# HARDCOPY Assignment dikumpulkan ke Departemen Teknik Kimia Lt.2, Ruangan Yoga Wienda/Merissa Bestari.
# SOFTCOPY Assignment dikirim via e-mail ke plantdesigndtk2014@gmail.com. File dikumpul dalam bentuk PDF, hanya 1 file per kelompok (cover, isi, lampiran, semua jadi satu PDF) ***
1. DRAFT Dikumpul SOFTCOPY ke e-mail maksimum pukul 23.59 pada hari deadline (Presentasi hari Selasa dikumpul Jum'at; presentasi hari Kamis dikumpul Senin.).
2. REPORT Dikumpulkan HARDCOPY dan SOFTCOPY (keduanya) SATU HARI SEBELUM PRESENTASI (presentasi Selasa dikumpulkan Senin; Kamis dikumpulkan Rabu). Maksimum pukul 18.00 pada hari deadline.
# REVISED adalah revisi assignment. Dikumpulkan SOFTCOPY paling lambat satu minggu dari hari presentasi maksimum pukul 23.59 pada hari deadline.
***
Arahan SUBJECT & FILE NAME untuk SOFTCOPY:
Subject email dan nama file disamakan mengikuti format berikut: (TK/INT/BIO/PAR)(No.Kelompok)_(DRAFT/REPORT/REVISED)_Assignment(ke? ) Keterangan: TK: Teknik Kimia Reguler INT: Teknik Kimia Internasional BIO: Teknologi Bioproses PAR: Teknik Kimia Paralel & Ekstensi
Contoh: TK1_DRAFT_ASSIGNMENT1 BIO1_REPORT_ASSIGNMENT1 PAR4_DRAFT_ASSIGNMENT1 INT_REVISED_ASSIGNMENT1 *** Borang Kontribusi Kelompok wajib diisi oleh MASING-MASING INDIVIDU setelah menyelesaikan setiap assignment.
Borang kontribusi diisi SETIAP SETELAH ASSIGNMENT; secara online melalui: http://bit.ly/borangpabrik2014 Link dibuka mulai dari hari pengumpulan REPORT hingga satu hari setelah hari PRESENTASI. Harap diingatkan agar anggota kelompok seluruhnya mengisi.
***
Informasi lain akan diberikan menyusul untuk masing-masing Assignment.
Terima kasih.
CP Asisten Pabrik Kelas Selasa: Albert (0817149696) & Priscilla (08999384034) Kelas Kamis: Meyda (081287468470) & Kharis (085781240421) Assignment 1 Feasibility Study & Flowsheeting INTRODUCTION : Background, Basic Theory, Market & Capacity Analysis (determine production capacity), Raw Material Analysis (if it is needed), Plant Location Analysis PROCESS SELECTION: Alternative Processes, Process Selection (based on Decision Making Process), Process Description (describe in details the selected process, technology and equipment needed and how to select the type of equipment, also describe the operating conditions of each process and stream especially the temperature, flowrate, & pressure), BFD, PFD, & P&ID MASS & ENERGY BALANCE: Mass & Energy Balance each process, overall mass & energy balance, mass & energy efficiency calculation, simulation of process using simulator Assignment 2 Equipment Sizing & Material Construction Assignment 3 Process Integration & Optimization HEAT EXCHANGER NETWORK ANALYSIS: Heat Exchanger Network Design (includes stream classification and pinch design method) UTILITY: Utility equipment selection & description, water utility, fuel utility, electric utility, comparison of utilityrequirements before and after HEN (calculate the energy efficiency) REVISED P&ID (considering HEN) Assignment 4 HSE & Plant Layout HEALTH AND ENVIRONMENTAL SAFETY ASSESSMENT: Including HIRA, HAZID, HAZOP, operational details, Personal equipment, area classification, safe range between equipment, process control details WASTE MANAGEMENT: Identifying waste and impurities, numerous ways to manage the waste, selected concept and embedding it in process flowsheeting PLANT LAYOUT: total factory layout, process layout (incuding size and safe range), warehouse, utilities, 3D perspective Assignment 5 Economic Analysis Calculation of Capital Expenditure, Operational Cost, Profitability Analysis, Sensitivity Analysis (including guhtrie factor, FOB CIF, etc)