Vous êtes sur la page 1sur 6

1 OF 4 SHEET NO

DOL STARTING ON
TRANSFORMER
DOCUMENT NO:
CALCULATION
APPD. BY/DATE
00
DESIGN
ARA/
AJG/
SCN/
CHKD. BY/DATE
C
9
3
0
0
3
4

R
1
Kvaerner Powergas
CLIENT : RELIANCE PETROLEUM LTD.
REVISION NO.
ISSUED FOR
PREPD BY/DATE
SE
SE
OF 4
1.0 Objective:-
3.0 Project Basis:-
Following are the basis for making this Calculation
-
-
-
-
-
-
-
4.0 Notes:-
-
-
5.0 Nomenclature:-
R1 - Resistance of motor feeder cable in Ohms/km (Value taken from cable catalogue)
X1 - Reactance of motor feeder cable in Ohms/km (Value taken from cable catalogue)
L1 - Length of motor feeder cable in meters
Ist - Starting current of motor in amps
Itflc - Full load current of Transformer in amps
Imflc - Full load current of motor in amps
Xt - Transformer impedance in p.u
Xg - Grid Source impedance in p.u
Xso - Equivalent impedance upto trafo secondary in Ohms
Rc - Resistance of motor feeder cable in Ohms
Xc - Reactance of motor feeder cable in Ohms
V1 -Per phase rated voltage of motor in volts/KV
C
9
3
0
0
3
4

R
1
Transformer % Impedance (Xt) 10
Rated Motor Phase Voltage KV (V1) 3.81
Whenever the actual drops exceed the allowable limits they would be highlighted in "RED".
Fault MVA at Source 31.25
Transformer Primary KV
The objective of this Calculation is to calculate the starting voltage drop at Motor Terminals when
starting a Motor on DOL starter for a particular rating of Transformer.
VOLTAGE DROP CALCULATION
, DOL STARTING ON TRAFO. Kvaerner Powergas
CLIENT : RELIANCE PETROLEUM LTD.
DOCUMENT NO:
SHEET NO
that particular value would be highlighted in "RED"
11
Base MVA for calculation purpose 1
Whenever the vectorial sum of Base load current & Starting current, exceeds 150% of FLC of trafo,
Allowable Percentage Voltage drop during starting at Motor 15.00
Transformer MVA Rating 12.5
SE
SE
OF 4
VOLTAGE DROP CALCULATION
, DOL STARTING ON TRAFO. Kvaerner Powergas
CLIENT : RELIANCE PETROLEUM LTD.
DOCUMENT NO:
SHEET NO
Vms -Per phase voltage at motor terminals during starting in volts/KV
Vbs -Per phase voltage at Bus during starting in volts/KV
Cos fst -Power factor at the motor terminal during staring
Cos ffl -Power factor at the motor terminal during running at full load
KV
b -
Phase to Phase Base Voltage
MVA
b
- Base MVA
6.0 Formulae used:-
Per phase method is adopted for calculation
1 V1
2
= (Vms*Cosf + Is*Rc)
2
+ (Vms*Sinf + Ist*Xc + Ist*Xso)
2
2 Vbs
2
= (Vms*Cosf + Is*Rc)
2
+ (Vms*Sinf + Ist*Xc)
2
3
Xso = [(KV
b
)2 / (MVA
b
)] * [Xt + Xg]
Kvaerner Powergas
Project No:- 2090/1005
PROJECT:- MULTIPURPOSE CHEMICAL TERMINALS
CLIENT:- RELIANCE PETROLEUM LTD.
REV NO:- 00
DOC NO:-
SR. Transformer Trafo % Allowable % Highest Ist/Iflc Fault MVA Trafo Motor Phase Base MVA Xt in pu Xg in pu Xso in FLC Motor Imflc Motor Istart Starting
NO. MVA rating Impedance drop at motor motor KW factor at source primary KV voltage "V1" ohms Cos f fl FL eff. of Motor Line Cos fst
1 12.5 10 15.00 37 6 31.25 11 3.81 1 0.008 0.032 1.7419 0.86 0.925 4.07 20.7532198 0.37
2 12.5 10 15.00 45 6 31.25 11 3.81 1 0.008 0.032 1.7419 0.87 0.93 4.87 24.8161416 0.35
3 12.5 10 15.00 55 6 31.25 11 3.81 1 0.008 0.032 1.7419 0.88 0.93 5.88 29.9861711 0.33
4 12.5 10 15.00 75 6 31.25 11 3.81 1 0.008 0.032 1.7419 0.89 0.94 7.84 40.0006777 0.31
5 12.5 10 15.00 90 6 31.25 11 3.81 1 0.008 0.032 1.7419 0.89 0.94 9.41 48.0008132 0.3
6 12.5 10 15.00 110 6 31.25 11 3.81 1 0.008 0.032 1.7419 0.9 0.94 11.38 58.0157977 0.28
7 12.5 10 15.00 132 6 31.25 11 3.81 1 0.008 0.032 1.7419 0.9 0.95 13.51 68.8861261 0.25
8 12.5 10 15.00 700 6 31.25 11 3.81 1 0.008 0.032 1.7419 0.9 0.94 72.39 369.19144 0.2
Sheet 4 of 6
Kvaerner Powergas
Project No:- 2090/1005
PROJECT:- MULTIPURPOSE CHEMICAL TERMINALS
CLIENT:- RELIANCE PETROLEUM LTD.
REV NO:- 00
DOC NO:-
Length Motor Cable "R1" "X1" No. of Rc in Xc in Starting Co-efficient Co-efficient Co-efficient Motor term. % drop at Bus voltage % drop at 1.5*Itflc Ist+25 %Base
"L1"in met. size & Type Ohm/km Ohm/km runs ohms ohms Sin f "a" "b" "c" voltage"Vms" motor (volts)"Vbs" Bus in AMPS load in amps
200 3C X 70, AL 0.532 0.083 1 0.1064 0.0166 0.929 1.0000 69.444 -14514763.224 3775.261 0.912 3776.398 0.882 1640.42 290.12
200 3C X 70, AL 0.532 0.083 1 0.1064 0.0166 0.937 1.0000 83.608 -14514188.580 3768.175 1.098 3769.486 1.063 1640.42 292.86
200 3C X 95, AL 0.385 0.083 1 0.077 0.0166 0.944 1.0000 101.079 -14513314.043 3759.430 1.327 3760.663 1.295 1640.42 296.25
200 3C X 150, AL 0.249 0.082 1 0.0498 0.0164 0.951 1.0000 134.974 -14511149.094 3742.461 1.773 3743.703 1.740 1640.42 303.09
200 3C X 70, AL 0.532 0.083 2 0.0532 0.0083 0.954 1.0000 161.818 -14509035.369 3729.023 2.125 3730.170 2.095 1640.42 308.99
200 3C X 95, AL 0.385 0.083 2 0.0385 0.0083 0.960 1.0000 196.210 -14505784.415 3711.804 2.577 3712.893 2.549 1640.42 315.25
200 3C X 120, AL 0.305 0.082 2 0.0305 0.0082 0.968 1.0000 234.514 -14501560.917 3692.640 3.080 3693.713 3.052 1640.42 322.28
200 3C X 150, AL 0 0 1 0 0 0.980 1.0000 1260.226 -14102514.180 3177.715 16.595 3177.715 16.595 1640.42 577.59
Sheet 5 of 6
Kvaerner Powergas
Project No:- 2090/1005
PROJECT:- MULTIPURPOSE CHEMICAL TERMINALS
CLIENT:- RELIANCE PETROLEUM LTD.
REV NO:- 00
DOC NO:-
Ist+50 %Base Ist+80 %Base
load in amps load in amps
563.39 836.75
566.05 839.38
569.32 842.61
575.87 849.05
581.51 854.59
587.28 860.18
593.71 866.38
824.87 1084.76
Sheet 6 of 6

Vous aimerez peut-être aussi