EMAE'S Experience in the substitution of the regulation systems of the underground power plant, Henry Borden, is presented. The power plant is located in Cubatao, Sao Paulo, and the company responsible for it is EMAE - Empresa Metropolitana de Aguas e Energia S / a. The modernization consisted in the installation of digital electronic governors and potential regulation, indirect static excitation and auxiliary system of 125 Vcc.
EMAE'S Experience in the substitution of the regulation systems of the underground power plant, Henry Borden, is presented. The power plant is located in Cubatao, Sao Paulo, and the company responsible for it is EMAE - Empresa Metropolitana de Aguas e Energia S / a. The modernization consisted in the installation of digital electronic governors and potential regulation, indirect static excitation and auxiliary system of 125 Vcc.
EMAE'S Experience in the substitution of the regulation systems of the underground power plant, Henry Borden, is presented. The power plant is located in Cubatao, Sao Paulo, and the company responsible for it is EMAE - Empresa Metropolitana de Aguas e Energia S / a. The modernization consisted in the installation of digital electronic governors and potential regulation, indirect static excitation and auxiliary system of 125 Vcc.
Power Plant, Henry Borden Ana Tereza A. Marques Alonso Tomazelli; lvaro Martins; Carlos Alberto Rodrigues da Silva; Edval Delboni; Jos Alberto da Silva Matos; Mrcio Galdino Dvila; Jos Roberto Muriano; Mauro Antonio Pinto; - EMAE Empresa Metropolitana de guas e Energia.
Abstract- The aim of this paper is to present Henry Bordens regulation systems modernization. This power plant is located in Cubato, So Paulo, and the company responsible for it is EMAE Empresa Metropolitana de guas e Energia S/A.. The modernization consisted in the total substitution of the regulation systems, which include the installation of digital electronic governors and potential regulation, indirect static excitation and auxiliary system of 125 Vcc. The aim of this project is: New composition of the security and operation liability conditions of the regulation system of the power plant; Extension of usefulness with lower costs; Faster answering time; Decrease of the maintenance costs; Improvement of operational performance especially during the instability occurrences in the system.
Index Terms-- Modernization, Velocity Governors, Tension Regulation, Indirect static excitation. I. NOMENCLATURE HMI: Human-Machine Interface; HPU: Hydraulic Pressure Unit; PRT: Voltage Regulation System; PRV: Velocity Governors System; PLC: Programmer Logic Control; MLDTs: Magneto strictive Linear Displacement Transducer II. INTRODUCTION T HE aim of this project is to present Henry Bordens regulation systems modernization. This power plant is located in Cubato, So Paulo, and the company responsible for it is EMAE Empresa Metropolitana de guas e Energia S/A. Henry Borden Underground Power Plant was built back in 1950, located inside the massif of Serra do Mar Mountain and is responsible for the generation of 420 MW, which are produced by six (06) units composed by Pelton Turbines with head of 720m. The modernization consisted in the total substitution of the regulation systems, which include the installation of digital electronic governors and potential regulation, indirect static excitation and auxiliary system of 125 Vcc. III. HISTORY In 1889, a law signed by President Campos Salles allowed Light and Power Company Limited to be operational in Brazil. After building many small power plants there was the necessity of enlarging the generation park, mainly because of the fast industrial growth of So Paulo city and thus of the demand for electricity. So in 1926 the first generation unit of Henry Borden started operating. Its importance lies in its strategical position because it is located in the South, Southeast and Center-West system, which is the most important economical area of the country and near the shipping center of So Paulo. Nowadays, it is also important for the electrical system in situations of low stability of the system black out. Its hydraulic and generation systems contain reservoir, channels, power plants and associate structures which aim: - To administrate the operation concerned about the rational and multiple uses of water and hydraulic resources available, promoting the generation of energy disposed in load centers; - To control the floods in So Paulos regions; - The distribution of water for public supply; - To preserve the environment. Nowadays, its generation park lies inside the city of So Paulo along with the preservation area of Mata Atlntica forest, surrounded by people in its reservoir and pollution waters.
This work was supported by EMAE Empresa Metropolitana de guas e Energia So Paulo. The author of this paper is: The EMAEs hydraulic complex, Henry Borden, was until A.T.A. M. A. Tomazelli (e-mail:ana.tomazelli@emae.sp.gov.br)
Paper accepted for presentation at 2003 IEEE Bologna Power Tech Conference, June 23th-26th, Bologna, Italy 0-7803-7967-5/03/$17.00 2003 IEEE
the early 60s the biggest generation pole of Latin America. Henry Borden is constituted by two high head power plants, with a flow of 157 m 3 /s and hydraulic center of 889 MW. The first is formed by 8 generation units with the total capacity of 469 MW. Each unit contains two horizontal Pelton turbines with the generator in its center, connected by a penstock, called Usina Henry Borden Externa. The other one, named Henry Borden Subterrnea (Underground power plant), contains 6 generation units (11 to 16) inside a cave of 120 m of extension, width of 21 m and 39 m high. This plant has 6 generation units constituted by vertical Pelton Turbines, each one with the total capacity of 420 MW. Henry Borden Externas first generation group started operating in 1926 and Henry Borden Subterrnea in 1956. IV. FORMER VELOCITY GOVERNORS AND VOLTAGE REGULATION DESCRIPTION A. VELOCITY GOVERNORS The velocity governors were mechanical/hydraulic kind in the old conception, with answering time relatively slow, which led to deficiency when in operation, because the load and frequency systems need fast answering time. They were at the end of their usefulness what caused bad efficiency to the Henry Borden Power Plant. Hydraulic pressure unit, valves, and air/oil accumulators, manually controlled, working at pressure between 20 to 30 Kgf/cm 2 formed them. Basically, the servomotors of needles 11 to 14 were of simple effect, while the 15 and 16 ones were of double effect, part of them placed inside the water stream, and part inside the adjacent rocks. The units 11 to 14 had Woodward velocity governors, and the units 15 and 16 Charmilles governors. The operation of the 6 units started between 03/1956 and 06/1961.
B. VOLTAGE REGULATION The excitation system of the generation units had GFA - 4 Voltage Regulators made by General Electric. These systems were composed by pilot rotary exciters, motor controlled resistance and main rotary exciters. The voltage regulator led the motor controlled resistance to small voltage variations. These variations changed the machines excitation, in order to satisfy the needs of the electric system. Under system variations, that demand fast and significant variation of excitation current, the voltage regulator ordered contacts that provided resistance to the main excitation fields circuit or enabled it according to the machines need of excitation or not.
C. FORMER GOVERNORS MAIN PROBLEMS The governors main problems were: - Consuming of some components, caused by the time of operation; - Difficulty to obtain new spare parts, because there were not any of them in the country; - Difficulty in the field calibration; - Inefficient pumping to replace oil in the reservoir; - Oil contamination caused by the water, because of the bad seal of the servomotor; - Low operational flexibility because the regulation worked only on the four (4) injectors at the same time; - Setting limitations to obtain damping and adequate response velocity . NOTE: each unit had its own governors. V. DESCRIPTION OF THE NEW REGULATION TERMS The process of modernization and automation of Henry Borden Subterrrena (Underground) started in September of 1998, trough the new Velocity Governors System, Indirect Static Excitation, Voltage Regulating Control, Digital Synchronism and auxiliary system of 125 Vcc for the units 11 to 16. These systems allowed the remote command and supervision of Underground Henry Borden regulation trough the control room of Henry Borden Externa, including the start, stop, and synchronism of the generation units. The companies responsible for the project were: GE-Global Controls Service and Voith-Siemens Hydro. The new systems started operating between November 1999 and June 2001. The Underground Power Plant is not fully automated yet, because the start conditions are still made by the operator, step-by-step. After that, trough a single command, the unit can start and synchronize to the system. The load necessary to the system is given by the operator trough a command in the HMI (Human-Machine Interface) installed in the velocity regulator panel. Moreover, another HMI was also installed at Henry Borden center control room (approximately 1500m of distance), permitting the start and stop of the machines in a remote way, through optical cable communication (MODBUS). Besides the start and stop of the generation units in an automatic way, the new system allows the synchronism semi automatic, automatic and manual. The new systems permit two operation ways: local and remote. The selection is made by a command key inside the velocity governors panel (PRV). The signals controlled by PRT are sent to the velocity governors through a hardware using analogical signals of 4 to 20 mA. For each machine the following items are controlled: - position of each needle; - position of the deflector; - opening limit; - velocity; - frequency; - voltage (equalized value) - reactive power;
- active power; - excitement error; - velocity governor error; - to lower or to higher the velocity / frequency reference; - to lower or to higher the voltage reference; - generators field voltage; - generators field current; - maximum and minimum field current; - stator current; - position of the breaks; In the Henry Borden Externa, traditional power plant, the following screens for command, control and supervision of the regulation systems were introduced: - 1 screen with general summary of 6 units; - 1 screen per unit, Turbine; - 1 screen per unit, Generator; - 1 screen per unit, Hydraulic pressure unit ( HPU); - 1 general screen for alarms. - A. GOVERNORS OF VELOCITY The regulation program assures that all the needles and deflectors provide virtual feedback in an independent way under any kinds of disturbs. Each element contains its own PID, along with associate obtaining. This kind of control allows the operation of the turbine combining needles in couples in order to optimize the generator efficiency. During the start in low power levels, only two (2) needles are used. As the power generated raises, the other couple of needles begin to operate. In order to avoid that these transactions cause disturbs in the power generated, the regulator controls the total water flow trough the turbine, without concerning about the individual position of each needle. The system also allows two (2) ways of operation: 1) Flow control: In this case, the set point used is the flow one, so no conversion is necessary. 2) Power control: In this case is used the curve Flow X Power to convert the power values into flow values. The governor regulations system of the 6 units uses Woodwards PLC (MICRONET) which was integrated (attached) by General Electric Global Controls Services. The governor is composed by the following: - Main controller, Micronet TMR (Triple Modular Redundant) equipment; - Digital Synchronizer and Load Control (DSLC) for automatic synchronization; - Protech 203, used as velocity protection equipment. - The electro hydraulic interface - EHI is composed by proportional valves, which activate the needles. For the deflectors it was used a 2-stage distribution valve. In this valve it is included an emergency stop valve, manually operated, a solenoid valve for emergency stop and a pattern building block. All these pieces are put together in the hydraulic pressure central. In this system the electronic feeding of the needles position is made using linear transducers named MLDTs Magneto strictive Linear Displacement Transducer, installed in each servomotor (1 for the deflector and 4 for the needles). The hydraulic pressure unit, the pneumatic brakes of the generator and the hydraulic breaks of the turbine are also controlled by the MICRONET. The HMIs for local command are installed at the door of the governor panel, which were produced by GE FANUC, touch screen, and are connected by serial cable RS 232 to the Micronet. The individual control of each unit is linked in a MODBUS protocol net. The remote HMI, constituted by a microprocessor computer, IBM PC kind, with a LCD monitor is also connected to this net. It was used the supervisor software INTELLUTION FIX 32, with 2000 points for supervision, installed at the control room of Henry Borden Externa Power Plant. The communication between the controllers net and the PC was made using a optical fiber cable.
B. VOLTAGE REGULATION AND INDIRECT STATIC EXCITATION SYSTEMS The Voltage Regulating and Indirect Static Excitation Systems are digital electronic and are formed by: 1 Metal Control panel containing: - Control SIMADYN D using thyristor converter SITOR. The connection between the SIMADYN D and the SITOR is executed by cylindrical shielded cable of 50 wires. - HMI named OP2, for visualization of the parameters of the Generator and of the Voltage Regulator, alarm messages and entry of commands and measures in test. - Protection Relay of the Generator: F040 (ANSI 40 Excitement loss relay), F059 (ANSI 59 over-voltage relay) e F064 (ANSI 64 ground fail relay). - Exchanging switch with extractable knob (S001) of Local- Remote commands. 2 - Excitation Transformer The Excitation Transformer, which is placed in the excitation transformers box. The Excitation System takes from the Synchronous machines terminals the necessary energy requested for the excitation. The schematic diagram below shows the beginning of basic operation of the station excitation system in the power part, where the indirect excitation system was adopted:
Scheme 1 Indirect Excitation System
The control of the generated voltage is made by acting on the winding field of the brushless excitation producer. In order to start up the excitation, is used 250 Vdc system. Accomplishments of the SIMADYND controller: - The voltage regulation; - Generation of shoot pulses by the thyristors; - Generation of set points of the terminal voltage and the excitation current; - The stop and the supervision of the excitation system. The excitation system and the voltage regulation have local automatism through dedicates commands and control digital systems. Constituted by the automatic Commutation system follow up, witch in case of failure of the automatic voltage control channel, allows in an independent and non-stop way, the transference to the manual control channel , keeping the supervision of the systems. They posses a special software Struck for the systems, which interface and communication software, with open protocol. They also posses automatic failure detection systems and processing, which make possible repairs without stopping the equipment. The communication doors are RS-232 and RS-485, with standardized local nets. These new regulation systems introduced the following improvements: - Fast response of excitation in face of the load variations. - Sensibility and adjust in case of transients and sudden voltage elevations. - Fast response in case of load loss. - Stable acting during normal operation. - Ability of adjusting the system voltage level. VI. RELEVANT ASPECTS OF THE PROJECT The construction of the power plant happened between the 20s to 50s, and today it works in apparently satisfactory conditions. Nevertheless the machines and the electro- mechanic systems needed intervention from time to time because of the lack of spare parts and because there was no similar national equipment for the substitution of several components, and therefore the progressive obsolescence of the former system. Hydraulic constructions with identical equipment capacity would mean big investments. The modernization of the Henry Borden Underground Power Plant makes possible the innovation of the trust (security) operational and the extension of the useful life of it with lower and possible investments. The modernization, through the incorporation of command, control, protection and supervision systems with digital technology made possible bigger income, efficiency and the reduction of operational costs. The experience used substitution and modernization technologies, which go through the following themes: - Substitution of former velocity, mechanical governors by new digital electronical ones; - Substitution of the hydraulic pressure system by a high pressure one, including new hydraulic units, distributor valves of pattern control, sensors, and instruments required; - Possibility of connection between the hydraulic units, 2 by 2, aiming the increase of operational availability, which means to promote the operation of two generation units through the connected pressure system; - Substitution of the needles and deflectors servomotors for the new high pressure hydraulic system; - Substitution of the existing air compressors by a Nitrogen gas in bladder accumulators; - Substitution of the mechanic system that indicates the position of the needles by digital electronic control based on linear position transducers MLDT, and the install of velocity magnetic sensors (magnetic pick ups); - Substitution of former analogical voltage regulators by digital, electronic, multi processed ones; - Substitution of the rotating pilot exciter by indirect static excitation systems; - Substitution of conventional command, control and limiters by digital command, control and limiters including the optional function PSS (Power System Stabilizer). VII. EMAES EXPERIENCE
The implantation of the regulation systems at Underground Henry Borden Power Plant, because of the challenges faced, which promoted new acknowledgement and experience for the company, such as the following: - Definition and standardization of the most important redundancies in the systems; - The need of substitution and adaptation of the systems, auxiliary control equipment; - Difficulty in the adaptation of the new servomotors, due to the physical limitations of the plant (without modifying the injectors profiles); - Relevant aspects related to the connection between the hydraulic pressure units; - Standardization of the components ;
- Interface executive project between the previous and the present systems; - Considerations about the install of the PSS (Power System Stabilizer); - Necessity of studying the coordination and selection of the protection systems. VIII. CONCLUSION The new systems offer: - Re-composition of the safety operation; - Introduction of the Power Plant into the modern process of operation and maintenance; - Standardization of the governors, voltage regulators and hydraulic pressure units; - Standardization of the spare parts; - Reduction of maintenance and operational cost; - Improvement of the systems efficiency with the diminution of the feedback time when it operates in the electrical system, controlling the load and the frequency; - Enlarging the usefulness life of the generation units with lower cost; - The possibility of remote operation of the generation units. IX. REFERENCES
[1] Technical Specification of EMAE - ET TGM 012/96. [2] GE Global Controls Services Maintenance and Operation Manual; Governors Systems. [3] Voith Siemens Hydro - Maintenance and Operation Manual; Indirect Static Excitation System and Tension Regulation.
X. BIOGRAPHY Ana Tereza A. M. Alonso Tomazelli was born in Santa Cruz do Rio Pardo, So Paulo, Brazil on June 20, 1954. She is mechanical engineer, graduated from the Federal University of Itajub. Her employment experience included the EMAE Empresa Metropolitana de guas e Energia do Estado de So Paulo. Her special fields of interest included hydraulic equipment. She is experienced in power plant automation and inspections of hydraulics equipments. She has also participated of international inspections of foundry and machining of equipment, conferencing about the subject on the IAHR.