Part (1) - General 1-1 description of work: Bsiness: !"is section deals wit" t"e sppl# and installation of vibration isolation$ 1-% re&lations and t"e criteria sed: !o follow re&lations and standards issed b# t"e followin& lead to access to an acceptable level of 'alit# of (aterials) e'ip(ent and t"e contractor to propose alternative s#ste(s and (eet 'alit# standards si(ilar to t"ose (entioned "ere t"at is co((itted to review and approval prior to se$ *n# S+ *r an# ,$ - *(erican Societ# of ,n&ineers "eatin&) refri&eration and air conditionin&$ 1-- offerin&s: !"e contractor to sb(it t"e followin& articles for review and approval before startin& t"e i(ple(entation of work: *) a certificate attestin& t"at t"e (aterials of constrction vibration isolation devices are identical wit" t"e conditions of t"ese specifications$ B) catalo&es containin& perfor(ance data) incldin& t"e rates of pre&nanc# and deviations static and ade'ac# of inslation and constrction (aterials) t"e p"#sical di(ensions and wei&"ts$ 1-. transfer and receipt of e'ip(ent and (ac"iner#: *) t"e "andover of all e'ip(ent and (ac"iner# wit"in t"e ori&inal fnds$ B) (st c"eck all e'ip(ent and (ac"iner# deliver# ti(e to ensre t"at no da(a&e as well as co(patibilit# wit" specifications$ /) 0n case of discover# (aterials or e'ip(ent da(a&ed or not in confor(it# wit" t"e specifications (st be repaired or replaced i((ediatel#$ 1) (st be transferred and t"e deliver# and stora&e of all e'ip(ent and (ac"iner#) accordin& to t"e (anfactrer2s reco((endations to avoid da(a&e to t"e($ 1-5 'alit# control: *) !"e contractor responsible for t"e 'alit# of all work and (aterials sed) and t"erefore provide a proposed pro&ra((e of screenin& and testin& to ac"ieve 'alit# of t"e work otlined in t"e specifications$ B) t"e contractor to appoint dele&ates eli&ible to 'alit# control to be present drin& t"e e3ection site work$ Part (%): 4alit# %-1 #ear: *) (st be done to ensre all &oods and (ac"iner# and e'ip(ent fro( one plant wit"in t"e 5in&do( of Sadi *rabia if possible$ 6st also obtain approval for i(port (or local prc"ase) an# of t"e &oods) appliances and e'ip(ent (anfactred otside t"e 5in&do() before workin& prc"ase orders$ B) (st ensre vibration isolation devices for e'ip(ent service and alternatin& and vibration b# t"e (anfactrer of sc" e'ip(ent (st be c"osen isolation devices in accordance wit" t"e reco((endations inclded in !able %6 (Section 5%) of t"e *(erican Societ# for t"e booklet en&ineers "eatin&) refri&eration and air conditionin& and for 7sitations of critical e'ip(ent$7 %-% vibration isolation devices: *) devices of t"e t#pe (1): !"ese (st be devices of t"e t#pe of iron *l8enbrki#al(sna of stainless t"at Bedsprin&s consists of one or (ore fnd telescope e'ipped wit" iron spple(ents and &idance and feedback nails settle(ent as re'ired$ B) devices of t"e t#pe (%): 6st be t"ese kinds of fle3ible rbber t"ickness of %5 (( to provide t"e connector tnnel fro( a rbber (aterial *lbiotl S"attck "elicopter and inte&rated$ 9e (st also be reinforced wit" wire condctors iron co(plete wit" t"e necessar# rail links$ /) devices of t"e t#pe (-): !"ese (st be in t"e for( of (ac"iner# and t"e prevailin& t"ickness of %5 (( cork) so :eoprene "eart consists of cork t"ickness t 5 and 1% (( t"ick srfaces of :eoprene %5 t 6 (( in t"e for( side of t"e transversal part of a pro(inent so as to ensre proper deviation above t"e pre&nanc# rate ran&ed between ;0 kPa and .1. kPa$ Part 000: 0(ple(entation --1 e3a(ination: !"e contractor c"eck all e'ip(ent and (ac"iner# installed directl# before to (ake sre no da(a&e b# 0 0n t"e case of discover# of an# devices or e'ip(ent not confor( to t"e specifications (st replace or repair e'ip(ent needed to be refor(ed i((ediatel#$ --% vibration isolation devices: *) (st install t"ese devices in accordance wit" t"e instrctions issed b# t"e (anfactrer$ B) be installed inslation of t"e t#pe (%) *ll nits files fans and "eaters nits and coolin& (ac"ines and all t"e e'ip(ent and rotatin& and Seis(ic awa# fro( bildin&s$ /) be installed devices isolate t"e vibrations of t"e t#pe (%) t"e connections p(ps and refri&eration e'ip(ent and connections c"illed water pipes and air-"andlin& nits) water-cooled connections files$ 1) be installed devices isolate t"e vibrations of t"e t#pe (-) nder t"e rles of c"illed water p(ps located otside t"e bildin&s$ ,) pon co(pletion of t"e installation of vibration isolation and isolated before operatin& t"e e'ip(ent (st re(ove all dirt fro( t"e srrondin& areas and fro( t"e botto( of all t"e e'ip(ent t"at "ad been isolated$ <) (st be workin& all t"e fi3in&s for e'ip(ent t"at are isolated in a (anner condcive to fll freedo( of (ove(ent of sc" e'ip(ent$ ,nd section