12
th
u!" #2$
n%
u!"
Wee&: Thirtieth '()*
Site Activities undertaken: Casting of foundation with foundation beam.
Casting of column in foundation completed
Blockwork in foundation completed
Backflling with laterite and 0-0mm aggregate and
compaction done.
Spreading and leveling of warehouse area with 0-
0mm aggregate
Checks carried out: !ength" spacing" alignments" laps" form treatment"
cleanliness"
cover to reinforcement"
defects" concrete mi#"
!evels and compliance with architectural and
structural drawings.
$rawings that have been
updated:
$wg. % &$'()*+)S,)$- 0. $wg. %
&$'()*+)S,)$- 0(
$wg. % &$'()*+)S,)$- 0/ $wg. %
&$'()*+)S,)$- /A
$wg. % &$'()*+)S,)$- 00 $wg. %
&$'()*+)S,)$- 01
$wg. % &$'()S,)-2.)$- 0. $wg. %
&$'()S,)-2.)$- 0
$wg. % &$'()S,)-2()$- 0/ $wg. %
&$'()A3)00.-004
3e5uired information for coming
week:
Stairs details
-hat 6ou have learnt within
period
Setting out of Column using control points
7ore e#perience in the interpretation architectural
and structural drawings
Challenges faced 8enerator for the poker vibrator broke down making
it di9cult for concrete to be vibrated when poured.
:#cavated trench caved in which made surfaces
unclean for concrete pour
:#pectations from;
- $esign o9ce
- Supervisors
- +oremen
- *ther sta<
&B:
+iling of reports" drawing registers" superseded drawings should be done
appropriatel6
*btain and fle copies of !aborator6 ,est results for concrete cubes and
reinforcement bars.
Assist. Site Engineers Report
Project: NDK2 Warehouse Tema
2(
r%
u!" #+
th
August Wee&:
Thirt"#Secon% '(2*
Site Activities undertaken: Casting of 8round +loor slab completed
Casting of column from 8round +loor to +irst +loor
Completed
:#cavation" foundation" block work" concrete wall
and hardcore flling completed at e#tension
=it e#cavation of warehouse >.? completed.
:#cavation of septic tank
Checks carried out: !ength" spacing" alignments" laps" form treatment"
cleanliness"
cover to reinforcement"
defects" concrete mi#"
!evels and compliance with architectural and
structural drawings.
$rawings that have been
updated:
$wg. % &$'()*+)S,)$- 0. $wg. %
&$'()*+)S,)$- 0(
$wg. % &$'()*+)S,)$- 0/ $wg. %
&$'()*+)S,)$- /A
$wg. % &$'()*+)S,)$- 01 $wg. %
&$'()*+)S,)$- 0@
$wg. % &$'()S,)S2)$- 0. $wg. %
&$'()S,)S2)$- 0(
$wg. % &$'()S,)S2)$- 0/ $wg. %
&$'()S,)S2)$-0
$wg. % &$'()S,)S2)$-00 $wg. %
&$'()S,)S2)$-01
$wg. % &$'()S,)S2)$-0@
3e5uired information for coming
week:
3evision of architectural drawing if available
=rovision of service drawing if available
-hat 6ou have learnt within
period
7ore e#perience and knowledge in setting out
2ow various formworks are formed especiall6 beam
so9ts
'nowledge and usage of the water level
Challenges faced
:#pectations from;
- $esign o9ce
- Supervisors
- +oremen
- *ther sta<
&B:
+iling of reports" drawing registers" superseded drawings should be done
appropriatel6
*btain and fle copies of !aborator6 ,est results for concrete cubes and
reinforcement bars.
Assist. Site Engineers Report
Project: NDK2 Warehouse Tema
,
th
August #21
th
August Wee&:
Thirt"#-ourth '(.*
Site Activities undertaken: Blinding for precast base at warehouse . is
completed and precast base has been placed.
:#cavation of pit at warehouse / is completed and
blinding has also been completed
Block work on ground Aoor is @0B completed
:#tension of column height to /m is completed.
Septic tank behind warehouse / is nearl6 completed
with onl6 the concrete cover slab remaining to be
cast
+ormwork for 3.C. vault wall is completed and
waiting to be casted
Checks carried out: !ength" spacing" alignments" laps" form treatment"
cleanliness"
cover to reinforcement"
defects" concrete mi#"
!evels and compliance with architectural and
structural drawings.
$rawings that have been
updated:
$wg. % &$'()*+)S,)$- 0. $wg. %
&$'()*+)S,)$- 0(
$wg. % &$'()*+)S,)$- 0/ $wg. %
&$'()*+)S,)$- /A
$wg. % &$'()*+)S,)$- 01 $wg. %
&$'()*+)S,)$- 0C
$wg. % &$'()*+)S,)$- 0CA
3e5uired information for coming
week:
3evision of o9ce structural drawing for columns and
beams
-hat 6ou have learnt within
period
7ore e#perience and knowledge in setting out
,aking levels using the automatic levelling
instrument.
Dnterpretations of structural steel drawings
Challenges faced 3einforcement delivered to site are sometimes
messed up therefore making it di9cult in
identif6ing them instantl6
:#pectations from;
- $esign o9ce
- Supervisors
- +oremen
- *ther sta<
&B:
+iling of reports" drawing registers" superseded drawings should be done
appropriatel6
*btain and fle copies of !aborator6 ,est results for concrete cubes and
reinforcement bars.
Assist. Site Engineers Report
Project: NDK2 Warehouse Tema
2(
r%
August #.
th
Septem/er Wee&:
Thirt"#Si0th '($*
Site Activities undertaken: Casting of base e#tension for .000 E (000 mm base
for warehouse . and / is completed
Casting of plinth column and setting of hold down
bolts at warehouse . completed
+i#ing of reinforcement for plinth at warehouse /
+i#ing of reinforcement for frst Aoor beams of o9ce
building
Casting of septic tank cover slab behind warehouse
/
Casting of vault room in o9ce building
Checks carried out: !ength" spacing" alignments" laps" form treatment"
cleanliness"
cover to reinforcement" position of hold down bolts"
defects" concrete mi#"
!evels and compliance with architectural and
structural drawings.
$rawings that have been
updated:
$wg. % &$'()*+)S,)$- 0. $wg. %
&$'()*+)S,)$- 0(
$wg. % &$'()*+)S,)$- 0/ $wg. %
&$'()*+)S,)$- /A
$wg. % &$'()*+)S,)$- 01A $wg. %
&$'()*+)S,)$- 0C
$wg. % &$'()*+)S,)$- 0CA $wg. %
&$'()*+)S,)$- 0@
3e5uired information for coming
week:
3evision of o9ce structural drawing for columns
-hat 6ou have learnt within
period
7ore e#perience and knowledge in setting out
,aking levels using the automatic levelling
instrument.
Dnterpretations of structural steel drawings
7ore e#perience and knowledge in setting out hold
down bolts
Challenges faced $iesel generator for =oker Fibrator is not working
therefore making vibrating of concrete ver6 di9cult.
:#pectations from;
- $esign o9ce
- Supervisors
- +oremen
- *ther sta<
&B:
+iling of reports" drawing registers" superseded drawings should be done
appropriatel6
*btain and fle copies of !aborator6 ,est results for concrete cubes and
reinforcement bars.
Assist. Site Engineers Report
Project: NDK2 Warehouse Tema
$
th
Septem/er #11
th
Septem/er
Wee&: Thirt"#Eighth '(1*
Site Activities undertaken: Casting of plinth column and setting of hold down
bolts at warehouse / completed
+i#ing of reinforcement for frst Aoor beams of o9ce
building
Casting of frst Aoor slab and beams completed
Casting of ground peripheral beam at warehouse .
completed
Casting of vault wall in o9ce building
Checks carried out: !ength" spacing" alignments" laps" form treatment"
cleanliness"
cover to reinforcement" position of hold down bolts"
$efects" concrete mi#" !evels and compliance with
architectural and structural drawings.
$rawings that have been
updated:
$wg. % &$'()*+)S,)$- 0/ $wg. %
&$'()*+)S,)$- /A
$wg. % &$'()*+)S,)$- 0/B $wg. %
&$'()*+)S,)$- 0/C
$wg. % &$'()*+)S,)$- 0 $wg. %
&$'()*+)S,)$- 0A
$wg. % &$'()*+)S,)$- 04 $wg. %
&$'()*+)S,)$- 01
$wg. % &$'()*+)S,)$- 0CA $wg. %
&$'()*+)S,)$- 0@ $wg. % &$'()*+)S,)$- .0
$wg. % &$'()*+)S,)$- .0A $wg. %
&$'()*+)S,)$- .. $wg. % &$'()*+)A3)$-
0/ $wg. % &$'()*+)A3)$- 0C $wg. %
&$'()*+)A3)$- 0@
3e5uired information for coming
week:
-hat 6ou have learnt within
period
7ore e#perience in taking levels using the
automatic leveling instrument.
Dnterpretations of structural steel drawings
7ore e#perience and knowledge in setting out hold
down bolts
knowledge on how Aoor slabs are constructed using
3ibsGtrasacco beamsH
general knowledge in forming formwork to receive
3ibs
Challenges faced
:#pectations from;
- $esign o9ce
- Supervisors
- +oremen
- *ther sta<
&B:
+iling of reports" drawing registers" superseded drawings should be done
appropriatel6
*btain and fle copies of !aborator6 ,est results for concrete cubes and
reinforcement bars.
Assist. Site Engineers Report
Project: NDK2 Warehouse Tema
2)
th
Septem/er #)2
n%
2cto/er 2)1)
Wee&: 3ortieth '.)*
Site Activities undertaken: Casting of +irst +loor to Second +loor Columns
completed
=lacing of 7esh and Casting of -arehouse . and /
8round +loor Slab in ba6s
+orming formwork for second Aoor beams and
cantilever slab of o9ce building
+i#ing of reinforcement for Second Aoor beams of
o9ce building
Checks carried out: !ength" spacing" alignments" laps" form treatment"
cleanliness"
Cover to reinforcement" $efects" concrete mi#"
!evels and compliance with architectural and
structural drawings.
$rawings that have been
updated:
&o Ipdate
3e5uired information for coming
week:
-hat 6ou have learnt within
period
7ore e#perience in taking levels using the
automatic leveling instrument.
2ow to cast large concrete Aoor slabs in ba6s and
the t6pes of construction Joints
Challenges faced
:#pectations from;
- $esign o9ce
- Supervisors
- +oremen
- *ther sta<
&B:
+iling of reports" drawing registers" superseded drawings should be done
appropriatel6
*btain and fle copies of !aborator6 ,est results for concrete cubes and
reinforcement bars.
Assist. Site Engineers Report
Project: NDK2 Warehouse Tema
).
n%
2cto/er#1$
th
2cto/er 2)1)
Wee&: 3ort" Secon% '.2*
Site Activities undertaken: Striking of formwork to soft of frst Aoor beams and
bracings
=lacing of 7esh and Casting of -arehouse . and /
8round +loor
Slab in ba6s completed
Casting of second Aoor beams" slab" cantilever slab
and upstand beams completed
Casting of second Aoor Columns to roof Aoor C0B
completed
Continuation of block work at ground Aoor
Checks carried out: !ength" spacing" alignments" laps" form treatment"
cleanliness"
Cover to reinforcement" $efects" concrete mi#"
!evels and compliance with architectural and
structural drawings.
$rawings that have been
updated:
$wg. % &$'()*+)S,)$- 0. $wg. %
&$'()*+)S,)$- 0(
$wg. % &$'()*+)S,)$- 0/ $wg. %
&$'()*+)S,)$- /A
$wg. % &$'()*+)S,)$- 0/B $wg. %
&$'()*+)S,)$- 0/C
$wg. % &$'()*+)S,)$- 0 $wg. %
&$'()*+)S,)$- 0A
$wg. % &$'()*+)S,)$- 04 $wg. %
&$'()*+)S,)$- 01
$wg. % &$'()*+)S,)$- 0CA $wg. %
&$'()*+)S,)$- 0@ $wg. % &$'()*+)S,)$- .0
$wg. % &$'()*+)S,)$- .0A $wg. %
&$'()*+)S,)$- .. $wg. % &$'()*+)A3)$-
0.-0@
3e5uired information for coming
week:
:lectrical" Air-Conditioning and plumbing drawing of
o9ce building.
$etails of warehouse o9ce and washrooms
-hat 6ou have learnt within
period
7ore e#perience in taking levels using the
automatic leveling instrument.
7ore e#perience and technical know-how in forming
formwork to so9t of beam and bracing of ribs.
7ore knowledge in construction of rib slab Gtrassaco
fast AoorH
-ork planning and site management
Challenges faced
:#pectations from;
- $esign o9ce
- Supervisors
- +oremen
- *ther sta<
&B:
+iling of reports" drawing registers" superseded drawings should be done
appropriatel6
*btain and fle copies of !aborator6 ,est results for concrete cubes and
reinforcement bars.
Assist. Site Engineers Report
Project: NDK2 Warehouse Tema
11
n%
2cto/er#()
th
2cto/er 2)1)
Wee&: 3ort" -ourth '..*
Site Activities undertaken: Striking of formwork to soft of second Aoor beams
and bracings
=it e#cavation of -arehouse (
Casting of roof Aoor beams" 00mm concrete
topping and upstand beams completed
Casting of second Aoor Columns to roof Aoor
completed
Continuation of block work at ground Aoor
Checks carried out: !ength" spacing" alignments" laps" form treatment"
cleanliness"
Cover to reinforcement" $efects" concrete mi#"
!evels and compliance with architectural and
structural drawings.
$rawings that have been
updated:
3e5uired information for coming
week:
.
$etails of warehouse o9ce and washrooms
-hat 6ou have learnt within
period
7ore e#perience in taking levels using the
automatic leveling instrument.
7ore e#perience and technical know-how in forming
formwork to so9t of beam and bracing of ribs.
7ore knowledge in construction of rib slab Gtrassaco
fast AoorH
'nowledge in the construction of upstand beams
Challenges faced
:#pectations from;
- $esign o9ce
- Supervisors
- +oremen
- *ther sta<
&B:
+iling of reports" drawing registers" superseded drawings should be done
appropriatel6
*btain and fle copies of !aborator6 ,est results for concrete cubes and
reinforcement bars.
Assist. Site Engineers Report
Project: NDK2 Warehouse
Tema )1
th
No4#1(th
th
No4
2)1) Wee&: 3ort"#si0th '.$*
Site Activities undertaken: Casting of ground Aoor to frst Aoor stair case
=it e#cavation of -arehouse ( and casting of
blinding
=lacing of precast base and casting of e#tensions at
warehouse (
Casting of plinth 10B completed at warehouse >(?
Steel erection at warehouse >/?
Continuation of blockworks at warehouse >.?" >/? and
o9ce building
Checks carried out: !ength" spacing" alignments" laps" form treatment"
cleanliness" steel numbers and it?s positions
Cover to reinforcement" $efects" concrete mi#"
!evels and compliance with architectural and
structural drawings.
$rawings that have been
updated:
$wg. % &$'()*+)A3)$- 00. $wg. %
&$'()*+)A3)$- 001
$wg. % &$'()A3)S2) 00. $wg. % &$'()A3)S2)
00.B
$wg. % &$'()A3)S2) 00.C
3e5uired information for coming
week:
.
-hat 6ou have learnt within
period
7ore e#perience in taking levels using the
automatic leveling instrument.
,echnical 'nowledge in the forming of formwork for
staircase.
Challenges faced
:#pectations from;
- $esign o9ce
- Supervisors
- +oremen
- *ther sta<
&B:
+iling of reports" drawing registers" superseded drawings should be done
appropriatel6
*btain and fle copies of !aborator6 ,est results for concrete cubes and
reinforcement bars.
Assist. Site Engineers Report
Project: NDK2 Warehouse Tema
15
th
No4#2+th
th
No4 2)1) Wee&:
3ort"#eighth '.1*
Site Activities undertaken: Casting of frst Aoor to second Aoor stair case
Casting of plinth is completed at warehouse >(?
Continuation of blockworks at warehouse >.?" >/? and
o9ce building
+irst +i# of electrical and Air-conditioning at o9ce
building
Checks carried out: !ength" spacing" alignments" laps" form treatment"
cleanliness" height of electrical and air conditioning
positions and it adherence to companies procedure
Cover to reinforcement" $efects" concrete mi#"
!evels and compliance with architectural and
structural drawings.
$rawings that have been
updated:
3e5uired information for coming
week:
3evised drawing of o9ce building electrical and air-
condition drawing
3evised drawing of o9ce building second Aoor
arrangement
-hat 6ou have learnt within
period
7ore e#perience in taking levels using the
automatic leveling instrument.
,echnical 'nowledge in the forming of formwork for
staircase.
*verall idea and e#perience in electrical and air
conditioning frst f#
Challenges faced
:#pectations from;
- $esign o9ce
- Supervisors
- +oremen
- *ther sta<
&B:
+iling of reports" drawing registers" superseded drawings should be done
appropriatel6
*btain and fle copies of !aborator6 ,est results for concrete cubes and
reinforcement bars.
Assist. Site Engineers Report
Project: NDK2 Warehouse Tema
2,
th
No4#1)th
th
Dec. 2)1) Wee&:
3i-tieth '5)*
Site Activities undertaken: Casting of -arehouse >(? ground Aoor slab is 10B
completed
Steel erection for warehouse >/? is /0B completed
as at toda6
*9ce building blockworks is @1B completed
:#ternal plastering of o9ce building
+irst +i# of electrical and Air-conditioning installation
on ground Aoor of o9ce building nearl6 completed
Checks carried out: !ength" spacing" alignments" laps" form treatment"
cleanliness" height of electrical and air conditioning
gadgets positions and it adherence to companies
procedure
Cover to reinforcement" $efects" concrete mi#"
!evels and compliance with architectural and
structural drawings.
$rawings that have been
updated:
$wg. % &$'(-A3-$- 000
$wg. % &$'(-A3-$- 00(
$wg. % &$'(-A3-$- 00/
3e5uired information for coming
week:
+oundation details of partition fence wall
8eneral arrangement of foundation of securit6 o9ce
-hat 6ou have learnt within
period
7ore e#perience in taking levels using the
automatic leveling instrument.
:#perience in the interpretation of steel structural
drawing for erection.
*verall idea and e#perience in electrical and air
conditioning frst f#
Challenges faced
:#pectations from;
- $esign o9ce
- Supervisors
- +oremen
- *ther sta<
&B:
+iling of reports" drawing registers" superseded drawings should be done
appropriatel6
*btain and fle copies of !aborator6 ,est results for concrete cubes and
reinforcement bars.
Assist. Site Engineers Report
Project: NDK2 Warehouse Tema
).
th
an#1.
th
an. 2)1) Wee&: T6o
')2*
Site Activities undertaken: =lastering of *9ce Building
Steel erection for warehouse >.? and >(? is C0B
completed as at toda6
*9ce building blockworks is @1B completed
+irst +i# of fre alarm s6stems for o9ce building
Casting of ,ie beam on Blockwork of -arehouse >/?
Arranging of timber trusses of o9ce building
Checks carried out: !ength" spacing" alignments" laps" form treatment"
cleanliness" height of electrical and air conditioning
gadgets positions and it adherence to companies
procedure
Cover to reinforcement" $efects" concrete mi#"
!evels and compliance with architectural and
structural drawings.
$rawings that have been
updated:
$wg. % &$'(-A3-$- 00/
$wg. % &$'(-A3-$- 001
$wg. % &$'(-A3-$- 00/
S70.
&$'(-:!-00/
3e5uired information for coming
week:
-hat 6ou have learnt within
period
Challenges faced
:#pectations from;
- $esign o9ce
- Supervisors
- +oremen
- *ther sta<
&B:
+iling of reports" drawing registers" superseded drawings should be done
appropriatel6
*btain and fle copies of !aborator6 ,est results for concrete cubes and
reinforcement bars.

Vous aimerez peut-être aussi