Note: references are to paragraphs. Figures and tables are not included
A
ACA Standard Form of Contract for Project Partnering PPC
2000 4.1.2.10A
acceleration 4.2.6.1(a); 4.2.6.2; 4.2.6.3
acceptance certificates 4.1.2.18(c)
accidents 5.2.1
ACE see Association of Consulting Engineers
activity schedules 2.3.3.2; 4.4.10.5;
Part 4 Section 4: Appendix C
addendums 3.2.4.6
adjudication 4.1(Intro); 4.4.1
administration cost Part 4 Section 2: Appendix A1
admissible items 4.2.4.2; 4.2.5; Part 4 Section 2:
Appendix C3, D
advance payments 4.4.7.10(d)
agent see employers agent
allrisks insurance 4.1.3; Part 4 Section 2: Appendix A10
all risks yield 2.2.2.3(d)
allowances see tax allowances
alteration costs Part 2 Section 2: Appendix C4
alternative design solutions Part 2 Section 1: Appendix C
amounts previously certified 4.4.7.10(c)
analyses 2.1.7.2(b); 5.4.6
analysis 1.2.7; 3.1.2.11; 5.4.3.1
see also risk analysis
analysis checklist 3.1.3.4
Appendix to the Form of Tender 4.1.2.11(b)
application for reimbursement, written 4.2.3.1(c); 4.2.3.3
appointment documents 2.5(Intro)
approval processes 3.1.4.14(c)
arbitration 4.1.2.5(c); 4.2.1.6
arbitrator 4.1.2.11(c); 4.2.1.5
architect as certifier 4.4(Intro); 4.4.2; 4.4.8.1; 4.4.8.2
architect as contract administrator 4.2(Intro); 4.4.2.3;
4.4.5.2
architects information 2.1.3.3(c); 2.1.7.3(b)
architects instruction 4.4.7.3(iii)(iv)
Architects List 4.1.2.10(c)
ascertained damages 4.1.4.3(e)
ascertainment 4.2
application 4.2.4.10
costs versus prices 4.2.4.8
definition of 4.2(Intro); 4.2.2.3
documentation for 4.2.3.4
global or individual 4.2.4.9
judgement in 4.2.2.3; 4.2.4.5
responsibility for 4.2.4.14.2.4.2
Association of Consulting Engineers 3.2(Intro)
conditions of engagement 3.2.1.5; 3.2.2.6(a); 3.2.2.7(a)
assumptions Part 2 Section 1: Appendix C
attendances 3.2.4.3
audit trail 4.3.2.4; 5.6.7.4; 5.6.7.5
Index (12/03)
Page 1
Page 2
Index (12/03)
Index (12/03)
Page 3
Page 4
Index (12/03)
Index (12/03)
Page 5
Page 6
holidays-with-pay 5.4.7
Hong Kong decision 4.1.5
house rebuilding costs 5.4.4.5
Housing Grants and Reconstruction Act 1996 4.4.2.4
housing sinking fund 2.2.5.4
Hudsons approach 4.1.5.2
human resources 3.1.4.4
Human Rights Act 1998 5.6.8
I
ICE 6th Edition: Substantial Completion 4.1.2.12;
ICE 7th Edition: Substantial Completion 4.1.2.11; 4.1.5;
4.1.6.4 (c)
ICE contracts, extension of time 4.5.11
ICE Design and Construct Clause 48(3) 4.1.2.11(d);
4.1.2.13
ICE Design and Construct Forms 4.1.2.13
ICE Minor Works 4.1.2.14; 4.1.4.1(a); 4.1.5
image processing of documents 5.6.4; 5.6.5; 5.6.7.4; 5.6.7.5
implementation 1.1.2.2; 3.1.2.7; 3.1.2.13; 3.1.4
implementation of contract 3.1.1.16
implementation process 3.1; 3.1.1.13; 3.1.4
inadmissible items 4.2.6
incentives 2.2.3; Part 2 Section 2 Appendix D5, D6
independent client advice 1.1.2; 3.1.1.6
indices Part 2 Section 1: Appendix A2.3; 5.4.3.2
Indices and Forecasts 5.4.4.2
industrial building Part 2 Section 2: Appendix D4
inflation 2.1.3.6; 2.1.4.8; 2.1.5.7; 2.2.2.2; 3.1.4.13(k); 4.2.5.7
information
general, design and build contract Part 2 Section 4:
Appendix B2.1
preparation of 2.1.4.4; 2.1.5.5
production of 2.5.4.8
requirements 2.1.3.3; 2.1.4.3; 2.1.5.3; 2.1.7.3; Part 2
Section 4: Appendix B2
see also cost information; data; documents; records of costs
information management policy 5.6.7.2
information security 5.6.7.1; 5.6.7.4
information services 5.25.5
initial control document 1.1.3.2
initial design input
role of employers agent Part 2 Section 4: Appendix A1
initial/first year allowances Part 2 Section 2: Appendix D6
inspection 2.4.3.4; 3.1.4.18; 4.4.7.9
installations Part 4 Section 1: Appendix A2.2
specialist 3.2.2.6(b)
Institute of Chemical Engineers Forms (I Chem E) 4.1.2.18
instructions
late 4.2.1.7(b); 4.2.4.10(c); 4.2.5.4(e)
post-completion 4.1.6.2
insurance 3.1.2.9(f); Part 3 Section 1: Appendix A6(n);
3.2.4.3; 4.1.6.5(b); Part 4 Section 2: Appendix A10;
4.3.3.5(b); 4.4.7.9
insurance risks 4.1.4.3(d)
interest rates 2.2.2.2; 2.2.2.3; 2.2.5.1; 2.2.5.3; 5.2.5.6
interested parties 1.1.5.4
inter-generational equality 2.6 (Intro); 2.6.1; 2.6.5; 2.6.7
interim certificates 4.2.4.6
see also valuations for interim certificates
Index (12/03)
Index (12/03)
Page 7
Page 8
Index (12/03)
Index (12/03)
Page 9
Page 10
Index (12/03)
Index (12/03)
Page 11
time
at large 4.1.6.2(b)
budget 3.1.4.14(d)
checking 3.1.4.14(d)
checklist 3.1.3.14
constraints 3.1.4.14(g)
contingency 3.1.4.14(g)
control overview 3.1.4.14
criterion 3.1.2.8(b)
extension of see extension of time
framework 3.1.4.14(a)
plan 3.1.4.11(e); 3.1.4.14(d)
risk 3.1.2.9; 3.1.2.10
timescale 3.1.2.2
timing 3.1.2.14(f)
tort 3.2.2.7(c)
traditional strategy 3.1.1.14; 3.1.2.5; 3.1.2.11; Part 3
Section 1: Appendix A1
transfer of building 4.1.1
Treasury Bonds 2.2.2.3(b)(c)(d)
turnkey 2.4.5.2
two-stage completion 4.1.4
two-stage tender 2.4.5.4
U
ultimate cost 3.1.2.2
uncertainty 4.3.2.6
see also risk
underpricing 4.2.3.1(a)
uniqueness 3.1; 3.1.1.2; 3.1.1.3
unit quantities see element unit quantities
unit rates Part 2 Section 1: Appendix A2.1; A2.2
updating 3.1.4.12(e)
user functions 1.2.7.5; 1.2.7.6; Part 1 Section 2: Appendix A
user requirements 3.1.4.13
W
wage rates 5.4.4.2
wall to floor ratio Part 2 Section 1: Appendix C
warranty 3.1.2.10(c); 3.2.4.3
warranty contracts 3.1.1.16(b)
waste 4.2.5.6
water testing Part 4 Section 1: Appendix A6
whole-life costs 3.1.4.15
With Contractors Design Form 4.1.2.3(e); 4.1.2.5
work executed 4.4.7.1; 4.4.7.2
work not properly executed 4.4.7.10(b); 4.4.7.10(g)
worked examples
life cycle costing 2.2.5
tax allowances 2.2.3.7
works
outstanding 4.1.1; 4.1.2.10(b); 4.1.2.11(c); 4.1.2.13;
4.1.2.14(c); 4.1.4.1(c); 4.1.4.2(a); 4.1.5
packages 2.4.5.2; 3.1.2.5
workshops
risk management 4.3.2.8; 4.3.3.3(a)(i)(b)(iv); 4.3.3.4(b)
value engineering 1.2(Intro); 1.2.3.1; 1.2.4.4; 1.2.5; 1.2.6;
1.2.911
World Commission on the Environment and Development
2.6 (Intro)
writing down allowance Part 2 Section 2: Appendix D7
written application for reimbursement 4.2.3.3; 4.2.6.1;
4.2.6.4
written down value Part 2 Section 2: Appendix A6
V
valuation and investment tables (Parrys) 2.2.5.7
valuations for interim certificates
administration 4.4.8
checklist 4.4.2.14.4.2.4
communications 4.4.5
content 4.4.7
covering letter 4.4.8.2
further reading Part 4 Section 4: Appendix A
other Forms of Contract 4.4.11
other relevant Contract Terms 4.4.10
preparation method 4.4.6
purpose of 4.4(Intro); 4.4.1
special situations 4.4.9
start of contract 4.4.4
under JCT Contract 4.4.3
value added tax see VAT (Value Added Tax)