Vous êtes sur la page 1sur 94

Table of Contents

Page 1 of 5
EE_TCP
2007 Edition
TESTING AND COMMISSIONING PROCEDURE
FOR
ELECTRICAL INSTALLATION
Page 2 of 21
[Type text]
Testing and Commissioning Procedure for
Eectrica Instaation
!" O#$ecti%es of t&e Testing and Commissioning 'T(C) *or+s
The objectives of the T & C works are
!i" To verif# $ro$er f%nctioning of the e&%i$'ent(s#ste' after installation) and
!ii" To verif# that the $erfor'ance of the installed e&%i$'ent(s#ste's 'eet with the s$ecified design intent
thro%gh a series of tests and adj%st'ents*
!iii" To ca$t%re and record $erfor'ance data of the whole installation as the baseline for f%t%re
o$eration and 'aintenance*
," Sco-e of t&e Testing and Commissioning 'T(C) *or+s
2*1 Preli'inar# +te$s for Testing and Co''issioning
,efore carr#ing o%t T&C- the Contractor shall take the following ste$s
!a" +%b'it draft T&C $roced%res to the client a$$roval* The draft T&C $roced%res shall incl%de
essential $roced%res 'entioned in this $roced%re $l%s additional T&C $roced%res re&%ired for s$ecific
installations as well as 'an%fact%rer.s reco''endation)
!b" /btain design drawings and s$ecifications and to be thoro%ghl# ac&%ainted with the design
intent)
!c" /btain co$ies of a$$roved sho$ drawings and e&%i$'ent sched%les)
!d" 0eview a$$roved sho$ drawings and e&%i$'ent sched%les)
!e" Check 'an%fact%rer.s o$erating instr%ctions and stat%tor# re&%ire'ents)
!f" Ph#sicall# ins$ect the installation and e&%i$'ent to deter'ine variations fro' designs and(or
s$ecifications*
!g" Check individ%al co'$onents- e*g* ke# switches- control e&%i$'ent- circ%it breaker stat%s- etc* for $ro$er
$osition and settings for co'$leteness of installation*
!h" Check incl%sion of 'an%fact%rer.s t#$ical e&%i$'ent testing data or factors before T&C of
$artic%lar e&%i$'ent*
1*2 Testing and 2ns$ection d%ring Constr%ction
The $%r$ose of these tests is to ens%re that all co'$onents and s#ste's are in a satisfactor# and safe condition
before start %$* Preli'inar# adj%st'ent and setting of e&%i$'ent at this stage shall also be carried o%t at the
sa'e ti'e to $ave wa# for the co'ing f%nctional $erfor'ance tests*
,efore carr#ing o%t an# test- the Contractor shall ens%re that the installation co'$lies with all relevant stat%tor#
re&%ire'ents and reg%lations* The T&C works shall co'$l# with all site safet# reg%lator# re&%ire'ents
c%rrentl# in force- incl%ding b%t not li'ited to
!i" Electricit# /rdinance- Cha$ter 304- and other s%bsidiar# legislation herein)
Page 1 of 21
!ii" The Code of Practice for the Electricit# !5iring" 0eg%lations !C/P" !iii" 2EC
40143 6Electrical 2nstallations of ,%ilding7
!iv" Electricit# s%$$l# r%les of the relevant $ower s%$$l# co'$anies
1*1 +tat%tor# Test and 2ns$ection
The stat%tor# test and ins$ection herein stated in this T&C $roced%re shall refer to the
0eg%lations 8os* 19- 20- 21 and 22 of the Electricit# !5iring" 0eg%lations %nder the
Electricit# /rdinance Cha$ter 304E*
1*3 :%nctional Perfor'ance Tests
The $%r$ose of f%nctional $erfor'ance tests is to de'onstrate that the e&%i$'ent(installation
can 'eet the f%nctional and $erfor'ance re&%ire'ents as s$ecified in the ;eneral(Partic%lar
+$ecifications* :%nctional $erfor'ance test sho%ld $roceed fro' the testing of individ%al
co'$onents to the testing of different s#ste's in the installation*
The Contractor 'a# have to 'ake te'$orar# 'odifications as the test $roceeds* The
s$ecific tests re&%ired and the order of tests will var# de$ending on the t#$e and si<e of
s#ste's- n%'ber of s#ste's- se&%ence of constr%ction- interface with other installations-
relationshi$ with the b%ilding ele'ents and other s$ecific re&%ire'ents as indicated in the
;eneral(Partic%lar +$ecifications* The testing of s#ste's 'a# have to be carried o%t in
stages de$ending on the $rogress of work or as $ro$osed b# the Contractor*
Part of the tests 'a# be re&%ired to be carried o%t in s%$$liers. $re'ises in accordance with
the $rovisions in the ;eneral(Partic%lar +$ecification*
=n# $erfor'ance deficiencies revealed d%ring the f%nctional $erfor'ance tests '%st be
eval%ated to deter'ine the ca%se and whether the# are $art of the contract%al obligations*
=fter co'$letion of the necessar# corrective 'eas%res- the Contractor shall re$eat the tests*
2f an# test cannot be co'$leted beca%se of circ%'stances that are be#ond the control of the
Contractor- it shall be $ro$erl# doc%'ented and re$orted to the P,+E- who shall then liaise
with the relevant $arties to resolve the sit%ation* The Contractor shall res%'e his testing work
i''ediatel# %$on the attain'ent of a s%itable testing environ'ent*
1*5 >oc%'entation and >eliverables
The Contractor shall s%b'it his $ro$osed T&C $roced%res together with the Testing and
Co''issioning Progress Chart shown in =nne? 2 to =nne? 2@- where a$$licable- to P,+E for
a$$roval*
=ll ins$ection and T&C res%lts shall be recorded b# the Contractor in the a$$ro$riate test
record for's- the reference of which is shown against each individ%al test* +a'$le of these
for's can be fo%nd in =nne? 2 and =nne? 222*
Page 3 of 21
>ata recorded in other for'ats 'a# also acce$table s%bject to agree'ent between the
P,+E and the Contractor* A$on co'$letion of all the re&%ired T&C works- the Contractor.s
$roject engineer shall co'$lete and sign the testing and co''issioning certificate as shown in
Part 1 and 2 of =nne? 2 and(or =nne? 222 to the effect that the agreed T&C works have
been d%l# carried o%t*
:%nctional test re$orts covering all 'eas%red data- data sheets- and a co'$rehensive s%''ar#
describing the o$eration of the s#ste' at the ti'e of the f%nctional tests shall be $re$ared and
s%b'itted to the P,+E* >eviations in $erfor'ance fro' the ;eneral(Partic%lar +$ecifications
or the design intent sho%ld be recorded- with a descri$tion and anal#sis incl%ded*
5here re&%ired in the ;eneral(Partic%lar +$ecification- the Contractor shall cond%ct a final
eval%ation of the $erfor'ance of the Electrical 2nstallation- the res%lts of which shall be
incl%ded in the co''issioning re$ort*
The Contractor shall sign work co'$letion certificate!s" and iss%e to the P,+E after
co'$letion of the electrical installation or an# work s%bse&%ent to re$air- alteration or addition
to an e?isting installation* This sho%ld be done before the installation is energi<ed*
3* Testing and Co''issioning !T&C" Proced%res
3*1 Tests and 2ns$ections d%ring Constr%ction
:or those tests to be carried o%t on different s#ste's of the installation d%ring constr%ction to
ens%re their s%itabilit# for o$erating at the design conditions- certificates of s%ch tests shall be
iss%ed together with certificates of an# work tests*
The Contractor shall s%b'it the details of the tests and ins$ection d%ring constr%ction to P,+E
for a$$roval on co''ence'ent of the installation work*
The tests and ins$ection shall incl%de- b%t not li'ited to- the followings !a"
@is%al ins$ection)
!b" Earth electrode resistance) and
!c" Contin%it# of $rotective cond%ctor*
>etails of these tests shall be in accordance with relevant sections of this $roced%re*
3*2 +tat%tor# 2ns$ection and Test for Bow @oltage 2nstallations
3*2*1 2ns$ection before Test
= vis%al ins$ection shall be 'ade to verif# that the electrical
Page 5 of 21
5
installation (e&%i$'ent as installed is correctl# selected and erected in accordance
with the C/P Code 21= and C/P =$$endi? 11- and that there is no a$$arent
da'age* The vis%al ins$ection shall incl%de a check on the following ite's- where
a$$ro$riate
!a" =de&%ac# of working s$ace- access- and 'aintenance facilities)
!b" Connections of cond%ctors) !c"
2dentification of cond%ctors)
!d" =de&%ac# of the si<es of cond%ctor in relation to c%rrent carr#ing
ca$acit# and voltage dro$)
!e" Correct connections of all e&%i$'ent with s$ecial attention to socket
o%tlets- la'$holders- isolators- switches- resid%al c%rrent devices-
'iniat%re circ%it breakers- and $rotective cond%ctors-
!f" Presence of fire barriers and $rotection against ther'al effects)
!g" Cethods of $rotection against direct contact with live $arts !incl%ding
'eas%re'ent of distances where a$$ro$riate"- i*e* $rotection b# ins%lation
of live $arts- or $rotection b# barriers or enclos%res)
!h" Presence of a$$ro$riate devices for isolation and switching) !i"
Choice and setting of $rotective and indicative devices)
!j" Babelling of circ%its- f%ses- $rotective devices- switches- isolators
and ter'inals)
!k" +election of e&%i$'ent and $rotective 'eas%res a$$ro$riate to adverse
environ'ental conditions)
!l" Presence of danger and warning notices)
!'" Presence of diagra's- instr%ctions and other si'ilar
infor'ation)
!n" Connection of single $ole devices for $rotection or switching in $hase
cond%ctors onl#)
!o" Cethod of $rotection against indirect contact) !$"
Prevention of '%t%al detri'ental infl%ence) !&" Presence of
%ndervoltage $rotective devices)
Page 4 of 21
!r" Erection 'ethod) and
!s" =n# other a$$ro$riate ins$ection as listed in C/P =$$endi?
11*
3*2*2 +e&%ence of Tests
The following ite's- where relevant- are to be tested $referabl# in the se&%ence
indicated below
!a" Contin%it# of $rotective cond%ctors- incl%ding 'ain and
s%$$le'entar# e&%i$otential bonding-
!b" Contin%it# of ring final circ%it cond%ctors- !c"
2ns%lation resistance-
!d" Polarit#-
!e" Earth electrode resistance-
!f" Earth fa%lt loo$ i'$endance-
!g" :%nctions of all $rotective devices- !h"
:%nctions of all ite's of e&%i$'ent*
2n the event of an# test indicating fail%re to co'$l#- that test and those $receding-
the res%lts of which 'a# have been infl%enced b# the fa%lt indicated- shall be
re$eated after the fa%lt has been rectified*
3*2*1 Cond%ctor Contin%it#
!a" Contin%it# of Protective Cond%ctors
The test shall be in accordance with C/P Code 21, !1"*
Ever# $rotective cond%ctor- incl%ding all cond%ctors and an# e?traneo%s
cond%ctive $arts %sed for e&%i$otential bonding sho%ld be tested for
contin%it#* The test sho%ld be 'ade b# connecting together the ne%tral
and $rotective cond%ctors at the 'ains $osition and checking between
earth and ne%tral at ever# o%tlet b# a contin%it# tester- which sho%ld
show a reading near <ero*
!b" Contin%it# of 0ing :inal Circ%it
The test shall be in accordance with C/P Code 21, !3"*
The ring circ%it sho%ld be tested fro' the distrib%tion board*
Page 7 of 21
The ends of the two cables for'ing the $hase cond%ctor sho%ld be
se$arated- and a contin%it# test sho%ld show a reading near <ero
between the two) the sa'e tests to be 'ade between the two cables that
for' the ne%tral cond%ctor- and between the two cables that for' the
$rotective cond%ctor*
The testing 'ethod in above $aragra$h is onl# a$$licable when the ring
circ%it has been ins$ected thro%gho%t- $rior to the test- to ascertain that
no interconnection !'%ltiDloo$s" e?ists on the ring circ%it* /therwise-
the testing 'ethods sti$%lated in Part 1 of the ;%idance 8ote 1 to
,+7471- sho%ld be ado$ted instead*
3*2*3 2ns%lation 0esistance
The test shall be in accordance with C/P Code 21, !5"*
= s%itable direct c%rrent !d*c*" ins%lation tester sho%ld be %sed to 'eas%re ins%lation
resistance* Care sho%ld be taken to ens%re that the ins%lation of the e&%i$'ent %nder
test co%ld withstand the test voltage witho%t da'age*
To carr# o%t this test- it is acce$table to divide large installation into sections with
gro%$s of o%tlets- each gro%$ containing not less than 50 o%tlets* The ter'
o%tlet in this case incl%des ever# $oint and ever# switch* = socket o%tlet
or a$$liance or l%'inaire incor$orating a switch is regarded as one o%tlet*
5hen 'eas%red with all f%se links in $lace- all switches and circ%it breakers
!incl%ding- if $racticable- the 'ain switch" closed and all $oles or $hases of the
wiring electricall# connected together- the ins%lation resistance to earth sho%ld
not be less than the a$$ro$riate val%es given in Table 21 !1" of C/P* :or best
$ractice- the ins%lation resistance shall not be lower than 1*0 'ega oh' for low
voltage installation %nder a test voltage of d*c* 500@*
5hen 'eas%red between all cond%ctors connected to an# one $hase or $ole of the
s%$$l# and- in t%rn- all cond%ctors connected to each other $hase or $ole- the
ins%lation resistance sho%ld not be less than the a$$ro$riate val%es in Table 21!1"
of C/P* :or best $ractice- the ins%lation resistance shall not be lower than 1*0
'ega oh' for low voltage installation %nder a test voltage of d*c* 500@*
:or the sake of enhanced safet#- when the val%e of ins%lation resistance
'eas%red is near the 'ini'%' val%es as re&%ired in this T&C $roced%re- or at a
relativel# low valves where considered abnor'al to trade.s $ractice- the concerned
circ%it (installation shall be reDchecked to i'$rove and reDtest shall be cond%cted
afterward*
2n carr#ing o%t the test
Page E of 21
!a" wherever $racticable- all la'$s sho%ld be re'oved and all c%rrent
%sing e&%i$'ent sho%ld be disconnected and all local switches controlling
la'$s or other e&%i$'ent sho%ld be closed)
!b" where the re'oval of la'$s and(or the disconnection of c%rrent
%sing e&%i$'ent is i'$racticable- the local switches controlling s%ch
la'$s and(or e&%i$'ent sho%ld be o$en)
!c" electronic devices connected in the installation sho%ld be isolated or
short circ%ited where a$$ro$riate so that the# are not da'aged b# the test
voltage*
!d" where the circ%its contain voltage sensitive devices- the test sho%ld
'eas%re the ins%lation resistance to earth with all live cond%ctors
!incl%ding the ne%tral" connected together*
The se&%ence of test shall be as follows
!1" Cain switch(switchboard and o%tgoing circ%its with s%bD'ain switches
being isolated)
!2" +%bD'ain switches(switchboards and o%tgoing circ%its with final
circ%its boards being isolated) and
!1" :inal circ%it boards and final circ%its*
5here e&%i$'ent is disconnected for the test and the e&%i$'ent has e?$osed
cond%ctive $arts re&%ire to be connected to $rotective cond%ctors- the ins%lation
resistance between the e?$osed cond%ctive $arts and all live $arts of the e&%i$'ent
sho%ld be 'eas%red se$aratel# and sho%ld have a 'ini'%' ins%lation resistance
not less than 0*5
Cega/h'*
:or +ite ,%ilt =sse'blies- the ins%lation a$$lied to the live $arts of the
asse'blies for $rotection against direct contact shall be tested with an a$$lied
voltage e&%ivalent to that s$ecified in the a$$ro$riate 0eg%lation and( or C/P for
si'ilar factor#Db%ilt e&%i$'ent* The s%$$le'entar# ins%lation of +ite ,%ilt
=sse'blies for $rotection against indirect contact shall be tested for degree of
$rotection not less than 2P 2F- and the ins%lation enclos%re shall be tested with an
a$$lied voltage e&%ivalent to that s$ecified in the a$$ro$riate 0eg%lation and
(or C/P for si'ilar factor#Db%ilt e&%i$'ent*
3*2*5 Polarit#
The test shall be in accordance with C/P Code 21, !4"* = test of
$olarit# sho%ld be carried o%t to verif# that
!a" ever# f%se and singleD$ole control and $rotective device is
Page 9 of 21
connected in the $hase cond%ctor onl#-
!b" centreDcontact ba#onet and EdisonDt#$e screw la'$holders to 2EC 4021E
in circ%its having an earthed ne%tral cond%ctor- have their o%ter or
screwed contacts connected to that ne%tral cond%ctor- and
!c" wiring has been correctl# connected to socket o%tlets and si'ilar
accessories*
3*2*4 Earth Electrode 0esistance
The test shall be in accordance with C/P Code 21, !7"*
= $ro$er earth electrode resistance tester sho%ld be %sed to 'eas%re earth electrode
resistance* =n alternating c%rrent at 50 G< of a stead# val%e is $assed between the
earth electrode T and an a%?iliar# earth electrode T1 $laced at a se$aration
distance reco''ended b# the 'an%fact%rer of the tester b%t in an# case sho%ld
not be less than 20 'etres awa#* = second a%?iliar# earth electrode T2- which 'a#
be a 'etal s$ike driven into the gro%nd- is then inserted halfDwa# between T and
T1- and the voltage dro$ between T and T2- divided b# the c%rrent flowing between
T and T1- gives a 'eas%red earth electrode resistance of earth electrode T*
:or an electrical installation having fo%r or 'ore earth electrodes which are
installed 'ore or less in line- following a general direction not e?ceeding 15
deviation and with se$aration between adjacent electrodes not less than the
reco''ended distance b# the 'an%fact%rer of the tester b%t in an# case not
less than 20 'etres- these electrodes can be %sed in t%rn as the a%?iliar# electrodes
for the $%r$ose of 'eas%ring the earth electrode resistances*
The following alternative 'ethod for 'eas%ring the earth electrode resistance 'a#
be %sed if the electricit# s%$$l# is connected* = loo$ i'$edance tester sho%ld be
connected between the $hase cond%ctor at the origin of the installation and the earth
electrode with the test link o$en- and a test $erfor'ed* This i'$edance reading
co%ld be treated as the electrode resistance*
3*2*7 Earth :a%lt Boo$ 0esistance
The test shall be in accordance with C/P Code 21, !E"*
The earth fa%lt loo$ i'$edance sho%ld be 'eas%red b# a $haseDearth loo$ tester
with a scale calibrated in oh's*
The earth fa%lt loo$ i'$edance sho%ld not e?ceed the re&%ire'ents of
C/P Code 11*
,efore the test begins- it is essential to establish- b# ins$ection- that
Page 10 of 21
the earthing cond%ctor and all relevant earth connections are in $lace- and that the
bonding connection to electricit# s%$$lier.s earthing facilities is disconnected*
Ceas%res sho%ld be taken- d%ring the i'$edance tests es$eciall# when the earth
leakage $rotective devices are effectivel# re'oved for the d%ration of the tests- to
ens%re that the installation is not being %sed other than b# $erson!s" carr#ing o%t the
tests*
3*2*E :%nctions of =ll >evices incl%ding Protective >evices The test
shall be in accordance with C/P Code 21, !9"* :%nctional Test of
0esid%al C%rrent >evice !0C>"
!a" :%nction of resid%al c%rrent devices sho%ld be checked b# a resid%al
c%rrent device tester si'%lating an earth fa%lt in order to verif# its
effective o$eration* The inDb%ilt test b%tton sho%ld also be tested for
$ro$er f%nctioning* /ne of the testing 'ethods is s$ecified in
s%b$aragra$h !b" and !c" below* /ther testing 'ethods co'$l#ing with
relevant national(international standards are also acce$table*
!b" The test sho%ld be 'ade on the load side of the 0C> between the $hase
cond%ctor of the $rotected circ%it and the associated circ%it $rotective
cond%ctor* The load sho%ld be disconnected d%ring the test*
!c" :or general $%r$ose 0C>s to 2EC 4100E or 0C,/s to 2EC41009-
with a leakage c%rrent flowing e&%ivalent to 50H of the rated tri$$ing
c%rrent of the 0C>- the device sho%ld not o$en* 5hen a leakage
c%rrent is flowing e&%ivalent to
100H of the rated tri$$ing c%rrent of the 0C>- the device sho%ld
o$en in less than 100 's %nless it is of T#$e +!or selective" which
incor$orates an intentional ti'e dela#- when it sho%ld tri$ within the ti'e
range fro' 110 's to 500 's*
:%nction of other $rotective devices- s%ch as 'iniat%re circ%it breakers-
'o%lded case circ%it breakers- air circ%it breakers- f%sed switches- switchDf%ses and
$rotective rela#s etc* sho%ld be checked b# hand o$eration as a$$ro$riate*
:%nction of all ite's of e&%i$'ent s%ch as isolators- switches and indicative devices
sho%ld be checked b# hand o$eration*
3*2*9 =dditional Check for 2nstallation in Ga<ardo%s Environ'ent
The following additional check- where a$$ro$riate- shall be carried o%t for
installations in ha<ardo%s environ'ent in accordance with C/P Code 21, !10"
!a" 5here a$$ro$riate- the area involved sho%ld be checked to
Page 1111 of
21
ens%re Igas free. condition before ins%lation and earth fa%lt loo$
i'$edance test are carried o%t*
!b" =ll e&%i$'ent sho%ld be s%itabl# $rotected according to the t#$es of
$rotection %nder C/P Code 15* The integrit# of the t#$e of $rotection
$rovided for the e&%i$'ent sho%ld not be jeo$ardised b# the 'ethod of
installation* 8o alteration that 'a# invalidate the conditions of $rotection
can be %sed*
!c" E&%i$'ent sho%ld be ke$t clean and free fro' acc%'%lation of
d%st- foreign $articles and deleterio%s s%bstances* E&%i$'ent
is ke$t free fro' condensation*
!d" =ll la'$s- f%ses and re$laceable $arts sho%ld be checked so that correct
rating and t#$es are being %sed*
!e" The s%rface te'$erat%re of all e&%i$'ent sho%ld be a$$ro$riate
to the t#$e of $rotection being $rovided*
3*1 +tat%tor# 2ns$ection and Test for Gigh @oltage 2nstallations
3*1*1 2ns$ection before Test
The ins$ection shall be in accordance with C/P Code 21C*
2ns$ection of G*@* installations sho%ld follow those for B*@* installations listed in
section 1*5 of this $roced%re with additional checks on the following ite's where
relevant
!a" $rovision of s%itable locking facilities for ever# entr# to an
G*@* switchroo'(s%bstation)
!b" contin%it# of $rotective cond%ctors es$eciall# the bonding of all e?$osed
cond%ctive $arts) and
!c" $rovision of $adlock facilities for sh%tters- ke# bo?es etc*
3*1*2 +afet#
Preca%tionar# 'eas%res sho%ld be taken and the 'ethods of tests sho%ld be
s%ch that no danger to $ersons or $ro$ert# can occ%r even if the circ%it being tested
is defective*
,efore carr#ing o%t the T&C for high voltage installations- the Contractor shall
s%b'it risk assess'ent- safet# $lan and i'$le'entation $roced%re to P,+E for
a$$roval*
3*1*1 Testing 0e&%ire'ents
Testing for Gigh @oltage installations sho%ld be referred to relevant
Page 1212 of
21
recogni<ed standards- 'an%fact%rers. reco''endation- o$erations and 'aintenance
instr%ctions*
The Contractor shall res$onsible to s%b'it a f%ll T&C $lan with ins$ection
and test details to P,+E for a$$roval*
3*3 :%nctional Test of +#ste' (E&%i$'ent
3*3*1 Bightning Protection +#ste'
The whole lightning $rotection s#ste' shall be tested for contin%it# between air
ter'inations and earthing ter'inations and the resistance shall be recorded*
The earth ter'ination resistance shall be tested and recorded* Each earth
ter'ination shall have a resistance to earth not e?ceeding the $rod%ct given b# 10J
ti'es the n%'ber of earth ter'inations to be $rovided* The whole of the lightning
$rotection s#ste' shall have a co'bined resistance to earth not e?ceeding 10J*
5here the steel work of the str%ct%re is %sed as down cond%ctor- the contin%it# of
the steel work shall be tested and recorded*
Bocations of all earth electrodes and down ta$e ro%ting shall be checked to be clear
of an# dangero%s goods store- diesel tanks and infla''able stores- etc*
=ll connections at ter'inations- tee off $oints and earth electrodes shall be
checked for tightness*
3*3*2 Circ%itr# Check
=ll circ%its shall be verified thro%gh switching o$eration to ens%re that the circ%its
are installed in accordance with the designated circ%it* The tests shall incl%de b%t not
be li'ited to the following
!a" on(off switching of the lighting circ%it to ens%re that the lighting
circ%it is installed corres$onding to the lighting switch- $rotective device
and labelling)
!b" switching of the general $ower circ%it to ens%re that the circ%it
corres$onds to the $rotective device s%ch as 0C>- 0C,/ and CC,- and
that the $rotective device $erfor's in accordance with the designated
d%t#)
!c" switching of the 'ain switch ( isolator to ens%re the corres$onding circ%it
is $ro$erl# controlled b# the 'ain switch ( isolator)
!d" switching of all s%bD'ain and 'ain distrib%tion circ%its- e*g* b%sd%cts-
cable feeders- %ndergro%nd cables- etc* to ens%re the
EE_TCP
2007 Edition Page 1111 of
21
correct isolation of the connected circ%it)
!e" switching of all changeover switches to ens%re the changing over
se&%ence corres$onds to the design criteria)
!f" ens%ring all the $rotective devices $erfor' $ro$erl# against the
designated circ%it*
3*3*1 Charger and ,atter# +et
The following ins$ections and tests shall be carried o%t after co'$letion of the
installation of the res$ective s#ste' and the connection of the $er'anent s%$$l#
cable
!a" ins$ection of the charger for correct connection to the 'ains s%$$l#
thro%gh a s%itable rated f%se)
!b" ins$ection of the batteries $ro$er connections)
!c" ins$ection of instr%'ents- indicating la'$s- f%ses- rela#s and labels on
batter# charger)
!d" for initial setD%$- the batteries shall be charged at the 'an%al highest rate
%ntil the charging c%rrent re'ains constant* The starting and finishing
ti'e are recorded* The ca$acit# of charger is checked for ca$abilit# of
recharging the batteries fro' f%ll# discharged to f%ll# charged within the
s$ecified d%ration)
!e" the charger o%t$%t on load with batteries disconnected shall be
'eas%red* This sho%ld be between 110H and 115H of the nor'al
batteries voltage and within the o$erating voltage li'its of all
connected devices)
!f" the charger c%rrent on load with batter# disconnected shall be 'eas%red*
This sho%ld be less than the 'a?i'%'
reco''ended contin%o%s charge c%rrent for the batteries)
!g" on interr%$tion of 'ains in$%t to the charger- the $ro$er o$eration of
connected devices on standb# batteries shall be checked* 2n the case of
switch tri$$ing in +witchboard- 'ains in$%t shall be interr%$ted to check
whether the ca$acit# of the batteries is ade&%ate to tri$ the associated air
circ%it breaker consec%tivel# at least 20 ti'es or %$ to twent# air circ%it
breakers si'%ltaneo%sl#- whichever the greater)
!h" the correct f%nction of charger fail('ains fail(batter#
disconnected(boost charge(trickle charge indications as
s$ecified shall be checked*
3*3*3 Bighting 2nstallation
EE_TCP
2007 Edition Page 1313 of
21
Bighting installation shall be tested in ter's of its light &%alit# and control as
following
!a" ,efore carr#ing o%t the lighting 'eas%re'ent and test- all l%'inaries shall
be checked against the s$ecified colo%r te'$erat%re- bea'ing angle of
s$ot la'$ and ai'ing angle for e?terior floodlights*
!b" The ai'ing angle of e?ternal lighting or $lanter lighting shall be
co''issioned so as not to create glare or an# obstr%ctive light to e?ternal
environ'ent*
!c" ,efore co''issioning and (or setting of lighting control devices which
incl%ding b%t not li'ited to ti'er switch- occ%$anc# sensor- $hotocell and
infraDred sensor- the Contractor shall s%b'it co''issioning (setting
$ro$osal to P,+E for a$$roval*
!d" 2ll%'ination level of lighting installation for individ%al areas
(roo's shall be 'eas%red to verif# the light o%t$%t* The Contractor
shall s%b'it the $ro$osed locations and height levels for carr#ing o%t the
'eas%re'ent of ill%'inance level to P,+E for a$$roval before
co''ence'ent of 'eas%re'ent* Presentation of the 'eas%re'ent res%lt
shall be in the for' of 'arked %$ la#o%t $lan for the $artic%lar area*
!e" ,ase on the 'eas%red ill%'inance res%lts for individ%al areas
(roo's- the lighting %nifor'it# of the res$ective areas (roo's shall be
eval%ated in ter's of 'ini'%' to average ill%'inance ratio and(
or an# other %nifor'it# ratio as re&%ired b# the P,+E*
!d" =ll gro%$ing of l%'inaries shall be tested b# hand o$eration of the
corres$onding switches or ti'ers*
!e" :or lighting installation with interface connection to b%ilding 'anage'ent
s#ste' !,C+"- or central control and 'onitoring s#ste' !CCC+" or
si'ilar central co'$%ter control s#ste'- the Contractor shall coDordinate
with other contractors res$onsible for s%ch co'$%ter control s#ste'- if
re&%ired- to de'onstrate $ro$er control f%nction of the lighting
installation*
3*3*5 >igital C%ltif%nction Power Ceter
The digital '%ltif%nction $ower 'eter shall be tested to verif# the 'eas%re'ent-
recording and interfacing f%nctions as re&%ired in the ;eneral +$ecification*
Prior to the test for ever# digital '%ltif%nction $ower 'eter- the
EE_TCP
2007 Edition Page 1515 of
21
Contractor shall $rovide 'an%fact%rer.s calibration certificate for each 'eter for
checking on the acc%rac#*
The Contractor shall $rovide testing kit to verif# the reading acc%rac# of the digital
'%ltif%nction $ower 'eter*
:or installation of digital '%ltif%nction $ower 'eter with connection to b%ilding
'anage'ent s#ste' !,C+"- or central control and 'onitoring s#ste' !CCC+" or
si'ilar central co'$%ter 'onitoring s#ste'- the Contractor shall coDordinate with
other contractor res$onsible for s%ch co'$%ter 'onitoring s#ste'- if re&%ired- to
de'onstrate $ro$er f%nctioning and interfacing of the 'eter*
:or installation of digital '%ltif%nction $ower 'eter witho%t e?ternal connection to
b%ilding 'anage'ent s#ste' or CCC+- the interface f%nctions incl%ding digital and
analog%e o%t$%t shall be tested b# 'eans of $l%gging in co''%nication 'od%le
$rovided b# the Contractor*
The re$lace'ent 'echanis' of the 'eter shall be tested* The test shall de'onstrate
that the re$lace'ent of the 'eter does not re&%ire the switching off of the
res$ective switchgear* C%rrent transfor'ers shorting block to $revent o$en
circ%iting the c%rrent transfor'ers shall also be tested*
3*3*4 >igital Power =nal#<er
The testing re&%ire'ent for digital $ower anal#ser shall be in accordance to section
1*9*5*
2n addition to test re&%ire'ent as sti$%lated in section 1*9*5- the event alar'
f%nction and wavefor' ca$t%re f%nction of the digital $ower anal#ser shall also be
tested* The Contractor shall $ro$ose si'%lated test 'ethod for P,+E.s a$$roval*
3*3*7 ,%sbar Tr%nking +#ste'
2n general- b%sbar tr%nking s#ste' shall be certified b# testing laboratories or
organi<ations as stated in the C/P* 2t shall be t#$e tested in accordance with
Cla%se E*1*1 of 2EC 40319D2* The verification of shortDcirc%it strength shall be
carried o%t b# an 2nde$endent +hort Circ%it Testing /rgani<ation*
+hortDcirc%it test on the $hase and ne%tral b%sbars shall be carried o%t in accordance
with Cla%se E*2*1 of 2EC 40319D1 to the val%e of shortD circ%it c%rrent s$ecified in
the ;eneral +$ecification*
The b%sbar ins%lation shall be tested in accordance with Cla%se E*2*2 of 2EC
40319D1* =ll test certificates shall be $resented d%ring ins$ection and testing*
EE_TCP
2007 Edition Page 1414 of
21
The b%sbar tr%nking s#ste' shall also be tested to verif# its contin%it#- ins%lation
resistance- $olarit#- earth fa%lt loo$ i'$edance and other $ara'eters as a$$ro$riate
after installation*
:or installation of b%sbar tr%nking with long r%n- $hase trans$osition of b%sbar in
accordance with 'an%fact%rer.s reco''endation shall be checked*
Pl%gDin ta$Doff %nit of b%sbar tr%nking s#ste' shall be tested to verif# $ro$er and
safe o$eration* Cechanical interlock- &%ick fastening and &%ick releasing
'echanis' of the ta$Doff %nit shall be tested* Positive earth connection of ta$Doff
%nit shall be checked*
=fter $ower energi<ation of the b%sbar tr%nking s#ste'- infrared scanning at
connecting joints shall be carried o%t to check for abnor'al rise in te'$erat%re
at joints* The Contractor shall s%b'it $ro$osal of the test 'ethodolog# and $ro$ose
testing $oints for P,+E a$$roval $rior to the test*
3*3*E E&%i$'ent and =$$liances
Testing on electrical e&%i$'ent and a$$liances s%$$lied within the electrical
installation- e*g* 'eters- fans- etc* shall be carried o%t in accordance with the
relevant sections of other ,%ilding +ervices ,ranch Testing and Co''issioning
Proced%res for other b%ilding services installations and 'an%fact%rer.s
reco''ended testing $roced%res*
3*3*9 =n# /ther Tests that are Considered 8ecessar# to Ceet the >esign
2ntent
:or an# other s#ste' (e&%i$'ent that are not covered b# this T&C Proced%re- the
contractor shall s%b'it f%ll details of testing re&%ire'ents as reco''ended b# the
relevant 'an%fact%rer to P,+E for a$$roval*
3*5 =ssess'ent of =n# Characteristics of E&%i$'ent Bikel# to have Gar'f%l
Effects
,efore carr#ing o%t the T&C- the Contractor shall cond%ct assess'ent for an# characteristics
of e&%i$'ent likel# to have har'f%l effects %$on other electrical e&%i$'ent or other services-
or i'$air the s%$$l#* Those characteristics incl%de the following
!a" /vervoltages)
!b" Andervoltages)
!c" :l%ct%ating loads) !d"
Anbalanced loads)
EE_TCP
2007 Edition Page 1717 of
21
!e" Power factor)
!f" +tarting c%rrents) !g"
Gar'onic c%rrents)
!h" >irect c%rrent !d*c*" feedback)
!i" Gigh fre&%enc# oscillations) and
!j" 8ecessit# for additional connection to earth*
The Contractor shall- after cond%ct the assess'ent- s%b'it an assess'ent re$ort to P,+E for
consideration*
3*4 Test and 2ns$ection for Bow @oltage C%bicle +witchboard !B@+,"
The following sections sti$%lated the additional ins$ection and testing re&%ire'ents for B@+,
installation* :or co'$rehensive testing and co''issioning- the Contractor shall also refer to
relevant sections of this T&C Proced%re and carr# o%t ins$ection (test accordingl#*
3*4*1 @is%al 2ns$ection
@is%al ins$ection shall be carried o%t for the $ro$er installation of the B@+,
2nstallation in accordance with the +$ecification* The following co'$onents shall be
incl%ded
!a" constr%ction of t#$e tested asse'bl#)
!b" 'ain b%sbars and dro$$ers(risers)
!c" air circ%it breakers(f%se switches)
!d" $ower factor correction ca$acitor bank) !e"
har'onic filter)
!f" a%to'atic Changeover +witch)
!g" instr%'entation and $rotection devices) !h"
inco'ing(o%tgoing b%sbars and cables) !i" $ortable
earthing e&%i$'ent)
!j" o$erating handles(ke#s) !k"
h#dra%lic tr%ck)
EE_TCP
2007 Edition Page 1E1E of
21
!l" r%bber ins%lation 'at*
3*4*2 +ite Test before Connection of 2nco'ing +%$$l#
The following tests shall be carried o%t on site after co'$letion of installation of the
B@+, and before the connection of the inco'ing s%$$l# cable
!a" >ielectric Test
>ielectric test shall be carried o%t to verif# the dielectric $ro$erties
of the B@+,* The test re&%ire'ents shall be in accordance to 2EC 40319D
1*
!b" 2ns%lation Test
This shall be carried o%t b# 'eans of a 1000@ ins%lation tester or
si'ilar instr%'ent*
!c" +econdar# 2njection Test
This shall be carried o%t %sing a*c* and shall check !a$$ro?i'atel#" that
$rotection rela#s or devices f%nction in accordance with their
$erfor'ance c%rves b# a test at the lowest setting and two f%rther tests of
c%rrent and ti'ing*
!d" Pri'ar# 2njection Test
This shall be carried o%t to $rove the correct o$eration of $rotective
devices or s#ste' when set at the agreed setting*
!e" Polarit# Check for C%rrent Transfor'er !C*T*"
This shall be carried o%t to ens%re that all C*T* are correctl# connected*
!f" :%nctional Test of =ll >evices
This shall be carried o%t to ens%re that all devices can o$erate $ro$erl# as
intended*
The e&%i$'ent to be tested shall incl%de- b%t not li'ited to- all circ%it
breakers- isolating switches- changeover switches- contactors- interlocking
facilities- $rotective rela#s- earth leakage tri$$ing devices- 'etering
facilities and instr%'ents*
!g" Contact 0esistance Test
This shall be carried o%t b# 'eans of K>%ctorK tester or si'ilar
instr%'ent to ens%re that contacts and joints for switchgears- cables-
b%sbars as well as the contacts and joints
EE_TCP
2007 Edition Page 1919 of
21
for o%tgoing cables and b%sbars are 'aintained in good condition*
!h" Te'$erat%re 0ise Bi'its Test
This shall be carried o%t as defined in 2EC 40319D1*
5ith the $rior a$$roval b# the P,+E- the $ri'ar# injection test and te'$erat%re
rise li'its test can be carried o%t in factor# d%e to site constraints*
3*4*1 +ite Test =fter Connection of 2nco'ing +%$$l#
The following tests shall be carried o%t after the inco'ing s%$$l# cables are
connected and the 6+witchboard7 s%ccessf%ll# co''issioned on no load
!a" $haseDtoD$hase voltage test) !b"
$haseDtoDne%tral voltage test) !c" $haseD
toDearth voltage test) !d" ne%tralDtoDearth
voltage test)
!e" $hase se&%ence test on each and ever# o%tgoing circ%it*
3*7 Power Energi<ation
3*7*1 8otification of Co'$letion
=fter the $ro$er testing and co''issioning of the electrical installation- the
Contractor shall notif# the a$$ro$riate =%thorit#- thro%gh the P,+E- on the
co'$letion of the installation and its readiness for ins$ection and testing*
3*7*2 Preli'inar# +te$s for Power Energi<ation
The followings shall be checked before $ower energi<ation
!a" b%sbar cha'bers- 'ain and s%bD'ain switch connections i*e* bolts and
n%ts tightness)
!b" earthing connections at co'$art'ents- all switches and earth electrodes)
!c" clearance of live $arts fro' direct contact with or an# likelihood
of contact with tools- s$%rio%s bare cond%ctors re'aining in switches-
air circ%it breakers !=C," and switch c%bicles)
EE_TCP
2007 Edition Page 2020 of
21
!d" $olarit#- $hase se&%ence of all switches and relevant f%se ratings)
!e" standDb# batter# s%$$l# and the o$eration of sh%nt tri$ 'echanis')
!f" settings of overc%rrent- earth fa%lt rela#s and c%rrent transfor'er
!C*T*" $olarit#)
!g" vac%%' cleaning of switches and =C,s) !h"
$rovision of danger and warning signs*
!i" Certified 5ork Co'$letion Certificate in accordance to the re&%ire'ent of
C/P Code 19*
3*7*1 +witch /n Process
5henever there is an# break of ti'e e*g* the ne?t da#- in carr#ing o%t the switch on
$rocess- reDtest of ins%lation resistance is re&%ired* The following $roced%res shall
be followed in the switch on $rocess
!a" switch on the 'ain switch(=C, with all other s%bD'ain switches off)
!b" if nor'al- switch on other s%bD'ain switches one b# one with all other
o%tgoing switches off)
!c" if nor'al- then switch on all other o%tDgoing switches one b# one)
!d" observe the disc of the overc%rrent !o(c" and earth fa%lt $rotection
rela#s for an# 'ove'ent for 2>CT rela#s or for digital $rotection rela#s
check whether there are an# fa%lt indications)
!e" kee$ vigilance for abo%t 10 'in%tes to see if an# s'ell or abnor'al
noise being generated*
3*E Calibrated E&%i$'ent
3*E*1 The Contractor shall s%$$l# the calibrated e&%i$'ent relevant for T&C of the
electrical installation as sti$%lated in the $artic%lar s$ecification of the contract or
the ;eneral +$ecification whichever a$$ro$riate* The e&%i$'ent shall be calibrated
b# the recogni<ed laboratories accredited with the Gong Long Baborator#
=ccreditation +che'e !GL/B=+" or other worldwideDrecognised laboratories
d%ring the active $eriod of the contract*
3*E*2 = list of e&%i$'ent $ro$osed b# the contractor to be %sed for T&C
'%st be agreed with the P,+E $rior to T&C* =ll e&%i$'ent re&%iring
EE_TCP
2007 Edition Page 2121 of
21
$eriodic calibration shall have this carried o%t before the work co''ences* >ata
sheets of s%ch testing instr%'ent showing 'an%fact%rer.s na'e- 'odel n%'ber-
latest date of calibration and correction factors shall be s%b'itted to the P,+E for
record* 2f an# ite' re&%ires reDchecking the acc%rac# beca%se of the ti'e that has
ela$sed since the $revio%s calibration- this shall be carried o%t $rior to co''encing
the work*
=nne? 2
=rchitect%ral +ervices >e$art'ent
,+,M +tandard :or' 8oP,+(+0*042!2007"
=nne? 2
Page 1 of 30
2ss%e >ate 17 >ec 2007
0evision >ate D
EE_TCP !2007 Edition"
.uiding Ser%ices .ranc& Form No" P.S/SR"01,
T e sting and Co mm i ssioning C ert ifi c ate on E ectr i c a Instaation
Part ! 2 Deta i of P ro$ect
1*1 Project title !with location"
1*2 N P*5*P* ( Project 8o*
1*1 N Contract(+%bDcontract(O%otation 8o*
1*3 N Contractor(+%bDcontractor
1*5 P,+E
1*4 P,+2
Part , 2 Dec arat i on
2*1 2 certif# that the Electrical 2nstallation as s$ecified in the NContract(+%b
contract((O%otation at the above location has been ins$ected- tested and co''issioned in
accordance with this $roced%re and(or an# other $roced%res agreed between the P,+E
and the Contractor* The res%lts are satisfactor# in the as$ects as 'entioned in Part 1
and(or as recorded in Part 3 of this Certificate- e?ce$t as indicated in the C/CCE8T+
ite's*
2*2 2 also certif# that site tests have been $erfor'ed in accordance with the re&%ire'ents set
o%t in =nne? 2 of this $roced%re and that the res%lts are satisfactor#* = record of the tests
has been $re$ared and s%b'itted to the $roject ,+E*
N2*1 2 also certif# that the lightning $rotection s#ste' has been ins$ected and tested- in
accordance with the re&%ire'ents of 2EC42105D12004*
!8a'e of Contractor.s
0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
!>esignation of Contractor.s
0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
!8a'e and +ta'$ of Contractor"
+ignat%re D
! "
Post
Tel* 8o*
>ate
8ote This certificate '%st be signed b# a $erson a%thori<ed b# the :ir'(Co'$an#
N >elete if not a$$licable
Tested ( Checked b#
!8a'e of Contractor.s 0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
5itnessed b#
!8a'e!s" of NP,+E(P,+2"
+ignat%re D
! "
Post
Tel* 8o*
>ate
=rchitect%ral +ervices >e$art'ent
,+,M +tandard :or' 8oP,+(+0*042!2007"
=nne? 2
Page 2 of 30
2ss%e >ate 17 >ec 2007
0evision >ate D
EE_TCP !2007 Edition"
=nne? 2
2te's tested (
checked b#
C o n tractor
2te's witnessed
b#
P, + E (P, +2
Part 3" Items I ns-ected and T ested
1*1 +tat%t or # 2 n s $ ecti o n and T est fo r B o w @ o ltage ! B *@*" 2 n stallati o n
1*1*1 @i s% al 2 ns $ec ti o n ! C /P C ode 21= a n d C /P = $$e n d i? 11"
1*1*1*1 5orking +$ace and :acilities
!a" =de&%ac# working s$ace and safe access $rovided
for switch roo' and (or electrical facilities*
NPes(8o(8*=* NPes(8o(8*=*
!b" Entrance (e?it to switch roo' and(or electrical facilities NPes(8o(8*=* NPes(8o(8*=*
are free of obstr%ction*
!c" +%itable locking facilities $rovided for switch roo' and NPes(8o(8*=* NPes(8o(8*=*
(or electrical facilities*
!d" +%itable lighting $rovision $rovided for switch roo' and NPes(8o(8*=* NPes(8o(8*=*
(or electrical facilities*
!e" +%itable ventilation $rovision $rovided for switch roo' NPes(8o(8*=* NPes(8o(8*=*
and (or electrical facilities*
!f" +%itable tools for withdrawal of f%ses at f%se board NPes(8o(8*=* NPes(8o(8*=*
$rovided*
!g" = warning notice I>=8;E0Q+A,+T=T2/8-
A8=ATG/02+E> E8T0P P0/G2,2TE>. and I

NPes(8o(8*=* NPes(8o(8*=*
QQRSTT. $rovided at
ever# entrance of switch roo'*
!h" :ire barriers and other 'eas%res for $rotection against NPes(8o(8*=* NPes(8o(8*=*
ther'al effects are $ro$erl# installed*
!i" >anger notices- warning notices- sche'atic diagra's- NPes(8o(8*=* NPes(8o(8*=*
instr%ctions and si'ilar infor'ation are correctl# and
ade&%atel# $rovided*
!j" 5arning notices for s%bstations and switchroo's NPes(8o(8*=* NPes(8o(8*=*
$rovided in co'$liance with Code 17*
!k" 5arning notices for earthing and 'ain bonding NPes(8o(8*=* NPes(8o(8*=*
connections $rovided in co'$liance with Code 17*
!l" =ll switchgears- distrib%tion boards and electrical NPes(8o(8*=* NPes(8o(8*=*
e&%i$'ent $ro$erl# labelled*
=nne? 2
2te's tested (
checked b#
C o n tractor
2te's witnessed
b#
P, + E (P, +2
1*1*1*2 +witchboard- Cain +witch and Circ%it ,reaker
!a" =n %$DtoDdate notice of $eriodic ins$ection and testing
$rovided at $oint of s%$$l# !i*e* a switchboard- a
circ%it breaker or a distrib%tion board" of the
installation*
NPes(8o(8*=* NPes(8o(8*=*
!b" Circ%its- f%ses- switches- ter'inals- etc* are $rovided
with a legible and d%rable identification label*
NPes(8o(8*=* NPes(8o(8*=*
!c" 8o visible da'age to i'$air safet#* NPes(8o(8*=* NPes(8o(8*=*
!d" 5ork done $ro$erl# recorded in logbook* NPes(8o(8*=* NPes(8o(8*=*
!e" =n %$DtoDdate sche'atic diagra' dis$la#ed* NPes(8o(8*=* NPes(8o(8*=*
!f" =ll accessible live $arts screened with ins%lating $late or
earthed 'etal*
NPes(8o(8*=* NPes(8o(8*=*
!g" =ll e?$osed cond%ctive $arts effectivel# earthed* NPes(8o(8*=* NPes(8o(8*=*
!h" Earthing s#ste' effectivel# connected* NPes(8o(8*=* NPes(8o(8*=*
!i" 5arning notice dis$la#ed at 'ain bonding connections* NPes(8o(8*=* NPes(8o(8*=*
!j" =ll $rotective devices are f%nctioned $ro$erl# and
correctl# set*
NPes(8o(8*=* NPes(8o(8*=*
!k" +%itable interlock sche'e $rovided to $revent $arallel
o$eration of two or 'ore so%rces of s%$$l# and 3D$ole
inco'ing and interconnecting circ%it breakers $rovided
for s%$$l# to be taken fro' 'ore than one so%rce and
is interconnected*
NPes(8o(8*=* NPes(8o(8*=*
!l" Electricall# and 'echanicall# interlocked 3D$ole
changeover device!s" where standb# generator set!s"
is installed*
NPes(8o(8*=* NPes(8o(8*=*
!'" The breaking ca$acit# of all circ%it breakers
(interconnection devices are able to withstand the
$ros$ective fa%lt c%rrent*
NPes(8o(8*=* NPes(8o(8*=*
!n" Protective rela#s have been correctl# set and overc%rrent
$rotective devices s%itabl# set for all circ%its*
NPes(8o(8*=* NPes(8o(8*=*
Tested ( Checked b#
!8a'e of Contractor.s 0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
5itnessed b#
!8a'e!s" of NP,+E(P,+2"
+ignat%re D
! "
Post
Tel* 8o*
>ate
2te's tested (
checked b#
C o n tractor
2te's witnessed
b#
P, + E (P, +2
!o" Protective t#$e c%rrent transfor'ers are %sed for
$rotective rela#s*
NPes(8o(8*=* NPes(8o(8*=*
!$" = 'eans of isolation $rovided for ever# circ%it* NPes(8o(8*=* NPes(8o(8*=*
!&" /$eration of circ%it breakers and 'ain switches checked* NPes(8o(8*=* NPes(8o(8*=*
!r" Control- indication and alar' f%nctions checked* NPes(8o(8*=* NPes(8o(8*=*
!s" 8o %ndersi<ed cond%ctor %sed between the 'ain b%sbar
and f%se(CC,.s*
NPes(8o(8*=* NPes(8o(8*=*
!t" :%ses(CC,.s 'atching the lowest rated cond%ctor in
the circ%it*
NPes(8o(8*=* NPes(8o(8*=*
!%" +%itable cable ter'inations $rovided* NPes(8o(8*=* NPes(8o(8*=*
!v" Cable cond%ctors of correct $hases connected* NPes(8o(8*=* NPes(8o(8*=*
!w" +ingleD$ole devices for $rotection or switching connected
in $hase cond%ctors onl#*
NPes(8o(8*=* NPes(8o(8*=*
1*1*1*1 >istrib%tion ,oard
!a" = warning notice I>=8;E0. and I.
$rovided on the front $anel of ever# distrib%tion
board*
NPes(8o(8*=* NPes(8o(8*=*
!b" = notice of $eriodic testing $rovided at or near the 'ain
distrib%tion board incor$orating a resid%al c%rrent
device*
NPes(8o(8*=* NPes(8o(8*=*
!c" >istrib%tion boards sec%rel# 'o%nted on
s%itable s%$$orts*
NPes(8o(8*=* NPes(8o(8*=*
!d" = s%itable switch $rovided to control each
distrib%tion board*
NPes(8o(8*=* NPes(8o(8*=*
!e" Phase barriers for 1D$hase distrib%tion board $rovided* NPes(8o(8*=* NPes(8o(8*=*
!f" The breaking ca$acit# of CC, is co'$l# with
C/P Code 9*
NPes(8o(8*=* NPes(8o(8*=*
!g" +%itable tools for withdrawal of f%ses at a f%se
board $rovided- where necessar#*
NPes(8o(8*=* NPes(8o(8*=*
!h" Circ%its connected to CC, or f%se in accordance with
the sche'atic diagra'*
NPes(8o(8*=* NPes(8o(8*=*
Tested ( Checked b#
!8a'e of Contractor.s 0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
5itnessed b#
!8a'e!s" of NP,+E(P,+2"
+ignat%re D
! "
Post
Tel* 8o*
>ate
2te's tested (
checked b#
C o n tractor
2te's witnessed
b#
P, + E (P, +2
1*1*1*3 Cond%ctors- Cables and wirings
!a" 8o visible da'age to i'$air safet#*
!b" =ll live cond%ctors and their 'ethods of ins%lation- in
relation to design c%rrents of circ%its and to the o$erating
c%rrents of the $rotective devices- are $ro$erl# selected
and erected*
NPes(8o(8*=* NPes(8o(8*=*
!c" =ll cables- fle?ible cords- switches- $l%gs and socket
o%tlets- accessories and e&%i$'ent are fo%nd to be in
good working conditions*
NPes(8o(8*=* NPes(8o(8*=*
!d" =ll cond%ctors are correctl# and sec%rel# connected and
identified*
NPes(8o(8*=* NPes(8o(8*=*
!e" =r'o%red cables $ro$erl# ter'inated to 'etal casing
or tr%nking b# $ro$er cable glands*
NPes(8o(8*=* NPes(8o(8*=*
!f" Cables $assing thro%gh s'oke lobb# $rotected
b# enclos%res of ade&%ate fire rating*
NPes(8o(8*=* NPes(8o(8*=*
!g" 8onDsheathed cables $rotected b# cond%it- tr%nking or
d%cting*
NPes(8o(8*=* NPes(8o(8*=*
!h" Cables and d%ctings ade&%atel# s%$$orted* NPes(8o(8*=* NPes(8o(8*=*
!i" Cables at distrib%tion board or b%sbar ter'inated with
cable l%gs*
NPes(8o(8*=* NPes(8o(8*=*
!j" Cain cables connected %$ with correct $olarit#* NPes(8o(8*=* NPes(8o(8*=*
!k" Cables $rotected against 'echanical da'age and s%itabl#
s%$$orted*
NPes(8o(8*=* NPes(8o(8*=*
!l" =ll e?$osed 'etal $arts incl%ding the ar'o%r effectivel#
earthed*
NPes(8o(8*=* NPes(8o(8*=*
Tested ( Checked b#
!8a'e of Contractor.s 0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
5itnessed b#
!8a'e!s" of NP,+E(P,+2"
+ignat%re D
! "
Post
Tel* 8o*
>ate
=nne? 2
2te's tested (
checked b#
C o n tractor
2te's witnessed
b#
P, + E (P, +2
1*1*1*5 ,%sbar tr%nking s#ste' incl%ding rising 'ains
!a" The rising 'ains- lateral 'ains and 'eter boards
$ositioned at $laces accessible fro' $%blic area*
NPes(8o(8*=* NPes(8o(8*=*
!b" :ire barriers $rovided where the b%sbar tr%nking s#ste'
$asses thro%gh floor slabs or walls designated as fire
barriers*
NPes(8o(8*=* NPes(8o(8*=*
!c" Cables $assing thro%gh s'oke lobb# $rotected
b# enclos%res of ade&%ate fire rating*
NPes(8o(8*=* NPes(8o(8*=*
!d" 8onDsheathed cables $rotected b# cond%it- tr%nking or
d%cting*
NPes(8o(8*=* NPes(8o(8*=*
!e" ,%sbar tr%nking s#ste's- cables and d%ctings
ade&%atel# s%$$orted*
NPes(8o(8*=* NPes(8o(8*=*
!f" The bolts- n%ts- screws- etc* for b%sbar s%$$orts-
b%sbar connections have been checked for correct
tightness in accordance with 'an%fact%rers.
reco''endations*
NPes(8o(8*=* NPes(8o(8*=*
!g" The b%sbar tr%nking s#ste' is $ro$erl# and
correctl# installed and aligned*
NPes(8o(8*=* NPes(8o(8*=*
!h" 8o d%st- foreign $articles and deleterio%s s%bstances are
acc%'%lated on the b%sbar tr%nking s#ste'*
NPes(8o(8*=* NPes(8o(8*=*
!i" The b%sbar tr%nking s#ste' is free fro' condensation* NPes(8o(8*=* NPes(8o(8*=*
!j" =r'o%red cables $ro$erl# ter'inated to 'etal casing
or tr%nking b# $ro$er cable glands*
NPes(8o(8*=* NPes(8o(8*=*
!k" +%itable cable l%gs %sed for ter'inating cables* NPes(8o(8*=* NPes(8o(8*=*
!l" Preca%tion against corrosion taking on al%'ini%'
cond%ctor joined to co$$er cond%ctor*
NPes(8o(8*=* NPes(8o(8*=*
!'" C%to%t f%ses for ta$$ing off s%$$l# fitted with
ins%lated carriers*
NPes(8o(8*=* NPes(8o(8*=*
Tested ( Checked b#
!8a'e of Contractor.s 0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
5itnessed b#
!8a'e!s" of NP,+E(P,+2"
+ignat%re D
! "
Post
Tel* 8o*
>ate
=nne? 2
2te's tested (
checked b#
C o n tractor
2te's witnessed
b#
P, + E (P, +2
1*1*1*4 :inal Circ%its
!a" =ll f%ses and single $ole switches connected to the $hase
cond%ctors onl# with correct $olarit#*
NPes(8o(8*=* NPes(8o(8*=*
!b" 5iring for e'ergenc# lightings and fire
services installation segregated fro' other
wirings*
NPes(8o(8*=* NPes(8o(8*=*
!c" Bow voltage circ%its segregated fro' e?tra low
voltage circ%its*
NPes(8o(8*=* NPes(8o(8*=*
!d" Cables of all $hases and ne%tral of the circ%it b%nched
and contained in the sa'e cond%it*
NPes(8o(8*=* NPes(8o(8*=*
!e" E?$osed ins%lated nonDsheathed cables $rotected* NPes(8o(8*=* NPes(8o(8*=*
!f" 5iring inside false ceiling $rotected b# cond%it(tr%nking
or 'etallic sheath*
NPes(8o(8*=* NPes(8o(8*=*
!g" +ocket o%tlets installed below 1*5' fro' floor
being sh%ttered t#$e co'$l#ing with the $rescribed
re&%ire'ents*
NPes(8o(8*=* NPes(8o(8*=*
!h" 8o socket o%tlet installed close to water ta$- gas ta$ or
cooker so as to avoid danger*
NPes(8o(8*=* NPes(8o(8*=*
!i" :loor socket o%tlets $rotected with s%itable cover* NPes(8o(8*=* NPes(8o(8*=*
!j" 8o 2D$in sockets installed* =ll socket o%tlets connected
with $rotective cond%ctors and live cond%ctors
ter'inated at correct ter'inals*
NPes(8o(8*=* NPes(8o(8*=*
!k" 0adial final circ%its %sing 5=(15= socket o%tlets
in co'$liance with Code 4>*
NPes(8o(8*=* NPes(8o(8*=*
!l" :inal circ%its %sing 11= socket o%tlets in
co'$liance with Code 4E*
NPes(8o(8*=* NPes(8o(8*=*
!'" :inal circ%its %sing ind%strial socket o%tlets in
co'$liance with Code 4: or 4; or 4G*
NPes(8o(8*=* NPes(8o(8*=*
!n" Circ%it $rotective cond%ctor is for'ed b# the enclos%re
and a se$arate $rotective cond%ctor between the
earthing ter'inal of socket o%tlet and its associated
'etal bo? $rovided*
NPes(8o(8*=* NPes(8o(8*=*
Tested ( Checked b#
!8a'e of Contractor.s 0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
5itnessed b#
!8a'e!s" of NP,+E(P,+2"
+ignat%re D
! "
Post
Tel* 8o*
>ate
2te's tested (
checked b#
C o n tractor
2te's witnessed
b#
P, + E (P, +2
!o" Circ%it $rotective cond%ctor is not for'ed b# the
enclos%re and a se$arate $rotective cond%ctor to
the earthing ter'inal of socket o%tlet $rovided*
NPes(8o(8*=* NPes(8o(8*=*
!$" 0esid%al c%rrent device having a rated resid%al o$erating
c%rrent not e?ceeding 10'= $rovided for all socket
o%tlets*
NPes(8o(8*=* NPes(8o(8*=*
!&" Cini'%' si<es of $rotective cond%ctors are $rovided
as $er re&%ire'ent in C/P Code 11 for li'itation of
$rotective cond%ctor i'$edance*
NPes(8o(8*=* NPes(8o(8*=*
!r" Ceans of isolation $rovided for ever# fi?ed a$$liance* NPes(8o(8*=* NPes(8o(8*=*
!s" =ll chokes- starters and ca$acitors of discharge la'$s
enclosed in earthed 'etal bo?!es" and s%itabl# ventilated*
NPes(8o(8*=* NPes(8o(8*=*
!t" Phase cond%ctors connected to the centre contact of the
EdisonDt#$e screw la'$ holders*
NPes(8o(8*=* NPes(8o(8*=*
!%" 8o switches other than a switch fed fro' a safet# so%rce
or o$erated b# an ins%lation cord or rod or a $%shDb%tton
t#$e of switch having an ins%lated b%tton of a large
s%rface area $rovided in bathroo's*
NPes(8o(8*=* NPes(8o(8*=*
!v" +haver s%$$l# %nit co'$l#ing with ,+E8 40732
or e&%ivalent*
NPes(8o(8*=* NPes(8o(8*=*
!w" +ocket o%tlet in bathroo' installed in <one 1 !i*e* 0*4'
awa# fro' shower basin or batht%b") and $rotected b#
a
10'= resid%al c%rrent device or $rotected b# an
isolating transfor'er to ,+E8 40732*
NPes(8o(8*=* NPes(8o(8*=*
!?" 8o fi?ed l%'inaire nor fi?ed heater having %ng%arded
heating ele'ents installed within reach of a $erson
%sing the bath or shower*
NPes(8o(8*=* NPes(8o(8*=*
!#" =$$liances e?$osed to weather being s$lashD$roof t#$e* NPes(8o(8*=* NPes(8o(8*=*
!<" B%'inaires- switches- sockets and $l%gs- cable co%$lers
installed o%tdoor- being s$lash$roof t#$e*
NPes(8o(8*=* NPes(8o(8*=*
!aa" ;eneral(site lighting readil# accessible to the $%blic
s%$$lied fro' a safet# so%rce*
NPes(8o(8*=* NPes(8o(8*=*
!ab" ;eneral(site lighting not readil# accessible to the $%blic
and not s%$$lied fro' a safet# so%rce- $rotected b#
0C> having a rated resid%al o$erating c%rrent not
e?ceeding
10'=*
NPes(8o(8*=* NPes(8o(8*=*
Tested ( Checked b#
!8a'e of Contractor.s 0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
5itnessed b#
!8a'e!s" of NP,+E(P,+2"
+ignat%re D
! "
Post
Tel* 8o*
>ate
=nne? 2
2te's tested (
checked b#
C o n tractor
2te's witnessed
b#
P, + E (P, +2
1*1*1*7 Earthing and ,onding
!a" Earth rod electrode!s" having a 'ini'%' dia'eter 12*5
'' co$$er or 14 '' galvanised or stainless steel
%sed*
NPes(8o(8*=* NPes(8o(8*=*
!b" Co$$er ta$e earth electrode having a cross section of not
less than 25 '' ? 1 ''*
NPes(8o(8*=* NPes(8o(8*=*
!c" Co$$er $late earth electrode not less than 1'' in
thickness and having a 'a?i'%' di'ension of
1200'' ? 1200''
NPes(8o(8*=* NPes(8o(8*=*
!d" 8o gas(water $i$e %sed as earth electrodes* NPes(8o(8*=* NPes(8o(8*=*
!e" = test link $rovided at the 'ain earthing ter'inal* NPes(8o(8*=* NPes(8o(8*=*
!f" Cini'%' si<e of $rotective cond%ctor %sed
in co'$liance with C/P Table 11!1"*
!g" Protective cond%ctor %$ to and incl%ding 4''
2
with
green and #ellow ins%lation sheath %sed thro%gho%t
its length*
!h" ,onding cond%ctors of not less than 150''
2
co$$er
e&%ivalent %sed for connection to the earthing ter'inal of
the electricit# s%$$lier.s transfor'er!s" or %ndergro%nd
cable!s"*
NPes(8o(8*=* NPes(8o(8*=*
NPes(8o(8*=* NPes(8o(8*=*
NPes(8o(8*=* NPes(8o(8*=*
!i" Co$$er links $rovided at joints of 'etallic tr%nking
which for's $art of a $rotective cond%ctor*
NPes(8o(8*=* NPes(8o(8*=*
!j" +e$arate $rotective cond%ctors $rovided for all
fle?ible cond%its*
NPes(8o(8*=* NPes(8o(8*=*
!k" = warning notice I+=:ETP EBECT02C=B
C/88ECT2/8Q>/ 8/T 0EC/@E and I U V
QQW. $rovided at all 'ain earthing and
bonding connections*
NPes(8o(8*=* NPes(8o(8*=*
!l" Cain e&%i$otential bonding cond%ctors effectivel#
connected to 'ain water $i$es- 'ain gas $i$es- other
services $i$es(d%cting and e?$osed 'etallic $arts of
str%ct%ral fra'ework*
NPes(8o(8*=* NPes(8o(8*=*
Tested ( Checked b#
!8a'e of Contractor.s 0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
5itnessed b#
!8a'e!s" of NP,+E(P,+2"
+ignat%re D Post
Tel* 8o*
=nne? 2
2te's tested (
checked b#
C o n tractor
2te's witnessed
b#
P, + E (P, +2
>ate
!'" +%$$le'entar# e&%i$otential bonding
effectivel# $rovided between e?$osed
cond%ctive $arts and e?traneo%s cond%ctive
$arts*
NPes(8o(8*=* NPes(8o(8*=*
!n" E?$osed cond%ctive $arts of fi?ed e&%i$'ent installed
o%tside e&%i$otential <one effectivel# earthed for 0*3 sec*
disconnection*
NPes(8o(8*=* NPes(8o(8*=*
!o" E?$osed cond%ctive $arts of fi?ed e&%i$'ent installed
within e&%i$otential <one effectivel# earthed for 5 sec*
disconnection*
NPes(8o(8*=* NPes(8o(8*=*
!$" Effectiveness of the 'ain e&%i$otential bonding
connection to the 'ain earthing ter'inal and lightning
$rotection s#ste'*
NPes(8o(8*=* NPes(8o(8*=*
!&" Earthing cond%ctors of ade&%ate si<e* NPes(8o(8*=* NPes(8o(8*=*
1*1*1*E Bightning Protection
!a" The contin%it# of air ter'ination network (down
cond%ctor (earth ter'ination network has been
checked and fo%nd satisfactor#*
NPes(8o(8*=* NPes(8o(8*=*
!b" =ll cond%ctors and joints for lightning $rotection
s#ste' are electricall# and 'echanicall# so%nd and
correctl# connected*
NPes(8o(8*=* NPes(8o(8*=*
!c" Connection link to the 'ain earthing ter'inal $rovided*
Test joint $rovided
NPes(8o(8*=* NPes(8o(8*=*
!d" 0od electrode!s" having a 'ini'%' dia'eter 12*5
'' co$$er or 14 '' galvanised or stainless steel
%sed*
NPes(8o(8*=* NPes(8o(8*=*
!e" Co$$er ta$e electrode having a crosssection of not less
than 25 '' ? 1 ''*
NPes(8o(8*=* NPes(8o(8*=*
!f" Co$$er $late electrode not less than 1 '' in
thickness and having a 'a?i'%' di'ension of
1200'' ?
1200''
NPes(8o(8*=* NPes(8o(8*=*
!g" 8o gas(water $i$e %sed as earth electrodes* NPes(8o(8*=* NPes(8o(8*=*
!h" 8o evidence of corrosion likel# to lead deterioration
of the lightning $rotection s#ste'*
NPes(8o(8*=* NPes(8o(8*=*
Tested ( Checked b#
!8a'e of Contractor.s 0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
5itnessed b#
!8a'e!s" of NP,+E(P,+2"
+ignat%re D Post
Tel* 8o*
>ate
1*1*1*9 Cotors (Transfor'ers
!a" 8o visible da'age to i'$air safet#* NPes(8o(8*=* NPes(8o(8*=*
!b" = local switch was $rovided to control ever# 'otor NPes(8o(8*=* NPes(8o(8*=*
!c" Ceans $rovided to $revent %ne?$ected restarting of
'otors where s%ch restarting 'ight ca%se danger*
NPes(8o(8*=* NPes(8o(8*=*
!d" :le?ible cond%its ter'inated with s%itable brass b%shes* NPes(8o(8*=* NPes(8o(8*=*
!e" +e$arate s%$$l# to 'otor heaters having its ter'inals
screened- with warning notice $rovided*
NPes(8o(8*=* NPes(8o(8*=*
!f" =ll accessible live $arts screened with ins%lating $late or
earthed 'etal*
NPes(8o(8*=* NPes(8o(8*=*
!g" Pro$er ventilation $rovided to avoid e?cessive
te'$erat%re rise*
NPes(8o(8*=* NPes(8o(8*=*
Tested ( Checked b#
!8a'e of Contractor.s 0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
5itnessed b#
!8a'e!s" of NP,+E(P,+2"
+ignat%re D
! "
Post
Tel* 8o*
>ate
=nne? 2
2te's tested (
checked b#
C o n tractor
2te's witnessed
b#
P, + E (P, +2
1*1*2 C o n d % c tor C o n ti n% it# ! C /P C ode 21, !1" a n d !3""
1*1*2*1 =ll $rotective cond%ctors incl%ding all cond%ctors and an#
e?traneo%s cond%ctive $arts %sed for e&%i$otential bonding
have been tested for contin%it#*
NPes(8o(8*=* NPes(8o(8*=*
1*1*2*2 =ll final ring circ%it cond%ctors incl%ding the
$rotective cond%ctors have been tested for contin%it#*
NPes(8o(8*=* NPes(8o(8*=*
1*1*2*1 Cond%ctor contin%it# test res%lts recorded in =nne? 2- Part 3* NPes(8o(8*=* NPes(8o(8*=*
1*1*1 2 ns% la ti o n 0 e s is ta n ce ! C /P C ode 21, !5""
1*1*1*1 The ins%lation resistance to earth is 8/T less than 1 CX* NPes(8o(8*=* NPes(8o(8*=*
1*1*1*2 The ins%lation resistance between $hases ($oles is 8/T less than NPes(8o(8*=* NPes(8o(8*=*
1 CX*
1*1*1*1 The ins%lation resistance of e&%i$'ent between the e?$osed NPes(8o(8*=* NPes(8o(8*=*
cond%ctive $arts and all live $arts is 8/T less than 0*5 CX when
tested individ%all# and se$aratel# and if there is no a$$ro$riate
re&%ire'ent !C/P Code 21, !5"!f""*
1*1*1*3 The ins%lation resistance of electrical se$aration re&%ired for
circ%its of safet# e?traDlow voltage e&%i$'ent- or re&%ired for
$rotection against indirect contact is tested with a voltage of
500@
NPes(8o(8*=* NPes(8o(8*=*
d*c* for one 'in%te and is not less than 5CX*
1*1*1*5 2ns%lation resistance test res%lts recorded in =nne? 2- Part 3* NPes(8o(8*=* NPes(8o(8*=*
1*1*3 P o lar it# ! C /P C ode 21, !4""
1*1*3*1 =ll f%ses and singleD$oles devices are connected in the $hase
cond%ctors onl#*
NPes(8o(8*=* NPes(8o(8*=*
1*1*3*2 =ll wiring has been correctl# connected to socket o%tlets and
la'$holders- etc*
NPes(8o(8*=* NPes(8o(8*=*
1*1*3*1 The o%ter or screwed contacts of centreDcontact ba#onet and
Edison screw la'$holders in circ%its having an earthed
ne%tral cond%ctor is connected to that ne%tral cond%ctor*
NPes(8o(8*=* NPes(8o(8*=*
1*1*3*3 Polarit# check res%lts recorded in =nne? 2- Part 3* NPes(8o(8*=* NPes(8o(8*=*
Tested ( Checked b#
!8a'e of Contractor.s 0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
5itnessed b#
!8a'e!s" of NP,+E(P,+2"
+ignat%re D
! "
Post
Tel* 8o*
>ate
Tested ( Checked b#
!8a'e of Contractor.s 0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
5itnessed b#
!8a'e!s" of NP,+E(P,+2"
+ignat%re D
! "
Post
Tel* 8o*
>ate
=nne? 2
2te's tested (
checked b#
C o n tractor
2te's witnessed
b#
P, + E (P, +2
1*1*5 Ear th E lec trode 0 e s is ta n ce ! C /P C ode 21, !7""
1*1*5*1 The resistance to earth has been 'eas%red at the $osition of
ever# earth electrode and of the 'ain earth ter'inal* The res%lts
are satisfactor#*
NPes(8o(8*=* NPes(8o(8*=*
1*1*5*2 >etails of earth electrode and resistance test res%lts recorded in
=nne? 2- Part 3*
NPes(8o(8*=* NPes(8o(8*=*
1*1*4 Ear th :a % lt B oo$ 2 ' $eda n ce ! C /P C ode 21, !E""
1*1*4*1 The earth fa%lt loo$ i'$edance of all circ%its has been fo%nd
satisfactor# for o$eration of the $rotective devices for earth
fa%lt $rotection*
NPes(8o(8*=* NPes(8o(8*=*
1*1*4*2 Earth fa%lt loo$ i'$edance 'eas%re'ent res%lts recorded on
=nne? 2- Part 3*
NPes(8o(8*=* NPes(8o(8*=*
1*1*7 :%ncti o nal T esting o f = ll >evices 2n cl % d in g P rotecti v e >e v ices
! C /P C ode 21, !9""
1*1*7*1 +i'%lation tests on the o$eration of devices for earth
fa%lt $rotection are satisfactor#*
NPes(8o(8*=* NPes(8o(8*=*
1*1*7*2 50H of the rated tri$$ing c%rrent shall not ca%se the
resid%al c%rrent circ%it breaker to o$en*
NPes(8o(8*=* NPes(8o(8*=*
1*1*7*1 100H of the rated tri$$ing c%rrent shall ca%se the resid%al c%rrent
circ%it breaker to o$en within 100's or at an# dela# ti'e
declared b# the 'an%fact%rer of the device*
NPes(8o(8*=* NPes(8o(8*=*
1*1*7*3 5here the resid%al c%rrent circ%it breaker has a rated tri$$ing
c%rrent not e?ceeding 10'= and has been installed to red%ce
the risk associated with direct contact- a resid%al c%rrent of
150'= sho%ld ca%se the circ%it breaker to o$en within 30's*
NPes(8o(8*=* NPes(8o(8*=*
1*1*7*5 2n no event sho%ld the test c%rrent be a$$lied for a $eriod
e?ceeding one second*
NPes(8o(8*=* NPes(8o(8*=*
1*1*7*4 Gand o$eration on $rotective devices s%ch as 'iniat%re circ%it
breakers- 'o%lded case circ%it breakers- air circ%it breakers-
f%sed switches- switchDf%ses and $rotective rela#s- etc* are
satisfactor#*
NPes(8o(8*=* NPes(8o(8*=*
1*1*7*7 Gand o$eration on all ite's of e&%i$'ent s%ch as
isolators- switches and indicative devices are satisfactor#*
NPes(8o(8*=* NPes(8o(8*=*
1*1*7*E :%nctional test of all devices incl%ding $rotective devices
had been recorded on =nne? 2- Part 3*
NPes(8o(8*=* NPes(8o(8*=*
=nne? 2
2te's tested (
checked b#
C o n tractor
2te's witnessed
b#
P, + E (P, +2
1*1*E = dd iti o n al Ch ec k s fo r 2n stallati o n s in Ga<ar do % s E nv ir o n ' e n t
! C /P C ode 21, !10""
1*1*E*1 The e&%i$'ent is s%itabl# $rotected according to the t#$es of
$rotection %nder C/P Code 15* The integrit# of the $rotection
$rovided for the e&%i$'ent is not jeo$ardised b# the 'ethod
of installation* 8o alteration that 'a# invalidate the conditions
of $rotection has been %sed*
NPes(8o(8*=* NPes(8o(8*=*
1*1*E*2 8o d%st- foreign $articles and deleterio%s s%bstances are
acc%'%lated on the e&%i$'ent* The e&%i$'ent is free
fro' condensation*
NPes(8o(8*=* NPes(8o(8*=*
1*1*E*1 Ba'$s- f%ses and re$laceable $arts of correct rating and t#$es
are %sed*
NPes(8o(8*=* NPes(8o(8*=*
1*1*E*3 The s%rface te'$erat%re of all e&%i$'ent is a$$ro$riate to
the t#$e of $rotection $rovided*
NPes(8o(8*=* NPes(8o(8*=*
Tested ( Checked b#
!8a'e of Contractor.s 0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
5itnessed b#
!8a'e!s" of NP,+E(P,+2"
+ignat%re D
! "
Post
Tel* 8o*
>ate
1*2 +tat%t or # 2 n s $ ecti o n and T est fo r Gigh @ o ltage ! G*@*" 2 n stallati o n
1*2*1 @i s% al 2 ns $ec ti o n ! C /P C ode 21C a n d C /P = $$e n d i? 11"
1*2*1*1 5orking +$ace and :acilities
!a" =de&%ac# working s$ace and safe access $rovided for
G*@* switch roo' and (or electrical facilities*
NPes(8o(8*=* NPes(8o(8*=*
!b" Entrance (e?it to G*@* switch roo' and(or electrical NPes(8o(8*=* NPes(8o(8*=*
facilities are free of obstr%ction*
!c" Provision of s%itable locking facilities for ever# entr# to NPes(8o(8*=* NPes(8o(8*=*
an G*@* switch roo' (s%bstation*
!d" +%itable lighting $rovision $rovided for G*@* switch NPes(8o(8*=* NPes(8o(8*=*
roo' and (or electrical facilities*
!e" +%itable ventilation $rovision $rovided for G*@* switch NPes(8o(8*=* NPes(8o(8*=*
roo' and (or electrical facilities*
!f" +%itable tools for withdrawal of circ%it breakers NPes(8o(8*=* NPes(8o(8*=*
$rovided*
!g" = warning notice I>=8;E0Q+A,+T=T2/8-
A8=ATG/02+E> E8T0P P0/G2,2TE>. and I

NPes(8o(8*=* NPes(8o(8*=*
QQRSTT. $rovided at
ever# entrance of G*@* switch roo'*
!h" :ire barriers and other 'eas%res for $rotection against NPes(8o(8*=* NPes(8o(8*=*
ther'al effects are $ro$erl# installed*
!i" >anger notices- warning notices- sche'atic diagra's- NPes(8o(8*=* NPes(8o(8*=*
instr%ctions and si'ilar infor'ation are correctl# and
ade&%atel# $rovided*
!j" 5arning notices for s%bstations and G*@* switch roo's NPes(8o(8*=* NPes(8o(8*=*
$rovided in co'$liance with Code 17*
!k" 5arning notices for earthing and 'ain bonding NPes(8o(8*=* NPes(8o(8*=*
connections $rovided in co'$liance with Code 17*
!l" =ll switchgears- distrib%tion boards and electrical NPes(8o(8*=* NPes(8o(8*=*
e&%i$'ent $ro$erl# labelled*
Tested ( Checked b#
!8a'e of Contractor.s 0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
5itnessed b#
!8a'e!s" of NP,+E(P,+2"
+ignat%re D
! "
Post
Tel* 8o*
>ate
!'" Contin%it# of $rotective cond%ctors es$eciall# the
bonding of all e?$osed cond%ctive $arts are
satisfactor#*
NPes(8o(8*=* NPes(8o(8*=*
!n" Provision of $adlock facilities for sh%tters- ke# bo?es
etc* $rovided*
NPes(8o(8*=* NPes(8o(8*=*
!o" Bogbook $rovided and work done $ro$erl# recorded* NPes(8o(8*=* NPes(8o(8*=*
!$" /ther ins$ection ite's as re&%ired b# the
'an%fact%rers of related e&%i$'ent are satisfactor#*
NPes(8o(8*=* NPes(8o(8*=*
1*2*1*2 +witchboard and Circ%it ,reakers
!a" 8o visible da'age to i'$air safet#* NPes(8o(8*=* NPes(8o(8*=*
!b" =$$ro$riate devices $rovided for isolation and switching* NPes(8o(8*=* NPes(8o(8*=*
!c" Ever# circ%it breaker $rovided with a legible and d%rable
identification label*
NPes(8o(8*=* NPes(8o(8*=*
!d" =n %$DtoDdate sche'atic diagra' dis$la#ed* NPes(8o(8*=* NPes(8o(8*=*
!e" =ll accessible live $arts screened with ins%lating $late or
earthed 'etal*
NPes(8o(8*=* NPes(8o(8*=*
!f" =ll e?$osed cond%ctive $arts effectivel# earthed* NPes(8o(8*=* NPes(8o(8*=*
!g" Earthing s#ste' effectivel# connected* NPes(8o(8*=* NPes(8o(8*=*
!h" 5arning notice dis$la#ed at 'ain bonding connections* NPes(8o(8*=* NPes(8o(8*=*
!i" =ll $rotective devices are f%nctioned $ro$erl# and
correctl# set*
NPes(8o(8*=* NPes(8o(8*=*
!j" 2nitial ('aintenance test carried o%t according to relevant
recognised standards and 'an%fact%rers.
reco''endation- where a$$ro$riate- with test re$orts*
!ins%lation resistance test- $ress%re test etc*"
NPes(8o(8*=* NPes(8o(8*=*
!k" /ther ins$ection ite's as re&%ired b# the
'an%fact%rers of related e&%i$'ent are satisfactor#*
NPes(8o(8*=* NPes(8o(8*=*
Tested ( Checked b#
!8a'e of Contractor.s 0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
5itnessed b#
!8a'e!s" of NP,+E(P,+2"
+ignat%re D
! "
Post
Tel* 8o*
>ate
1*2*1*1 Cond%ctors- Cables and wirings
!a"
!b"
8o visible da'age to i'$air safet#*
=ll live cond%ctors and their 'ethods of ins%lation- in
NPes(8o(8*=*
NPes(8o(8*=*
NPes(8o(8*=*
NPes(8o(8*=*
relation to design c%rrents of circ%its and to the o$erating
c%rrents of the $rotective devices- are $ro$erl#
selected and erected*
!c" =ll cables- fle?ible cords- switches- $l%gs and socket
o%tlets- accessories and e&%i$'ent are fo%nd to be in
good working conditions*
NPes(8o(8*=* NPes(8o(8*=*
!d" =ll cond%ctors are correctl# and sec%rel# connected
and identified*
NPes(8o(8*=* NPes(8o(8*=*
!e" =r'o%red cables $ro$erl# ter'inated to 'etal casing
or tr%nking b# $ro$er cable glands*
NPes(8o(8*=* NPes(8o(8*=*
!f" Cables $assing thro%gh s'oke lobb# $rotected
b# enclos%res of ade&%ate fire rating*
NPes(8o(8*=* NPes(8o(8*=*
!g" 8onDsheathed cables $rotected b# cond%it- tr%nking or
d%cting*
NPes(8o(8*=* NPes(8o(8*=*
!h" Cables and d%ctings ade&%atel# s%$$orted* NPes(8o(8*=* NPes(8o(8*=*
!i" Cables at distrib%tion board or b%sbar ter'inated with
cable l%gs*
NPes(8o(8*=* NPes(8o(8*=*
!j" Cain cables connected %$ with correct $olarit#* NPes(8o(8*=* NPes(8o(8*=*
!k" Cables $rotected against 'echanical da'age and s%itabl#
s%$$orted*
NPes(8o(8*=* NPes(8o(8*=*
!l" =ll e?$osed 'etal $arts incl%ding the ar'o%r
effectivel# earthed*
NPes(8o(8*=* NPes(8o(8*=*
!'" 2nitial ('aintenance test carried o%t according to relevant
recognised standards and 'an%fact%rers.
reco''endation- where a$$ro$riate- with test re$orts*
!ins%lation resistance test- $ress%re test etc*"
NPes(8o(8*=* NPes(8o(8*=*
!n" /ther ins$ection ite's as re&%ired b# the
'an%fact%rers of related e&%i$'ent are satisfactor#*
NPes(8o(8*=* NPes(8o(8*=*
Tested ( Checked b#
!8a'e of Contractor.s 0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
5itnessed b#
!8a'e!s" of NP,+E(P,+2"
+ignat%re D
! "
Post
Tel* 8o*
>ate
=nne? 2
2te's tested (
checked b#
C o n tractor
2te's witnessed
b#
P, + E (P, +2
1*2*1*3 Transfor'ers (Cotors
!a" 8o visible da'age to i'$air safet#* NPes(8o(8*=* NPes(8o(8*=*
!b" =ll accessible live $arts screened with ins%lating $late or
earthed 'etal*
NPes(8o(8*=* NPes(8o(8*=*
!c" Pro$er ventilation $rovided to avoid e?cessive
te'$erat%re rise*
NPes(8o(8*=* NPes(8o(8*=*
!d" 2nitial ('aintenance test carried o%t according to relevant
recognised standards and 'an%fact%rers.
reco''endation- where a$$ro$riate- with test re$orts*
!ins%lation resistance test- $ress%re test etc*"
NPes(8o(8*=* NPes(8o(8*=*
!e" /ther ins$ection ite's as re&%ired b# the
'an%fact%rers of related e&%i$'ent are satisfactor#*
NPes(8o(8*=* NPes(8o(8*=*
1*2*1*5 Earth
!a" = warning notice I+=:ETP EBECT02C=B
C/88ECT2/8Q>/ 8/T 0EC/@E and I U V
QQW. $rovided at all 'ain earthing and
bonding connections*
NPes(8o(8*=* NPes(8o(8*=*
!b" Earthing cond%ctors of ade&%ate si<e* NPes(8o(8*=* NPes(8o(8*=*
!c" /ther ins$ection ite's as re&%ired b# the
'an%fact%rers of related e&%i$'ent are satisfactor#*
NPes(8o(8*=* NPes(8o(8*=*
1*2*1*4 >irect C%rrent !d*c*" ,atter# +#ste'
!a" Condition of batter# s#ste' is satisfactor#* NPes(8o(8*=* NPes(8o(8*=*
!b" @oltage of each batter# cell 'eas%red* NPes(8o(8*=* NPes(8o(8*=*
!c" /ther ins$ection ite's as re&%ired b# the
'an%fact%rers of related e&%i$'ent are satisfactor#*
NPes(8o(8*=* NPes(8o(8*=*
Tested ( Checked b#
!8a'e of Contractor.s 0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
5itnessed b#
!8a'e!s" of NP,+E(P,+2"
+ignat%re D
! "
Post
Tel* 8o*
>ate
=nne? 2
2te's tested (
checked b#
C o n tractor
2te's witnessed
b#
P, + E (P, +2
1*2*1*7 /$eration and Testing Tools and E&%i$'ent
!a" Pro$er o$eration tools and e&%i$'ent $rovided for
switching and isolation %se*
NPes(8o(8*=* NPes(8o(8*=*
!b" +%itable selfDtest high voltage tester $rovided for
verif#ing e&%i$'ent dead*
NPes(8o(8*=* NPes(8o(8*=*
!e" /ther ins$ection ite's as re&%ired b# the
'an%fact%rers of related e&%i$'ent are satisfactor#*
NPes(8o(8*=* NPes(8o(8*=*
1*2*1*E /ther 8ecessar# 2ns$ections
!a" /ther ins$ection ite's as re&%ired b# the
'an%fact%rers of related e&%i$'ent shall be stated and
a$$ended in se$arate for's* The ite's are fo%nd
satisfactor#*
NPes(8o(8*=* NPes(8o(8*=*
1*2*2 T esting o f Gigh @ o ltage ! G*@*" 2 n stallati o ns ! C /P C od e 21 >"
1*2*2*1 +afet# Preca%tion
!a" +afet# re&%ire'ents for testing of G*@* installations are
reco''ended fro' 'an%fact%rers of related
e&%i$'ent and e?ec%ted*
NPes(8o(8*=* NPes(8o(8*=*
!b" Pro$er $reca%tionar# 'eas%res are taken and the
'ethods of tests sho%ld be s%ch that no danger to $ersons
or $ro$ert# can occ%r even if the circ%it being tested is
defective*
NPes(8o(8*=* NPes(8o(8*=*
1*2*2*2 Testing
!a" Testing re&%ire'ents and detailed test $roced%res for of
G*@* installations are reco''ended fro' 'an%fact%rers
of related e&%i$'ent and a$$roved*
NPes(8o(8*=* NPes(8o(8*=*
!b" =ll tests for G*@* installations are recorded in se$arate
for's and $ro$erl# endorsed*
NPes(8o(8*=* NPes(8o(8*=*
Tested ( Checked b#
!8a'e of Contractor.s 0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
5itnessed b#
!8a'e!s" of NP,+E(P,+2"
+ignat%re D
! "
Post
Tel* 8o*
>ate
=nne? 2
2te's tested (
checked b#
C o n tractor
2te's witnessed
b#
P, + E (P, +2
1*1 : %n c ti o n al T e s t o f + # st e' (E& %i $ ' e n t
1*1*1 B ightning P ro tec ti o n + # st e'
1*1*1*1 The contin%it# between air ter'inations and earthing
ter'inations is tested*
NPes(8o(8*=* NPes(8o(8*=*
1*1*1*2 Ceas%red earth ter'ination network resistance to earth not
'ore than 10 /h' when the connection to 'ain earthing
ter'inal disconnected*
NPes(8o(8*=* NPes(8o(8*=*
1*1*1*1 Test res%lts recorded in =nne? 2- Part 3* NPes(8o(8*=* NPes(8o(8*=*
1*1*2 C ir c%it r # C heck
1*1*2*1 =ll circ%its incl%ding lighting and $ower circ%its have been
verified thro%gh switching o$eration that the# are installed
in accordance with the designated circ%its*
NPes(8o(8*=* NPes(8o(8*=*
1*1*1 Ch a r g er a n d , atter# +et
1*1*1*1 The original factor# test certificates of the charger and batter#
have been checked and fo%nd satisfactor#*
NPes(8o(8*=* NPes(8o(8*=*
1*1*1*2 The charger is connected to the 'ains s%$$l# thro%gh a
s%itable rated f%se*
NPes(8o(8*=* NPes(8o(8*=*
1*1*1*1 ,atteries connections have been done $ro$erl#* NPes(8o(8*=* NPes(8o(8*=*
1*1*1*3 2nstr%'ents- indicating la'$s- f%ses- rela#s and labels on
batter# charger are $rovided and installed $ro$erl#*
NPes(8o(8*=* NPes(8o(8*=*
1*1*1*5 The ca$acit# of the charger is ca$able of recharging the batteries
fro' f%ll# discharged to f%ll# charged within the s$ecified
d%ration*
NPes(8o(8*=* NPes(8o(8*=*
1*1*1*4 The charger o%t$%t on load with batteries disconnected
is satisfactor#*
NPes(8o(8*=* NPes(8o(8*=*
1*1*1*7 The charger c%rrent on load with batteries disconnected
is satisfactor#*
NPes(8o(8*=* NPes(8o(8*=*
Tested ( Checked b#
!8a'e of Contractor.s 0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
5itnessed b#
!8a'e!s" of NP,+E(P,+2"
+ignat%re D
! "
Post
Tel* 8o*
>ate
=nne? 2
2te's tested (
checked b#
C o n tractor
2te's witnessed
b#
P, + E (P, +2
1*1*1*E The ca$acit# of batteries has been checked and tested b#
interr%$ting the 'ains in$%t to the charger and act%ation (
o$eration of the connected devices and the res%lts are satisfactor#*
NPes(8o(8*=* NPes(8o(8*=*
1*1*1*9 The f%nctions and indications of charger fail ( 'ain fail ( batter#
disconnected ( boost charge ( trickle charge- 'ains and batter#
have been checked and tested and the res%lts are satisfactor#*
NPes(8o(8*=* NPes(8o(8*=*
1*1*3 B ighting 2 nstallati o n
1*1*3*1 B%'inaires and Bighting :ittings
!a" Colo%r te'$erat%re of light fittings was checked and
as s$ecified*
NPes(8o(8*=* NPes(8o(8*=*
!b" =ll la'$s are the correct wattage and voltage ratings
!c" ,ea' angle of s$ot la'$ is co''issioned* NPes(8o(8*=* NPes(8o(8*=*
!d" =i'ing angle of e?ternal lighting or $lanter lighting is
co''issioned so as not to create glare or an#
obstr%ctive light to e?ternal environ'ent*
NPes(8o(8*=* NPes(8o(8*=*
!e" E?terior floodlights have been ai'ed according
to re&%ire'ents !$artic%larl# relevant for s$orts
installations"
NPes(8o(8*=* NPes(8o(8*=*
!f" :l%orescent la'$s have the correct $hos$hor* NPes(8o(8*=* NPes(8o(8*=*
1*1*3*2 Bighting Control !/n(/ff and >i''ing"
!a" ;ro%$s of l%'inaries are assigned to the correct $osition
in grid switch or grid single circ%it di''er and tested
b# hand o$eration*
NPes(8o(8*=* NPes(8o(8*=*
!b" Bighting control s#ste' !e*g* ti'er switch- occ%$anc#
sensor- $hotocell and infraDred sensor- etc*" are correctl#
co''issioned and set*
NPes(8o(8*=* NPes(8o(8*=*
!c" Ti'er switch o$erated lighting control s#ste'
can $ro$erl# o$erate as co''issioned*
NPes(8o(8*=* NPes(8o(8*=*
!d" Photocell o$erated lighting control s#ste' can $ro$erl#
o$erate as co''issioned*
NPes(8o(8*=* NPes(8o(8*=*
Tested ( Checked b#
!8a'e of Contractor.s 0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
5itnessed b#
!8a'e!s" of NP,+E(P,+2"
+ignat%re D
! "
Post
Tel* 8o*
>ate
!e" 2nfraDred sensor o$erated lighting control s#ste'
can $ro$erl# o$erate as co''issioned*
NPes(8o(8*=* NPes(8o(8*=*
!f" /cc%$anc# sensor o$erated lighting control s#ste'
can $ro$erl# o$erate as co''issioned*
NPes(8o(8*=* NPes(8o(8*=*
!g" :C radio switches have been config%red to the relevant
receivers
NPes(8o(8*=* NPes(8o(8*=*
!h" Bighting control b# CCC+ or ,C+ is tested and
$ro$erl# f%nctioned*
NPes(8o(8*=* NPes(8o(8*=*
1*1*3*1 Bighting Ceas%re'ent
!a" 2ll%'inance level of lighting installation for
individ%al areas (roo's is 'eas%red %nder its design
condition*
NPes(8o(8*=* NPes(8o(8*=*
!b" Ceas%re'ent res%lts recorded* NPes(8o(8*=* NPes(8o(8*=*
1*1*5 >igital C %lti f%ncti o n P o w er Ceter
1*1*5*1 Can%fact%rer.s calibration certificate for each 'eter is $rovided* NPes(8o(8*=* NPes(8o(8*=*
1*1*5*2 The readings of electrical $ara'eters b# the 'eter and b# test
kit are recorded in =nne? 2- Part 3*
NPes(8o(8*=* NPes(8o(8*=*
1*1*5*1 0e'ote 'onitoring f%nctions b# CCC+ or ,C+ are tested
and fo%nd satisfactor#*
NPes(8o(8*=* NPes(8o(8*=*
1*1*5*3 2nterfacing f%nctions for selfDcontained 'eter are tested b#
%sing $l%gDin co''%nication 'od%le and fo%nd satisfactor#*
NPes(8o(8*=* NPes(8o(8*=*
1*1*5*5 0e$lace'ent 'echanis' of 'eter is tested and fo%nd satisfactor#* NPes(8o(8*=* NPes(8o(8*=*
1*1*5*4 C%rrent transfor'er !C*T*" shorting block to $revent
o$en circ%iting the C*T* is $rovided and tested*
NPes(8o(8*=* NPes(8o(8*=*
Tested ( Checked b#
!8a'e of Contractor.s 0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
5itnessed b#
!8a'e!s" of NP,+E(P,+2"
+ignat%re D
! "
Post
Tel* 8o*
>ate
1*1*4 >i g ital P o w er = n al # <er
1*1*4*1 Can%fact%rer.s calibration certificate for each $ower anal#<er is
$rovided*
NPes(8o(8*=* NPes(8o(8*=*
1*1*4*2 The readings of electrical $ara'eters b# the digital
$ower anal#<er and b# test kit are recorded in =nne? 2-
Part 3*
NPes(8o(8*=* NPes(8o(8*=*
1*1*4*1 0e'ote 'onitoring f%nctions b# CCC+ or ,C+ are tested
and fo%nd satisfactor#*
NPes(8o(8*=* NPes(8o(8*=*
1*1*4*3 2nterfacing f%nctions for selfDcontained digital $ower anal#<er
are tested b# %sing $l%gDin co''%nication 'od%le and fo%nd
satisfactor#*
NPes(8o(8*=* NPes(8o(8*=*
1*1*4*5 0e$lace'ent 'echanis' of 'eter is tested and fo%nd satisfactor#* NPes(8o(8*=* NPes(8o(8*=*
1*1*4*4 C%rrent transfor'er !C*T*" shorting block to $revent
o$en circ%iting the C*T* is $rovided and tested*
NPes(8o(8*=* NPes(8o(8*=*
1*1*4*7 Event alar' and wavefor' ca$t%re f%nctions of digital
$ower anal#ser is tested and fo%nd satisfactor#*
NPes(8o(8*=* NPes(8o(8*=*
1*1*7 , %s b ar T r %nking + # st e'
1*1*7*1 T#$e test certificate iss%ed b# testing laboratories or organi<ations
as stated in C/P is $rovided*
NPes(8o(8*=* NPes(8o(8*=*
1*1*7*2 The bolts- n%ts- screws- etc* for b%sbar s%$$orts- b%sbar
connections have been checked for correct tightness in accordance
with 'an%fact%rers. reco''endations*
NPes(8o(8*=* NPes(8o(8*=*
1*1*7*1 8o d%st- foreign $articles and deleterio%s s%bstances are
acc%'%lated on the b%sbar tr%nking s#ste'* The b%sbar
tr%nking s#ste' is free fro' condensation*
NPes(8o(8*=* NPes(8o(8*=*
1*1*7*3 Contin%it#- ins%lation resistance- $olarit#- earth fa%lt loo$
i'$edance and other re&%ired test are carried o%t- recorded
and fo%nd satisfactor#*
NPes(8o(8*=* NPes(8o(8*=*
1*1*7*5 Phase trans$osition of b%sbar tr%nking with long r%n in
accordance with 'an%fact%rer.s reco''endation is
$rovided*
NPes(8o(8*=* NPes(8o(8*=*
Tested ( Checked b#
!8a'e of Contractor.s 0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
5itnessed b#
!8a'e!s" of NP,+E(P,+2"
+ignat%re D
! "
Post
Tel* 8o*
>ate
=nne? 2
2te's tested (
checked b#
C o n tractor
2te's witnessed
b#
P, + E (P, +2
1*1*7*4 /$eration of $l%gDin ta$Doff %nit is tested and fo%nd satisfactor#* NPes(8o(8*=* NPes(8o(8*=*
1*1*7*7 Cechanical interlock- &%ick fastening and &%ick releasing
'echanis' of ta$Doff %nit are tested and fo%nd
satisfactor#*
NPes(8o(8*=* NPes(8o(8*=*
1*1*7*E 2nfrared scanning at selective connection joints to check for hot
te'$erat%re s$ot is carried o%t*
NPes(8o(8*=* NPes(8o(8*=*
1*1*E E& % i$ ' e n t a n d = $$ lia n ces
1*1*E*1 E&%i$'ent and a$$liances are tested in accordance to relevant
sections of other ,+, T&C Proced%res and (or
'an%fact%rer.s reco''ended testing $roced%res*
NPes(8o(8*=* NPes(8o(8*=*
1*1*9 = n # /t h er T e s ts th at are C o ns idered 8ece ss ar# to Ceet th e
>e sign 2 nt e nt
1*1*9*1 >etails of other tests are enclosed in se$arate testing checklist
and(or for' a$$roved b# P,+E*
NPes(8o(8*=* NPes(8o(8*=*
Tested ( Checked b#
!8a'e of Contractor.s 0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
5itnessed b#
!8a'e!s" of NP,+E(P,+2"
+ignat%re D
! "
Post
Tel* 8o*
>ate
1*3 =ssess'ent if =n# Characteristics of E&%i$'ent Bikel# to have
Gar'f%l Effects
NPes(8o(8*=* NPes(8o(8*=*
=ssess'ent details stated as follows
Tested ( Checked b#
!8a'e of Contractor.s 0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
5itnessed b#
!8a'e!s" of NP,+E(P,+2"
+ignat%re D
! "
Post
Tel* 8o*
>ate
1*5 Co''ents NPes(8o(8*=* NPes(8o(8*=*
Tested ( Checked b#
!8a'e of Contractor.s 0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
5itnessed b#
!8a'e!s" of NP,+E(P,+2"
+ignat%re D
! "
Post
Tel* 8o*
>ate
=nne? 2
=rchitect%ral +ervices >e$art'ent
,+,M +tandard :or' 8oP,+(+0*042!2007"
=nne? 2
Page 27 of 30
2ss%e >ate 17 >ec 2007
0evision >ate D
EE_TCP !2007 Edition"
Part 4 2 T est Record attac & ed to t & e T est C ert i f i cate
4"! Test for Lo5 6otage 'L"6") Instaations
Test record
attached
3*1*1 Cond%ctor Contin%it# Ceas%re'ents NPes(8o(8*=*
3*1*2 2ns%lation 0esistance Ceas%re'ents NPes(8o(8*=*
3*1*1 Polarit# Test NPes(8o(8*=*
3*1*3 Earth Electrode 0esistance Ceas%re'ent NPes(8o(8*=*
3*1*5 Earth :a%lt Boo$ 2'$edance Ceas%re'ent NPes(8o(8*=*
3*1*4 :%nctions of =ll >evices 2ncl%ding Protective >evices NPes(8o(8*=*
3*1*7 =dditional Checks for 2nstallations in Ga<ardo%s Environ'ent NPes(8o(8*=*
4", Test for 7ig& 6otage '7"6") Instaations
3*2*1 Test for's for G*@* installations as reco''ended b# 'an%fact%rers of related
G*@* e&%i$'ent (s#ste's
NPes(8o(8*=*
4"3 Functiona Test for S8stem /E9ui-ment
3*1*1 Earth Electrode 0esistance Ceas%re'ent for Bightning Protection +#ste' NPes(8o(8*=*
3*1*2 Test of >igital C%ltif%nction Power Ceter (Power =nal#<er NPes(8o(8*=*
4"4 Testing E9ui-ment
3*3*1 Bist of testing e&%i$'ent NPes(8o(8*=*
Tested ( Checked b#
!8a'e of Contractor.s 0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
5itnessed b#
!8a'e!s" of NP,+E(P,+2"
+ignat%re D
! "
Post
Tel* 8o*
>ate
=nne? 2
3*1*1 C ond%ctor C ontin%it# Ceas%re'ents
Circ%it 8o* or
>etails of
E&%i$'ent
Contin%it# of Protective
Cond%ctors
Ceas%red 0esistance
!/h'" at o%tlet
Contin%it# of 0ing :inal Circ%it
Ceas%red 0esistance !/h'" for
0e'arks
Phase
Cond%ctor
8e%tral
Cond%ctor
Protective
Cond%ctor
8otes The test 'ethod for ring final circ%it is onl# a$$licable when the circ%it has been ins$ected thro%gho%t- $rior to
the test- to ascertain that no interconnection !'%ltiDloo$s" e?ists on the ring circ%it* /therwise- the testing
'ethods sti$%lated in Part 1 of the ;%idance 8ote 1 to ,+7471- sho%ld be ado$ted instead*
Tested ( Checked b#
!8a'e of Contractor.s 0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
5itnessed b#
!8a'e!s" of NP,+E(P,+2"
+ignat%re D
! "
Post
Tel* 8o*
>ate
=nne? 2
=rchitect%ral +ervices >e$art'ent
,+,M +tandard :or' 8oP,+(+0*042!2007"
=nne? 2
Page 29 of 30
2ss%e >ate 17 >ec 2007
0evision >ate D
EE_TCP !2007 Edition"
3*1*2 2 ns%lation 0 esistance Ceas%re'ents
Circ%it no'inal voltage
Test @oltage !d*c*"
Circ%it 8o* or >etails
of E&%i$'ent
2ns%lation 0esistance to
Earth
!Cega /h'"
2ns%lation 0esistance ,etween Phases (Poles
!Cega /h'"
0e'arks
B1DB2B18 B2DB1B18 B1DB1B28 8DB1B2B1
8otes +e&%ence of testing the ins%lation resistance shall be as follows D
!a" Cain switch(switchboard and o%tgoing circ%its with s%bD'ain switches being isolated)
!b" +%bD'ain switches(switchboards and o%tgoing circ%its with final circ%its boards being isolated) and
!c" :inal circ%it boards and final circ%its*
Tested ( Checked b#
!8a'e of Contractor.s 0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
5itnessed b#
!8a'e!s" of NP,+E(P,+2"
+ignat%re D
! "
Post
Tel* 8o*
>ate
=nne? 2
3*1*1 P olarit# Test
=rchitect%ral +ervices >e$art'ent
,+,M +tandard :or' 8oP,+(+0*042!2007"
=nne? 2
Page 10 of 30
2ss%e >ate 17 >ec 2007
0evision >ate D
EE_TCP !2007 Edition"
Circ%it 8o* or >etails of
E&%i$'ent
Polarit# Test 0es%lts 0e'arks
Tested ( Checked b#
!8a'e of Contractor.s 0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
5itnessed b#
!8a'e!s" of NP,+E(P,+2"
+ignat%re D
! "
Post
Tel* 8o*
>ate
=nne? 2
3*1*3 Ear t h E l ec t rode 0 e s i s t ance Ceas%re ' ent
=rchitect%ral +ervices >e$art'ent
,+,M +tandard :or' 8oP,+(+0*042!2007"
=nne? 2
Page 11 of 30
2ss%e >ate 17 >ec 2007
0evision >ate D
EE_TCP !2007 Edition"
Earth
Electrode
>esignation
T#$es- Caterials and +i<e(>i'ension of
Earth Electrode
0esistance to Earth
at Position of Each
Electrode
!/h'"
0esistance to Earth
at Position of Cain
Earth Ter'inal
!/h'"
0e'arks
0od ( Ta$e ( Plate ( /thers ! "
Co$$er ( +tainless +teel ( ;alvanised +teel
( /thers ! "
+i<e (di'ension (dia'eter
+e$aration of Earth Electrodes !for installation having '%lti$le rod electrodes" !'"
>escri$tion of ,onding Connections to the Point of +%$$l#
Tested ( Checked b#
!8a'e of Contractor.s 0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
5itnessed b#
!8a'e!s" of NP,+E(P,+2"
+ignat%re D
! "
Post
Tel* 8o*
>ate
=nne? 2
3*1*5 Earth :a %lt B oo$ 2 ' $edance Ceas%re'ents
=rchitect%ral +ervices >e$art'ent
,+,M +tandard :or' 8oP,+(+0*042!2007"
=nne? 2
Page 12 of 30
2ss%e >ate 17 >ec 2007
0evision >ate D
EE_TCP !2007 Edition"
Circ%it 8o* or >etails of
E&%i$'ent
Earth :a%lt Boo$ 2'$edance
!/h'"
0e'arks
Tested ( Checked b#
!8a'e of Contractor.s 0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
5itnessed b#
!8a'e!s" of NP,+E(P,+2"
+ignat%re D
! "
Post
Tel* 8o*
>ate
=nne? 2
=rchitect%ral +ervices >e$art'ent
,+,M +tandard :or' 8oP,+(+0*042!2007"
=nne? 2
Page 11 of 30
2ss%e >ate 17 >ec 2007
0evision >ate D
EE_TCP !2007 Edition"
3*1*4 : %nctions of =ll >evices 2 nc l %d i ng P r o t ec ti ve >ev i ces
:%nctional Test of 0esid%al C%rrent >evice !0C>"
Circ%it 8o* (>esignation of
Protective >evices
Test 0es%lts 0e'arks
,%iltDin test
b%tton
!tri$$ed (not
tri$$ed"
50H rated
tri$$ing c%rrent
!tri$$ed (not
tri$$ed"
/$ening ti'e
%nder 100H
rated tri$$ing
c%rrent
!'s"
Gand o$eration
:%nctional check for other $rotective devices- e*g* CC,- CCC,- =C,- f%sed switches- switchDf%ses and $rotective rela#s- etc*
Circ%it 8o* (>esignation of
/ther Protective >evices
0es%lts of hand o$eration 0e'arks
:%nctional check of all ite's of e&%i$'ent s%ch as isolators- switches and indicative devices
Circ%it 8o* (>esignation of
/ther Protective >evices
0es%lts of hand o$eration 0e'arks
Tested ( Checked b#
!8a'e of Contractor.s 0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
5itnessed b#
!8a'e!s" of NP,+E(P,+2"
+ignat%re D
! "
Post
Tel* 8o*
>ate
=nne? 2
=rchitect%ral +ervices >e$art'ent
,+,M +tandard :or' 8oP,+(+0*042!2007"
=nne? 2
Page 13 of 30
2ss%e >ate 17 >ec 2007
0evision >ate D
EE_TCP !2007 Edition"
3*1*7 =dditional C hecks f or 2 nstallations in Ga < a rdo%s Environ'ent
8otes >etails of additional checks for installations in ha<ardo%s environ'ent shall be recorded in this for' whereas
a$$ro$riate*
Tested ( Checked b#
!8a'e of Contractor.s 0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
5itnessed b#
!8a'e!s" of NP,+E(P,+2"
+ignat%re D
! "
Post
Tel* 8o*
>ate
=nne? 2
=rchitect%ral +ervices >e$art'ent
,+,M +tandard :or' 8oP,+(+0*042!2007"
=nne? 2
Page 15 of 30
2ss%e >ate 17 >ec 2007
0evision >ate D
EE_TCP !2007 Edition"
3*2 T e st f or Gi g h @olt a g e !G*@*" 2 nst a ll a tions
8otes >etails of test re&%ire'ents as reco''ended b# 'an%fact%rers of relative G*@* e&%i$'ent (s#ste's shall be
stated and a$$ended here* Test res%lts of res$ective re&%ire'ents shall also be recorded and a$$ended in this
for' whereas a$$ro$riate*
Tested ( Checked b#
!8a'e of Contractor.s 0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
5itnessed b#
!8a'e!s" of NP,+E(P,+2"
+ignat%re D
! "
Post
Tel* 8o*
>ate
=nne? 2
=rchitect%ral +ervices >e$art'ent
,+,M +tandard :or' 8oP,+(+0*042!2007"
=nne? 2
Page 14 of 30
2ss%e >ate 17 >ec 2007
0evision >ate D
EE_TCP !2007 Edition"
3*1*1 Ear t h E l ec t rode 0 e s i s t ance Ceas%re ' ent f or B i g h t n i ng P ro t ec ti on + # s t e '
Earth
Electrode
>esignation
T#$es- Caterials and +i<e(>i'ension of
Earth Electrode
0esistance to Earth at
Position of Each Electrode
!/h'"
0e'arks
0od ( Ta$e ( Plate ( /thers ! "
Co$$er ( +tainless +teel ( ;alvanised +teel
( /thers ! "
+i<e (di'ension (dia'eter
Co'bined resistance to earth !for '%lti$le earth ter'inations"
Tested ( Checked b#
!8a'e of Contractor.s 0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
5itnessed b#
!8a'e!s" of NP,+E(P,+2"
+ignat%re D
! "
Post
Tel* 8o*
>ate
=nne? 2
=rchitect%ral +ervices >e$art'ent
,+,M +tandard :or' 8oP,+(+0*042!2007"
=nne? 2
Page 17 of 30
2ss%e >ate 17 >ec 2007
0evision >ate D
EE_TCP !2007 Edition"
3*1*2 T e st of >i g it a l C%ltif%n c tion P ow e r C e te r ( Pow e r =n a l# < e r
=* E&%i$'ent >etails
Circ%it >esignation
,rand and Codel 8%'ber
C%rrent Transfor'er 0atio
@oltage Transfor'er 0atio
,* 0eading =cc%rac# Test
Para'eters Ceter reading Test kit reading H error
0*C*+* @ o ltage ! @"
B1D8
B2D8
B1D8
B1DB2
B2DB1
B1DB1
0 *C* +* C% rre n t ! = "
B1
B2
B1
8
1 $hase average
= ctive P o w er ! k 5 "
B1
B2
B1
1 $hase total
0 eacti v e P o w er ! k @ = r"
B1
B2
B1
1 $hase total
= $$ a r e nt P o w er ! k @ ="
B1
B2
B1
1 $hase total
= c tive E n e r g # ! k 5 h"
2nstantaneo%s
C%'%lated
Tested ( Checked b#
!8a'e of Contractor.s 0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
5itnessed b#
!8a'e!s" of NP,+E(P,+2"
+ignat%re D
! "
Post
Tel* 8o*
>ate
=nne? 2
3*1*2 T e st of >i g it a l C%ltif%n c tion P ow e r C e te r ( Pow e r =n a l# < e r ! Cont.d"
,* 0eading =cc%rac# Test !Cont.d"
=rchitect%ral +ervices >e$art'ent
,+,M +tandard :or' 8oP,+(+0*042!2007"
=nne? 2
Page 1E of 30
2ss%e >ate 17 >ec 2007
0evision >ate D
EE_TCP !2007 Edition"
Para'eters Ceter reading Test kit reading H error
: r e & % e n c#
P o w er : actor
B1
B2
B1
>e ' a n d C% rre n t ! = "
B1
B2
B1
>e ' and = ctive P o w er ! k 5 "
1 $hase total
>e ' a nd = $$ a r e nt P o w er ! k @ ="
1 $hase total
T G> ! H"
@oltage
C%rrent
@o lta g e T G> o f / rder ! H"
1
5
7
9
11
11
15
17
19
21
21
25
27
29
11
Tested ( Checked b#
!8a'e of Contractor.s 0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
5itnessed b#
!8a'e!s" of NP,+E(P,+2"
+ignat%re D
! "
Post
Tel* 8o*
>ate
=rchitect%ral +ervices >e$art'ent
,+,M +tandard :or' 8oP,+(+0*042!2007"
=nne? 2
Page 19 of 30
2ss%e >ate 17 >ec 2007
0evision >ate D
EE_TCP !2007 Edition"
=nne? 2
3*1*2 T e st of >i g it a l C%ltif%n c tion P ow e r C e te r ( Pow e r =n a l# < e r ! Cont.d"
,* 0eading =cc%rac# Test !Cont.d"
Para'eters Ceter reading Test kit reading H error
C% rre n t T G> o f / rder ! H"
1
5
7
9
11
11
15
17
19
21
21
25
27
29
11
Tested ( Checked b#
!8a'e of Contractor.s 0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
5itnessed b#
!8a'e!s" of NP,+E(P,+2"
+ignat%re D
! "
Post
Tel* 8o*
>ate
=nne? 2
=rchitect%ral +ervices >e$art'ent
,+,M +tandard :or' 8oP,+(+0*042!2007"
=nne? 2
Page 30 of 30
2ss%e >ate 17 >ec 2007
0evision >ate D
EE_TCP !2007 Edition"
3*3*1 B ist of Testing E&%i$'ent
T#$e Codel +erial 8o* of
2nstr%'ent
>ate of
Calibration
Tested ( Checked b#
!8a'e of Contractor.s 0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
5itnessed b#
!8a'e!s" of NP,+E(P,+2"
+ignat%re D
! "
Post
Tel* 8o*
>ate
=nne? 22
=rchitect%ral +ervices >e$art'ent
,+,M +tandard :or' 8oP,+(+0*022!2007"
=nne? 22
Page 1 of 3
2ss%e >ate 17 >ec 2007
0evision >ate D
EE_TCP !2007 Edition"
.uiding Ser%ices .ranc& Form No" P.S/SR"0,,
Testing and Commissioning Progress C&art for Eectrica Instaation
Contract 8o*
Contract Title
8a'e of Electrical Contractor(s%bDcontractor
Contract Period ( ( 20 to ( ( 20 N 0evised ( =ct%al Co'$letion >ate ( ( 20
1*
1*1
1*2
1*1
Testing and Commissioning Progress C&art for Eectrica Instaation ' Re%" )
'!)
>ates
!2"
0e'ark
=ctivities
+tat%tor# ins$ection and test
for B*@* installation
@is%al ins$ection
;(:
1(:
2(:
1(:
3(:
+%b'ission of 0ecord of Test
Cond%ctor contin%it# test
;(:
1(:
2(:
1(:
3(:
+%b'ission of 0ecord of Test
2ns%lation resistance test
;(:
1(:
2(:
1(:
3(:
+%b'ission of 0ecord of Test
0eference to
=$$roved T&C
Proced%re
=nne? 2
+ection 1*1*1
+ection 1*1*2
+ection 1*1*1
+ = + = + = + = + = + = + = + =
Tested ( Checked b#
!8a'e of Contractor.s 0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
5itnessed b#
!8a'e!s" of NP,+E(P,+2"
+ignat%re D
! "
Post
Tel* 8o*
>ate
=rchitect%ral +ervices >e$art'ent
,+,M +tandard :or' 8oP,+(+0*022!2007"
=nne? 22
Page 2 of 3
2ss%e >ate 17 >ec 2007
0evision >ate D
EE_TCP !2007 Edition"
=nne? 22
1*3
1*5
1*4
1*7
1*E
2*
Testing and Commissioning Progress C&art for Eectrica Instaation ' Re%" )
'!)
>ates
!2"
0e'ark
=ctivities
Polarit# test
;(:
1(:
2(:
1(:
3(:
+%b'ission of 0ecord of Test
Earth electrode resistance test
+%b'ission of 0ecord of Test
Earth fa%lt loo$ i'$edance test
;(:
1(:
2(:
1(:
3(:
+%b'ission of 0ecord of Test
:%nctional testing of all
devices incl%ding $rotective
devices
;(:
1(:
2(:
1(:
3(:
+%b'ission of 0ecord of Test
=dditional checks for
installations in ha<ardo%s
environ'ent
+%b'ission of 0ecord of Test
+tat%tor# ins$ection and test
for G*@* installation
0eference to
=$$roved T&C
Proced%re
=nne? 2
+ection 1*1*3
+ection 1*1*5
+ection 1*1*4
+ection 1*1*7
+ection 1*1*E
+ = + = + = + = + = + = + = + =
Tested ( Checked b#
!8a'e of Contractor.s 0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
5itnessed b#
!8a'e!s" of NP,+E(P,+2"
+ignat%re D
! "
Post
Tel* 8o*
>ate
=rchitect%ral +ervices >e$art'ent
,+,M +tandard :or' 8oP,+(+0*022!2007"
=nne? 22
Page 1 of 3
2ss%e >ate 17 >ec 2007
0evision >ate D
EE_TCP !2007 Edition"
=nne? 22
2*1
2*2
1*
1*1
Testing and Commissioning Progress C&art for Eectrica Instaation ' Re%" )
'!)
>ates
!2"
0e'ark
=ctivities
@is%al ins$ection
;(:
1(:
2(:
1(:
3(:
+%b'ission of 0ecord of Test
Testing of G*@* installation
;(:
1(:
2(:
1(:
3(:
+%b'ission of 0ecord of Test
:%nctional test of s#ste'
(e&%i$'ent
Bighting $rotection s#ste'
+%b'ission of 0ecord of Test
0eference to
=$$roved T&C
Proced%re
=nne? 2
+ection 1*2*1
+ection 1*2*2
+ection 1*1*1
+ = + = + = + = + = + = + = + =
1*2 Circ%itr# check
;(:
1(:
2(:
1(:
3(:
+%b'ission of 0ecord of Test
+ection 1*1*2
Tested ( Checked b#
!8a'e of Contractor.s 0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
5itnessed b#
!8a'e!s" of NP,+E(P,+2"
+ignat%re D
! "
Post
Tel* 8o*
>ate
=rchitect%ral +ervices >e$art'ent
,+,M +tandard :or' 8oP,+(+0*022!2007"
=nne? 22
Page 3 of 3
2ss%e >ate 17 >ec 2007
0evision >ate D
EE_TCP !2007 Edition"
=nne? 22
1*1
1*3
1*5
1*4
1*7
1*E
3*
Testing and Commissioning Progress C&art for Eectrica Instaation ' Re%" )
'!)
>ates
!2"
0e'ark
=ctivities
Charger and batter# set
+%b'ission of 0ecord of Test
Bighting installation
;(:
1(:
2(:
1(:
3(:
+%b'ission of 0ecord of Test
>igital '%ltif%nction $ower
'eter
+%b'ission of 0ecord of Test
>igital $ower anal#<er
+%b'ission of 0ecord of Test
,%sbar tr%nking s#ste'
;(:
1(:
2(:
1(:
3(:
+%b'ission of 0ecord of Test
E&%i$'ent and =$$liances
+%b'ission of 0ecord of Test
+%b'ission of T&C
Certificate
0eference to
=$$roved T&C
Proced%re
=nne? 2
+ection 1*1*1
+ection 1*1*3
+ection 1*1*5
+ection 1*1*4
+ection 1*1*7
+ection 1*1*E
+ = + = + = + = + = + = + = + =
8 o tes
N >elete as a$$ro$riate
!1" 2nsert revision no*
!2" 2nsert additional col%'ns as necessar#
+ D sched%le H co'$letion
= D act%al H co'$letion
Tested ( Checked b#
!8a'e of Contractor.s 0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
5itnessed b#
!8a'e!s" of NP,+E(P,+2"
+ignat%re D
! "
Post
Tel* 8o*
>ate
=nne? 222
=rchitect%ral +ervices >e$art'ent
,+,M +tandard :or' 8oP,+(+0*044!2007"
=nne? 222
Page 1 of 25
2ss%e >ate 17 >ec 2007
0evision >ate D
EE_TCP !2007 Edition"
.uiding Ser%ices .ranc& Form No" P.S/SR"011
T e sting and Co mm i ssioning C ert ifi c ate on L o5 6otage Cu#ice S 5 i tc&#oard Instaation
Part ! 2 Deta i of P ro$ect
1*1 Project title !with location"
1*2 N P*5*P* ( Project 8o*
1*1 N Contract(+%bDcontract(O%otation 8o*
1*3 N Contractor(+%bDcontractor
1*5 P,+E
1*4 P,+2
Part , 2 Dec arat i on
2*1 2 certif# that the Bow @oltage C%bicle +witchboard 2nstallation as s$ecified in the
NContract(+%b contract((O%otation at the above location has been ins$ected- tested and
co''issioned in accordance with this $roced%re and(or an# other $roced%res agreed
between the P,+E and the Contractor* The res%lts are satisfactor# in the as$ects as
'entioned in Part 1 and(or as recorded in Part 3 of this Certificate- e?ce$t as indicated in
the C/CCE8T+ ite's*
2*2 2 also certif# that site tests have been $erfor'ed in accordance with the re&%ire'ents set
o%t in =nne? 222 of this $roced%re and that the res%lts are satisfactor#* = record of the
tests has been $re$ared and s%b'itted to the $roject ,+E*
!8a'e of Contractor.s
0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
!>esignation of Contractor.s
0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
!8a'e and +ta'$ of Contractor"
+ignat%re D
! "
Post
Tel* 8o*
>ate
8ote This certificate '%st be signed b# a $erson a%thori<ed b# the :ir'(Co'$an#
N >elete if not a$$licable
=nne? 222
2te's tested (
checked b#
C o n tractor
2te's witnessed
b#
P, + E (P, +2
=rchitect%ral +ervices >e$art'ent
,+,M +tandard :or' 8oP,+(+0*044!2007"
=nne? 222
Page 2 of 25
2ss%e >ate 17 >ec 2007
0evision >ate D
EE_TCP !2007 Edition"
Part 3"
1*1
Ite m s I n s - ected a n d T ested
@is%al 2 ns $ ecti o n
1*1*1 C o n st r % cti o n o f T # $ e T ested = sse ' b l# ! TT = "
1*1*1*1 ;eneral constr%ction and standard of finishing of TT=
are satisfactor#*
NPes(8o(8*=* NPes(8o(8*=*
1*1*1*2 Bevelling and align'ent of TT= are satisfactor#* NPes(8o(8*=* NPes(8o(8*=*
1*1*1*1 The TT= has been $ro$erl# 'o%nted* NPes(8o(8*=* NPes(8o(8*=*
1*1*1*3 Babels have been $ro$erl# $rovided and installed* NPes(8o(8*=* NPes(8o(8*=*
1*1*1*5 =ccess for 'aintenance has been allowed* NPes(8o(8*=* NPes(8o(8*=*
1*1*1*4 The la#o%t of the TT= is in confor'it# with the
a$$roved drawings*
NPes(8o(8*=* NPes(8o(8*=*
1*1*1*7 The $h#sical di'ension of the TT= is in confor'it# with
the a$$roved drawings*
NPes(8o(8*=* NPes(8o(8*=*
1*1*1*E >anger notices and o$eration instr%ctions have been ade&%atel#
$rovided*
NPes(8o(8*=* NPes(8o(8*=*
1*1*1*9 Earthing bar and earthing connections have been $rovided* NPes(8o(8*=* NPes(8o(8*=*
1*1*1*10 Earth wire has been installed for hinged front $anels carr#ing B*@*
e&%i$'ent*
NPes(8o(8*=* NPes(8o(8*=*
1*1*1*11 The bolts- n%ts- washers and screws are of nonDferro%s 'aterial* NPes(8o(8*=* NPes(8o(8*=*
1*1*1*12 @er'in $roof has been satisfactoril# $rovided* NPes(8o(8*=* NPes(8o(8*=*
1*1*1*11 The co'$art'entation of the TT= confor's with the s$ecified
re&%ire'ents*
NPes(8o(8*=* NPes(8o(8*=*
Tested ( Checked b#
!8a'e of Contractor.s 0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
5itnessed b#
!8a'e!s" of NP,+E(P,+2"
+ignat%re D
! "
Post
Tel* 8o*
>ate
=rchitect%ral +ervices >e$art'ent
,+,M +tandard :or' 8oP,+(+0*044!2007"
=nne? 222
Page 1 of 25
2ss%e >ate 17 >ec 2007
0evision >ate D
EE_TCP !2007 Edition"
=nne? 222
2te's tested (
checked b#
C o n tractor
2te's witnessed
b#
P, + E (P, +2
1*1*2 Ca in , %s bars a n d > ro$$er s (0 is ers
1*1*2*1 The b%sbar arrange'ents- incl%ding s$acing and 'eans
of s%$$ort- confor' with the t#$eDtested drawings*
NPes(8o(8*=* NPes(8o(8*=*
1*1*2*2 +egregation between the b%sbar and the c%bicle is in accordance
with the s$ecified I:or'.*
NPes(8o(8*=* NPes(8o(8*=*
1*1*2*1 The di'ensions of the b%sbars are ade&%ate for the
design loading*
NPes(8o(8*=* NPes(8o(8*=*
1*1*2*3 The b%sbars have been electroDtinned* NPes(8o(8*=* NPes(8o(8*=*
1*1*2*5 ,%sbar links have been $rovided for installation of C*T*s* NPes(8o(8*=* NPes(8o(8*=*
1*1*2*4 Phase identifications have been $rovided for the b%sbars* NPes(8o(8*=* NPes(8o(8*=*
1*1*2*7 The bolts- n%ts- screws etc* for b%sbar s%$$orts-
b%sbar connections have been checked for correct
tightness*
NPes(8o(8*=* NPes(8o(8*=*
1*1*1 = ir C irc % it , rea k er ! = C , " (: %s e + w itc h es
1*1*1*1 The =C, ratings are in accordance with the a$$roved
working drawings*
NPes(8o(8*=* NPes(8o(8*=*
1*1*1*2 =rc ch%tes are $rovided* NPes(8o(8*=* NPes(8o(8*=*
1*1*1*1 +h%tters have been $rovided at the j%nction of b%sbar(=C,
connection*
NPes(8o(8*=* NPes(8o(8*=*
1*1*1*3 The n%'ber and rating of =C,(f%se switches are in
confor'it# with the a$$roved working drawings*
NPes(8o(8*=* NPes(8o(8*=*
1*1*1*5 The f%se ratings are in confor'it# with the a$$roved
working drawings*
NPes(8o(8*=* NPes(8o(8*=*
1*1*1*4 The f%ses have been $ro$erl# fi?ed* NPes(8o(8*=* NPes(8o(8*=*
1*1*1*7 The contact s%rfaces of the =C,(f%se switches have been
ke$t clean*
NPes(8o(8*=* NPes(8o(8*=*
Tested ( Checked b#
!8a'e of Contractor.s 0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
5itnessed b#
!8a'e!s" of NP,+E(P,+2"
+ignat%re D
! "
Post
Tel* 8o*
>ate
=nne? 222
2te's tested (
checked b#
C o n tractor
2te's witnessed
b#
P, + E (P, +2
=rchitect%ral +ervices >e$art'ent
,+,M +tandard :or' 8oP,+(+0*044!2007"
=nne? 222
Page 3 of 25
2ss%e >ate 17 >ec 2007
0evision >ate D
EE_TCP !2007 Edition"
1*1*3 2 nst r % ' entati o n and P ro tecti o n
1*1*3*1 The Power Co*.s 'eter control f%ses- 'eter board- cabling- etc*
have been $ro$erl# installed*
NPes(8o(8*=* NPes(8o(8*=*
1*1*3*2 The t#$e and range of the 'eas%ring instr%'ents incl%ding
digital '%ltif%nction 'eters and digital $ower anal#<ers are in
accordance with those a$$roved*
NPes(8o(8*=* NPes(8o(8*=*
1*1*3*1 T#$e and range of $rotection rela#s incl%ding digital
$rotection rela#s are in accordance with those a$$roved*
NPes(8o(8*=* NPes(8o(8*=*
1*1*3*3 The o$erating voltage of the sh%nt tri$ coil co'$lies with
the s$ecification*
NPes(8o(8*=* NPes(8o(8*=*
1*1*3*5 The batter# charger and associated control(instr%'ent
co'$l# with the s$ecification*
NPes(8o(8*=* NPes(8o(8*=*
1*1*3*4 The batter# voltage and charging c%rrent have been checked
and fo%nd satisfactor#*
NPes(8o(8*=* NPes(8o(8*=*
1*1*3*7 The ca$acit# of the batter# has been tested b# tri$$ing the =C,
and res%lts are satisfactor#*
NPes(8o(8*=* NPes(8o(8*=*
1*1*3*E The ca$acit# of the batter# for digital '%ltif%nction 'eters(
digital $ower anal#<ers( digital $rotection rela#s has been tested
and res%lts are satisfactor#*
NPes(8o(8*=* NPes(8o(8*=*
1*1*3*9 The reDcharging ti'e of the batter# co'$lies with
the s$ecification*
NPes(8o(8*=* NPes(8o(8*=*
1*1*3*10 The control cables have been $ro$erl# identified and connected* NPes(8o(8*=* NPes(8o(8*=*
1*1*3*11 0%bber gro''ets have been $rovided for holes thro%gh
which control cables $ass*
NPes(8o(8*=* NPes(8o(8*=*
Tested ( Checked b#
!8a'e of Contractor.s 0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
5itnessed b#
!8a'e!s" of NP,+E(P,+2"
+ignat%re D
! "
Post
Tel* 8o*
>ate
=nne? 222
2te's tested (
checked b#
C o n tractor
2te's witnessed
b#
P, + E (P, +2
1*1*5 2 n c o ' ingD o % tg o in g C a b les a n d , %s bars
1*1*5*1 Pro$er facilities have been $rovided for fi?ing of
inco'ing(o%tgoing cables*
NPes(8o(8*=* NPes(8o(8*=*
1*1*5*2 =de&%ate s$ace has been allowed for fi?ing of
inco'ing(o%tgoing cables*
NPes(8o(8*=* NPes(8o(8*=*
1*1*5*1 The cables for ter'ination have been soldered or $ro$erl#
fitted with sockets*
NPes(8o(8*=* NPes(8o(8*=*
1*1*5*3 Pro$er tightness of b%sbar(cable connection has been checked* NPes(8o(8*=* NPes(8o(8*=*
1*1*5*5 Phase identification has been $rovided b# a$$roved 'eans* NPes(8o(8*=* NPes(8o(8*=*
1*1*5*4 Pro$er identification has been $rovided for each cable* NPes(8o(8*=* NPes(8o(8*=*
1*1*5*7 Anwanted o$enings have been sealed %$* NPes(8o(8*=* NPes(8o(8*=*
1*1*4 C is ce lla n e o % s
1*1*4*1 Portable earthing e&%i$'ent as a$$roved has been $rovided* NPes(8o(8*=* NPes(8o(8*=*
1*1*4*2 /$erating handles and ke#s c(w 'o%nting board have
been $rovided*
NPes(8o(8*=* NPes(8o(8*=*
1*1*4*1 +$are f%ses as agreed c(w 'o%nting board have been $rovided* NPes(8o(8*=* NPes(8o(8*=*
1*1*4*3 G#dra%lic handling tr%ck has been $rovided* NPes(8o(8*=* NPes(8o(8*=*
1*1*4*5 0%bber ins%lating 'at has been $rovided* NPes(8o(8*=* NPes(8o(8*=*
1*1*4*4 +che'atic diagra' has been fra'ed and installed* NPes(8o(8*=* NPes(8o(8*=*
1*1*4*7 /$eration se&%ence instr%ctions have been $rovided for
interlock facilities*
NPes(8o(8*=* NPes(8o(8*=*
Tested ( Checked b#
!8a'e of Contractor.s 0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
5itnessed b#
!8a'e!s" of NP,+E(P,+2"
+ignat%re D
! "
Post
Tel* 8o*
>ate
=nne? 222
2te's tested (
checked b#
C o n tractor
2te's witnessed
b#
P, + E (P, +2
1*2 +ite T ests
1*2*1 , e fore c o nn ec ti o n o f in c o ' in g s% $$ l# th e fo ll o w in g te s ts
h a v e been carried o % t o n s ite a fter th e B * @* c % bicle
s w itc h board h as been $ro$erl# erected a n d v is% all# ins $ ected*
T h e re s% lts are satis fact or #*
1*2*1*1 2ns%lation test NPes(8o(8*=* NPes(8o(8*=*
1*2*1*2 >ielectric test NPes(8o(8*=* NPes(8o(8*=*
1*2*1*1 Polarit# check for c%rrent transfor'ers NPes(8o(8*=* NPes(8o(8*=*
1*2*1*3 +econdar# injection test NPes(8o(8*=* NPes(8o(8*=*
1*2*1*5 Pri'ar# injection test NPes(8o(8*=* NPes(8o(8*=*
1*2*1*4 Electrical 0esistance Test NPes(8o(8*=* NPes(8o(8*=*
1*2*1*7 Te'$erat%reDrise Bi'it Test !at factor# ( site"N NPes(8o(8*=* NPes(8o(8*=*
1*2*1*E :%nctional Test NPes(8o(8*=* NPes(8o(8*=*
1*2*2 = fter co nn ection o f in c o ' i n g s% $$l# th e follo w in g te s ts h a v e
been carried o % t a n d th e r e s% lts are s ati sf actor # *
1*2*2*1 @oltage test NPes(8o(8*=* NPes(8o(8*=*
1*2*2*2 Phase se&%ence test NPes(8o(8*=* NPes(8o(8*=*
1*2*2*1 :%nctional test for digital '%ltif%nction $ower 'eter
(digital $ower anal#<er
NPes(8o(8*=* NPes(8o(8*=*
1*2*1 T h e abo v e te s t re s% lts h a v e been recorded in t h e 6 T e s t 0 ecord s 7
as sh o w n in = nn e? 222 P a rt 3 o f th is $roced % re*
NPes(8o(8*=* NPes(8o(8*=*
Tested ( Checked b#
!8a'e of Contractor.s 0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
5itnessed b#
!8a'e!s" of NP,+E(P,+2"
+ignat%re D
! "
Post
Tel* 8o*
>ate
1*1 = n # ot h er te s ts th at are co ns idered n ece ss ar# to ' eet th e d e s ig n
intent*
Tested ( Checked b#
!8a'e of Contractor.s 0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
5itnessed b#
!8a'e!s" of NP,+E(P,+2"
+ignat%re D
! "
Post
Tel* 8o*
>ate
1*3 C o '' e n ts
Tested ( Checked b#
!8a'e of Contractor.s 0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
5itnessed b#
!8a'e!s" of NP,+E(P,+2"
+ignat%re D
! "
Post
Tel* 8o*
>ate
=nne? 222
Part 4 2 T est Record attac & ed to t & e T est C ert i f i cate
4"! Test #efore Connection of Incoming Su--8
Test record
attached
3*1*1 2ns%lation Test NPes(8o(8*=*
3*1*2 >ielectric Test NPes(8o(8*=*
3*1*1 Polarit# Check for C%rrent Transfor'er !C*T*" NPes(8o(8*=*
3*1*3 +econdar# 2njection Test NPes(8o(8*=*
3*1*5 Pri'ar# 2njection Test NPes(8o(8*=*
3*1*4 Contact 0esistance Test !>%ctor Test" NPes(8o(8*=*
3*1*7 Te'$erat%reDrise Bi'it Test NPes(8o(8*=*
4", Functiona Test of A De%ices
3*2*1 =ir Circ%it ,reaker NPes(8o(8*=*
3*2*2 :%seswitches (+witches (=%to'atic Changeover Contactor NPes(8o(8*=*
3*2*1 CCC, c(w /vercc%rent and (or Earth Beakage Tri$$ing
>evices
NPes(8o(8*=*
3*2*3 >igital Protection 0ela# NPes(8o(8*=*
4"3 Test After Connection of Incoming Su--8
3*1*1 @oltage Test NPes(8o(8*=*
3*1*2 Phase +e&%ence Test NPes(8o(8*=*
3*1*1 >igital C%ltif%nction Power Ceter (>igital Power =nal#<er
4"4 Testing E9ui-ment
3*3*1 Bist of testing e&%i$'ent NPes(8o(8*=*
Tested ( Checked b#
!8a'e of Contractor.s 0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
5itnessed b#
!8a'e!s" of NP,+E(P,+2"
+ignat%re D
! "
Post
Tel* 8o*
>ate
=nne? 222
3*1*1 2 ns%lation Test
To carr# o%t ins%lation test %sing a 1000@ d*c* 'eggar*
Poles
Ceas%red
2ns%lation resistance with
all switching devices o$en
!Cega/h'"
2ns%lation resistance with
all switching devices closed
!Cega/h'"
B1 E
B2 E
B1 E
B1 B2
B2 B1
B1 B1
E 8
B1 8
B2 8
B1 8
Tested ( Checked b#
!8a'e of Contractor.s 0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
5itnessed b#
!8a'e!s" of NP,+E(P,+2"
+ignat%re D
! "
Post
Tel* 8o*
>ate
=nne? 222
3*1*2 > i e l ec t r i c Test
3*1*2*1 The test shall be carried o%t with all switching devices closed
Test voltage 2500@ a*c*- 50 G<
>%ration 1 'in%te
Poles 'eas%red 2ns%lation resistance !Cega/h'"
Earth B1 Y B2 Y B1 Y 8
8 B1 Y B2 Y B1 Y E
B1 B2 Y B1 Y 8 Y E
B2 B1 Y B1 Y 8 Y E
B1 B1 Y B2 Y 8 Y E
3*1*2*2 =fter test at 3*1*2*1 another ins%lation test %sing 1000@ d*c* 'eggar shall be carried o%t with all switching
devices closed*
Poles 'eas%red 2ns%lation resistance !Cega/h'"
B1 E
B2 E
B1 E
B1 B2
B2 B1
B1 B1
E 8
B1 8
B2 8
B1 8
Tested ( Checked b#
!8a'e of Contractor.s 0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
5itnessed b#
!8a'e!s" of NP,+E(P,+2"
+ignat%re D
! "
Post
Tel* 8o*
>ate
=nne? 222
3*1*1 P olarit# Check for C %rrent Transfor'er ! C*T*"
+atisfactor# !Z "
Ansatisfactor# !F"
8/T co'$leted !8C"
8/T a$$licable !8="
0e'arks
Ceas%re'ent C*T*
B1
B2
B1
8
Protection C*T*
B1
B2
B1
8
Tested ( Checked b#
!8a'e of Contractor.s 0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
5itnessed b#
!8a'e!s" of NP,+E(P,+2"
+ignat%re D
! "
Post
Tel* 8o*
>ate
=nne? 222
3*1*3 + econdar# 2 njection Test
3*1*3*1 /verc%rrent 0ela#
0ela# settings C%rrent
inject !="
/$erating ti'e !sec"
C%rrent setting
H
Ti'e setting 8or'al =ct%al
B1
B1
B1
50
50
100
1
1
0*5
5
10
10
B2
B2
B2
50
50
100
1
1
0*5
5
10
10
B1
B1
B1
50
50
100
1
1
0*5
5
10
10
3*1*3*2 Earth :a%lt 0ela#
0ela# settings C%rrent
inject !="
/$erating ti'e !sec"
C%rrent setting
H
Ti'e setting 8or'al =ct%al
8
8
8
10
10
20
1
1
0*5
2*5
5
2
Tested ( Checked b#
!8a'e of Contractor.s 0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
5itnessed b#
!8a'e!s" of NP,+E(P,+2"
+ignat%re D
! "
Post
Tel* 8o*
>ate
=nne? 222
3*1*5 P ri'ar# 2 njection Test
3*1*5*1 :or overc%rrent rela#s and earth fa%lt rela#s set at s$ecified settings
Pri'ar# c%rrent !=" +econdar# c%rrent !=" +$ill c%rrent !="
B1 B2 B1 8
B1DB2
B2DB1
B1DB1
B1D8
B2D8
B1D8
Tested ( Checked b#
!8a'e of Contractor.s 0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
5itnessed b#
!8a'e!s" of NP,+E(P,+2"
+ignat%re D
! "
Post
Tel* 8o*
>ate
=nne? 222
3*1*4 C ontact 0esistance Test !>%ctor Test"
Position of Test
!2t shall incl%de all joints and connections* The followings are
for reference onl#*"
Ceas%red 0esistance
!'icro /h'"
[oints on 'ain b%sbars
Connections between hori<ontal and vertical b%sbars
Connections of =C,(f%se switches
=n# other joints (connections
Tested ( Checked b#
!8a'e of Contractor.s 0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
5itnessed b#
!8a'e!s" of NP,+E(P,+2"
+ignat%re D
! "
Post
Tel* 8o*
>ate
=nne? 222
3*1*7 Te ' $erat%reDrise B i'i t Test
='bient =ir Te'$erat%re at Bocation 1 !
o
C"
='bient =ir Te'$erat%re at Bocation 2 !
o
C"
='bient =ir Te'$erat%re at Bocation 1 !
o
C"
8o* Position
!Positions of test sho%ld incl%de all joints and connections* The
followings are for reference onl#*"
Te'$erat%re 0ise
=t stead# state !
o
C"
Test Bi'it
1* +%$$l# connection B1 $hase
2* +%$$l# connection B2 $hase
1* +%$$l# connection B1 $hase
3* Gori<ontal b%sbars B1 $hase
5* Gori<ontal b%sbars B2 $hase
4* Gori<ontal b%sbars B1 $hase
7* @ertical b%sbars B1 $hase
E* @ertical b%sbars B2 $hase
9* @ertical b%sbars B1 $hase
10* +witchgear inco'ing ter'inal B1 $hase
11* +witchgear inco'ing ter'inal B2 $hase
12* +witchgear inco'ing ter'inal B1 $hase
11* Connection b%sbar to switchgear B1 $hase
13* Connection b%sbar to switchgear B2 $hase
15* Connection b%sbar to switchgear B1 $hase
Tested ( Checked b#
!8a'e of Contractor.s 0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
5itnessed b#
!8a'e!s" of NP,+E(P,+2"
+ignat%re D
! "
Post
Tel* 8o*
>ate
=nne? 222
3*2*1 : %nctional Test f or =ir C irc%it , r eaker
=ir Circ%it ,reaker >esignation
2te' Check !where a$$licable"
+atisfactor# !Z "
Ansatisfactor# !F"
8/T co'$leted !8C"
8/T a$$licable !8="
0e'arks
1* 0acking in and o%t of =C,
2* /$erating of a%to'atic sh%tter and $adlock
1* Cechanical closing 'echanis'
3* Electrical closing 'echanis'
5* Cechanical tri$$ing o$eration
4* /verc%rrent tri$ o$eration
7* Earth leakage tri$ o$eration
E* Andervoltage release o$eration
9* /$eration of castell ke# interlock
10* =C, $anel door interlock
11* Cechanical /8(/:: indicator
12* /$eration of a%?iliar# switches
11* =lign'ent of contacts 'echanis'
Tested ( Checked b#
!8a'e of Contractor.s 0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
5itnessed b#
!8a'e!s" of NP,+E(P,+2"
+ignat%re D
! "
Post
Tel* 8o*
>ate
=nne? 222
3*2*2 : %nctional Test f or : %seDswitches (+witches ( =%to'atic Chan g e over C ontactor
2te' Check !where a$$licable"
+atisfactor# !Z "
Ansatisfactor# !F"
8/T co'$leted !8C"
8/T a$$licable !8="
0e'arks
1* /$erating of $adlock and interlock
2* Cechanical closing 'echanis'
1* Electrical closing 'echanis'
Tested ( Checked b#
!8a'e of Contractor.s 0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
5itnessed b#
!8a'e!s" of NP,+E(P,+2"
+ignat%re D
! "
Post
Tel* 8o*
>ate
=nne? 222
3*2*1 : %nctional Test f or CCC, c(w /verc % rrent and ( or Earth B eaka g e Tri$$ing >evices
2te' Check !where a$$licable"
+atisfactor# !Z "
Ansatisfactor# !F"
8/T co'$leted !8C"
8/T a$$licable !8="
0e'arks
1* /verc%rrent tri$ o$eration
2* Earth leakage tri$ o$eration
Tested ( Checked b#
!8a'e of Contractor.s 0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
5itnessed b#
!8a'e!s" of NP,+E(P,+2"
+ignat%re D
! "
Post
Tel* 8o*
>ate
=nne? 222
3*2*3 : %nctional Test f or >i g ital P rotection 0 ela#
2te' Check the following f%nctions !where a$$licable"
+atisfactor# !Z "
Ansatisfactor# !F"
8/T co'$leted !8C"
8/T a$$licable !8="
0e'arks
1* +election of rela# characteristic c%rves
2* :a%lt recording f%nction
1* +elfDs%$ervision feat%res which 'onitor the control
circ%it of digital rela#
3* 0e'ote o$eration f%nction
5* Co''%nication facilities
Tested ( Checked b#
!8a'e of Contractor.s 0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
5itnessed b#
!8a'e!s" of NP,+E(P,+2"
+ignat%re D
! "
Post
Tel* 8o*
>ate
=nne? 222
3*1 Tests after C onnection of 2 nco'ing + %$$l#
3*1*1 @ o lta g e T e s t
@oltage !@"
B1DE
B2DE
B1DE
B1DB2
B2DB1
B1DB1
ED8
B1D8
B2D8
B1D8
3*1*2 P h a s e +e & % e n ce T e s t
N +atisfactor# ( Ansatisfactor# ( 8/T co'$leted ( 8/T a$$licable
Tested ( Checked b#
!8a'e of Contractor.s 0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
5itnessed b#
!8a'e!s" of NP,+E(P,+2"
+ignat%re D
! "
Post
Tel* 8o*
>ate
=nne? 222
3*1*1 : %n c tion a l T e st f or >i g it a l C%ltif%n c tion P ow e r C e te r ( >i g it a l P ow e r =n a l # < e r
=* E&%i$'ent >etails
Circ%it >esignation
,rand and Codel 8%'ber
C%rrent Transfor'er 0atio
@oltage Transfor'er 0atio
,* 0eading =cc%rac# Test
Para'eters Ceter reading Test kit reading H error
0*C*+* @ o ltage ! @"
B1D8
B2D8
B1D8
B1DB2
B2DB1
B1DB1
0 *C* +* C% rre n t ! = "
B1
B2
B1
8
1 $hase average
= ctive P o w er ! k 5 "
B1
B2
B1
1 $hase total
0 eacti v e P o w er ! k @ = r"
B1
B2
B1
1 $hase total
= $$ a r e nt P o w er ! k @ ="
B1
B2
B1
1 $hase total
= c tive E n e r g # ! k 5 h"
2nstantaneo%s
C%'%lated
Tested ( Checked b#
!8a'e of Contractor.s 0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
5itnessed b#
!8a'e!s" of NP,+E(P,+2"
+ignat%re D
! "
Post
Tel* 8o*
>ate
=nne? 222
3*1*1 T e st of >i g it a l C%ltif%n c tion P ow e r C e te r ( Pow e r =n a l# < e r ! Cont.d"
,* 0eading =cc%rac# Test !Cont.d"
Para'eters Ceter reading Test kit reading H error
: r e & % e n c#
P o w er : actor
B1
B2
B1
>e ' a n d C% rre n t ! = "
B1
B2
B1
>e ' and = ctive P o w er ! k 5 "
1 $hase total
>e ' a nd = $$ a r e nt P o w er ! k @ ="
1 $hase total
T G> ! H"
@oltage
C%rrent
@o lta g e T G> o f / rder ! H"
1
5
7
9
11
11
15
17
19
21
21
25
27
29
11
Tested ( Checked b#
!8a'e of Contractor.s 0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
5itnessed b#
!8a'e!s" of NP,+E(P,+2"
+ignat%re D
! "
Post
Tel* 8o*
>ate
=nne? 222
3*1*1 T e st of >i g it a l C%ltif%n c tion P ow e r C e te r ( Pow e r =n a l# < e r ! Cont.d"
,* 0eading =cc%rac# Test !Cont.d"
Para'eters Ceter reading Test kit reading H error
C% rre n t T G> o f / rder ! H"
1
5
7
9
11
11
15
17
19
21
21
25
27
29
11
Tested ( Checked b#
!8a'e of Contractor.s 0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
5itnessed b#
!8a'e!s" of NP,+E(P,+2"
+ignat%re D
! "
Post
Tel* 8o*
>ate
=nne? 222
3*3*1 B ist of Testing E&%i$'ent
T#$e Codel +erial 8o* of
2nstr%'ent
>ate of Calibration
Tested ( Checked b#
!8a'e of Contractor.s 0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
5itnessed b#
!8a'e!s" of NP,+E(P,+2"
+ignat%re D
! "
Post
Tel* 8o*
>ate
=nne? 2@
=rchitect%ral +ervices >e$art'ent
,+,M +tandard :or' 8oP,+(+0*024!2007"
=nne? 2@
Page 1 of 2
2ss%e >ate 17 >ec 2007
0evision >ate D
EE_TCP !2007 Edition"
.uiding Ser%ices .ranc& Form No" P.S/SR"0,1
Testing and Commissioning Progress C&art for Lo5 6otage Cu#ice S5itc&#oard Instaation
Contract 8o*
Contract Title
8a'e of Electrical Contractor(s%bDcontractor
Contract Period ( ( 20 to ( ( 20 N 0evised ( =ct%al Co'$letion >ate ( ( 20
1*
2*
2*1
2*2
2*1
2*3
2*5
2*4
Testing and Commissioning Progress C&art for Lo5 6otage Cu#ice S5itc&#oard Instaation ' Re%" )
'!)
>ates
!2"
0e'ark
=ctivities
@is%al ins$ection
+%b'ission of 0ecord of Test
+ite tests before connection of
inco'ing s%$$l#
2ns%lation test
+%b'ission of 0ecord of Test
>ielectric test
+%b'ission of 0ecord of Test
C%rrent transfor'er $olarit#
test
+%b'ission of 0ecord of Test
+econdar# injection test
+%b'ission of 0ecord of Test
Pri'ar# injection test
+%b'ission of 0ecord of Test
Contact resistance test !>%ctor
Test"
+%b'ission of 0ecord of Test
0eference to
=$$roved T&C
Proced%re
=nne? 222
+ection 1*1
+ection 1*2*1*1
& 1*2*1
+ection 1*2*1*2
& 1*2*1
+ection 1*2*1*1
& 1*2*1
+ection 1*2*1*3
& 1*2*1
+ection 1*2*1*5
& 1*2*1
1*2*1*4 & 1*2*1
+ = + = + = + = + = + = + = + =
Tested ( Checked b#
!8a'e of Contractor.s 0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
5itnessed b#
!8a'e!s" of NP,+E(P,+2"
+ignat%re D
! "
Post
Tel* 8o*
>ate
=rchitect%ral +ervices >e$art'ent
,+,M +tandard :or' 8oP,+(+0*024!2007"
=nne? 2@
Page 2 of 2
2ss%e >ate 17 >ec 2007
0evision >ate D
EE_TCP !2007 Edition"
=nne? 2@
2*7
2*E
1*
1*1
1*2
1*1
3*
Testing and Commissioning Progress C&art for Lo5 6otage Cu#ice S5itc&#oard Instaation ' Re%" )
'!)
>ates
!2"
0e'ark
=ctivities
Te'$erat%reDrise li'it test
+%b'ission of 0ecord of Test
:%nctional Test
+%b'ission of 0ecord of Test
+ite tests after connection of
inco'ing s%$$l#
@oltage test
+%b'ission of 0ecord of Test
Phase se&%ence test
+%b'ission of 0ecord of Test
:%nctional test for digital
$ower 'eter($ower anal#<er
+%b'ission of 0ecord of Test
+%b'ission of T&C
Certificate
0eference to
=$$roved T&C
Proced%re
=nne? 222
1*2*1*7 & 1*2*1
1*2*1*E & 1*2*1
1*2*2*1 & 1*2*1
1*2*2*1 & 1*2*1
3*2*1
+ = + = + = + = + = + = + = + =
8 o tes
N >elete as a$$ro$riate
!1" 2nsert revision no*
!2" 2nsert additional col%'ns as necessar#
+ D sched%le H co'$letion
= D act%al H co'$letion
Tested ( Checked b#
!8a'e of Contractor.s 0e$resentative"
+ignat%re D
! "
Post
Tel* 8o*
>ate
5itnessed b#
!8a'e!s" of NP,+E(P,+2"
+ignat%re D
! "
Post
Tel* 8o*
>ate

Vous aimerez peut-être aussi