SSR 2009

NORMS OF OUTPUT SSR-2009


S/No Item of works Output
A Laour !orms
a" FORMATION
# $arr%a&e of 'o!stru't%o!a( mater%a(s )Ma!ua((*" + ,-./ 'um per (aour per 0a*
2 Jungle clearance such as clearance of shrubs
brushwoods, under growth and small trees not
exceeding 30 cms in girth measured at one mtr above
ground level including grubbing up roots in areas
having annual rainfall upto 200 cms
+ 23 sqm per labour per day
3 - Do - in areas having rainfall more than 200 cms + 2 sqm per labour per day
! "utting down trees exceeding 30 cms and not
exceeding #$ cms measured at %0 mtr above ground
level, grubbing up roots, filling up holes&hollows,
rammed properly and leveled incl lopping branches,
trimming, stac'ing the useful materials and removal of
rubbish upto a distance of 20 mtr
+ %0 labour, ( sawyer each per
tree per day
$ - Do - each additional 2$ cm girth exceeding #$ cms + &# sawyer and $&! labour per
tree per day
) *ough excavation in soil&soil mixed with small
boulders, getting out incl disposing all excavated
materials lead upto 3 m and upto %$ m depth
+ 2%2# cum per labour per day
# *ough excavation in soft roc' which can be
quarried&split with crowbars and disposing all
excavated materials lead upto 3 m and upto %$ m
depth
+ %0) cum per labour per day
+ *ough excavation in hard roc' by drilling with
compressor, blasting and getting out including stac'ing
of serviceable materials and disposal of unserviceable
materials lead upto 3 m and upto %$ m depth
+ %+# cum per labour per day
, -arth wor' in excavation in soil&soil mixed with
boulders including dressing up road formation,
cambering and getting out incl disposing all excavated
materials lead upto 3 m and %$ m depth
+ 2%00 cum per labour per day
0 -xcavation in soft roc' which can be quarried &split
with crowbars or wedges dressing up road formation
including cambering and getting out incl disposing all
excavated materials lead upto 3 m and %$ m depth
+ %0 cum per labour per day
-xcavation in hard roc' by drilling with compressor,
blasting including dressing up road formation,
cambering, providing cross slop and by filling up
hollows with stone metal where required and getting
out including stac'ing of serviceable materials and
disposing all excavated materials lead upto 3 m and
%$ m depth
+ %$ cum per labour per day
2 -arth wor' in emban'ment including raising or
lowering spreading in layers not exceeding 30 cm incl
watering, rolling and finishing to required shape and
level not exceeding %$ mtr high above the base in
ordinary soil%

+ 3%#2 cum per labour per day
S/No Item of works Output
1 - 7
SSR 2009
3 .urfing of slopes of emban'ments including
preparation of ground, sieving, spreading manure&
planting grass roots&seeding to obtain even surface
and initial watering by spray
+ 3#%00 sqm per labour per day
#, Temporar* 'u(1erts 'ompos%!& of a((* support
a!0 0e'k%!& w%t2 a((%es %!'(u0%!& 0%sma!t(%!&
t2e same a!0 '(ear%!& t2e s%te3 upto 2 mtr spa!
+ 4 'arp w%t2 / (aour per !os of
'u(1ert
#. 5re't%o! a!0 (au!'2%!&/0e(au!'2%!& of temporar*
a%(e* r%0&e
+ 6 (aour per MT
" MAT5RIAL
"ollection of rubble stone $ x 20 cms average
section suitable for walling&aprons bunds, road side
edging etc, including brea'ing to si/e and stac'ing at
loading point
+ %#$ cum per labour per day
2 "ollection of stone boulders&quarried stone the
smaller dimension shall be equal to $ cms to 22%$
cms and no stone shall be more than 2$ cms, the
longer dimension, stac'ing at loading point
+ 2%2! cum per labour per day
3 "ollection of bond&through stone 20 x 2$ cm average
section including brea'ing to si/e and stac'ing at
loading point
0 0%,2 cum per labour per day
! "ollection of shingle + %3 cum per labour per day
$ "ollection of sand from river bed including screening
etc% with an average lead of 00 mtrs and 2$ mtrs lift
including stac'ing
+ 0%$# cum per labour per day
) 1rea'ing stone to stone metal standard si/e )3 mm
for 213 or hard core including stac'ing%
+ 0%!2 cum per labour per day
# 1rea'ing stone to stone metal standard si/e !$ mm
for 4"" including stac'ing%
+ 0%3)! cum per labour per day
+ 1rea'ing stone to stone chips standard si/e 22%! mm
for 4"" including stac'ing%
0 0%,) cum per labour per day
9 7reak%!& of 82ama/o1erur!t r%'ks to
meta(/'oarse a&&re&ate a!0 sta'k%!& a(o!&
roa0s%0e-
+ 0-92 'um per (aour per 0a*
#0 :ress%!& sto!e #. ; 20 'ms a1era&e se't%o! *
2ammer for fa'e work %! 'ourse0 ru(e sto!e
maso!r* or ot2erw%se %!'(u0%!& sta'k%!&
+ 0-2/ 'um per maso! per 0a*
'" P5RMAN5NT
-xcavation in trenches not exceeding %2 m width and
%$ m depth in soil&soil mixed with boulders dressing
bottom and sides, getting out incl disposing all
excavated materials lead upto 3 m
+ %#+ cum per labour per day
2 - Do - soft roc' + 0%+3 cum per labour per day
3 - Do - hard roc' 5by blasting6 + %!0 cum per labour per day
! 7dd for extra lead for 3 m and part thereof on item on
srl 8o% , 2 and 3 above
+ $%)) cum per labour per day
$ 9ard core comprising of bro'en road metal si/e $0
mm graded downward spread in layers not exceeding
$ cm including watering, ramming and finishing to
required level and gradient%
0 %$0 cum per labour per day
) Dewatering below water table /one in area having
rain fall upto 200 cm
+ %0, labour per cum per day
S/No Item of works Output
2 - 7
SSR 2009
# Dewatering below water table /one in area having
rain fall above 200 cm
+ %30+ labour per cum per day
9 La*%!& 'eme!t 'o!'rete #+4+/ or #+,+9 or #+.+#0 )#
'eme!t3 4 sa!0 a!0 / 'oarse a&&re&ate /# 'eme!t
, sa!0 a!0 9 'oarse a&&re&ate/# 'eme!t . sa!0
a!0 #0 'oarse a&&re&ate" m%;e0 %! 'o!'rete m%;er
)o!e a& 'eme!t 'apa'%t*" e;'(u0%!& 'e!ter%!&
a!0 s2utter%!& %! fou!0at%o! of wa((s et'-
+ 20 'um per 2. (as a!0 0-0.
maso! per 0a*
9 Re%!for'e0/p(a%! 'eme!t 'o!'rete #+2+, )#
'eme!t 2 sa!0 a!0 , 'oarse a&&re&ate" %! s(as3
m%;e0 %! 'o!'rete m%;er )o!e a& 'eme!t
'apa'%t*" e;'(u0%!& 'e!ter%!& a!0 s2utter%!&
+ 6 'um per 2. (as a!0 0-29.6
maso! per 0a*
#0 R$$ M-203 R$$ M-2.3 R$$ M-40 < M-4. e;'(u0%!&
'e!ter%!& a!0 s2utter%!&
+ 6 'um per 2. (as a!0 0-#,29
maso! per 0a*
"entering and shuttering including strutting and
propping
+ $%3 sqm per carpenter with %
labour per day
2 "utting, bending, placing and binding reinforcement
of 3: round bars upto 2 mm dia
+ , 'g per 1&smith with labour
per day
3 -Do- beyond 2 mm dia + 3# 'g per 1&smith with labour
per day
#, Pre 'ast s(a R$$ #+2+, + 6 'um per 2. (as a!0 2
maso!3 #-0.,9 7/Sm%t2 <
2-4/69 $arp per 0a*
#. Maso!r* work %! 'o!'rete 2o((ow (o'k + 4-#,, (aour per 'um w%t2
0-2.9, 7/sm%t2 < 0-.922 maso!
) ;inishing surface of concrete road pavement by
belting
0 00 sqm per labour per day
# ;inishing surface of concrete road pavement by
brooming
+ $0 sqm per labour per day
+ 1ric' walling in cement mortar + %2$ cum per mason with %+0
labour per day
#9 =a((%!& of ru(e sto!e3 (a%0 0r* we(( o!0e0 fa'e
w%t2 se(e'te0 o!0 sto!e e1e!(* spa'e0 > 2 Nos
per S?m of wa(( fa'e
+ 0-92 'um per maso! w%t2 #-9
(aour per 0a*
20 :ausage walling 5*ubble masonry6 + %0 cum per %0, mason
< 2%0, labour and 0%3 1&smith
per day
2# :r* wa((%!& %! @eo-S*!t2et%' !ett%!& + 0-92 'um per maso! w%t2 2
(aour per 0a*
22 :lope reinforcement with =eo-synthetic netting + 2%00 labour with 0%$0 mason per
0 sqm per day
24 Ra!0om or po(*&o!a( ru(e wa((%!& rou&2t to
'ourse at ,. to /0 'm %! 'eme!t mortar
+ 0-92 'um per maso! w%t2 2
(aour per 0a*
2! ;illing of stone&selected materials in proper manner
behind the retaining&breast wall
+ %+, cum per labour per day
2$ :tone pitching with required thic'ness + !%2$ cum per mason with 3
labour per day
S/No Item of works Output
3 - 7
SSR 2009
2) :ausage walling 5Dry boulder filling6 + 2%0# labour with
0%0, mason < 0%0, 1&smith per
cum per day
2# %2 cm plaster in "3 0) 5 cement0 ) sand6 + 0%$2 sqm per mason with >
labour per day
2+ 2%$ cm plaster in "3 0) 5 cement0 ) sand6 + )%) sqm per mason with 2&3
labour per day
2, ;lush or rule pointing on stone wor's with cement
mortar 03 5 cement0 3 sand6
+ %$2 sqm per mason with >
labour per day
30 2hite washing + 0%20 labour per 0 sqm per day
3 4ainting 52 coats6 + 20 sqm per painter with one
labour per day
32 ;alse ceiling with ply wood ! mm thic' + +%,0!3 labour with %+$,
carpenter per 0 sqm per day
SURFA$IN@
3oorum spreading + !%0# labour per 0 sqm per day
2 @ra!u(ar Su 7ase #0 'm t2%'k w%t2 sa!03
moorum < @ra1e(
+ 0-2,4 (aour per #0 s?m per
0a*
4 @ra!u(ar Su 7ase #. 'm t2%'k w%t2 sa!03
moorum < @ra1e(
+ 0-266 (aour per #0 s?m per
0a*
, @ra!u(ar Su 7ase #0/#. 'm t2%'k w%t2 r%'k
a&&re&ate
+ #0-.0 s?m per (aour per 0a*
. @ra!u(ar Su 7ase #0 'm t2%'k w%t2 sto!e
a&&re&ate
+ #0-.0 s?m per (aour per 0a*
) =ranular :ub 1ase $ cm thic' with stone aggregate + ,%00 sqm per labour per day
# :hingling $0 mm thic' 0 0%+) labour per 0 sqm per day
+ :hingling #$ mm thic' 0 0%23 labour per 0 sqm per day
9 S2%!&(%!& #00 mm t2%'k + 0-2,/ (aour per #0 s?m per
0a*
#0 S2%!&(%!& #.0 mm t2%'k + 0-269 (aour per #0 s?m per
0a*
?ime soil stabilisation + %!2 labour per 0 sqm
2 :and blan'eting 2$&00 mm thic' + 0%$ labour per 0 sqm
#4 S'ar%f*%!& e;%st%!& 7T surfa'e + #-4#/. (aour per #0 s?m
! 2ater 1ound 3acadam 0 cm consolidated
thic'ness incl all wor' as specified
+ 0%3 sqm per labour per day
$ - Do - #%$ cm thic' + $%! sqm per labour per day
) 2et 3ix 3acadam #$ mm thic' 0 !)%$ sqm per labour per day
# 2et 3ix 3acadam 00 mm thic' 0 3$%0 sqm per labour per day
+ 4reparing 213 surface laying 2%$ cm premix carpet
with stone chippings applying sand seal coat and
rolling
+ # sqm per labour per day
, -Do- 2 cm premix carpet + #%# sqm per labour per day
20 ?iquid seal coat + $ sqm per labour per day
S/No Item of works Output
4 - 7
SSR 2009
2 4reparing 213 surface and laying precoated
bituminous mixture of 2 parts bro'en stone
metal and part sand including consolidation
complete as in premix dense carpet ! cm
consolidated thic'ness
+ )%# sqm per labour per day
22 -Do- $ cm 52@6 + $%3! sqm per labour per day
24 Surfa'e 0ress%!& )Two 'oat" w%t2 %tume! 90/#00 + #0 s?m per (aour per 0a*
2, Surfa'e 0ress%!& )Two 'oat" w%t2 $75 + 0-.099 s?m per (aour per 0a*
2$ :urface dressing renewal coat + 0%!$) lab per 0 sqm
2) 4remixed sand seal coat consisting of )%+ Ag bitumen
and 0%0) cum of sand per 0 sqm of road
+ 0%0 labour per 0 sqm per day
2# 2 cm thic' premix carpet with liquid seal coat using
cationic bitumen emulsion
+ %0 labour per 0 sqm
2+ 2 cm thic' premix carpet with premixed seal coat,
using cationic bitumen emulsion
+ %0 labour per 0 sqm per day
2, 1uilt up spray grouting #$ mm thic' + %)3 labour per 0 sqm per day

30 3ix seal surfacing type B7C + %0+!+ labour per 0 sqm per
day
4# M%; sea( surfa'%!& t*pe A7B + #-0,29 (aour per #0 s?m per
0a*
42 La*%!& . 'm )(a%0 t2%'k!ess" s2%!&(e or ot2er
s%m%(ar appro1e0 mater%a( sprea0 a!0
(e1e(e0 to &ra0%e!t
+ .4-6/ s?m per (aour per 0a*
44 La*%!& 6-. 'm )(a%0 t2%'k!ess" s2%!&(e or ot2er
s%m%(ar appro1e0 mater%a( sprea0 a!0
(e1e(e0 to &ra0%e!t
+ ,/-9. s?m per (aour per 0a*
4, La*%!& #0 'm )(a%0 t2%'k!ess" s2%!&(e or ot2er
s%m%(ar appro1e0 mater%a( sprea0 a!0
(e1e(e0 to &ra0%e!t
+ ,0-/. s?m per (aour per 0a*
4. La*%!& #. 'm )(a%0 t2%'k!ess" s2%!&(e or ot2er
s%m%(ar appro1e0 mater%a( sprea0 a!0
(e1e(e0 to &ra0%e!t
+ 4.-9, s?m per (aour per 0a*
3) ?ime stabilisation + %!2 labour per 0 sqm per day
3# ;or reduction in labour for blac' topping over an
already existing blac' topped surface
+ 0%3#3 labour per 0 sqm per day
3+ 1ituminous macadam #%$ cm thic' 0 3%$0 labour per 0 sqm per day
3, 1ituminous macadam $ cm thic' 0 2%, labour per 0 sqm per day
!0 7sphaltic concrete 0 %23 labour per 0 sqm per day
! 7dd to or deduct from any item of bituminous wor' for
variation in the quantity of paving bitumen per
Ag
+ 0%0! labour per 0 sqm per day
!2 7dd to or deduct from any item of bituminous wor' for
variation in the quantity of chippings per 0%0
cum si/e of chipping 2%$ mm graded
downwards
+ 0%0 labour per 0 sqm per day
!3 2$ mm thic' :emi Dense 1ituminous concrete 0 %#)++ labour per 0 sqm per
day per day
!! ;orming 2 mm thic' expansion Doints filled with
preformed filler and top 30 mm premixed and
sealed with sealing compound 00 mm depth
+ 0%22 labour per 0 m per day
!$ -Do- $0 mm depth + 0%22 labour per 0 m per day
!) -Do- 200 mm depth + 0%3 labour per 0 m per day
!# -Do- 2$0 mm depth + 0%3 labour per 0 m per day

5 - 7
SSR 2009
S/No Item of works Output
!+ ;orming 20 mm thic' expansion Doints filled with
preformed filler and top 30 mm premixed and
sealed with sealing compound 00 mm depth
+ 0%2$ labour per 0 m per day
!, -Do- $0 mm depth + 0%2$ labour per 0 m per day
$0 -Do- 200 mm depth + 0%3! labour per 0 m per day
$ -Do- 2$0 mm depth + 0%3! labour per 0 m per day
$2 7dd to items of expansion Doints, if provided with 20
mm dia mild steel dowel one metre long with
ferrules, faced at !00 mm centers including
boring form wor' and preformed filler for
dowel
+ 0%2$2 labour per 8o% with
0%+, 1&smith per day
$3 ;orming contracting 5Dummy6 Doint )0 mm deep x 0
mm wide filled with sealing compound
+ 0%2$ labour per 0 m per day
$! ;orming construction Doint 30 mm x 0 mm wide filled
with sealing component
+ 0%$ labour per 0 m per day
$$ 7dd to or deduct from the item of contraction Doint for
every $ mm depth of Doint
+ 0%02 labour per 0 m per day
./ $S7 6./#00 mm t2%'k + #.-,0 s?m per (aour per 0a*
.6 Mastic Asphalt 25 mm thick #0-00 (aour per 4. s?m per
0a*
.9 Ta'k 'oat o! prepare0 %tum%!ous/&ra!u(ar
surfa'e
+ #6.0 S?m per (aour per 0a*
.9 F%;%!& roa0 0e(%!eator + 40 Nos per (aour per 0a*
/0 5re't%!&/f%;%!& of C=D eam 'ras2 arr%er + ,-.0 mtr per (aour per 0a*
/# F%;%!& roa0s 'at e*es + .0 Nos per (aour per 0a*
7 P(a!t/5?u%pme!t
*ough excavation in mixed soil 5soil mixed with
boulders6 and getting out
+ !3%2+ cum per Do/e-EE per hour%
2 *ough excavation in soft roc', which can be quarried
or split with do/er blade and getting out
+ 2+%32 cum per Do/e-EE per hour%
3 *ough excavation in hard roc' by blasting and
getting out
+ 2+%32 cum per Do/e-EE per hour%
, Rou&2 e;'a1at%o! %! m%;e0 so%( )so%( m%;e0 w%t2
ou(0ers" a!0 &ett%!& out
+ /0 'um per 2*0rau(%' e;'a1ator
per 2our-
. Rou&2 e;'a1at%o! %! soft ro'k w%t2 2.0/2/0 'fm
'ompressor w%t2 2 Ea'k 2ammers
+ 2,0 'um per $ompr per 0a*
) *ough excavation in hard roc' with 2$0&2)0 cfm
compressor with 2 Dac' hammers
+ 20 cum per compr per day
6 :%sma!t(%!& of stru'tures w%t2 2.0/2/0 'fm
'ompressor w%t2 2 Ea'k 2ammers
+ 9 'um per 'ompr per 0a*
9 5art2work %! ema!kme!t * f%((%!& w%t2 eart2
free from roots et'- sprea0%!& %! (a*ers
+ .00 'um per RR per 0a*
9 5art2work %! ema!kme!t * f%((%!& w%t2 eart2
free from roots et'- sprea0%!& %! (a*ers
+ #00 'um per motor &ra0er per
2our
#0 Loa0%!& mater%a(s or s%m%(ar %tems + 40 'um per 2our per 8$7
## $rus2%!& sto!e meta( s%Fe .0 mm &ra0e0 0ow! to
#2-.0 mm out of se(e'te0 sto!e
+ ##-,4 'um per 2our per 20 TPG
'rus2er
6 - 7
SSR 2009
S/No Item of works Output
#2 $rus2%!& sto!e '2%ps of s%Fe 20 mm !om%!a( s%Fe
&ra0e0 0ow!war0s out of se(e'te0 sto!e
+ ##-04 'um per 2our per 20 TPG
'rus2er
#4 $rus2%!& sto!e '2%pp%!&s of s%Fe / mm !om%!a(
s%Fe &ra0e0 0ow!war0s out of se(e'te0
sto!e
+ #0-/6 'um per 2our per 20 TPG
'rus2er
! Dewatering below water table /one in area having
rain fall upto 200 cm
0 %0, water pump per cum
$ Dewatering below water table /one in area having
rain fall above 200 cm
0 %30+ water pump per cum
#/ M%;%!& mortar for 'o!'rete )#+.+#03 #+,+9 < #+4+/" + 20 'um per m%;er 0a*
#6 M%;%!& mortar for 'o!'rete )#+2+,3#+#-.+4" + 6 'um per m%;er 0a*
#9 $o!so(%0at%o! of su-&ra0e %! SM7 w%t2 9 to #0
to! roa0 ro((er
+ #9.0 s?m per ro((er per 0a*
, "onsolidation of =ranular :ub 1ase $ cm with + to
0 ton road roller
+ ,0 sqm per roller per day
20 "onsolidation of =ranular :ub 1ase 0 cm with + to
0 ton road roller
+ 2$0 sqm per roller per day
2 "onsolidation of shingle with $0 mm + to 0 ton road
roller
+ !#) sqm per roller per day
22 Consolidation of shingle with 75 mm 8 to 10
ton road roller
3+$ sqm per roller per day
23 "onsolidation of shingle with 00 mm + to 0 ton
road roller
+ 3+$ sqm per roller per day
2, $o!so(%0at%o! of s2%!&(e w%t2 #.0 mm 9 to #0 to!
roa0 ro((er
49. s?m per ro((er per 0a*
2$ "onsolidation of water bound macadam surface
0 cm thic' with + to 0 ton road roller
+ 2!+ sqm per roller per day
2/ $o!so(%0at%o! of water ou!0 ma'a0am surfa'e
6-. 'm t2%'k w%t2 9 to #0 to! roa0 ro((er
+ 462 s?m per ro((er per 0a*
26 M%;%!& a&&re&ates w%t2 wet m%; p(a!t /0 TPG + #4-06 'um per 2our
29 M%;%!& a&&re&ates w%t2 2ot m%; p(a!t 20/40 TPG + 9-99 'um per 2our
2, "onsolidation of 2et 3ix 3acadam #$ mm thic' with
+ to 0 ton road roller
+ 3$ sqm per roller per day
30 "onsolidation of 2et 3ix 3acadam 00 mm thic'
with + to 0 ton road roller
+ 2!+ sqm per roller per day
3 - Do - 2 coats surface dressing + $)0 sqm per roller per day
42 $o!so(%0at%o! of 2-. 'm t2%'k prem%; 'arpet
%!'(u0%!& sa!0 sea( 'oat w%t2 9 to #0 to!
roa0 ro((er
+ ./0 s?m per ro((er per 0a*
33 -Do- 2 cm thic' + $)0 sqm per roller per day
4, Geat%!& %tume! w%t2 tar o%(er 2000 Ltrs + #900 H& of %tume! per 0a*
3$ "onsolidation of bituminous mixture 2 part of bro'en
stone metal and one part of sand ! cm thic'
with + to 0 ton road roller
+ 3#2 sqm per roller per day
4/ $o!so(%0at%o! of 20 'm t2%'k moorum sprea0%!&
to #. 'm )'o!so(%0ate0" w%t2 roa0 ro((er
9/#0 to!
+ 2.0 s?m per ro((er per 0a*
3# "onsolidation on soil stabilisation 5with lime6 $ cm
thic' 5consolidated6 with ** +&0 ton
+ ,0, sqm per roller per day
3+ "onsolidation of sand blan'eting 2$&00 mm thic'
with *oad *oller +&0 ton
+ 2000 sqm per roller per day
7 - 7
SSR 2009
S/No Item of works Output
3, "onsolidation of built up spray grouting #%$ cm thic'
with *oad *oller +&0 ton
+ 2!+ sqm per roller per day
!0 "onsolidation of bituminous macadam #%$ cm&$ cm
thic' with *oad *oller +&0 ton
+ 3#2 sqm per roller per day
! "onsolidation of 7sphaltic concrete ! cm thic' with
*oad *oller +&0 ton
+ 3#2 sqm per roller per day
!2 "onsolidation of surface dressing renewal coat with
*oad *oller +&0 ton
+ $)0 sqm per roller per day
!3 "onsolidation of 2 cm thic' premix carpet with liquid
seal coat with *oad *oller +&0 ton
+ $)0 sqm per roller per day
,, $o!so(%0at%o! of prem%;e0 sa!0 sea( 'oat w%t2 RR
9/#0
+ #9.0 s?m per ro((er per 0a*
!$ "onsolidation of mix seal surfacing type F7@& type B1C
with ** +&0
+ #)2 sqm per roller per day
!) "onsolidation of 2$ mm thic' semi dense bituminous
concrete with ** +&0
+ $,$ sqm per roller per day
!# "arrying capacity of tipper 5!%$ cum6 for stone chips
and sand upto $ Am initial lead 53%#$ cum per
trip6
+ # .rips per veh per day
!+ "arrying capacity of tipper 5!%$ cum6 for
boulders&stone&ballast upto $ Am initial lead
53%#$ cum per trip6
+ + .rips per veh per day
,9 $arr*%!& 'apa'%t* of t%pper ),-. 'um" for stores
upto . Hm %!%t%a( (ea0 ). MT per tr%p"
+ , Tr%ps per 1e2 per 0a*
.0 $arr*%!& 'apa'%t* of t%pper )#2 'um" for sto!e
'2%ps a!0 meta( upto . Hm %!%t%a( (ea0 )9-/
'um per tr%p"
+ 9 Tr%ps per 1e2 per 0a*
$ Ma!power a(o!&w%t2 Ie2/5?pt/P(a!t
Do/er D-$0 5:i/e-EE6 + 3 labour per day
2 "ompressor 2$0&2)0 cfm with two Dac' hammer + 3 labour per day
3 *oad *oller +&0 ton + labour per day
, Got M%; P(a!t 20/40 TPG + #6 (aour per 0a*
. =et M%; P(a!t /0 TPG + #, (aour per 0a*
/ Se!sor Pa1er + / (aour per 0a*
6 Pa* (oa0er/ =2ee( :oFer/8$7 + , (aour per 0a*
9 Motor &ra0er #00 'um per 2our + 2 (aour per 0a*
9 Sto!e $rus2er 20 TPG + #0 (aour per 0a*
0 ?oad "arrier&.ipper + # labour per day
2ater .ruc' , A? capacity + labour per day
#2 $o!'rete m%;er + 2. (aour per 0a*
#4 $ra!e #0 To! + #0 (aour per 0a*
#, 7%tume! pressure 0%str%utor + 2 (aour per 0a*
: MAT5RIALS AN: STOR5 NORMS
Surfa'%!& =orks
# @S7 #0 'm t2%'k w%t2 sa!03morrum < &ra1e( + S/Meta( 0-62 'um
S/$2%ps 0-./ $um
Sa!0 0-42 'um
Per #0 s?m
2 @S7 #. 'm t2%'k w%t2 sa!03morrum < &ra1e( + @ra1e( #-09 'um
Sa!0 0-62 'um
per #0 s?m
4 @S7 #0 'm t2%'k w%t2 r%'k a&&re&ate + 7r%'k A&&- #-.2 'um per #0
s?m
, @S7 #. 'm t2%'k w%t2 r%'k a&&re&ate + 7r%'k A&&- 2-29 'um per #0
s?m
8 - 7
SSR 2009
S/No Item of works Jua!t%t*
. @S7 #0 'm t2%'k w%t2 sto!e a&&re&ate + S/Meta( 0-./ 'um
S/'2%ps 0-62 'um
Sa!0 0-42 'um
Per #0 s?m
/ @S7 #. 'm t2%'k w%t2 sto!e a&&re&ate + S/Meta( 0-9, 'um
S/'2%ps #-09 'um
Sa!0 0-,9 'um
Per #0 s?m
6 S2%!&(%!& .0 mm + S2%!&(e 0-/6. 'um per #0
s?m
9 S2%!&(%!& 6. mm + S2%!&(e #-0#2. 'um per #0
s?m
9 S2%!&(%!& #00 mm + S2%!&(e #-20 'um per #0 s?m
#0 S2%!&(%!& #.0 mm + S2%!&(e #-90 'um per #0 s?m
## Sa!0 (a!ket%!& 2. mm + Sa!0 0-4#2. 'um per #0 s?m
#2 Sa!0 (a!ket%!& #00 mm + Sa!0 #-2. 'um per #0 s?m
#4 =7M 6-. 'm t2%'k S/meta( 0-99 'um
S/'2%ps - 0-#4. 'um
Sa!0 0-06. 'um
per #0 s?m
#,- =7M #0 'm t2%'k + S/meta( #-42 'um
S/'2%ps - 0-29. 'um
Sa!0 0-#0 'um
per #0 s?m
#.- =et M%; Ma'a0am 6. mm t2%'k Sa!0/0ust 0-4/#/ 'um
S/meta( 0-4/#/ 'um
S/'2%ps 0-,92# 'um
Per #0 s?m
#/- =et M%; Ma'a0am #00 mm t2%'k Sa!0/0ust 0-,92# 'um
S/meta( 0-,92# 'um
S/'2%ps 0-/,29 'um
Per #0 s?m
#6- Prem%; 'arpet%!& w%t2 sa!0 sea( 'oat 2 'm t2%'k
o1er =7M surfa'e
+ Sto!e '2%ps -0-26, 'um3
Sa!0 0-0/ 'um a!0
7%tume! 2#-6. H&
F%rewoo0 ,.-#4 H&
Per #0 s?m
#9- Prem%; 'arpet%!& w%t2 sa!0 sea( 'oat 2-. 'm t2%'k
o1er =7M surfa'e
+ Sto!e '2%ps - 0-4,4 'um3
Sa!0 0-0/ 'um3
7%tume! 2.-,9 H&
F%rewoo0 .4-/9 H&
Per #0 s?m
#9 2 'm t2%'k 7T w%t2 sa!0 sea( 'oat o! e;%st%!& 7T
surfa'e
+ Sto!e '2%ps - 0-26, 'um
Sa!0 0-0/ 'um
7%tume! 2#-6. H&
F%rewoo0 ,.-#4 H&
Per #0 s?m
20 Prem%; 'arpet%!& , 'm t2%'k o1er =7M surfa'e + S/'2%ps 0-,0 'um3
Sa!0 0-20 'um
7%tume!-44-.0 H&
F%rewoo0 6.-.0 H&
Per #0 s?m
2# Prem%; 'arpet%!& . 'm t2%'k o1er =7M surfa'e + S/'2%ps 0-.0 'um3
Sa!0 0-2. 'um
7%tume!-,#-90 H&
F%rewoo0 9,-,0 H&
Per #0 s?m
S/No Item of works Jua!t%t*
9 - 7
SSR 2009
22- L%?u%0 sea( 'oat + S/'2%pp%!&s 0-09 'um
7%tume! 9-90 H&
F%rewoo0 #/-#0 H&
Per #0 s?m
24 Surfa'e 0ress%!& re!ewa( 'oat )two 'oat" + S/'2%ps 0-2. 'um
7%tume! 42-00 H&
F%rewoo0 ,9-.0 H&
Per #0 s?m
2,- 7u%(t up spra* &rout%!& 6-. 'm t2%'k + S/meta( - #-#4 'um3
7%tume! 40 H&
F%rewoo0 40-00 H&
Per #0 s?m
2. 7%tum%!ous Ma'a0am 6-. 'm t2%'k + S/'2%ps 0-9022 'um3
Sa!0 0-#.92 'um
7%tume! .,-4294 H&
L:O #,-..4 Ltrs
Per #0 s?m
2/- 7%tum%!ous Ma'a0am . 'm t2%'k + S/'2%ps 0-/0#, 'um3
Sa!0 0-#0/# 'um
7%tume! 4/-2#9. H&
L:O 9-602 Ltrs
Per #0 s?m
26 :e!se 7%tum%!ous Ma'a0am 6-. 'm t2%'k + S/'2%ps 0-,0. 'um3
Sa!0 0-44 'um
S/0ust 0-0#. 'um
7%tume! 64-.6/9 H&
L:O #,-..4 Ltrs
Per #0 s?m
29 :e!se 7%tum%!ous Ma'a0am . 'm t2%'k + S/'2%ps 0-26 'um3
Sa!0 0-#0/# 'um
S/0ust 0-0# 'um
7%tume! ,9-0.#4 H&
L:O 9-602 Ltrs
Per #0 s?m
29- Asp2a(t%' 'o!'rete , 'm t2%'k + S/'2%ps 0-42#. 'um
Sa!0 0-2.#, 'um
$eme!t #9-0.2, k&
7%tume! ,6-#20, k&
L:O 6-6/#/ Ltrs
Per #0 s?m
40- Asp2a(t%' 'o!'rete 2-. 'm t2%'k + S/'2%ps 0-20# 'um
Sa!0 0-#.6# 'um
$eme!t ##-2926 k&
7%tume! 29-,.04 k&
L:O ,-9.99 Ltrs
Per #0 s?m
4# Sem%-0e!se %tum%!ous 'o!'rete 2-. 'm t2%'k + Sa!0 0-#,/9 'um
S/'2%ps 0-2#4 'um
S/:ust 0-006, 'um
7%tume! 2.-9/#. k&
L:O ,-9.# Ltr
Per #0 s?m
42 Sem%-0e!se %tum%!ous 'o!'rete , 'm t2%'k + Sa!0 0-24.# 'um
S/'2%ps 0-4,09 'um
S/:ust 0-0##9 'um
7%tume! ,#-.49. k&
L:O 6-6/#/ Ltr
Per #0 s?m
44 Mast%' Asp2a(t 2. mm t2%'k + 7%tume! .6-29.6 H&
S/'2%pp%!&s 0-###, 'um
S/'2%ps 0-#/29 'um
L%me #02-9.6# H&
Per #0 s?m
S/No Item of works Jua!t%t*
10 - 7
SSR 2009
4, Ta'k 'oat + 7%tume! emu(s%o! 2-.0 H&
Per #0 s?m
4. Prem%; 'arpet w%t2 (%?u%0 sea( 'oat 2-. 'm t2%'k + S/'2%ps - 0-4,2. 'um3
Sa!0 0-09 'um
7%tume! 29-0. k&
F%rewoo0 .9-42. H&
Per #0 s?m
4/ Prem%; 'arpet w%t2 (%?u%0 sea( 'oat 2 'm t2%'k + S/'2%ps - 0-26, 'um3
Sa!0 0-09 'um
7%tume! 2,-62 k&
F%rewoo0 .0-20 H&
Per #0 s?m
46 Prem%; sa!0 sea( 'oat + Sa!0 0-0/0 'um
7%tume! /-90 H&
F%rewoo0 ##-00 H&
Per #0 s?m
49 2 'm t2%'k prem%; w%t2 (%?u%0 sea( 'oat us%!& $75 + S/'2%ps 0-26 'um
S/'2%pp%!&s 0-09 'um
$75 4#-40 H&
Per #0 s?m
49 2 'm t2%'k prem%; w%t2 sa!0 sea( 'oat us%!& $75 + S/'2%ps 0-26 'um
Sa!0 0-0/ 'um
$75 29-40 H&
Per #0 s?m
,0 Two 'oat surfa'e 0ress%!& w%t2 $75 + S/'2%ps 0-20 'um
$75 20-00 H&
Per #0 s?m
,#- Pr%me 'oat + $75 6-.0 H&
Per #0 s?m
,2- $S7 6-. 'm t2%'k + S/meta( 0-429 'um
S/'2%ps 0-4#,6 'um
Sa!0 0-4,64 'um
Per #0 s?m
,4- $S7 #0 'm t2%'k + S/meta( 0-,46, 'um
S/'2%ps 0-,#9/ 'um
Sa!0 0-,/4 'um
Per #0 s?m
,, M%; sea( surfa'%!& T*pe AAB + Sa!0 0-0/0 'um
S/'2%ps 0-2# 'um
7%tume! 22-00 k&
F%rewoo0 ,0-90 H&
Per #0 s?m
,. M%; sea( surfa'%!& T*pe A7B + Sa!0 0-0/0 'um
S/'2%ps 0-2# 'um
7%tume! #9-00 k&
F%rewoo0 46-90 H&
Per #0 s?m
P5RMAN5NT =ORHS
!) -xcavation in hard *oc' + -xplosive 0%3$ 'g per cum of
9ard *oc'
,6 5;'a1at%o! %! soft Ro'k + 5;p(os%1e 0-#6. k& per 'um of
soft Ro'k
,9 Gar0 'ore + S/meta( #-0. 'um per 'um
S/No Item of works Jua!t%t*
11 - 7
SSR 2009
!, 4"" 0$00 + :&metal G 0%,+ cum
:and G 0%!, cum
"ement G 2) 'g
4er cum
$0 4"" 0!0+ + :&metal G 0%,# cum
:and G 0%!+ cum
"ement G )$ 'g
4er cum
.# P$$ #+4+/ + S/meta( 0-92 'um
Sa!0 0-,/ 'um
$eme!t 220 k&
Per 'um
.2 P$$ #+2+, + S/'2%ps 0-90 'um
Sa!0 0-,. 'um
$eme!t 26.-44 k&
Per 'um
.4 R$$ #+2+, + S/'2%ps 0-90 'um3
Sa!0 0-,. 'um a!0
$eme!t 26.-44 k&
Per 'um
., R$$ M-20 + S/'2%ps 0-90 'um
Sa!0 0-,. 'um
$eme!t 4,6-44 k&
Per 'um
.. R$$ M-2. + S/'2%ps 0-90 'um
Sa!0 0-,. 'um
$eme!t ,04-44 k&
Per 'um
./ R$$ M 40 + S/'2%ps 0-90'um
Sa!0 0-,. 'um
$eme!t ,0/-/6 k&
Per 'um
.6 R$$ M 4. + S/'2%ps 0-90'um
Sa!0 0-,. 'um
$eme!t ,22-00 k&
Per 'um
.9 R$$ M ,0 + S/'2%ps 0-90'um
Sa!0 0-,. 'um
$eme!t ,4.-00 k&
Per 'um
$, 3asonry wor' in "oncrete 9ollow bloc' + :&chips G 0%$3! cum
:and G 0%!)#+ cum
"ement G #0%3# 'g
4er cum
/0 7r%'k maso!r* %! 'm #+/ + Sa!0 0-202 'um
7r%'ks .00 Nos
$eme!t ,6-00 H&
Per 'um
/# 7r%'k maso!r* %! 'm #+, + Sa!0 0-20 'um
7r%'ks .00 Nos
$eme!t 6#-00 H&
Per 'um
/2 7r%'k maso!r* %! 'm #+4 + Sa!0 0-#6. 'um
7r%'ks .00 Nos
$eme!t 9.-00 H&
Per 'um
/4 RRM 0r* + Ru(e sto!e #-#0 'um per
'um
)! :ausage walling 5masonry6 + *ubble stone G %22 cum
=E wire G %+0 Ag
4er cum
S/No Item of works Jua!t%t*
12 - 7
SSR 2009
/. Sausa&e wa((%!& )ou(0er f%((%!&" + Sto!e ou(0er #-22 'um
@I w%re 9-24 H&
Per 'um
// :r* wa((%!& w%t2 @eo-s*!t2et%' !ett%!& + Ru(e sto!e #-22 'um
@eo-s*!t2et%' !et ##-90 s?m
Per 'um
)# *ubble walling in cement mortar 0) + *ubble stone G %0 cum
:and G 0%3 cum
"ement G #3%$ 'g
4er cum
)+ *ubble walling in cement mortar 0! + *ubble stone G %0 cum
:and G 0%32 cum
"ement G 2 'g
4er cum
), *ubble walling in cement mortar 03 + *ubble stone G %0 cum
:and G 0%32 cum
"ement G !! 'g
4er cum
#0 ?ined drain + *ubble stone G 0%3)2$ cum
4er mtr
6# F(us2 po%!t%!& o! Sto!e work w%t2 $M #+4 + Sa!0 0-09 'um
$eme!t 4/-.0 k&
Per #0 s?m
#2 %2 cm thic' plaster 0) + :and G 0%22# cum
"ement G $$%00 Ag
4er 0 sqm
#3 2%$ cm thic' plaster 0) + :and G 0%3) cum
"ement G ++%00 Ag
4er 0 sqm
#! 4roviding steel centering and shuttering including
preparing and removing the same
5considering use of 0 times6
+ .imber 0%0! cum per 0 sqm
#$ ;alse ceiling with ply wood ! mm thic' + 4ly wood ! mm - 0%030, sqm
.imber - 0%0++ cum
per 0 sqm
#) ;illing of stone + :tone boulder - %0 cum
per cum of bac' fill qty
66 Sto!e p%t'2%!& + Ru(e sto!e #-2. 'um per
'um
#+ 2hite washing + ?ime - 2%!0 'g per 0 sqm
#, 4ainting + 4aint - $%00 ?trs per 0 sqm for
two coats
90 Roa0 mark%!& w%t2 t2ermop(ast%' pa%!t 2. mm + Pa%!t 2.-00 H&
@(ass ea0s 2-.0 H&
LP@ &as ,-,, H&
Per #0 s?m
Not
e
The highlighted norms are updated as per MoSRT&H Standard Data Book
for Rate Analysis. All norms are suggestive only and atual !uantity "ill
#e "orked out #ased on $o# mi% formula&design mi%.