1. DRAFT
Dikumpul SOFTCOPY ke e-mail maksimum pukul 23.59 pada hari deadline (Presentasi hari
Selasa dikumpul Jum'at; presentasi hari Kamis dikumpul Senin.).

2. REPORT
Dikumpulkan HARDCOPY dan SOFTCOPY (keduanya) SATU HARI SEBELUM
PRESENTASI (presentasi Selasa dikumpulkan Senin; Kamis dikumpulkan Rabu). Maksimum
pukul 18.00 pada hari deadline.

# REVISED adalah revisi assignment.
Dikumpulkan SOFTCOPY paling lambat satu minggu dari hari presentasi maksimum pukul
23.59 pada hari deadline.

***

Arahan SUBJECT & FILE NAME untuk SOFTCOPY:

Subject email dan nama file disamakan mengikuti format berikut:
(TK/INT/BIO/PAR)(No.Kelompok)_(DRAFT/REPORT/REVISED)_Assignment(ke?
)
Keterangan:
TK: Teknik Kimia Reguler
INT: Teknik Kimia Internasional
BIO: Teknologi Bioproses
PAR: Teknik Kimia Paralel & Ekstensi

Contoh:
TK1_DRAFT_ASSIGNMENT1
BIO1_REPORT_ASSIGNMENT1
PAR4_DRAFT_ASSIGNMENT1
INT_REVISED_ASSIGNMENT1
***
Borang Kontribusi Kelompok wajib diisi oleh MASING-MASING INDIVIDU setelah
menyelesaikan setiap assignment.

Borang kontribusi diisi SETIAP SETELAH ASSIGNMENT; secara online
melalui: http://bit.ly/borangpabrik2014
Link dibuka mulai dari hari pengumpulan REPORT hingga satu hari setelah hari PRESENTASI.
Harap diingatkan agar anggota kelompok seluruhnya mengisi.


***

Informasi lain akan diberikan menyusul untuk masing-masing Assignment.


Terima kasih.

CP Asisten Pabrik
Kelas Selasa: Albert (0817149696) & Priscilla (08999384034)
Kelas Kamis: Meyda (081287468470) & Kharis (085781240421)
Assignment 1 Feasibility Study & Flowsheeting
INTRODUCTION : Background, Basic Theory, Market & Capacity Analysis
(determine production capacity), Raw Material Analysis (if it is needed), Plant
Location Analysis
PROCESS SELECTION: Alternative Processes, Process Selection (based on
Decision Making Process), Process Description (describe in details the selected
process, technology and equipment needed and how to select the type of
equipment, also describe the operating conditions of each process and stream
especially the temperature, flowrate, & pressure), BFD, PFD, & P&ID
MASS & ENERGY BALANCE: Mass & Energy Balance each process, overall mass &
energy balance, mass & energy efficiency calculation, simulation of process using
simulator
Assignment 2 Equipment Sizing & Material Construction
Assignment 3 Process Integration & Optimization
HEAT EXCHANGER NETWORK ANALYSIS: Heat Exchanger Network Design
(includes stream classification and pinch design method)
UTILITY: Utility equipment selection & description, water utility, fuel utility,
electric utility, comparison of utilityrequirements before and after HEN (calculate
the energy efficiency)
REVISED P&ID (considering HEN)
Assignment 4 HSE & Plant Layout
HEALTH AND ENVIRONMENTAL SAFETY ASSESSMENT: Including HIRA, HAZID,
HAZOP, operational details, Personal equipment, area classification, safe range
between equipment, process control details
WASTE MANAGEMENT: Identifying waste and impurities, numerous ways to
manage the waste, selected concept and embedding it in process flowsheeting
PLANT LAYOUT: total factory layout, process layout (incuding size and safe
range), warehouse, utilities, 3D perspective
Assignment 5 Economic Analysis
Calculation of Capital Expenditure, Operational Cost, Profitability Analysis,
Sensitivity Analysis (including guhtrie factor, FOB CIF, etc)