ABB Group 1MRS757407 May 21, 2012 Slide 1 MicroSCADA Pro MicroSCADA Pro team, ABB Power system Network Management, Substation Automation Products Reference projects. Vuosaaren Satama harbour needed optimal and more efficient lighting for the harbor area Not all of the lighting is needed all the time and therefore they use 3 light groups, fogg sensors and time based control in the harbor.
ABB Group 1MRS757407 May 21, 2012 Slide 1 MicroSCADA Pro MicroSCADA Pro team, ABB Power system Network Management, Substation Automation Products Reference projects. Vuosaaren Satama harbour needed optimal and more efficient lighting for the harbor area Not all of the lighting is needed all the time and therefore they use 3 light groups, fogg sensors and time based control in the harbor.
ABB Group 1MRS757407 May 21, 2012 Slide 1 MicroSCADA Pro MicroSCADA Pro team, ABB Power system Network Management, Substation Automation Products Reference projects. Vuosaaren Satama harbour needed optimal and more efficient lighting for the harbor area Not all of the lighting is needed all the time and therefore they use 3 light groups, fogg sensors and time based control in the harbor.
MicroSCADA Pro MicroSCADA Pro team, ABB Power System Network Management, Substation Automation Products
Reference projects
ABB Group 1MRS757407 May 21, 2012 | Slide 2 Optimazation of harbour lighting Customer need Customer Vuosaaren Satama needed optimal and more efficient lighting for the harbour area Not all of the lighting is needed all the time and therefore they use 3 light groups, fogg sensors and time based control in the harbor Ideally the foggy harbour has the optimal lighting in different during the day ABB response Fogg sensor: Removing diverse light groups Time based control Customer benefits The customer has several operators of whom energy consumption is calculated and reported with MicroSCADA Pro system
Vuosaaren Satama harbour
ABB Group 1MRS757407 May 21, 2012 | Slide 3 Infrastructure Project Example Power SCADA for Bangkok Skytrain (BTS) Customer need Competitive Power SCADA replacement and extension of existing equipment Scalability, hierarchical architecture and openness at all level ABB response MicroSCADA Pro Hot-Standby System Computers, Workstations and Peripherals. RTU560 multi processor architecture and redundancy for IEC60870-5-104. Gateway to Siemens RTUs,signaling System via ELCOM 90. Customer benefits Future proof and flexible expandability Guaranteed system lifetime support Secure investment Customer: BTS Bangkok Mass Transit System Thailand
Year of commissioning: 20092011 Headquarter of ELECTROHUILA S.A. ESP in Neiva (Huila)
ABB Group 1MRS757407 May 21, 2012 | Slide 4 Power Management Control System for a building Customer need Power Monitoring and Control System for worlds tallest building Monitoring of Loads, Indicating Faults, Events and Alarms ABB response MicroSCADA with RTU560 OPC Link to other Systems Presentation of Single line diagrams, alarm-and event list, Measurement Reports in MicroSCADA Customer benefits Fault tolerant system (redundancy) Possibilities to collect data from a wide range of third party equipments Scalability, easy to expand
Burj Khalifa Tower Project
ABB Group 1MRS757407 May 21, 2012 | Slide 5 Energy Management System (EMS)
Customer need Etihad Towers is a complex of 5 towers (apartments, commercial center, offices, hotel).
ABB Response ABBs MicroSCADA Pro products are an optimal solution for such complex project. Features of both MicroSCADA and RTU 560 are stretched to significant limits, programming the 125 shedding sequences.
Customer Benefits Reliabe and secured power supply Etihad Towers, Abu Dhabi, United Arab Emirates
ABB Group 1MRS757407 May 21, 2012 | Slide 6 Infrastucture Project Example Dublin Airport MV SCADA Customer need: Centralized MV network supervision & control Automated functions such as load transfer on outage & high information security ABB response: MicroSCADA Pro Hot-Standby, RTU560, REF54x Operator HMI in control centre and several locations across the airport SMS on critical alarms & events Strict security policy Customer benefits: Control any device from any location, No more need for 24h operator crew presence Extensibility e.g. 75% addition of SCADA-visible feeders in just 2011 extensions capacity exists for much more High flexibility for 3 rd party IED integration Customer: Dublin Airport Authority Year of commissioning: 2010
ABB Group 1MRS757407 May 21, 2012 | Slide 7 Infrastructure project Customer need The Nakilat ship repair and maintenance yard in Ras Laffan will be among the largest in the world and have an annual capacity to handle about 200 vessels. It is expected to begin operation in 2010. The new facility is suitable for the repair and maintenance of very large LNG carriers and a wide range of other vessels and facilities. Nakilats aim was to standardise all equipment
ABB Response LV and MV switchgear panels Transformer
Customer Benefits ABB offered package solution ABBs ability to provide strong, local after-sales service. Nakilat ship repair yard, Qatar
ABB Group 1MRS757407 May 21, 2012 | Slide 8 Distribution SCADA application Customer need Uniform SCADA system covering the whole Estonian distribution network with integration to available systems Independent system maintenance with good support from supplier if needed ABB response Main, three regional, five local and several substation level MicroSCADA systems Interfacing to IEDs, third party SCADA / GIS systems with ELCOM and re-use of existing MicroSCADAs Customer benefits Reduction in power distribution interruptions Lower cost for system operation and maintenance
Customer: Eesti Energia AS Year of commissioning: 2002
System update 2010
Eesti Energia Estonia
ABB Group 1MRS757407 May 21, 2012 | Slide 9 Distribution SCADA application Customer need Uniform SCADA system covering large geographiconal area/distribution network with integration to available systems Independent local system maintenance with good support from supplier
ABB response DC Main SCADA, three regional SCADA, then local and several substation level MicroSCADA systems Interfacing third party SCADA and to IEDs Customer benefits Centralized Supervisory and Control within distribution area Reduction in power distribution interruptions Lower cost for system operation and maintenance
Customer: EasternDistribution Utility Lithuania Year of commissioning: 2004
AB Rytu skristomieji tinklai (RST) Lithuania
ABB Group 1MRS757407 May 21, 2012 | Slide 10 SCADA application with SYS 600 Customer need Central SCADA for Power Distribution in the City of Neiva. Integration of 5 existing and a retrofit existing Substation ABB response MicroSCADA Pro Hot-Standby System Computers, Workstations and Peripherals Historical database Server HIS600 SPA-, LON-DNP3.0 and IEC61850 standard implementation Customer benefits Future proof and flexible expandability of the SCADA System Less or shorter interruptions High functionality trough a maximum level of IED integration Customer: Electrohuila S.A. E.S.P Neiva, Colombia Year of commissioning: 2009
Electrohuila S.A Esp Colombia
ABB Group 1MRS757407 May 21, 2012 | Slide 11 Distributed Distribution Management System(DMS) Customer need Reliable Centralized/Distributed Distribution Management System Open system, easy connections for various SCADAs, good horizontal integration to graphical Information System/Customer Data System ABB response DMS600 with wide functionality Distributed/Centralized structure Interfaces to NIS, SCADA Customer benefits Flexible operation Good overall view for network management Increased power supply reliability
Curstomer: Fortum Distribution Oy Finland Year of commissioning: 2002-2007, 2009
Fortum, Finland
ABB Group 1MRS757407 May 21, 2012 | Slide 12 Network Planning System Customer need Rapid, harmonized network planning process to support ambitious expansion projects Predictability and ability to simulate changes in demand and in customer base over time ABB response Countrywide MicroSCADA Pro network information and planning system with long-term maintenance contract Future-proof system allowing seamless and easy expansion to full- fledged SCADA/DMS Customer benefits Professionally designed network Safe and efficient use of network assets Reliable data for investment decisions Customer: EEPCO Year of commissioning: 2004
EEPCO, Ethiopia
ABB Group 1MRS757407 May 21, 2012 | Slide 13 Distribution SCADA/DMS upgrade extension Customer need Reliable Distribution SCADA/Distribution Management System Open system, easy connections for various protocols, Good vertical integration to protection relays ABB response Integrated SCADA/DMS system Totally verified DMS fault management functionality Total concept from SCADA to IEDs and Distribution Network RTUs Customer benefits Increased power supply reliability Shortened power supply breaks Savings for maintenance costs Customer: Savon Voima Oy,Finland Year of commissioning: 2007-09
Savon Voima
ABB Group 1MRS757407 May 21, 2012 | Slide 14 Main Power Distribution SCADA and District Heating Customer need Reliable, open Distribution SCADA Good vertical integration to GIS/DMS SA/IEDs protection relays/Distribution Network RTUs ABB response Reliable open MicroSCADA Pro Total DA concept with SCADA/IEDs and distribution network RTUs Flexible system for clients own applications and maintenance Customer benefits Easy access to all process information network Improvement of the quality of electricity and heat Take the full advantage of the power distribution network capacity Rationalize working process
Customer: Tampereen Shkverkko Oy Finland Year of commissioning: 2007-09
SCADA upgrades, Tampere energy
ABB Group 1MRS757407 May 21, 2012 | Slide 15 Industrial SCADA application Customer need Repsol-YPF improve, increase efficient and secure the energy supply of the heavy crude oil production facility by SCADA system of the Block 16 ABB response Two redundant SCADA/EMS/LMS/DMS IEC 60870-5-104 communication over WAN with RTU 560s, SCADA, Energy Management, Load Management and Distribution Management basic functions Customer benefits Fault tolerant systems (redundancy) Possibility integrate wide range of third party equipments Scalability, easy to expand by more complex EMS/LMS/DMS functions
Customer:Repsol YPF Year of commissioning: 2007
Repsol YPF Block 16
ABB Group 1MRS757407 May 21, 2012 | Slide 16 SCADA/SA system for industry application MAP TA PHUT OLEFINS CO. Ltd. Thailand
Customer need Industrial SCADA/SA system to control and supervise power supply within cement factory Supply of IEDs and integrations for IEDs and DCS system ABB response Integrated SCADA/SA system based on MicroSCADA Pro 9.2 Deep integration for IEDs Advantages for vertical integration due to same supplier for SCADA and IEDs Customer benefits One system and IED manufacturer Excellent local support for extensions and lifetime maintenance Customer: MAP TA PHUT OLEFINS CO.,LTD. Year of commissioning: 2009
ABB Group 1MRS757407 May 21, 2012 | Slide 17 SCADA for industry application Customers need Centralized Supervisory and Control for factory switchgears Better supervision and control for Power consumption Integrations of protection relays ABBs response MicroSCADA Pro for centralized supervisory and control ABB protection relays Vertical integration to IEDs Customers benefits Energy consumption supervisory/savings Reliable power distribution Breakless production Customer: Outokumpu Norzink AS Year of commissioning: 2004
Protection & Control for MV Switchgears in Outokumpu
ABB Group 1MRS757407 May 21, 2012 | Slide 18 Distribution SCADA application with DMS 600 Customer need To improve distribution network reliability in the cities of DaNang, Hue, Qui Nhonand BuonMa Thout Competitive project financing ABB response MicroSCADA based SCADA systems with DMS 600 and RTUs for primary and secondary substations Arrangement of concessional credit financing Customer benefits Less and shorter power distribution interruptions through enhanced supervision and control Project financing cost reduction Customer: Power Company 3 Year of commissioning: 2009
4-cities, Vietnam
ABB Group 1MRS757407 May 21, 2012 | Slide 19 SCADA/DMS application for housing area Customer need SA/SCADA with distribution network fault management Field Proven System based on IEC 61850 ABB response ABB one system for S/A and DMS Korean Standard FRTU interfaced Extension is proven Customer benefits All information and operation with one system Excellent local competence Reduce the cost Easy extension Customer: Korea National Housing Corporation Year of commissioning: 2008
Asan & Baebang, South Korea
ABB Group 1MRS757407 May 21, 2012 | Slide 20 SCADA system for building application Customer need Electrical Network Monitoring and Control (ENMC) System for the mall. Bahrain City Centre Mall is a large scale retail and leisure complex in the city of Manama. ABB response Redundant System Servers -LAN and fiber connection to substation RTUs Dedicated RTUs in each substation communicating with energy meters and protection relays Automated control sequences for Load Shedding Customer benefits Fault tolerant system (redundancy) Scalability, easy to expand Customer: Majid Al Futtaim Group Year of commissioning: 2008 Bahrain City Centre Mall ENMC
ABB Group 1MRS757407 May 21, 2012 | Slide 21 SCADA system for building application Customer need Scalable central SCADA for all existing Substations and future expansions High system reliability and availability for Hospital environment ABB response MicroSCADA Pro Hot-Standby System and Workstations Bus bar coloring, Supervision of Generators, alarms via GSM 15 Remote Terminal Unit RTU560 for 400V voltage level with serial IEC60870-5-101 and IEC60870-5-104 Customer benefits Low maintenance costs during operation Guaranteed system lifetime support Long term investment Customer: HUCH (Largest Hospital in Finland) 2001: Installation and commissioning 2002- 2008: Substation extensions and retrofit projects 2009
Helsinki University Central Hospital (HUCH)
ABB Group 1MRS757407 May 21, 2012 | Slide 22 SCADA/DMS for railway application Customer need SCADA / DMS system covering Country Wide Railway distribution network area Integration/Connection to available Signaling systems ABB response Field proven Hot-Standby MicroSCADA system incl. Remote Terminals (RTUs), Distribution Terminals (DTUs), Line Differential Protection Relays. Customer specific Control sequences, DMS for Switching Plan Creation, Simulation and Dynamic Network Topology Customer benefits Cost Reduction in System operation and maintenance Future proof and flexible expandability of the SCADA-system Customer: RHK Finnish Railway Year of commissioning: 20032006
RHK Finnish Railway
ABB Group 1MRS757407 May 21, 2012 | Slide 23 Power Distribution SCADA/DMS for railway Customer need Uniform Railway SCADA system covering large geographical area/railway power distribution network with integration to available systems Independent local system maintenance with good support from supplier ABB response Main SCADA with basic DMS functionality, three regional SCADA, 17 pcs of RTUs Interfacing IEDs Customer benefits Centralized Supervisory and Control within distribution area Reduction in power distribution interruptions Lower cost for system operation and maintenance Customer: Lithuanian Railway (LG) Lithuania Year of commissioning: 2004
Lithuanian Railway
ABB Group 1MRS757407 May 21, 2012 | Slide 24 Power SCADA for Bangkok Skytrain (BTS) Customer need Competitive Power SCADA replacement and extension of existing equipment Scalability, hierarchical architecture and openness at all level ABB response MicroSCADA Pro Hot-Standby System Computers, Workstations and Peripherals. RTU560 multi processor architecture and redundancy for IEC60870-5-104. Gateway to Siemens RTUs and signaling System via ELCOM 90. Customer benefits Future proof and flexible expandability Guaranteed system lifetime support Secure investment Customer: BTS Bangkok Mass Transit System Thailand Year of commissioning: 2009
ABB Group 1MRS757407 May 21, 2012 | Slide 25 SCADA for airport application Customer need Higher-than-average reliability demands for power distribution Centralized supervision and control, including eight (8) 400- 900kVA Emergency Power Generators ABB response MicroSCADA Pro Hot-Standby System, SPACOM protection relays. IEC61850 standard implementation Supervision and control for 40 primary-and secondary substations Customer benefits Less and shorter interruptions High functionality trough a maximum level of IED integration and field-tested applications Flexible expandability
Customer:Finavia Year of commissioning: Ugraded in 2007 and 2008
Helsinki-Vantaa Airport 110/20kV
ABB Group 1MRS757407 May 21, 2012 | Slide 26 Main SCADA with SA for tunnel application Customer need Supervisory and Control Systems to be able to control tunnel lights, ventilation, traffic and power supply Substation Automation system to control HV/MV/LV portions for power supply with IED integrations. ABB response Same SCADA platform to Control Centre SCADA and SA System at substation level. Vertical and horizontal (IEDs) integration advantages Customer benefits Same system- and IED manufacturer Reliable system concept Lower cost for system operation and maintenance Customer: PMU 85/Hai Van Tunnel Vietnam Year of commissioning: 2004