Vous êtes sur la page 1sur 10

Cluster Level Optimization Report

ZTE RF optimization Team 7/26/2014 Confidential Information of ZTE Corporation.


No Spreading without Permission
Page1, Total10





Lahore City Cluster Level Optimization Report
CMpak GSM Network
Cluster Name C1_Cluster_7





Date Pre DT : 2-April -2012
Analyst: Tanvir Asher
DT Engineer: Zaman Saleem



























Cluster Level Optimization Report
ZTE RF optimization Team 7/26/2014 Confidential Information of ZTE Corporation.
No Spreading without Permission
Page2, Total10

1-Introduction:
Sr. Area Name Action Taken Timeline Status Responsibility
1 Lahore_Cluster-7 Optimization Cluster level DT 12:00 PM DONE Tanvir ASHER
1.1 Test Methods
1.1.1 Vehicle test environment: The test mobile phone is installed in the vehicle; no external antenna
used.

1.1.2 Cluster Drive Test Terminal Pattern:
MS1: Long Call
MS2: Idle
Long Call duration: 10 min and wait time 5 sec

1.1.3 Test Software:
TEMS Investigation (Version-10.0.1)
1.1.4 DT KPIs Formulae
Coverage Rate= Sum of 0 to 90 Samples/ (Total number of Samples) 100
RxQual Rate= [(Sum of 0 to 3 Samples) + (Sum of 4 to 6 Samples) x 0.7] / (Total number of
Samples) x 100
Call Setup Success Rate= Call successful times/Call attempt timesx100%
Handover Success Rate= HO successful times/HO successes+HO failuresx100%









2.1-DT KPI:
Cluster Level Optimization Report
ZTE RF optimization Team 7/26/2014 Confidential Information of ZTE Corporation.
No Spreading without Permission
Page3, Total10

PRE
Test Coverage Rate RxQual Rate HOSR CSSR CDR
PRE 99.24% 96.2% 97.94% 70% 0%
POST
Test Coverage Rate RxQual Rate HOSR CSSR CDR
POST
2.2-EVENTS:
PRE POST
Event #[no.of] Event #[no.of]
Blocked Call 3 Blocked Call
Call Attempt 30 Call Attempt
Call Attempt Retry 8 Call Attempt Retry
Call End 27 Call End
Call Established 21 Call Established
Call Initiation 29 Call Initiation
Call Setup 21 Call Setup
Dropped Call 0 Dropped Call
Handover 238 Handover
Handover Failure 5 Handover Failure








3.1 Rx Lev Sub (PRE)
Cluster Level Optimization Report
ZTE RF optimization Team 7/26/2014 Confidential Information of ZTE Corporation.
No Spreading without Permission
Page4, Total10


Rx Lev Sub (PRE)
Range Samples %age
-60 to 0 26071 12
-70 to -60 48760 22
-80 to -70 99256 45
-90 to -80 46157 21
-110 to -90 1676 1






4.1 Rx Lev Full (PRE)
Cluster Level Optimization Report
ZTE RF optimization Team 7/26/2014 Confidential Information of ZTE Corporation.
No Spreading without Permission
Page5, Total10


Rx Lev Full (PRE)
Range Samples %age
-60 to 0 36704 58
-70 to -60 19183 30
-80 to -70 6899 11
-90 to -80 441 1
-110 to -90 4 0






5.1 Rx Qual Sub (PRE)
Cluster Level Optimization Report
ZTE RF optimization Team 7/26/2014 Confidential Information of ZTE Corporation.
No Spreading without Permission
Page6, Total10


Rx Qual Sub (PRE)
Range Samples %age
6 to 7 4329 2
4 to 5 13490 6
0 to 3 204101 92







6.1 C/I (PRE)
Cluster Level Optimization Report
ZTE RF optimization Team 7/26/2014 Confidential Information of ZTE Corporation.
No Spreading without Permission
Page7, Total10


C/I (PRE)
Range Samples %age
21 to 35 88002 40
14 to 21 109287 49
1 to 14 23616 11
0 to 1 990 0









7 Detail analysis cluster Optimization:
Cluster Level Optimization Report
ZTE RF optimization Team 7/26/2014 Confidential Information of ZTE Corporation.
No Spreading without Permission
Page8, Total10

7.1: Two consecutive blocked calls on the cell LHR_7659_2 and 1 block call on 7659_1 due to
TCH Allocation Failure or no TCH Assignment







7.2: Handover Failure from 7394_6 to 4015_9. 4015_9 audit and down tilt recommended.
Cluster Level Optimization Report
ZTE RF optimization Team 7/26/2014 Confidential Information of ZTE Corporation.
No Spreading without Permission
Page9, Total10


7.3: Handover Failure from 4626_5_6 to 6369-4.6369_4 Overshooting down tilting required.










7.4 Ping Pong Handovers. Audit of 7399_5; 7399_4; 6355_4; 6355_4; 4552_6; 7386_5 required.
Cluster Level Optimization Report
ZTE RF optimization Team 7/26/2014 Confidential Information of ZTE Corporation.
No Spreading without Permission
Page10, Total10


7.5 HO Failure from 6357_4 to 5013_6. Ho Margin and frequency plan 6357_4 to 5013_6 should
check



End.

Vous aimerez peut-être aussi