PT.Sandabi Indah Lestari

Daily Mill Production Report

Palm Oil Mill - Padang Jaya


Bengkulu Utara

July 31, 2013

FFB Row Material

FFB in yard
Today

Description

Actual
Afdeling 1
Afdeling 2
Afdeling 3
Afdeling 4
Afdeling 5
Seluma

Current Month

Estimat

26,550
26,530
12,380
25,070
14,700
14,700

Actual

35,264
30,665
29,131
36,797
21,465
30,323

661,320
671,520
699,050
1,001,470
469,860
416,790
3,929,560

Current Year

Estimate

Actual

1,093,184
950,615
903,061
1,140,707
665,415
940,013

4,562,650
3,888,570
3,835,040
5,413,830
2,699,810
3,339,570

Estimate
6,112,971
5,315,629
5,049,829
6,378,681
3,720,913
6,124,019

Sub Total

119,930

183,774

5,696,994

23,775,740

32,727,030

Out Site

766,800

480,655

15,163,303 14,900,005

77,456,372

96,799,958

Grand Total

886,730

664,429

19,092,863 20,596,999 101,232,112 129,526,988

CPO Production
Standard
Oil Production
Extraction Ratio
FFA
Moisture
Dirt
Carotine
Dobi

> 20,30
< 3,50
< 0,15
< 0,025
> 380
> 2,70

Blance Unsterilised

Balance to Sterilised

16

89,817

FFB Proc
Mill/Hour
Press/Hour
Kg/Cage

Kernel Production
Today
191,339
21.04
2.66
0.13
0.018
362
2.72

Curr Month Curr Year


4,072,563
20.98
3.29
0.18
0.022
369
2.78

20,186,303
19.90
3.13
0.14
0.022
371
2.75

Standard
Kernel Production
Extraction Ratio
FFA
Moisture
Dirt
Broken Kernel
Oil Content

> 5,00
< 1,00

Today
40,000
4.40
0.48
7.51
8.52
12.69
44.11

Curr Month Curr Year


910,000
4.69
0.54
6.98
7.49
12.69
45.18

4,413,000
4.35
0.53
6.95
7.06
12.35
44.11

Page 2 of 2

Mill Power Generation and Fuel Consumption


Operation Hours

Monthly

Diesel 1
Diesel 2
Diesel 3
Turbin 1
Turbin 2

81.10
84.10
107.00
402.47
141.84

3.90
20.29

Yearly
367.30
372.10
374.06
437.50
1,559.3

KWH

Fuel

240
12,992

Litre/Hrs Litre/FFB
-

Litre/KW

0.26
14.29

Total

14.550

Water Quality Control

Mill Operating Hours

Press 1
Press 2
Press 3
Press 4
Decanter 1
Decanter 2
Purifier 1
Purifier 2
Sand Cyclone 1
Sand Cyclone 2
Fruit Elevator 1
Fruit Elevator 1
Claybath
Hydro Cyclone

KWH/ FFB

Today

Monthly

Yearly

20.42
20.57
20.55
15.59
18.01
21.54
21.54
21.27
1.63
21.21
-

239.08
491.86
286.62
291.22
448.32
239.38
64.14
1.11
531.31
516.84
409.39
77.30
531.79
-

2,038.59
1,816.42
1,247.32
1,851.85
2,445.73
1,277.78
1,793.86
415.46
2,621.33
1,679.14
1,760.05
967.67
2,691.62
-

Today
Ripple Mill 1
Ripple Mill 2
Ripple Mill 3
Boiler 1
Boiler 2
Tippler
Threser 1
Threser 2
Shredder 1
Shredder 2
Komatsu
JCB 1
JCB 2
Bachus Turner

21.13
21.75
11.33
20.30
12.66
12.77
14.00
13.50
7.15

Monthly
369.60
66.22
156.53
432.68
132.27
362.06
186.96
362.64
94.87
95.62
384.99
427.47
118.96

Yearly

Feed Water

2,022.70
1,362.58
867.29
872.24
1,998.18
1,622.26
1,015.53
1,810.11
1,445.72
1,434.57
2,218.92
215.50
2,221.74
674.21

PH
TDS (ppm)
Silica (ppm)
Hardness (ppm)
Feed Water
PH
TDS (ppm)
Silica (ppm)
Hardness (ppm)
Sulfit (ppm)
Posphate (ppm)
Iron (ppm)

Standart

Result

Standart
-

6.45
12.00
7.60
Result
11.20
1,050.00
75.60
1.20
64.20
66.10
0.68

Milling Hours Utility


Today

Monthly

Yearly

Shift Hours
Milling Hours
Production Downtime
Breakdown Hours
Cleaning and Maint
Awaiting Fruit

24.00
20.58
3.42

596.89 3,321.31
532.74 2,664.80
1.91
15.17
134.35 1,636.41

Total Hours Lost


Shift Utility
Mill Utility

24.00
85.75
85.75

669.00 4,316.38
89.25
80.23
79.63
61.74

Checked by

Approved by

Askur Hayat Lubis


Mill Head Assistent

Ngatimin Yahman
Mill Manager

Comments: