Highway Design Engineer Team Leader with Pragmatic Experience.
Houston, Texas. Civil Engineering. September 2014.

35 years in design, planning and construction of a variety of rural and urban
roads, bridges, utilities and freeways, in and around the Houston area.

BERNARD J. MURPHY, P. E. Texas license # 66323 since 1989.
Contact: Bernard.Murphy2016@Gmail.com 832 971 6423

July 2007 to Present: Transportation Manager & Business Development, with LCR Inc.

Developed contacts with Chambers County officials to pursue work in high
growth industrial and seaport area east of Houston.
Won contracts to design and build road, drainage and pipeline infrastructure.
LISTEN to the customer and tailor designs that fit THEIR needs.
Petrochemicals, Pipelines safety, Wetlands, Flooding, Trucks, Trains, Barges
and Traffic growth drive design and construction choices. Seek input from
stakeholders, host workshops, brainstorm solutions, foster a teamwork buzz.
Visit the field and TALK to folks often; they feel like partners and help the job.
Fort Bend Co. High growth residential area west of Houston. Rebuild mature
urban streets: utility, ROW, cost and people issues. Patience is key.
I designed fancy bridges in new up market town. Worked closely with architects
and builders at every stage to ensure a quality product. I never point the finger at
others when things go awry. Work hard on the problem, easy on the people.
Attend functions with government and private clients. Offer impartial engineering
advice; politicians appreciate discrete warning of potential problems.
Work hard to gain confidence of all project stakeholders.

July 1980 to May 2007: Texas Dept. of Transportation (Houston District).

Principal Design Engineer Manager, 10 Yrs. 1997-2007. TxDOT

Freeways IH-10(E), SH-99, US 59(N), IH-45(N). Rural FM 1314. Featuring ROW,
ENV, Haz_Mat, Utilities, TCPs, drainage, bridges, roadway, walls, plans specs,
estimate (PS&E), Schedules, Claims, legal hearings.
Listen to the locals. Concentrate on essentials. Taylor plans to the contractor and
travelling public. Shepherd through construction. Concept to Ribbon Cutting.

Construction Management, 17 Yrs. 1980-1997. TxDOT.

Freeways US 59(N), SH 249/FM 1960, US 59(S)/IH 610(W), BW 8(N), IH-10(W),
SH 288. Survey, materials, structures, drainage, traffic control, utilities, pipelines,
scheduling, claims, field changes. Keep contractor paid up and public moving.
Rural roads in rolling terrain and multiple small bridge replacements.
100 issues might stall any project. I seek and attack problems to stay on track.

Education:
Bachelors of Science, Civil & Structural Engineering University of Bradford, England 1981.


C:\Users\BillKathy\Documents\greig wells\Greig Wells 2014\Bernard Murphy.docx
Computers:
Very strong in MICROSTATION. Good in PRIMAVERA , WinStorm, HEC-RAS, some
Geopak, GIS. Microsoft Office suite.

Compensation

I will consider salary and benefits packages over $130K/Y. I would prefer a straight
hourly rate of $90/Hr. with no benefits. I am physically fit, in great health, rarely sick,
dont smoke. Get along readily with people and foster a happy cooperative team spirit. I
am NOT willing to relocate from the Houston area but 20% travel is OK.






------------------------------------------------------
TxDOT PRECERTIFICATION CATEGORIES - APPROVED
---------------------------------------------------------------------
CATEGORY
CATEGORY PRE-CERTIFICATION
OF WORK DATE CATEGORY OF WORK DESCRIPTION
-------- ----------------- ------------------------------------------------------------
2.13.1 11/14/2007 HAZARDOUS MATERIALS INITIAL SITE ASSESSMENT
3.1.1 11/6/2007 ROUTE STUDIES & SCHEMATIC DESIGN - MINOR ROADWAYS
3.2.1 11/6/2007 ROUTE STUDIES & SCHEMATIC DESIGN - MAJOR ROADWAYS
3.3.1 11/6/2007 ROUTE STUDIES & SCHEMATIC DESIGN - COMPLEX HIGHWAYS
3.4.1 11/6/2007 MINOR BRIDGE LAYOUTS
4.2.1 11/6/2007 MAJOR ROADWAY DESIGN
4.3.1 11/6/2007 COMPLEX HIGHWAY DESIGN
6.1.1 5/23/2011 ROUTINE BRIDGE INSPECTION
8.1.1 12/18/2007 SIGNING, PAVEMENT MARKING AND CHANNELIZATION
10.1.1 12/20/2007 HYDROLOGIC STUDIES
10.2.1 12/20/2007 BASIC HYDRAULIC DESIGN
11.1.1 6/21/2011 ROADWAY CONSTRUCTION MANAGEMENT AND INSPECTION
11.2.1 7/15/2011 MAJOR BRIDGE CONSTRUCTION MANAGEMENT AND INSPECTION
12.1.2 6/21/2011 PORTLAND CEMENT CONCRETE
EMPLOYEE PRE-CERTIFICATION STATUS REPORT AS OF SEPT 1, 2014

Vous aimerez peut-être aussi