Section 15610

Vibration isolation devices


Part (1) - General
1-1 description of work:
Bsiness: !"is section deals wit" t"e sppl# and installation of vibration
isolation$
1-% re&lations and t"e criteria sed:
!o follow re&lations and standards issed b# t"e followin& lead to access to
an acceptable level of 'alit# of (aterials) e'ip(ent and t"e contractor to
propose alternative s#ste(s and (eet 'alit# standards si(ilar to t"ose
(entioned "ere t"at is co((itted to review and approval prior to se$
*n# S+ *r an# ,$ - *(erican Societ# of ,n&ineers "eatin&) refri&eration and
air conditionin&$
1-- offerin&s:
!"e contractor to sb(it t"e followin& articles for review and approval before
startin& t"e i(ple(entation of work:
*) a certificate attestin& t"at t"e (aterials of constrction vibration isolation
devices are identical wit" t"e conditions of t"ese specifications$
B) catalo&es containin& perfor(ance data) incldin& t"e rates of pre&nanc#
and deviations static and ade'ac# of inslation and constrction (aterials)
t"e p"#sical di(ensions and wei&"ts$
1-. transfer and receipt of e'ip(ent and (ac"iner#:
*) t"e "andover of all e'ip(ent and (ac"iner# wit"in t"e ori&inal fnds$
B) (st c"eck all e'ip(ent and (ac"iner# deliver# ti(e to ensre t"at no
da(a&e as well as co(patibilit# wit" specifications$
/) 0n case of discover# (aterials or e'ip(ent da(a&ed or not in confor(it#
wit" t"e specifications (st be repaired or replaced i((ediatel#$
1) (st be transferred and t"e deliver# and stora&e of all e'ip(ent and
(ac"iner#) accordin& to t"e (anfactrer2s reco((endations to avoid
da(a&e to t"e($
1-5 'alit# control:
*) !"e contractor responsible for t"e 'alit# of all work and (aterials sed)
and t"erefore provide a proposed pro&ra((e of screenin& and testin& to
ac"ieve 'alit# of t"e work otlined in t"e specifications$
B) t"e contractor to appoint dele&ates eli&ible to 'alit# control to be present
drin& t"e e3ection site work$
Part (%): 4alit#
%-1 #ear:
*) (st be done to ensre all &oods and (ac"iner# and e'ip(ent fro( one
plant wit"in t"e 5in&do( of Sadi *rabia if possible$ 6st also obtain
approval for i(port (or local prc"ase) an# of t"e &oods) appliances and
e'ip(ent (anfactred otside t"e 5in&do() before workin& prc"ase
orders$
B) (st ensre vibration isolation devices for e'ip(ent service and
alternatin& and vibration b# t"e (anfactrer of sc" e'ip(ent (st be
c"osen isolation devices in accordance wit" t"e reco((endations inclded
in !able %6 (Section 5%) of t"e *(erican Societ# for t"e booklet en&ineers
"eatin&) refri&eration and air conditionin& and for 7sitations of critical
e'ip(ent$7
%-% vibration isolation devices:
*) devices of t"e t#pe (1):
!"ese (st be devices of t"e t#pe of iron *l8enbrki#al(sna of stainless t"at
Bedsprin&s consists of one or (ore fnd telescope e'ipped wit" iron
spple(ents and &idance and feedback nails settle(ent as re'ired$
B) devices of t"e t#pe (%):
6st be t"ese kinds of fle3ible rbber t"ickness of %5 (( to provide t"e
connector tnnel fro( a rbber (aterial *lbiotl S"attck "elicopter and
inte&rated$ 9e (st also be reinforced wit" wire condctors iron co(plete
wit" t"e necessar# rail links$
/) devices of t"e t#pe (-):
!"ese (st be in t"e for( of (ac"iner# and t"e prevailin& t"ickness of %5
(( cork) so :eoprene "eart consists of cork t"ickness t 5 and 1% (( t"ick
srfaces of :eoprene %5 t 6 (( in t"e for( side of t"e transversal part of a
pro(inent so as to ensre proper deviation above t"e pre&nanc# rate ran&ed
between ;0 kPa and .1. kPa$
Part 000: 0(ple(entation
--1 e3a(ination:
!"e contractor c"eck all e'ip(ent and (ac"iner# installed directl# before to
(ake sre no da(a&e b# 0 0n t"e case of discover# of an# devices or
e'ip(ent not confor( to t"e specifications (st replace or repair
e'ip(ent needed to be refor(ed i((ediatel#$
--% vibration isolation devices:
*) (st install t"ese devices in accordance wit" t"e instrctions issed b#
t"e (anfactrer$
B) be installed inslation of t"e t#pe (%) *ll nits files fans and "eaters nits
and coolin& (ac"ines and all t"e e'ip(ent and rotatin& and Seis(ic awa#
fro( bildin&s$
/) be installed devices isolate t"e vibrations of t"e t#pe (%) t"e connections
p(ps and refri&eration e'ip(ent and connections c"illed water pipes and
air-"andlin& nits) water-cooled connections files$
1) be installed devices isolate t"e vibrations of t"e t#pe (-) nder t"e rles of
c"illed water p(ps located otside t"e bildin&s$
,) pon co(pletion of t"e installation of vibration isolation and isolated
before operatin& t"e e'ip(ent (st re(ove all dirt fro( t"e srrondin&
areas and fro( t"e botto( of all t"e e'ip(ent t"at "ad been isolated$
<) (st be workin& all t"e fi3in&s for e'ip(ent t"at are isolated in a (anner
condcive to fll freedo( of (ove(ent of sc" e'ip(ent$
,nd section