Project report

Scope of the project


Project Pilot house for a residential scheme
Duration 12 months
Budget - 15 million

Progress report
After 6 months project progress

0
5
10
15
20
25
30
35
40
45
50
7
/
1
6
/
1
4
7
/
2
9
/
1
4
8
/
1
1
/
1
4
8
/
2
4
/
1
4
9
/
6
/
1
4
9
/
1
9
/
1
4
1
0
/
2
/
1
4
1
0
/
1
5
/
1
4
1
0
/
2
8
/
1
4
1
1
/
1
0
/
1
4
1
1
/
2
3
/
1
4
1
2
/
6
/
1
4
1
2
/
1
9
/
1
4
1
/
1
/
1
5
1
/
1
4
/
1
5
1
/
2
7
/
1
5
2
/
9
/
1
5
2
/
2
2
/
1
5
3
/
7
/
1
5
3
/
2
0
/
1
5
4
/
2
/
1
5
4
/
1
5
/
1
5
4
/
2
8
/
1
5
5
/
1
1
/
1
5
5
/
2
4
/
1
5
6
/
6
/
1
5
6
/
1
9
/
1
5
7
/
2
/
1
5
7
/
1
5
/
1
5
7
/
2
8
/
1
5
8
/
1
0
/
1
5
8
/
2
3
/
1
5
Milestone: No
Remaining Tasks
Name Start Finish % Complete Remaining
Work
Resource
Names

site
investigatio
n
Mon
9/1/14
Fri
9/19/14
100% 360
hrs
engineer,
surveyor,
labour
site
clearing
Mon
9/22/14
Fri
10/10/14
100% 240
hrs
labour,
lorry
excavation Mon
10/13/1
4
Fri
11/21/14
100% 720
hrs
excavator,
labour,
lorry
Foundation
formwork
Mon
11/24/1
4
Fri
12/12/14
100% 120
hrs
carpenters
Foundation
reinforcem
ent
Wed
12/3/14
Tue
12/23/14
100% 120
hrs
skilled
labours
Foundation
concreting
Wed
12/24/1
4
Wed
12/24/14
100% 16 hrs concrete
mixture,
labour
concrete
curing
Thu
12/25/1
4
Wed
12/31/14
100% 40 hrs labour
Ground
floor slab
formwork
Thu
1/1/15
Wed
1/21/15
100% 120
hrs
carpenters
Ground
floor slab
reinforcem
ent
Mon
1/5/15
Fri
1/23/15
100% 120
hrs
skilled
labours
Ground
floor slab
Mon
1/26/15
Mon
1/26/15
100% 16 hrs concrete
mixture,
concreting labour
Ground
floor
column
reinforcem
nt
Tue
1/27/15
Mon
2/16/15
100% 120
hrs
skilled
labours
Ground
floor
column
formwork
Tue
1/27/15
Mon
2/16/15
100% 120
hrs
carpenters
Ground
floor
column
concreting
Tue
2/17/15
Wed
2/18/15
100% 32 hrs concrete
mixture,
labour
Ground
floor
column
formwork
removal
Thu
2/19/15
Thu
2/19/15
100% 8 hrs carpenters
Ground
floor
column
curing
Thu
2/19/15
Thu
2/19/15
100% 8 hrs labour
Ground
floor beam
formwork
Fri
2/20/15
Thu
3/12/15
100% 120
hrs
carpenters
Ground
floor beam
reinforcem
ent
Fri
2/20/15
Thu
3/12/15
100% 120
hrs
skilled
labours
Ground
floor beam
concreting
Fri
3/13/15
Mon
3/16/15
100% 32 hrs concrete
mixture,lab
our
<New
Milestone>
Tue
3/17/15
Tue
3/17/15
0% 0 hrs
Ground
floor beam
formwork
removal
Tue
3/17/15
Tue
3/17/15
0% 8 hrs carpenters
Ground
floor beam
curing
Tue
3/17/15
Tue
3/17/15
0% 8 hrs labour
First floor
slab
formwork
Wed
3/18/15
Tue
4/7/15
0% 120
hrs
carpenters
First floor
slab
reinforcem
ent
Fri
3/27/15
Thu
4/16/15
0% 120
hrs
skilled
labours
First floor
slab
concreting
Fri
4/17/15
Fri
4/17/15
0% 16 hrs concrete
mixture,lab
our
First floor
slab curing
Mon
4/20/15
Wed
4/22/15
0% 24 hrs labour
First floor
column
reinforcem
ent
Thu
4/23/15
Wed
5/13/15
0% 120
hrs
skilled
labours
First floor
column
formwork
Thu
4/23/15
Wed
5/13/15
0% 120
hrs
carpenters
<New
Milestone>
Tue
5/5/15
Tue
5/5/15
0% 0 hrs
First floor
column
concreting
Thu
5/14/15
Fri
5/15/15
0% 32 hrs concrete
mixture,lab
our
First floor
column
formwork
removal
Mon
5/18/15
Mon
5/18/15
0% 8 hrs carpenters
First floor
column
curing
Mon
5/18/15
Mon
5/18/15
0% 8 hrs labour
First floor
beam
formwork
Tue
5/19/15
Mon
6/8/15
0% 120
hrs
carpenters
First floor
beam
reinforcem
ent
Tue
5/19/15
Mon
6/8/15
0% 120
hrs
skilled
labours
First floor
beam
concreting
Tue
6/9/15
Tue
6/9/15
0% 16 hrs concrete
mixture,lab
our
Ground
floor
masonry
Wed
3/18/15
Tue
4/28/15
0% 480
hrs
labour,mas
ons
Ground
floor
parapet
walls with
gate runs
Wed
3/18/15
Tue
4/28/15
0% 240
hrs
sub
contractor
Ground
floor pipe
line for
water
supply
installation
Wed
4/29/15
Tue
6/9/15
0% 240
hrs
sub
contractor
Ground
floor
electricity
installation
Wed
4/29/15
Tue
5/19/15
0% 120
hrs
sub
contractor
Ground
floor
telephone
and
internet
Wed
4/29/15
Tue
5/19/15
0% 120
hrs
sub-
contractor
installation
Ground
floor waste
water and
sewer
disposal
installation
Wed
4/29/15
Tue
5/19/15
0% 120
hrs
sub
contractor
Ground
floor
finishes
Wed
4/29/15
Tue
6/9/15
0% 480
hrs
labour,skill
ed labours
First floor
masonry
Wed
6/10/15
Tue
7/21/15
0% 480
hrs
labour,mas
ons
Ground
floor
parapet
walls with
gate runs
Wed
6/10/15
Tue
7/21/15
0% 240
hrs
sub
contractor
First floor
pipe line
for water
supply
installation
Wed
7/22/15
Tue
8/11/15
0% 120
hrs
sub
contractor
First floor
electricity
installation
Wed
7/22/15
Tue
8/11/15
0% 120
hrs
sub
contractor
First floor
telephone
and
internet
installation
Wed
7/22/15
Tue
8/11/15
0% 120
hrs
sub
contractor
First floor
waste
water and
sewer
disposal
installation
Wed
7/22/15
Tue
8/11/15
0% 120
hrs
sub
contractor










Completed activities
Foundation
Ground floor slab
Ground floor columns
Ground floor beam

Remaining activities
Ground floor masonry
First floor slab
First floor columns
First floor beams
Finishes and services installation
Roof
First floor
finishes
Wed
7/22/15
Tue
9/1/15
0% 480
hrs
labour,skill
ed labours
Roof Wed
6/10/15
Tue
7/21/15
0% 480
hrs
skilled
labours,lab
our
0% 0 hrs

















Resource allocation








0 hrs
200 hrs
400 hrs
600 hrs
800 hrs
1,000 hrs
1,200 hrs
1,400 hrs
1,600 hrs
1,800 hrs
2,000 hrs
Remaining Work





Risk assessments

Identify exposures to loss
Property
Personnel
Net income
Liability


General liability coverage & costs
Third party damages
Bodily injury , Property damages , Personal injury
Defense expenses
Settlements





Hazard and Accident Causation (Identified Hazard)

Precaution Control Measure (Limit hazard movement) By reducing its probability of occurrence
Preventive control measure (limit hazard entry) By reducing its severity
Consideration of hazards in terms of their probability of occurrence
and severity of consequence provides the general rationale
for performing all safety risk assessments, which are undertaken
as follows:
1. Estimate the probability of a hazards occurrence
2. Evaluate the risk associated with the hazard based upon the frequency and severity
estimations
3. Respond to the hazard by implementing suitable control measures.












Risk assessments

Identify exposures to loss
Property
Personnel
Net income
Liability


General liability coverage & costs
Third party damages
Bodily injury , Property damages , Personal injury
Defense expenses
Settlements





Hazard and Accident Causation (Identified Hazard)

Precaution Control Measure (Limit hazard movement) By reducing its probability of occurrence
Preventive control measure (limit hazard entry) By reducing its severity
Consideration of hazards in terms of their probability of occurrence and severity of consequence
provides the general rationale for performing all safety risk assessments, which are undertaken
as follows:
1. Estimate the probability of a hazards occurrence
2. Evaluate the risk associated with the hazard based upon the frequency and severity
estimations
3. Respond to the hazard by implementing suitable control measures.