Thickness in mm Sale Order/ Item No

Procedure No & Rev.


Acceptance Std
Make (Magnaflux) /Type Batch No Exp. Date
Cleaner SKC-I 10D02 Mar-15
Penetrant SKL-SP1 09E26 Apr-14
Developer SKD-S2 10F09 May-15
Duration
(Minutes)
Start time End time
5 11.50am 11.55am
10 11.56am 12.06pm
4 12.07pm 12.11pm
10 12.12pm 12.22pm
Result: Acceptable as per procedure NQAP-9B-01 rev.0
Name
Signature
Date
Method of removing Excess
Penetrant
Drying time after removal of
excess penetrant
10 mins
4 mins
using dry lint free cloth & moistened by solvent
Penetrant Dwell time
Performed by
NDE Level II
15-Oct-10
26.5 mm
NQAP-9B-01 Rev.0
Inspection Agency
Customer SA 193M Gr.B7 XYZ
8"
Class 600
Qty
Suspendable
Non-aqueous
EXAMINATION DETAILS
ASME Sec III Div.1 Subsec NB
Area Examined
4 Nos (S1 to S4)
Surface Condition machined
2AA42
Method of Application of
Penetrant
Light Equipment
Type of Penetrant Visible solvent removable
TEST PARAMETERS
Half of the length
Time of Examination
Examined
NDE Level II / NDE Level III
LARSEN & TOUBRO
Valves - Coimbatore
Material Specification
Valve Type
Valve Size
LIQUID PENETRANT EXAMINATION
REPORT
Report No
Date of Examination
Heat No / Serial No
Gate Valve
Stud - 1 1/8
Developing time
LT/PT/0001-FA
PT0001-FA
Pressure Rating
N0001
PT No
After Heat treatment
Component examined
Developer Type
Process
Drying time after removal of
excess penetrant
spraying
Penetrant dwell time
Part Temp. C 5 mins
100W bulb at a distance of 8 in
10 mins
Surface Preparation
Method of applying
Developer
Spraying
Developer dwell time
using lint free cloth moistened by solvent
below 50C Drying time after precleaning
Record of Indication and its Evaluation :
Drying time after pre cleaning
Form No:NF-053-R0 Page of
Thickness in mm Sale Order/ Item No
Procedure No & Rev.
Acceptance Std
Make (Magnaflux) /Type Batch No Exp. Date
Cleaner SKC-I 10D02 Mar-15
Penetrant SKL-SP1 09E26 Apr-14
Developer SKD-S2 10F09 May-15
Duration
(Minutes)
Start time End time
5 12.30pm 12.35pm
10 12.36pm 12.46pm
4 12.47pm 12.51pm
10 12.52pm 1.02pm
Result: Acceptable as per procedure NQAP-9B-01 rev.0
Name
Signature
Date
LARSEN & TOUBRO
Valves - Coimbatore
LIQUID PENETRANT EXAMINATION
REPORT
Valve Type Gate Valve Report No LT/PT/0001-FA
Valve Size 8" Date of Examination 15-Oct-10
Pressure Rating Class 600 Heat No / Serial No 2AA42
Component examined Stud - 1 1/8 PT No PT0001-FA
Material Specification SA 193M Gr.B7 Customer XYZ
26.5 mm N0001
NQAP-9B-01 Rev.0
Inspection Agency
ASME Sec III Div.1 Subsec NB Qty 4 Nos (S1 to S4)
EXAMINATION DETAILS
Time of Examination After Heat treatment Surface Condition machined
Area Examined Next half of the length
TEST PARAMETERS
Surface Preparation using lint free cloth moistened by solvent Developer Type
Suspendable
Non-aqueous
Type of Penetrant Visible solvent removable
Method of applying
Developer
Spraying
Method of Application of
Penetrant
spraying Developer dwell time 10 mins
Drying time after precleaning 5 mins Part Temp. C below 50C
Penetrant dwell time 10 mins
Method of removing Excess
Penetrant
4 mins
Drying time after removal of
excess penetrant
using dry lint free cloth & moistened by solvent
Light Equipment 100W bulb at a distance of 8 in
Record of Indication and its Evaluation :
Process
Drying time after pre cleaning
Penetrant Dwell time
Drying time after removal of
excess penetrant
Developing time
Performed by
NDE Level II
Examined
NDE Level II / NDE Level III
Form No:NF-053-R0 Page of
Thickness in mm Sale Order/ Item No
Procedure No & Rev.
Acceptance Std
Make (Magnaflux) /Type Batch No Exp. Date
Cleaner SKC-I 10D02 Mar-15
Penetrant SKL-SP1 09E26 Apr-14
Developer SKD-S2 10F09 May-15
Duration
(Minutes)
Start time End time
5 1.07pm 1.12pm
10 1.13pm 1.23pm
4 1.24pm 1.28pm
10 1.29pm 1.39pm
Result: Acceptable as per procedure NQAP-9B-01 rev.0
Name
Signature
Date
LARSEN & TOUBRO
Valves - Coimbatore
LIQUID PENETRANT EXAMINATION
REPORT
Valve Type Gate Valve Report No LT/PT/0002-FA
Valve Size 8" Date of Examination 15-Oct-10
Pressure Rating Class 600 Heat No / Serial No 2AA42
Component examined Stud - 1 1/8 PT No PT0002-FA
Material Specification SA 193M Gr.B7 Customer XYZ
26.5 mm N0001
NQAP-9B-01 Rev.0
Inspection Agency
ASME Sec III Div.1 Subsec NB Qty 4 Nos (S5 to S8)
EXAMINATION DETAILS
Time of Examination After Heat treatment Surface Condition machined
Area Examined Half of the length
TEST PARAMETERS
Surface Preparation using lint free cloth moistened by solvent Developer Type
Suspendable
Non-aqueous
Type of Penetrant Visible solvent removable
Method of applying
Developer
Spraying
Method of Application of
Penetrant
spraying Developer dwell time 10 mins
Drying time after precleaning 5 mins Part Temp. C below 50C
Penetrant dwell time 10 mins
Method of removing Excess
Penetrant
4 mins
Drying time after removal of
excess penetrant
using dry lint free cloth & moistened by solvent
Light Equipment 100W bulb at a distance of 8 in
Record of Indication and its Evaluation :
Process
Drying time after pre cleaning
Penetrant Dwell time
Drying time after removal of
excess penetrant
Developing time
Performed by
NDE Level II
Examined
NDE Level II / NDE Level III
Form No:NF-053-R0 Page of
Thickness in mm Sale Order/ Item No
Procedure No & Rev.
Acceptance Std
Make (Magnaflux) /Type Batch No Exp. Date
Cleaner SKC-I 10D02 Mar-15
Penetrant SKL-SP1 09E26 Apr-14
Developer SKD-S2 10F09 May-15
Duration
(Minutes)
Start time End time
5 2.15pm 2.20pm
10 2.21pm 2.31pm
4 2.32pm 2.36pm
10 2.37pm 2.47pm
Result: Acceptable as per procedure NQAP-9B-01 rev.0
Name
Signature
Date
LARSEN & TOUBRO
Valves - Coimbatore
LIQUID PENETRANT EXAMINATION
REPORT
Valve Type Gate Valve Report No LT/PT/0002-FA
Valve Size 8" Date of Examination 15-Oct-10
Pressure Rating Class 600 Heat No / Serial No 2AA42
Component examined Stud - 1 1/8 PT No PT0002-FA
Material Specification SA 193M Gr.B7 Customer XYZ
26.5 mm N0001
NQAP-9B-01 Rev.0
Inspection Agency
ASME Sec III Div.1 Subsec NB Qty 4 Nos (S5 to S8)
EXAMINATION DETAILS
Time of Examination After Heat treatment Surface Condition machined
Area Examined Next half of the length
TEST PARAMETERS
Surface Preparation using lint free cloth moistened by solvent Developer Type
Suspendable
Non-aqueous
Type of Penetrant Visible solvent removable
Method of applying
Developer
Spraying
Method of Application of
Penetrant
spraying Developer dwell time 10 mins
Drying time after precleaning 5 mins Part Temp. C below 50C
Penetrant dwell time 10 mins
Method of removing Excess
Penetrant
4 mins
Drying time after removal of
excess penetrant
using dry lint free cloth & moistened by
solvent
Light Equipment 100W bulb at a distance of 8 in
Record of Indication and its Evaluation :
Process
Drying time after pre cleaning
Penetrant Dwell time
Drying time after removal of
excess penetrant
Developing time
Performed by
NDE Level II
Examined
NDE Level II / NDE Level III
Form No:NF-053-R0 Page of
Thickness in mm Sale Order/ Item No
Procedure No & Rev.
Acceptance Std
Make (Magnaflux) /Type Batch No Exp. Date
Cleaner SKC-I 10D02 Mar-15
Penetrant SKL-SP1 09E26 Apr-14
Developer SKD-S2 10F09 May-15
Duration
(Minutes)
Start time End time
5 2.50pm 2.55pm
10 2.56pm 3.06pm
4 3.07pm 3.11pm
10 3.12pm 3.22pm
Result: Acceptable as per procedure NQAP-9B-01 rev.0
Name
Signature
Date
LARSEN & TOUBRO
Valves - Coimbatore
LIQUID PENETRANT EXAMINATION
REPORT
Valve Type Gate Valve Report No LT/PT/0003-FA
Valve Size 8" Date of Examination 15-Oct-10
Pressure Rating Class 600 Heat No / Serial No 2AA42
Component examined Stud - 1 1/8 PT No PT0003-FA
Material Specification SA 193M Gr.B7 Customer XYZ
26.5 mm N0001
NQAP-9B-01 Rev.0
Inspection Agency
ASME Sec III Div.1 Subsec NB Qty 4 Nos (S9 to S12)
EXAMINATION DETAILS
Time of Examination After Heat treatment Surface Condition machined
Area Examined half of the length
TEST PARAMETERS
Surface Preparation using lint free cloth moistened by solvent Developer Type
Suspendable
Non-aqueous
Type of Penetrant Visible solvent removable
Method of applying
Developer
Spraying
Method of Application of
Penetrant
spraying Developer dwell time 10 mins
Drying time after precleaning 5 mins Part Temp. C below 50C
Penetrant dwell time 10 mins
Method of removing Excess
Penetrant
4 mins
Drying time after removal of
excess penetrant
using dry lint free cloth & moistened by
solvent
Light Equipment 100W bulb at a distance of 8 in
Record of Indication and its Evaluation :
Process
Drying time after pre cleaning
Penetrant Dwell time
Drying time after removal of
excess penetrant
Developing time
Performed by
NDE Level II
Examined
NDE Level II / NDE Level III
Form No:NF-053-R0 Page of
Thickness in mm Sale Order/ Item No
Procedure No & Rev.
Acceptance Std
Make (Magnaflux) /Type Batch No Exp. Date
Cleaner SKC-I 10D02 Mar-15
Penetrant SKL-SP1 09E26 Apr-14
Developer SKD-S2 10F09 May-15
Duration
(Minutes)
Start time End time
5 3.30pm 3.34pm
10 3.35pm 3.45pm
4 3.46pm 3.50pm
10 3.51pm 4.01pm
Result: Acceptable as per procedure NQAP-9B-01 rev.0
Name
Signature
Date
LARSEN & TOUBRO
Valves - Coimbatore
LIQUID PENETRANT EXAMINATION
REPORT
Valve Type Gate Valve Report No LT/PT/0003-FA
Valve Size 8" Date of Examination 15-Oct-10
Pressure Rating Class 600 Heat No / Serial No 2AA42
Component examined Stud - 1 1/8 PT No PT0003-FA
Material Specification SA 193M Gr.B7 Customer XYZ
26.5 mm N0001
NQAP-9B-01 Rev.0
Inspection Agency
ASME Sec III Div.1 Subsec NB Qty 4 Nos (S9 to S12)
EXAMINATION DETAILS
Time of Examination After Heat treatment Surface Condition machined
Area Examined next half of the length
TEST PARAMETERS
Surface Preparation using lint free cloth moistened by solvent Developer Type
Suspendable
Non-aqueous
Type of Penetrant Visible solvent removable
Method of applying
Developer
Spraying
Method of Application of
Penetrant
spraying Developer dwell time 10 mins
Drying time after precleaning 5 mins Part Temp. C below 50C
Penetrant dwell time 10 mins
Method of removing Excess
Penetrant
4 mins
Drying time after removal of
excess penetrant
using dry lint free cloth & moistened by
solvent
Light Equipment 100W bulb at a distance of 8 in
Record of Indication and its Evaluation :
Process
Drying time after pre cleaning
Penetrant Dwell time
Drying time after removal of
excess penetrant
Developing time
Performed by
NDE Level II
Examined
NDE Level II / NDE Level III
Form No:NF-053-R0 Page of
Thickness in mm Sale Order/ Item No
Procedure No & Rev.
Acceptance Std
Make (Magnaflux) /Type Batch No Exp. Date
Cleaner SKC-I 10D02 Mar-15
Penetrant SKL-SP1 09E26 Apr-14
Developer SKD-S2 10F09 May-15
Duration
(Minutes)
Start time End time
5 4.05pm 4.10pm
10 4.11pm 4.21pm
4 4.22pm 4.26pm
10 4.27pm 4.37pm
Result: Acceptable as per procedure NQAP-9B-01 rev.0
Name
Signature
Date
LARSEN & TOUBRO
Valves - Coimbatore
LIQUID PENETRANT EXAMINATION
REPORT
Valve Type Gate Valve Report No LT/PT/0004-FA
Valve Size 8" Date of Examination 15-Oct-10
Pressure Rating Class 600 Heat No / Serial No 2AA42
Component examined Stud - 1 1/8 PT No PT0004-FA
Material Specification SA 193M Gr.B7 Customer XYZ
26.5 mm N0001
NQAP-9B-01 Rev.0
Inspection Agency
ASME Sec III Div.1 Subsec NB Qty 5 Nos (S13 to S17)
EXAMINATION DETAILS
Time of Examination After Heat treatment Surface Condition machined
Area Examined half of the length
TEST PARAMETERS
Surface Preparation using lint free cloth moistened by solvent Developer Type
Suspendable
Non-aqueous
Type of Penetrant Visible solvent removable
Method of applying
Developer
Spraying
Method of Application of
Penetrant
spraying Developer dwell time 10 mins
Drying time after precleaning 5 mins Part Temp. C below 50C
Penetrant dwell time 10 mins
Method of removing Excess
Penetrant
4 mins
Drying time after removal of
excess penetrant
using dry lint free cloth & moistened by
solvent
Light Equipment 100W bulb at a distance of 8 in
Record of Indication and its Evaluation :
Process
Drying time after pre cleaning
Penetrant Dwell time
Drying time after removal of
excess penetrant
Developing time
Performed by
NDE Level II
Examined
NDE Level II / NDE Level III
Form No:NF-053-R0 Page of
Thickness in mm Sale Order/ Item No
Procedure No & Rev.
Acceptance Std
Make (Magnaflux) /Type Batch No Exp. Date
Cleaner SKC-I 10D02 Mar-15
Penetrant SKL-SP1 09E26 Apr-14
Developer SKD-S2 10F09 May-15
Duration
(Minutes)
Start time End time
5 4.40pm 4.45pm
10 4.46pm 4.56pm
4 4.57pm 5.01pm
10 5.02pm 5.12pm
Result: Acceptable as per procedure NQAP-9B-01 rev.0
Name
Signature
Date
LARSEN & TOUBRO
Valves - Coimbatore
LIQUID PENETRANT EXAMINATION
REPORT
Valve Type Gate Valve Report No LT/PT/0004-FA
Valve Size 8" Date of Examination 15-Oct-10
Pressure Rating Class 600 Heat No / Serial No 2AA42
Component examined Stud - 1 1/8 PT No PT0004-FA
Material Specification SA 193M Gr.B7 Customer XYZ
26.5 mm N0001
NQAP-9B-01 Rev.0
Inspection Agency
ASME Sec III Div.1 Subsec NB Qty 5 Nos (S13 to S17)
EXAMINATION DETAILS
Time of Examination After Heat treatment Surface Condition machined
Area Examined next half of the length
TEST PARAMETERS
Surface Preparation using lint free cloth moistened by solvent Developer Type
Suspendable
Non-aqueous
Type of Penetrant Visible solvent removable
Method of applying
Developer
Spraying
Method of Application of
Penetrant
spraying Developer dwell time 10 mins
Drying time after precleaning 5 mins Part Temp. C below 50C
Penetrant dwell time 10 mins
Method of removing Excess
Penetrant
4 mins
Drying time after removal of
excess penetrant
using dry lint free cloth & moistened by
solvent
Light Equipment 100W bulb at a distance of 8 in
Record of Indication and its Evaluation :
Process
Drying time after pre cleaning
Penetrant Dwell time
Drying time after removal of
excess penetrant
Developing time
Performed by
NDE Level II
Examined
NDE Level II / NDE Level III
Form No:NF-053-R0 Page of
Thickness in mm Sale Order/ Item No
Procedure No & Rev.
Acceptance Std
Make (Magnaflux) /Type Batch No Exp. Date
Cleaner SKC-I 10D02 Mar-15
Penetrant SKL-SP1 09E26 Apr-14
Developer SKD-S2 10F09 May-15
Duration
(Minutes)
Start time End time
5 5.15pm 5.20pm
10 5.21pm 5.31pm
5 5.32pm 5.37pm
10 5.38pm 5.48pm
Result: Acceptable as per procedure NQAP-9B-01 rev.0
Name
Signature
Date
LARSEN & TOUBRO
Valves - Coimbatore
LIQUID PENETRANT EXAMINATION
REPORT
Valve Type Gate Valve Report No LT/PT/0005-FA
Valve Size 8" Date of Examination 15-Oct-10
Pressure Rating Class 600 Heat No / Serial No B201
Component examined Nut - 1 1/8 PT No PT0005-FA
Material Specification SA 194M Gr.2H Customer XYZ
9.5 mm N0001
NQAP-9B-01 Rev.0
Inspection Agency
ASME Sec III Div.1 Subsec NB Qty 6 Nos (N1 to N6)
EXAMINATION DETAILS
Time of Examination After Heat treatment Surface Condition machined
Area Examined 100%
TEST PARAMETERS
Surface Preparation using lint free cloth moistened by solvent Developer Type
Suspendable
Non-aqueous
Type of Penetrant Visible, Solvent removable
Method of applying
Developer
Spraying
Method of Application of
Penetrant
spraying Developer dwell time 10 mins
Drying time after precleaning 5 mins Part Temp. C below 50C
Penetrant dwell time 10 mins
Method of removing Excess
Penetrant
5 mins
Drying time after removal of
excess penetrant
using dry lint free cloth & moistened by
solvent
Light Equipment 100W bulb at a distance of 8 in
Record of Indication and its Evaluation :
Process
Drying time after pre cleaning
Penetrant Dwell time
Drying time after removal of
excess penetrant
Developing time
Performed by
NDE Level II
Examined
NDE Level II / NDE Level III
Form No:NF-053-R0 Page of
Thickness in mm Sale Order/ Item No
Procedure No & Rev.
Acceptance Std
Make (Magnaflux) /Type Batch No Exp. Date
Cleaner SKC-I 10D02 Mar-15
Penetrant SKL-SP1 09E26 Apr-14
Developer SKD-S2 10F09 May-15
Duration
(Minutes)
Start time End time
5 5.50pm 5.55pm
10 5.56pm 6.06pm
5 6.07pm 6.12pm
10 6.13pm 6.23pm
Result: Acceptable as per procedure NQAP-9B-01 rev.0
Name
Signature
Date
LARSEN & TOUBRO
Valves - Coimbatore
LIQUID PENETRANT EXAMINATION
REPORT
Valve Type Gate Valve Report No LT/PT/0006-FA
Valve Size 8" Date of Examination 15-Oct-10
Pressure Rating Class 600 Heat No / Serial No B201
Component examined Nut - 1 1/8 PT No PT0006-FA
Material Specification SA 194M Gr.2H Customer XYZ
9.5 mm N0001
NQAP-9B-01 Rev.0
Inspection Agency
ASME Sec III Div.1 Subsec NB Qty 6 Nos (N7 to N12)
EXAMINATION DETAILS
Time of Examination After Heat treatment Surface Condition machined
Area Examined 100%
TEST PARAMETERS
Surface Preparation using lint free cloth moistened by solvent Developer Type
Suspendable
Non-aqueous
Type of Penetrant Visible, Solvent removable
Method of applying
Developer
Spraying
Method of Application of
Penetrant
spraying Developer dwell time 10 mins
Drying time after precleaning 5 mins Part Temp. C below 50C
Penetrant dwell time 10 mins
Method of removing Excess
Penetrant
5 mins
Drying time after removal of
excess penetrant
using dry lint free cloth & moistened by
solvent
Light Equipment 100W bulb at a distance of 8 in.
Record of Indication and its Evaluation :
Process
Drying time after pre cleaning
Penetrant Dwell time
Drying time after removal of
excess penetrant
Developing time
Performed by
NDE Level II
Examined
NDE Level II / NDE Level III
Form No:NF-053-R0 Page of
Thickness in mm Sale Order/ Item No
Procedure No & Rev.
Acceptance Std
Make (Magnaflux) /Type Batch No Exp. Date
Cleaner SKC-I 10D02 Mar-15
Penetrant SKL-SP1 09E26 Apr-14
Developer SKD-S2 10F09 May-15
Duration
(Minutes)
Start time End time
5 6.30pm 6.35pm
10 6.36pm 6.46pm
5 6.47pm 6.52pm
10 6.53pm 7.03pm
Result: Acceptable as per procedure NQAP-9B-01 rev.0
Name
Signature
Date
LARSEN & TOUBRO
Valves - Coimbatore
LIQUID PENETRANT EXAMINATION
REPORT
Valve Type Gate Valve Report No LT/PT/0007-FA
Valve Size 8" Date of Examination 15-Oct-10
Pressure Rating Class 600 Heat No / Serial No B201
Component examined Nut - 1 1/8 PT No PT0007-FA
Material Specification SA 194M Gr.2H Customer XYZ
9.5 mm N0001
NQAP-9B-01 Rev.0
Inspection Agency
ASME Sec III Div.1 Subsec NB Qty 6 Nos (N13 to N18)
EXAMINATION DETAILS
Time of Examination After Heat treatment Surface Condition machined
Area Examined 100%
TEST PARAMETERS
Surface Preparation using lint free cloth moistened by solvent Developer Type
Suspendable
Non-aqueous
Type of Penetrant Visible, Solvent removable
Method of applying
Developer
Spraying
Method of Application of
Penetrant
spraying Developer dwell time 10 mins
Drying time after precleaning 5 mins Part Temp. C below 50C
Penetrant dwell time 10 mins
Method of removing Excess
Penetrant
5 mins
Drying time after removal of
excess penetrant
using dry lint free cloth & moistened by
solvent
Light Equipment 100W bulb at a distance of 8 in.
Record of Indication and its Evaluation :
Process
Drying time after pre cleaning
Penetrant Dwell time
Drying time after removal of
excess penetrant
Developing time
Performed by
NDE Level II
Examined
NDE Level II / NDE Level III
Form No:NF-053-R0 Page of
Thickness in mm Sale Order/ Item No
Procedure No & Rev.
Acceptance Std
Make (Magnaflux) /Type Batch No Exp. Date
Cleaner SKC-I 10D02 Mar-15
Penetrant SKL-SP1 09E26 Apr-14
Developer SKD-S2 10F09 May-15
Duration
(Minutes)
Start time End time
5 8.46am 8.51am
10 8.52am 9.02am
5 9.03am 9.08am
10 9.09am 9.019am
Result: Acceptable as per procedure NQAP-9B-01 rev.0
Name
Signature
Date
LARSEN & TOUBRO
Valves - Coimbatore
LIQUID PENETRANT EXAMINATION
REPORT
Valve Type Gate Valve Report No LT/PT/0008-FA
Valve Size 8" Date of Examination 16-Oct-10
Pressure Rating Class 600 Heat No / Serial No B201
Component examined Nut - 1 1/8 PT No PT0008-FA
Material Specification SA 194M Gr.2H Customer XYZ
9.5 mm N0001
NQAP-9B-01 Rev.0
Inspection Agency
ASME Sec III Div.1 Subsec NB Qty 6 Nos (N19 to N24)
EXAMINATION DETAILS
Time of Examination After Heat treatment Surface Condition machined
Area Examined 100%
TEST PARAMETERS
Surface Preparation using lint free cloth moistened by solvent Developer Type
Suspendable
Non-aqueous
Type of Penetrant Visible, Solvent removable
Method of applying
Developer
Spraying
Method of Application of
Penetrant
spraying Developer dwell time 10 mins
Drying time after precleaning 5 mins Part Temp. C below 50C
Penetrant dwell time 10 mins
Method of removing Excess
Penetrant
5 mins
Drying time after removal of
excess penetrant
using dry lint free cloth & moistened by
solvent
Light Equipment 100W bulb at a distance of 8 in.
Record of Indication and its Evaluation :
Process
Drying time after pre cleaning
Penetrant Dwell time
Drying time after removal of
excess penetrant
Developing time
Performed by
NDE Level II
Examined
NDE Level II / NDE Level III
Form No:NF-053-R0 Page of
Thickness in mm Sale Order/ Item No
Procedure No & Rev.
Acceptance Std
Make (Magnaflux) /Type Batch No Exp. Date
Cleaner SKC-I 10D02 Mar-15
Penetrant SKL-SP1 09E26 Apr-14
Developer SKD-S2 10F09 May-15
Duration
(Minutes)
Start time End time
5 9.25am 9.30am
10 9.31am 9.41am
5 9.42am 9.47am
10 9.48am 9.58am
Result: Acceptable as per procedure NQAP-9B-01 rev.0
Name
Signature
Date
LARSEN & TOUBRO
Valves - Coimbatore
LIQUID PENETRANT EXAMINATION
REPORT
Valve Type Gate Valve Report No LT/PT/0009-FA
Valve Size 8" Date of Examination 16-Oct-10
Pressure Rating Class 600 Heat No / Serial No B201
Component examined Nut - 1 1/8 PT No PT0009-FA
Material Specification SA 194M Gr.2H Customer XYZ
9.5 mm N0001
NQAP-9B-01 Rev.0
Inspection Agency
ASME Sec III Div.1 Subsec NB Qty 6 Nos (N25 to N30)
EXAMINATION DETAILS
Time of Examination After Heat treatment Surface Condition machined
Area Examined 100%
TEST PARAMETERS
Surface Preparation using lint free cloth moistened by solvent Developer Type
Suspendable
Non-aqueous
Type of Penetrant Visible, Solvent removable
Method of applying
Developer
Spraying
Method of Application of
Penetrant
spraying Developer dwell time 10 mins
Drying time after precleaning 5 mins Part Temp. C below 50C
Penetrant dwell time 10 mins
Method of removing Excess
Penetrant
5 mins
Drying time after removal of
excess penetrant
using dry lint free cloth & moistened by
solvent
Light Equipment 100W bulb at a distance of 8 in.
Record of Indication and its Evaluation :
Process
Drying time after pre cleaning
Penetrant Dwell time
Drying time after removal of
excess penetrant
Developing time
Performed by
NDE Level II
Examined
NDE Level II / NDE Level III
Form No:NF-053-R0 Page of
Thickness in mm Sale Order/ Item No
Procedure No & Rev.
Acceptance Std
Make (Magnaflux) /Type Batch No Exp. Date
Cleaner SKC-I 10D02 Mar-15
Penetrant SKL-SP1 09E26 Apr-14
Developer SKD-S2 10F09 May-15
Duration
(Minutes)
Start time End time
5 10.00am 10.05am
10 10.06am 10.16am
5 10.17am 10.22am
10 10.23am 10.33am
Result: Acceptable as per procedure NQAP-9B-01 rev.0
Name
Signature
Date
LARSEN & TOUBRO
Valves - Coimbatore
LIQUID PENETRANT EXAMINATION
REPORT
Valve Type Gate Valve Report No LT/PT/0010-FA
Valve Size 8" Date of Examination 16-Oct-10
Pressure Rating Class 600 Heat No / Serial No B201
Component examined Nut - 1 1/8 PT No PT0010-FA
Material Specification SA 194M Gr.2H Customer XYZ
9.5 mm N0001
NQAP-9B-01 Rev.0
Inspection Agency
ASME Sec III Div.1 Subsec NB Qty 4 Nos (N31 to N34)
EXAMINATION DETAILS
Time of Examination After Heat treatment Surface Condition machined
Area Examined 100%
TEST PARAMETERS
Surface Preparation using lint free cloth moistened by solvent Developer Type
Suspendable
Non-aqueous
Type of Penetrant Visible, Solvent removable
Method of applying
Developer
Spraying
Method of Application of
Penetrant
spraying Developer dwell time 10 mins
Drying time after precleaning 5 mins Part Temp. C below 50C
Penetrant dwell time 10 mins
Method of removing Excess
Penetrant
5 mins
Drying time after removal of
excess penetrant
using dry lint free cloth & moistened by
solvent
Light Equipment 100W bulb at a distance of 8 in.
Record of Indication and its Evaluation :
Process
Drying time after pre cleaning
Penetrant Dwell time
Drying time after removal of
excess penetrant
Developing time
Performed by
NDE Level II
Examined
NDE Level II / NDE Level III
Form No:NF-053-R0 Page of
Thickness in mm Sale Order/ Item No
Procedure No & Rev.
Acceptance Std
Make (Magnaflux) /Type Batch No Exp. Date
Cleaner SKC-I 10D02 Mar-15
Penetrant SKL-SP1 09E26 Apr-14
Developer SKD-S2 10F09 May-15
Duration
(Minutes)
Start time End time
5 10.40am 10.45am
10 10.46am 10.56am
5 10.57am 11.02am
10 11.03am 11.13am
Result: Acceptable as per procedure NQAP-9B-01 rev.0
Name
Signature
Date
LARSEN & TOUBRO
Valves - Coimbatore
LIQUID PENETRANT EXAMINATION
REPORT
Valve Type Gate Valve Report No LT/PT/0011-FA
Valve Size 8" Date of Examination 16-Oct-10
Pressure Rating Class 600 Heat No / Serial No 2AA57
Component examined Stud 3/4" PT No PT0011-FA
Material Specification SA 193M Gr.B7 Customer XYZ
17.4mm N0001
NQAP-9B-01 Rev.0
Inspection Agency
ASME Sec III Div.1 Subsec NB Qty 5 Nos (GS1 to GS4)
EXAMINATION DETAILS
Time of Examination After Heat treatment Surface Condition machined
Area Examined Half of the length
TEST PARAMETERS
Surface Preparation using lint free cloth moistened by solvent Developer Type
Suspendable
Non-aqueous
Type of Penetrant Visible, Solvent removable
Method of applying
Developer
Spraying
Method of Application of
Penetrant
spraying Developer dwell time 10 mins
Drying time after precleaning 5 mins Part Temp. C below 50C
Penetrant dwell time 10 mins
Method of removing Excess
Penetrant
5 mins
Drying time after removal of
excess penetrant
using dry lint free cloth & moistened by
solvent
Light Equipment 100W bulb at a distance of 8 in.
Record of Indication and its Evaluation :
Process
Drying time after pre cleaning
Penetrant Dwell time
Drying time after removal of
excess penetrant
Developing time
Performed by
NDE Level II
Examined
NDE Level II / NDE Level III
Form No:NF-053-R0 Page of
Thickness in mm Sale Order/ Item No
Procedure No & Rev.
Acceptance Std
Make (Magnaflux) /Type Batch No Exp. Date
Cleaner SKC-I 10D02 Mar-15
Penetrant SKL-SP1 09E26 Apr-14
Developer SKD-S2 10F09 May-15
Duration
(Minutes)
Start time End time
5 11.20am 11.25am
10 11.26am 11.36am
5 11.37am 11.42am
10 11.43am 11.53am
Result: Acceptable as per procedure NQAP-9B-01 rev.0
Name
Signature
Date
LARSEN & TOUBRO
Valves - Coimbatore
LIQUID PENETRANT EXAMINATION
REPORT
Valve Type Gate Valve Report No LT/PT/0011-FA
Valve Size 8" Date of Examination 16-Oct-10
Pressure Rating Class 600 Heat No / Serial No 2AA57
Component examined Stud 3/4" PT No PT0011-FA
Material Specification SA 193M Gr.B7 Customer XYZ
17.4mm N0001
NQAP-9B-01 Rev.0
Inspection Agency
ASME Sec III Div.1 Subsec NB Qty 5 Nos (GS1 to GS4)
EXAMINATION DETAILS
Time of Examination After Heat treatment Surface Condition machined
Area Examined Next half of the length
TEST PARAMETERS
Surface Preparation using lint free cloth moistened by solvent Developer Type
Suspendable
Non-aqueous
Type of Penetrant Visible, Solvent removable
Method of applying
Developer
Spraying
Method of Application of
Penetrant
spraying Developer dwell time 10 mins
Drying time after precleaning 5 mins Part Temp. C below 50C
Penetrant dwell time 10 mins
Method of removing Excess
Penetrant
5 mins
Drying time after removal of
excess penetrant
using dry lint free cloth & moistened by
solvent
Light Equipment 100W bulb at a distance of 8 in.
Record of Indication and its Evaluation :
Process
Drying time after pre cleaning
Penetrant Dwell time
Drying time after removal of
excess penetrant
Developing time
Performed by
NDE Level II
Examined
NDE Level II / NDE Level III
Form No:NF-053-R0 Page of
Thickness in mm Sale Order/ Item No
Procedure No & Rev.
Acceptance Std
Make (Magnaflux) /Type Batch No Exp. Date
Cleaner SKC-I 10D02 Mar-15
Penetrant SKL-SP1 09E26 Apr-14
Developer SKD-S2 10F09 May-15
Duration
(Minutes)
Start time End time
5 12.00pm 12.05pm
10 12.06pm 12.16pm
5 12.17pm 12.22pm
10 12.23pm 12.33pm
Result: Acceptable as per procedure NQAP-9B-01 rev.0
Name
Signature
Date
LARSEN & TOUBRO
Valves - Coimbatore
LIQUID PENETRANT EXAMINATION
REPORT
Valve Type Gate Valve Report No LT/PT/0012-FA
Valve Size 8" Date of Examination 16-Oct-10
Pressure Rating Class 600 Heat No / Serial No B200
Component examined Nut 3/4" PT No PT0012-FA
Material Specification SA 194M Gr.2H Customer XYZ
7.4 mm N0001
NQAP-9B-01 Rev.0
Inspection Agency
ASME Sec III Div.1 Subsec NB Qty 5 Nos (H1 to H5)
EXAMINATION DETAILS
Time of Examination After Heat treatment Surface Condition machined
Area Examined 100%
TEST PARAMETERS
Surface Preparation using lint free cloth moistened by solvent Developer Type
Suspendable
Non-aqueous
Type of Penetrant Visible, Solvent removable
Method of applying
Developer
Spraying
Method of Application of
Penetrant
spraying Developer dwell time 10 mins
Drying time after precleaning 5 mins Part Temp. C below 50C
Penetrant dwell time 10 mins
Method of removing Excess
Penetrant
5 mins
Drying time after removal of
excess penetrant
using dry lint free cloth & moistened by
solvent
Light Equipment 100W bulb at a distance of 8 in.
Record of Indication and its Evaluation :
Process
Drying time after pre cleaning
Penetrant Dwell time
Drying time after removal of
excess penetrant
Developing time
Performed by
NDE Level II
Examined
NDE Level II / NDE Level III
Form No:NF-053-R0 Page of
Thickness in mm Sale Order/ Item No
Procedure No & Rev.
Acceptance Std
Make (Magnaflux) /Type Batch No Exp. Date
Cleaner SKC-I 10D02 Mar-15
Penetrant SKL-SP1 09E26 Apr-14
Developer SKD-S2 10F09 May-15
Duration
(Minutes)
Start time End time
5 12.40pm 12.45pm
10 12.46pm 12.56pm
5 12.57pm 1.02pm
10 1.03pm 1.13pm
Result: Acceptable as per procedure NQAP-9B-01 rev.0
Name
Signature
Date
LARSEN & TOUBRO
Valves - Coimbatore
LIQUID PENETRANT EXAMINATION
REPORT
Valve Type Gate Valve Report No LT/PT/0013-FA
Valve Size 8" Date of Examination 16-Oct-10
Pressure Rating Class 600 Heat No / Serial No B200
Component examined Nut 3/4" PT No PT0013-FA
Material Specification SA 194M Gr.2H Customer XYZ
7.4 mm N0001
NQAP-9B-01 Rev.0
Inspection Agency
ASME Sec III Div.1 Subsec NB Qty 5 Nos (H6 to H10)
EXAMINATION DETAILS
Time of Examination After Heat treatment Surface Condition machined
Area Examined 100%
TEST PARAMETERS
Surface Preparation using lint free cloth moistened by solvent Developer Type
Suspendable
Non-aqueous
Type of Penetrant Visible, Solvent removable
Method of applying
Developer
Spraying
Method of Application of
Penetrant
spraying Developer dwell time 10 mins
Drying time after precleaning 5 mins Part Temp. C below 50C
Penetrant dwell time 10 mins
Method of removing Excess
Penetrant
5 mins
Drying time after removal of
excess penetrant
using dry lint free cloth & moistened by
solvent
Light Equipment 100W bulb at a distance of 8 in.
Record of Indication and its Evaluation :
Process
Drying time after pre cleaning
Penetrant Dwell time
Drying time after removal of
excess penetrant
Developing time
Performed by
NDE Level II
Examined
NDE Level II / NDE Level III
Form No:NF-053-R0 Page of
Customer
Material Specification Type of weld
Thickness in mm 60
Acceptance Std
Note
Make (Checkmate) /Type Batch No Exp. Date
Cleaner MAGNAFLUX 13J02 Sep-14
Penetrant MAGNAFLUX 13H11 Aug-14
Developer MAGNAFLUX 13K05 Oct-14
Duration
(Minutes)
Start time End time
5 10.30am 10.35am
10 10.40 am 10.50am
3 11.00am 11.03am
10 11.10am 11.25am
Result No indication found on welding area.
Name
Signature
Date
Page1 of 1
Job name MOUNTING Report No PPI/PT/020
Part number 5.529209.M Date of Examination 23-Dec-13
PPI-1 M/S DANIELI INDIA
BUTT WELD EN 10025-2 GR S355JR
Developing time
Serial number
Stage of Inspection
Time of Examination After Heat Treatment
FINAL WELD
Fabrication Surface Condition
Area Examined 100%
TEST PARAMETERS
Surface Preparation using lint free cloth moistened by solvent Developer Type
Suspendable
Non-aqueous
Type of Penetrant Visible, Solvent removable
Method of applying
Developer
spraying
Method of Application of
Penetrant
spraying Developer dwell time 10 mins
Drying time after precleaning 5 mins Part Temp. C Room Temp
Penetrant dwell time 10 mins
Method of removing Excess
Penetrant
using dry lint free cloth & moistened by
solvent
Drying time after removal of
excess penetrant
3 mins
Light Equipment 100W bulb at a distance of 8 in.
Record of Indication and its Evaluation :
Process
Drying time after pre cleaning
Penetrant Dwell time
Drying time after removal of
excess penetrant
Performed by
NDE Level II
Witnessed by
EXAMINATION DETAILS
LIQUID PENETRANT EXAMINATION
REPORT
PPI
ASME SEC VIII Div 1 APPENDIX 8
Customer
Material Specification Type of weld
Thickness in mm 60
Acceptance Std
Note
Make (Checkmate) /Type Batch No
Cleaner MAGNAFLUX 13J02
Penetrant MAGNAFLUX 13H11
Developer MAGNAFLUX 13K05
Duration
(Minutes)
Start time End time
5 11.15am 11.20am
10 11.25 am 11.35am
3 11.45am 11.48am
10 11.55am 12.05pm
Result No indication found on welding area.
Developing time
Drying time after pre cleaning
Penetrant Dwell time
Drying time after removal of
excess penetrant
Record of Indication and its Evaluation :
Process
Method of removing Excess
Penetrant
using dry lint free cloth & moistened by
solvent
Drying time after removal of
excess penetrant
3 mins
Light Equipment 100W bulb at a distance of 8 in.
Drying time after precleaning 5 mins Part Temp. C Room Temp
Penetrant dwell time 10 mins
Type of Penetrant Visible, Solvent removable
Method of applying
Developer
spraying
Method of Application of
Penetrant
spraying Developer dwell time 10 mins
100%
TEST PARAMETERS
Surface Preparation using lint free cloth moistened by solventDeveloper Type
Suspendable
Non-aqueous
EXAMINATION DETAILS
Stage of Inspection FINAL WELD
Time of Examination After Heat Treatment
Surface Condition Fabrication
Area Examined
EN 10025-2 GR S355JR BUTT WELD
ASME SEC VIII Div 1 APPENDIX 8
Part number 5.529209.M Date of Examination 23-Dec-13
Serial number PPI-2 M/S DANIELI INDIA
PPI
LIQUID PENETRANT EXAMINATION
REPORT
Job name MOUNTING Report No PPI/PT/021
Name
Signature
Date
Performed by
NDE Level II
Witnessed by
Exp. Date
Sep-14
Aug-14
Oct-14
Record of Indication and its Evaluation :
Room Temp
spraying
10 mins
TEST PARAMETERS
Suspendable
Non-aqueous
EXAMINATION DETAILS
Fabrication
BUTT WELD
23-Dec-13
M/S DANIELI INDIA
PPI/PT/021
Page1 of 1
Customer
Material Specification Type of weld
Thickness in mm 80
Acceptance Std
Note
Make (Checkmate) /Type Batch No
Cleaner MAGNAFLUX 13J02
Penetrant MAGNAFLUX 13H11
Developer MAGNAFLUX 13K05
Duration
(Minutes)
Start time End time
5 1.30pm 1.35pm
10 1.40pm 1.50pm
3 2.00pm 2..03pm
10 2.10pm 2.20pm
Result No indication found on welding area.
Developing time
Drying time after pre cleaning
Penetrant Dwell time
Drying time after removal of
excess penetrant
Record of Indication and its Evaluation :
Process
Method of removing Excess
Penetrant
using dry lint free cloth & moistened by
solvent
Drying time after removal of
excess penetrant
3 mins
Light Equipment 100W bulb at a distance of 8 in.
Drying time after precleaning 5 mins Part Temp. C Room Temp
Penetrant dwell time 10 mins
Type of Penetrant Visible, Solvent removable
Method of applying
Developer
spraying
Method of Application of
Penetrant
spraying Developer dwell time 10 mins
100%
TEST PARAMETERS
Surface Preparation using lint free cloth moistened by solventDeveloper Type
Suspendable
Non-aqueous
EXAMINATION DETAILS
Stage of Inspection FINAL WELD
Time of Examination AFTER WELDING
Surface Condition Fabrication
Area Examined
EN 10025-2 GR S355JR BUTT WELD
ASME SEC VIII Div 1 APPENDIX 8
Part number 5.860650.T Date of Examination 23-Dec-13
Serial number PPI-3 M/S DANIELI INDIA
PPI
LIQUID PENETRANT EXAMINATION
REPORT
Job name SHACKLE Report No PPI/PT/022
Name
Signature
Date
Performed by
NDE Level II
Witnessed by
Exp. Date
Sep-14
Aug-14
Oct-14
Record of Indication and its Evaluation :
Room Temp
spraying
10 mins
TEST PARAMETERS
Suspendable
Non-aqueous
EXAMINATION DETAILS
Fabrication
BUTT WELD
23-Dec-13
M/S DANIELI INDIA
PPI/PT/022
Page1 of 1
Material Specification IS 2062 Gr B Customer
Thickness in mm 40 Type of weld
Acceptance Std
Make Batch No Exp. Date
Cleaner MAGNAFLUX 13J02 Sep-15
Penetrant MAGNAFLUX 13J11 Aug-15
Developer MAGNAFLUX 14A03 Jan-16
Duration
(Minutes)
Start time End time
5 2.30pm 2.40pm
10 2.55pm 3.05pm
3 3.10pm 3.13pm
10 3.15pm 3.25pm
Result No indication found on welding area.
Name
Signature
Date

Drying time after removal of
excess penetrant
Developing time
Performed by
NDE Level II
Witnessed by
Process
Drying time after pre cleaning
Penetrant Dwell time
Light Equipment 100W bulb at a distance of 8 in.
Record of Indication and its Evaluation :
Penetrant dwell time 10 mins
Method of removing Excess
Penetrant
using dry lint free cloth & moistened by
solvent
Drying time after removal of
excess penetrant
3 mins
Method of Application of
Penetrant
spraying Developer dwell time 10 mins
Drying time after precleaning 5 mins Part Temp. C Room Temp
TEST PARAMETERS
Surface Preparation using lint free cloth moistened by solvent Developer Type
Suspendable
Non-aqueous
Type of Penetrant Visible, Solvent removable Method of applying Developer spraying
Time of Examination AFTER WELDING
Surface Condition Fabrication
Area Examined 100%
EXAMINATION DETAILS
Stage of Inspection FINAL WELD
ASME SEC VIII Div 1 APPENDIX 8
PPI
LIQUID PENETRANT EXAMINATION
REPORT
Job name LOAD TEST STRUCTURE Report No
BUTT WELD
PPI/PT/024
Part number 46M1511000000,REV NO:3 Date of Examination 5-Jul-14
M/S L&T HED
Material Specification IS 2062 Gr B Customer
Thickness in mm 25
Acceptance Std
Make Batch No Exp. Date
Cleaner MAGNAFLUX 13J02 Sep-15
Penetrant MAGNAFLUX 13J11 Aug-15
Developer MAGNAFLUX 14A03 Jan-16
Duration
(Minutes)
Start time End time
5 2.30pm 2.40pm
10 2.55pm 3.05pm
3 3.10pm 3.13pm
10 3.15pm 3.25pm
Result No indication found on welding area.
Name
Signature
Date

PPI
LIQUID PENETRANT EXAMINATION
REPORT
Job name BEAM Report No PPI/PT/028
Part number BB43AC70EC10990,R3 Date of Examination 2-Jun-14
M/S L&T KOBELCO
ASME SEC VIII Div 1 APPENDIX 8
EXAMINATION DETAILS
Stage of Inspection FINAL WELD
Time of Examination AFTER WELDING
Surface Condition Fabrication
Area Examined 100%
TEST PARAMETERS
Surface Preparation using lint free cloth moistened by solvent Developer Type
Suspendable
Non-aqueous
Type of Penetrant Visible, Solvent removable Method of applying Developer spraying
Method of Application of
Penetrant
spraying Developer dwell time 10 mins
Drying time after precleaning 5 mins Part Temp. C Room Temp
Penetrant dwell time 10 mins
Method of removing Excess
Penetrant
using dry lint free cloth & moistened by
solvent
Drying time after removal of
excess penetrant
3 mins
Light Equipment 100W bulb at a distance of 8 in.
Record of Indication and its Evaluation :
Process
Drying time after pre cleaning
Penetrant Dwell time
Drying time after removal of
excess penetrant
Developing time
Performed by
NDE Level II
Witnessed by

Vous aimerez peut-être aussi