Vous êtes sur la page 1sur 70

Lets Go Green

Lifes Good When its Green



21.5% Savings on Energy Use
31.8% Savings on Potable Water Use
30 KW on-grid Solar PV system
3.91% Offset by On-Site Renewable Energy
91.7% Diversion from Landfill of Construction Waste
30.6% Use of Materials with Recycled Content
45.2% Use of Materials Regionally Available
LG Green Building
Jebel Ali - Dubai
3/60

Global Sales
LGE Consolidated Basis, IFRS
Unit : USD Billion
Total does not equal 100 percent as divisional sales pertain solely to LG Electronics Korea and overseas
subsidiaries and include internal transactions, other subsidiaries earnings, etc.

2006 2007 2008 2009 2010 2011
USD 39
USD 44
USD 45
USD 43.4
USD 48.2
USD 48.97
AE 8%
HA 20%
MC 22%
HE 41%

AE Company (Air Conditioning & Energy Solution)
Residential
Manufactured Koreas
1st air conditioner
1st company to sell
100 million units
Worlds Top selling
air conditioning manufacture for
8years
Air Conditioning &
Energy Solution

AE Company (Air Conditioning & Energy Solution)
Full line-up of comprehensive air conditioning solutions LG VRF
Multi V Systems (VRF) Heating(Residential)
Indoor Units
Single Systems Multi Split Systems
Rooftop
Heating(Commercial)
HVAC Solution

AE Company (Air Conditioning & Energy Solution)
Full line-up of comprehensive air conditioning solutions
LG Chiller
Chiller System
AHU CTHU NPP(Nuclear Power Plant) Ventilation Systems
Control Systems Building Management Systems
HVAC Solution


AE Company (Air Conditioning & Energy Solution)
Vertical Solution
Multi V III Multi V Water II DX AHU Multi V Space III
eco V
Low Static Duct
Low Static Duct
Art-1 Way
LED
PLS
DX AHU
Chiller
eco V
Multi V Water
BMS
Multi V Geo
Chiller
ART COOL
Home Energy Management System
Office Buildings Hotels High-Rise Buildings
Hotel Solutions

AE Company (Air Conditioning & Energy Solution)
Vertical Solution
Hospitals Shopping Malls
4-Way Cassette
1-Way Cassette Multi V Water
Multi V Geo
Chiller
BMS
DX AHU
BMS

LG Multi V System

Contents

What is VRF System ?
Variable Refrigerant
Flow
The Variable Refrigerant Flow System has the ability to control the
amount of refrigerant flowing through the system
Simply, each FCU/AHU unit receives only the required amount of
refrigerant in order to meet the cooling load of the conditioned space
The Inverter Unit will Gradually Increases or Decreases its Capacity
based on the load by increasing or decreasing the rotation speed of
the motor.

World Best COP Tech.
V Scroll Inverter compressor
Sine wave inverter
control
Cyclone sub-cooling circuit
High static propeller fan
BLDC Inverter Fan Motor
Uniform (refrigerant)
distributor
Wide Louver fin in Heat
Exchanger
Ventilation with AHU
- No individual control
- Freeze & burst
(chilled & hot water type)
- Big energy consumption
(pump & fan)
- Low air volume, static
- No ventilation & humidification
- Low installation space
- Inverter compressor
Low energy consumption
(Inverter compressor)

Big air volume,
high static pressure
Ventilation & humidification
IAQ control
Easy Installation
Features
Convectional AHU VRF Indoor Unit

Contents

14/60
How it works?
Control of the refrigerant flow by inverter compressor
INV ST1 INV ST1
INV
INV
ST1
14%
100%
100%
Comp. capacity control
L
o
a
d

10%
P
Indoor
Units

Contents

15/60
Technical Innovation
V Scroll inverter compressor is LG Compressor Brand name. The compressor
is manufactured by LG Korean factory using state of the art techniques. The
adoption of the BLDC motor makes the system more efficient and powerful.
Innovation 1 V scroll
V Scroll inverter compressor
BLDC motor
More efficient
Scroll type
Bigger performance
Rotor
Steel Plates
ND Magnetic
Reluctance torque
Magnetic torque
Inverter driver
i
T
N
S
Multi V is made in Korean factory as well major components like compressor.

Contents

16/60
Technical Innovation
Sub-cooling is one of the most important technologies in VRF system.
LG Multi V use more efficient cyclone type. By cyclone sub-cooling
circuit, Best effect can be achieved.
Cyclone sub-cooling circuit
Sub-cooling circuit
More efficient
Less pressure loss
Cyclone
Larger heat-
exchange area
Sub-cooling
P
r
e
s
s
u
r
e

Enthalpy
Condenser
Evaporator
E
x
p
a
n
s
i
o
n

Theory and Effects
1st effect : Refrigerant pressure loss reduce
Long and high rising piping

2nd effect : Cooling capacity gets improved
In a thermodynamic point of view
Innovation 2 Cyclone SCC

Contents

17/60
Inverter Technology of Multi V III
Inverter Technology Controls the Refrigerant Flow by Varying the
Compressor Revolution as per the Cooling load.
Micro processor
& Inverter logic
Inverter Scroll
compressor
Sensor less
Control
PWM


U
V
W
50Hz
Revolution
Low
High
Cooling load
Partial load
Full load
Variable
Refrigerant
Flow
Cooling
Capacity
Ambient Temp : 35
Only 1 room cooling
Ambient Temp : 46
All rooms cooling
EEV
EEV
Partial capacity
Full load
20Hz
120Hz

Contents

18/60
How it works?
Control by remote controller of users
INV ST1 INV ST1
18
CPU CPU CPU CPU
P

Contents

19/60
How it works?
Control of the refrigerant Flow by Electronic Expansion Valve
T1 = Set temperature from Remote controller air temperature
T2 = Suction air temperature sensor
T3 = Inlet refrigerant temperature sensor (liquid)
T4 = Outlet refrigerant temperature sensor (gas)
S
u
c
t
i
o
n

D
i
s
c
h
a
r
g
e

Blower speed
Liquid
Gas
Electronic expansion valve
(0~1350 pulses)
T3
T2
Blower
T4
T1
Control
Box
EEV

Contents

20/60
How it works?
Multi V control low pressure of system in case of cooling operation
Cooling
comp
Fan
SC EEV
Indoor
EEV
Component Cooling Mode
Compressor Low Pressure
Fan High Pressure
Indoor EEV Superheat control
SC EEV
Superheat of Sub
Cooling
Pressure
Target low pressure
Time
Start
Target high
pressure
Compressor control ( speed up by inverter )
Fan control ( speed up by inverter )

Contents

21/60
Owing to VRF Technology, Multi V is the Brand Name of LG.
What is LG Multi V?
Multi V is the LG VRF system: -
Compared to the Common On-Off Controlled Compressor,
the Inverter Controlled Compressor is able to run the proper
revolution (Hz) in order to provide the best efficiency (power
Consumption), Exceptional dehumidification& Temp Control.
On-Off system
Inverter system

Contents

Multi V System Layout
Combination of Maximum 64 Indoor Units
Console
ARTCOOL
Gallery
ARTCOOL
Mirror
High static
duct
2Way
CST
4Way
CST
Max. 48HP
Low static
duct
1Way
CST
Refrigerant Pipes
Y Branch
IDU combination Rate
Multi V III : 130 %
Multi V III Tropical Model
22/60

Contents

Product Roadmap Multi V Outdoor
23/60
Single unit max 16Hp, 3 Unit combination is possible (Max 48Hp)
Single unit max 16Hp
8 &10HP Medium
12 , 14 & 16HP Large
Combination 48Hp
48HP Max

7k 9k 12k 15k 18k 24k 28k 36k 42k 48k
2.2 2.8 3.6 4.2 5.6 7.1 8.2 10.6 12.3 14.1
5k
1.6
Btu/h
kW
ART COOL
Series
SRAC

Ceiling
Cassette
Ceiling
Concealed
Duct
Floor
Standing
Mirror
Ceiling & Floor
Ceiling Suspended
Wall Mounted
1Way (Art)
2Way
4Way
High Static
Low Static
Built-in
With Case
Without Case
Gallery
Console
Fresh air Intake
76k 96k
23.9 30.2
Product Roadmap Multi V Indoor

Multi V & AHU
Large capacity with No BMS)
Control Kit
Temp. Senor / RA, SA(essential), OA, Mix(optional)
Humid. Senor / RA, SA, OA(optional)
Damper Actuator / EA, OA, Mix(optional)
Differential Pressure switch(optional)
Valve for Humidifier(optional)
CO2 Sensor(optional)
Smoke Detector(optional)
Optional
RA EA OA SA
Expansion Kit AHU
Outdoor Unit
Wired
remote controller
Communication wire
Connection Pipe Thermistor
Signal (On/Off)
Signal (DC0~10V)
Expansion Kit

Multi V & AHU
Large capacity with Communication Kit & BMS
Room air
Temp Sensor
(should be
installed into
the return air part)
Expansion Kit
Outdoor Unit
Comm. Kit
Optional
Wired
remote controller
Connection Pipe
Communication wire
Thermistor
Signal(On/Off)
AHU
RA EA OA SA
Expansion Kit

Contents

27/60
Introduction of Multi V III Tropical
LG Multi V is the most strong VRF system.
TUV certification for continuous operation under 54 during 24 hours.
Outstanding Performance

Contents

28/60
Introduction of Multi V III Tropical
LG Multi V is the most efficient VRF system. COP Max 4.3 at rated
condition
BLDC
inverter compressor
New refrigerant
distributor
Sine wave
inverter control
Cyclone
sub-cool circuit
High static
propeller fan
BLDC
Inverter Fan Motor
Wide Louver fin in
Heat Exchanger
Heat pump model (8HP), T1 condition
Coefficient of Performance (COP) =
Cooling capability
Energy consumption
3
.
4

4
.
3

conventional
26%
COP comparison
[ Average value]

-. kW / Ton = 0.87 @ T1
-. kW / Ton = 1.10 @ T3
COP data
Outstanding Performance

Contents

31/60
Introduction of Multi V III Tropical
Extending pipe length and elevation
Total piping length
Actual longest Piping length (Eqvlnt)
Longest piping length after 1st branch
(Conditional application)
Level difference between ODU and IDU
Level difference between IDU and IDU
Level difference between ODU and ODU
1000m
200m
(225m)
40m
(90m)
110m
15m
5m
Project R&D Center Building
Const. Dim 5,619.14 m
Type R&D Building
Location Seoul. Korea
TTL Dim. 84,307.09 m
Scale 5F ~ 20F
Test building
Level Difference
Between ODU and IDU
Max110m
Longest piping
length
Max 225m
Outstanding Performance

Contents

32/60
Introduction of Multi V III Tropical
Design & installation degree of freedom increase
( Fan External static pressure - Max 8mmAq)
Conventional
Outstanding Performance

Contents

33/60
Introduction of Multi V III Tropical
8 Stages of night silence operation are possible during the night time.
It can give comfort to owner and a neighbor.
Night silence operation
100 Capacity
Sound level
Load
night
day
day
8:00
12:00
4:00
8:00
Time (am)
8:00
12:00
4:00
Mode end
Mode start
Ambient temp
Smart Functions

Contents

35/60
Introduction of Multi V III Tropical
Minimizing any inconvenience that may occur in an emergency
situation
Back-up operation _Compressor
Malfunction
Back-up
operation
Back-up operation _Unit
All single unit of Multi V III tropical has more 2 compressors.
Malfunction
Back-up operation
Smart Functions

Contents

36/60
Introduction of Multi V III Tropical
To make life span of compressor even, alternative operation is
possible.
Alternative operation
ON OFF
Smart Functions

Contents

37/60
Introduction of Multi V III Tropical
Automatic test run, refrigerant amount check, real-time inspection
and back-up operation for parts and sensors, maximizing reliability of the
product & minimizing installation and maintenance time.
Fault Detection and Diagnosis (FDD)
01 Automatic test run
02 Refrigerant amount check
03 Real time diagnosis (refrigerant and parts)
04 Real time back-up (compressor and
sensors)
05 Refrigerant recovery function
Smart Functions

Contents

38/60
Introduction of Multi V III Tropical
Easy and fast test run. Auto test run function help you to save the
checking time during the final stage of installation
Automatic test run _ FDD
Conventional
test run
Auto Test Run
Setting LGMV PC
100%
operation
1Unit
operation
Report
Report Start
Sensors
Operating cycle
Electric status
Refrigerant amount
Auto test run check list
60%
Time Save
Report by HTLM
Smart Functions

Contents

39/60
Introduction of Multi V III Tropical
This kind of mistake can happen in site. However problem is that it is
very hard to find the reason because it is not commonsense mistake. But
Multi V can check it automatically for the best installation.
Incorrect piping notice _ FDD
Incorrect piping
(liquid line + gas line)
Incorrect communication line notice _ FDD
Incorrect communication line
communication line
Refrigerant piping
Smart Functions

Contents

40/60
Introduction of Multi V III Tropical
Real-time automatic fault prediction function
Multi V III allows you to check the current status for the sensors and the EEV,
which are the major components for system control, through a test run
Sensor
EEV
Sensor
Outdoor unit Indoor unit
Temperature sensor
Pressure sensor
8
2
3
0
Smart Functions

Contents

41/60
Introduction of Multi V III Tropical
Pump down and out function can reduce the refrigerant discharge.
Pump down
When an indoor unit malfunctions, this function collects the refrigerant remaining in
the piping line or that unit to an outdoor unit
When an outdoor unit malfunctions, this function collects the refrigerant in another
indoor unit or a piping line
Transfers
refrigerant
Transfers
refrigerant
Malfunction
Malfunction
Pump out
Smart Functions

Contents

42/60
Introduction of Multi V III Tropical
4way piping provides a different installation method. So It can reduce
installation cost.
4way piping
Installation of bottom piping is available.
LG provide accessory for easy installation.
Left
Front
Bottom
Right
Bottom direction
Piping cover needed
Not good looking
Smart Functions

Contents

43/60
Introduction of Multi V III Tropical
Easy to install refrigerant pipe & Easy maintenance (Standing SVC)
Service area reduction and Easy standing service and maintenance
Conventional
Front SVC Area
900
C/Box Open area
500
SVC Area
Standing service
available
50%
Smart Functions

Contents

44/60
Introduction of Multi V III Tropical
Quick and right service is necessary. Black Box built in Multi V
records operation data for 3 minutes. SVC engineer can analysis
the problem and take quick and right action owing to operation
history.
Black Box for data acquisition
Error
occurred
Ambient temp.
High pressure
Low pressure
Sensor status
Operation data etc.
SVC
-. Analysis with recorded data &
-. Quick and right service
Record operation data
SD memory module
: 3 months data recording
3 minutes
Smart Functions


Green Building Initiative LEED Regulations
The LEED green building certification program is an initiative by The U.S. Green Building Council, Inc.
(USGBC) to positively impact our natural environment, economy, health, and productivity through well
designed buildings, energy efficient equipment, and high quality material.

Today, there are many breakthroughs in building science, technology, and operations that are available for
designers and building owners to maximize both economic and environmental performance of their buildings.

The green building movement offers an unprecedented opportunity to respond to the most
important challenges of our time, including global climate change, dependence on non sustainable and
expensive sources of energy.

LEED 2009 for New Construction and Major Renovations
100 base points; 6 possible Innovation in Design and 4 Regional Priority points
Certified 4049 points
Silver 5059 points
Gold 6079 points
Platinum 80 points and above


Green Building Initiative LEED Regulations
1. Sustainable site (26 Pts)
2. Water Efficiency (10 Pts)
3. Energy & Atmosphere (35 Pts) 31 Pts LG can address



4. Material & Resources (14 Pts)
5. Indoor Environmental Quality (15 Pts) 4 Pts LG can address





6. Innovation in Design (6 Pts) 5 Pts LG can address


Project Name Brighton College
Building Type School
Project owner Bloom Properties
Consultant Name Implement Consultant
Contractor Name Emirates Link Maltauro
Place/ City UAE Abu Dhabi
Completion Date September 2011
Type Of Units Multi V& AHU Units
Total Capacity 1,200_Ton
Total Project Value 1,100,000_$
49
Land Mark Multi V Project
Important requirement of the client
BMS compatible AC system
The minimum Operating cost
Higher emphasis on Indoor air quality (IAQ)
Reliable operation, at 54 deg C Ambient
Educational

50
Project Name GEMS American Academy
Building Type School
Project owner GEMS Education
Consultant Name National Engineering Bearu
Contractor Name Trinity Engineering Services
Place/ City UAE Abu Dhabi
Completion Date September 2011
Type Of Units Multi V& AHU Units.
Total Capacity 1,112_Ton.
Total PJT Value 1,136,000_$.
Important requirement of the client
BMS compatible AC system.
The minimum Operating cost.
Higher emphasis on Indoor air quality (IAQ).
Reliable operation, at 54 deg C Ambient.
Note: LG award extended to other Products.
Land Mark Multi V Project
Educational

Project Name Refurbishment of 8 Schools
Building Type School
Project owner Abu Dhabi Education Council
Consultant Name Conseco International
Contractor Name Different Contractors
Place/ City UAE Abu Dhabi
Completion Date September 2010
Type Of Units Multi V
Total Capacity 2,105_Ton
Total Project Value 2,000,000_$
Notes
3 Schools Awarded to LG out of 8.
Electricity Bill is a Major Concern of Government, as
such they remove old units and adopt the VRF system
Land Mark Multi V Project
Educational

Project Name Refurbishment of 10 Schools
Building Type School
Project owner Abu Dhabi Education Council
Consultant Name Ian Banham and Associates
Contractor Name Different Contractors
Place/ City UAE Abu Dhabi
Completion Date September 2011
Type Of Units Multi V & FAHU/ AHU Units
Total Capacity 2,500_Ton
Total Project Value 2,500,000_$
Notes
LG for the 2
nd
Year in a row awarded a part of these
Schools ( Five Schools Awarded to LG out of 10)
LG delivered 26 FAHU/ AHU along with the Multi V
Electricity Bill is a Major Concern of Government, as
such they remove old units and adopt the VRF system
Land Mark Multi V Project
Educational

53
Project Name Khaitan Police HQ
Building Type Government
Project owner Ministry of Public Works
No Of Floors G+M+2 Building
Consultant Name Ministry of Public Works
Contractor Name
Place/ City Kuwait
Completion Date November 2011
Type Of Units Multi V
Total Capacity 200_Ton
Total Project Value 240,000_$
Client requirements
Centrally control the AC units from one location,
MEW (Ministry of Electricity & Water) Approval
Capability of Working in ambient temperature of 54 C
without tripping.
Land Mark Multi V Project
Government

54
Project Name Korean Embassy
Building Type Government
Project owner South Korea
No Of Floors G+6 Building
Consultant Name Ministry Of Interior
Contractor Name M/s Imtiyaz
Place/ City Kuwait
Completion Date October 2011
Type Of Units Multi V
Total Capacity 250_Ton
Total Project Value 375,000_$
Client requirements
Centrally control the AC units from one location,
Group control multiple units serving the same zone.
Capability of Working in ambient temperature of 54 C
without tripping.
Land Mark Multi V Project
Government

Project Name Oman Botanic Garden
Building Type Commercial Building
Project owner OBG
No Of Floors G+1 Building
Consultant Name ALATAC
Contractor Name Mercury
Place/ City Oman Muscat
Completion Date June, 2012
Type Of Units Multi V
Total Capacity 520_Ton
Total Project Value 550,000_$
Notes
Project for cultivating rare plants.
Client insisted for eco friendly and energy saving techn
ology.
Land Mark Multi V Project
Government

56
Project Name Arabian Horse Stud
Building Type Lab & Care Center - 10 Horse
Stable to His Highness
Project owner Sheikh Mohammed Bin
Rashid Al Maktoum
Consultant Name Engineers Office
Place/ City UAE Dubai
Completion Date December 2009
Type Of Units Multi V, (40 ODU, 400 FCU)
Total Capacity 800_Ton
Total Project Value 1,120,000_$
Client requirements
Sustainable design with green Refrigerant.
The lesser the better power consumption.
Capability of Monitoring& Controlling the AC units, and
auto back up operation.
Land Mark Multi V Project
Government

Project Name Al Gurum Resort
Building Type Residential Development
Project owner Al Dar Properties
No Of Villas 70 Villas Phase I
Contractor Name Six Construct
Place/ City UAE Abu Dhabi
Completion Date October 2008
Type Of Units Multi V
Total Capacity 1,750_Ton
Total Project Value 2,400,000_$
Notes:
Super Premium Villas, the Selling price of each villa
is around 25 Million AED
BMS compatible AC system.
Compatible to Home Net.
Reliable operation, at 54 deg C Ambient
Land Mark Multi V Project
Residential

Project Name Abu Dhabi International
Shooting Club
Building Type Residential Development
Project owner IMCC
No Of Villas 385 Villas
Contractor Name Fibrex, Thermo
Place/ City UAE Abu Dhabi
Completion Date June 2011
Type Of Units Multi V, (385 ODU/ 4,000 FCU)
Total Capacity 5,361_Ton
Total PJT Value 6,800,000_$
Notes
Estidama Compliance Pearl 1
Electricity Bill for the owners/ Tenants of the Villa
Reliable operation, at 54 deg C Ambient.
Land Mark Multi V Project
Residential

Project Name Adearest Owners Villa
Building Type Residential
Project owner Adearest
No Of Villas 3 Big Premium Villa
Contractor Name Adearest
Place/ City UAE Sharjah
Completion Date Aug 2008
Type Of Units Multi V
Total Capacity 173_Ton
Total PJT Value 250,000_$
Notes
Project originally designed with Daikin VRV
Fast delivery & Commissioning support , help LG to
win the PJT
Land Mark Multi V Project
Residential

60
Project Name Laya Orchid Hotel
Building Type Hospitality
Project owner Laya hospitality
No Of Floors G+7 Building
Contractor Name Envicon Emirates
Place/ City UAE Dubai
Completion Date January 2012
Type Of Units Multi V
Total Capacity 400_Ton
Total Project Value 400,000_$
Notes
Compatibility with BMS system.
Project originally designed with Air Cooled Chillers and
then converted to VRF to reduce the Electric power
consumption.
LG solution extended to include HA& Hotel TV.
Land Mark Multi V Project
Hospitality

Project Name Dhalak Resort
Building Type Resort for Qatar Emirs Family
Project owner Qatar Dair
Consultant Name W S Atkins
Contractor Name QDVC
Place/ City Dhalak, Eritrea
Completion Date Sept 2010
Type Of Units Multi V
Total Capacity 275_Ton.
Total PJT Value 370,000_$.
Notes
Less Outdoor space available
LG provided full support from design, installation, SVC
Land Mark Multi V Project
Hospitality

62
Project Name Savanah Flamingo Resort
Building Type Hospitality
Project owner TDIC (Tourism Development &
Invest. Co) (Abu Dhabi Gov)
Consultant Name W.S. Atkins
Contractor Name Al Shafar Contracting
Place/ City UAE Abu Dhabi
Completion Date June 2011
Type Of Units Multi V & AHU
Total Capacity 800_Ton
Total Project Value 1,600,000_$
Notes
Estidama Pearl 2 Compliance.
Electric Power source is Diesel Generator, so its a mus
t to reduce the power consumption ASAP.
Capability of working up to 54 of ambient temperature
Land Mark Multi V Project
Hospitality

63
Project Name ZUMA Restaurant
Building Type Restaurant
Project owner ZUMA/DIFC
Consultant Name Design & Build - Penguin
Contractor Name Penguin Engineering
Place/ City UAE Dubai
Completion Date July 2008
Type Of Units Multi V
Total Capacity 150_Ton
Total Project Value 200,000_$
Notes
District cooling connection was not enough
Operating cost was also a concern.
Limited condensing unit space at the parking area
Land Mark Multi V Project
Hospitality

64
Project Name Belhoul Hospital
Building Type Hospital
Project owner Belhoul Life care
No Of Floors G+5 Building
Consultant Name Nutek
Contractor Name ARJ
Place/ City UAE Dubai
Completion Date January 2010
Type Of Units Multi V
Total Capacity 250_Ton
Total Project Value 300,000_$
Notes
Project originally designed with Air Cooled Chillers and
then converted to VRF to reduce the cost of Electric
Connection and Electric power consumption,
Offered with Central Controller.
Land Mark Multi V Project
Hospital

65
Project Name Al Jazi Tower
Building Type Commercial Offices
Project owner Al Khaliji HQ Bank
No Of Floors G+18 Building,
2
nd
, 3
rd
7 4
th
Floor Only
Place/ City Qatar
Completion Date December 2008
Type Of Units Multi V
Total Capacity 162_Ton
Total Project Value 200,000_$
Notes
Project originally designed with Air Cooled Chillers and
then converted to VRF to reduce the connecting load
Client required individual billing for the offices
Premium AC which is capable of handling high
elevation building
Land Mark Multi V Project
Commercial

66
Project Name Ajman Bank
Building Type Bank
Project owner EDARA
No Of Floors G+2 Building
Consultant Name Mac Nally Consultant
Contractor Name
Place/ City UAE Ajman
Completion Date December 2008
Type Of Units Multi V
Total Capacity 220_Ton
Total Project Value 250,000_$
Notes
Project originally designed with Air Cooled Chillers and
then converted to VRF to reduce the power consumption,
Client required individual billing for offices.
Land Mark Multi V Project
Commercial

67
Project Name Dubai Bank
Building Type Bank
Project owner Dubai Bank
No Of Floors G+2 Building
Consultant Name Engineers Office
Contractor Name SS. Lootha Constructions
Place/ City UAE Dubai
Completion Date July 2009
Type Of Units Multi V
Total Capacity 159_Ton
Total Project Value 200,000_$
Notes
Project originally designed with Air Cooled Chillers and
then converted to VRF to reduce the cost of
Electric Connection and Electric power consumption,
Offered with Central Controller.
Land Mark Multi V Project
Commercial

68
Project Name Al Meraas Sales Center
Building Type Office Bldg
Project owner Al MERAAS
No Of Floors G+M Building
Consultant Name SPW Consultant
Contractor Name
Place/ City UAE Dubai
Completion Date Nov 2009
Type Of Units Multi V
Total Capacity 120_Ton
Total Project Value 150,000_$
Notes
Project Demands for less operational cost, as client
need to pay the electricity bill
Offered with Central Controller.
Land Mark Multi V Project
Commercial

Project Name Airport Heights ECGA
Building Type Commercial Building
Project owner ECGA
No Of Floors
Consultant Name IBN Khaldoun
Contractor Name HJB
Place/ City Oman Muscat
Completion Date Under Commissioning
Type Of Units Multi V
Total Capacity 200_Ton
Total Project Value 225,000_$
Notes
Its a Ministry of Finance PJT
Green Technology
Installation Flexibility and Network solution
Land Mark Multi V Project
Commercial
PROJECT UNDER COMMISSIONING

Project Name Yahya Group Holding Building
Building Type Office Building
Project owner Yahya Group Holding
No Of Floors G+1 Building
Consultant Name Al Abraj
Contractor Name OGE
Place/ City Oman - SOHAR
Completion Date December 2011
Type Of Units Multi V
Total Capacity 135_Ton
Total Project Value 160,000_$
Notes
Project owner looking for energy saving technology in o
rder to reduce annual electrical cost.
LG proposed Multi V and highlighted annual savings
Land Mark Multi V Project
Commercial

Project Name British Council Building
Building Type Office Building
Project owner British Council
No Of Floors G+1 Building
Consultant Name Majaan
Contractor Name Cemec
Place/ City Oman - Muscat
Completion Date January 2012
Type Of Units Multi V
Total Capacity 20_Ton
Total Project Value 30,000_$
Notes
Project originally designed with Air Cooled Chillers and
then converted to VRF to reduce the cost of Electric
Connection and Electric power consumption,
Offered with Central Controller.
Land Mark Multi V Project
Commercial

72
Project Name Hubara Bird Culture
Building Type Laboratory Center
Project owner Abu Dhabi Authority For
Culture& Heritage (ADACH)
Consultant Name Lab Design
Contractor Name Adearest
Place/ City UAE Al Ain
Completion Date August 2008
Type Of Units Multi V
Total Capacity 527_Ton
Total Project Value 685,000_$
Client Requirements
Sustainable design with green Refrigerant
The lesser the better power consumption
Capability of Monitoring& Controlling the AC units
Land Mark Multi V Project
Miscellaneous

Vous aimerez peut-être aussi