PONDS, RESERVOIRS AND OTHER APPLICATIONS


YEAR CLIENT APPLICATION
HDPE
THICKNESS
(MM)
QTY
(M2)
1983
King Fahad Gardens in Taif.
(Cont. : Binladin)
Ornamental Lake 1.00 10,061
1983
Royal Commission for Jubail & Yanbu
National Methanol Co., Al Jubail.
Storm Ponds 2.00 116,130
1983
Royal Commission for Jubail & Yanbu
National Methanol Co., Al Jubail.
Bunded Area 2.50 35,000
1983
Hindi
Bahrain
Sewage Pond 2.50 6680
1984
King Fahad Palace, Riyadh
(Cont. : Saudi Oger Ltd.)
Sewage Pond 1.00 36,321
1984
Al Jabalein Co.
Al-Khobar
Effluent Pond 1.00 10,000
1984
GETCO
Riyadh
Brine Pond 2.00 13,000
1984
PACIFIC
Al Ahsa

Sewage Pond

2.00

13,000
1985 Ministry of Agriculture Brine Pond 1.00 344,946
1987
Ministry of Agriculture
Al Qassim
( Saudi Aquaculture & Fish Farming Co.)
Fish Pond 0.75 10.536
1988
Ministry of Municipal & Rural Affairs
Nassriyah Interchange in Riyadh
(Cont. : Itihad Al Tatwir, Al Tanmia)
Underground Tunnel 0.75 26,340
1988
Ministry of Agriculture
Prince Sultan Farm in Riyadh.
( Cont.: Al Ameel Company)

Water Pond

1.00

5436
1988
Petromin Petrola
Rabigh Infrastructure Project (SAFINCO)
Sewage Lagoon 2.50 6,000
1988
Petromin Petrola
Rabigh Project
Water Pond 2.50 170,000
YEAR CLIENT / CONTRACTOR APPLICATION
HDPE
THICKNESS
(MM)
QTY
(M2)

Page 2

1988
Ministry of Municipal & Rural Affairs
Nassriyah Interchange in Riyadh
(Cont. : Itihad Al Tatwir, Al Tanmia)
Underground Tunnel 0.75 26,340
1998
Ministry of Agriculture
Prince Sultan Farm in Riyadh.
( Cont.: Al Ameel Company)
Water Pond 1.00 5,436
1989
Saudi Aramco
Ipsa 2 project in Yanbu
( Cont. : Meedco - Mitsubishi)
Evaporation Pond 0.75 5,268
1989
Saudi Aramco
Ipsa 2 project (IPS 7)
Oil project pump station in PS 9, AFIF
Evaporation Pond 1.00 23,103
1989
Ministry of Communication
King Abdul Aziz Square, Riyadh
Under Ground Tunnel 2.00 40,000
1989
Saudi Aramco
Al Wasia
Evaporation Pond 0.75 3,512
1990
Saudi Aramco
PS 6, Shaqra.
Water Pond 0.75 2,350
1990
Al Rajhi Office Building
Riyadh.
Water Pond 0.75 8,000
1990
Pemref Export Refinery Terminal
Riyadh
Water Pond 2.00 33,000
1990 Diwan Al Amir Foundation 2.00 110,000

1990
Saudi Aramco
Infrastructure

Evaporation Pond

1.50

18,000
1990
Makkah Municipality
(Cont. : M. Binladin Co.)
Drainage Tunnel 2.00 14,070
1991
Royal Commission for Jubail & Yanbu
National Methanol Company, Jubail.
Foundation 2.00 670
1991
Saudi Aramco,
Dhahran. (Cont. : CCC)
Evaporation Pond 1.50 2,700
1991
Haram Extension Project
Makakh
(Cont. : M. Binladin Co.)
Foundation 1.50 5,278
1991
Saad Binladin Commercial Complex
Riyadh. (Saudi Binladin Group)
Foundation 1.50 4,700
1991
Makkah Municipality
Toilet Projects
(Cont. : Saudi Binladin Group)
Foundation 2.00 5,590



Page 3 of 24

1991
Ministry of Pilgrims, Makkah
(Cont. : Yousef Al Jurayyad Cont. Est.)
Foundation 1.50 3,500
1992
Ministry of Defense & Aviation
Riyadh.
(Cont. : Gustav Epple Arabia Ltd.)
Evaporation Pond 1.00 30,000
1992
Ministry of Defense & Aviation
Strategic Storage Program
(ABV Rock Group KB, Riyadh)
Under ground fuel storage 2.00 130,000

1992
Ministry of Agriculture
Riyadh.
(Cont. : Hashim Al Hashim)
Water Reservoir 1.00 8,000
1992
Saudi Aramco
Riyadh
(Cont. : Bin Qaraya)
Holding Water Pond 1.50 2000
1992
Saudi Binladin Group
Saad Binladin Commercial Complex, Riyadh.
Foundation 1.50 5,000
1992
Haram Extension Project
Souk Al Saghir Underpass Project
Makkah.
Underpass 2.00 120,000
1992
Dhaffer Office Building
Riyadh.
Foundation 1.50 4,000
1992
Oman Mining Company
Oman.
Heap leach pad 1.00 1,250
1992
Petroleum Development Oman (PDO)
(Cont. : Galfar Engg. & Cont. Co., Oman)
Water ponds 1.00 8,500
1992
Petroleum Development Oman (PDO)
(Cont. : Desertline Projects LLC, Oman)
Water ponds 1.00 4,500
1992
Oman Mining Company
Oman.
Foundation 1.00 1,000
1992
Abalkhail Farms
Al Kharj
Roof Garden 1.50 1,000
1993
Al Hokair Building
Riyadh
Foundation 1.50 1,200
1993
Seikh Abdul Aziz Al Sheikh Building
Riyadh.
Foundation 1.50 2,500
1993
Saudi Ceramic Co. Building
(Cont. : Al Sarif Corporation, Riyadh)
Foundation 1.50 3,500
YEAR CLIENT / CONTRACTOR APPLICATION
HDPE
THICKNESS
(MM)
QTY
(M2)

Page 4
1993
KACST Laboratories Project,
Riyadh
(Cont. : Dumez Co. Ltd.)
Liquid chemical waste pond. 1.50 6,000
1993
Mohammed Qasim Ali Tailous
Al Adhel, Jeddah.
Water pond

2.00
1.50
2,400
1993
Bahrain Municipality, Bahrain
(Cont. : Gulf Markets International)
Water lagoon 1.50 2,000
1993
Ministry of Agriculture
Saad Garden, Al Wasia.
Water Pond 2.00 4,500
1993
Al Swaidi Shopping Center
Riyadh
Foundation 0.75 2,800
1993
Private Building
(Cont. : Kanadilcom, Riyadh)
Roof lining 1.50 1,200
1993
Petroleum Development Oman (PDO)
Jabel Aswad Project
(Cont. : Gulfar Engineering, Muscat)
Water pond 1.00 2,200
1993
Al Hokair Building
Riyadh
Foundation 1.50 650
1993
Abdul Aziz Al Abalkhail
Riyadh
Foundation 1.50 6,000
1993
General Osama Kurawshi Pvt. Bldg.
Riyadh.
Foundation 1.50 1,200
1994
Royal Commission for Jubail & Yanbu
Al Jubail
Solid waste landfill 2.00 176,000
1994
Saudi Aramco
Al Kawtha, Riyadh.

Evaporation pond and Oil
pits.
1.50 12,000
1994
Arab Pesticide Industries Co. (FAFCO)
Jubail.
Rain water basin 1.00 1,800
1994
Municipality of Makkah
(Cont. : ARTEC, Makkah)
Tunnel lining

2.00
1.50

6,570
750
1994
Private Villa
Al Busly, Riyadh

Foundation

1.50

1,000
1994
Private Villa
(Cont. : Al Fanar, Riyadh)

Foundation
1.50 1,000
1994
Private Villa
Jameel Al Khalfa, Riyadh

Water tank
1.50 500
1994
Saudi Aramco, GOSP - 7
Udhaliya.
Evaporation pond

1.50 &
HDT 1.50
2,000
1994
Dr. Khalid Al Huzaimi (Private farm)
Riyadh.
Fish pond 1.50 2,100
YEAR CLIENT / CONTRACTOR APPLICATION
HDPE
THICKNESS
(MM)
QTY
(M2)

Page 5
1994
Suhail and Saud Bahwan
Muscat, Oman.
Evaporation pond 1.00 8,154
1994
Saudi Aramco, GOSP - 6
Uthmaniyah.
Evaporation pond
1.50 &
HDT 1.50
1,200
1994
Private Villa
Al Sabaka, Riyadh.
Foundation 1.50 2,000
1994
Al Fifi Company
Al Kharj
Water tank 1.50 250
1994
Al Rajhi Building Complex
Dammam.
Foundation 1.50 1,800
1994
Bahrain Municipality
(Cont. : Gulf Markets International,
Bahrain)
Artificial Lake 1.00 11,000
1994
Private Villa
Fazza Est., Riyadh.
Foundation 1.50 650
1994
Ministry of Agriculture (Saad Gardens)
(Cont. : Sulaiman Al Jibrin, Riyadh)
Water reservoir 1.50 3,000
1994
Khalid Mubarak
Riyadh
Water tank 1.50 1,000
1994
Al Fazza Est.
Riyadh
Foundation 1.50 1,500
1994
Prince of Jizan
Jizan

Artificial lake

1.00
(Blue color)

1,800
1995
AIFC Polyester Plant, Yanbu
(Cont. : Saudi Shinwa, Yanbu)
Sea water pond 2.00 3,750
1995
KACST, Al Qassim
( Cont. : GETCO, Riyadh)
Evaporation pond 0.75 17,000
1995
ZAM ZAM Water tanks, Makkah
(Cont. : Saudi Binladin Group)
Water storage tanks
1.50
2.00
6,900
1995
Al Aziziah - Agricultural products Co.
Riyadh.
Water reservoir

1.00
(Blue color)
5,300
1995
Petroleum Development Oman (PDO)
(Cont. : Munanoor Inc., Muscat)

Liquid chemical waste pit.
1.50 2,250

1995
Mohammed Al Swailem Co. Ltd.
Riyadh.
Foundation 1.50 4,500

1995
Petroleum Development Oman (PDO)
(Cont. : Munanoor Inc., Muscat)

Water pit
Al Mesba.
1.50 3,500
1995
Prince Farm
Durma, Riyadh
(Cont. : Saudi Socotec)
Water tank 1.00 2,500
YEAR CLIENT / CONTRACTOR APPLICATION
HDPE
THICKNESS
(MM)
QTY
(M2)

Page 6
1995
Prince Farm
Diraiya, Riyadh
(Cont. : Sulaiman Al Jibrin, Riyadh)
Water pond
1.00
(Blue color)
1,600

1995
Saudi Aramco - GOSP - 1, Haradh
(Cont. : Abdullah Al Shuwayer, Dammam)
Evaporation pond 1.00

6,500
1995
Petroleum Development Oman (PDO)
(Cont. : Munanoor Inc., Muscat)
Reserve water pit (one)
Al Noor.D
1.0 3,200
1995
Petroleum Development Oman (PDO)
(Cont. : Munanoor Inc., Muscat)
Solid chemical waste pit -
Marmul
1.50 1,065

1995
Petroleum Development Oman (PDO)
(Cont. : Munanoor Inc., Muscat)

Hydrocarbon pit
Mina Al Fahal
1.50 250

1995
Sabayek Ferro Alloys
Jubail.
Pond and canal
0.75
1.00
8,900
1995
Ministry of Defense & Aviation
Riyadh.
Water tanks
Al Kharj, Riyadh.
1.50 700

1996
Haram Expansion Project, Makkah
(Cont. : Saudi Binladin Co.)
Zam Zam water tanks -
Medina
2.00 2,200
1996
Petroleum Development Oman (PDO)
(Cont. : Munanoor Inc, Muscat)
Water pit
Al Fajr
1.50 3,070
1996
Petroleum Development Oman (PDO)
(Cont. : Munanoor Inc, Muscat)
Waster reserve pit
Soumu. B
1.50 2,080
1996
Saudi Aramco
Waste water treatment plant, Rastanura
(Cont. : Modern Arab Const. Co. Ltd.
Al Khobar)
Evaporation pond 1.50 13,000
1996
King Abdul Aziz City for Science and Technology.
(Cont. : GETCO - Riyadh)
Evaporation pond
Muzamiyah.
0.75 10,000
1996
Arab Security Studies and Training Center
Riyadh.
Roof lining 1.00 50,000
1996
Petroleum Development Oman (PDO)
(Cont. : Munanoor Inc, Muscat)
Water pit
Al Kanz
1.50 3,500
1996
Ras Abu Fontas B
Power Desalination Station - Qatar
(Cont. Midmac Cont., Qatar)
Evaporation pond 2.00 1,340
1996
Mahd AdDahab Gold Mine.
(Cont. : Hindas Corp., Jubail)
Pond Lining 1.00 800
1996
Petroleum Development Oman (PDO)
(Cont. : Munanoor Inc, Muscat)
Water pit
Muknaizna Deep
1.50 3,500
YEAR CLIENT / CONTRACTOR APPLICATION
HDPE
THICKNESS
(MM)
QTY
(M2)

Page 7
1996
Saudi Aramco - GOSP - 3
Abqaiq.
Drainage pit 1.50 600
1996
Petroleum Development Oman (PDO)
(Cont. : Munanoor Inc, Muscat)
Water pit - CME & I
Construction.
1.00 5,600
1997
Petroleum Development Oman
(Cont. : Munanoor Inc, Muscat)
Water pit 1.00 20,000

1997
Saudi Aramco - Yanbu Refinery
(Cont. : Abdullah Faleh H. Al Dossary,
Yanbu)
Evaporation pond 1.50 1,885
1997
Petroleum Development Oman
(Cont. : Munanoor Inc, Muscat)
Water pit
Qarnalam
1.00 5,800
1997
Petroleum Development Oman
(Cont. : Munanoor Inc, Muscat)
Disposal pit 1.00 300
1997
Sludge & Water Authority
Makkah.
Water storage tank
3.00
2.00
10,000
670
1998
Ministry of Defense & Aviation
Safwa Sewage Treatment Plant
(Cont. : M & M Company, Riyadh)
Evaporation pond 0.75 14,500
1998
Saudi Aramco
Dhahran Bulk Plant
Evaporation pond 1.50 5,268
1999
Saudi Aramco
Hawiya Gas Development Pipe Lines
(Cont. : Saipem - Techint JV, Al Khobar)

Evaporation Pond

1.00

16,000
1999
Sanaa Sewage Treatment Plant, Yemen
(Cont. : Dumez GTM, Yemen)
Lagoon lining
1.00
2.00
0.50
56,712
17,100
39708
1999
King Faizal Foundatiion
Al Faizaliah Project, Riyadh
(Cont. : Saudi Binladin Group)
Roof lining 2.00 5,000

1999
Saudi Aramco - Qatif Bulk Plant, Qatif
(Cont. : Bealusing Cont. Est., Abqaiq)
Pond lining 1.50 2,000
1999
Dukhan Consolidated Facilited upgrade- Qatar
(Cont. : Midmac Contracting, Qatar)
Evaporation pond 1.50 1,273
1999
The National Titanium Dioxide Co. Ltd.
CRISTAL, Yanbu.
Pond lining
1.50
HDT
28,000
1999 IBN Rushd, Yanbu
Industrial Waste Water Pond
Lining
1.50 17,800
1999
Petroleum Development Oman.
(Cont. : Desert Line Projects Company)
Pond Lining 1.00 2,700
YEAR CLIENT / CONTRACTOR APPLICATION
HDPE
THICKNESS
(MM)
QTY
(M2)

Page 8
1999
Petroleum Development Oman.
(Cont. : Desert Line Projects Company)
Pond Lining 1.00 2,250
2000
Mahd AdDahab Mine
Saudi Arabian Mining Company
Pond Lining

1.50 34,000
2000
Petroleum Development Oman.
(Cont. : Desert Line Projects Company)
Pond Lining 1.00 4,300

2000

Petroleum Development Oman
(Cont. Desert Line Projects Company)
Pond Lining 1.00 2,175
2000
Strategic Storage Program
Riyadh, ABV Rock Group KB.
Pond Lining 1.00 7,000
2000
Petroleum Development Oman
(Cont. Desert Line Projects Company)
Water pit lining 1.00 4,325

2000

Petroleum Development Oman
(Cont. Desert Line Projects Company)
Water pit lining. 1.00 2,035

2000
Ministry of Defense & Aviation
Strategic Storage Program
(ABV Rock Group KB, Riyadh)
Under ground fuel storage 2.00 50,000
2000
Petroleum Development Oman
(Cont. Gulf Petrochemical Services & Trading LLC,
Muscat.)
Water pit lining. 1.00 2,016
2000
Petroleum Development Oman
North Oman Drilling Rig Location
(Cont. : Suhail & Saud Bahwan LLC)
Water pit lining. 1.00 3,300

2000

Saudi Aramco Surge Tank Area, Mubraz
(Cont. AKTS Dhahran)
Evaporation Pond 1.00 1,500
2000
Petroleum Development Oman
(Cont. : Gulf Petrochemical Services & Trading LLC,
Muscat.)
Water pit 1.00 7,000

2001
Shoaiba Power Plant
(Saudi Archirodon Ltd., Jeddah)
Evaporation pond 2.00 95,750
2001
Royal Commission for Jubail
(Cont. : Modern Arab Const. Co. Ltd)

Potable water storage tank
lining.
0.50 26,650
2001
Saudi Aramco Jeddah North Bulk Plant
(ABV Rock Group KB Jeddah)
Pond Lining 1.00 3,350
2001
Petroleum Development Oman
(Cont. : Suhail & Saud Bahwan LLC)
Water pit lining 1.00 9,500
2001
Petroleum Development Oman
Al Nadha Al Omania Job
(Cont. : Suhail & Saud Bahwan LLC)
Water pit lining 1.00 12,175
YEAR CLIENT / CONTRACTOR APPLICATION
HDPE
THICKNESS
(MM)
QTY
(M2)

Page 9
2001
Qatar Chemical Company
Mesaieed Industrial City, Doha, Qatar
(Cont. :Consolidated Contractors Intl SAL,
Doha, Qatar)
Pond Lining 2.00 4900
2001
Al Mashrikiya Travo Project
Petroleum Development Oman
(Cont. : Suhail & Saud Bahwan LLC)
Pond Lining 1.00 1,070
2001
Muscat Municipality
(Cont. : Gulfar Engineering, Muscat)
Waste Dump Yard lining. 1.50 5000
2001
Yemen Petroleum - Yemen
(Cont. : Nexen Petroleum Intl Ltd., Canada)
Pond Lining 1.50 36,000
2001
Petroleum Development Oman
Al Nadha Al Omania
(Cont. : Suhail & Saud Bahwan LLC)
Pond Lining 1.00 4,500
2001
CRISTAL Yanbu.
The National Titanium Dioxide Co. Ltd.
Pond Lining HDT 1.5 8,800

2001
Petroleum Development Oman
Al Nahdha Al Omaniah Co. (LLC.)
Pits No. : FN 35.02.36 & FN 35.02.46
(Cont. : Suhail & Saud Bahwan LL.C, Muscat.)
Water pit lining 1.00 5,137

2001
Petroleum Development Oman
Al Nahdha Al Omaniah Co. (LLC.)
Pits No. : FN 35.27.18 & FN 35.27.21
(Cont. : Suhail & Saud Bahwan LL.C, Muscat.)
Water pit lining 1.00 5,560
2001
Petroleum Development Oman
Al Nahdha Al Omaniah Co. (LLC.)
Pits No. : Fahud 35.13.13
(Cont. : Suhail & Saud Bahwan , Muscat.)
Water pit lining 1.00 5,137
2001
Saudi Aramco
Uthmaniya Water SS Plant 43 Hofuf
(Cont. : M.H. Al Otaibi Est. Dammam)
Pond Lining 1.5 5370
2001
Petroleum Development Oman
Al Nahdha Al Omaniah Co. (LLC.)
North Oman Drilling Rig Location
Pits No. FN 35.27.85, 90, 94 and 96
(Cont. : Suhail & Saud Bahwan, Muscat)
Water pit lining 1.00 11,000
2002
Saudi Aramco
Haradh Gas Plant Permanent Communication
(Cont. : ABACORP, Al Khobar)
Pond Lining 0.75 522,234
2002
Minagish Water Injection Plant
Kuwait
(Cont. : CCC (Kuwait) W.L.L.)
Pond Lining 1.50 78,960
YEAR CLIENT / CONTRACTOR APPLICATION
HDPE
THICKNESS
(MM)
QTY
(M2)

Page 10
2002
Prince Sultan Humanitarian City, Riyadh.
(Cont. : Saudi Al Terais, Riyadh)
Pond Lining 1.50 15,400
2002

Petroleum Development Oman
Al Nahdha Al Omaniah Co. (LLC.)
North Oman Drilling Rig Location
(Cont. : Suhail & Saud Bahwan, Muscat.)
Water pit lining 1.00 7,520
2002
Petroleum Development Oman
Al Nahdha Al Omaniah Co. (LLC.)
Natih Master Pit, Oman.
(Cont. : Suhail & Saud Bahwan, Muscat.)
Water pit lining 1.00 5,955
2002
Petroleum Development Oman
Al Nahdha Al Omaniah Co. (LLC.)
in three different locations.
(cont. : Suhail & Saud Bahwan, Muscat)
Water pit lining 1.00 11,700
2002
Saudi Aramco
Haradh Bachelor Camp, Haradh
(Cont. : Reza Environmental Industries, Jeddah, J
& P, Riyadh.)
Evaporation Pond
Sewage Treatment Plant
2.00
1.50
11,000
1,800
2002
Water Treatment Plant, Hail
(Cont. : Al Khorayef Operation & Maintenance Co.,
Riyadh)
Evaporation pond 1.00 5,200
2002
Petroleum Development Oman
Al Nahdha Al Omaniah Co. (LLC.)
Saihrawl Master Pit, Oman.
(Cont. : Suhail & Saud Bahwan, Muscat.)
Water pit lining 2.00 9,230
2002
Petroleum Development Oman
Al Nahdha Al Omaniah Co. (LLC.)
Fakhr A - Location, Oman.
(Cont. : Suhail & Saud Bahwan, Muscat.)
Water pit lining 1.00 9,200
2002
Kuwait Oil Company Kuwait
Effluent Water Disposal Pits & Installation of New
pumps at various gathering centers
(Area 2)
(Cont. : Combined Group Co. for Trading and
Contracting W.L.L, Safat, Kuwait)
Pond Lining 2.00 475,000
2002
Kuwait Oil Company Kuwait
Effluent Water Disposal Pits & Installation of New
pumps at various gathering centers
( Area 3)
(Cont. : COPRI Construction Enterprises W.L.L,
Safat, Kuwait).
Pond Lining

2.00 485,000
YEAR CLIENT / CONTRACTOR APPLICATION
HDPE
THICKNESS
(MM)
QTY
(M2)

Page 11
2002
Kuwait Oil Company Kuwait
Effluent Water Disposal Pits & Installation of New
pumps at various gathering centers
(Area 1)
(Cont. : Mushrif Trading & Contracting Co.
Rumaithiya, Kuwait)
Pond Lining 2.00 375,000
2002
Petroleum Development Oman
Galfar Engineering & Cont. Co. LLC
Well No. : F-35-50-15
(Cont. : Suhail & Saud Bahwan, Muscat.)
Water pit lining 1.00 4,342
2002
Petroleum Development Oman
Galfar Engineering & Cont. Co. LLC
(Cont. : Suhail & Saud Bahwan, Muscat.)
Water pit lining 2.00 3,636
2003
Mazoon Petrogas Project
Galfar Engineering & Cont. Co. LLC
(Cont. : Bahwan Building Matls, Muscat.)
Water pit lining 1.00 10,132
2003
PDO-North Oman Service Contract
Special Technical Services LLC
(Cont. : Bahwan Building Matls, Muscat.)
Water pit lining 1.00 7,237
2003
PDO-North Oman Service Contract
Al Mashrikia Travo LLC
(Cont. : Bahwan Building Matls, Muscat.)
Water pit lining 1.00 4,341
2003
PDO-North Oman Service Contract
Special Technical Services LLC
(Cont. : Bahwan Building Matls, Muscat.)

Water pit lining

1.00 4,342
2003
National Guard , Riyadh
(Cont. : GETCO , Riyadh)
Pond Lining 0.75 14,830
2003
Petrokemya - Jubail
(Cont. : ABACORP, Al Khobar)
Evaporation Pond lining 2.50 4,081
2003
PDO-North Oman Service Contract
Special Technical Services LLC
(Cont. : Bahwan Building Matls, Muscat.)
Water pit lining 1.00 4,342
2003
PDO-North Oman Service Contract
Special Technical Services LLC
(Cont. : Bahwan Bldg. Materials, Muscat.)
Water pit lining 1.00 2,400
2003
United Ethylene Oxide / Ethylene Glycol Project -
JUEG
(Cont. : Mohammed Al Mojil Group Dammam)
Sump pit lining
( 4 Sumps )
2.00 1,427
2003
PDO North Oman Service Contract
Galfar Engineering & Cont. Co. LLC
(Cont. : Bahwan Bldg. Materials Muscat)
Water pit lining 1.00 3,450
YEAR CLIENT / CONTRACTOR APPLICATION
HDPE
THICKNESS
(MM)
QTY
(M2)

Page 12
2003
PDO North Oman Service Contract
Galfar Engineering & Cont. Co. LLC
(Cont. : Bahwan Bldg. Materials Muscat)
Water pit lining 1.00 4,342
2003
PDO North Oman Service Contract
Galfar Engineering & Cont. Co. LLC
(Cont. : Bahwan Bldg. Materials Muscat)
Water pit lining 1.00 2,894
2003
PDO North Oman Service Contract
Galfar Engineering & Cont. Co. LLC
(Cont. : Bahwan Bldg. Materials Muscat)
Water pit lining 1.00 5,789
2003
PDO-North Oman Service Contract
Special Technical Services LLC
(Cont. : Bahwan Bldg. Materials, Muscat)
Water pit lining 2.00 10,907
2003
PDO North Oman Service Contract
Galfar Engineering & Cont. Co. LLC
(Cont. : Bahwan Bldg. Materials Muscat)
Water pit lining. 1.00 7,237
2003
PDO North Oman Service Contract
Galfar Engineering & Cont. Co. LLC
(Cont. : Bahwan Bldg. Materials Muscat)
Water pit lining 1.00 8,634
2003
PDO North Oman Service Contract
Galfar Engineering & Cont. Co. LLC
(Cont. : Bahwan Bldg. Materials Muscat)
Water pit lining 1.00 7,237
2003
PDO North Oman Service Contract
Galfar Engineering & Cont. Co. LLC
(Cont. : Bahwan Bldg. Materials Muscat)
Water pit lining 1.00 5,789
2003
PDO North Oman Service Contract
Galfar Engineering & Cont. Co. LLC
(Cont. : Bahwan Bldg. Materials Muscat)
Water pit lining 1.00 7,237
2004
Waste Water Retention Basin JUPC,
Jubail. KO 34
(Cont. : Saudi Binladin Group)
Concrete Basins
(3 Basins)
1.00 22,000
2004
U & O utilities JUPC , Jubail
(Cont. : Mohamed Al Mojil Group )
Sump Pit Lining
( 8 Sumps )
2.00 1,650
2004
Oman-India Fertilizer Project, Sur Town (Cont. :
Consolidated Contracting Co.)
Evaporation Pond Lining &
Storm Pit Lining
1.50 19,500
2004
Oman-India Fertilizer Project, Sur Town
(Cont. : Consolidated Contracting Co.)
Sewage Water Treatment Pond 1.00 7,500
2004
PDO-North Oman Service Contract
Special Technical Services LLC
(Cont. : Bahwan Building Matls, Muscat.)
Water pit lining 2.00 8,400
YEAR CLIENT / CONTRACTOR APPLICATION
HDPE
THICKNESS
(MM)
QTY
(M2)

Page 13
2004
Saudi Arabian Oil Co. - Berri Gas Plant
(Cont. : GAMA Al Moushegah Arabia Ltd
Al Toqbha.).

Evaporation Pond

0.75 ( Texture) 19,500
2004
Structural Concrete Marshalling Yard JUPC,
Jubail.(Cont. : Saudi Binladin Group, Jubail)

Foundation Lining

1.00

1,500


2004
Saudi Aramco
Hawayah Evaporation Pond
(Cont. : Al Atfain Arabain Co Abqaiq)
Evaporation pond lining 1.00 13,348
2004
Saudi Aramco
KFIA Campus Safwa

Waste fuel containment pond
lining.
1.5 (Texture) 760
2004
Sharjah Municipality.
(Cont: Ceres Associates, Ras Al Khaimah)
Industrial Liquid Waste
Treatment and Disposal
Project.
2.00 25,944
2004
Ministry of Agriculture and Water
(Cont: Swayeh Co. Ltd., Riyadh)
Water Treatment Plant 1.00 162,064
2004
Artificial Lake at Al-Ammariyah Farms Riyadh.
(Owner: Jarir Investment, Riyadh)

Lake Waterproofing

1.50 5,000
2004
Ministry of Defence and Aviation
(Cont: Al JabreenTrad & Cont Est., Riyadh)
Evaporation Pond 1.50 10,513
2004
Water Reservoir for Model Project
(Cont: M. Binladin Co., Jeddah)
Pond Lining 2.00 1,137
2004
PDO-North Oman Service Contract
Special Technical Services LLC
(Cont. : Bahwan Building Matls, Muscat.)
Water pit lining 1.00 4,500
2004
Saudi Aramco Uthaliya GOSP 9
(Cont. : M.H. Al-Otaibi Est, Dammam)
New Drainage Pond Lining 1.50 3,950
2004
JUPC Structural Fire Training Area, Jubail
(Cont. : NESMA, Al Khobar)
Oily Water Pond 1.00 800
2004 M. Binladin Company, Jeddah Foundation 2.00 750
2004
Upgrade Qatif Bulk Plant Saudi Aramco
(Cont. : Metal Services for Trading & Cntracting
Co., Dammam)

Evaporation Pond Lining
Tank Foundation Lining
(2 Tanks)
1.00
1.00
3,750
1,900
2004
Dhahran Bulk Plant Saudi Aramco
(Cont. : M.S. Al Suwaidi Industrial Services
Co. Jubail )

Evaporation pond lining
Tank foundation lining
(2 tanks)

1.00
1.00

3,750
1,900
2005
Mowah Desalination Plant
Client: Mowah Company Ltd.
Evaporation Pond Lining

1.00

110,000
YEAR CLIENT / CONTRACTOR APPLICATION
HDPE
THICKNESS
(MM)
QTY
(M2)

Page 14
2005
PDO-North Oman Service Contract Karnalam
Special Technical Services LLC
(Cont. : Bahwan Building Matls, Muscat.)
Water pit lining 1.00 2,500
2005
Saudi Archirodon, Jeddah
Shoaiba Power Plant Stage 2, Phase 1
Client : Saudi Electric Company.
Evaporation pond lining 2.00 41,004
2005
Saudi Archirodon, Jeddah
Shoaiba Power Plant Stage 2, Phase 2
Client : Saudi Electric Company.
Evaporation pond lining 2.00 33,000
2005
Water Treatment Plant, Muzneb, Al Qassim
Client : Ministry of Water, Qassim Branch
Cont. : Al Fahd Est., Riyadh.
Evaporation Pond lining 2.50 80,000
2005
Water Treatment Plant, Hawtha Bani Tamim
Client: Ministry of Water & Electricity
Cont. : Swayeh Co., Riyadh

Evaporation pond lining

1.00 60,270
2005
Refurbishment of Sanitary Sewer Systems
SAFCO / IBN AL BAYTAR Main Plants, Jubail
(Cont. : Modern Arab Construction Co. Ltd.
Al Khobar)
Chemical Sewer Pits
Secondary Containment
Lining

Anchor Knob Sheet
4.00 mm

HD 2.00
2000


510
2005
National Environmental Preservation Co.
Al BeeAh Jubail
Waste water concrete basins (2
Nos.) & 1 pond.
2.00 2,850
2005
Saudi Aramco
Upgrade WWTP at Rastanura and Juaymah
(Cont. : M.S. Al-Suwaidi Industrial Co., Jubail)
Evaporation pond HDT 0.75 14,265
2005
Musannah Air Base Ministry of Defense,
Sultanate of Oman
(Cont. : Carrllion Alawi, Oman).
Evaporation Pond 1.00 16,170
2005
Replace Water Treatment Facility @ Abqaiq Plants,
Saudi Aramco.
(Cont. : F.M. Al Qahtani Sons Co., Khobar)
Evaporation pond 1.50 21,950
2006
Drilling Pit at Turkman # 2 @ Luksar Well Site
locations
(Cont.: Abdul Ali Al-Ajmi Co. Ltd, Al Hasa)
Temporary Retention ponds 1.00 21,315
2006
SHY-1 NGL Pipeline Upgrade at Pump Station # 06 ,
Saudi Aramco
(Cont.: NESMA , Al Khobar)
Emergency Ponds & Retention
Basin
1.00 11,000
2006
EWG 1 P/L Conversion To Sales Gas CR #
6600014780 , Saudi Aramco
(Cont.: Saudi Arabian SAIPEM Ltd,
Al Khobar)
Evaporation Ponds 1.00 105,000
YEAR CLIENT / CONTRACTOR APPLICATION
HDPE
THICKNESS
(MM)
QTY
(M2)

Page 15
2006
Petro-Rabigh Joint Venture Development Project
Early Works , PETRO RABIGH
( Client : PETRO RABIGH )
Evaporation Pond 1.00 252,000
2006
Saudi Binladin Group PCM Division
Jubail.
Client : Linear Alpha Olefins Plant
Jubail Industrial City

Catch Basin

2.00 2,160
2006
Riyadh Municipality
(Cont. : Masaad for Roads Co., Riyadh)
Leachate collection sump 2.00 1,160
2006
Ras Abu Fontas Desalination Plant, Qatar
Client : Qatar Electricity & Water Co.
(Cont. : Kettaneh Construction WLL, Qatar)
Water Containment
Foundation lining
2.00 29,964
2006
YANSAB Ethylene Glycol 1 Project, Yanbu
Client : YANSAB
(Cont. : Mohammed Al Mojil Group MMG)
Sump pit lining
2.00
Geonet
1,600
1,600
2006
Saudi Aramco,
Upgrade WWTP at Rastanura and Juaymah
(Cont. : M.S. Al-Suwaidi Industrial Co., Jubail)

Evaporation pond

1.00 26,000
2006
PDO North Oman Service Contract
Main Cont. : M/s. Al Mashrikia Trano LLC
(Cont. : Bahwan Bldg. Materials, Muscat)
Water pit / Mud pit lining 1.00 8,500
2006
Saudi Aramco - P26-Site Preparation for Khurais
Area Development, Khurais. Contract #
6600015909
(Cont. : Al Khodari & Sons Co., Dammam)

Evaporation ponds

0.75 521,500
2006 Arabian Shrimp Company Ltd. (ASCO), Jizan Aquaculture Shrimp farm 1.00


8,820


2006
Upgrade Waste Water System
East West Pipelines Pump Stations Project
Client: Saudi Aramco.
(Cont: Discovery Contracting Co.)

Pond Lining

1.00 400,000
2006
Turkman Drill Pit location
(Cont: Saad Hamad Al Dossary)
Pond Lining 1.00 2,940
2006
Abqaiq Landfill Class I & Pond Lining
(Cont: Abdullah H. Balharith & Partners Co.)
Landfill & Pond Lining 2.00 4,200
2006
Saudi Aramco Pump Station # 6
(Cont: Saudi Arabian SAIPEM Ltd.)
Pond Lining 1.00 7,500
YEAR CLIENT / CONTRACTOR APPLICATION
HDPE
THICKNESS
(MM)
QTY
(M2)

Page 16
2007
NATPET PP Project, Yanbu
(Cont. : GAMA Al Moushegah Arabia Ltd
Al Toqbha.)
Sea water pond lining 3.00 18,850
2007
National Water & Environment Technology Co. Ltd.,
Jeddah.

Concrete Containment

1.50
Geotextile 300 gsm
22,750
2007
Al Khafji Joint Operation KJO
(Cont: M.A. Kharafi & Sons Co.)
Oily Sludge Pits lining (Two
Pits)
1.00 17,500
2007
SHARQ 3
rd
Expansion Project Foster Wheeler
(Cont: Saudi Binladin Group SBG)
Sump Pit Lining 2.00 1,500
2007
Temporary Holding Ponds Saudi Aramco @ PS #
07, PS # 10, KM 101 & KM 125.
(Cont: Saudi Arabian SAIPEM Co.)
Pond Lining
1.00

37,100
2007
Shoaiba Power Plant, IWPP SIEMENS
(Cont: Saudi Archirodon, Jeddah)
Concrete Protection Lining of
UVC Structures
AKS 4.00 mm (CPL) 2,960
2007
Evaporation Pong Jubail
(Cont: NTE National Trading Est.)
Evaporation Pond 2.00 10,300
2007
Evaporation Pond, Abqaiq
(Cont: NTE National Trading Est.)
Oil Pit Abqaiq 1.50 5,540
2007
Al Khafji Joint Operation KJO
(Cont: Arabian Drilling Co.)
Pond Lining 2.00 6,600
2007
WW Upgrade at Bulk Plants
(Cont: As Osais MCM Co. Ltd)

Evaporation Pond 1.00 30,000
2007
HWLF Evaporation Pond
(Cont: National Environmental Preservation Co.
Al Beeah)
Evaporation Pond 2.00 3,380
2007
Evaporation Pond
(Cont: Abdullah H. Balharith & Partners Co.)
Pond Lining 2.00 6,600
2007
Durrat Al Bahrain Infrastructure Phase 1 (Cont:
Nass Corporation, Bahrain)
Irrigation Lake 1.00 12,000
2007
WWS Western, Eastern & Central Region Bulk
Plants, Saudi Aramco
(Cont: Al Khodari & Sons Co., Dammam)
Evaporation Pond 0.75 60,000
2007
Shedgum Gas Plant, Saudi Aramco
(Cont: Modern Company for Maintenance &
Contracting)
Sludge Pond 0.75 6,300
YEAR CLIENT / CONTRACTOR APPLICATION
HDPE
THICKNESS
(MM)
QTY
(M2)

Page 17
2008
Riffa Views
(Cont: Braemar Nass Joint Venture, Bahrain)
Lake Lining 1.50 68,000
2008
Bulghah Gold Mine
(Client: Saudi Arabian Mining Co MAADEN)
Heap Leach
2.00
1.50
415,000
3,500
2008
KIDAN North Location, Saudi Aramco
(Cont: Ahmed Al Binali & Sons Co., Dammam)
Pond Lining 2.00 4,800
2008
Khurais Industrial Complex, Saudi Aramco
(Cont: A.A. Turki Group of Companies, Dammam)
Evaporation Pond 0.75 11,345
2008
Saudi Aramco Pump Station
(Cont: Saad Al Dossary, Al Hassa)
Pond Lining 1.00 2,680
2008
Petro Rabigh Plant Rabigh
PC2 Monomer Project
(Cont: Mohammad Al Mojil Group, Dammam)
Evaporation Pond 1.00 3,000
2008
National Chevrom Philips (NCP) Project
(Cont: Ahmed Al Binali & Sons Co., Dammam)
Pond Lining 2.50 13,524
2008
IBN RUSHD, Yanbu
(Cont: Sanai Commercial Est, Yanbu)
Sea Water Pond 2.00 3,100
2008
Ministry of Water & Electricity
(Cont: National Water & Environmental
technology, Jeddah)
Pond Lining 1.50 6,000
2008
Ministry of Water & Electricity Authority
(Cont: Al Rashid Trading & Contracting Co,
Riyadh)
Evaporation Pond

1.00 205,800
2008
Saudi Electricity Co.,
(Cont: Environmental Horizon (Rabigh & Shoaiba)
Ash Dumping Yard

1.50 44,000
2008
Waste Water Upgrade Expansion @ Saudi Aramco
Safaniyah, Tanajib & Abu Ali
(Cont: M.S. Al-Suwaidi Industrial Co., Jubail)
Pond Lining

0.75 503,500
2008


Rida Mining Co, Sudan
Abidiya Gold Mine
Leachate Pad & Evaporation
Pond
1.50
1.00
Geotextile
Geonet
137,000
3,500
13,000
2,500
2008
Upgrade Waste Water System-Central Region Bulk
Plants, Riyadh, Qassim & Sulayyil -Saudi Aramco.
(Cont: Al Khodari & Sons Co., Dammam)
Evaporation Pond 0.75 23,000
YEAR CLIENT / CONTRACTOR APPLICATION
HDPE
THICKNESS
(MM)
QTY
(M2)

Page 18
2009
Saudi Electricity Co.,
(Cont: Environmental Horizon (Shoaiba)
Ash Dumping Yard

1.50

19,800

2009
Shoaiba Power Plant Extension Stage II
(Cont: Saudi Archirodon, Jeddah)
Evaporation Pond
Temporary Pond
2.00
1.00
40,800
1,200
2009
King Abdullah university of Science & Technology-
Central Utility Plant- Rabigh
(Cont: NESMA, National Engineering Service &
marketing Co. Ltd, Al Khobar)
Evaporation Pond

0.75 12,000
2009
Khurais Common Facilities Project
(Cont: Ahmed Al Binali & Sons Co., Dammam)
Evaporation Pond

0.75 15,800
2009
Jizan Water treatment Palnt - Jizan
(Cont: Mohammed Ali Al Swailem Company for
Commercial & Cont.)
Evaporation Pond

0.75 110,000
2009
Ministry of Water & Electricity Authority
Tanuma Sewage Treatment Plant
(Cont: Future Horizon Co 2009, Bisha, Asir)
Evaporation Pond

2.00 4,500
2009
Saudi Electricity Co, Qurayyah Combined Power
Plant Project
(Cont: Arabian Bemco Contracting Co. Ltd, Al
Khobar)
Pond Lining 0.75 33,125
2009 Cont: Abdullah h. Balgarith & Partners co Pond lining 2.00 6,800
2009 Cont: National Environmental Preservation co)
Evaporation Pond

1.50 300
2009
Maaden Phosphate project, Raz Al Zour
( cont. Ahmed Al Binali & Sons Co, Dammam
Evaporation Pond 1.50 25,000
2009
Sewage Water Treatment Pond Dahran Bulk Plant
- Dahran
(Cont: M.S. Al-Suwaidi Industrial Co., Jubail)
Pond Lining 0.75 16,300
2009
Kidan North location- Provision of civil Work
Service D0906
Cont. Ahmed N. Al Binali, Dammama
Pond lining 1.50 7,200
YEAR CLIENT / CONTRACTOR APPLICATION
HDPE
THICKNESS
(MM)
QTY
(M2)

Page 19
2009
Maaden Ammonia Phosphate Project
Ras Al Zour- Jubail
Cont. Samsung Saudi Arabia
Evaporation Pond

2.00 1,200
2010
Awali Park Project - BAPCO
Co. Bahrain Petroleum Company B.S.C, Bahrain
Artificial Lake Lining 2.00 33,125
2010
Al Salam Aircraft Co- Backstop Facilities
Cont. Jonnou & Parakavaidas (SA) Ltd, Riyadh
Water Pond
1.50 MM
Geo-textile
2, 100
2,200
2010
Cont. Al Ameen garden,Bahrain

Artificial Lake
2.00 MM
Geo-textile
6,000
12,000
2010
Manifa Development Project- Central Processing
Facilities Saudi Aramco
Cont. Modern Arab Construction Co, Al
Khobar,
Evaporation Pond (Under
Execution)

1.50 MM 30,000
2010


Arrar Water Treatment plant - Arar
(Cont: Al Rashid trading & Contracting
Riyadh)
Evaporation Pond (Under
Execution)

1.50 MM 30,000
2010
Kidan North 8 ,( CN # D-10-001), Provision of
civil Work Service
(Cont: Ahmed N. Al Binali, Dammam)
Pond lining 1.50 8,000
2010
National Chevron Philips , NCP project
(Cont: Dywidag Saudi Arabia, Jubail)
Pond lining 1.50 7,200
2010
Drilling contract Service Unit
(Cont: abdul Rahman Al Shalawi, Al khobar)
Temporary water Ponds in
Qatif, Turaif, QRTN, Manifa ,
Nariya, Hawaya locations

1.00 400,000
2010
Khafji- KJO Water Injection Facility
(Cont: Arabian Drilling Co, Dammam)
Water Pond 1.00 mm 5,000
2010
Saudi Aramco Wasit Site Preparation Project
(Cont: Abdul Ali Al-Ajmi Co. Ltd.)
Evaporation / Maturation &
Facultative Ponds
(Under Execution)
HDPE 0.75 mm
Geotextile
1,520,000
1,909,707
2010
Kidan -provision Of Civil Works
(CN-#D-10-001); Saudi Arabian Oil Company
Cont. Ahmed Al Binali & Sons Co., Dammam
Temporary pond lining 1.50 mm
8,000

YEAR CLIENT / CONTRACTOR APPLICATION
HDPE
THICKNESS
(MM)
QTY
(M2)

Page 20
2010
Makkah - Million Cubic Tank
Cont. Abujedayel Est. Makkah
Water tank 2.50 mm 2,000
2010
Manifa Development Project - Saudi Aramco
Cont. Abdul Rahman Al Shalawi Industrial service
pond lining 1.00 mm 50,000
2010
Tabuk Bulk Plant Project - Saudi Aramco
M.S. Al Suwaidi Industrial Services, Jubail
Oily Water Pond Lining
0.75 mm

13,000
2010
National Chevron Philips
NCP- U & O civil Works
Cont. Dywidag Saudi Arabia
Evaporation pond lining

2.50 mm

13700
2010
Sadui Aramco Well site drilling Contracts
Cont. Gecat Limited company
Pond lining at Abu Ali,
Al Hooj area
1.00 mm 50,000
2010
Wasea Bulk Plant Saudi Aramco
Cont. Snopec International petroleum Co
Evaporation pond 1.00 mm 7,023
2010
Landfill at Jubail Sanitary area - Surface
Impoundment Unit
Cont. Environment Development Co, Jubail
Pond Lining 2.00 mm 11,800
2010
Saudi Kayan LDPE plant, Jubail
Cont. Dywidag Saudi Arabia, Jubail
Pond lining 1.50 mm 9,350
2010
Water Treatment Plant, Tathleeth
Cont. National water & Environmental
Technologies, Jeddah
Pond Lining
2.00 mm
1.50 mm
Geotextile
5,500
8,010
4,000
2010
Wellsite Drilling Contract Service Unit
Contract No. 3000324548
Cont. Gecat Limited Company , Al Khobar
Temporary pond Lining 1.00 mm 50,320
2010
SHEDGUM WIP-2, Abqaio
Cont. M.H. Al otaibi, Dammam
Pond Lining 1.50mm 3,000
2011
Saudi Aramco Drilling Contract - UKAYKIRA -1
Kidan
Cont. Ahmed N. Al Binali Contracting , Dammam

Temporary pond Lining 1.50 mm 11,000
YEAR CLIENT / CONTRACTOR APPLICATION
HDPE
THICKNESS
(MM)
QTY
(M2)

Page 21
2011
Bahrain Petroleum company Awali Park
Maameri Contracing & Main Est. , Bahrain
Artificial Lake -
Blue color Lining
1.50 mm 4,500
2011
Evaporation Pond
Cont. Environmental Services Co, Ras tanura
Evaporation Pond 1.50 mm 11,000
2011
Wasea Bulk Plant Project
SNOPEC International Petroleum Co, Al Khobar
Evaporation Po0nd 1.00 mm 7,090
2011
Riyadh PP11 IPP project Riyadh
Cont. Assad Said Corporation For Cont, Riyadh
Strom Water Evaporation
Pond
1.50 mm 9,750
2011
Sheyba NGL Recovery Site preparation and access
Roads Saudi Aramco
Cont. Abu Ali Al Ajmi, Al Hasa
Evaporation Pond
HDPE 0.75 mm
Geogrid
Geotextile TS 60
475,000
160,000
20,000
2011
Riyadh PP11 IPP project Riyadh
Cont. Assad Said Corporation For Cont, Riyadh
Waste Water Evaporation
Pond
1.50 mm 7,950
2011
Wasit - Site Preparation- Saudi Aramco
Cont. Abu Ali Al Ajmi, Al Hasa
Evaporation Pond HDPE 0.75 mm
470,000

2011
Rijal Al Maa Water Treatment Plant
( Bisha & Mohail Area) -
Ministry of water & Electricity
Cont. Future Horizon , Riyadh
Pond Lining HDPE 2.00 mm 4,500
2011
Waste Water Treatment - Khursaniya
( Saudi Aramco)
Cont. Sarh Al Maali Gen. Cont. Est, Jubail
Pond Lining
HDPE 0.75 mm

9,600
2011
10 Nos R.O Plant Project Qasim
Ministry of Water & Electricity
Abdullah & faizal Sons of Abdullah Saad Al Rashid
for Water & Environmental advanced technology
Co, Riyadh
Evaporation Pond HDPE 0.75 mm 430,000
2011
National guard Water Treatment Project
Cont. Spectrum Engineering Solution Inc, Riyadh
Pond Lining
HDPE 0.75 mm

9,000

YEAR CLIENT / CONTRACTOR APPLICATION
HDPE
THICKNESS
(MM)
QTY
(M2)

Page 22
2011
Evaporation pond Lining for Border Security Force.
Cont. Al Rahid Trading Riyadh & Contracting Co
Evaporation Ponds
HDPE 0.75 mm

9,000

2011
Bahrain Petroleum Company
Cont. Dubai Haorizon intl. Co. W.L.L.M, Manama,
Bahrain
Evaporation pond & sump 1.50 mm 2,500
2011
Dar Al Riyadh
Cont. ITCO ( Industrial Technologies Company)
Artificial lake 1.00 mm 4,700
2011
Industrial Waste Water Plant -8, Stage 1, Plant -
1, MARAFIQ , Jubail
Cont. Al Manar Arabian Corp , Dammam
Evaporation Pond 1.50 mm 14,700
2011
Riyadh PP11 IPP project Riyadh
Cont. Assad Said Corporation For Cont, Riyadh
Strom Water Evaporation
Pond
1.50 mm 11,400
2012
Idustrial Jubail IWTP-8 Upgrade Project, Marafiq.
Cont. Al Manar Arabian Corp , Dammam
Evaporation Pond 1.50 mm 21,560
2012
Evaporation Pond @ Quoaiyah
Cont. Jama Environmental System
Evaporation Pond 0.75 mm 89,262
2012 Abdulrahman M. Al-Shalawi Est for Contracting Evaporation Pond 1.00 mm 100,000
2012
Saudi Kayan LDPE Plant Project
Cont. DYWIDAG Saudi Arabia Co. Ltd
Pond Lining 1.50 mm 7,840
2012
Qurayyah Combined Cycle Power Plant Phase C.
Cont. UNICORP International Trading
Pond Lining
HDPE 2.00 mm
Geo Textile TS60
23,334
250
2012
Wasit Gas Processing Facilities Civil &
Architectural Works
Cont. Abdullah A.M. Al-Khodari & Sons Co.,
Strom Water Pond Lining 0.75 mm 956,981
YEAR CLIENT / CONTRACTOR APPLICATION
HDPE
THICKNESS
(MM)
QTY
(M2)

Page 23
2012
Dar Al Riyadh , Dhirayah Project
Cont. Dar AL RIYADH
Pond Lining
HDPE 1.00 mm
Geotextile TS 65
4,950
4,555
2012
PP10 CCGT Power Station Riyadh
Cont. Arabian Bemco Contracting Co. Ltd
Evaporation Pond
HDPE 2.00 mm
Geotextile TS 40
102,900
105,840
2012
Rehab of Oxidation Ponds Yanbu
Cont. GEMS, Global Environmental Management
Services
Pond HDPE 1.50 mm 77,100
2012
SADARA CHEM I Project Jubail
Cont. Nasser S. Al-Hajri
Sump HDPE 1.50 mm 8,245
2013
Maaden Aluminum Project Raz Al Khair
Cont. DYWIDAG Saudi Arabia Co. Ltd
Flush Pond Protection System
HDPE 1.50 mm
Geotextile TS 50
Geotextile P 40
6,525
4,200
3,000
2013
SIPCHEME PBT Project Jubail.
Cont. Global Sources, Jubail
Sump HDPE 2.00 mm 1,350
2013
Stabilization PAD JOHFA Project,
Cont. GEMS, Global Environmental Management
Services
Pond Lining HDPE 2.00 mm 5,145
2013
Wasit Gas Plant Project,
Cont. Consolidated Contractors Co. W.L.L
Pond Lining HDPE 0.75 mm 5,000
2013
Tandaha STP Project,
Cont. National Water & Environment Technologies
Co. Ltd.
Pond Lining HDPE 1.50 mm 5,640
2013
SHOAIBA II CCPP Project
Cont. Saudi Archirodon Group NV
Evaporation Pond HDPE 1.50 mm 43,904
YEAR CLIENT / CONTRACTOR APPLICATION
HDPE
THICKNESS
(MM)
QTY
(M2)

Page 24
2013
KEMYA Project
Cont. Naba International Ltd, Jubail
Pond Lining
HDPE 2.00 mm
Geotextile TS 20
2,600
2,200
2013
JARODIA STP (Labkha) Project
Cont. SysTech Control System Technology Co.
Pond Lining HDPE 0.75 mm 58,780
2013
15RO Plants Project (15 Location)
Cont. SysTech Control System Technology Co.
Pond Lining HDPE 0.75 mm 150,000
2013
Shaqra, Zulfi & Majma University Project
Cont. SysTech Control System Technology Co.
Pond Lining HDPE 0.75 mm 37,800
2013
Bulk Plant North Jeddaha
Cont. A.A. Al Busaili Sons Co.

Pond Lining HDPE 1.50 mm 8,400
2013
Jazan Bulk Plant, Saudi Aramco Project
Cont. Arabian Fal Holding Co.
Pond Lining HDPE 1.00 mm 3,300
2013
Petrokemya ABS Project
Cont. RAPCO Groups.
Pond Lining HDPE 1.50 mm 1,000