Vous êtes sur la page 1sur 3

Phase-I

Fitup

KP0-Line1725
KP0-Line1708
KP0-Line1702

KP0-Line1721

KP0-Line1701

Joint
No
FW02
FW03
FW06
FW05
FW07
FW12
FW21
FW22
FW27
FW16
FW09
FW6
FW6A
FW12
FW11
FW21
FW17
FW40
FW42
FW35
FW35A
FW22
FW03

KP0 Total

Welding

Dia

Date

Fitup Report

Dia

Date

36
36
36
36
36
20

3/11/2013
3/11/2013
3/11/2013
8/11/2013
3/11/2013
3/11/2013

3/11/2013
3/11/2013
3/11/2013

36
36
36
36
36
20

6/11/2013
6/11/2013
6/11/2013
11/11/2013
11/10/2013
4/11/2013

48
48
36
48
42
42
42
42
42
42
42
42
42
42
42
48
48

10/11/2013
8/11/2013
8/11/2013
8/11/2013
13/11/13
13/11/13
13/11/13
14/11/13
12/11/2013
8/11/2013
12/11/2013
8/11/2013
7/11/2013
14/16/13
14/16/13
5/11/2013
5/11/2013

48
48
36
48
42
42
42

11/11/2013
11/10/2013
10/11/2013
11/10/2013
14/11/13
14/11/13
14/11/13

42

13/11/13

42

13/11/13

42
42

15/16/13
15/16/13

938

3/11/2013
9/11/2013

9/11/2013
9/11/2013

Visual
Report

RT/PAUT

PWHT

MPI

Hardness

Date

Date

Date

Date

Remarks
ARC STRIKE-NEED MPI/UT Report
ARC STRIKE-NEED MPI/UT Report

9/11/2013

9/11/2013
9/11/2013
674

ACTIVITIES ON KP-0
1) Spool erection, Fit-up and Welding in progress inside and outside the station.
2) PWHT, MPI and Hardness activities are to be started.
3) PAUT/RT Total 26 Joints (PAUT-16 / BSR RT-10) completed and accepted
FW18
FW21
FW22
FW27
FW17
FW12
FW39
FW01
FW40
FW38
FW03
FW04
FW05
FW06
FW07
FW08
FW09
FW10
FW11
FW14
FW15
FW16
FW23
FW24
FW25
FW28
FW29
FW30
FW31
FW32
FW33
FW34
FW35
FW36
FW12R
SV1 Total

36
36
36
36
36
36
36
36
36
36
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
0
408

24-10-13
24-10-13
24-10-13
24-10-13
25-10-13
27-10-13
27-10-13
27-10-13
28-10-13
28-10-13
29-10-13
29-10-13
29-10-13
29-10-13
29-10-13
29-10-13
29-10-13
29-10-13
29-10-13
29-10-13
29-10-13
29-10-13
29-10-13
29-10-13
29-10-13
29-10-13
29-10-13
29-10-13
29-10-13
29-10-13
29-10-13
29-10-13
29-10-13
29-10-13
-

36
36
36
36
36
0
36
36
36
36
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
36
408

24-10-13
24-10-13
25-10-13
28-10-13
26-10-13
27-10-13
27-10-13
27-10-13
28-10-13
28-10-13
30-10-13
30-10-13
30-10-13
30-10-13
30-10-13
30-10-13
30-10-13
30-10-13
30-10-13
30-10-13
30-10-13
30-10-13
29-10-13
29-10-13
29-10-13
30-10-13
30-10-13
30-10-13
30-10-13
30-10-13
30-10-13
30-10-13
30-10-13
30-10-13

27-10-13
27-10-13
27-10-13
29-10-13
27-10-13
28-10-13
28-10-13
28-10-13
29-10-13
29-10-13
31-10-13
31-10-13
31-10-13
31-10-13
31-10-13
31-10-13
31-10-13
31-10-13
31-10-13
31-10-13
31-10-13
31-10-13
31-10-13
31-10-13
31-10-13
31-10-13
31-10-13
31-10-13
31-10-13
31-10-13
31-10-13
31-10-13
31-10-13
31-10-13

ACTIVITIES ON SV-1
1) Field piping activities (Spool erection, Fit-up and Welding) are completed.
2) PWHT, NDT, Hardness testing activities (MPI, PAUT, RT) are completed on 3-11-13.
3) Piping Supports welding and installation Completed.
4) Hydro testing of station piping completed on 15/11/13 and found acceptable.

SV2
SV2 Total

ACTIVITIES ON SV-2
1) No piping work started as of 15-11-13.

3/11/2013
3/11/2013
3/11/2013
3/11/2013
3/11/2013
PAUT-R
3/11/2013
3/11/2013
3/11/2013
3/11/2013
3/11/2013
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
8/11/2013 7/11/2013

4/11/2013
4/11/2013
4/11/2013
4/11/2013
4/11/2013
4/11/2013
4/11/2013
4/11/2013
4/11/2013
4/11/2013
4/11/2013
4/11/2013
4/11/2013
4/11/2013
4/11/2013
4/11/2013
4/11/2013
4/11/2013
4/11/2013
4/11/2013
4/11/2013
4/11/2013
4/11/2013
4/11/2013
4/11/2013
4/11/2013
4/11/2013
4/11/2013
4/11/2013
4/11/2013
4/11/2013
4/11/2013
4/11/2013
4/11/2013
8/11/2013

4/11/2013
4/11/2013
4/11/2013
4/11/2013
4/11/2013
4/11/2013 Repair welding done on 6-11-13
4/11/2013
4/11/2013
4/11/2013
4/11/2013
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
8/11/2013

SV3-Line
3004

SV3-Line
3002

FW19
FW23
FW24
FW29
FW40
FW41
FW1
FW2
FW13
FW18
FW42
FW43
FW30
FW31
FW32
FW33
FW34
FW35
FW36
FW37
FW38
FW04
FW05
FW06
FW07
FW08
FW09
FW10
FW11
FW12
FW25
FW15
FW16
FW17
FW26
FW27

36
36
36
36
36
36
36
36
36
36
20
20
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2

14-10-13
14-10-14
16-10-13
16-10-13
17-10-13
17-10-13
17-10-13
17-10-13
17-10-13
17-10-13
18-10-13
18-10-13
21-10-13
21-10-13
21-10-13
21-10-13
21-10-13
21-10-13
21-10-13
21-10-13
21-10-13
21-10-13
21-10-13
21-10-13
21-10-13
21-10-13
21-10-13
21-10-13
21-10-13
21-10-13
23-10-13
23-10-13
23-10-13
23-10-13
23-10-13
23-10-13

36
36
36
36
36
36
36
36
36
36
20
20
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2

23-10-13
23-10-13
18-10-13
24-10-13
20-10-13
22-10-13
22-10-13
20-10-13
23-10-13
18-10-13
23-10-13
24-10-13
24-10-13
22-10-13
22-10-13
24-10-13
22-10-13
22-10-13
24-10-13
22-10-13
22-10-13
24-10-13
22-10-13
22-10-13
24-10-13
22-10-13
22-10-13
24-10-13
22-10-13
22-10-13
24-10-13
24-10-13
24-10-13
24-10-13
24-10-13
24-10-13

26-10-13
26-10-13
20-10-13
26-10-13
20-10-13
26-10-13
26-10-13
20-10-13
26-10-13
20-10-13
26-10-13
26-10-13
26-10-13
26-10-13
26-10-13
26-10-13
26-10-13
26-10-13
26-10-13
26-10-13
26-10-13
26-10-13
26-10-13
26-10-13
26-10-13
26-10-13
26-10-13
26-10-13
26-10-13
26-10-13
26-10-13
26-10-13
26-10-13
26-10-13
26-10-13
26-10-13

FW4
FW5
FW4A
FW2

20
20
20
2

18-10-13
19-10-13
19-10-14
19-10-15

20
20
20
2

24-10-13
24-10-13
24-10-13
24-10-13

26-10-13
26-10-13
26-10-13
26-10-13

SV 3 Total

510

31-10-13 P
1-11?
1-11?
31-10-13 P

27-10-13
27-10-13
26-10-13
26-10-13
29-10-13
31-10-13
31-10-13
29-10-13
31-10-13 P
30-10-13
31-10-13 P
30-10-13
30-10-13
29-10-13
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required

31-10-13
31-10-13
31-10-13
31-10-13
31-10-13
31-10-13
31-10-13
31-10-13
31-10-13
31-10-13
31-10-13
31-10-13
27-10-13
31-10-13
31-10-13
27-10-13
31-10-13
31-10-13
27-10-13
31-10-13
31-10-13
27-10-13
31-10-13
31-10-13
27-10-13
31-10-13
31-10-13
27-10-13
31-10-13
31-10-13
27-10-13
27-10-13
31-10-13
31-10-13
31-10-13
31-10-13

30-10-13
30-10-13
30-10-13
30-10-13
30-10-13
31-10-13
31-10-13
30-10-13
30-10-13
30-10-13
30-10-13
30-10-13
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required
Not Required

30-10-13
27-10-13
29-10-13
Not Required

31-10-13
31-10-13
31-10-13
27-10-13

30-10-13
30-10-13
30-10-13
Not Required

31-10-13 P
1-11?

510

ACTIVITIES ON SV-3
1) Field piping activities (Spool erection, Fit-up and Welding) are completed.
2) PWHT, RT, PAUT, Hardness & MPI 100% completed.
3) Piping Support shoes welding and installation is completed.
4) Support Installation, Teflon pads, wear pads installation (for valves, piping spools etc.) are pending.
5 Hydro testing of piping spools and associated Pipeline section is completed and accepted on 8-11-13.
6) Installation of Vent Line (578-3003-V-20"-61170-N) is not started.
7) Initial walk-down on SV3 Completed with GASCO OPN, produced punch list items are handed over to Dodsal for necessary actions.
FW07
FW10
FW06
FW11
FW41
FW23
FW24
FW42
KP42-Line
FW40
3001
FW38
FW35
FW11
FW37
FW07
KP42-Line FW10
3017
FW11
FW06
FW02
FW17
FW10
FW11
FW18
FW16A1
FW36
FW16
FW37
FW61
FW42
FW31
FW23A
FW60
FW43A
FW46
FW43
KP42-Line
FW44
3002
FW45
FW38
KP42-Line
3015

36
36
36
36
36
42
42
36
36
36
18
36
36
30
30
30
36
36
30
36
36
30
36
36
36
36
30
36
36
36
36
36
36
2
2
2
2

21-10-13
21-10-13
22-10-13
26-10-13
26-10-13
26-10-13
26-10-13
29-10-13
29-10-13
29-10-13
4/11/2013
5/11/2013
7/11/2013
27-10-13
27-10-13
27-10-13
3/11/2013
29-10-13
29-10-13
31-10-13
31-10-13
1/11/2013
1/11/2013
3/11/2013
3/11/2013
4/11/2013
4/11/2013
4/11/2013
4/11/2013
5/11/2013
4/11/2013
4/11/2013
4/11/2013
11/11/2013
11/11/2013
11/11/2013
11/11/2013

36
36
36
36
36
42
42
36
36
36
18
36
36
30
30
30
30
36
30
36
36
30
36
36
36
36
36
36
36
36
36
36
36
2
2
2
2

29-10-13
29-10-13
29-10-13
4/11/2013
29-10-13
4/11/2013
4/11/2013
30-10-13
31-10-13
31-10-13
5/11/2013
5/11/2013
9/11/2013
1/11/2013
1/11/2013
1/11/2013
1/11/2013
31-10-13
31-10-13
1/11/2013
1/11/2013
1/11/2013
4/11/2013
4/11/2013
4/11/2013
5/11/2013
6/11/2013
7/11/2013
6/11/2013
5/11/2013
5/11/2013
6/11/2013
6/11/2013
12/11/2013
12/11/2013
12/11/2013
12/11/2013

9/11/2013
9/11/2013
9/11/2013
9/11/2013
9/11/2013
9/11/2013
9/11/2013
12/11/2013
9/11/2013
9/11/2013
9/11/2013
9/11/2013
9/11/2013
9/11/2013
9/11/2013
9/11/2013
9/11/2013
9/11/2013
9/11/2013
9/11/2013
9/11/2013
12/11/2013
12/11/2013
12/11/2013
9/11/2013
12/11/2013
12/11/2013

5/11/2013
7/11/2013
5/11/2013
5/11/2013
11/11/2013
7/11/2013
11/11/2013
11/11/2013
9/11/2013
11/11/2013
11/11/2013
14/11/13
10/11/2013
10/11/2013
9/11/2013
9/11/2013

14/11/13
14/11/13
14/11/13
14/11/13

14/11/13
14/11/13
14/11/13
14/11/13

14/11/13

14/11/13

14/11/13
Repair IN PAUT
Repair in PAUT
14/11/13
14/11/13

14/11/13
Repair in PAUT

Missing PWHT Thermocouple in 2 locatins- To be verifed in Hardness


16/11/13
16/11/13
16/11/13
16/11/13

16/11/13
16/11/13

KP42-Line
3002

KP42-Line
3003 D

KP42-Line
3018

KP42-Line
3007

KP42-Line
3014
KP42 Total

FW39
FW40
FW33
FW34
FW35
FW24
FW25
FW26
FW27
FW28
FW29
FW19
FW20
FW21
FW03
FW2
FW3
FW6
FW11
FW7
FW10
FW12
FW13
FW14
FW3
FW4
FW5
FW11
FW2A
FW2B
FW10
FW4
FW14
FW15
FW03
FW05
FW22

2
2
2
2
2
2
2
2
2
2
2
2
2
2
36
4
4
30
30
30
30
2
2
2
2
2
2
36
36
36
36
36
20
20
20
20
20
1638

11/11/2013
11/11/2013
11/11/2013
11/11/2013
11/11/2013
11/11/2013
11/11/2013
11/11/2013
11/11/2013
11/11/2013
11/11/2013
11/11/2013
11/11/2013
11/11/2013
8/11/2013
29-10-13
29-10-13
3/11/2013
3/11/2013
3/11/2013
3/11/2013
11/11/2013
11/11/2013
11/11/2013
11/11/2013
11/11/2013
11/11/2013
7/11/2013
8/11/2013
8/11/2013
8/11/2013
8/11/2013
7/11/2013
7/11/2013
8/11/2013
7/11/2013
6/11/2013

2
2
2
2
2
2
2
2
2
2
2
2
2
2
36
4
4
30
30
30
30
2
2
2
2
2
2
36
36
36
36
36
20
20
20
20
20
1638

12/11/2013
12/11/2013
12/11/2013
12/11/2013
12/11/2013
12/11/2013
12/11/2013
12/11/2013
12/11/2013
12/11/2013
12/11/2013
12/11/2013
12/11/2013
12/11/2013
7/11/2013
31-10-13
31-10-13
4/11/2013
6/11/2013
4/11/2013
4/11/2013
12/11/2013
12/11/2013
12/11/2013
12/11/2013
12/11/2013
12/11/2013
8/11/2013
9/11/2013
9/11/2013
9/11/2013
9/11/2013
8/11/2013
8/11/2013
9/11/2013
9/11/2013
7/11/2013

ACTIVITIES ON KP-42
1) Piping activities including spool erection and welding is on going.
2) PWHT started on 4-11-13, 41 Joints completed.
3) PAUT is ongoing - 27 Joints Completed and found 3 Joints to be repaired.
4) Hardness Testing - 13 Joints completed and in progress.
Net Total
3494
3230

9/11/2013
9/11/2013
9/11/2013
9/11/2013
9/11/2013
9/11/2013
9/11/2013

12/11/2013
12/11/2013
12/11/2013
12/11/2013
12/11/2013
12/11/2013
12/11/2013
12/11/2013
12/11/2013
12/11/2013

14/11/13

16/11/13

11/11/2013
16/11/13
16/11/13
11/11/2013
11/11/2013
11/11/2013

14/11/13

14/11/13