Data Pumping test Kelompok : 4 lokasi : Sumur 6 Cipacing Hari/Tanggal: Sabtu,13 April 2013 kordinat : Cuaca Pagi : Cerah Volume ember = 9 ltr Cuaca Siang : Cerah water level awal = 2 m Cuaca Sore : Mendung
Penurunan = (7.18-2.00)m = 5.18 m Total waktu = 5 jam PH = 7.1 EC = 0.304 TDS = 205 Temp air = 20 0 C
Q = V/t V= 9 L T=300 menit = 18.000 S Q= 9 L/18.000 S= 5x10 -4 L/S Debit pemakaian Timba sumur selama 300 menit yaitu 5x10 -4 L/S T= 2.3 x 5x10 -4 / 4.3.14 (2.06-2.00)=1.52x10 -3 L 2 /T -1 K=T/b = 1.52x10 -3 L 2 /T -1 /1.17= 1.3x10 -3
Perhitungan Data Recovering Test
Q = V/t V = 9 L Q = 9/14.400 = 6.25 x 10 -4 L/S Maka debit timba sumur pada 240 menit yaitu 6.25 x 10 -4 L/S T= 2.3 x 6.25 x 10 -4 / 4.3.14 ( 7.19-4.64) = 4.5 x 10 -5 L 2 /T -1
K = T/b = 4.5 x 10 -5 /1.17 = 3.8 x 10 -5
Gradient hidroulik Sumur 1 dan sumur 2 I=dh/dL = (3.5-3.3)/839= 2.3 x 10 -4
Sumur 2 dan sumur 3 I=dh/dL= (6.5-3.3)/839= 3.8 x 10 -3
Sumur 3 dan sumur 4 I=dh/dL = (7.5-6.5)/790= 1.26 x 10 -3
Sumur 4 dan sumur 5 I=dh/dL = (7.5-2.1)/719=7.5 x 10 -3
Sumur 5 dan sumur 6 I=dh/dL = (6.9-2.1)/694.5= 6.9 x 10 -3
Sumur 6 dan sumur 7 I= dh/dL = (7.1-6.9)/695=2.8 x 10 -4
Sumur 7 dan sumur 8 I= dh/dL= (7.1-4.8)/708.5 = 3.2 x 10 -3
BAB IV. Kesimpulan 1. Debit sungai 1 lebih besar daripada debit sungai 2 karena sungai 1 memiliki elevasi lebih rendah daripada sungai 2 dan memiliki arus yang lebih cepat sehingga waktu yang diperlukan oleh air dalam menempuh suatu jarak lebih singkat daripada sungai 2. 2. litologi di daerah penelitian tersusun oleh breksi vulkanik dengan komposisi fragmen batuan beku dan batupasir serta matriks berupa tuff. 3. Besar elevasi berbanding lurus dengan kedalaman Muka air tanah ( MAT). 4. Daerah penelitian merupakan daerah yang memiliki jenis aquifer yang baik karena tersusun atas breksi vulkanik dan tuff pada recovery test dapat dilihat celah-celah batuan dengan mudah meneteskan air dan waktu yang diperlukan untuk posisi MAT semula tidak terlalu lama.