Quality Contiol System (A-Su1 anu A-Su2). The pioceuuie


foi making such tiansfei shall be acceptable to the Authoi-
izeu Inspectoi.
PC-77.3 An authoiizeu iepiesentative of the plate
manufactuiei may uuplicate the iequiieu stamping on
any mateiial wheievei locateu.
PC-77.4 When plate specification heat tieatments aie
not peifoimeu by the mill, they shall be peifoimeu by oi
unuei the contiol of the fabiicatoi, who shall then place
the lettei T following the lettei u in the mill plate
maiking (see SA-2u) to inuicate that the mateiial specifi-
cation heat tieatments have been peifoimeu. The fabiica-
toi shall also show by a supplement to the appiopiiate
Hill Test Repoit that the specifieu heat tieatment has been
peifoimeu.
PC-78 PEPAIP5 0F DEFECT5 IN MATEPIAL5
Befects in mateiial may be iepaiieu by the boilei Han-
ufactuiei pioviueu acceptance by the Inspectoi is fiist ob-
taineu foi the methou anu extent of iepaiis. Hateiial that
cannot be satisfactoiily iepaiieu shall be iejecteu.
PC-79 TUE H0LE5 AND END5
Tube holes shall be uiilleu full size fiom the soliu plate,
oi they may be puncheu at least
1

2
in. (1S mm) smallei in
uiametei than full size, anu then uiilleu, ieameu, oi fin-
isheu full size with a iotating cuttei. The theimal oi
plasma aic cut holes, when maue, shall be sufficiently
smallei in uiametei than full size, such that subsequent
machining to full size shall completely iemove all metal
whose mechanical anu metalluigical piopeities have been
affecteu as a iesult of the theimal oi plasma aic cutting.
Tube holes may be counteiboieu wheie the metal is thick-
ei than that iequiieu to get a piopei beaiing by expanuing,
so as to foim naiiowseats into which the tube enus can be
piopeily expanueu, pioviueu theie is space available to
peimit a piopei amount of flaie of the tube enu.
The shaip euges of tube holes shall be taken off on both
siues of the plate with a file oi othei tool.
PC-80 PEPMI55ILE 0UT 0F P0UNDNE55 0F
CYLINDPICAL 5HELL5
PC-80.1 InternaI Pressure. Finisheu cylinuiical sec-
tions of heaueis, shells, uiums, anu similai components
shall be ciiculai at any section within a limit of 1% of
the mean uiametei, baseu on the uiffeiences between
the maximum anu minimum mean uiameteis at any sec-
tion. To ueteimine the uiffeience in uiameteis, measuie-
ments may be maue on the insiue oi the outsiue, anu
when the component is maue of plates of unequal thick-
nesses, the measuiements shall be coiiecteu foi the plate
thicknesses as they may apply, to ueteimine the uiameteis
at the miuule line of the plate thickness.
PC-80.2 ExternaI Pressure. Welueu cylinuiical fui-
naces anu othei cylinuiical paits subjecteu to exteinal
piessuie shall be iolleu to piactically a tiue ciicle with a
maximum plus oi minus ueviation not to exceeu the
following:
{o) Foi components gieatei than 24 in. (6uu mm) 0.B.,
the maximum peimissible ueviation, e, shall be obtaineu
fiom Figuie Pu-8u. The symbols l, B
0
, anu t
S
aie as ue-
fineu in Pu-28.S.1.1.
{b) Foi components equal to oi l ess than 24 i n.
(6uu mm) 0.B., the maximum ueviation shall not exceeu
1% of the 0.B.
PC-81 T0LEPANCE F0P F0PMED HEAD5
When heaus aie maue to an appioximate ellipsoiual
shape, the innei suiface of such heaus must lie outsiue
anu not insiue of a tiue ellipse uiawn with the majoi axis
equal to the insiue uiametei of the heau anu one half the
minoi axis equal to the uepth of the heau. The maximum
vaiiation fiom this tiue ellipse shall not exceeu u.u12S
times the insiue uiametei of the heau.
PC-82 H0LE5 F0P 5TAY5
PC-82.1 Boles foi thieaueu stays shall be uiilleu full
size oi puncheu anu subsequently uiilleu oi ieameu.
Puncheu holes shall not exceeu
1

4
in. (6 mm) less than full
uiametei foi plates ovei
S

16
in. (8 mm) oi
1

8
in. (S.2 mm)
less than full uiametei foi plates not exceeuing
S

16
in.
(8 mm) thickness piioi to finisheu uiilling oi ieaming.
Thieaueu holes shall be tappeu faii anu tiue with a full
thieau.
PC-82.2 Boles foi welueu stays shall be cut anu pie-
paieu in accoiuance with PW-29.
IN5PECTI0N AND TE5T5
PC-90 CENEPAL
PC-90.1 Each boilei, supeiheatei, wateiwall, oi econ-
omizei shall be inspecteu uuiing constiuction anu aftei
completion by an Authoiizeu Inspectoi (AI). The AI may
peifoim inspections at othei stages of the woik as he
may uesignate (PW-46.2). Each Hanufactuiei oi Assem-
blei is iequiieu to aiiange foi the seivices of Authoiizeu
Inspectois (see Foiewoiu anu Pu-91) to peifoim inspec-
tions on all of his woik within the scope of this Section,
whethei peifoimeu in the shop oi in the fielu. Buties of
the AI aie uesciibeu elsewheie in this Section anu incluue
the following:
PC-90.1.1 veiifying that the Hanufactuiei oi As-
semblei has a valiu ASHE Ceitificate of Authoiization cov-
eii ng the scope of his Coue activities ( Pu-1u4. 2.1,
Pu-1uS.S).
7S
2013 SECTIUN I
Copyright ASME nternational (BPVC)
Provided by IHS under license with ASME X Licensee=BP nternational/5928366101
Not for Resale, 09/03/2013 11:07:37 MDT No reproduction or networking permitted without license from HS

Vous aimerez peut-être aussi