEDE DA PROCURADORIA EM TABATINGA - AM
REPBLICA
CLIENTE:
OBRA:
REA:
LOCAL:
DATA:
TABATINGA AM
Maro de 2009
ITEM
10.1
10.1.1
10.1.2
10.1.3
10.2
10.2.1
10.2.2
10.3
10.3.1
10.4
10.4.1
REV.:01
CPU
CPU
CPU
CPU
CPU
CPU
CPU
PESSOAL
ENGENHEIRO DE CAMPO (1/2)
MESTRE de obra (1)
VIGIA (2)
MATERIAIS DE CONSUMO
COPIAS de projetos
E.P.I (Equipamentos de Proteo Individual)
TRANSPORTE
VALE-TRANSPORTE de pessoal
ALIMENTAO
CAF DA MANH E almoo de pessoal
Pgina 8 de 94
un
QUANT.
Custo Unitrio
(R$) c/ BDI
ms
ms
ms
6.00
6.00
6.00
5,108.72
5,590.00
2,339.06
30,652.32
33,540.00
14,034.38
ms
ms
6.00
6.00
156.00
1,321.20
936.00
7,927.22
ms
6.00
1,716.00
10,296.00
ms
6.00
2,002.00
12,012.00
Subtotais (R$)
11,374.17
19,853.50
40,524.77
3,433.42
15,438.22
21,653.13
293,167.55
34,060.40
43,682.26
Pgina 9 de 94
Subtotais (R$)
12,946.89
10,823.48
14,151.19
5,760.70
6,317.71
31,874.19
133,947.66
65,895.73
21,357.26
17,591.13
29,103.54
6,305.10
Pgina 10 de 94
Subtotais (R$)
8,331.18
22,080.66
22,080.66
6,568.39
37,492.03
10,524.70
Pgina 11 de 94
Subtotais (R$)
26,967.33
Pgina 12 de 94
Subtotais (R$)
140,527.12
132,699.03
Pgina 13 de 94
Subtotais (R$)
7,828.09
57,985.63
31,782.66
Pgina 14 de 94
Subtotais (R$)
26,202.97
20,309.73
5,893.24
45,732.70
4,935.34
7,119.06
109,397.92
Pgina 15 de 94
Subtotais (R$)
768,109.79
Pgina 16 de 94
CLIENTE:
OBRA:
BASE:TCPO13 - PINI
BDI:
30.00%
TAXAS: LS
122.32%
OBS: ITENS COM CDIGO VER TABELA TCPO (NESTA TABELA NOS SERVIOS NO CONSTAM BDI)
ITEM
1.1.1.1
1.2.1.1
CPU
Unitrio
Total (R$)
1.0000
45.50
45.50
1.0000
45.50
45.50
ART DA OBRA
un
un
1.0000
1.0000
750.00
750.00
750.00
750.00
ART DA OBRA
Unid.
Coef.
1.2.1.2
CPU
un
un
1.0000
1.0000
3,862.36
3,862.36
3,862.36
3,862.36
1.2.1.3
CPU
vb
vb
1.0000
1.0000
3,500.00
3,500.00
3,500.00
3,500.00
2.2.2.1
CPU
cj
cj
1.0000
1.0000
900.00
900.00
900.00
900.00
2.2.3.2
CPU
cj
m2
H
H
KG
M
M2
1.0000
14.4000
25.0000
28.0000
0.2090
80.4000
30.0600
1,493.00
12.48
7.87
5.07
5.22
2.29
26.26
1,493.00
179.71
196.75
141.96
1.09
184.12
789.38
03110.3.1.4
01270.0.19.1
01270.0.45.1
05060.3.20.11
06062.3.4.5
09115.8.6.1
2.2.1
02220.8.4.1
01270.0.40.1
22050.3.40.2
22070.9.1.1
22600.9.3.5
2.3.1
14515.8.1.1
1.0000
1.5000
0.0750
235.72
7.87
120.17
5.0000
18.39
4.73
115.60
15.0000
1.55
5.07
99.30
m3
m3
1.0000
1.0000
3.92
3.92
3.92
3.92
2.3.2
CPU
un
dia
dia
1.0000
7.0000
1.0000
186.67
3.67
161.00
186.67
25.67
161.00
2.4.1
02595.8.1.1
m2
m2
1.0000
1.0000
3.98
3.98
3.98
3.98
2.5.1
un
un
1.0000
0.0050
2,850.00
570,945.77
2,854.73
2,854.73
Desmobilizao
un
un
1.0000
0.0050
2,850.00
570,945.77
2,854.73
2,854.73
2.5.2
11.81
9.01
3.1.1.1
CPU
01270.0.45.1
m
H
1.0000
4.0000
15.21
5.07
20.28
20.28
3.1.1.2
SINAPI
m3
m3
1.0000
1.0000
428.17
428.17
428.17
428.17
3.1.1.3
03310.8.13.2
m3
1.0000
47.25
47.25
m3
1.0000
47.25
47.25
m3
H
1.0000
4.0000
20.28
5.07
20.28
M3
H
1.0000
3.2000
16.22
5.07
16.22
3.1.1.4
02315.8.1.9
01270.0.45.1
3.1.1.5
02315.8.7.1
01270.0.45.1
Pgina 17 de 94
CLIENTE:
OBRA:
BASE:TCPO13 - PINI
BDI:
30.00%
TAXAS: LS
122.32%
OBS: ITENS COM CDIGO VER TABELA TCPO (NESTA TABELA NOS SERVIOS NO CONSTAM BDI)
ITEM
3.2.1.1
3.2.1.2
3.2.2.1
3.2.2.2
03140.8.2.1
SINAPI
SINAPI
Unid.
Coef.
Unitrio
Total (R$)
m2
1.0000
42.82
42.82
m2
1.0000
42.82
42.82
m2
1.0000
18.39
18.39
m2
1.0000
18.39
18.39
m3
m3
1.0000
1.0000
441.58
441.58
441.58
m3
1.0000
m3
1.0000
86.41
86.41
86.41
3.2.3.1
03210.8.1.6
kg
kg
1.0000
1.0000
7.82
7.82
7.82
7.82
3.2.3.2
03210.8.1.10
kg
kg
0.1100
1.0000
5.33
5.33
5.33
5.33
3.2.3.3
03210.8.1.11
kg
kg
0.1100
1.0000
6.10
6.10
6.10
6.10
3.2.3.4
03210.8.1.12
kg
kg
14.9000
1.0000
6.66
6.66
6.66
6.66
3.3.1.1
05125.8.1.1
kg
kg
1.0000
1.0000
10.25
10.25
10.25
10.25
m2
1.0000
23.96
23.96
m2
1.0000
23.96
23.96
m2
1.0000
95.15
95.15
m2
1.0000
95.15
95.15
m2
1.0000
68.84
68.84
m2
1.0000
68.84
68.84
m2
1.0000
43.58
43.58
m2
1.0000
43.58
43.58
m2
H
H
KG
KG
M3
UN
1.0000
4.0000
4.0000
0.2500
0.6000
0.0156
25.0000
546.08
7.87
5.07
1.88
3.60
264.27
12.00
358.51
31.48
20.28
0.47
2.16
4.12
300.00
m3
1.0000
1,074.24
1,074.24
4.1.1
4.1.2
4.1.3
4.1.4
4.1.5
04211.8.2.3
04840.8.5.2
04840.8.5.3
07210.8.1.3
04270.8.1.1
01270.0.40.1
01270.0.45.1
SINAPI
03210.3.5.4
04060.8.1.34
SINAPI
4.1.6
SINAPI
ISOLAMENTO TRMICO de parede interna empregando painel semirgido de fibra de vidro, e=5 cm, fixado com arame e tela
ISOLAMENTO TRMICO de parede interna empregando painel semi-rgido
de fibra de vidro, e=5 cm, fixado com arame e tela
Pgina 18 de 94
CLIENTE:
OBRA:
BASE:TCPO13 - PINI
BDI:
30.00%
TAXAS: LS
122.32%
OBS: ITENS COM CDIGO VER TABELA TCPO (NESTA TABELA NOS SERVIOS NO CONSTAM BDI)
ITEM
Unid.
Unitrio
Total (R$)
m3
Coef.
1.0000
1,074.24
1,074.24
4.1.7
SINAPI
m3
m3
1.0000
1.0000
15.09
15.09
15.09
15.09
4.1.8
SINAPI
m2
m2
1.0000
1.0000
3.01
3.01
3.01
3.01
4.1.9
02220.8.11.1
m2
m2
1.0000
1.0000
4.10
4.10
4.10
4.10
M2
H
H
4.1.10
02220.8.11.2
01270.0.40.1
01270.0.45.1
4.2.1.1
4.2.1.2
4.2.1.3
4.2.1.4
SINAPI
SINAPI
SINAPI
CPU
01270.0.1.11
01270.0.19.1
01270.0.40.1
01270.0.45.1
08110.3.1.2
MERCADO
SINAPI
08710.3.3.1
4.2.1.5
CPU
01270.0.1.11
01270.0.19.1
01270.0.40.1
01270.0.45.1
08110.3.1.2
MERCADO
SINAPI
08710.3.3.1
4.2.2.1
4.2.2.2
4.2.2.3
CPU
01270.0.40.1
01270.0.45.1
SINAPI
02065.3.5.1
MERCADO
SINAPI
08520.8.1.4
Pedreiro
Servente
Areia lavada tipo mdia
Cimento Portland CP II-E-32 (resistncia: 32,00 MPa)
Porta de alumnio em veneziana- EA-2 (0,70x2,10) m
Pgina 19 de 94
8.20
7.87
5.07
0.1400
1.4000
un
1.0000
255.43
255.43
un
1.0000
255.43
255.43
un
1.0000
186.23
186.23
un
1.0000
186.23
186.23
un
1.0000
215.30
215.30
un
1.0000
215.30
215.30
un
H
H
H
H
CJ
1.0000
3.7500
3.7500
1.3000
1.3000
1.0000
507.80
5.69
7.87
7.87
5.07
96.00
474.99
21.34
29.51
10.23
6.59
96.00
UN
1.0000
225.19
225.19
UN
1.0000
27.84
27.84
UN
3.0000
19.43
58.29
un
H
H
H
H
CJ
1.0000
3.7500
3.7500
1.3000
1.3000
1.0000
432.74
5.69
7.87
7.87
5.07
96.00
408.28
21.34
29.51
10.23
6.59
96.00
UN
1.0000
150.13
150.13
UN
1.0000
36.19
36.19
UN
3.0000
19.43
58.29
un
H
H
M3
KG
un
1.0000
1.5000
2.5000
0.0029
1.1700
1.0000
609.59
7.87
5.07
40.60
0.34
584.48
609.48
11.81
12.68
0.12
0.40
584.48
m2
1.0000
247.98
247.98
m2
1.0000
247.98
247.98
m2
1.0000
390.43
390.43
8.20
1.10
7.10
CLIENTE:
OBRA:
BASE:TCPO13 - PINI
BDI:
30.00%
TAXAS: LS
122.32%
OBS: ITENS COM CDIGO VER TABELA TCPO (NESTA TABELA NOS SERVIOS NO CONSTAM BDI)
ITEM
4.2.2.4
SINAPI
4.2.2.5
4.2.3.1
08820.8.2.13
PORTA de vidro temperado esp. 10mm inclusive ferragens VT01/VT02 (01p 1,40X2,10m; 01p 4,53x2,50m)
PORTA de vidro temperado esp. 10mm inclusive ferragens - VT01/VT02
(01p 1,40X2,10m; 01p 4,53x2,50m)
Unid.
Coef.
Unitrio
Total (R$)
m2
1.0000
390.43
390.43
m2
1.0000
309.76
309.76
m2
1.0000
309.76
309.76
m2
1.0000
400.00
400.00
m2
1.0000
400.00
400.00
m2
1.0000
581.07
581.07
m2
1.0000
581.07
581.07
327.75
285.00
285.00
285.00
327.75
285.00
370.50
327.75
CPU
MERCADO
08820.13.1.1
08820.13.1.2
m2
M2
%
%
1.0000
1.0000
1.3000
1.1500
CPU
01270.0.40.1
01270.0.45.1
02060.3.2.2
02065.3.5.1
m2
H
H
M3
KG
M2
1.0000
3.0000
3.0000
0.0080
2.8400
1.0000
81.17
0.34
130.00
4.3.1
08830.8.1.2
m2
m2
1.0000
1.0000
255.68
255.68
255.68
255.68
4.3.2
SINAPI
m2
1.0000
153.64
153.64
m2
1.0000
153.64
153.64
m2
1.0000
96.62
96.62
m2
1.0000
96.62
96.62
4.2.3.2
4.2.4.1
4.4.1
07410.8.3.1
170.43
7.87
5.07
4.4.2
07620.8.2.6
m
m
1.0000
1.0000
20.59
20.59
20.59
20.59
4.4.3
CPU
m2
m2
1.0000
1.0000
8.90
8.90
8.90
8.90
4.4.4
05125.8.5.1
m2
m2
1.0000
1.0000
107.63
107.63
107.63
107.63
m
m
KG
1.0000
0.9750
35.00
2.56
m2
m2
1.0000
1.0000
18.29
18.29
18.29
18.29
m2
1.0000
16.18
16.18
m2
1.0000
16.18
16.18
m2
H
H
M2
1.0000
0.4400
0.2200
1.1900
57.48
7.87
5.07
42.90
57.13
3.46
1.12
51.05
KG
4.4000
0.34
1.50
4.4.5
09705.3.2.10
4.5.1.1
02710.8.6.2
4.5.1.2
SINAPI
4.5.1.5
CPU
01270.0.30.1
01270.0.45.1
MERCADO
SINAPI
Pgina 20 de 94
23.61
15.21
0.65
0.97
130.00
37.50
35.00
2.50
CLIENTE:
OBRA:
BASE:TCPO13 - PINI
BDI:
30.00%
TAXAS: LS
122.32%
OBS: ITENS COM CDIGO VER TABELA TCPO (NESTA TABELA NOS SERVIOS NO CONSTAM BDI)
ITEM
4.5.1.6
4.5.1.7
CPU
01270.0.30.1
01270.0.45.1
MERCADO
SINAPI
CPU
01270.0.30.1
01270.0.45.1
MERCADO
SINAPI
Unid.
Coef.
Unitrio
Total (R$)
m2
H
H
M2
1.0000
0.4400
0.2200
1.1900
57.48
7.87
5.07
42.90
57.13
3.46
1.12
51.05
KG
4.4000
0.34
1.50
m2
H
H
M2
1.0000
0.4400
0.2200
1.1900
146.85
7.87
5.07
118.00
146.49
3.46
1.12
140.42
KG
4.4000
0.34
1.50
4.5.1.8
09655.8.6.1
PLACA vinlica 30x30 cm, e=2 mm, fixada com cola base de
neoprene
PLACA vinlica 30x30 cm, e=2 mm, fixada com cola base de neoprene
m2
m2
1.0000
1.0000
40.02
40.02
40.02
40.02
4.5.1.9
09640.8.7.1
m2
1.0000
74.67
74.67
m2
1.0000
74.67
74.67
0.84
1.27
5.07
4.5.1.10
09606.8.3.1
01270.0.45.1
09705.3.2.24
4.5.2.1
09705.8.12.4
1.0000
2.87
2.87
m2
1.0000
2.87
2.87
m2
H
H
m2
1.0000
0.5015
0.5015
0.0275
17.53
7.87
5.07
401.41
17.53
3.95
2.54
11.04
4.5.2.3
CPU
01270.0.30.1
01270.0.45.1
SINAPI
MERCADO
09705.3.2.24
SINAPI
m2
H
H
KG
M2
KG
1.0000
0.4000
0.2000
0.2500
1.0500
0.9500
51.42
7.87
5.07
1.88
42.90
1.90
52.84
3.15
1.01
0.47
45.05
1.81
m2
4.0000
0.34
1.36
m2
1.0000
30.31
30.31
m2
1.0000
30.31
30.31
m2
H
H
KG
M2
1.0000
0.4000
0.2000
0.2500
1.0500
7.87
5.07
1.88
42.90
51.04
3.15
1.01
0.47
45.05
m2
4.0000
0.34
1.36
m2
1.0000
42.36
42.36
m2
1.0000
42.36
42.36
4.5.3.1
4.5.3.2
4.5.4.1
09500.8.8.4
m2
AREIA
Pedreiro
Servente
ARGAMASSA mista de cimento, cal hidratada e areia peneirada trao 1:2:8
CPU
01270.0.30.1
01270.0.45.1
SINAPI
MERCADO
SINAPI
CAL
1.90
REBOCO PAULISTA
ESP.=25MM
4.5.2.5
CIMENTO,
0.2500
0.4400
CPU
01270.0.40.1
01270.0.45.1
04060.8.1.75
09720.8.3.1
1:2:8
4.5.2.2
4.5.2.4
TRAO
M2
H
KG
CPU
01270.0.1.1
01270.0.33.1
MERCADO
Tabica em gesso
Ajudante
Montador
Tabica em gesso
m
H
H
M
1.0000
0.7000
0.7000
1.0000
11.03
5.07
7.87
2.13
11.19
3.55
5.51
2.13
09906.8.2.1
m2
1.0000
6.76
6.76
Pgina 21 de 94
2.10
1.27
0.84
CLIENTE:
OBRA:
BASE:TCPO13 - PINI
BDI:
30.00%
TAXAS: LS
122.32%
OBS: ITENS COM CDIGO VER TABELA TCPO (NESTA TABELA NOS SERVIOS NO CONSTAM BDI)
ITEM
4.5.4.2
4.5.4.4
SINAPI
SINAPI
PINTURA
COM
TINTA
LTEX
ACRLICA
em
parede
externa/interna/forro, com duas demos, sem massa corrida
PINTURA COM TINTA LTEX ACRLICA em parede externa/interna/forro,
com duas demos, sem massa corrida
Unid.
Unitrio
Total (R$)
m2
Coef.
1.0000
6.76
6.76
m2
1.0000
5.23
5.23
m2
1.0000
5.23
5.23
m2
1.0000
8.60
8.60
m2
1.0000
8.60
8.60
4.5.4.5
09115.8.14.1
m2
m2
1.0000
1.0000
8.92
8.92
8.92
8.92
4.5.4.6
SINAPI
m2
m2
1.0000
1.0000
5.47
5.47
5.47
5.47
4.5.4.7
09906.8.4.1
m2
1.0000
5.08
5.08
m2
1.0000
5.08
5.08
4.5.4.8
01270.0.1.19
01270.0.41.1
09906.3.9.1
09910.3.12.1
09910.3.30.21
Ajudante de pintor
Pintor
Zarco
Aguarrs mineral
Lixa para superfcie metlica grana 100
m2
H
H
L
L
UN
1.0000
0.6000
0.6000
0.1200
0.0300
0.3000
01270.0.1.19
01270.0.41.1
09906.3.9.1
09910.3.12.1
09910.3.30.21
m2
H
H
L
L
UN
L
26.0000
0.8000
0.8000
0.1200
0.0300
0.3000
0.1600
16.77
5.66
2.18
15.98
m2
1.0000
9.51
9.51
m2
1.0000
9.51
9.51
m2
1.0000
30.67
30.67
m2
1.0000
30.67
30.67
m2
1.0000
49.48
49.48
m2
1.0000
49.48
49.48
m2
1.0000
6.19
6.19
m2
1.0000
6.19
6.19
m2
1.0000
25.49
25.49
m2
1.0000
25.49
25.49
m2
m2
1.0000
1.0000
31.82
31.82
31.82
31.82
m
H
H
1.0000
0.8000
0.6000
17.76
7.87
5.07
17.72
6.30
3.04
4.5.4.9
4.6.1
4.6.2
4.6.3
4.6.4
4.6.5
4.6.6
4.7.1.1
07120.8.3.1
07110.8.6.1
07110.8.2.1
SINAPI
07110.8.4.2
SINAPI
CPU
01270.0.30.1
01270.0.45.1
Pgina 22 de 94
10.97
5.69
7.87
16.77
5.66
2.18
16.24
5.69
7.87
3.41
4.72
2.01
0.17
0.65
4.55
6.30
2.01
0.17
0.65
2.56
CLIENTE:
OBRA:
BASE:TCPO13 - PINI
BDI:
30.00%
TAXAS: LS
122.32%
OBS: ITENS COM CDIGO VER TABELA TCPO (NESTA TABELA NOS SERVIOS NO CONSTAM BDI)
ITEM
4.7.1.2
CPU
01270.0.30.1
01270.0.45.1
MERCADO
SINAPI
4.8.1.1
0.34
0.14
KG
0.4000
0.34
0.14
m
m
1.0000
1.0000
7.11
7.11
7.11
7.11
1.0000
6.58
6.58
1.0000
6.58
6.58
0.0038
299.57
53.06
1.12
1.0000
51.94
51.94
0.0038
299.57
34.12
1.12
1.0000
33.00
33.00
un
H
H
H
H
UN
1.0000
3.3000
3.3000
1.0000
1.0000
2.0000
600.06
5.69
7.87
7.87
5.07
0.81
600.06
18.78
25.97
7.87
5.07
1.62
UN
M
6.0000
1.1200
0.73
0.15
4.38
0.17
UN
UN
1.0000
1.0000
62.04
12.00
62.04
12.00
UN
1.0000
2.89
2.89
UN
1.0000
114.85
114.85
UN
UN
1.0000
1.0000
17.52
253.60
17.52
253.60
UN
1.0000
73.30
73.30
04060.8.1.80
09380.6.12.1
0.4000
19.35
6.30
3.04
9.88
SINAPI
09635.8.14.1
KG
19.38
7.87
5.07
8.98
4.7.1.4
4.7.2.2
Total (R$)
8.25
1.0000
0.8000
0.6000
1.1000
04060.8.1.80
09380.6.11.1
Unitrio
7.50
m
H
H
m
09655.8.7.1
09635.8.13.1
Coef.
1.1000
Ladrilhista
Servente
RODAP de cermica Eliane Mithos Arthemis Bone 10x50cm
Argamassa pr-fabricada de cimento colante para assentamento de peas
cermicas
4.7.1.3
4.7.2.1
Unid.
m
M
M3
M
M3
CPU
4.8.1.2
15410.8.14.3
un
un
1.0000
1.0000
265.74
265.74
265.74
265.74
4.8.1.3
SINAPI
un
un
1.0000
1.0000
172.44
172.44
172.44
172.44
un
H
H
H
H
UN
1.0000
3.3000
3.3000
2.0000
2.0000
2.0000
583.17
5.69
7.87
7.87
5.07
0.81
583.17
18.78
25.97
15.74
10.14
1.62
UN
KG
UN
12.0000
0.2500
1.0000
0.73
2.83
102.93
8.76
0.71
102.93
UN
1.0000
355.87
355.87
UN
UN
UN
1.0000
1.0000
1.0000
4.13
7.49
2.80
4.13
7.49
2.80
4.8.1.4
CPU
01270.0.1.14
01270.0.24.1
01270.0.40.1
01270.0.45.1
05060.3.12.1
05060.3.6.2
08770.3.13.1
15410.3.3.3
15007.3.2.1
15152.3.13.2
15155.3.15.1
15155.3.3.1
Pgina 23 de 94
CLIENTE:
OBRA:
BASE:TCPO13 - PINI
BDI:
30.00%
TAXAS: LS
122.32%
OBS: ITENS COM CDIGO VER TABELA TCPO (NESTA TABELA NOS SERVIOS NO CONSTAM BDI)
ITEM
Unid.
Unitrio
Total (R$)
UN
Coef.
1.0000
28.23
28.23
4.8.1.5
15410.8.3.2
un
un
1.0000
1.0000
295.02
295.02
295.02
295.02
4.8.1.6
15410.8.23.1
un
un
1.0000
1.0000
401.70
401.70
401.70
401.70
4.8.1.7
SINAPI
un
1.0000
171.14
171.14
un
1.0000
171.14
171.14
un
H
H
M
1.0000
3.5000
3.5000
1.6000
272.45
5.69
7.87
0.15
272.45
19.92
27.55
0.24
UN
1.0000
74.50
74.50
UN
un
1.0000
1.0000
24.75
125.50
24.75
125.50
un
H
H
M
1.0000
2.4000
2.4000
0.9400
280.69
5.69
7.87
0.15
187.70
13.66
18.89
0.14
un
1.0000
155.01
155.01
4.8.1.8
CPU
01270.0.1.14
01270.0.24.1
15143.3.5.1
15155.3.11.4
15155.3.14.1
MERCADO
4.8.1.9
CPU
01270.0.1.14
01270.0.24.1
15143.3.5.1
SINAPI
4.8.1.10
CPU
01270.0.1.14
01270.0.24.1
15143.3.5.1
MERCADO
un
H
H
M
un
1.0000
1.4000
1.4000
0.9400
1.0000
115.00
5.69
7.87
0.15
95.87
115.00
7.97
11.02
0.14
95.87
4.8.1.11
15410.8.27.2
un
un
1.0000
1.0000
73.85
73.85
73.85
73.85
4.8.1.13
15110.8.3.1
un
1.0000
182.39
182.39
un
1.0000
182.39
182.39
un
1.0000
464.20
464.20
un
1.0000
464.20
464.20
un
H
H
1.0000
1.5000
1.5000
7.87
5.07
307.20
11.81
7.61
UN
un
12.0000
1.0000
0.16
285.87
1.92
285.87
2.0000
2.0000
7.87
5.07
325.80
15.74
10.14
UN
12.0000
0.16
1.92
UN
1.0000
298.00
298.00
un
H
H
M3
1.0000
2.5000
2.5000
0.0052
618.30
7.87
5.07
40.60
464.26
19.68
12.68
0.21
4.8.1.14
4.8.1.15
10820.8.10.3
CPU
01270.0.40.1
01270.0.45.1
05060.3.6.1
MERCADO
4.8.1.16
15007.8.1.1
01270.0.40.1
01270.0.45.1
05060.3.6.1
15007.3.1.2
4.8.1.17
CPU
01270.0.40.1
01270.0.45.1
SINAPI
Bancada (2,40x0,60)m, em mrmore branco especial polido, 20mm cozinha - conforme projeto
Pedreiro
Servente
Areia lavada tipo mdia
Pgina 24 de 94
UN
H
H
CLIENTE:
OBRA:
BASE:TCPO13 - PINI
BDI:
30.00%
TAXAS: LS
122.32%
OBS: ITENS COM CDIGO VER TABELA TCPO (NESTA TABELA NOS SERVIOS NO CONSTAM BDI)
ITEM
4.8.1.18
CPU
01270.0.40.1
01270.0.45.1
SINAPI
02065.3.5.1
SINAPI
4.8.1.19
CPU
01270.0.40.1
01270.0.45.1
SINAPI
02065.3.5.1
SINAPI
4.8.1.20
CPU
01270.0.40.1
01270.0.45.1
SINAPI
02065.3.5.1
SINAPI
4.8.1.21
4.8.1.22
10640.8.3.1
15480.8.6.1
01270.0.1.14
01270.0.24.1
15410.3.32.1
4.9.2
Bancada (2,10x0,55)m, em mrmore branco especial polido, 20mm copas procurador - conforme projeto
Pedreiro
Servente
Areia lavada tipo mdia
Cimento Portland CP II-E-32 (resistncia: 32,00 MPa)
Suporte para bancada
Bancada (2,10x0,55)m, em mrmore branco especial polido, 20mm - copas
procurador - conforme projeto
Bancada (1,86x0,42)m, em mrmore branco especial polido, 20mm lavatrio de apoio, lav. procurador e banheiros - conforme projeto
Pedreiro
Servente
Areia lavada tipo mdia
Cimento Portland CP II-E-32 (resistncia: 32,00 MPa)
Suporte para bancada
Bancada (1,86x0,42)m, em mrmore branco especial polido, 20mm lavatrio de apoio, lav. procurador e banheiros - conforme projeto
Coef.
2.2700
3.0000
Unitrio
0.34
25.00
Total (R$)
0.77
75.00
M2
1.4400
247.17
355.92
un
H
H
M3
KG
KG
1.0000
2.5000
2.5000
0.0052
2.2700
3.0000
237.90
7.87
5.07
40.60
0.34
25.00
198.65
19.68
12.68
0.21
0.77
75.00
M2
0.3654
247.17
90.32
un
H
H
M3
KG
KG
1.0000
2.5000
2.5000
0.0052
2.2700
3.0000
517.41
7.87
5.07
40.60
0.34
25.00
393.81
19.68
12.68
0.21
0.77
75.00
M2
1.1550
247.17
285.48
un
H
H
M3
KG
KG
1.0000
2.5000
2.5000
0.0052
2.2700
3.0000
385.09
7.87
5.07
40.60
0.34
25.00
301.42
19.68
12.68
0.21
0.77
75.00
M2
0.7812
247.17
193.09
m2
m2
1.0000
1.0000
332.10
332.10
332.10
332.10
0.5000
0.5000
5.69
7.87
101.59
2.85
3.94
1.0000
1.0000
7.68
87.13
7.68
87.13
0.0774
5.07
0.39
0.39
0.0800
0.0800
0.0900
0.1000
1.0000
0.1000
0.0050
0.1500
7.87
5.07
39.00
0.13
4.05
0.90
65.00
0.19
9.05
0.63
0.41
3.51
0.01
4.05
0.09
0.33
0.03
UN
H
H
Ajudante de encanador
Encanador
Tubo de ligao de lato com canopla para chuveiro para gua fria e
quente (comprimento: 230,00 mm / dimetro da seo: 1/2 " / tipo de
acabamento: CROMADO)
Chuveiro eltrico (potncia: 5400 W / tenso: 220 V)
UN
UN
02915.8.2.1
01270.0.45.1
M2
H
02920.8.2.2
M2
H
H
M3
KG
M2
KG
M3
KG
15480.3.5.1
4.9.1
Bancada (0,87x0,42)m, em mrmore branco especial polido, 20mm wc, sute procurador - conforme projeto
Pedreiro
Servente
Areia lavada tipo mdia
Cimento Portland CP II-E-32 (resistncia: 32,00 MPa)
Suporte para bancada
Bancada (0,87x0,42)m, em mrmore branco especial polido, 20mm - wc,
sute procurador - conforme projeto
Unid.
KG
KG
01270.0.28.1
01270.0.45.1
SINAPI
02920.3.2.1
02920.3.3.2
02930.3.1.1
SINAPI
02930.3.5.1
5.1.1
15142.8.23.5
m
m
1.0000
1.0000
10.44
10.44
10.44
10.44
5.1.2
SINAPI
m
m
1.0000
1.0000
8.12
8.12
8.12
8.12
5.1.3
SINAPI
m
m
1.0000
1.0000
5.72
5.72
5.72
5.72
5.1.4
SINAPI
m
m
1.0000
1.0000
3.41
3.41
3.41
3.41
5.1.5
SINAPI
un
1.0000
5.73
5.73
Pgina 25 de 94
CLIENTE:
OBRA:
BASE:TCPO13 - PINI
BDI:
30.00%
TAXAS: LS
122.32%
OBS: ITENS COM CDIGO VER TABELA TCPO (NESTA TABELA NOS SERVIOS NO CONSTAM BDI)
ITEM
Unid.
un
Coef.
1.0000
Unitrio
5.73
Total (R$)
5.73
5.1.6
SINAPI
un
un
1.0000
1.0000
5.32
5.32
5.32
5.32
5.1.7
15142.8.11.4
un
un
1.0000
1.0000
3.80
3.80
3.80
3.80
5.1.8
15142.8.11.3
un
un
1.0000
1.0000
3.09
3.09
3.09
3.09
5.1.9
15142.8.12.2
un
un
1.0000
1.0000
4.26
4.26
4.26
4.26
5.1.10
SINAPI
un
un
1.0000
1.0000
9.18
9.18
9.18
9.18
5.1.11
15142.8.19.4
un
un
1.0000
1.0000
5.70
5.70
5.70
5.70
5.1.12
SINAPI
un
un
1.0000
1.0000
3.57
3.57
3.57
3.57
5.1.13
UN
H
H
L
1.0000
0.1700
0.1700
0.0152
24.75
0.97
1.34
0.38
UN
KG
1.0000
0.0116
1.06
32.80
1.06
0.38
4.12
5.69
7.87
5.1.14
SINAPI
un
un
1.0000
1.0000
8.33
8.33
8.33
8.33
5.1.15
15142.8.17.3
un
un
1.0000
1.0000
6.73
6.73
6.73
6.73
5.1.16
15142.8.17.6
un
un
1.0000
1.0000
10.31
10.31
10.31
10.31
5.1.17
15142.8.15.6
un
un
1.0000
1.0000
5.45
5.45
5.45
5.45
5.1.18
15142.8.15.4
un
un
1.0000
1.0000
2.68
2.68
2.68
2.68
5.1.19
15142.8.15.3
un
un
1.0000
1.0000
2.04
2.04
2.04
2.04
5.1.20
15142.8.31.2
un
un
1.0000
1.0000
1.89
1.89
1.89
1.89
5.1.21
15142.8.31.1
un
un
1.0000
1.0000
1.81
1.81
1.81
1.81
5.1.22
15142.8.3.3
un
un
1.0000
1.0000
12.60
12.60
12.60
12.60
5.1.23
15142.8.3.2
un
un
1.0000
1.0000
10.37
10.37
10.37
10.37
5.1.25
SINAPI
un
un
1.0000
1.0000
66.66
66.66
66.66
66.66
Pgina 26 de 94
CLIENTE:
OBRA:
BASE:TCPO13 - PINI
BDI:
30.00%
TAXAS: LS
122.32%
OBS: ITENS COM CDIGO VER TABELA TCPO (NESTA TABELA NOS SERVIOS NO CONSTAM BDI)
ITEM
Unid.
Coef.
Unitrio
Total (R$)
5.1.26
SINAPI
un
un
1.0000
1.0000
29.30
29.30
29.30
29.30
5.1.27
SINAPI
un
un
1.0000
1.0000
40.99
40.99
40.99
40.99
5.1.28
15110.8.2.2
un
un
1.0000
1.0000
60.18
60.18
60.18
60.18
5.1.29
SINAPI
un
un
1.0000
1.0000
44.16
44.16
44.16
44.16
5.1.30
CPU
01270.0.1.14
01270.0.24.1
06062.3.6.3
08770.3.13.1
15141.3.16.2
un
H
H
M
KG
1.0000
14.0000
14.0000
10.0000
0.1000
1,178.89
5.69
7.87
13.40
2.83
1,178.89
79.66
110.18
134.00
0.28
UN
2.0000
8.32
16.64
UN
2.0000
10.42
20.84
15143.3.5.1
MERCADO
UN
M
UN
4.0000
3.0300
1.0000
25.12
0.15
716.35
100.48
0.45
716.35
5.1.31
CPU
01270.0.1.14
01270.0.24.1
mercado
un
H
H
un
1.0000
8.0000
8.0000
1.0000
758.48
5.69
7.87
650.00
758.48
45.52
62.96
650.00
5.1.32
SINAPI
un
un
1.0000
1.0000
53.10
53.10
53.10
53.10
5.1.33
SINAPI
un
un
1.0000
1.0000
29.59
29.59
29.59
29.59
5.1.34
15410.8.2.1
AUTOMTICO de bia
AUTOMTICO de bia
un
un
1.0000
1.0000
37.56
37.56
37.56
37.56
un
un
1.0000
1.0000
44.00
44.00
44.00
44.00
15141.3.16.3
15141.3.16.6
5.1.35
15410.8.26.2
5.1.36
CPU
un
un
1.0000
1.0000
800.00
800.00
800.00
800.00
5.1.37
15142.8.13.2
01270.0.1.14
01270.0.24.1
15142.3.14.2
UN
H
H
1.0000
0.0900
0.0900
1.65
1.22
5.69
7.87
UN
L
KG
1.0000
0.0095
0.0053
1.24
24.75
32.80
UN
H
H
1.0000
0.1400
0.1400
2.12
UN
L
KG
1.0000
0.0125
0.0075
1.57
24.75
32.80
UN
H
H
L
1.0000
0.1400
0.1400
0.0110
1.66
24.75
3.56
0.80
1.10
0.27
UN
KG
1.0000
0.0066
1.17
32.80
1.17
0.22
15142.3.18.1
15142.3.4.1
5.1.38
15142.8.13.3
01270.0.1.14
01270.0.24.1
15142.3.14.3
15142.3.18.1
15142.3.4.1
5.1.39
Pgina 27 de 94
2.87
0.51
0.71
1.24
0.24
0.17
1.90
5.69
7.87
4.02
0.80
1.10
1.57
0.31
0.25
1.90
5.69
7.87
CLIENTE:
OBRA:
BASE:TCPO13 - PINI
BDI:
30.00%
TAXAS: LS
122.32%
OBS: ITENS COM CDIGO VER TABELA TCPO (NESTA TABELA NOS SERVIOS NO CONSTAM BDI)
ITEM
5.1.40
SINAPI
01270.0.1.14
5.1.41
15142.8.8.2
01270.0.1.14
01270.0.24.1
15142.3.10.2
15142.3.18.1
15142.3.4.1
5.1.42
01270.0.24.1
01270.0.6.1
05060.3.31.2
05060.3.5.1
13105.3.3.75
16115.3.2.74DD
01270.0.24.1
01270.0.6.1
05060.3.31.2
05060.3.5.1
16115.3.2.74DD
01270.0.24.1
01270.0.6.1
05060.3.31.2
05060.3.5.1
16115.3.2.74DD
01270.0.24.1
01270.0.6.1
05060.3.31.2
05060.3.5.1
16115.3.2.74DD
5.1.49
5.1.50
Encanador
Ajudante de encanador
Parafuso com rosca soberba galvanizado (comprimento: 85,00 mm /
dimetro nominal: 8,00 mm)
Bucha de nylon (dimetro nominal da bucha: 8,00 mm)
Braadeira galvanizada tipo omega - chapa #12 - 40 mm
Arruela lisa de 3/8 " - galvanizada
5.1.45
5.1.48
Encanador
Ajudante de encanador
Parafuso com rosca soberba galvanizado (comprimento: 85,00 mm /
dimetro nominal: 8,00 mm)
Bucha de nylon (dimetro nominal da bucha: 8,00 mm)
Braadeira galvanizada tipo omega - chapa #12 - 32 mm
Arruela lisa de 3/8 " - galvanizada
5.1.44
5.1.47
Encanador
Ajudante de encanador
Parafuso com rosca soberba galvanizado (comprimento: 85,00 mm /
dimetro nominal: 8,00 mm)
Bucha de nylon (dimetro nominal da bucha: 8,00 mm)
Braadeira galvanizada tipo omega - chapa #12 - 25 mm
Arruela lisa de 3/8 " - galvanizada
5.1.43
5.1.46
Unid.
Encanador
Ajudante de encanador
Parafuso com rosca soberba galvanizado (comprimento: 85,00 mm /
dimetro nominal: 8,00 mm)
Bucha de nylon (dimetro nominal da bucha: 8,00 mm)
Braadeira galvanizada tipo omega - chapa #12 - 50 mm
Arruela lisa de 3/8 " - galvanizada
15143.8.11.4
01270.0.1.14
01270.0.24.1
15143.3.12.1
15143.3.5.1
15141.8.20.2
01270.0.1.14
01270.0.24.1
15141.3.20.2
15141.8.20.3
01270.0.1.14
01270.0.24.1
15141.3.20.3
Ajudante de encanador
Encanador
Plug (bujo) de PVC branco roscvel (dimetro da seo: 1/2 ")
Fita de vedao para tubos e conexes roscveis (largura: 18 mm)
15143.8.15.2
01270.0.1.14
01270.0.24.1
15143.3.16.2
15143.3.5.1
15143.8.15.3
01270.0.1.14
01270.0.24.1
Ajudante de encanador
Encanador
Unio de PVC branco roscvel (dimetro da seo: 3/4 ")
Fita de vedao para tubos e conexes roscveis (largura: 18 mm)
Ajudante de encanador
Encanador
Pgina 28 de 94
Coef.
UN
1.0000
0.1400
UN
H
H
UN
L
KG
0.1800
0.1800
1.0000
0.0024
0.0053
Unitrio
Total (R$)
19.09
19.09
19.09
1.18
2.44
5.69
7.87
0.95
24.75
32.80
UN
H
H
1.0000
0.3500
0.3500
UN
UN
UN
UN
2.0000
2.0000
1.0000
2.0000
UN
H
H
1.0000
0.3500
0.3500
UN
UN
UN
UN
2.0000
2.0000
1.0000
2.0000
UN
H
H
1.00
0.3500
0.3500
UN
UN
UN
UN
2.0000
2.0000
1.0000
2.0000
UN
H
H
1.0000
0.3500
0.3500
UN
UN
UN
UN
2.0000
2.0000
1.0000
2.0000
UN
H
H
UN
M
0.0900
0.0900
1.0000
0.3100
UN
H
H
0.2000
0.2000
UN
1.0000
UN
H
H
1.00
0.2000
0.2000
UN
1.0000
4.33
UN
H
H
UN
M
1.00
0.1100
0.1100
1.0000
1.5700
4.09
UN
H
H
1.00
0.1100
0.1100
7.26
7.87
5.69
0.59
0.13
0.57
0.09
3.62
1.02
1.42
0.95
0.06
0.17
6.94
2.75
1.99
1.18
0.26
0.57
0.18
7.87
5.69
0.59
0.13
0.55
0.09
6.92
2.75
1.99
1.18
0.26
0.55
0.18
7.87
5.69
0.59
0.13
0.70
0.09
7.07
2.75
1.99
1.18
0.26
0.70
0.18
7.87
5.69
0.59
0.13
0.80
0.09
7.17
2.75
1.99
1.18
0.26
0.80
0.18
5.69
7.87
0.34
0.15
5.69
7.87
2.64
1.61
0.51
0.71
0.34
0.05
5.35
1.14
1.57
2.64
5.69
7.87
7.04
1.14
1.57
4.33
1.49
5.69
7.87
5.58
0.63
0.87
3.85
0.24
1.49
5.69
7.87
8.75
0.63
0.87
3.85
0.15
CLIENTE:
OBRA:
BASE:TCPO13 - PINI
BDI:
30.00%
TAXAS: LS
122.32%
OBS: ITENS COM CDIGO VER TABELA TCPO (NESTA TABELA NOS SERVIOS NO CONSTAM BDI)
ITEM
5.1.51
01270.0.41.1
01270.0.9.1
09905.3.2.1
09905.3.3.1
09905.3.4.1
09910.3.3.1
Unid.
UN
M
Coef.
1.0000
1.9400
Unitrio
6.97
0.15
M
H
H
UN
L
UN
L
1.00
0.4000
0.2000
0.0800
0.0200
0.2500
0.1500
6.77
7.46
2.12
16.18
Total (R$)
6.97
0.29
5.69
7.87
7.50
2.28
1.57
0.54
0.15
0.53
2.43
5.2.1
15152.8.22.4
m
m
1.0000
1.0000
14.25
14.25
14.25
14.25
5.2.2
SINAPI
m
m
1.0000
1.0000
10.46
10.46
10.46
10.46
5.2.3
15152.8.22.2
m
m
1.0000
1.0000
8.62
8.62
8.62
8.62
5.2.4
SINAPI
m
m
1.0000
1.0000
5.23
5.23
5.23
5.23
5.2.5
SINAPI
un
un
1.0000
1.0000
20.88
20.88
20.88
20.88
5.2.6
SINAPI
un
un
1.0000
1.0000
5.27
5.27
5.27
5.27
5.2.7
SINAPI
un
un
1.0000
1.0000
4.51
4.51
4.51
4.51
5.2.8
CPU
01270.0.1.14
01270.0.24.1
15152.3.21.1
15153.3.1.1
un
H
H
KG
1.0000
0.2200
0.2200
0.0100
30.00
1.25
1.73
0.30
UN
UN
1.0000
1.0000
0.43
2.10
0.43
2.10
5.81
5.69
7.87
5.2.9
SINAPI
UN
UN
1.0000
1.0000
21.19
21.19
21.19
21.19
5.2.10
15152.8.8.3
un
un
1.0000
1.0000
10.99
10.99
10.99
10.99
5.2.11
SINAPI
un
un
1.0000
1.0000
5.54
5.54
5.54
5.54
5.2.12
SINAPI
un
un
1.0000
1.0000
4.62
4.62
4.62
4.62
5.2.13
15152.8.19.1
un
un
1.0000
1.0000
18.58
18.58
18.58
18.58
5.2.14
15152.8.10.1
un
un
1.0000
1.0000
7.48
7.48
7.48
7.48
5.2.15
SINAPI
un
un
1.0000
1.0000
14.92
14.92
14.92
14.92
5.2.16
SINAPI
un
un
1.0000
1.0000
14.88
14.88
14.88
14.88
Pgina 29 de 94
CLIENTE:
OBRA:
BASE:TCPO13 - PINI
BDI:
30.00%
TAXAS: LS
122.32%
OBS: ITENS COM CDIGO VER TABELA TCPO (NESTA TABELA NOS SERVIOS NO CONSTAM BDI)
ITEM
Unid.
Coef.
Unitrio
Total (R$)
5.2.17
SINAPI
un
un
1.0000
1.0000
6.72
6.72
6.72
6.72
5.2.18
SINAPI
un
un
1.0000
1.0000
7.57
7.57
7.57
7.57
5.2.19
SINAPI
un
un
1.0000
1.0000
5.82
5.82
5.82
5.82
5.2.20
SINAPI
un
un
1.0000
1.0000
3.99
3.99
3.99
3.99
5.2.21
15155.8.1.3
un
un
1.0000
1.0000
37.28
37.28
37.28
37.28
5.2.22
15155.8.5.1
un
un
1.0000
1.0000
15.22
15.22
15.22
15.22
5.2.23
15155.8.6.1
un
un
1.0000
1.0000
235.93
235.93
235.93
235.93
5.2.24
07725.8.1.2
un
un
1.0000
1.0000
10.66
10.66
10.66
10.66
5.2.25
CPU
01270.0.1.14
01270.0.24.1
mercado
m
H
H
m
1.0000
0.1000
0.1000
1.0000
4.17
5.69
7.87
2.81
4.17
0.57
0.79
2.81
5.2.26
CPU
un
un
1.0000
1.0000
800.00
800.00
800.00
800.00
5.2.27
02620.8.1.5
un
H
H
H
H
H
H
M3
M3
M3
KG
KG
M2
KG
1.0000
0.2250
1.1900
1.1900
0.2250
4.1400
8.1900
0.1610
0.0200
0.0570
7.6400
41.9000
0.2000
2.5800
81.17
69.68
67.25
0.42
0.34
12.48
3.74
1.28
6.77
9.37
1.77
32.58
41.52
13.07
1.39
3.83
3.21
14.25
2.50
9.65
UN
KG
M2
141.0000
0.0440
0.0590
0.25
6.55
21.92
35.25
0.29
1.29
un
H
H
H
H
H
H
M3
M3
M3
KG
KG
M2
KG
1.0000
0.1150
0.6050
0.6050
0.1150
2.9100
5.3100
0.1050
0.0100
0.0320
5.4600
26.2000
0.1000
1.3200
01270.0.1.10
01270.0.1.11
01270.0.19.1
01270.0.25.1
01270.0.40.1
01270.0.45.1
02060.3.2.2
02060.3.3.1
02060.3.3.2
02065.3.2.1
02065.3.5.1
03110.3.1.4
03210.3.5.2
04211.3.4.1
05060.3.3.1
06062.3.5.7
5.2.28
15110.8.10.1
01270.0.1.10
01270.0.1.11
01270.0.19.1
01270.0.25.1
01270.0.40.1
01270.0.45.1
02060.3.2.2
02060.3.3.1
02060.3.3.2
02065.3.2.1
02065.3.5.1
03110.3.1.4
03210.3.5.2
Pgina 30 de 94
178.02
5.69
5.69
7.87
7.87
7.87
5.07
114.40
5.69
5.69
7.87
7.87
7.87
5.07
81.17
69.68
67.25
0.42
0.34
12.48
3.74
0.65
3.44
4.76
0.91
22.90
26.92
8.52
0.70
2.15
2.29
8.91
1.25
4.94
CLIENTE:
OBRA:
BASE:TCPO13 - PINI
BDI:
30.00%
TAXAS: LS
122.32%
OBS: ITENS COM CDIGO VER TABELA TCPO (NESTA TABELA NOS SERVIOS NO CONSTAM BDI)
ITEM
5.2.29
01270.0.40.1
01270.0.45.1
02060.3.2.2
02060.3.3.2
02065.3.5.1
01270.0.1.10
01270.0.1.11
01270.0.19.1
01270.0.25.1
02060.3.3.1
02065.3.2.1
03110.3.1.4
03210.3.5.2
04211.3.4.1
05060.3.3.1
06062.3.5.7
5.2.30
01270.0.40.1
01270.0.45.1
02060.3.2.2
02060.3.3.2
02065.3.5.1
01270.0.1.10
01270.0.1.11
01270.0.19.1
01270.0.25.1
02060.3.3.1
02065.3.2.1
03110.3.1.4
03210.3.5.2
04211.3.4.1
05060.3.3.1
06062.3.5.7
5.2.31
01270.0.40.1
01270.0.42.1
01270.0.45.1
02060.3.2.2
02060.3.3.2
02065.3.5.1
01270.0.1.10
01270.0.1.11
01270.0.19.1
01270.0.25.1
02060.3.3.1
02065.3.2.1
03110.3.1.4
03210.3.5.2
04211.3.4.1
05060.3.3.1
06062.3.5.7
Unid.
Coef.
UN
KG
M2
101.0000
0.0220
0.0300
un
H
H
M3
M3
KG
H
H
H
H
M3
KG
M2
KG
1.0000
6.0000
40.0000
4.5500
0.3700
230.0000
5.0000
5.0000
5.0000
5.0000
5.5000
10.6500
0.5000
3.0000
UN
KG
M2
589.0000
0.0900
0.1000
un
H
H
M3
M3
KG
H
H
H
H
M3
KG
M2
KG
1.0000
18.0000
56.0000
5.1200
0.4200
315.0000
12.0000
12.0000
12.0000
12.0000
7.8500
10.9800
0.6000
5.0000
UN
KG
M2
875.0000
0.1200
0.1800
m
H
H
H
M3
M3
KG
H
H
H
H
M3
KG
M2
KG
1.0000
2.3200
2.5000
9.8400
3.8000
0.3500
315.0000
5.0000
5.0000
5.0000
5.0000
4.1800
8.1600
0.5000
4.0000
UN
KG
M2
Unitrio
Total (R$)
0.25
6.55
21.92
25.25
0.14
0.66
1,413.23
7.87
5.07
69.68
0.42
12.48
3.74
47.22
202.80
369.32
24.88
78.20
28.45
28.45
39.35
39.35
383.24
4.47
6.24
11.22
0.25
6.55
21.92
147.25
0.59
2.19
81.17
67.25
0.34
5.69
5.69
7.87
7.87
2,103.22
7.87
5.07
69.68
0.42
12.48
3.74
141.66
283.92
415.59
28.25
107.10
68.28
68.28
94.44
94.44
546.99
4.61
7.49
18.70
0.25
6.55
21.92
218.75
0.79
3.95
81.17
67.25
0.34
5.69
5.69
7.87
7.87
1,138.22
7.87
7.87
5.07
69.68
0.42
12.48
3.74
18.26
19.68
49.89
308.45
23.54
107.10
28.45
28.45
39.35
39.35
291.26
3.43
6.24
14.96
625.0000
0.0110
0.1600
0.25
6.55
21.92
156.25
0.07
3.51
81.17
67.25
0.34
5.69
5.69
7.87
7.87
5.2.32
02220.8.9.1
m2
m2
1.0000
1.0000
7.61
7.61
7.61
7.61
5.2.33
02315.8.1.10
m3
1.0000
22.81
22.81
m3
1.0000
22.81
22.81
5.2.34
02315.8.8.2
m2
m2
1.0000
1.0000
7.60
7.60
7.60
7.60
5.2.35
02315.8.7.1
m3
m3
1.0000
1.0000
20.50
20.50
20.50
20.50
Pgina 31 de 94
CLIENTE:
OBRA:
BASE:TCPO13 - PINI
BDI:
30.00%
TAXAS: LS
122.32%
OBS: ITENS COM CDIGO VER TABELA TCPO (NESTA TABELA NOS SERVIOS NO CONSTAM BDI)
ITEM
Unid.
Coef.
Unitrio
Total (R$)
114.66
114.66
114.66
114.66
5.2.36
02720.8.5.1
m3
m3
1.0000
1.0000
5.2.37
15152.8.7.2
01270.0.1.14
01270.0.24.1
15152.3.1.2
UN
H
H
1.0000
0.2800
0.2800
UN
KG
1.0000
0.0100
0.99
30.00
UN
H
H
1.0000
0.4500
0.4500
7.79
UN
1.0000
1.60
1.60
UN
KG
1.0000
0.0230
5.50
30.00
5.50
0.69
UN
H
H
1.0000
0.3600
0.3600
5.72
UN
1.0000
1.14
1.14
UN
KG
1.0000
0.0150
4.13
30.00
4.13
0.45
UN
H
H
KG
1.0000
0.2800
0.2800
0.0100
5.16
30.00
8.96
1.59
2.20
0.30
UN
1.0000
0.97
0.97
UN
1.0000
3.89
3.89
UN
H
H
1.0000
0.4500
0.4500
7.51
UN
1.0000
1.60
1.60
UN
KG
1.0000
0.0230
5.22
30.00
5.22
0.69
UN
H
H
1.0000
0.4600
0.4600
13.93
UN
KG
2.0000
0.0450
1.60
30.00
3.20
1.35
UN
1.0000
9.38
9.38
UN
H
H
1.0000
0.3700
0.3700
11.24
UN
KG
UN
2.0000
0.0300
1.0000
1.14
30.00
8.06
UN
H
H
1.0000
0.2900
0.2900
6.83
UN
KG
UN
2.0000
0.0198
1.0000
0.99
30.00
4.26
un
H
H
1.0000
0.2900
0.2900
UN
KG
2.0000
0.0198
15152.3.21.1
5.2.38
15152.8.9.4
01270.0.1.14
01270.0.24.1
15152.3.1.4
15152.3.13.3
15152.3.21.1
5.2.39
15152.8.9.3
01270.0.1.14
01270.0.24.1
15152.3.1.3
15152.3.13.2
15152.3.21.1
5.2.40
15153.8.4.2
01270.0.1.14
01270.0.24.1
15152.3.21.1
15153.3.1.2
15153.3.7.1
5.2.41
15152.8.8.4
01270.0.1.14
01270.0.24.1
15152.3.1.4
15152.3.11.3
15152.3.21.1
5.2.42
15152.8.20.4
01270.0.1.14
01270.0.24.1
15152.3.1.4
15152.3.21.1
15152.3.27.3
5.2.43
15152.8.20.3
01270.0.1.14
01270.0.24.1
15152.3.1.3
15152.3.21.1
15152.3.27.2
5.2.44
15152.8.20.2
01270.0.1.14
01270.0.24.1
15152.3.1.2
15152.3.21.1
15152.3.27.1
5.2.45
01270.0.1.14
01270.0.24.1
15152.3.1.2
15152.3.21.1
Pgina 32 de 94
5.09
5.69
7.87
0.99
0.30
6.10
5.69
7.87
4.88
5.69
7.87
3.80
5.69
7.87
6.10
5.69
7.87
6.24
5.69
7.87
5.02
5.69
7.87
13.89
2.56
3.54
10.60
2.05
2.83
13.61
2.56
3.54
20.17
2.62
3.62
16.26
2.11
2.91
2.28
0.90
8.06
3.93
5.69
7.87
10.77
1.65
2.28
1.98
0.59
4.26
5.69
7.87
0.99
30.00
1.59
2.20
6.51
1.65
2.28
1.98
0.59
CLIENTE:
OBRA:
BASE:TCPO13 - PINI
BDI:
30.00%
TAXAS: LS
122.32%
OBS: ITENS COM CDIGO VER TABELA TCPO (NESTA TABELA NOS SERVIOS NO CONSTAM BDI)
ITEM
5.2.46
Coef.
1.0000
Unitrio
Total (R$)
UN
H
H
1.0000
0.0700
0.0700
2.70
0.95
5.69
7.87
UN
KG
1.0000
0.0100
0.99
30.00
0.99
0.30
UN
1.0000
1.41
1.41
un
H
H
M3
KG
1.0000
1.5000
1.5000
0.0219
9.9400
81.17
0.34
92.57
11.81
7.61
1.78
3.38
UN
1.0000
68.00
68.00
un
H
H
M3
KG
1.0000
1.5000
1.5000
0.0219
9.9400
81.17
0.34
69.57
11.81
7.61
1.78
3.38
UN
1.0000
45.00
45.00
un
H
H
M3
KG
UN
1.0000
1.5000
1.5000
0.0219
9.9400
1.0000
UN
H
H
1.0000
0.4500
0.4500
UN
UN
UN
2.0000
2.0000
1.0000
0.59
0.13
2.20
1.18
0.26
2.20
UN
M
UN
UN
1.0000
1.5000
5.0000
6.0000
0.80
2.40
0.13
0.09
0.80
3.60
0.65
0.54
UN
H
H
1.0000
0.4200
0.4200
UN
UN
UN
2.0000
2.0000
1.0000
0.59
0.13
2.20
1.18
0.26
2.20
UN
M
UN
UN
1.0000
1.5000
5.0000
6.0000
0.80
2.40
0.13
0.09
0.80
3.60
0.65
0.54
UN
H
H
1.0000
0.3500
0.3500
UN
UN
UN
2.0000
2.0000
1.0000
0.59
0.13
2.20
1.18
0.26
2.20
UN
M
UN
UN
1.0000
1.5000
5.0000
6.0000
0.80
2.40
0.13
0.09
0.80
3.60
0.65
0.54
UN
H
H
1.0000
0.3000
0.3000
UN
2.0000
15152.8.16.1
01270.0.1.14
01270.0.24.1
15152.3.1.2
15152.3.21.1
15152.3.22.1
5.2.47
01270.0.40.1
01270.0.45.1
02060.3.2.2
02065.3.5.1
5.2.48
01270.0.40.1
01270.0.45.1
02060.3.2.2
02065.3.5.1
5.2.49
01270.0.40.1
01270.0.45.1
02060.3.2.2
02065.3.5.1
5.2.50
Pedreiro
Servente
Areia lavada tipo mdia
Cimento Portland CP II-E-32 (resistncia: 32,00 MPa)
TAMPO DE FERRO fundido c/ inscrio "ESGOTO"- T33
01270.0.24.1
01270.0.6.1
05060.3.31.2
5.2.51
01270.0.24.1
01270.0.6.1
05060.3.31.2
5.2.52
01270.0.24.1
01270.0.6.1
05060.3.31.2
5.2.53
01270.0.24.1
01270.0.6.1
05060.3.31.2
Pgina 33 de 94
Unid.
UN
7.87
5.07
7.87
5.07
7.87
5.07
81.17
0.34
68.00
7.87
5.07
7.87
5.07
7.87
5.69
7.87
5.07
0.59
3.65
0.40
0.55
92.57
11.81
7.61
1.78
3.38
68.00
15.05
3.54
2.28
14.66
3.31
2.13
13.98
2.75
1.99
12.91
2.36
1.52
1.18
CLIENTE:
OBRA:
BASE:TCPO13 - PINI
BDI:
30.00%
TAXAS: LS
122.32%
OBS: ITENS COM CDIGO VER TABELA TCPO (NESTA TABELA NOS SERVIOS NO CONSTAM BDI)
ITEM
Coef.
2.0000
1.0000
Unitrio
0.13
2.20
UN
M
UN
UN
1.0000
1.5000
5.0000
6.0000
0.60
2.40
0.13
0.09
0.60
3.60
0.65
0.54
01270.0.41.1
01270.0.9.1
09905.3.2.1
09905.3.3.1
09905.3.4.1
09910.3.3.1
M
H
H
UN
L
UN
L
1.0000
0.4000
0.2000
0.0800
0.0200
0.2500
0.1500
3.40
2.75
6.77
7.46
2.12
16.18
5.56
1.36
0.55
0.54
0.15
0.53
2.43
01270.0.41.1
01270.0.9.1
09905.3.2.1
09905.3.3.1
09905.3.4.1
09910.3.3.1
M
H
H
UN
L
UN
L
1.0000
0.4000
0.2000
0.0800
0.0200
0.2500
0.1500
3.40
2.75
6.77
7.46
2.12
16.18
5.56
1.36
0.55
0.54
0.15
0.53
2.43
6.1.1.1
CPU
01270.0.1.13
01270.0.22.1
MERCADO
cj
H
H
cj
1.0000
4.0000
4.0000
1.0000
334.24
5.69
7.87
280.00
334.24
22.76
31.48
280.00
6.1.1.2
16131.8.3.34
1.0000
35.03
35.03
1.0000
35.03
35.03
5.2.54
5.2.55
Unid.
UN
UN
Total (R$)
0.26
2.20
6.1.1.3
16131.8.2.18
un
un
1.0000
1.0000
27.52
27.52
27.52
27.52
6.1.1.4
15500.8.1.20
un
un
1.0000
1.0000
141.16
141.16
141.16
141.16
6.1.1.7
16132.8.2.9
01270.0.1.13
01270.0.22.1
16132.3.3.9
M
H
H
M
16132.8.4.9
01270.0.1.13
01270.0.22.1
16132.3.1.9
UN
H
H
UN
6.1.1.9
CPU
6.1.1.10
16137.8.1.10
6.1.1.8
6.1.2.1
6.1.2.2
CPU
01270.0.1.13
01270.0.22.1
MERCADO
CPU
01270.0.1.13
01270.0.22.1
MERCADO
Ajudante de eletricista
Eletricista
FORNECIMENTO E Montagem QGBT, complet
Ajudante de eletricista
Eletricista
FORNECIMENTO E Montagem QFL-TE, completo
Pgina 34 de 94
0.6000
0.6000
1.1000
39.10
5.69
7.87
28.15
29.31
5.69
7.87
0.2400
0.2400
1.0000
26.06
cj
cj
1.0000
1.0000
3,200.00
3,200.00
3,200.00
3,200.00
un
1.0000
743.07
743.07
un
1.0000
743.07
743.07
cj
H
H
UN
1.0000
42.0000
42.0000
1.0000
5.69
7.87
1,531.61
2,101.13
238.98
330.54
1,531.61
cj
H
H
UN
1.0000
28.0000
28.0000
1.0000
5.69
7.87
2,000.00
2,379.68
159.32
220.36
2,000.00
3.41
4.72
30.97
1.37
1.89
26.06
CLIENTE:
OBRA:
BASE:TCPO13 - PINI
BDI:
30.00%
TAXAS: LS
122.32%
OBS: ITENS COM CDIGO VER TABELA TCPO (NESTA TABELA NOS SERVIOS NO CONSTAM BDI)
ITEM
6.1.2.3
Unid.
cj
H
H
UN
Coef.
1.0000
40.0000
40.0000
1.0000
Unitrio
5.69
7.87
2,600.00
Total (R$)
3,142.40
227.60
314.80
2,600.00
cj
H
H
UN
1.0000
28.0000
28.0000
1.0000
5.69
7.87
1,800.00
2,179.68
159.32
220.36
1,800.00
CPU
01270.0.1.13
01270.0.22.1
MERCADO
CPU
01270.0.1.13
01270.0.22.1
MERCADO
cj
H
H
UN
1.0000
20.0000
20.0000
1.0000
5.69
7.87
800.00
1,071.20
113.80
157.40
800.00
CPU
01270.0.1.13
01270.0.22.1
MERCADO
cj
H
H
UN
1.0000
20.0000
20.0000
1.0000
5.69
7.87
700.00
971.20
113.80
157.40
700.00
CPU
01270.0.1.13
01270.0.22.1
MERCADO
cj
H
H
UN
1.0000
133.0000
133.0000
1.0000
5.69
7.87
15,000.00
16,803.48
756.77
1,046.71
15,000.00
CPU
01270.0.1.13
01270.0.22.1
MERCADO
un
H
H
UN
1.00
20.0000
20.0000
1.0000
5.69
7.87
700.00
971.20
113.80
157.40
700.00
CPU
01270.0.1.13
01270.0.22.1
MERCADO
cj
H
H
UN
1.00
20.0000
20.0000
1.0000
5.69
7.87
800.00
1,071.20
113.80
157.40
800.00
CPU
01270.0.1.13
01270.0.22.1
MERCADO
m
H
H
UN
1.0000
0.8500
0.8500
1.0000
5.69
7.87
44.00
55.53
4.84
6.69
44.00
CPU
01270.0.1.13
01270.0.22.1
MERCADO
un
H
H
UN
1.0000
0.4000
0.4000
1.0000
5.69
7.87
16.48
21.90
2.28
3.15
16.48
CPU
01270.0.1.13
01270.0.22.1
MERCADO
T 90 horizontal 200x50 mm
Ajudante de eletricista
Eletricista
T 90 horizontal 200x50 mm
un
H
H
UN
1.0000
0.5000
0.5000
1.0000
5.69
7.87
29.38
36.16
2.85
3.94
29.38
CPU
01270.0.1.13
01270.0.22.1
MERCADO
un
H
H
UN
1.0000
0.2000
0.2000
1.0000
5.69
7.87
9.49
12.20
1.14
1.57
9.49
CPU
01270.0.1.13
01270.0.22.1
MERCADO
un
H
H
UN
1.0000
0.2000
0.2000
1.0000
8.50
5.69
7.87
5.79
8.50
1.14
1.57
5.79
6.1.3.6
CPU
01270.0.1.13
01270.0.22.1
MERCADO
un
H
H
UN
1.0000
0.1500
0.1500
1.0000
3.13
5.69
7.87
1.10
3.13
0.85
1.18
1.10
6.1.3.10
16131.8.3.2
m
m
1.0000
1.0000
12.83
12.83
12.83
12.83
6.1.2.4
6.1.2.5
6.1.2.6
6.1.2.7
6.1.2.9
6.1.2.10
6.1.3.1
6.1.3.2
6.1.3.3
6.1.3.4
6.1.3.5
Ajudante de eletricista
Eletricista
FORNECIMENTO E Montagem QFL - 1P, completo
Ajudante de eletricista
Eletricista
FORNECIMENTO E Montagem QTU-TE, completo
Pgina 35 de 94
CLIENTE:
OBRA:
BASE:TCPO13 - PINI
BDI:
30.00%
TAXAS: LS
122.32%
OBS: ITENS COM CDIGO VER TABELA TCPO (NESTA TABELA NOS SERVIOS NO CONSTAM BDI)
ITEM
Unid.
Coef.
Unitrio
Total (R$)
6.1.3.11
16131.8.3.3
m
m
1.0000
1.0000
6.1.3.13
16131.8.3.5
m
m
1.0000
1.0000
19.21
19.21
21.66
19.21
6.1.3.14
16131.8.2.2
un
un
1.0000
1.0000
5.31
5.31
5.31
5.31
6.1.3.15
16131.8.2.3
un
un
1.0000
1.0000
6.95
6.95
6.95
6.95
6.1.3.17
16132.8.4.5
un
un
1.0000
1.0000
5.70
5.70
5.70
5.70
6.1.3.18
16131.8.5.2
un
un
1.0000
1.0000
1.81
1.81
1.81
1.81
6.1.3.19
16131.8.5.3
un
un
1.0000
1.0000
2.16
2.16
2.16
2.16
6.1.3.22
16131.8.1.3
un
un
1.0000
1.0000
0.62
0.62
0.62
0.62
6.1.3.23
16131.8.1.4
cj
cj
1.0000
1.0000
0.84
0.84
0.84
0.84
6.1.3.25
16131.8.1.6
cj
cj
1.0000
1.0000
1.76
1.76
1.76
1.76
6.1.3.26
16136.8.3.1
un
un
1.0000
1.0000
2.94
2.94
2.94
2.94
un
un
1.0000
1.0000
3.86
3.86
3.86
3.86
m
H
H
M
4.0000
0.1500
0.1500
1.1000
16135.8.1.37
01270.0.1.13
01270.0.22.1
16135.3.1.19
un
H
H
UN
1.0000
0.5000
0.5000
1.0000
01270.0.1.13
01270.0.22.1
un
H
H
UN
1.0000
0.6000
0.6000
1.0000
un
H
H
UN
1.0000
0.6000
0.6000
1.0000
16135.8.1.28
01270.0.1.13
01270.0.22.1
16135.3.1.28
un
H
H
UN
1.0000
0.6000
0.6000
1.0000
8.85
16120.8.2.2
m
m
1.0000
1.0000
2.29
2.29
6.1.3.27
6.1.3.29
16136.8.3.2
CPU
01270.0.1.13
01270.0.22.1
6.1.3.30
6.1.3.31
6.1.3.32
01270.0.1.13
01270.0.22.1
6.1.3.33
6.1.4.1
Pgina 36 de 94
19.21
3.63
5.69
7.87
1.45
15.12
5.69
7.87
8.34
17.14
5.69
7.87
9.00
17.19
5.69
7.87
9.05
16.99
5.69
7.87
2.29
2.29
0.85
1.18
1.60
2.85
3.94
8.34
3.41
4.72
9.00
3.41
4.72
9.05
3.41
4.72
8.85
CLIENTE:
OBRA:
BASE:TCPO13 - PINI
BDI:
30.00%
TAXAS: LS
122.32%
OBS: ITENS COM CDIGO VER TABELA TCPO (NESTA TABELA NOS SERVIOS NO CONSTAM BDI)
ITEM
Unid.
Coef.
Unitrio
Total (R$)
2.87
2.87
2.87
2.87
6.1.4.2
16120.8.2.3
m
m
1.0000
1.0000
6.1.4.3
16120.8.1.22
01270.0.1.13
01270.0.22.1
16120.3.5.1
m
H
H
1.0000
0.1300
0.1300
1.0200
m
H
H
1.0000
0.1400
0.1400
1.0200
m
H
H
1.0000
0.4600
0.4600
1.0200
36.00
m
H
H
m
1.0000
0.5000
0.5000
1.0000
5.69
7.87
2.16
m
H
H
14.0000
0.1600
0.1600
1.0200
m
H
H
60.0000
0.1700
0.1700
1.0200
16120.8.1.10
01270.0.1.13
01270.0.22.1
16120.3.4.8
m
H
H
75.0000
0.3400
0.3400
1.0200
m
H
H
M
100.0000
0.1000
0.1000
1.0200
0.52
cj
H
H
1.0000
1.1000
1.1000
158.87
5.69
7.87
158.87
6.26
8.66
cj
UN
1.0000
2.0000
115.77
4.30
115.77
8.60
UN
UN
1.0000
2.0000
17.68
0.95
17.68
1.90
cj
H
H
1.0000
1.2000
1.2000
124.59
5.69
7.87
124.59
6.83
9.44
cj
1.0000
108.32
108.32
cj
H
1.0000
1.1000
129.31
5.69
129.31
6.26
6.1.4.4
6.1.4.5
6.1.4.6
6.1.4.7
6.1.4.8
6.1.4.9
16120.8.1.23
01270.0.1.13
01270.0.22.1
16120.3.5.13
16120.8.1.30
01270.0.1.13
01270.0.22.1
16120.3.5.6
CPU
01270.0.1.13
01270.0.22.1
Mercado
6.1.4.10
01270.0.1.13
01270.0.22.1
6.1.5.1
CPU
01270.0.1.13
01270.0.22.1
Mercado
16580.3.1.3
16580.3.5.5
16580.3.7.7
6.1.5.2
CPU
01270.0.1.13
01270.0.22.1
Mercado
6.1.5.3
CPU
01270.0.1.13
Ajudante de eletricista
Eletricista
Cabo isolado em PVC 0,6/1 KV - 70C - unipolar baixa tenso
(encordoamento: CLASSE 2 / seo transversal: 6,00 mm)
Ajudante de eletricista
Eletricista
CABO cobre n #16mm
Pgina 37 de 94
4.17
5.69
7.87
2.36
0.74
1.02
2.41
5.47
5.69
7.87
3.50
0.80
1.10
3.57
42.96
5.69
7.87
2.62
3.62
36.72
14.49
2.85
3.94
2.16
4.27
5.90
4.32
7.78
5.69
7.87
0.91
1.26
5.50
5.61
8.21
5.69
7.87
5.79
0.97
1.34
5.91
26.48
5.69
7.87
21.44
1.93
2.68
21.87
1.89
5.69
7.87
0.57
0.79
0.53
CLIENTE:
OBRA:
BASE:TCPO13 - PINI
BDI:
30.00%
TAXAS: LS
122.32%
OBS: ITENS COM CDIGO VER TABELA TCPO (NESTA TABELA NOS SERVIOS NO CONSTAM BDI)
ITEM
6.1.5.4
CPU
01270.0.1.13
01270.0.22.1
Mercado
6.1.5.5
01270.0.1.13
01270.0.22.1
Mercado
Unid.
H
Coef.
1.1000
Unitrio
7.87
Total (R$)
8.66
cj
1.0000
114.39
114.39
cj
H
H
1.0000
0.8000
0.8000
62.47
5.69
7.87
62.47
4.55
6.30
cj
1.0000
51.62
51.62
cj
H
H
1.0000
0.8000
0.8000
cj
1.0000
85.00
95.85
5.69
7.87
85.00
6.1.6.1
16143.8.2.9
cj
cj
1.0000
1.0000
9.53
9.53
9.53
9.53
6.1.6.2
16143.8.2.8
cj
cj
1.0000
1.0000
13.57
13.57
13.57
13.57
6.1.6.3
16143.8.2.1
cj
cj
1.0000
1.0000
16.08
16.08
16.08
16.08
6.1.6.4
16143.8.3.1
cj
1.0000
22.83
22.83
cj
1.0000
22.83
22.83
6.1.6.5
16143.8.2.3
cj
cj
1.0000
1.0000
22.99
22.99
22.99
22.99
6.1.6.6
16143.8.6.1
cj
cj
1.0000
1.0000
23.68
23.68
23.68
23.68
6.1.6.7
16143.8.6.1
TOMADA dois plos mais terra 20 A - 250 V, na cor preta, com espelho
completo
TOMADA dois plos mais terra 20 A - 250 V, na cor preta, com espelho
completo
cj
cj
1.0000
1.0000
23.68
23.68
23.68
23.68
cj
cj
1.0000
1.0000
2.38
2.38
2.38
2.38
cj
H
H
UN
1.0000
0.5300
0.5300
1.0000
cj
H
H
cj
1.0000
0.8000
0.8000
1.0000
cj
H
H
cj
1.0000
0.8000
0.8000
1.0000
2.65
6.1.6.8
16143.8.5.2
6.1.6.9
01270.0.1.13
01270.0.22.1
6.1.6.10
01270.0.1.13
01270.0.22.1
Mercado
6.1.6.11
01270.0.1.13
01270.0.22.1
Mercado
22.99
5.69
7.87
15.80
12.65
5.69
7.87
1.80
13.50
5.69
7.87
6.1.7.1
CPU
01270.0.1.13
01270.0.22.1
Mercado
m
H
H
m
1.0000
0.3500
0.3500
1.0200
17.91
5.69
7.87
12.91
17.91
1.99
2.75
13.17
6.1.7.2
15500.8.1.20
un
1.0000
141.16
141.16
Pgina 38 de 94
4.55
6.30
3.02
4.17
15.80
4.55
6.30
1.80
4.55
6.30
2.65
CLIENTE:
OBRA:
BASE:TCPO13 - PINI
BDI:
30.00%
TAXAS: LS
122.32%
OBS: ITENS COM CDIGO VER TABELA TCPO (NESTA TABELA NOS SERVIOS NO CONSTAM BDI)
ITEM
Unid.
un
Coef.
1.0000
Unitrio
141.16
Total (R$)
141.16
6.1.7.3
un
H
H
UN
UN
1.0000
0.9500
0.9500
1.0000
1.0000
5.69
7.87
18.85
8.31
40.04
5.41
7.48
18.85
8.31
CPU
01270.0.22.1
01270.0.1.13
99.13.702.1
99.13.703.1
cj
H
H
UN
UN
1.0000
2.5000
2.5000
0.0833
1.0000
7.87
5.69
125.52
10.23
54.59
19.68
14.23
10.46
10.23
6.1.7.5
CPU
01270.0.1.13
01270.0.22.1
MERCADO
cj
H
H
UN
1.0000
3.8000
3.8000
1.0000
301.53
5.69
7.87
250.00
301.53
21.62
29.91
250.00
6.1.7.6
02315.8.1.10
m3
1.0000
22.81
22.81
m3
1.0000
22.81
22.81
m3
m3
1.0000
1.0000
20.50
20.50
20.50
20.50
un
H
H
1.0000
15.0000
15.0000
2,775.00
5.69
7.87
2,775.00
85.35
118.05
UN
1.0000
2,571.60
2,571.60
un
H
H
UN
1.0000
2.0000
2.0000
1.0000
220.00
5.69
7.87
192.88
220.00
11.38
15.74
192.88
un
H
H
UN
1.0000
1.5000
1.5000
1.0000
98.00
5.69
7.87
77.66
98.00
8.54
11.81
77.66
un
un
1.0000
1.0000
240.00
240.00
240.00
240.00
un
1.0000
250.00
250.00
un
1.0000
250.00
250.00
un
1.0000
250.00
250.00
un
1.0000
250.00
250.00
un
1.0000
50.00
50.00
un
1.0000
50.00
50.00
un
1.0000
3.00
3.00
un
1.0000
3.00
3.00
un
2.0000
15.00
15.00
6.1.7.4
6.1.7.7
02315.8.7.1
6.2.1.1
CPU
01270.0.1.13
01270.0.22.1
MERCADO
6.2.1.2
6.2.1.3
6.2.1.4
CPU
01270.0.1.13
01270.0.22.1
MERCADO
CPU
01270.0.1.13
01270.0.22.1
MERCADO
CPU
Ajudante de eletricista
Eletricista
PATCH panel 1U, 24 portas, RJ-45, categoria 6
Ajudante de eletricista
Eletricista
ORGANIZADOR de cabos fechado horizontal 1U
6.2.1.5
6.2.1.6
6.2.1.7
6.2.1.8
6.2.1.9
CPU
CPU
CPU
CPU
CPU
Pgina 39 de 94
CLIENTE:
OBRA:
BASE:TCPO13 - PINI
BDI:
30.00%
TAXAS: LS
122.32%
OBS: ITENS COM CDIGO VER TABELA TCPO (NESTA TABELA NOS SERVIOS NO CONSTAM BDI)
ITEM
6.2.1.10
CPU
Unid.
Unitrio
Total (R$)
un
Coef.
1.0000
15.00
15.00
un
un
1.0000
1.0000
1,500.00
1,500.00
1,500.00
1,500.00
6.2.1.11
CPU
un
un
3.0000
1.0000
60.00
60.00
60.00
60.00
6.2.2.1
CPU
01270.0.1.13
01270.0.22.1
MERCADO
m
H
H
UN
1.0000
0.8500
0.8500
1.0000
55.53
5.69
7.87
44.00
55.53
4.84
6.69
44.00
CPU
01270.0.1.13
01270.0.22.1
MERCADO
un
H
H
UN
1.0000
0.4000
0.4000
1.0000
21.90
5.69
7.87
16.48
21.90
2.28
3.15
16.48
CPU
01270.0.1.13
01270.0.22.1
MERCADO
un
H
H
UN
1.0000
0.4000
0.4000
1.0000
25.32
5.69
7.87
19.90
25.32
2.28
3.15
19.90
CPU
01270.0.1.13
01270.0.22.1
MERCADO
T 90 horizontal 200x50 mm
Ajudante de eletricista
Eletricista
T 90 horizontal 200x50 mm
un
H
H
UN
1.0000
0.5000
0.5000
1.0000
36.16
5.69
7.87
29.38
36.16
2.85
3.94
29.38
CPU
01270.0.1.13
01270.0.22.1
MERCADO
TERMINAL 200x50mm
Ajudante de eletricista
Eletricista
TERMINAL 200x50mm
un
H
H
UN
1.0000
0.2000
0.2000
1.0000
12.20
5.69
7.87
9.49
12.20
1.14
1.57
9.49
CPU
01270.0.1.13
01270.0.22.1
MERCADO
un
H
H
UN
1.0000
0.2000
0.2000
1.0000
8.50
5.69
7.87
5.79
8.50
1.14
1.57
5.79
CPU
01270.0.1.13
01270.0.22.1
MERCADO
un
H
H
UN
1.0000
0.1500
0.1500
1.0000
4.16
5.69
7.87
2.13
4.16
0.85
1.18
2.13
6.2.2.8
16132.8.1.3
m
m
1.0000
1.0000
5.87
5.87
5.87
5.87
6.2.2.9
16132.8.4.3
un
un
1.0000
1.0000
3.41
3.41
3.41
3.41
6.2.2.10
16132.8.5.3
un
un
1.0000
1.0000
1.36
1.36
1.36
1.36
6.2.2.11
16136.8.3.1
cj
cj
1.0000
1.0000
2.94
2.94
2.94
2.94
6.2.2.12
16131.8.1.4
un
un
1.0000
1.0000
0.84
0.84
0.84
0.84
6.2.2.13
16136.8.2.1
un
1.0000
12.03
12.03
un
1.0000
12.03
12.03
un
1.0000
6.2.2.2
6.2.2.4
6.2.2.3
6.2.2.5
6.2.2.6
6.2.2.7
6.2.2.14
16136.8.2.3
Pgina 40 de 94
34.07
CLIENTE:
OBRA:
BASE:TCPO13 - PINI
BDI:
30.00%
TAXAS: LS
122.32%
OBS: ITENS COM CDIGO VER TABELA TCPO (NESTA TABELA NOS SERVIOS NO CONSTAM BDI)
ITEM
6.2.2.15
6.2.2.16
16143.8.5.2
16143.8.5.2
Unid.
H
H
Coef.
1.2500
1.2500
Unitrio
Total (R$)
5.69
7.87
UN
1.0000
17.12
ESPELHO em PVC para caixa 4 " x 2 " com 2 furos para os conectores
RJ-45
ESPELHO em PVC para caixa 4 " x 2 " com 2 furos para os conectores RJ45
cj
cj
1.0000
1.0000
2.38
2.38
2.38
2.38
cj
cj
1.0000
1.0000
2.38
2.38
2.38
2.38
17.12
6.2.2.17
16143.8.5.2
cj
cj
1.0000
1.0000
2.38
2.38
2.38
2.38
6.2.2.18
16143.8.10.2
un
un
1.0000
1.0000
3.93
3.93
3.93
3.93
6.2.2.19
CPU
01270.0.1.13
01270.0.22.1
MERCADO
un
H
H
UN
1.0000
0.1000
0.1000
1.0000
2.91
5.69
7.87
1.45
2.81
0.57
0.79
1.45
6.2.2.20
16137.8.1.30
un
un
1.0000
1.0000
267.32
267.32
267.32
267.32
6.2.2.21
16136.8.4.7
un
1.0000
477.56
477.56
un
1.0000
477.56
477.56
6.2.2.22
15500.8.1.20
un
un
1.0000
1.0000
141.16
141.16
141.16
141.16
6.2.3.1
16120.8.4.2
m
m
1.0000
1.0000
1.49
1.49
1.49
1.49
6.2.3.2
CPU
01270.0.1.13
01270.0.22.1
Mercado
m
H
H
m
1.0000
0.0200
0.0200
1.0000
1.31
5.69
7.87
1.04
1.31
0.11
0.16
1.04
CPU
01270.0.1.13
01270.0.22.1
Mercado
m
H
H
m
1.0000
0.0500
0.0500
1.0000
2.81
5.69
7.87
2.13
2.81
0.28
0.39
2.13
6.2.3.4
16120.8.3.62
m
m
1.0000
1.0000
2.17
2.17
2.17
2.17
6.2.4.1
CPU
un
un
1.0000
1.0000
1,200.00
1,200.00
1,200.00
1,200.00
6.2.4.2
CPU
un
un
1.0000
1.0000
3.00
3.00
3.00
3.00
un
un
1.0000
1.0000
120.00
120.00
120.00
120.00
un
un
1.0000
1.0000
4.50
4.50
4.50
4.50
m
m
1.0000
1.0000
6.2.3.3
6.2.4.3
6.2.4.4
6.2.4.5
CPU
CPU
16131.8.3.3
Pgina 41 de 94
7.11
9.84
19.21
CLIENTE:
OBRA:
BASE:TCPO13 - PINI
BDI:
30.00%
TAXAS: LS
122.32%
OBS: ITENS COM CDIGO VER TABELA TCPO (NESTA TABELA NOS SERVIOS NO CONSTAM BDI)
ITEM
6.2.4.6
6.2.4.7
6.2.4.8
6.2.4.9
6.2.4.10
6.2.4.11
6.2.4.12
6.2.4.13
6.2.4.14
16131.8.2.2
16131.8.5.3
16132.8.1.8
16132.8.4.8
16132.8.5.8
16131.8.1.8
16143.8.5.2
6.3.1.1
16131.8.3.30
6.3.1.2
16715.8.2.2
16131.8.3.29
Unid.
Coef.
Unitrio
Total (R$)
un
un
m
un
un
un
un
m
m
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
m
m
1.0000
1.0000
9.66
9.66
9.66
9.66
1.0000
7.70
7.70
1.0000
7.70
7.70
6.95
2.16
22.11
17.66
9.78
6.40
2.38
9.80
2.78
6.3.1.3
16131.8.2.14
un
un
1.0000
1.0000
4.37
4.37
4.37
4.37
6.3.1.4
16131.8.2.13
un
un
1.0000
1.0000
3.58
3.58
3.58
3.58
6.3.1.5
16135.8.1.37
un
un
1.0000
1.0000
15.12
15.12
15.12
15.12
6.3.1.6
16135.8.1.28
un
un
1.0000
1.0000
16.99
16.99
16.99
16.99
6.3.1.7
16120.8.3.2
m
m
1.0000
1.0000
1.99
1.99
1.99
1.99
un
1.0000
61.49
61.49
un
1.0000
61.49
61.49
un
1.0000
21.68
21.68
un
1.0000
21.68
21.68
6.3.1.8
6.3.1.9
16136.8.2.5
16136.8.2.2
6.3.1.10
CPU
un
un
1.0000
1.0000
1,750.00
1,750.00
1,750.00
1,750.00
6.3.1.11
CPU
un
un
1.0000
1.0000
4,200.00
4,200.00
4,200.00
4,200.00
6.3.1.12
15500.8.1.20
cj
cj
1.0000
1.0000
141.16
141.16
141.16
141.16
6.3.1.13
6.3.1.14
6.3.1.15
6.3.1.16
16131.8.1.4
16131.8.3.5
16131.8.2.5
un
cj
m
1.0000
1.0000
1.0000
2.16
0.84
21.66
un
1.0000
18.29
6.3.1.17
16131.8.5.5
un
un
m
un
un
un
m
un
un
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
1.0000
3.93
1.76
5.87
3.41
1.36
0.84
2.29
590.00
590.00
6.3.1.18
6.3.1.19
6.3.1.20
6.3.1.21
6.3.1.22
6.3.1.23
6.3.1.24
16131.8.1.5
16132.8.1.3
16132.8.4.3
16120.8.2.2
Pgina 42 de 94
590.00
590.00
CLIENTE:
OBRA:
BASE:TCPO13 - PINI
BDI:
30.00%
TAXAS: LS
122.32%
OBS: ITENS COM CDIGO VER TABELA TCPO (NESTA TABELA NOS SERVIOS NO CONSTAM BDI)
ITEM
6.3.1.25
6.3.1.26
Coef.
1.0000
1.0000
Unitrio
380.00
380.00
Total (R$)
380.00
380.00
un
un
1.0000
1.0000
850.00
850.00
850.00
850.00
FONTE 24 VAC
un
un
1.0000
1.0000
270.00
270.00
270.00
270.00
FONTE 24 VAC
6.3.1.27
Unid.
un
un
6.3.2.1
CPU
un
un
1.0000
1.0000
1,970.00
1,970.00
1,970.00
1,970.00
6.3.2.2
CPU
m
m
1.0000
1.0000
15.00
15.00
15.00
15.00
6.3.2.3
CPU
un
un
1.0000
1.0000
12.00
12.00
12.00
12.00
6.3.2.4
16132.8.1.3
m
m
1.0000
1.0000
5.87
5.87
5.87
5.87
6.3.2.5
16132.8.4.3
un
un
1.0000
1.0000
3.41
3.41
3.41
3.41
6.3.2.6
16136.8.2.5
un
1.0000
61.49
61.49
un
1.0000
61.49
61.49
SIRENE ELETRONICA
un
un
1.0000
1.0000
145.00
145.00
145.00
145.00
3.08
5.69
7.87
2.40
3.08
0.28
0.39
2.40
6.3.2.7
CPU
SIRENE ELETRONICA
CPU
01270.0.1.13
01270.0.22.1
Mercado
CABO PP 3x2,5mm2
Ajudante de eletricista
Eletricista
CABO PP 3x2,5mm2
m
H
H
m
1.0000
0.0500
0.0500
1.0000
6.3.2.9
6.3.2.10
6.3.2.11
6.3.2.12
16131.8.3.3
16131.8.2.3
m
un
un
un
1.0000
1.0000
5.0000
2.0000
7.1.1
CPU
un
H
H
1.0000
21.0000
21.0000
2,185.00
5.69
7.87
2,185.00
119.49
165.27
un
1.0000
1,900.24
1,900.24
un
H
H
1.0000
21.0000
21.0000
2,645.00
5.69
7.87
2,645.00
119.49
165.27
un
1.0000
2,360.24
2,360.24
un
H
H
1.0000
40.0000
40.0000
3,910.00
5.69
7.87
3,910.00
227.60
314.80
6.3.2.8
01270.0.1.13
01270.0.22.1
Mercado
7.1.2
CPU
01270.0.1.13
01270.0.22.1
Mercado
7.1.3
CPU
01270.0.1.13
01270.0.22.1
Pgina 43 de 94
19.21
6.95
2.16
0.84
CLIENTE:
OBRA:
BASE:TCPO13 - PINI
BDI:
30.00%
TAXAS: LS
122.32%
OBS: ITENS COM CDIGO VER TABELA TCPO (NESTA TABELA NOS SERVIOS NO CONSTAM BDI)
ITEM
Unid.
Coef.
Unitrio
Total (R$)
un
1.0000
3,367.60
3,367.60
7.1.4
CPU
un
un
1.0000
1.0000
95.00
95.00
95.00
95.00
7.1.5
15142.8.22.3
m
m
1.0000
1.0000
8.88
8.88
8.88
8.88
7.1.6
CPU
01270.0.1.14
01270.0.24.1
Mercado
m
H
H
m
1.0000
0.3000
0.3000
1.1000
28.30
5.69
7.87
20.19
26.28
1.71
2.36
22.21
CPU
01270.0.1.14
01270.0.24.1
Mercado
m
H
H
m
1.0000
0.3000
0.3000
1.1000
39.30
5.69
7.87
29.36
36.36
1.71
2.36
32.30
CPU
01270.0.1.14
01270.0.24.1
Mercado
m
H
H
m
1.0000
0.4000
0.4000
1.1000
39.70
5.69
7.87
31.16
39.70
2.28
3.15
34.28
CPU
01270.0.1.13
01270.0.22.1
Mercado
CABO PP 3x2,5mm2
Ajudante de eletricista
Eletricista
CABO PP 3x2,5mm2
m
H
H
m
1.0000
0.0500
0.0500
1.0000
3.08
5.69
7.87
2.40
3.08
0.28
0.39
2.40
8.1.1
13970.8.1.2
un
un
1.0000
1.0000
126.91
126.91
126.91
126.91
8.1.2
13960.8.1.1
EXTINTOR CO2s,CAP.10B
EXTINTOR CO2s,CAP.10B
un
un
1.0000
1.0000
370.50
370.50
370.50
370.50
7.1.7
7.1.8
7.1.9
8.1.3
CPU
un
un
1.0000
1.0000
12.00
12.00
12.00
12.00
8.1.4
CPU
MARCAO de piso
un
un
1.0000
1.0000
48.00
48.00
48.00
48.00
un
1.0000
144.92
144.92
un
1.0000
144.92
144.92
m
m
1.0000
1.0000
2.72
2.72
2.72
2.72
MARCAO de piso
8.1.5
16530.8.1.1
8.1.6
09690.8.1.1
9.2.1
CPU
01270.0.45.1
LIMPEZA permanente
01740.8.1.1
9.2.2
10.1.1
10.1.2
10.1.3
CPU
CPU
CPU
Servente
ms
H
1.0000
110.0000
557.70
5.07
557.70
557.70
m2
m2
1.0000
1.0000
3.55
3.55
3.55
3.55
ms
ms
1.0000
0.5000
3,929.79
7,859.57
3,929.79
3,929.79
ms
ms
1.0000
1.0000
4,300.00
4,300.00
4,300.00
4,300.00
VIGIA (2)
ms
ms
1.0000
1.0000
1,799.28
1,799.28
1,799.28
1,799.28
VIGIA (2)
Pgina 44 de 94
CLIENTE:
OBRA:
BASE:TCPO13 - PINI
BDI:
30.00%
TAXAS: LS
122.32%
OBS: ITENS COM CDIGO VER TABELA TCPO (NESTA TABELA NOS SERVIOS NO CONSTAM BDI)
ITEM
10.2.1
Unid.
COPIAS de projetos
Coef.
Unitrio
Total (R$)
COPIAS de projetos
ms
ms
1.0000
1.0000
120.00
120.00
120.00
120.00
10.2.2
CPU
ms
ms
1.0000
1.0000
1,016.31
1,016.31
1,016.31
1,016.31
10.3.1
CPU
VALE-TRANSPORTE de pessoal
VALE-TRANSPORTE de pessoal (10 operarios x 22 dias) r$ 6,00 (ida
+volta)
ms
un
1.0000
220.0000
6.00
1,320.00
1,320.00
ms
1.0000
10.4.1
CPU
un
1,540.00
220.0000
7.00
1,540.00
COMPOSIES - DETALHADAS
Relatrio de Composies (GLOBAL)
BASE:TCPO13 - PINI (SETEMBRO/09)
TAXAS: LS= 12
ITEM
2.2.2
2.2.4
2.2.3
2.2.1
CDIGO
DESCRIO
02210.6.1.1
02220.8.1.2
01270.0.40.1
01270.0.45.1
02220.8.11.1
01270.0.40.1
01270.0.45.1
02220.8.14.1
01270.0.40.1
01270.0.45.1
02220.8.4.1
01270.0.40.1
22050.3.40.2
22070.9.1.1
M
M3
H
H
M2
H
H
M2
H
H
M3
H
UN
H PROD
1.00
0.30
3.00
0.07
0.70
0.05
0.50
1.50
0.08
5.00
H PROD
15.00
M2
H
H
M3
0.13
1.30
-
H
H PROD
4.50
0.06
22.94
H PROD
0.17
1.86
M3
20.50
Pedreiro
Servente
APILOAMENTO de fundo de vala com mao de 30 kg
Servente
LOCAO da obra, execuo de gabarito
Carpinteiro
Servente
Arame galvanizado (bitola: 16 BWG)
Prego 18 x 27 com cabea (dimetro da cabea: 3,4 mm / comprimento:
Pontalete 3a. construo (seo transversal: 3x3 " / tipo de madeira: cedro)
Tbua 3a. construo (seo transversal: 1x9 " / tipo de madeira: cedrinho)
CAIXA DE INSPEO em alvenaria - 1/2 tijolo comum macio revestido
internamente com argamassa de cimento e areia sem peneirar, trao 1:3,
lastro de concreto e = 10 cm, tampa e = 5 cm, dimenses 60 x 60 x 60 cm
Ajudante de armador
Ajudante de carpinteiro
Carpinteiro
Armador
Pedreiro
Servente
Areia lavada tipo mdia
Pedra britada 1
Pedra britada 2
Cal hidratada CH III
Cimento Portland CP II-E-32 (resistncia: 32,00 MPa)
Chapa compensada resinada (espessura: 12,00 mm)
Barra ao CA-60 (bitola: 5,00 mm / massa linear: 0,154 kg/m)
Tijolo macio cermico 5,7 x 9 x 19 (comprimento: 190,00 mm / largura:
90,00 mm / altura: 57,00 mm)
Arame recozido (dimetro do fio: 1,25 mm / bitola: 18 BWG)
Tbua 3a. construo (seo transversal: 1x12 " / tipo de madeira:
LASTRO DE CONCRETO (contra-piso) , incluindo preparo de caixa, e = 5
Pedreiro
Servente
CONCRETO NO ESTRUTURAL , preparo com betoneira
LASTRO DE AREIA com areia grossa
H
H
M2
H
M2
H
H
KG
KG
M
M2
UN
0.35
3.50
1.50
0.13
0.13
0.02
0.01
0.04
0.09
-
7.87
5.07
7.60
5.07
1.68
7.87
5.07
H
H
H
H
H
H
M3
M3
M3
KG
KG
M2
KG
UN
0.23
1.19
1.19
0.23
4.14
8.19
0.16
0.02
0.06
7.64
41.90
0.20
2.58
141.00
KG
M2
M2
H
H
M3
M3
0.04
0.06
0.40
0.80
0.05
-
22600.9.3.5
5.2.33
5.2.34 e
6.1.7.6
02220.8.9.1
01270.0.40.1
01270.0.45.1
02315.8.1.10
01270.0.45.1
22070.9.1.5
22600.9.5.1
5.2.36 e
6.1.7.7
5.2.35
2.4.1
02315.8.7.1
01270.0.40.1
01270.0.45.1
02315.8.8.2
01270.0.45.1
02595.8.1.1
01270.0.19.1
01270.0.45.1
05060.3.2.4
05060.3.20.6
06062.3.2.1
06062.3.5.4
02620.8.1.5
5.2.27
01270.0.1.10
01270.0.1.11
01270.0.19.1
01270.0.25.1
01270.0.40.1
01270.0.45.1
02060.3.2.2
02060.3.3.1
02060.3.3.2
02065.3.2.1
02065.3.5.1
03110.3.1.4
03210.3.5.2
04211.3.4.1
4.5.1.1
5.2.37
05060.3.3.1
06062.3.5.7
02710.8.6.2
01270.0.40.1
01270.0.45.1
03320.8.1.2
02720.8.5.1
UNID.
Pgina 45 de 94
COEF.
PREO
MAT.(R$)
124.19
PREO M.O.(R$)
17.57
7.87
5.07
4.10
7.87
5.07
2.93
7.87
5.07
87.84
7.87
120.17
18.39
1.55
PREO
OUTROS(R$)
45.50
38.99
4.73
5.07
1.02
7.61
7.87
5.07
22.81
5.07
2.30
10.76
6.68
3.83
20.53
84.73
6.15
7.87
0.43
93.29
5.69
5.69
7.87
7.87
7.87
5.07
81.17
69.68
67.25
0.42
0.34
12.48
3.74
0.25
6.55
21.92
9.48
189.59
96.92
8.80
7.87
5.07
31.96
17.74
0.01
0.15
CLIENTE:
OBRA:
BASE:TCPO13 - PINI
BDI:
30.00%
TAXAS: LS
122.32%
OBS: ITENS COM CDIGO VER TABELA TCPO (NESTA TABELA NOS SERVIOS NO CONSTAM BDI)
ITEM
Fonte - TCPO
01270.0.45.1
02060.3.2.4
02752.8.6.1
4.5.1.4
01270.0.40.1
01270.0.45.1
03310.8.1.41
06062.3.3.2
02753.8.1.5
4.5.1.2
02753.1.1.1
04060.8.1.27
03310.8.13.1
3.2.2.2
03310.8.2.43
03350.8.2.1
03850.8.3.9
09115.8.5.1
03110.8.25.1
03110.8.26.1
03110.8.2.7
3.2.1.1
03110.8.24.15
03110.8.25.2
03110.8.26.2
03140.8.2.1
3.2.1.2
01270.0.1.11
03140.7.1.1
3.2.3.2
3.2.3.3
3.2.3.4
06062.3.2.4
06062.3.5.20
03210.8.1.10
01270.0.1.10
01270.0.25.1
03150.3.3.6
03210.3.2.3
05060.3.3.1
03210.8.1.11
01270.0.1.10
01270.0.25.1
03150.3.3.6
03210.3.2.2
05060.3.3.1
03210.8.1.12
01270.0.1.10
01270.0.25.1
03150.3.3.6
03210.3.2.5
05060.3.3.1
03210.8.1.6
3.2.3.1
01270.0.1.10
01270.0.25.1
03150.3.3.6
03210.3.5.2
05060.3.3.1
03310.8.13.2
3.1.1.3
3.1.1.2
3.2.2.1
01270.0.40.1
01270.0.45.1
22300.9.10.1
03310.8.2.5
03310.3.1.4
03310.8.2.6
03310.3.1.6
04085.8.1.1
4.1.6
01270.0.19.1
01270.0.25.1
01270.0.40.1
01270.0.45.1
02060.3.2.2
02060.3.3.1
02060.3.3.2
02065.3.5.1
03125.3.1.1
03210.3.2.2
05060.3.20.6
05060.3.3.1
06062.3.2.1
Unid.
H
M3
M2
Coef.
3.50
1.15
-
84.28
20.95
15.18
0.01
H
H
M3
1.00
1.00
0.07
227.26
7.87
5.07
31.96
0.15
M
M2
1.82
-
2.77
6.34
0.76
15.51
M2
M3
1.00
0.02
422.47
50.69
M3
48.00
0.05
21.98
0.03
M3
48.00
356.48
M2
M
600.00
600.00
0.01
0.10
0.01
11.46
M2
600.00
2.08
11.15
M2
1.00
1.27
3.75
M2
1.00
M2
33.76
9.07
M2
0.33
96.73
11.15
M2
1.00
1.54
3.75
M2
1.00
M2
H
LOC/UN/
MS
Pontalete 3 x 3" (altura: 75,00 mm / largura: 75,00 mm)
M
Tbua 1 x 6" (espessura: 25 mm / largura: 150 mm)
M
ARMADURA de ao para pilares, CA-50, corte e dobra na obra
KG
Ajudante de armador
H
Armador
H
Espaador circular de plstico para pilares, fundo e laterais de vigas, lajes, UN
pisos e estacas (cobrimento: 30 mm)
Barra de ao CA-50 1/2" (bitola: 12,50 mm / massa linear: 0,963 kg/m)
KG
Arame recozido (dimetro do fio: 1,25 mm / bitola: 18 BWG)
KG
ARMADURA de ao para vigas, CA-50, corte e dobra na obra
KG
Ajudante de armador
H
Armador
H
Espaador circular de plstico para pilares, fundo e laterais de vigas, lajes, UN
pisos e estacas (cobrimento: 30 mm)
Barra de ao CA-50 3/8" (bitola: 10,00 mm / massa linear: 0,617 kg/m)
KG
Arame recozido (dimetro do fio: 1,25 mm / bitola: 18 BWG)
KG
ARMADURA de ao para lajes, CA-50, corte e dobra na obra
KG
Ajudante de armador
H
Armador
H
Espaador circular de plstico para pilares, fundo e laterais de vigas, lajes, UN
pisos e estacas (cobrimento: 30 mm)
Barra de ao CA-50 5/16" (bitola: 8,00 mm / massa linear: 0,395 kg/m)
KG
Arame recozido (dimetro do fio: 1,25 mm / bitola: 18 BWG)
KG
ARMADURA de ao para estruturas em geral, CA-60, dimetro 5,0 mm,
KG
corte e dobra na obra
Ajudante de armador
H
Armador
H
Espaador circular de plstico para pilares, fundo e laterais de vigas, lajes, UN
pisos e estacas (cobrimento: 30 mm)
Barra ao CA-60 (bitola: 5,00 mm / massa linear: 0,154 kg/m)
KG
Arame recozido (dimetro do fio: 1,25 mm / bitola: 18 BWG)
KG
TRANSPORTE, lanamento, adensamento e acabamento do concreto em M3
fundao
Pedreiro
H
Servente
H
VIBRADOR de imerso, eltrico, potncia 1 HP (0,75 kW) - vida til 20.000 H PROD
CONCRETO estrutural dosado em central , fck 20 MPa
M3
Concreto dosado em central convencional brita 1 e 2 (resistncia: 20,0
M3
CONCRETO estrutural dosado em central , fck 25 MPa
M3
Concreto dosado em central convencional brita 1 e 2 (resistncia: 25,0
M3
VERGA RETA moldada no local com frma de madeira considerando 5
M3
reaproveitamentos, concreto armado fck = 13,5 MPa, controle tipo "B"
Carpinteiro
H
Armador
H
Pedreiro
H
Servente
H
Areia lavada tipo mdia
M3
Pedra britada 1
M3
Pedra britada 2
M3
Cimento Portland CP II-E-32 (resistncia: 32,00 MPa)
KG
Desmoldante de frmas para concreto
L
Barra de ao CA-50 3/8" (bitola: 10,00 mm / massa linear: 0,617 kg/m)
KG
Prego 18 x 27 com cabea (dimetro da cabea: 3,4 mm / comprimento:
KG
Arame recozido (dimetro do fio: 1,25 mm / bitola: 18 BWG)
KG
Pontalete 3a. construo (seo transversal: 3x3 " / tipo de madeira: cedro) M
Pgina 46 de 94
Unitrio
15.51
1.61
1.61
11.97
0.20
1.15
5.29
4.60
9.65
3.57
4.49
1.10
0.02
0.09
0.09
7.30
3.58
6.55
4.84
1.10
0.02
0.05
0.05
11.40
3.68
6.55
5.96
1.10
0.02
-
4.37
6.55
6.87
0.07
0.07
29.20
0.09
1.10
0.02
-
3.74
6.55
0.05
16.00
4.80
2.00
28.80
0.93
0.21
0.63
268.00
2.20
69.00
2.13
1.20
32.00
1.14
5.69
0.50
2.00
0.06
0.06
4.70
2.00
6.00
0.20
1.05
1.05
-
Total (R$)
5.07
0.84
5.69
7.87
0.09
1.26
5.69
7.87
0.09
0.69
5.69
7.87
0.09
0.95
5.69
7.87
0.26
250.46
238.53
259.32
246.97
903.16
47.17
0.03
7.87
5.07
5.07
0.14
326.97
0.15
7.87
7.87
7.87
5.07
81.17
69.68
67.25
0.34
6.91
3.68
6.68
6.55
3.83
CLIENTE:
OBRA:
BASE:TCPO13 - PINI
BDI:
30.00%
TAXAS: LS
122.32%
OBS: ITENS COM CDIGO VER TABELA TCPO (NESTA TABELA NOS SERVIOS NO CONSTAM BDI)
ITEM
Fonte - TCPO
06062.3.4.4
06062.3.5.7
22300.9.2.5
04211.8.2.3
4.1.1
01270.0.40.1
01270.0.45.1
04060.8.1.84
04211.3.2.1
04840.8.5.2
4.1.2
04840.6.4.1
04840.8.5.3
4.1.3
04840.6.4.2
3.3.1.1
05125.8.1.1
05125.6.6.1
05125.8.5.1
3.3.2.2
05125.6.6.1
07110.8.2.1
4.6.3
4.6.4
4.6.5
01270.0.1.9
01270.0.13.1
02065.3.9.2
07110.3.4.1
07120.3.12.1
07120.3.14.1
07110.8.4.1
01270.0.45.1
02065.3.9.2
07110.8.4.2
01270.0.40.1
01270.0.45.1
02060.3.2.2
02065.3.5.1
07110.3.1.1
07140.3.6.2
07110.8.6.1
4.6.2
4.6.6
01270.0.40.1
01270.0.45.1
02060.3.2.2
02065.3.5.1
07110.3.1.1
07120.3.17.1
07140.3.6.2
07140.8.4.2
01270.0.40.1
01270.0.45.1
02060.3.2.2
02065.3.5.1
07140.3.3.1
07210.8.1.3
4.1.4
01270.0.1.1
01270.0.13.2
05060.3.2.4
05060.3.23.1
05060.3.6.1
07210.3.2.8
07410.8.3.1
4.4.1
01270.0.1.20
01270.0.48.1
05060.3.31.1
07410.3.3.1
4.4.2
5.2.24
07915.3.1.1
07620.8.2.6
01270.0.1.20
01270.0.48.1
05060.3.20.5
07620.3.2.6
07725.8.1.2
01270.0.1.20
01270.0.48.1
07725.3.1.2
08210.8.3.2
4.2.1.3
01270.0.1.11
01270.0.19.1
01270.0.40.1
01270.0.45.1
02060.3.2.2
Pgina 47 de 94
Unid.
M
M2
H PROD
Coef.
16.30
10.00
0.31
Unitrio
2.85
21.92
0.51
5.07
M2
10.41
13.55
H
H
M3
UN
1.00
1.00
0.01
27.00
M2
94.15
M2
M2
1.00
-
94.15
68.84
M2
1.00
68.84
KG
KG
M2
1.00
-
10.25
10.25
107.63
KG
M2
10.50
-
H
H
KG
L
L
M2
M2
H
KG
M2
H
H
M3
KG
L
L
M2
0.50
0.50
2.30
0.80
0.50
1.10
0.40
2.30
1.60
0.50
0.03
11.00
0.56
0.30
-
H
H
M3
KG
L
L
L
M2
H
H
M3
KG
KG
M2
1.60
0.90
0.03
11.00
0.56
0.60
0.30
0.43
1.30
0.02
6.30
2.50
-
H
H
KG
M2
0.30
0.30
0.05
1.02
10.76
6.00
UN
5.00
0.16
M2
1.02
31.61
M2
93.64
H
H
UN
0.22
0.22
0.82
0.65
M2
1.06
87.77
KG
M
H
H
KG
M
0.00
0.50
0.50
0.07
1.03
17.24
13.81
UN
H
H
UN
UN
0.06
0.06
1.00
-
9.85
H
H
H
H
M3
3.75
3.75
1.40
1.40
0.01
237.35
0.28
Total (R$)
0.49
7.87
5.07
50.69
10.25
42.70
6.78
5.69
7.87
7.81
11.43
20.58
4.82
17.96
7.81
10.36
81.17
0.34
3.21
8.92
13.52
2.03
5.07
15.13
7.87
5.07
17.15
7.87
5.07
81.17
0.34
3.21
5.26
8.92
32.54
81.17
0.34
11.64
39.70
9.97
7.87
5.07
3.88
5.07
7.87
2.98
5.69
7.87
6.78
5.69
7.87
8.52
12.83
9.85
435.56
0.81
5.69
7.87
68.97
5.69
7.87
7.87
5.07
81.17
CLIENTE:
OBRA:
BASE:TCPO13 - PINI
BDI:
30.00%
TAXAS: LS
122.32%
OBS: ITENS COM CDIGO VER TABELA TCPO (NESTA TABELA NOS SERVIOS NO CONSTAM BDI)
ITEM
Fonte - TCPO
02065.3.2.1
02065.3.5.1
05060.3.20.4
05060.3.24.1
06062.3.8.2
08210.3.1.2
08210.3.2.1
08210.3.4.2
08710.3.10.4
08710.3.2.1
08210.8.3.3
4.2.1.1
01270.0.1.11
01270.0.19.1
01270.0.40.1
01270.0.45.1
02060.3.2.2
02065.3.2.1
02065.3.5.1
05060.3.20.4
05060.3.24.1
06062.3.8.2
08210.3.1.2
08210.3.2.1
08210.3.4.3
08710.3.10.4
08710.3.2.1
08210.8.3.4
4.2.1.2.2
01270.0.1.11
01270.0.19.1
01270.0.40.1
01270.0.45.1
02060.3.2.2
02065.3.2.1
02065.3.5.1
05060.3.20.4
05060.3.24.1
06062.3.8.2
08210.3.1.2
08210.3.2.1
08210.3.4.4
08710.3.10.4
08710.3.2.1
08520.8.1.3
4.2.2.4
01270.0.40.1
01270.0.45.1
02060.3.2.2
02065.3.5.1
08520.3.1.7
08520.8.1.4
4.2.2.3
01270.0.40.1
01270.0.45.1
02060.3.2.2
02065.3.5.1
08520.3.1.8
08810.8.4.1
4.3.2
4.2.3.1
4.3.1
08810.13.1.1
08810.3.4.4
08820.8.2.13
08810.3.6.2
08820.13.1.1
08820.13.1.2
08830.8.1.2
01270.0.40.1
01270.0.45.1
08830.3.1.2
09115.8.11.1
4.5.4.2
01270.0.1.19
01270.0.41.1
09906.3.3.1
Pgina 48 de 94
Unid.
KG
KG
KG
UN
Coef.
1.72
1.72
0.25
8.00
Unitrio
0.42
0.34
8.27
0.32
UN
6.00
0.96
UN
1.00
96.50
UN
2.00
43.33
UN
1.00
74.10
UN
1.00
152.30
UN
UN
3.00
-
4.48
435.55
H
H
H
H
M3
KG
KG
KG
UN
3.75
3.75
1.40
1.40
0.01
1.72
1.72
0.25
8.00
UN
6.00
0.96
UN
1.00
96.50
UN
2.00
43.33
UN
1.00
74.09
UN
1.00
152.30
UN
UN
3.00
-
4.48
469.73
H
H
H
H
M3
KG
KG
KG
UN
3.75
3.75
1.40
1.40
0.01
1.72
1.72
0.25
8.00
81.17
0.42
0.34
8.27
0.32
UN
6.00
0.96
UN
1.00
96.50
UN
2.00
43.33
UN
1.00
108.27
UN
1.00
152.30
UN
M2
3.00
-
4.48
319.76
H
H
M3
KG
M2
M2
1.50
1.00
0.00
1.94
1.00
-
81.17
0.34
318.70
373.56
H
H
M3
KG
M2
M2
1.50
1.00
0.00
1.94
1.00
-
81.17
0.34
372.50
240.30
ND
M2
M2
M2
%
%
M2
H
H
M2
M2
0.20
1.00
1.00
30.00
15.00
2.50
2.50
1.00
-
H
H
L
0.35
0.40
0.12
Total (R$)
68.97
5.69
7.87
7.87
5.07
81.17
0.42
0.34
8.27
0.32
68.97
5.69
7.87
7.87
5.07
16.87
7.87
5.07
16.87
7.87
5.07
200.25
200.25
10,482.02
227.87
227.87
227.87
223.33
223.33
3.26
32.35
7.87
5.07
5.14
5.69
7.87
9.94
CLIENTE:
OBRA:
BASE:TCPO13 - PINI
BDI:
30.00%
TAXAS: LS
122.32%
OBS: ITENS COM CDIGO VER TABELA TCPO (NESTA TABELA NOS SERVIOS NO CONSTAM BDI)
ITEM
4.5.4.5
Fonte - TCPO
09910.3.30.1
09910.3.7.2
09115.8.14.1
01270.0.1.19
01270.0.41.1
09906.3.10.1
09910.3.12.1
09910.3.30.1
09910.3.9.6
09960.3.26.3
09500.8.8.4
4.5.3.1
09500.6.3.2
09640.8.5.1
4.7.1.4
01270.0.1.11
01270.0.19.1
05060.3.20.4
06062.3.8.2
09640.3.4.1
4.5.1.8
09655.8.6.1
01270.0.13.2
01270.0.45.1
09655.3.1.1
09655.3.5.7
4.5.1.9 e 09655.8.7.1
4.7.1.3
01270.0.13.2
09655.3.1.1
09655.3.6.1
09705.8.12.4
4.5.2.1
01270.0.40.1
01270.0.45.1
04060.8.1.34
09720.8.3.1
4.5.2.4
01270.0.1.1
01270.0.13.2
09655.3.1.1
09720.3.2.5
09906.8.2.1
4.5.4.1
01270.0.1.19
01270.0.41.1
09906.3.4.1
09910.3.30.1
09906.8.4.1
4.5.4.7
4.5.4.6
01270.0.1.19
01270.0.41.1
09910.3.29.1
09910.3.30.21
09960.3.2.1
09960.3.26.4
09906.8.6.1
01270.0.1.1
02060.3.2.2
22070.9.1.9
22070.9.6.1
09940.8.1.1
4.5.4.4
01270.0.1.19
01270.0.41.1
09940.3.1.4
4.9.5
6.1.1.5
8.1.2
8.1.1
10640.8.3.1
01270.0.40.1
01270.0.45.1
02065.3.4.1
04060.8.1.34
10640.3.4.1
13105.8.4.1
01270.0.1.13
01270.0.22.1
13105.3.13.1
16120.3.2.2
13970.8.1.1
01270.0.40.1
01270.0.45.1
05060.3.6.1
13970.3.1.1
13970.8.1.2
01270.0.40.1
01270.0.45.1
Unid.
UN
L
M2
H
H
L
L
UN
L
L
M2
Coef.
0.25
0.17
0.30
0.40
0.03
0.06
1.00
0.19
0.03
-
M2
1.00
8.75
H
H
KG
UN
0.30
0.40
0.01
2.00
8.27
0.96
1.03
6.58
M2
H
H
KG
M2
0.17
0.17
0.14
1.05
37.82
6.56
Aplicador de revestimento
Cola de neoprene
Rodap vinlico tipo normal (altura: 50,00 mm / espessura: 2,00 mm)
CHAPISCO para parede interna ou externa com argamassa de cimento e
areia sem peneirar trao 1:3, e=5 mm
Pedreiro
Servente
ARGAMASSA de cimento e areia sem peneirar trao 1:3
LAMINADO melamnico para revestimento interno, fixado com cola base
de neoprene, e=1,3 mm
Ajudante
Aplicador de revestimento
Cola de neoprene
Laminado melamnico (espessura: 1,30 mm / tipo de acabamento:
texturizado / padro de cor: unicolor )
EMASSAMENTO de parede externa com massa acrlica com duas demos,
para pintura ltex
Ajudante de pintor
Pintor
Massa acrlica para pintura latex
Lixa para superfcie madeira/massa grana 100
APLICAO de primer epxi em estrutura de ao carbono com uma
demo, e=25 micra, com trincha
Ajudante de pintor
Pintor
Trincha dupla (largura: 2 ")
Lixa para superfcie metlica grana 100
Primer base de epxi
Solvente para tinta epxi
JATEAMENTO em estrutura de ao carbono ao metal branco (SSPC-SP5)
Ajudante
Areia lavada tipo mdia
COMPRESSOR de ar porttil rebocvel, diesel, potncia 119 HP (89 kW),
capacidade 10,2 m/min (360 pcm) - vida til 20.000 h
MQUINA para jateamento de areia, pneumtica, capacidade 270 l - vida
til 20.000 h
REVESTIMENTO texturizado em parede interna ou externa de alta
camada, aplicado com rolo
Ajudante de pintor
Pintor
Revestimento texturizado de alta camada (tipo de acabamento: granulado
fino irregular )
DIVISRIA sanitria de granito e=3 cm assentada com argamassa, no
Pedreiro
Servente
Cimento branco no estrutural
ARGAMASSA de cimento e areia sem peneirar trao 1:3
Placa de granito para divisria (espessura: 30,00 mm / cor: cinza
CORDOALHA de cobre nu e isoladores para pra-raios, seo 35 mm
Ajudante de eletricista
Eletricista
Suporte com roldana e chapa de encosto para pra-raios (dimetro da
seo: 3/8 " / tipo de acabamento: galvanizado a fogo)
Cabo de cobre nu (seo transversal: 35,00 mm)
EXTINTOR de p qumico pressurizado , capacidade 4 kg
Pedreiro
Servente
Bucha de nylon com parafuso auto atarraxante cabea panela, fenda
simples (comprimento: 50,00 mm / dimetro nominal do parafuso: 4,80 mm /
dimetro nominal da bucha: 8,00 mm)
Extintor com carga p qumico (quantidade: 4,00 kg)
EXTINTOR de p qumico pressurizado , capacidade 8 kg
Pedreiro
Servente
H
KG
M
M2
0.07
0.05
1.05
-
13.66
5.60
1.32
1.55
H
H
M3
M2
0.10
0.10
0.01
-
264.27
27.98
7.87
5.07
50.69
2.33
H
H
KG
M2
0.18
0.18
0.90
1.05
13.66
14.94
M2
2.58
H
H
KG
UN
M2
0.25
0.35
0.70
0.50
-
3.16
0.74
2.94
H
H
UN
UN
L
L
M2
H
M3
H PROD
0.10
0.20
0.08
0.25
0.10
0.01
0.50
0.05
0.30
H PROD
0.60
2.58
7.87
M2
4.90
5.81
H
H
KG
0.33
0.50
1.30
M2
H
H
KG
M3
M2
M
H
H
UN
2.40
4.77
0.70
0.00
1.00
0.50
0.50
0.50
288.86
M
UN
H
H
UN
1.00
0.40
0.40
2.00
6.96
85.32
UN
UN
H
H
1.00
0.40
0.40
85.00
121.73
Pgina 49 de 94
Unitrio
0.74
11.05
4.07
Total (R$)
4.86
5.69
7.87
13.31
5.66
0.74
12.58
6.55
42.36
42.36
4.86
5.69
7.87
2.20
7.87
5.07
13.66
34.20
0.55
7.87
5.07
7.87
4.18
5.69
7.87
2.14
5.69
7.87
7.09
2.18
16.64
16.45
15.79
7.26
5.07
81.17
34.70
8.71
5.69
7.87
3.77
2.13
264.27
286.50
8.72
2.90
43.23
7.87
5.07
50.69
6.78
5.69
7.87
3.52
5.18
7.87
5.07
0.16
5.18
7.87
5.07
0.49
OBS: ITENS COM CDIGO VER TABELA TCPO (NESTA TABELA NOS SERVIOS NO CONSTAM BDI)
ITEM
2.3.1
5.1.29
5.1.34
4.8.1.13
5.1.8
5.1.7
5.1.9
5.1.19
5.1.18
5.1.17
5.1.15
5.1.16
5.1.13
5.1.11
5.1.28
Pgina 50 de 94
Unid.
UN
Coef.
2.00
Unitrio
0.16
UN
M3
H
H IMP
1.00
0.72
0.24
121.41
UN
H
H
UN
M
UN
H
H
UN
M
UN
0.61
0.61
1.00
1.20
0.61
0.61
1.00
0.56
-
64.94
51.52
0.15
155.26
H
H
UN
M
2.00
2.00
1.00
0.60
137.00
29.97
M
UN
H
H
UN
L
KG
UN
H
H
UN
L
KG
UN
H
H
UN
1.88
0.18
0.18
1.00
0.00
0.01
0.28
0.28
1.00
0.00
0.01
0.20
0.20
1.00
L
KG
M
UN
H
H
UN
L
KG
UN
H
H
UN
L
KG
UN
H
H
UN
L
KG
UN
H
H
L
UN
0.00
0.00
0.31
0.09
0.09
1.00
0.01
0.01
0.14
0.14
1.00
0.01
0.01
0.14
0.14
1.00
0.03
0.02
0.30
0.30
0.02
1.00
24.75
32.80
0.15
1.46
KG
UN
H
H
L
UN
0.01
0.30
0.30
0.03
1.00
32.80
9.26
KG
UN
H
H
L
UN
0.02
0.45
0.45
0.06
1.00
32.80
27.51
KG
UN
H
H
L
UN
KG
UN
H
H
UN
M
0.04
0.30
0.30
0.01
1.00
0.01
0.61
0.61
1.00
0.94
32.80
7.30
Total (R$)
5.93
5.07
9.52
64.76
0.15
51.60
8.27
5.69
7.87
8.27
5.69
7.87
27.12
5.69
7.87
0.15
1.36
1.05
24.75
32.80
2.98
2.59
24.75
32.80
1.55
2.44
5.69
7.87
3.80
5.69
7.87
2.71
5.69
7.87
1.33
0.99
24.75
32.80
2.82
2.18
24.75
32.80
9.55
8.23
24.75
32.80
5.66
1.22
5.69
7.87
1.90
5.69
7.87
1.90
5.69
7.87
4.07
5.69
7.87
24.75
4.79
4.07
5.69
7.87
24.75
8.04
6.10
5.69
7.87
24.75
24.75
24.75
6.72
32.80
51.91
51.77
0.15
4.07
5.69
7.87
8.27
5.69
7.87
3.92
16.35
CLIENTE:
OBRA:
BASE:TCPO13 - PINI
BDI:
30.00%
TAXAS: LS
122.32%
OBS: ITENS COM CDIGO VER TABELA TCPO (NESTA TABELA NOS SERVIOS NO CONSTAM BDI)
ITEM
7.1.5
5.1.1
Fonte - TCPO
15142.8.22.3
01270.0.1.14
01270.0.24.1
15142.3.18.1
15142.3.23.3
15142.3.4.1
15142.8.23.5
01270.0.1.14
01270.0.24.1
15142.3.18.1
15142.3.23.5
15142.3.4.1
15142.8.3.2
5.1.23
01270.0.1.14
01270.0.24.1
15142.3.1.2
15142.3.18.1
15142.3.4.1
15143.3.5.1
15142.8.3.3
5.1.22
01270.0.1.14
01270.0.24.1
15142.3.1.3
5.2.14
5.2.13
15142.3.18.1
15142.3.4.1
15143.3.5.1
15152.8.10.1
01270.0.1.14
01270.0.24.1
15142.3.18.1
15142.3.4.1
15152.3.14.1
15152.8.19.1
01270.0.1.14
01270.0.24.1
15152.3.1.2
15152.3.1.4
15152.3.21.1
15152.3.24.3
5.2.3
5.2.1
5.2.10
15152.8.22.2
01270.0.1.14
01270.0.24.1
15152.3.1.2
15152.3.21.1
15152.3.29.1
15152.8.22.4
01270.0.1.14
01270.0.24.1
15152.3.1.4
15152.3.21.1
15152.3.29.2
15152.8.8.3
01270.0.1.14
01270.0.24.1
15152.3.1.3
15152.3.11.2
5.2.21
5.2.22
5.2.23
15152.3.21.1
15155.8.1.3
01270.0.1.14
01270.0.24.1
15155.3.4.3
15155.8.5.1
01270.0.1.14
01270.0.24.1
15155.3.17.1
15155.3.24.1
15155.3.6.1
15155.8.6.1
01270.0.1.14
01270.0.24.1
15152.3.21.1
15155.3.25.1
15155.3.26.1
4.8.1.3
15410.8.12.1
01270.0.1.14
01270.0.24.1
15143.3.5.1
Pgina 51 de 94
Unid.
M
H
H
L
M
KG
M
H
H
L
M
KG
UN
Coef.
0.45
0.45
0.00
1.50
0.00
0.24
0.24
0.00
1.01
0.00
-
Unitrio
6.85
H
H
UN
0.09
0.09
1.00
10.99
L
KG
M
UN
0.01
0.00
1.00
-
24.75
32.80
0.15
13.98
H
H
UN
0.14
0.14
1.00
13.47
L
KG
M
UN
H
H
L
KG
UN
0.01
0.00
1.25
0.29
0.29
0.02
0.01
1.00
24.75
32.80
0.15
3.55
UN
H
H
UN
0.46
0.46
1.00
12.34
UN
1.00
1.60
KG
UN
0.04
1.00
30.00
8.55
M
H
H
UN
0.30
0.30
0.33
4.55
KG
M
M
H
H
UN
0.00
1.01
0.52
0.52
0.33
30.00
4.09
7.20
KG
M
UN
H
H
UN
0.01
1.01
0.36
0.36
1.00
30.00
6.38
6.11
UN
1.00
4.52
KG
UN
H
H
UN
0.02
0.40
0.40
1.00
30.00
31.86
UN
H
H
UN
UN
0.40
0.40
1.00
1.00
9.80
UN
UN
H
H
KG
UN
1.00
0.45
0.45
0.10
1.00
5.13
229.83
UN
1.00
68.55
UN
H
H
M
1.50
1.50
0.84
215.10
24.75
4.54
32.80
7.19
24.75
7.07
32.80
11.38
Total (R$)
6.10
5.69
7.87
3.25
5.69
7.87
1.22
5.69
7.87
1.90
5.69
7.87
3.93
5.69
7.87
24.75
32.80
2.56
6.24
5.69
7.87
0.99
4.07
5.69
7.87
0.99
7.05
5.69
7.87
1.60
4.88
5.69
7.87
1.14
5.42
5.69
7.87
31.86
5.42
5.69
7.87
1.15
3.52
6.10
5.69
7.87
30.00
158.43
0.15
20.34
5.69
7.87
OBS: ITENS COM CDIGO VER TABELA TCPO (NESTA TABELA NOS SERVIOS NO CONSTAM BDI)
ITEM
4.8.1.2
4.8.1.6
5.1.35
4.8.1.11
4.8.1.7
4.8.1.5
6.1.4.5
6.1.4.2
6.1.4.3
6.1.4.4
6.2.2.12
6.3.1.4
Pgina 52 de 94
Unid.
UN
Coef.
1.00
Unitrio
62.04
UN
UN
1.00
1.00
12.00
2.89
UN
UN
UN
H
H
UN
UN
1.00
1.00
2.75
2.75
2.00
2.00
35.05
102.99
228.45
M
UN
0.84
1.00
0.15
62.04
UN
UN
1.00
1.00
12.00
2.89
UN
UN
UN
H
H
UN
M
UN
1.00
1.00
3.00
3.00
1.00
0.75
1.00
46.40
102.99
361.01
UN
1.00
36.75
UN
UN
UN
H
H
M
UN
1.00
1.00
0.34
0.34
0.60
1.00
176.39
48.40
39.39
UN
H
H
M
UN
UN
H
H
M
UN
1.40
1.40
0.94
1.00
3.50
3.50
1.60
1.00
54.86
UN
1.00
24.75
UN
1.00
160.00
UN
H
H
UN
UN
3.00
3.00
2.00
2.00
254.34
KG
M
UN
0.10
0.56
1.00
2.83
0.15
5.50
UN
1.00
2.89
UN
UN
UN
M
H
H
M
1.00
1.00
1.00
0.16
0.16
1.02
18.05
108.70
116.83
5.37
M
H
H
M
0.12
0.12
1.02
1.24
M
H
H
M
0.13
0.13
1.02
1.73
M
H
H
M
0.14
0.14
1.02
3.18
UN
H
H
UN
UN
UN
H
H
0.03
0.03
1.00
1.00
0.21
0.21
0.95
Total (R$)
37.29
5.69
7.87
0.81
0.19
40.68
5.69
7.87
20.25
0.15
79.11
4.61
5.69
7.87
0.15
39.30
0.15
54.72
259.49
18.99
5.69
7.87
47.47
5.69
7.87
0.15
74.50
40.68
5.69
7.87
0.81
0.19
2.17
5.69
7.87
5.26
1.63
5.69
7.87
1.22
1.76
5.69
7.87
1.70
1.90
5.69
7.87
3.12
0.34
0.61
5.88
0.41
5.69
7.87
2.85
5.69
7.87
CLIENTE:
OBRA:
BASE:TCPO13 - PINI
BDI:
30.00%
TAXAS: LS
122.32%
OBS: ITENS COM CDIGO VER TABELA TCPO (NESTA TABELA NOS SERVIOS NO CONSTAM BDI)
ITEM
6.3.1.3
6.1.1.3
6.3.1.2
6.3.1.1
6.1.1.2
6.1.3.10
6.1.3.11
6.1.3.12
e
6.1.3.13
e
6.1.3.25
6.1.3.26
6.1.3.27
6.1.3.28
6.1.3.14
Unid.
UN
Coef.
1.00
Unitrio
5.88
UN
H
H
UN
0.21
0.21
1.00
7.26
UN
H
H
UN
0.28
0.28
1.00
54.53
3.63
H
H
M
0.30
0.30
1.00
3.63
M
H
H
M
0.30
0.30
1.00
5.59
26.89
H
H
M
0.60
0.60
1.00
26.89
M
H
H
M
M
H
H
M
M
0.20
0.20
1.00
0.20
0.20
1.00
-
01270.0.1.13
01270.0.22.1
16132.3.3.4
16132.8.1.5
Ajudante de eletricista
Eletricista
Eletroduto de PVC rgido roscvel (dimetro da seo: 1 1/4 ")
ELETRODUTO de PVC rgido roscvel, sem conexes 50 mm (1 1/2")
H
H
M
M
0.30
0.30
1.00
-
01270.0.1.13
01270.0.22.1
16132.3.3.5
16132.8.1.6
01270.0.1.13
01270.0.22.1
16132.3.3.6
16132.8.3.1
01270.0.1.13
01270.0.22.1
16132.3.2.1
16132.8.3.2
01270.0.1.13
01270.0.22.1
16132.3.2.2
16132.8.3.3
01270.0.1.13
01270.0.22.1
16132.3.2.3
16131.8.2.2
01270.0.1.13
01270.0.22.1
16131.3.3.2
Ajudante de eletricista
Eletricista
Eletroduto de PVC rgido roscvel (dimetro da seo: 1 1/2 ")
ELETRODUTO de PVC rgido roscvel, sem conexes 60 mm (2")
Ajudante de eletricista
Eletricista
Eletroduto de PVC rgido roscvel (dimetro da seo: 2 ")
ELETRODUTO de PVC flexvel corrugado 16 mm
Ajudante de eletricista
Eletricista
Eletroduto de PVC flexvel corrugado amarelo (dimetro da seo: 16 mm)
ELETRODUTO de PVC flexvel corrugado 20 mm (1/2")
Ajudante de eletricista
Eletricista
Eletroduto de PVC flexvel corrugado amarelo (dimetro da seo: 20 mm)
ELETRODUTO de PVC flexvel corrugado 25 mm (3/4")
Ajudante de eletricista
Eletricista
Eletroduto de PVC flexvel corrugado amarelo (dimetro da seo: 25 mm)
CURVA de ao para eletroduto galvanizado a fogo, 20 mm (3/4")
Ajudante de eletricista
Eletricista
Curva 90 de ao para eletroduto (dimetro da seo: 3/4 " / tipo: roscvel /
tipo de galvanizao: a fogo/mdio )
CURVA de ao para eletroduto galvanizado a fogo, 25 mm (1")
Ajudante de eletricista
Eletricista
Curva 90 de ao para eletroduto (dimetro da seo: 1 " / tipo: roscvel /
tipo de galvanizao: a fogo/mdio )
CURVA 90 de PVC rgido para eletroduto roscvel, 40 mm (1 1/4")
Ajudante de eletricista
Eletricista
Curva 90 de PVC rgido roscvel para eletroduto (dimetro da seo: 1 1/4
CURVA 90 de PVC rgido para eletroduto roscvel, 50 mm (1 1/2")
Ajudante de eletricista
Eletricista
Curva 90 de PVC rgido roscvel para eletroduto (dimetro da seo: 1 1/2
LUVA de PVC para eletroduto rgido roscvel, 40 mm (1 1/4")
Ajudante de eletricista
Eletricista
Luva de PVC rgido roscvel para eletroduto (dimetro da seo: 1 1/4 ")
LUVA de PVC para eletroduto rgido roscvel, 50 mm (1 1/2")
Ajudante de eletricista
Eletricista
Luva de PVC rgido roscvel para eletroduto (dimetro da seo: 1 1/2 ")
CONDULETE em liga de alumnio fundido tipo "LL" 3/4"
Ajudante de eletricista
Eletricista
Condulete de alumnio tipo "LL" - roscvel (dimetro da seo: 3/4 ")
CONDULETE em liga de alumnio fundido tipo "LL" 1"
Ajudante de eletricista
Eletricista
H
H
M
M
H
H
M
M
H
H
M
M
H
H
M
M
H
H
M
UN
H
H
UN
0.30
0.30
1.00
0.30
0.30
1.00
0.15
0.15
1.10
0.15
0.15
1.10
0.15
0.15
1.10
0.14
0.14
1.00
UN
H
H
UN
0.14
0.14
1.00
5.05
UN
H
H
UN
UN
H
H
UN
UN
H
H
UN
UN
H
H
UN
UN
H
H
UN
UN
H
H
0.18
0.18
1.00
0.18
0.18
1.00
0.06
0.06
1.00
0.06
0.06
1.00
0.50
0.50
1.00
0.50
0.50
2.63
6.1.3.15
16131.8.2.3
01270.0.1.13
01270.0.22.1
16131.3.3.3
6.1.3.16
16132.8.4.4
01270.0.1.13
01270.0.22.1
16132.3.1.4
16132.8.4.5
01270.0.1.13
01270.0.22.1
16132.3.1.5
16132.8.5.4
01270.0.1.13
01270.0.22.1
16132.3.4.4
16132.8.5.5
01270.0.1.13
01270.0.22.1
16132.3.4.5
16135.8.1.37
01270.0.1.13
01270.0.22.1
16135.3.1.19
16135.8.1.38
01270.0.1.13
01270.0.22.1
6.1.3.17
6.1.3.20
6.1.3.21
6.3.1.5
6.3.1.6
Pgina 53 de 94
Total (R$)
2.85
5.69
7.87
7.26
3.80
5.69
7.87
54.53
4.07
5.69
7.87
4.07
5.69
7.87
5.59
8.14
5.69
7.87
2.09
2.09
3.16
3.16
3.87
2.71
5.69
7.87
2.71
5.69
7.87
4.07
5.69
7.87
3.87
4.90
4.07
5.69
7.87
4.90
6.53
6.53
1.25
1.14
1.33
1.21
1.60
1.45
3.41
4.07
5.69
7.87
2.03
5.69
7.87
2.03
5.69
7.87
2.03
5.69
7.87
1.90
5.69
7.87
3.41
1.90
5.69
7.87
5.05
2.63
3.26
3.26
1.29
1.29
1.61
1.61
8.34
8.34
12.75
2.44
5.69
7.87
2.44
5.69
7.87
0.81
5.69
7.87
0.81
5.69
7.87
6.78
5.69
7.87
6.78
5.69
7.87
OBS: ITENS COM CDIGO VER TABELA TCPO (NESTA TABELA NOS SERVIOS NO CONSTAM BDI)
ITEM
6.2.2.13
6.2.2.14
6.3.1.8
6.2.2.11
6.2.2.21
6.1.6.3
6.1.6.5
6.1.6.2
6.1.6.1
6.1.6.4
6.1.6.7
6.1.6.6
8.1.5
6.1.4.1
Pgina 54 de 94
Unid.
UN
UN
Coef.
1.00
-
Unitrio
12.75
6.61
H
H
UN
0.40
0.40
1.00
6.61
UN
12.19
H
H
UN
0.70
0.70
1.00
12.19
UN
41.15
H
H
UN
1.50
1.50
1.00
41.15
UN
H
H
UN
0.15
0.15
1.00
UN
211.31
H
H
UN
2.60
2.60
1.00
211.31
UN
H
H
UN
UN
H
H
UN
UN
H
H
UN
UN
H
H
UN
0.37
0.37
1.00
0.53
0.53
1.00
0.29
0.29
1.00
0.21
0.21
1.00
11.00
UN
15.64
H
H
UN
0.53
0.53
1.00
15.64
UN
H
H
UN
UN
H
H
UN
UN
H
H
UN
0.05
0.05
1.00
0.29
0.29
1.00
1.10
1.10
1.00
M
%
30.00
30.00
0.80
UN
1.00
1,361.67
Total (R$)
5.42
5.69
7.87
9.49
5.69
7.87
20.34
5.69
7.87
0.91
2.03
5.69
7.87
0.91
35.26
5.69
7.87
11.00
15.80
15.80
9.64
9.64
6.68
5.02
5.69
7.87
7.19
5.69
7.87
3.93
5.69
7.87
2.85
5.69
7.87
6.68
7.19
5.69
7.87
1.70
1.70
19.75
19.75
140.00
0.68
5.69
7.87
3.93
5.69
7.87
14.92
5.69
7.87
140.00
1.49
2,841.05
TOTAIS C/ BDI
59.15
975.00
5,021.07
4,550.00
1,170.00
1,940.91
306.43
5.10
242.67
5.17
3,711.15
3,711.15
26.36
556.62
61.43
26.36
21.09
Pgina 55 de 94
TOTAIS C/ BDI
55.67
23.91
574.05
112.33
10.17
6.93
7.93
8.66
13.33
31.15
123.70
89.49
56.65
466.07
1,396.51
Pgina 56 de 94
TOTAIS C/ BDI
19.62
3.91
5.33
10.66
332.06
242.10
279.89
617.49
530.76
792.32
322.37
507.56
Pgina 57 de 94
TOTAIS C/ BDI
402.69
520.00
755.39
426.08
221.57
332.38
199.73
125.61
26.77
11.57
139.92
48.74
23.78
21.03
74.26
Pgina 58 de 94
TOTAIS C/ BDI
74.26
190.44
52.03
97.07
2.73
3.73
22.79
68.69
39.40
66.35
55.07
14.54
8.79
Pgina 59 de 94
TOTAIS C/ BDI
6.80
11.18
11.60
7.11
6.60
14.26
21.11
12.36
39.87
64.32
8.05
33.14
41.37
23.04
Pgina 60 de 94
TOTAIS C/ BDI
25.16
9.24
8.55
68.98
44.36
780.07
345.46
224.17
758.12
Pgina 61 de 94
TOTAIS C/ BDI
383.53
522.21
222.48
354.19
244.00
149.49
96.01
237.11
603.46
399.36
423.54
603.54
Pgina 62 de 94
TOTAIS C/ BDI
258.24
511.96
391.85
431.73
132.07
0.51
11.77
13.57
10.56
7.44
4.43
7.45
Pgina 63 de 94
TOTAIS C/ BDI
6.92
4.94
4.02
5.54
11.93
7.41
4.64
5.36
10.83
8.75
13.40
7.09
3.48
2.65
2.46
2.35
16.38
13.48
86.66
Pgina 64 de 94
TOTAIS C/ BDI
38.09
53.29
78.23
57.41
1,532.55
986.02
69.03
38.47
48.83
57.20
1,040.00
3.73
5.23
4.62
Pgina 65 de 94
TOTAIS C/ BDI
24.82
4.71
9.02
8.99
9.19
9.32
2.09
6.96
9.15
7.25
11.38
Pgina 66 de 94
TOTAIS C/ BDI
9.75
18.53
13.60
11.21
6.80
27.14
6.85
5.86
7.56
27.55
14.29
7.20
6.01
24.15
9.72
19.40
19.34
Pgina 67 de 94
TOTAIS C/ BDI
8.74
9.84
7.57
5.19
48.46
19.79
306.71
13.86
5.42
1,040.00
231.42
148.71
Pgina 68 de 94
TOTAIS C/ BDI
1,837.20
2,734.19
1,479.69
9.89
29.65
9.88
26.65
Pgina 69 de 94
TOTAIS C/ BDI
149.06
6.61
18.06
13.78
11.64
17.70
26.22
21.13
14.00
8.46
Pgina 70 de 94
TOTAIS C/ BDI
4.74
120.34
90.44
120.34
19.57
19.06
18.17
16.79
Pgina 71 de 94
TOTAIS C/ BDI
7.23
7.23
434.51
45.54
35.78
183.51
50.83
38.11
4,160.00
965.99
2,731.47
3,093.58
Pgina 72 de 94
TOTAIS C/ BDI
4,085.12
2,833.58
1,392.56
1,262.56
21,844.52
1,262.56
1,392.56
72.18
28.48
47.01
15.86
11.05
4.07
16.68
Pgina 73 de 94
TOTAIS C/ BDI
24.97
28.16
6.90
9.04
7.41
2.35
2.81
0.81
1.09
2.29
3.82
5.02
4.72
19.66
22.28
22.34
22.08
2.98
Pgina 74 de 94
TOTAIS C/ BDI
3.73
5.42
7.11
55.84
18.84
10.11
10.67
34.42
2.45
206.53
161.97
168.10
Pgina 75 de 94
TOTAIS C/ BDI
81.21
124.60
12.39
17.64
20.90
29.68
29.89
30.78
30.78
3.09
29.88
16.44
17.55
23.29
183.51
Pgina 76 de 94
TOTAIS C/ BDI
52.05
70.97
391.99
29.65
26.65
3,607.50
286.00
127.40
312.00
325.00
325.00
65.00
3.90
19.50
Pgina 77 de 94
TOTAIS C/ BDI
1,950.00
78.00
72.18
28.48
32.92
47.01
15.86
11.05
5.41
7.63
4.43
1.77
3.82
1.09
15.64
44.29
Pgina 78 de 94
TOTAIS C/ BDI
3.09
3.09
3.09
5.11
3.65
347.52
620.83
183.51
1.94
1.70
3.65
2.82
1,560.00
3.90
156.00
5.85
24.97
Pgina 79 de 94
TOTAIS C/ BDI
9.04
2.81
28.74
22.96
12.71
8.32
3.09
12.74
3.61
12.56
10.01
5.68
4.65
19.66
22.09
2.59
79.94
28.18
2,275.00
5,460.00
183.51
2.81
1.09
28.16
23.78
5.11
2.29
7.63
4.43
1.77
1.09
2.98
767.00
Pgina 80 de 94
TOTAIS C/ BDI
494.00
1,105.00
351.00
2,561.00
19.50
15.60
7.63
4.43
79.94
188.50
4.00
24.97
9.04
2.81
1.09
2,840.50
3,438.50
5,083.00
Pgina 81 de 94
TOTAIS C/ BDI
123.50
11.54
34.16
47.27
51.61
4.00
164.98
481.65
15.60
62.40
188.40
3.54
725.01
4.62
5,108.72
5,590.00
2,339.06
Pgina 82 de 94
TOTAIS C/ BDI
156.00
1,321.20
1,716.00
2,002.00
COMPOSIES - DETALHADAS
Relatrio de Composies (GLOBAL)
BASE:TCPO13 - PINI (SETEMBRO/09)
TAXAS: LS= 122,32%
PREO
TOTAL(R$)
45.50
17.57
2.36
15.21
4.10
0.55
3.55
2.93
0.39
2.53
251.02
11.81
9.01
115.63
114.57
7.61
1.02
6.59
22.81
22.81
1.65
1.73
20.50
2.75
17.74
7.60
7.60
3.98
1.02
0.66
0.22
0.08
0.15
1.85
178.01
1.28
6.77
9.37
1.77
32.58
41.51
13.07
1.39
3.83
3.21
14.25
2.50
9.65
35.25
0.29
1.29
18.29
3.15
4.06
11.09
114.66
Pgina 83 de 94
TOTAIS C/ BDI
17.74
96.92
36.14
7.87
5.07
18.16
5.04
22.61
15.51
7.10
1,058.59
17,110.80
67.33
6,876.00
7,938.34
5.01
1.61
42.82
35.92
5.29
1.61
18.39
1.14
5.29
4.83
7.14
5.33
0.35
0.49
0.42
3.94
0.13
6.10
0.53
0.73
0.66
4.05
0.13
6.66
0.29
0.40
1.03
4.81
0.13
7.82
0.40
0.55
2.63
4.11
0.13
47.25
15.74
30.41
1.09
250.46
250.46
259.32
259.32
1,230.29
125.92
37.78
15.74
145.98
75.73
14.56
42.17
91.12
15.20
253.92
14.23
7.86
122.56
Pgina 84 de 94
TOTAIS C/ BDI
46.46
219.20
1.86
23.96
7.87
5.07
3.46
7.56
94.15
94.15
68.84
68.84
10.25
10.25
107.63
107.63
49.48
2.85
3.94
17.96
9.14
10.29
5.30
19.99
2.03
17.96
25.49
12.59
2.53
2.15
3.74
1.80
2.68
30.67
12.59
4.56
2.15
3.74
1.80
3.16
2.68
42.51
3.38
6.59
1.30
2.14
29.10
43.58
1.52
2.36
0.54
6.12
0.80
32.24
96.62
1.25
1.73
0.53
93.04
0.07
20.59
2.85
3.94
0.60
13.21
10.66
0.34
0.47
9.85
504.53
21.34
29.51
11.02
7.10
0.86
Pgina 85 de 94
TOTAIS C/ BDI
0.72
0.58
2.07
2.56
5.76
96.50
86.66
74.10
152.30
13.44
504.52
21.34
29.51
11.02
7.10
0.86
0.72
0.58
2.07
2.56
5.76
96.50
86.66
74.09
152.30
13.44
538.70
21.34
29.51
11.02
7.10
0.86
0.72
0.58
2.07
2.56
5.76
96.50
86.66
108.27
152.30
13.44
336.63
11.81
5.07
0.40
0.66
318.70
390.43
11.81
5.07
0.40
0.66
372.50
240.30
40.05
200.25
10,482.02
227.87
6,836.10
3,418.05
255.68
19.68
12.67
223.33
8.40
1.99
3.15
1.19
Pgina 86 de 94
TOTAIS C/ BDI
0.19
1.88
8.92
1.71
3.15
0.40
0.34
0.74
2.39
0.20
42.36
42.36
13.60
1.71
3.15
0.05
1.92
6.78
40.02
1.34
0.86
1.91
35.91
7.11
0.55
0.68
5.88
2.87
0.79
0.51
1.57
30.31
0.91
1.42
12.29
15.69
6.76
1.42
2.75
2.21
0.37
5.08
0.57
1.57
0.57
0.55
1.66
0.16
25.95
2.53
3.83
13.02
6.56
10.71
1.88
3.94
4.90
332.10
18.89
24.18
1.49
1.04
286.50
15.50
2.85
3.94
1.76
6.96
90.50
3.15
2.03
0.32
85.00
126.91
3.15
2.03
Pgina 87 de 94
TOTAIS C/ BDI
0.32
121.41
9.86
3.65
6.21
73.21
3.47
4.80
64.76
0.18
59.88
3.47
4.80
51.52
0.08
182.39
11.38
15.74
137.00
17.98
0.28
3.80
1.02
1.42
1.05
0.07
0.23
6.77
1.59
2.20
2.59
0.10
0.29
4.26
1.14
1.57
1.33
0.10
0.07
0.05
2.68
0.51
0.71
0.99
0.27
0.20
4.71
0.80
1.10
2.18
0.35
0.29
11.45
0.80
1.10
8.23
0.74
0.58
9.73
1.71
2.36
0.48
4.79
0.39
13.32
1.71
2.36
0.68
8.04
0.53
33.61
2.56
3.54
1.56
24.75
1.20
11.37
1.71
2.36
0.15
6.72
0.43
60.18
3.47
4.80
51.77
0.14
Pgina 88 de 94
TOTAIS C/ BDI
12.96
2.56
3.54
0.01
6.81
0.03
10.44
1.37
1.89
0.01
7.14
0.03
12.60
0.51
0.71
10.99
0.14
0.10
0.15
15.87
0.80
1.10
13.47
0.17
0.14
0.19
7.48
1.65
2.28
0.56
0.43
2.56
18.58
2.62
3.62
0.99
1.60
1.20
8.55
8.62
1.71
2.36
0.33
0.09
4.13
14.25
2.96
4.09
0.53
0.23
6.44
10.99
2.05
2.83
1.14
4.52
0.45
37.28
2.28
3.15
31.86
15.22
2.28
3.15
1.15
3.52
5.13
235.93
2.56
3.54
2.85
158.43
68.55
235.44
8.54
11.81
0.13
Pgina 89 de 94
TOTAIS C/ BDI
62.04
12.00
2.89
35.05
102.99
265.74
15.65
21.64
1.62
0.38
0.13
62.04
12.00
2.89
46.40
102.99
401.70
17.07
23.61
20.25
0.11
79.11
36.75
176.39
48.40
44.00
1.94
2.68
0.09
39.30
73.85
7.97
11.02
0.14
54.72
306.96
19.92
27.55
0.24
74.50
24.75
160.00
295.02
17.07
23.61
1.62
0.38
0.28
0.08
5.50
2.89
18.05
108.70
116.83
7.54
0.91
1.26
5.37
2.87
0.68
0.94
1.24
3.50
0.74
1.02
1.73
5.08
0.80
1.10
3.18
1.36
0.17
0.24
0.34
0.61
8.73
1.20
1.65
Pgina 90 de 94
TOTAIS C/ BDI
5.88
10.11
1.20
1.65
7.26
58.33
1.59
2.20
54.53
7.70
1.71
2.36
3.63
9.66
1.71
2.36
5.59
35.03
3.41
4.72
26.89
4.80
1.14
1.57
2.09
5.87
1.14
1.57
3.16
7.94
1.71
2.36
3.87
8.97
1.71
2.36
4.90
10.60
1.71
2.36
6.53
3.29
0.85
1.18
1.25
3.37
0.85
1.18
1.33
3.63
0.85
1.18
1.60
5.31
0.80
1.10
3.41
6.95
0.80
1.10
5.05
5.07
1.02
1.42
2.63
5.70
1.02
1.42
3.26
2.10
0.34
0.47
1.29
2.42
0.34
0.47
1.61
15.12
2.85
3.94
8.34
19.53
2.85
3.94
Pgina 91 de 94
TOTAIS C/ BDI
12.75
12.03
2.28
3.15
6.61
21.68
3.98
5.51
12.19
61.49
8.54
11.81
41.15
2.94
0.85
1.18
0.91
246.57
14.80
20.46
211.31
16.02
2.11
2.91
11.00
22.99
3.02
4.17
15.80
13.57
1.65
2.28
9.64
9.53
1.20
1.65
6.68
22.83
3.02
4.17
15.64
2.38
0.28
0.39
1.70
23.68
1.65
2.28
19.75
154.92
6.26
8.66
140.00
68.62
85,231.51
1,361.67
Pgina 92 de 94
02
03
04
VALORES (R$)
11,374.17
SERVIOS PRELIMINARES
19,853.50
FUNDAES DIRETA
3,433.42
ESTRUTURA DE CONCRETO
15,438.22
MESES
%
1.48%
2.58%
0.45%
2.01%
01
%
100.00%
100%
R$
R$11,374.17
ESTRUTURA METLICA
21,653.13
2.82%
PAREDES
34,060.40
4.43%
ESQUADRIAS
43,682.26
5.69%
VIDROS / ESPELHOS
6,317.71
0.82%
10
11
COBERTURA
31,874.19
Revestimentos de Piso
65,895.73
Revestimentos de Parede
21,357.26
4.15%
8.58%
2.78%
Revestimentos de Forro
17,591.13
2.29%
FALSE
100.000000%
FALSE
FALSE
FALSE
FALSE
100.000000%
100.000000%
FALSE
FALSE
FALSE
FALSE
100.000000%
100.000000%
FALSE
FALSE
FALSE
100.000000%
100.000000%
FALSE
FALSE
FALSE
100.000000%
100.000000%
FALSE
FALSE
FALSE
100.000000%
100.000000%
10.00%
10%
100.00%
100%
R$
R$3,433.42
FALSE
FALSE
FALSE
FALSE
FALSE
FALSE
70.00%
70%
30.00%
30%
R$10,806.75
R$4,631.47
70.00%
70%
30.00%
30%
R$15,157.19
R$6,495.94
80.00%
80%
20.00%
20%
R$27,248.32
R$6,812.08
20.00%
20%
30.00%
30%
20.00%
20%
20.00%
20%
10.00%
10%
R$8,736.45
R$13,104.68
R$8,736.45
R$8,736.45
R$4,368.23
20.00%
20%
40.00%
40%
20.00%
20%
10.00%
10%
10.00%
10%
R$1,263.54
R$2,527.08
R$1,263.54
R$631.77
R$631.77
20.00%
20%
40.00%
40%
20.00%
20%
10.00%
10%
10.00%
10%
R$
R$6,374.84
R$12,749.68
R$6,374.84
R$3,187.42
R$3,187.42
10.00%
10%
20.00%
20%
20.00%
20%
20.00%
20%
20.00%
20%
10.00%
10%
R$6,589.57
R$13,179.15
R$13,179.15
R$13,179.15
R$13,179.15
R$6,589.57
FALSE
FALSE
20.00%
20%
50.00%
50%
20.00%
20%
10.00%
10%
R$4,271.45
R$10,678.63
R$4,271.45
R$2,135.73
FALSE
R$
13
Pintura
29,103.54
3.79%
FALSE
R$
14
IMPERMEABILIZAO / TRATAMENTO
6,305.10
0.82%
FALSE
R$
15
8,331.18
1.08%
FALSE
R$
16
22,080.66
2.87%
FALSE
6,568.39
0.86%
FALSE
40.00%
40%
20.00%
20%
20.00%
20%
20.00%
20%
R$3,518.23
R$3,518.23
R$3,518.23
10.00%
10%
30.00%
30%
20.00%
20%
20.00%
20%
20.00%
20%
R$2,910.35
R$8,731.06
R$5,820.71
R$5,820.71
R$5,820.71
30.00%
30%
30.00%
30%
20.00%
20%
20.00%
20%
R$1,891.53
R$1,891.53
R$1,261.02
R$1,261.02
19
20
21
37,492.03
AR CONDICIONADO /CLIMATIZAO
140,527.12
57,985.63
45,732.70
4.88%
18.30%
7.55%
5.95%
10.00%
10%
30.00%
30%
20.00%
20%
20.00%
20%
20.00%
20%
R$2,499.35
R$1,666.24
R$1,666.24
R$1,666.24
FALSE
FALSE
FALSE
FALSE
20.00%
20%
20.00%
20%
60.00%
60%
R$4,416.13
R$4,416.13
R$13,248.40
FALSE
FALSE
4,935.34
0.64%
10.00%
10%
20.00%
20%
20.00%
20%
20.00%
20%
20.00%
20%
10.00%
10%
R$
R$3,749.20
R$7,498.41
R$7,498.41
R$7,498.41
R$7,498.41
R$3,749.20
15.00%
15%
20.00%
20%
25.00%
25%
20.00%
20%
10.00%
10%
10.00%
10%
R$
R$21,079.07
R$28,105.42
R$35,131.78
R$28,105.42
R$14,052.71
R$14,052.71
10.00%
10%
20.00%
20%
25.00%
25%
20.00%
20%
15.00%
15%
10.00%
10%
R$
R$5,798.56
R$11,597.13
R$14,496.41
R$11,597.13
R$8,697.84
R$5,798.56
FALSE
FALSE
FALSE
FALSE
30.00%
30%
20.00%
20%
10.00%
10%
40.00%
40%
R$13,719.81
R$9,146.54
R$4,573.27
R$18,293.08
FALSE
FALSE
FALSE
R$
23
24
SERVIOS COMPLEMENTARES
7,119.06
R$
109,397.92
768,109.79
0.93%
14.24%
100.00%
100%
100.00%
100%
16.50%
17%
16.50%
17%
16.50%
17%
16.50%
17%
16.50%
17%
17.50%
18%
R$1,174.64
R$1,174.64
R$1,174.64
R$1,174.64
R$1,174.64
R$1,245.84
16.50%
17%
16.50%
17%
16.50%
17%
16.50%
17%
16.50%
17%
17.50%
18%
R$
R$18,050.66
R$18,050.66
R$18,050.66
R$18,050.66
R$18,050.66
R$19,144.64
VALORES ACUMULADOS
PORCENTAGEM SIMPLES
PORCENTAGEM ACUMULADA
100.000000%
100.000000%
100.000000%
100.000000%
100.000000%
100.000000%
100.000000%
100.000000%
100.000000%
100.000000%
100.000000%
100.000000%
100.000000%
100.000000%
100.000000%
100.000000%
100.000000%
100.000000%
100.000000%
100.000000%
100.000000%
100.000000%
100.000000%
100.000000%
100.000000%
R$4,935.34
R$
100%
100.000000%
100.000000%
R$6,568.39
R$
22
FALSE
R$833.12
R$
18
FALSE
R$7,036.45
R$
17
FALSE
R$
R$
12
FALSE
R$1,985.35
R$
09
06
FALSE
90.00%
90%
R$
08
05
FALSE
R$17,868.15
R$
07
04
FALSE
R$
06
03
R$
R$
05
02
R$95,492.29
R$167,459.14
R$174,033.96
R$122,893.13
R$98,600.37
R$109,630.90
R$95,492.29
R$262,951.43
R$436,985.39
R$559,878.52
R$658,478.89
R$546,616.29
12.43%
21.80%
22.66%
16.00%
12.84%
14.27%
12.43%
34.23%
56.89%
72.89%
85.73%
71.16%
100.000000%
100.000000%
1 - BONIFICAO
10.00%
2 - ADMINISTRAO CENTRAL
5.00%
3 - IMPOSTOS
4.65%
3.1
3.2
3.3
PIS
ISS
COFINS
0.65%
1.00%
3.00%
4 - TAXA DE RISCO
1.00%
5 - DESPESAS FINANCEIRAS
2.00%
I
R
F
1
1
1
100
100
100
1 x100 1 i 1 r 1 f 1 x100
LDI
T S C L
1 t s c l
1
100
Sendo:
i
r
f
t
s
c
l
TM-SE:
=
=
=
=
=
=
=
6 - OUTRAS DESPESAS
3.26%
6.1
FERRAMENTAS E EQUIPAMENTOS DE PEQUENO PORTE
3.26%