DEVELOPMENT OF INTERNATIONAL

CRICKET STADIUM CUM SPORTS COMPLEX


IN LUCKNOW

Under Integrated Urban Rejuvenation Plan

ON DESIGN, FINANCE, BUILD, OPERATE AND MAINTAIN
BASIS UNDER PUBLIC PRIVATE PARTNERSHIP (PPP)

REQUEST FOR QUALIFICATION CUM PROPOSAL
DOCUMENT

JANUARY 2009

Nodal Agency



AWAS BANDHU, UTTAR PRADESH,
HOUSING & URBAN PLANNING DEPARTMENT,
GOVERNMENT OF UTTAR PRADESH

IST FLOOR, JANPATH MARKET,
LUCKNOW-226001

TEL: 0522-2237161 FAX:0522-2612098,
E-MAIL: awasbandhu@gmail.com
WEB: awas.up.nic.in

Project Consultants
Darashaw & Company Private Limited




RFQ cum RFP for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium cum Sports
Complex in Lucknow

RFQ cum RFP Volume I-Instruction to Bidders Page 1

NOTICE INVITING REQUEST FOR QUALIFICATION CUM PROPOSAL






DEVELOPMENT OF INTERNATIONAL LEVEL CRICKET STADIUM CUM SPORTS COMPLEX IN LUCKNOW
As Part Of IURP Uttar Pradesh, India on DBFOT basis

Government of Uttar Pradesh proposes development of development of International level Cricket Stadium cum
Sports Complex to be located near Amar Shaheed Path in Lucknow. UP Awas Bandhu is the nodal agency for
the project.

Under this a need to develop a world class Cricket Stadium cum Sports Complex along with a Sports academy in
Lucknow was felt. The Project Site is located at Lucknow bypass, Amar Shaheed Peeth. The site has an area of
50 acres and it is situated in between Sultanpur road and Gomti river on Amar Shaheed Path. The site can also
be approached through a service road next to Amar Shaheed Path. The site shall be given on lease for a period
of 35 years.

The development of the project is on Design-Build-Finance-Operate and Transfer (DBFOT) basis under which
the developer will Design, Finance, Construct, Maintain and Operate the project.

GoUP invites bids from the eligible developers either on their own or in consortium of up to four members, in
response to this RFQ cum RFP document

A pre bid meeting for the bidders who are interested in bidding for the above mentioned project will be held on
29.01.2009 hrs at Hotel Shangri La, New Delhi

The Eligibility Criteria and other terms and conditions are given in RFQ cum RFP Document. The RFQ cum RFP
may be obtained at the address given below on payment of Rs 25,000/- (Rupees Twenty Five Thousand only),
through account payee Demand Draft in favour of Awas Bandhu payable at Lucknow.. The RFQ cum RFP may
also be downloaded from the web http//awas.up.nic.in and submitted along with the Demand Draft as mentioned
above.

The last date for submission of RFQ cum RFP is 1300 Hrs on 12.02.2009.



For further details please contact
The Executive Director, The Project Coordinator,
Awas Bandhu, Uttar Pradesh, Darashaw & Company Pvt. Ltd.
Housing & Urban Planning Department, 12th Floor, Regent Chambers,
Government Of Uttar Pradesh 208, Nariman Point, Mumbai-400021
Ist Floor, Janpath Market, Lucknow-226001 Tel: 022-66388900 Fax: 022-67470549
Tel: 0522-2237161 Fax:0522-2612098, E-mail: neha-panchal@darashaw.com
E-Mail: awasbandhu@gmail.com,
Web : awas.up.nic.in





Awas Bandhu, Uttar Pradesh,
Housing & Urban Planning Department,
Government of Uttar Pradesh
RFQ cum RFP for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium cum Sports
Complex in Lucknow

RFQ cum RFP Volume I-Instruction to Bidders Page

2
Disclaimer

1. Though adequate care has been taken in the preparation of this RFQ cum RFP Document (Volumes I and
II), the Bidder should satisfy himself that the Document is complete in all respects including its legal
validity.
2. Neither Awas Bandhu, UP nor their employees or consultants make any representation or warranty as to
the accuracy, reliability or completeness of the information in this RFQ cum RFP (Volumes I and II) and it
is not possible for Awas Bandhu, UP to consider the investment objectives, financial situation and
particular needs of each party who reads or uses this document. Each prospective Bidder should conduct
his own investigations and analysis and check the accuracy, reliability and completeness of the
information in this RFQ cum RFP and obtain independent advice from appropriate sources.
3. Neither Awas Bandhu, UP nor their employees or consultants will have any liability to any prospective
bidder or any other person under the law of contract, tort, the principles of restitution or unjust enrichment
or otherwise for any loss, expense or damage which may arise from or be incurred or suffered in
connection with anything contained in this RFQ cum RFP, any matter deemed to form part of this RFQ
cum RFP, the award of the Project, the project information and any other information supplied by or on
behalf of Awas Bandhu UP, LDA or their employees, any consultants or otherwise arising in any way from
the selection process.
4. Awas Bandhu, UP reserves the right to reject any or all of the proposals submitted in response to this
RFQ cum RFP at any stage without assigning any reasons whatsoever.
5. Awas Bandhu, UP reserves the right to change any or all of the provisions of this RFQ cum RFP prior to
Proposal Due Date. Such changes would be intimated to all the parties being issued this RFQ cum RFP.
6. Awas Bandhu, UP reserves the right to change, modify, add to or alter the Selection Process including
inclusion of additional evaluation criteria at later stage, which in no event shall be later than the Proposal
Due Date. Any change in the Selection Process shall be intimated to all concerned parties.

RFQ cum RFP for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium cum Sports
Complex in Lucknow

RFQ cum RFP Volume I-Instruction to Bidders Page

3
Table of Contents

1 RFQ cum RFP DOCUMENT 5
2 Salient Information 6
3 Abbreviations 7
4 Definitions 8
5 INTRODUCTION 11
5.1 Background of Lucknow 11
5.2 Scope of the Project 12
5.3 Cost of the Project 13
5.4 Commercial Consideration 13
5.5 Project Implementation Mechanism 14
6 INFORMATION AND INSTRUCTION TO BIDDERS 15
6.1 Scope of Application 15
6.2 Eligible Bidders 15
6.3 Changes in Consortium Composition 16
6.4 Number of Applications 16
6.5 Application Preparation Cost 16
6.6 Project Inspection and Site Visit 16
6.7 Right to Accept or Reject any or all Applications 16
6.8 Contents of RFQ cum RFP Document 17
6.9 Clarifications 17
6.10 Amendment of RFQ cum RFP 17
6.11 Language 17
6.12 Currency 17
6.13 Validity of Application 18
6.14 Format and Signing of Application 18
6.15 Sealing and Marking of Applications 18
6.16 Submission of Bid 19
6.17 Application Due Date 19
6.18 Late Applications 20
6.19 Modifications/ Substitution/ Withdrawal of Proposals 20
6.20 Evaluation of Application - Due Date 20
6.21 Evaluation of Application Criteria 20
6.22 Evaluation of Application - Supporting Documents 20
6.23 Evaluation of Application - Right to Reject 20
6.24 Confidentiality 20
6.25 Tests of responsiveness 20
6.26 Clarifications 21
6.27 Qualification and Notification 21
6.28 RFP Documents 21
6.29 Fees of the Consultants 21
7 Other Instructions 22
7.1 General Provisions 22
7.2 Confidentiality 23
7.3 Communication between Bidders and Awas Bandhu, UP 23
7.4 Interpretation of Documents 24
7.5 Pre-Bid Conference 24
RFQ cum RFP for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium cum Sports
Complex in Lucknow

RFQ cum RFP Volume I-Instruction to Bidders Page

4
7.6 Enquiries concerning the RFQ cum RFP / Draft Concession Agreement 25
7.7 Amendment of RFQ cum RFP 25
7.8 Submission of Bids 25
7.9 Bid Opening 26
7.10 Earnest Money Deposit 26
7.11 Performance Security 27
7.12 Sources of Funds 28
8 DESCRIPTION OF THE SELECTION PROCESS 29
8.1 CRITERIA FOR EVALUATION 29
8.2 Evaluation of Financial Proposal (Assessment of Envelope B) 32
9 RULES REGULATING THE CONSORTIUM 33
9.1 Consortium of Bidders 33
10 METHODOLOGY & CRITERIA FOR EVALUATION OF FINANCIAL BID (ENVELOPE B) 35
10.1 Financial Proposal Evaluation 35
APPENDICES 37
APPENDIX 1A 38
APPENDIX 1B 39
APPENDIX 2 40
APPENDIX 3 41
APPENDIX 4 43
BID RESPONSE SHEET 1 44
BID RESPONSE SHEET 2 45
APPENDIX 5 46
BID RESPONSE SHEET 3 46
BID RESPONSE SHEET 4 47
APPENDIX 6 48
APPENDIX 7 49
APPENDIX 8 51
APPENDIX 9A 52
APPENDIX 9B 53
APPENDIX 10 54
APPENDIX 11 56
APPENDIX-12 Consultancy and Success Fee Commitment 57
APPENDIX-13 Format of Letter of Acceptance 58
APPENDIX-14 Format of Letter of Commitment 60
APPENDIX-15 Financial Proposal (Format for Information Submission) 62
APPENDIX-16 Performa for Bank Guarantee for Performance Security 63
EXHIBIT 1 65
ANNEXURE A - Project Site 67
ANNEXURE B - Technical Schedule 68


RFQ cum RFP for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium cum Sports
Complex in Lucknow

RFQ cum RFP Volume I-Instruction to Bidders Page

5
1 RFQ cum RFP DOCUMENT

Schedule of Bidding Process

(This RFQ cum RFP is issued to the applicant in response to the advertisement dated 22/01/2009)

1. Pre Bid Meeting 29.01.2009 at 1100 hrs at Hotel Shangri La New
Delhi
2. Last date for receipt of queries 27.01.2009 at 1900 hrs
3.Last date for submission of RFQ Cum RFP 12.02.2009 at 1300 hrs at the office of the
Executive Director, Awas Bandhu, Uttar Pradesh,
Housing & Urban Planning Department,
Government Of Uttar Pradesh
Ist Floor, Janpath Market,
Lucknow-226001
4.Date and time of Opening of RFQ cum RFP 12.02.2009 1400 hrs
5.Document Fees Rs. 25000 (Rupees Twenty Five Thousand),
through account payee Demand Draft in favour of
Awas Bandhu payable at Lucknow.




RFQ cum RFP for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium cum Sports
Complex in Lucknow

RFQ cum RFP Volume I-Instruction to Bidders Page 6

2 Salient Information

Following are the salient aspects of information regarding this bid document (RFQ cum RFP):

i. This bid document comprises the following:
a. Information to Bidders (Volume I)
b. Draft Concession Agreement (Volume II)
c. Technical Schedule (Volume II)
TEFR is available with the Bid Documents for reference of the bidders.

ii. The following shall be the Schedule of the Bidding Process.

MILESTONE DATE
Issue of RFQ cum RFP Document to Bidders 22.01.2009
Last Date for request for clarifications/suggestions to be
addressed at the Pre-Bid Meeting
27.01.2009 at 1900 hrs
Pre Bid Meeting at 11:00 hrs 29.01.2009 at Hotel Shangri
La New Delhi
Last Date for Submission up to 13:00 hrs. (Proposal Due
Date)
12.02.2009 at 1300 hrs at
the office of the Executive
Director, Awas Bandhu, Uttar
Pradesh, Housing & Urban
Planning Department,
Government Of Uttar
Pradesh
Ist Floor, Janpath Market,
Lucknow-226001
Opening of Envelope A 12.02.2009 1400 hrs
Opening of Envelope B 14.02.2009 1400 hrs
RFQ cum RFP for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium cum Sports
Complex in Lucknow

RFQ cum RFP Volume I- Instruction to Bidder Page 7

3 Abbreviations

ABUP Awas Bandhu, UP
BEC Bid Evaluation Committee
COD Commercial Operation Date
EMD Earnest Money Deposit
EOI Expression of Interest
EPC Engineering, Procurement and Construction
FDI Foreign Direct Investment
FAR Floor Area Ratio
ECS Equivalent Car Space
GoI Government of India
GoUP Government of Uttar Pradesh
Ha. Hectare or Hectares
LCM Lead ConsortiumMember
LOI Letter of Intent
LOA Letter of Award
LDA Lucknow Development Authority
MOU Memorandumof Understanding
RFP Request for Proposal
SPV Special Purpose Vehicle
UP Uttar Pradesh


RFQ cum RFP for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium cum Sports
Complex in Lucknow

RFQ cum RFP Volume I- Instruction to Bidder Page 8

4 Definitions

Associates
For a Bidding Company or a Consortium Member, only those entities would be Associates who control and is
controlled by or is under the common control with such applicant/consortium member.
Bid Document
Bid Document shall mean any document issued by Awas Bandhu, UP as part of the Bid Process.
Bid Process
Bid Process shall mean various activities taken up by Awas Bandhu, UP leading up to the selection of the
Successful Bidder/s.
Bidder(s)
Bidder(s) shall mean Bidding Company or Bidding Consortium that has submitted a Proposal in response to
this RFP Document.
Bidding Company
Bidding Company shall mean a corporate entity (Public or Private Limited) registered under the Companies Act,
1956 or equivalent International law
1
satisfying the basic eligibility criteria of bidding.
Bid Validity Period
Bid Validity Period shall mean the period stipulated in Clause 6.13 of Section 6 of this RFP Document, for which
the Proposal submitted is valid.
Bank
Bank shall mean any SBI, Nationalised Bank and Indian Scheduled Commercial Bank whose networth is not
less than Rs. 300 crores as on 31
st
March 2008.
Consortium
Consortium shall mean Group of Entities that have jointly submitted the proposal for the project.

Consortium Member
Each entity in the Bidding Consortium shall be referred to as a Consortium Member.
Earnest Money Deposit
Earnest Money Deposit or Bid Security shall have the meaning as referred in Section 7.10 of this document.
Effective Date
Effective Date means the date on which all the Conditions Precedent are satisfied or waived in writing by both
the Parties as per the Concession Agreement.

Floor Area Ratio
Floor Area Ratio means the quotient of the floor space excluding the area specifically exempted from
computation under these regulations that can be constructed in a plot to the plot area.

1
Relevant Act as applicable has to be provided along in Envelope A with extract of relevant sections attached to the Act.
RFQ cum RFP for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium cum Sports
Complex in Lucknow

RFQ cum RFP Volume I- Instruction to Bidder Page 9

FAR = Total covered floor area on all floors
Plot area

Financial Bid / Financial Proposal
Financial Bid / Financial Proposal shall mean the information submitted as per Appendix 15 of this document.

Good Industry Practice
Good Industry Practice shall mean practices, methods, techniques and standards as changed from time to time
that are generally accepted for use in the infrastructure, construction and real estate industry or any other good
industry practice which is relevant to the said project.

Lead Member / Lead Consortium Member (LCM)
In case of a Bidding Consortium, the Lead Member / Lead Consortium Member (LCM) shall be that Consortium
Member vested with the prime responsibility of developing the Project and holding not less than 51% stake in the
consortium.

Letter of Acceptance
Letter of Acceptance shall have a meaning as referred in Appendix 13 of this Document. It means Letter
submitted by the bidder accepting the Award or Intention to Award the Project to the bidder.

Letter of Commitment
Letter of Commitment shall have a meaning as referred Appendix 14 of this Document.

Project
Project shall mean Design, Build, Finance, Operation and Transfer of International Level Cricket Stadium cum
Sports Complex in Lucknow more specifically as mentioned under Clause 5.2 of Section 5.

Project Site shall mean the area as given in annexure A.

Proposal
Proposal shall mean the Technical and Financial Proposal to be submitted by the Bidders in response to this
Request for Qualification cum Request for Proposal.

Proposal Due Date
Proposal Due Date shall have the same meaning as referred to in Clause 6.17 section 6 of this Document.

Responsiveness / Non-responsive
Responsiveness / Non-responsive shall mean as referred in Clause 6.25 of Section 6 of this document.

Request for Qualification cum Proposal (RFQ cum RFP)
RFQ cum RFP for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium cum Sports
Complex in Lucknow

RFQ cum RFP Volume I- Instruction to Bidder Page 10

Request for Qualification cum Proposal shall mean this document issued to Bidders inviting the submission of
Proposal to Design, Build, Finance, Operate and Transfer of International Level Cricket Stadium cum Sports
Complex in Lucknow.

Selection Process
Selection Process shall have the same meaning as the 'Bid Process'.

Subsidiary/Subsidiaries
For a Bidding Company or a Consortium Member, Subsidiary / subsidiaries shall mean only those entities in
which the Bidding Company / Consortium Member hold(s) more than 50% of the voting securities directly.

Successful Bidder
The Successful Bidder shall mean the bidder who has been issued Letter of Intent by Awas Bandhu, UP and
Letter of Award by LDA indicating him as the Successful Bidder.

RFQ cum RFP for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium cum Sports
Complex in Lucknow

RFQ cum RFP Volume I- Instruction to Bidder Page 11

5 INTRODUCTION
5.1 Background of Lucknow

Lucknow is the capital of Indias
most populous state, Uttar
Pradesh and is situated about 500
km southeast of New Delhi in the
heart of the state. The city lies at
an average altitude of 110 meters
above mean sea level and
generally slopes to the east.
Lateral slopes are towards the
River Gomti, which flows from
north-west to south-east through
the heart of the city, dividing it into
the Trans-Gomti and Cis-Gomti
regions. The position of the City as
the only large urban centre amidst
a number of small towns in the
surrounding districts makes it an
attractive destination for job seekers and people in need of education and health facilities. Lucknow is known for
its cultural heritage. Some of the well-known historical buildings, which occupy a pride of place, include the
Residency, Bara Imambara, Rumi Darwaza, Husainabad Imambara, the Picture Gallery, Sikandarabagh,
Dilkusha Palace, Kaiserbagh Palace, the Hussainabad Clock Tower etc.

Area of Lucknow is 337.5 Sq. Km. The present population is around 32 lakhs. It is well connected by air and rail
connectivity is also very good with all the major stations in India.
Lucknow Development Authority
Lucknow Development Authority was established in 1974 under the Uttar Pradesh Urban Planning &
Development Act 1973. LDA has progressed from small beginnings to embrace an overreaching authority in the
development scenario of Lucknow. In consonance with the aspirations of modern India, LDA aims at coordinated
and planned development of a historical city: to enable Lucknow to achieve pride of place as the worthy capital of
the largest State of the country which has played a very important role in the Freedom Struggle, to extend urban
infrastructure to absorb the pressures of a rapidly changing society, and to provide an environment which would
enable the utmost satisfaction level of all sections of its inhabitants.

To fulfil its role, the Authority seeks to coordinate in accordance with a comprehensive Master Plan along with
the work of various other agencies involved in the creation and extension of urban infrastructure.

Taking forward this development process and to redress the lack of International level Cricket Stadium cum
Sports Complex in Lucknow of international standards in the State of UP, LDA has proposed to set-up same in
its capital-Lucknow.
RFQ cum RFP for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium cum Sports
Complex in Lucknow

RFQ cum RFP Volume I- Instruction to Bidder Page 12

5.2 Scope of the Project

Government of Uttar Pradesh (GoUP) through Awas Bandhu, UP intends to undertake various infrastructure
projects for implementation on Public Private Partnership (PPP) Mode under Integrated Urban Rejuvenation
Plan (IURP) scheme for selected cities of the state. Projects to be developed on PPP mode are being identified,
developed and implemented in various cities of Uttar Pradesh namely Lucknow, Kanpur, Ghaziabad, Meerut,
Agra, Aligarh, Allahabad and Varanasi,

Under this a need to develop a world class Cricket Stadium cum Sports Complex along with a Sports academy in
Lucknow was felt.

The Project Site is located at Lucknow bypass, Amar Shaheed Peeth. The site has an area of 50 acres and it is
situated in between Sultanpur road and Gomti river on Amar Shaheed Path. The site can also be approached
through a service road next to Amar Shaheed Path. The site shall be given on lease for a period of 35 years.

The successful bidders shall Design, Build, Finance, Operate and Transfer the Cricket Stadium cum Sports
Complex on the plot earmarked for the purpose over the concession period of 35 years, after which the facility
will be transferred to the Concessioning Authority. The maximum allowable FAR is 0.025 as per the prevailing
Development Control Regulations of LDA.

Awas Bandhu, UP through this RFQcP invites the Pre-Qualified bidders to participate in the Bid to
Design, Build, Finance, Operate and Transfer the Cricket Stadium cum Sports Complex in Lucknow.

The successful bidder shall construct following facilities and get all the approvals for commercial operations
within 24 months from the effective date:

A. Minimum Development Obligations
The stadium shall be designed for a minimum seating capacity of 50,000 people
Car Parking for minimum 2500 ECS for above essential facilities shall be provided
Sports Complex shall have facility and necessary infrastructure for at least 5 different types of games
that shall include badminton, basket ball\ valley ball, lawn tennis and shooting training.
An Olympic size (25 x 50 mt) swimming pool shall be provided within the sports complex
The sports complex shall have the seating capacity for 600 viewers
Support facilities and on site infrastructure like internal road network, lamp posts within the plot, fire
fighting system, security cabins, landscaping and other services required for the entire facility.

B. Optional component / facilities: The developer may also construct following optional facilities with prior
approval of LDA:

A sports academy
A club house or Gymnasium
Restaurant
Others

RFQ cum RFP for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium cum Sports
Complex in Lucknow

RFQ cum RFP Volume I- Instruction to Bidder Page 13

All the facilities are to be developed as per the minimum quality standards set out for the purpose in the technical
schedule appended as Annexure B with this document.

While undertaking development of the Project, the Successful Bidder shall adhere to latest amended National
Building Code of India, other relevant IS Codes and practices, Development Control Regulations, FAR Limits,
statutory requirements, laws of land, the principles of good industry practices and any other norms as applicable
from time to time.

The successful bidder shall be responsible for all the clearances as may be required for the development and
operations of the project. The project shall be ready for operation after taking all the clearance(s) within 24
months of the effective date.
5.3 Cost of the Project

The project is estimated to cost Rs 313,00,00,000/-(Rupees Three Hundred and Thirteen Crores Only)
5.4 Commercial Consideration

In consideration of the designated plot of land given on lease for a period of 35 years, the Successful bidder shall
quote the land area for commercial use in acres. (The land is located adjacent to the proposed facility). The said
land shall be given on 90 years lease.

The land shall be given on lease to the Concessionaire on completion of the following milestone:

Serial
Number
Minimum Development Obligation
(Milestone)
Percentage of land out of -----
acres to be given on 90 years
lease to the Concessionaire
1. Stadium with minimum seating
capacity of 50,000 people
50%
2. Sports Complex with seating capacity
for 600 viewers with at least 5 different
types of games that shall include
badminton, basket ball\ valley ball,
lawn tennis and shooting training.
30%
3. An Olympic size (25 x 50 mt)
swimming pool shall be provided within
the sports complex
10%
4 Car Parking for minimum 2500 ECS for
above essential facilities should be
provided. Support facilities and on site
infrastructure like internal road
network, lamp posts within the plot, fire
fighting system, security cabins,
landscaping ffand other services
required for the entire facility.
10%

RFQ cum RFP for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium cum Sports
Complex in Lucknow

RFQ cum RFP Volume I- Instruction to Bidder Page 14

The Concessioning Authority shall assure the conversion of land usage to Commercial, before the handover of
the land to the Concessionaire. The conversion charges shall be borne by the Concessioning Authority. The
maximum allowable FAR is 2.5 as per the prevailing Development Control Regulations of LDA.

The Concessioning Authority or its authorized representative shall satisfy himself of the successful completion of
each of the Milestone given above and then the Concessioning Authority shall provide peaceful possession of
the land adjacent to the Project Site within 15 days of the completion of the each of Milestone as provided in the
table above. The 90 years of lease period for the land shall start from the date of the handover of the land to the
Concessionaire by the Concessioning Authority. Each time a separate lease deed shall be executed at the time
of handover of the land to the Concessionaire.

The Concessionaire shall pay to the Concessioning Authority a yearly token lease rental of Rs 1/- (Rupees One
Only) per acre of land (on 50 acre earmarked for International Level Cricket Stadium cum Sports complex) for the
entire concession period of 35 years.

Bidders may please note that in case of failure of the bidder in completion of the project, as mentioned in the
scope of work and as per the minimum standards and specifications as per the technical schedule appended
with this document as Annexure B, within 24 months, the performance security furnished on the execution of the
Agreement shall be forfeited by LDA and blacklisted, as per the Provision of the draft concession agreement.
Additional measures as the Govt. may deem fit would be applicable on such a bidder.

However, bidders may note that in case the work is being executed as per the minimum technical specifications
in Annexure B but delayed due to Force Majeure Event as defined in the Draft Concession Agreement, the
remedies pertaining to such Force Majeure Event shall be applicable as per the provisions in the Draft
Concession Agreement.
5.5 Project Implementation Mechanism

The successful bidder in case of a consortium shall form a Special Purpose Vehicle (SPV) in the form of limited
company under Companies Act, 1956, registered in UP for the purpose of implementation of the project. The
Concession Agreement shall be signed between the SPV and LDA. In case, the successful bidder is a single
entity, the Concession Agreement shall be signed between the Single Entity and LDA. No SPV shall be formed in
case Single Entity is the Successful Bidder.


RFQ cum RFP for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium cum Sports
Complex in Lucknow

RFQ cum RFP Volume I- Instruction to Bidder Page 15

6 INFORMATION AND INSTRUCTION TO BIDDERS

6.1 Scope of Application

6.1.1 ABUP wishes to receive Applications from experienced and capable Bidders for proposal in respect of
the Project(s).

6.2 Eligible Bidders

6.2.1 The Bidder may be a single company or a group of maximum 4 companies (hereinafter referred to as
Consortium), coming together to implement the Project. The term Bidder used hereinafter would
therefore apply to both a single entity and/or a Consortium.

6.2.2 The Bidder should submit a Power of Attorney as per the format enclosed at Appendix 1A,
authorizing the signatory of the Application to commit the Bidder.

6.2.3 Applications submitted by a Consortium should comply with the following additional requirements:

a. Number of members in a consortium would be limited to maximum of 4;

b. The Application should contain the information required for each member of the Consortium

c. The purchaser of the RFQ CUM RFP document must be the Bidder itself or member of the consortium
submitting the application.

d. An individual Bidder cannot at the same time be member of a Consortium applying for this Project.
Further, a member of a particular Consortium cannot be member of any other Consortium applying for
this Project; an undertaking towards this end needs to be submitted by all members.

e. Members of the Consortium shall nominate one member as the Lead Member. The nomination shall be
supported by a Power of Attorney as per the format enclosed at Appendix 1B

f. Members of the Consortium shall enter into a Memorandum of Understanding (MOU) as per the format
enclosed at Appendix 10 and duly notarized for the purpose of making the Application and submitting a
Proposal. The MOU shall, inter alia:

i. Convey the intent to form a Special Purpose Vehicle with shareholding commitment(s) as stipulated in
this document, which would enter into the Concession Agreements and subsequently carry out all the
responsibilities as Concessionaire in terms of the Concession Agreement, in case the Concession to
undertake the Project is awarded to the Bidder.

ii. Clearly outline the proposed roles and responsibilities of each member in case of Consortium at each
stage,

iii. Commit the minimum equity stake as stipulated, and

iv. include a statement to the effect that all members of the Consortium shall be liable jointly severally for
the execution of the Project in accordance with the terms of the Concession Agreement

g. In case of consortium, the Lead Member shall hold at least 51% share in the shareholding.

h. The other members of the consortium shall hold a minimum of 11% share each in the shareholding.

RFQ cum RFP for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium cum Sports
Complex in Lucknow

RFQ cum RFP Volume I- Instruction to Bidder Page 16

6.2.4 Notwithstanding anything stated elsewhere in this document, ABUP shall have the right to seek
updated information from the Bidders to ensure their continued eligibility. Bidders shall provide
evidence of their continued eligibility in a manner that is satisfactory to ABUP. Bidder may be
disqualified if it is determined by the ABUP, at any stage of the process, that the Bidder will be unable
to fulfill the requirements of the Project or fails to continue to satisfy the Eligibility Criteria.
Supplementary information or documentations may be sought from Bidders at any time and must so
be provided within a reasonable time frame as stipulated by ABUP.

6.2.5 Any entity which has been barred or disqualified either by GOI or GOUP or their Departments or
agencies from participating in projects (BOT or otherwise) and such disqualification subsists as on the
Application date, would not be eligible to submit an Application, either individually or as member of a
Consortium. Bidder to submit an affidavit to this effect.

6.3 Changes in Consortium Composition

No change in Consortium Members shall be allowed till the completion of the project or a minimum of 3 years
(whichever is later). However, the Lead Consortium Member shall not be allowed to be changed over the entire
Concession Period and shall continue to hold 51% stake in the Consortium till the end of Concession Period.

6.4 Number of Applications

Each Bidder shall submit only one (1) Application in response to this RFQ cum RFP. Any Bidder, which submits
or participates in more than one Application will be disqualified and will also cause the disqualification of the
Consortiums / Bidder of which it is a member as the case may be.

6.5 Application Preparation Cost
The Bidder shall be responsible for all of the costs associated with the preparation of its Application and its
participation in the Selection process. ABUP will not be responsible or in any way liable for such costs,
regardless of the conduct or outcome of the qualification process.

6.6 Project Inspection and Site Visit

6.6.1 It is desirable that each Bidder submits its Application after inspecting the sites; and ascertaining for
itself the location, surroundings, access, transport, right of way or any other matter considered
relevant by it.

6.6.2 Site visit may be facilitated by ABUP. A prospective Bidder may notify ABUP in writing 3 days prior to
planned visit. ABUP would endeavor to facilitate the site visit depending upon the availability of the
concerned officials.

6.6.3 It would be deemed that by submitting the Application, Bidder has:

(a) Made a complete and careful examination of the RFQ CUM RFP and
(b) Received all relevant information requested from ABUP.

6.6.4 ABUP shall not be liable for any mistake or error on the part of the Bidder in respect of the above.

6.7 Right to Accept or Reject any or all Applications

6.7.1 Notwithstanding anything contained in this RFQ cum RFP, ABUP reserves the right to accept or reject
any Application and to annul the bidding process and reject all Applications / Proposals, at any time
without any liability or any obligation for such acceptance, rejection or annulment, without assigning
any reasons.

RFQ cum RFP for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium cum Sports
Complex in Lucknow

RFQ cum RFP Volume I- Instruction to Bidder Page 17

6.7.2 ABUP reserves the right to reject any Application if:

(a) At any time, a material misrepresentation is made or uncovered, or

(b) The bidder does not respond promptly and thoroughly to requests for supplemental information required for
the evaluation of the Application.

Such misrepresentation / improper response would lead to the disqualification of the Bidder. If the Bidder is a
Consortium, then the entire Consortium would be disqualified / rejected.


6.8 Contents of RFQ cum RFP Document

The RFQ cum RFP Document comprises the contents as given in the Table of Contents and would additionally
include any Addenda issued in accordance with the provisions of this Document.

6.9 Clarifications

Interested parties may address their queries relating to the RFQ cum RFP Document by email only at
awasbandhu@gmail.com with a mandatory copy to consultants at neha-panchal@darashaw.com. The queries
should reach the above latest by 1900 hrs on 27.01.2009.

ABUP would endeavour to respond to the queries by the date mentioned in the Schedule of Bidding Process.
The responses will be sent by fax/ email.

6.10 Amendment of RFQ cum RFP

6.10.1 At any time prior to the deadline for submission of Application, ABUP may, for any reason,
whether at its own initiative or in response to clarifications requested by any Bidder, modify the
RFQ cum RFP Document by the issuance of an Addendum.

6.10.2 Any Addendum thus issued will be sent in writing to all those who have purchased the RFQ
cum RFP Document and shall also be uploaded on www.awas.up.nic.in

6.11 Language

The Application and all related correspondence and documents should be written in the English language.
Supporting documents and printed literature furnished by Bidder with the Application may be in any other
language provided that they are accompanied by appropriate translations of the pertinent passages in the
English language duly certified appropriately. Supporting materials, which are not translated into English, may
not be considered. For the purpose of interpretation and evaluation of the Application, the English language
translation shall prevail.

6.12 Currency

The currency for the purpose of the Application shall be the Indian Rupee (INR). The conversion to Indian
Rupees shall be clearly indicated in the Appendix 4. In all such cases, the original figures in the relevant foreign
currency and the INR equivalent thereof must be given. The exchange rate(s) applied shall be clearly stated.
The conversion to Indian Rupees shall be based on the closing exchange rate published by the Reserve Bank of
India as on 31
st
December 2008. ABUP reserves the right to use any other suitable exchange rate for the
purposes of uniform evaluation for all Bidders.



RFQ cum RFP for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium cum Sports
Complex in Lucknow

RFQ cum RFP Volume I- Instruction to Bidder Page 18

613 Validity of Application

Applications shall remain valid for a period not less than 180 days from the Application Due Date. ABUP reserves
the right to reject any Application, which does not meet this requirement.

6.14 Format and Signing of Application

6.14.1 The Bidder would provide all the information as per this RFQ cum RFP Document. ABUP would
evaluate only those Applications that are received in the required format and are complete in
all respects.

6.14.2 The Bidder shall prepare one original of the documents comprising the Application and clearly
marked "ORIGINAL". In addition, the Bidder shall make two copies of the Application, clearly
marked "COPY". In the event of any discrepancy between the original and the copies, the
original shall prevail.

6.14.3 The Application and its copies shall be typed or written in indelible ink and each page shall be
initialled and stamped by the Bidder. All the alterations, omissions, additions, or any other
amendments made to the Application shall be initialled by the person(s) signing the
Application.

6.15 Sealing and Marking of Applications

6.15.1The First Envelope should be marked as Envelope A ( original and copy) and shall contain:

a) Power of Attorney for the signing authority as per the format enclosed at Appendix 1A,

b) Power of Attorney for the Lead member of the consortium as per the format enclosed at
Appendix 1B, in case of Consortium;

c) Bidder details (Appendix 2)

d) Application in the prescribed format (Appendix 3) along with supporting documents;

e) Completed Format for Experience as in Appendix 4 (BRS 1 to 2), along with supporting
documents.

f) Completed Format for Financial Capability Evaluation as in Appendix 5 (BRS3 &4) and
Appendix 7, along with supporting documents.

g) Format of Anti collusion certificate as in Appendix 8.

h) Format of Project Undertaking as in Appendix 9A.

i) In case of a Consortium, an undertaking from each member of Consortium certifying that it is
an exclusive member of that particular consortium alone and not a member of any other
consortium nor an independent Bidder, bidding for this project and has submitted only one (1)
Application in response to this RFQ CUM RFP. (Appendix 9B)

j) MOU in case of a Consortium (Appendix 10);

k) Earnest Money Deposit
l) Letter of Undertaking for the success fee of 1% of the Project Cost net of taxes, and
Consultancy Fees as per Appendix-12
RFQ cum RFP for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium cum Sports
Complex in Lucknow

RFQ cum RFP Volume I- Instruction to Bidder Page 19

m) Letter of Acceptance as per Appendix-13
n) Letter of Commitment as per Appendix-14

o) Documentary evidence, if applicable, relating to experience of group companies/associates as
per clause 8.1.2.

6.15.2 The second Envelope should be marked as Envelope B and shall include:
Financial Proposal as per Appendix-15.

Please note that Awas Bandhu, UP retains the right to ask for any further information/ clarification
during the Bid Process.


6.15.3 The Bidder shall also enclose in a separate envelope, enclosed in the outer envelope, a demand draft for
Rs 25,000/- (Rupees Twenty Five Thousand Only), through account payee Demand Draft in favour of
Awas Bandhu payable at Lucknow on any scheduled bank towards non refundable Document Fee.
Application unaccompanied by this demand draft will not be considered for evaluation and short-
listing.

6.16 Submission of Bid

Both the Envelopes A and B shall be put together in one envelope and be sealed properly. The Bidder
shall seal the original and copy duly marking the envelopes as "ORIGINAL" and "COPY" the envelopes shall
then be sealed in an outer envelope superscribing RFQ cum RFP for DEVELOPMENT OF International Level
Cricket Stadium cum Sports Complex in Lucknow UTTAR PRADESH and also the name(s) of
bidder/consortium

The envelope shall be addressed to:

The Executive Director,
Awas Bandhu, Uttar Pradesh,
Housing & Urban Planning Department,
Government Of Uttar Pradesh
Ist Floor, Janpath Market, Lucknow-226001 India
Tel: 0522-2237161 Fax:0522-2612098,
E-Mail: awasbandhu@gmail.com, Web: awas.up.nic.in

6.16.1 If the envelope is not sealed and marked as instructed above, ABUP assumes no responsibility for the
misplacement or premature opening of the contents of the Application submitted.


6.17 Application Due Date

Applications should be submitted before 1300 hours IST on the Application Due Date mentioned in the
Schedule of Bidding Process, at the address provided above in the manner and form as detailed in this
RFQ cum RFP. Applications submitted by either facsimile transmission, telex or e-mail will not be
considered for evaluation and short listing. However ABUP reserves the right to extend the Application
Due Date and Time, at any time prior to opening of RFQ cum RFP Applications; in such cases the
applications received prior to such extension shall not be opened. Further if the RFQ cum RFP
document is materially modified along/during such extended period, the RFQ cum RFP application
received prior to extension shall be returned to the applicants and appropriate time shall be allowed for
resubmission of the Applications.

RFQ cum RFP for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium cum Sports
Complex in Lucknow

RFQ cum RFP Volume I- Instruction to Bidder Page 20

6.18 Late Applications

Applications received after the Application Due Date shall not be considered,

6.19 Modifications/ Substitution/ Withdrawal of Proposals
The Bidder may modify, substitute or withdraw its Proposal after submission, provided that written notice of the
modification, substitution or withdrawal is received by ABUP before the Proposal Due Date and time. No
Proposal shall be modified or substituted or withdrawn by the Bidder after the Proposal Due Date and time

6.20 Evaluation of Application - Due Date

ABUP would open the Applications after 1400 hours IST on the Application Due Date mentioned in the Schedule
of Bidding Process, for the purpose of evaluation.

6.21 Evaluation of Application - Criteria

ABUP would subsequently examine and evaluate Applications in Accordance with the criteria set out in Section
8.

6.22 Evaluation of Application - Supporting Documents

ABUP reserves the right to call for supporting documentation to verify the data provided by Bidders, at any time
during the bidding process. The Bidder in such cases would need to provide the requested clarification /
documents promptly and within the stipulated time failing which the Bidder is liable to be disqualified at any stage
of the bidding process.

6.23 Evaluation of Application - Right to Reject

ABUP reserves the right to reject any Application if:

(a) At any time, a material misrepresentation is made or uncovered; or
(b) The Bidder does not respond promptly and thoroughly to requests for supplemental information required for
the evaluation of the Application.

6.24 Confidentiality

Information relating to the examination, clarification, evaluation, and recommendation for the short-listed Bidders
shall not be disclosed to any person not officially concerned with the process. ABUP will treat all information
submitted as part of Application in confidence and would require all those who have access to such material to
treat the same in confidence. ABUP will not divulge any such information unless it is ordered to do so by any
authority that has the power under law to require its disclosure.

6.25 Tests of responsiveness

6.25.1 Prior to evaluation of Applications, ABUP will determine whether each Application is responsive to the
requirements of the RFQ cum RFP. An Application shall be considered responsive if the
Application:

a) is received by the Application Due Date (Clause 6.17) including any extension thereof pursuant
to Clause 6.17
b) is accompanied by MOU in case of a Consortium ( Appendix 10), if applicable, duly supported
by Board resolution and charter documents
c) contains information required as per Appendix 3, 4(BRS 1 to2), 5(BRS 3 to 4) and 7.
RFQ cum RFP for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium cum Sports
Complex in Lucknow

RFQ cum RFP Volume I- Instruction to Bidder Page 21

d) It is accompanied by Bid Document Fee of Rs. 25,000/-
e) It is accompanied by a valid Earnest Money Deposit ;
f) Letter of Undertaking for the Success fee of 1% of project cost (net of taxes) to the consultants
and Consultancy Fees as per Appendix-12
g) Letter of Acceptance as per Appendix-13
h) Letter of Commitment as per Appendix-14
i) Contains all the documents which were to be submitted as per the provisions of Section 6.15 of
this Document.


ABUP reserves the right to reject any Application which is non-responsive and no request for alteration,
modification, substitution or withdrawal shall be entertained by ABUP in respect of such Applications.

6.26 Clarifications

To facilitate evaluation of Applications, ABUP may at its sole discretion, seek clarifications in writing from any
Bidder regarding its Application.

6.27 Qualification and Notification

After the evaluation of Applications, ABUP would announce a list of successful Bidders (Bidders) who
meet the Qualification Criteria. At the same time, ABUP would notify the other Bidders that their
Applications have been unsuccessful.


6.28 RFQ cum RFP Document

This RFQ cum RFP Documents contain the following:
Volume I - Instruction to Bidders
Volume II - Draft Concession Agreement, Technical Schedule
TEFR is available with the above documents for the reference of the bidder. However the bidder has to conduct
his own feasibility before submitting the bids.

6.29 Fees of the Consultants

Darashaw & Co Pvt Ltd has been appointed as a Consultant to assist Awas Bandhu, UP in handling the bid
process management for the selection of the Successful bidder.

The Success Fee of 1% of the project cost exclusive of taxes at applicable rates has been agreed by Awas
Bandhu UP, to be paid to Darashaw & Co Pvt Ltd for providing the above mentioned advisory services. The
Success Fee shall be net of all taxes (1% of Project Cost is net of all taxes).

Every bidder shall therefore submit along with the Proposal, an undertaking as per Appendix-12 for the Success
Fees of the Consultants (calculated at the rate of 1% of the project cost as mentioned in Section 5.3 of this RFQ
cum RFP document, plus taxes as applicable) and the Consultancy fees of Rs. 1, 00,000/- (Rupees One Lakh
only) to be reimbursed to Awas Bandhu, UP.

This success fee shall be paid in the form of a Demand Draft issued by a Bank in favour of Darashaw & Co Pvt
Ltd. Such a Demand Draft shall be extendable for a further period of 6 months by replacing it with a fresh
Demand Draft after 5 months of its issue if required and asked by Awas Bandhu, UP due to delay in signing of
Concession Agreement or otherwise beyond a period of 5 months from the date of issue of the said Demand
Draft. The Success Fee in the form of Demand Draft shall be handed over to Awas Bandhu, UP by the
RFQ cum RFP for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium cum Sports
Complex in Lucknow

RFQ cum RFP Volume I- Instruction to Bidder Page 22

Successful Bidder before the signing of the Concession Agreement. The successful bidder shall pay and deposit
the amount of withholding or other taxes to the credit of the relevant tax authorities and issue a certificate of
deduction and payment to Darashaw & Company Private Ltd.

The Consultancy Fee of Rs. 1,00,000/- (Rupees One Lakh only) paid by Awas Bandhu,UP to the Consultants will
be reimbursed by the bidder to Awas Bandhu, UP within 2 weeks of signing the concession agreement between
LDA and Bidder, on receipt of invoice from Awas Bandhu, UP.

7.1 General Provisions
7.1.1 Non-Discriminatory and Transparent Bidding Proceedings

Awas Bandhu, UP shall ensure that the rules for the Bid Process for the Project are applied in a non-
discriminatory, transparent and objective manner. Awas Bandhu, UP shall not provide to any Bidder, information
with regard to the Project or the Bidding Process, which may have the effect of restricting competition.
7.1.2 Prohibition against Collusion with other Bidder

Each Bidder shall warrant by its Bid that the contents of its Bid have been arrived at independently. Any Bid
which has been arrived at through consultation, collusion, or understanding with any other prospective Bidder for
the purpose of restricting competition shall be deemed to be invalid and the Bidder shall lose its Earnest Money
Deposit. The anti-collusion certificate submitted at the time of submission of RFQ CUM RFP shall be applicable.
7.1.3 Inducements
Any effort by a Bidder to influence processing of Bids or award decision by Awas Bandhu, UP or any officer,
agent or Advisor thereof may result in the rejection of such Bidders Bid. In such a rejection of Bid, the Bidder
shall lose its Earnest Money Deposit.
RFQ cum RFP for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium cum Sports
Complex in Lucknow

RFQ cum RFP Volume I- Instruction to Bidder Page 23

7.2 Confidentiality
7.2.1 Awas Bandhu, UP shall treat all Bids and other documents, information and solutions submitted by
Bidders as confidential, and shall take all reasonable precautions that all those who have access to such
material, treat this in confidence. Awas Bandhu, UP will not divulge any such information unless it is ordered to
do so by any authority, which has the power to require its release.
7.2.2 Each Bidder shall, whether or not it submits a Bid, treat the RFP Documents and other documents,
information and solutions provided by Awas Bandhu, UP in connection with the Project or the bidding
proceedings as confidential for a period of five (5) years from the issuance of the RFP Documents. During this
period, the Bidder shall not disclose or utilize any such documents, information without the written approval of
Awas Bandhu, UP or as required by law or any governmental authority.
7.2.3 Awas Bandhu, UP shall have the right to release the Bid information provided by the Bidders to its Advisors
for the purpose of Bid evaluation and negotiations. Each Bidder shall have the right to release these RFP
Documents and other Documents to its advisors and to financial institutions for the purpose of Bid preparation,
negotiations and financing. Both Awas Bandhu, UP and the Bidder shall ensure that their Advisors and/ or
financial institutions treat this information in confidence.
7.2.4 Any information relating to examination, clarification, evaluation and comparison of bids and
recommendations for the award of a contract shall not be disclosed to Bidders or any other person not officially
concerned with the Bid Process until the award to the Successful Bidder has been communicated, except of
reasons of public transparency.

7.3 Communication between Bidders and Awas Bandhu, UP

All communication, unless specified otherwise, on these RFP Documents to Awas Bandhu, UP shall be
addressed to:
The Executive Director,
Awas Bandhu, Uttar Pradesh,
Housing & Urban Planning Department,
Government of Uttar Pradesh
Ist Floor, Janpath Market, Lucknow-226001
Tel: 0522-2237161 Fax:0522-2612098,
E-Mail: awasbandhu@gmail.com
Web: http://awas.up.nic.in

All communication to the Bidder shall be sent to the Authorised Representative & Signatory at the addresses
mentioned in the covering letters to this RFP, unless Awas Bandhu, UP is advised otherwise.
RFQ cum RFP for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium cum Sports
Complex in Lucknow

RFQ cum RFP Volume I- Instruction to Bidder Page 24

7.4 Interpretation of Documents

Awas Bandhu, UP will have the sole discretion in relation to:
The interpretation of this RFP, the Proposals and any documentation provided in support of the
Proposals; and
All decisions in relation to the evaluation and ranking of Proposals, whether or not to request for any
clarifications or additional information from Bidder in relation to its Proposal and the selection of the
Successful Bidder.
Awas Bandhu, UP will have no obligation to explain its interpretation of this RFP, the Proposals or their
supporting documentation and information or to explain the evaluation process, ranking process or the
selection of the Successful Bidder.
7.5 Pre-Bid Conference
7.5.1 Awas Bandhu, UP will hold a Pre-Bid Conference on 29
th
January 2009 in Delhi at Hotel Shangri La in
order to clarify and discuss any provision or requirements with respect to technical/ commercial parameters of
the Project, these RFP Documents or any other related issues. Decisions communicated to bidders after pre-bid
or otherwise shall become part of the RFP documents.
7.5.2 Attendance of the Bidder at the Pre-Bid Conference is not mandatory. However, subsequent to the date
of the Pre-Bid Conference, Awas Bandhu, UP may not respond to questions or inquiries from any Bidder.

RFQ cum RFP for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium cum Sports
Complex in Lucknow

RFQ cum RFP Volume I- Instruction to Bidder Page 25

7.6 Enquiries concerning the RFQ cum RFP & Draft Concession Agreement
7.6.1 To make the Pre-Bid Conference more productive, Awas Bandhu, UP encourages a careful review of
these RFP Documents and preparation of the observations/ comments by the Bidder. The Bidder
should send their comments in writing at least 3 days prior to the date of Pre-Bid Conference.
Inquiries/ comments received after the set time limit may not be addressed at the Pre-Bid
Conference by Awas Bandhu, UP.
7.6.2 Awas Bandhu, UP at its discretion, may respond to inquiries submitted by any Bidder after the date
of the Pre-Bid Conference. Such a response will be sent in writing to all the Bidders and will qualify
as an Addendum.
7.6.3 All inquiries should be submitted to the Awas Bandhu, UP in writing by e-mail to
awasbandhu@gmail.com with a copy marked to neha-panchal@darashaw.com
7.6.4 No interpretation, revision or other communication regarding this solicitation is valid unless in writing
and is signed by an officer so designated by the Executive Director of Awas Bandhu, UP. Written
copies of Awas Bandhu, UP responses, including a description of the inquiry but without identifying
its source, will be sent to all the Bidder(s) and will qualify as an Addendum
7.7 Amendment of RFQ cumRFP
7.7.1 On its own initiative or on the basis of the Pre-Bid Conference and any further discussions with any/
all Bidder(s), Awas Bandhu, UP may at its own discretion make changes in the technical/commercial
parameters for the Project, which would be common for all the Bidders. Such changes in the
technical / commercial parameters of the Project will qualify as an Addendum.
7.7.2 The Addendum will be posted on the website of Awas Bandhu, UP http://awas.up.nic.in and will be
binding on the bidders. Each such Addendum shall become part of the RFP Documents.
7.7.3 In order to offer prospective Bidders a reasonable time to take into account an Addendum while
preparing their Proposals, or for any other reason, Awas Bandhu, UP may, at its discretion, extend
the Proposal Due Date.

7.8 Submission of Bids
7.8.1 Document Fee
The Bidder shall submit Document Fee of Rs. 25,000/- (Rupees Twenty Five Thousand only) along with
the Proposal.
The Bid Document Fee shall be in the form of a Demand Draft in favour of Awas Bandhu, UP, payable
at Lucknow.
The Bid Document Fee is non-refundable.
Bids not accompanied by Bid Document Fee shall be rejected.
RFQ cum RFP for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium cum Sports
Complex in Lucknow

RFQ cum RFP Volume I- Instruction to Bidder Page 26


7.9 Bid Opening
All Bids received by Awas Bandhu, UP will remain sealed and unopened in Awas Bandhu, UPs
possession until the Proposal Due Date. Awas Bandhu, UP shall open all Bids, received on or prior to
the Proposal Due Date mentioned under Schedule of Selection Process or on any date as extended by
Awas Bandhu, UP and communicated to the bidders. The Bids shall be opened in the presence of
Bidders representatives, who choose to attend. Bidders representatives attending the Bid Opening
shall register to evidence their presence.

The following information will be announced at the Bid Opening and recorded:
Bidders names
Names of Consortium Members

After the Bid Opening, information relating to the examination, clarification and evaluation of Bids and
recommendations concerning the Bid Award shall not be disclosed.
7.10 Earnest Money Deposit

The Bidder shall submit an Earnest Money Deposit (EMD) for an amount of Rs. 3,13,00,000/- (Rs.
Three Crores Thirteen Lakhs only) along with its Proposal.

The Earnest Money Deposit shall be in the form of Bank Guarantee (in the format prescribed in the
RFP) in favour of ABUP from SBI or any Nationalised Bank or Indian Scheduled Commercial Bank
whose networth is not less than Rs. 300 crores as on 31
st
March 2008 as per Section 4.

The EMD shall be valid for a minimum period of 90 days more than Bid Validity Period. Upon any
extension of the Bid Validity Period, the validity of the EMD shall be extended by the corresponding
period.

Awas Bandhu, UP shall have the right to reject the Proposal, which does not include the Earnest Money
Deposit as non-responsive.

The EMD of Unsuccessful Bidders, except the second successful bidder will be returned within a period
of ten (10) days from the date of acceptance of Letter of Intent by the Successful Bidder. However, the
EMD of second successful bidder shall be returned on signing of the concession agreement by the
successful bidder.
The EMD of the Successful Bidder shall be returned on submission of Performance Security by the
Successful Bidder to the Concessioning Authority.
In addition to the above, Awas Bandhu, UP will promptly release EMD of all the Bidders in the event
Awas Bandhu, UP decides to terminate the Bidding Process.

The EMD shall be forfeited by Awas Bandhu, UP, in any of the following case:

RFQ cum RFP for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium cum Sports
Complex in Lucknow

RFQ cum RFP Volume I- Instruction to Bidder Page 27

The Bidder withdraws his bid after the Proposal Due Date
Successful Bidder fails to accept Letter of Intent
Successful Bidder fails to submit the Performance Security or
As per the provisions of Draft Concession Agreement
7.11 Performance Security
The Successful Bidder shall for due and faithful performance of its obligations during the Project completion,
provide to LDA a performance security of Rs. 15,65,00,000/- (Rupees Fifteen Crore Sixty Five lakhs only) in the
form of Bank Guarantee (in the format prescribed in Appendix-16) from SBI or any Nationalised Bank or Indian
Scheduled Commercial Bank whose networth is not less than Rs. 300 crores as on 31
st
March 2008 as per
Section 4.

The performance security shall be provided within 15 days of issue of Letter of Award by LDA. The Performance
Security shall be released to the Successful Bidder as per provisions of the Draft Concession Agreement as
follow:

The Performance Security in the form of bank guarantee shall remain in force and effect beyond the period of six
months from the date of the expiry of the Concession Period. It shall be duly discharged and released to the
Concessionaire beyond the period of six months from the date of the expiry of Concession Period and transfer of
the International level Cricket Stadium cum Sports Complex to LDA.

The performance security in the form of bank guarantee shall be renewed every year beyond the period of six
months from the date of the expiry of the Concession Period by the Concessionaire. If the Agreement is
terminated due to any event other than a Concessionaire Event of Default, the Performance Security shall,
subject to the Concessioning Authoritys right to receive or recover amounts, if any, due from the Concessionaire
under this Agreement, be duly discharged and released to the Concessionaire.

Upon occurrence of a Concessionaire Default, the Concessioning Authority shall, without prejudice to its other
rights and remedies hereunder or in law, be entitled to invoke and appropriate the relevant amounts from the
Performance Security as Damages for such Concessionaire Default. Upon such invocation and appropriation
from the Performance Security, the Concessionaire shall, within 15 (fifteen) days thereof, replenish, in case of
partial appropriation, the Performance Security to its original level, and in case of appropriation of the entire
Performance Security provide a fresh Performance Security, as the case may be, and the Concessionaire shall,
within the time so granted, replenish or furnish fresh Performance Security as aforesaid failing which the
Concessioning Authority shall be entitled to terminate this Agreement in accordance with Article 13 of the
Concession Agreement.

In case the successful bidder fails to furnish the Performance Security within the stipulated time as mentioned
herein, the LOA shall stand void and LOI may be issued to the second successful bidder.
RFQ cum RFP for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium cum Sports
Complex in Lucknow

RFQ cum RFP Volume I- Instruction to Bidder Page 28


7.12 Sources of Funds

The responsibility to raise funds for the Project would rest with the Successful Bidder.
RFQ cum RFP for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium cum Sports
Complex in Lucknow

RFQ cum RFP Volume I- Instruction to Bidder Page 29

8 DESCRIPTION OF THE SELECTION PROCESS

8.1 CRITERIA FOR EVALUATION

8.1.1 Evaluation Parameters

The Bidder's competence and capability is proposed to be established by the following parameters:

(a) Technical Experience
(b) Financial capability factor, in terms of:
i. Turn over
ii. Net worth
iii. Net cash accruals

On each of these parameters, the Bidder would be required to meet the evaluation criteria as detailed in this
Section. Bidders meeting all the criteria only will be qualified for further evaluation of the Proposal.

8.1.2 Eligible Experience

Technical Experience

For the purpose of this RFQ cum RFP, the applicant which could be single entity or the consortium shall be
evaluated on the following:

(i) Development or construction of Core infrastructure projects (either individually or as a
consortium member)
(ii) Development or construction of Similar Infrastructure projects (either individually or as a
consortium member) each having a minimum project cost of Rupees 31 crores

Eligible project:
a) Projects awarded/awarded and under execution/completed during the last seven financial years,
not before 31
st
March 2001, shall only be considered.
b) Only eligible projects should be considered for category (i) above for estimation of the technical
experience. An eligible project would have minimum project cost of at least Rupees 39 crores. For
such category (i) evaluation, core infrastructure projects would mean national highways and
expressway, airports, refineries and pipelines thereof, railways, ports, power, telecom, industrial
parks, SEZs, Group Housing and Integrated/Hi-tech Township.

(c) More weightage will be given to experience of similar kind of infrastructure projects than to
experience of infrastructure projects. Similar kind of infrastructure: Construction and/or Operation of
Cricket Stadium, Sports Academy, Sports Stadium.

(d) Experience as a consortium member will be considered in proportion to the equity holding in the
project at the time of execution /construction of the Project.


Documentary evidence in the form of a CA certificate (Appendix 4) must be submitted along with the proposal:

a) a certificate from the appropriate authorities of respective clients should be submitted in support of
the above in case of completed projects.
b) Relevant pages of the Contract Agreement in projects which are awarded and under execution as
per clause 8.1.2 (a). Relevant pages shall mean the Preamble of this CA detailing the Parties and
the last pages detailing the signatories.
RFQ cum RFP for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium cum Sports
Complex in Lucknow

RFQ cum RFP Volume I- Instruction to Bidder Page 30

c) A copy of the Work Order/Letter of Award in cases where the work has been awarded within three
months before the RFQ CUM RFP application due date.

8.1.3 Details of Experience

The Bidder should furnish details of technical experience as on the date of submission of RFQ cum RFP as per
Appendix 4, Bid Response Sheet No. 1.


The Bidder must provide the necessary project specific information as per Appendix 4, Bid Response Sheet No.
2.

8.1.4 Financial Capability

The financial capability of the bidder / consortium will be evaluated on the basis of

(a) Turnover
(b) Net Worth and
(c) Net Cash accruals

The Bidders should provide information regarding the above based on audited annual accounts.

The Application must be accompanied by the audited Balance Sheet and Profit and Loss Account of the Bidder
(of each member in case of a consortium) as per Appendix 5 for the last three (3) Financial Years not prior to
2004-05.

8.1.5 Evaluation Criteria for Financial Capability

For the purpose of Qualification, the applicant a single entity or a consortium should demonstrate the
Threshold Financial Capability measured on the following criteria:

1. Minimum Turnover of Rs. 104 crores in each of the last three financial years not earlier than 2004-05
2. Minimum Net worth of Rs. 63 Crores as on 31
st
March 2008 as certified by Chartered Accountant.
3. Minimum Average Annual Net Cash Accruals of Rs. 31 Crores during the last three (3) financial years
not prior to 2004-05
4. Single entity bidder and all members of the consortium, if applicable, should be profit-making concerns
for the last 3 yrs not prior to 2004-05.

8.1.6 Special Conditions for a Consortium

In case the Bidder is a Consortium, turnover, net worth and net cash accruals would be taken as an
arithmetic sum of net worth, turnover and net cash accruals of each member of the Consortium,
calculated in the ratio of their stake in the consortium/JV. The Consortium would be required to meet
the threshold criteria on the basis of aggregate figures subject to provisions of this Clause .

8.1.7 Evaluation methodology

The technical and financial capacity of the bidder will be evaluated as per following:


S.No Criteria Marks Marking System
1. Technical criteria 65%
RFQ cum RFP for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium cum Sports
Complex in Lucknow

RFQ cum RFP Volume I- Instruction to Bidder Page 31

1a. Core infrastructure 30 marks Number of eligible
projects 15 marks
3 marks for initial
project and 1.5
marks for every
addl project.
Cumulative cost-
15 marks
1.5 marks for
initial Rs 39
crores and 0.75
marks for every
addl. comleted
Rs. 39 crs. or 0.50
marks for every
other addl. Rs. 39
crs.
1b. Similar infrastructure 35 marks Number of eligible
projects 20 marks
4 marks for initial
project and 2
marks for every
addl project.
Cumulative cost-
15 marks
3 marks for initial
Rs 31 crores and
2 marks for every
completed addl
Rs. 31 crs or 1.5
marks for every
other addl. Rs. 31
crs.
2 Financial criteria 35%
2a. Networth 15 marks 10 marks for the
initial Rs 63
crores and 5
marks for addl Rs.
63 crs
2b. Turnover 10 marks 7 marks for the
initial Rs 104
crores and 3
marks for addl Rs
104 crs
2c. Average Net Cash
accruals
10 marks 7 marks for the
initial Rs 63
crores and 3
marks for addl Rs.
63 crs


8.1.8 For evaluation of technical experience as per clause 8.1.2 and of financial capability as per clause 8.1.5,
the financial and technical capabilities of the group companies/associates shall also be considered (for
Projects costing Rs.300.00 cr or more). For these purposes group companies/associates shall mean the
following For the purposes hereof, associate means, in relation to the applicant/consortium member a
person who controls and is controlled by or is under the common control with such applicant/consortium
member. As used in this definition, the expression control means, with respect to a person, which is
company or corporation, the ownership, directly or indirectly of more than 50% of the voting shares of
such person, and with respect to a person which is not a company or corporation, the power to direct the
management and policies of such a person, whether by operation of law or by contract or otherwise.

RFQ cum RFP for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium cum Sports
Complex in Lucknow

RFQ cum RFP Volume I- Instruction to Bidder Page 32

In case the RFQ CUM RFP applicant claims the technical and/or financial capacity of its group
companies/associates, the applicant shall necessarily submit documentary evidence in proof of such
claims. Such documentary evidence shall consist of CA certificates to support such capacity and also to
establish requisite Control relationship as defined in 8.1.8 above.

8.1.9 The scores for the technical and financial capacity evaluated as per clause 8.1.7 shall be added to arrive
at combined score of each applicant against maximum total marks of 100. Applicants scoring 50% or
more in the combined scores shall be eligible to be shortlisted for issuance of RFP.
8.2 Evaluation of Financial Proposal (Assessment of Envelope B)

Financial Proposal of the Bidders only who have secured 50 % or more marks (Clause 8.1.7) on the evaluation of
envelop A would be evaluated. The evaluation criteria for assessment of the Financial Proposals are described in
Section 10 of this RFQ cum RFP. In case of ambiguity between the amount in words and figures the former shall
prevail.
RFQ cum RFP for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium cum Sports
Complex in Lucknow

RFQ cum RFP Volume I- Instruction to Bidder Page 33

9 RULES REGULATING THE CONSORTIUM

The objective of this stage is to outline the Rules regarding the Consortium. The Envelope A shall contain the
information in respect of the Bidder/Consortium as per Clause 6.15 of this RFP document. Following are the
rules which shall guide the operation of the Consortium:

9.1 Consortium of Bidders
9.1.1 Rules Regulating the Participation of a Consortium of Companies

Awas Bandhu, UP may also consider a bid submitted by a consortium of companies subject to the following
conditions:
1. The Consortium Members should not exceed four.
2. The foreign construction company / Developer may apply directly for the project or in
association with Indian Partner subject to the prevailing GoI, FDI and Indian Laws.
3. The members of the Consortium must form a Special Purpose Vehicle (SPV) and submit an
MoU to that extent as per Clause 6.2.3 (f) above.
4. The commercial arrangements and roles and responsibilities between the consortium partners
should be specified in Memorandum of Understanding and duly executed copy of MOU should
be submitted along with the proposal. The MOU to be entered into between the Consortium
Members as per Appendix 10 of this RFP Document shall reflect the above.
5. The members of the consortium shall designate among themselves one member as Lead
Consortium Member.
6. Lead Consortium Member shall hold a minimum of 51% equity in the SPV and each of the
other Consortium Member shall hold a minimum of 11% in the SPV.
7. The Members of the Consortium shall execute Power of Attorney as per the format enclosed in
Appendix 1B of RFQ cum RFP Document.
8. A bidder who has applied for a project in its individual capacity or as a part of a consortium
cannot participate as a Member of any other Consortium applying for this Project.
9.1.2 Change in Composition of Consortium

There should be no change in the consortium structure after the submission of bid. If there are any changes in
the consortium structure by any bidder, Awas Bandhu, UP reserves the right not to consider the change in the
consortium and to reject such a bid.
No change in Consortium Members shall be allowed till the completion of the project or a minimum of 3 years
(whichever is later). However, the Lead Consortium Member shall not be allowed to be changed over the entire
Concession Period and shall continue to hold 51% stake in the Consortium till the end of Concession Period.



RFQ cum RFP for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium cum Sports
Complex in Lucknow

RFQ cum RFP Volume I- Instruction to Bidder Page 34

9.1.3 Other Conditions in Respect of Consortium

Each Consortium Member shall have a minimum of 11% stake in the SPV formed. None of the Consortium
Member shall be allowed to dilute its stake till the completion of the project or a minimum of 3 years (whichever is
later).

Lead Consortium Member shall invest minimum 51% of the equity towards the project. Lead Consortium Member
shall not be allowed to dilute its stake to a level below 51% upto the end of Concession Period. However, in case
the Lead Consortium Member holds more than 51% stake in the Consortium, it may be allowed to dilute its stake
in a manner such that it does not fall to a level below 51% and such dilution in stake shall not be allowed till the
completion of the project or a minimum of 3 years (whichever is later).

Any change in Consortium members may be allowed only if equal or better replacement is there. However, any
change in consortium shall be at the discretion of the Concessioning Authority.


RFQ cum RFP for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium cum Sports
Complex in Lucknow

RFQ cum RFP Volume I- Instruction to Bidder Page 35

10 METHODOLOGY & CRITERIA FOR EVALUATION OF FINANCIAL
BID (ENVELOP B)

10.1 Financial Proposal Evaluation

This part of the Request for Proposal provides information on the methodology that will be used to
evaluate the Financial Proposals received.

The Project will be awarded to such Eligible Bidder, which submits a responsive Bid and offers to enter
into a Draft Concession Agreement on the best financial terms with LDA.

These RFP Documents stipulate the minimum qualification for the Project. These RFP Documents may
be amended or technical and financial parameters of the Project may be changed by Awas Bandhu, UP
by issue of an Addendum. Such an Addendum will form part of these RFP Documents and would be
common for all the Bidders. Bid Evaluation Committee reserves the right to reject the Proposals, which
do not conform to the provisions stipulated in the RFP Documents.

Financial Proposal of only the Bidders who have achieved on 50% or more marks after evaluation of
Envelope A, would be opened and evaluated. The Financial Proposals of the non-responsive Bidders
would be returned to the respective Bidders unopened.

Bid Evaluation Committee shall evaluate and submit its recommendations to the competent authority.
10.1.1 Responsiveness of Financial Proposal

BEC through Awas Bandhu, UP will open Envelope B of only who have achieved on 50% or more
marks after evaluation of Envelope A as per Section 8.1.7 of this document. Any bid containing caveats/
deviations from RFQ cum RFP Documents is liable to be rejected by BEC/ Awas Bandhu, UP.

Bidders shall be ranked as per the land in acres quoted by them. The proposal of the bidder quoting the
lowest area of the land in acres shall be considered as the proposal having highest financial score. The
proposal with highest financial score would be ranked first.
10.1.2 Determination of Preferred Bidder

Awas Bandhu, UP shall issue a Letter of Intent to the Successful Bidder after obtaining approval from
the Competent Authority which needs to be accepted within 7 days of issuance of Letter of Intent.

LDA shall issue a Letter of Award (LOA) after getting the approval of the Board to the successful bidder
within 7 days of issuance of LOI by Awas Bandhu, UP.
The Successful Bidder shall enter into Concession Agreement with LDA for the implementation of the
project within 30 days of issuance of LOA.
RFQ cum RFP for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium cum Sports
Complex in Lucknow

RFQ cum RFP Volume I- Instruction to Bidder Page 36


The successful Bidder shall be required to give performance security before signing of the Concession
Agreement within 30 days of issue of Letter of Award. If the Successful Bidder fails in entering into
contract (Concession Agreement) as required without giving the required clarifications to the satisfaction
of Awas Bandhu UP, Awas Bandhu UP reserves the right to begin negotiations with the next highest
ranked Bidder and so on.

Awas Bandhu, UP also reserves the right to reject any Proposal if:
- At any time, a material misrepresentation is made or uncovered, or
- The Bidder does not respond promptly and thoroughly to the requests for supplementary
information required for evaluation of the Proposal.
- The Proposal deviates from the commercial parameters of these RFP Documents.



RFQ cum RFP for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium cum Sports
Complex in Lucknow

RFQ cum RFP Volume I- Instruction to Bidder Page 37

APPENDICES

RFQ cum RFP for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium cum Sports
Complex in Lucknow

RFQ cum RFP Volume I- Instruction to Bidder Page 38

APPENDIX 1A
FORMAT FOR POWER OF ATTORNEY FOR SIGNING PROPOSAL
(On a Stamp Paper of appropriate value)
POWER OF ATTORNEY

Know all men by these presents, we ____________ (name and address of the registered office) do hereby
constitute, appoint and authorize Mr./Ms. _____________________ (name and address of residence) who is
presently employed with us and holding the position of __________________ as our attorney, to do in our name
and on our behalf, all such acts, deeds and things necessary in connection with or incidental to our proposal for
the International Level Cricket Stadium cum Sports Complex on Design, Build, Finance, Operate and Transfer
(DBFOT) basis in the state of Uttar Pradesh, including signing and submission of all documents and providing
information/ responses to Awas Bandhu, Uttar Pradesh, Housing & Urban Planning Department, Government Of
Uttar Pradesh, (ABUP), representing us in all matters before GOUP, and generally dealing with ABUP in all
matters in connection with our proposal for the said Project.

We hereby agree to ratify all such acts, deeds and things lawfully done by our said attorney pursuant to this
Power of Attorney and that all such acts, deeds and things lawfully done by our aforesaid attorney shall and shall
always be deemed to have been done by us.

For ------------------------

(Signature)
(Name, Title and Address)
Accepted

________________ (Signature)
(Name, Title and Address of the Attorney)

Company seal & stamp


Notes:
1. To be executed by the sole Bidder or the Lead Member in case of a Consortium duly supported .by a Board Resolution

2. The mode of execution of the Power of Attorney should be in accordance with the procedure, if any, laid down by the applicable law
and the charter documents of the executant(s) and when it is so required the same should be under common seal affixed in
accordance with the required procedure.

3. Also, where required, the executants(s) should submit for verification the extract of the charter documents and documents such as a
resolution / power of attorney in favour of the Person executing this Power of Attorney for the delegation of power hereunder on
behalf of the Bidder.


RFQ cum RFP for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium cum Sports
Complex in Lucknow

RFQ cum RFP Volume I- Instruction to Bidder Page 39

APPENDIX 1B

FORMAT FOR POWER OF ATTORNEY FOR LEAD MEMBER OF CONSORTIUM
(On a Stamp Paper of appropriate value)
POWER OF ATTORNEY

Whereas Awas Bandhu, Uttar Pradesh, Housing & Urban Planning Department, Government Of Uttar Pradesh., (ABUP)
has invited Proposals from interested parties for the International Level Cricket Stadium cumSports Complex on Design, Build,
Finance, Operate and Transfer (DBFOT) basis ("the Project").
Whereas, the members of the Consortium are interested in bidding for the Project and implementing the Project in
accordance with the terms and conditions of the Bid Document and other connected documents in respect of the Project,
and
Whereas, it is necessary under the Bid Document for the members of the Consortium to nominate one of them as the Lead
Member with all necessary power and authority to do for and on behalf of the Consortium, all such acts, deeds and things as
may be necessary in connection with or incidental to the Consortiums proposal for the Project.
NOW THIS POWER OF ATTORNEY WITNESSETH THAT:
We, M/s. _________________, and M/s. ________________ (the respective names and addresses of the registered office)
do hereby constitute, appoint and authorize M/s. __________________________ as the Lead Member of the Consortium
and as our attorney, to do on behalf of the Consortium, all or any of such acts, deeds or things as may be necessary in
connection with or incidental to the Consortiums proposal for the Project, including submission of application/ proposal,
participating in conferences, responding to queries, submission of information/ documents and generally to represent the
Consortium in all its dealings with Awas Bandhu, Uttar Pradesh, Housing & Urban Planning Department, Government Of
Uttar Pradesh., (ABUP), or any other Government Agency or any person, in connection with the Project until culmination of
the process of bidding and thereafter till the Concession Agreement is entered into with Awas Bandhu, Uttar Pradesh,
Housing & Urban Planning Department, Government Of Uttar Pradesh., (ABUP).
We hereby agree to ratify all such acts, deeds and things lawfully done by Lead Member as our said attorney pursuant to
this Power of Attorney and that all acts deeds and things lawfully done by our aforesaid attorney shall and shall always be
deemed to have been done by us/Consortium.
Dated this _______ Day of ________ 200_
(Executants)
(To be executed by all the members of the Consortium)
Company seal & stamp

Note:

1. The mode of execution of the Power of Attorney should be in accordance with the procedure, if any, laid down by the
applicable law and the charter documents of the executant(s) and when it is so required the same should be under common
seal affixed in accordance with the required procedure.

2. The executant(s) should submit for verification the extract of the charter documents and documents such as Board Resolution
and Power of Attorney in favour of the person executing this Power of Attorney in favour of the Lead Member.
RFQ cum RFP for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium cum Sports
Complex in Lucknow

RFQ cum RFP Volume I- Instruction to Bidder Page 40

APPENDIX 2
DETAILS OF BIDDER
1. (a) Name
(b) Country of Incorporation
(c) Address of the corporate headquarters and its branch office (s), if any, in India
(d) Date of incorporation and / or commencement of business

2 Brief description of the Company including details of its main lines of business and proposed
roles and responsibilities in this Project.

3 Name, Designation, Address and Phone Nos. of Authorized Signatory of the Bidder
(a) Name:
(b) Designation:
(c) Company:
(d) Address:
(e) Telephone No:
(f) E-mail Address:
(g) Fax No:

4 Details of individual (s) who will serve as the point of contact / communication for ABUP, within the
Company
(a) Name:
(b) Designation:
(c) Address:
(d) Telephone No.
(e) E-mail address:
(f) Fax No.

5 In case of Consortium:

(a) The information above (1-4) should be provided for all the Members of the Consortium
(b) Information regarding role of each Member should be provided as per table below:
Sl. No. Name of Member Role of the Member*
1
2

Specify whether Lead Member, Associate Member

(Signature of Authorised Signatory)


Company seal & stamp




RFQ cum RFP for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium cum Sports
Complex in Lucknow

RFQ cum RFP Volume I- Instruction to Bidder Page 41

APPENDIX 3
FORMAT FOR LETTER OF APPLICATION
[On the Letter Head of the Bidder (in case of Single Bidder) or Lead Member (in case of a Consortium)]

Date: ------------

The Executive Director,
Awas Bandhu, Uttar Pradesh,
Housing & Urban Planning Department,
Government Of Uttar Pradesh
Ist Floor, Janpath Market, Lucknow-226001 India

International Level Cricket Stadium cum Sports Complex on Design, Build, Finance, Operate and Transfer
(DBFOT) basis

Sir,

Being duly authorized to represent and act on behalf of _________________ (hereinafter referred to as "the
Bidder"), and having reviewed and fully understood all of the qualification requirements and information provided,
the undersigned hereby expresses its interest and apply for qualification for the International Level Cricket
Stadium cum Sports Complex.

We are enclosing our Proposal, in one Original and two Copies, with the details as per the requirements of the
Bid Document, for your evaluation.

The undersigned hereby also declares that the statements made and the information provided in the Proposal
are complete, true and correct in every detail.

We confirm that the application is valid for a period of 180 days from the due date of submission of application
and unconditional.

We hereby also confirm the following:

1. The Proposal is being submitted by (name of the biding Company/Lead Consortium member) who is the
Bidding Company/the Lead Consortium Member of the Bidding Consortium Comprising (mention the
names of the entities who are the Consortium Members), in accordance with the conditions stipulated in
the RFP.
2. As the Bidding Company/Lead Consortium Member (in case of a Bidding Consortium), we hereby
confirm to abide by the roles and responsibilities assigned to us as per the MoU between the
Consortium Members and as outlined in this RFP.
3. We have examined in detail and have understood the terms and conditions stipulated in the RFP
Document issued by Awas Bandhu, UP and in any subsequent communication sent by Awas Bandhu,
UP. We agree and undertake to abide by all these terms and conditions. Our Proposal is consistent with
all the requirements of submission as stated in the RFP or in any of the subsequent communications
from Awas Bandhu, UP.
4. We confirm that there are no conditions in Envelope B: Financial Proposal.
5. The information submitted in our Proposal is complete, is strictly as per the requirements stipulated in
the RFP, and is correct to the best of our knowledge and understanding. We would be solely
responsible for any errors or omissions in our Proposal.
6. We confirm that we have studied the provisions of the relevant Indian laws and regulations required to
enable us to prepare this Financial Proposal and as required to Design, Build, Finance, Operate and
Transfer International Level Cricket Stadium cum Sports Complex in Lucknow, in the event that we are
finally selected.
RFQ cum RFP for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium cum Sports
Complex in Lucknow

RFQ cum RFP Volume I- Instruction to Bidder Page 42

7. We confirm that all the terms and conditions of the Proposal are firm and valid for acceptance for a
period of 180 days from the Proposal due date.

Our PAN number is -----------------
Our TAN number is -----------------


Thanking You,

Yours Sincerely,


For and on behalf of : (name of the Bidding Company / Lead Consortium Member and the Company Seal)

Signature : (Authorised Representative & Signatory)

Name of the Person :

Designation :


RFQ cum RFP for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium cum Sports
Complex in Lucknow

RFQ cum RFP Volume I- Instruction to Bidder Page 43

APPENDIX 4

INFORMATION RELATED TO EXPERIENCE

GUIDELINES

1. Member Code : NA= Not Applicable in case of a single entity Bidder, LM =Lead member, AM=
Associate Member

2. The Chartered Accountant issuing the certification for Experience of the Bidder must hold a valid
Certificate of Practice.

3. Any Bidder consisting of a Single Entity should fill in details as per the row titled Single Entity Bidder and
ignore the other rows mentioned below. In case of a Consortium, the details need to be provided as per
the lower rows and the row titled Single Entity Bidder may be ignored.


























RFQ cum RFP for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium cum Sports
Complex in Lucknow

RFQ cum RFP Volume I- Instruction to Bidder Page 44

FORMAT FOR ESTABLISHING EXPERIENCE OF BIDDER


BID RESPONSE SHEET 1

S
.
N
o

N
a
m
e

o
f

t
h
e

P
r
o
j
e
c
t

T
y
p
e
:

S
i
m
i
l
a
r

o
r

c
o
r
e

i
n
f
r
a
s
t
r
u
c
t
u
r
e


Project

Date of
A
u
t
h
o
r
i
t
y

f
o
r

w
h
o
m

c
a
r
r
i
e
d

o
u
t

E
q
u
i
t
y

h
o
l
d
i
n
g

a
t

t
h
e

t
i
m
e

o
f

e
x
e
c
u
t
i
o
n
/
c
o
n
s
t
r
u
-
c
t
i
o
n

E
s
t
i
m
a
t
e
d

M
a
r
k
s

L
o
c
a
t
i
o
n

C
o
s
t

R
s
.

c
r
o
r
e
s

A
w
a
r
d

C
o
m
m
e
n
c
e
-
m
e
n
t

C
o
m
p
l
e
t
i
o
n







Tota
l




Note:
1. Only the eligible projects that satisfy technical criteria shall be included.
2. All the Financial numbers are to be given in INR
3. The format shall be filled up for each member of the consortium and as a cumulative experience for the
consortium


(Signature of Authorised Signatory)



Company seal & stamp




Signature , Name, Address and Membership No. of Chartered Accountant








RFQ cum RFP for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium cum Sports
Complex in Lucknow

RFQ cum RFP Volume I- Instruction to Bidder Page 45

Bid Response Sheet 2



Name of Bidder:
Member Code:
Category:
1. Name of Contract
Country
2. Name of Employer
3. Employers address, telephone and fax no.)
4. Role (strike out whichever is not applicable)
Developer/Prime contractor/ Subcontractor
5. Value of the Total Contract (in specified currencies and INR)
6. Value of the Bidders Contract (in specified currencies and INR)
7. Certified Billings till date (in specified currencies and INR and exchange rate)
8.
Date of Award
9
Date of Commencement of Project/ Contract
10.
Date of Completion/ Commissioning

(Signature of Authorised Signatory)


Company seal & stamp



Instructions

1. Information provided in this section is intended to serve as a back up for information provided in
accordance with Appendix 4, Bid Response Sheet 1.

2. The Projects cited must comply with the eligibility criteria specified in Clause 8.1.

3. A separate sheet should be filled for each of the Eligible Projects.




RFQ cum RFP for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium cum Sports
Complex in Lucknow

RFQ cum RFP Volume I- Instruction to Bidder Page 46

APPENDIX 5
FORMAT FOR ESTABLISHING FINANCIAL CAPABILITY OF THE BIDDER

Bid Response Sheet 3
Format for Financial Capability of Single Entity Bidder

Turnover, Net Worth and Net Cash Accruals

Net Worth
(Rs. Crores )
Net Cash Accruals (CA)
(Rs. Crores)
Turnover
( Rs. Crores)
As on 31.3.08 Year Year Year Year Year Year



(Signature of Authorised Signatory)


Company seal & stamp


Signature , Name, Address and Membership No. of Chartered Accountant
RFQ cum RFP for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium cum Sports
Complex in Lucknow

RFQ cum RFP Volume I- Instruction to Bidder Page 47


BID RESPONSE SHEET 4
Format for Financial Capability of Consortium

Turnover, Net Worth and Net Cash Accruals

Bidder Type
Equity
share (%)
Turnover
( Rs Crores)
Net
Worth
(Rs.
Crores)
Net Cash Accruals (CA)
(Rs. crores)
Year Year year As on
31
st

March
2008
Year Year Year Total
CA
Consortium
Member 1

Consortium
Member 2

Consortium
Member .

Total

Aggregate Turnover = Rs ---------------- crores
Aggregate Net worth = Rs ________ crores
Aggregate Net Cash Accruals = Rs ______ crores




(Signature of Authorised Signatory)


Company seal & stamp




Signature , Name, Address and Membership No. of Chartered Accountant


RFQ cum RFP for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium cum Sports
Complex in Lucknow

RFQ cum RFP Volume I- Instruction to Bidder Page 48


APPENDIX 6




This page is intentionally left blank
RFQ cum RFP for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium cum Sports
Complex in Lucknow

RFQ cum RFP Volume I- Instruction to Bidder Page 49

APPENDIX 7

GUIDELINES FOR PROVIDING INFORMATION RELATED TO FINANCIAL CAPABILITY

1. The Bidder should provide the Financial Capability based on its own audited financial statements. Financial
capability of the Bidder's parent company or its subsidiary or any associate company (who are not Members
of the Consortium) will not be considered for computation of the Financial Capability of the Bidder.

2. Member Code LM = Lead member, AM = Associate Member

3. Instructions for calculation of Financial Capability:

(a) Net Cash Accruals = (Profit After Tax + Depreciation + Other non-cash expenditure)

(b) Net Worth = Subscribed and Paid-up Equity (including Share Premium, if any) + Reserves - Revaluation
Reserves - Miscellaneous expenditure not written off-Deferred Revenue Expenditure-Deficit in Profit &
Loss Account

(c) The financial year would be the same as followed by the Bidder for its annual report. Year 1 will be the
last Financial Year. Year 2 shall be the year immediately preceding Year 1.

(d) The Bidder shall provide audited Annual Reports as required under this Bid Document. For a
Consortium, audited Annual Reports of all Members shall be provided.

(e) In case of a Consortium comprising of members with holdings in each other, the cross holdings between
the group companies comprising part of the Consortium will be deducted for the purpose of Net Worth
calculations.

4. Financial details of the Bidder. If the Bidder is a consortium the Financial Details of all the members. The
Financial Details should be provided in the following manner.



















Name of Member: Role of Member:

RFQ cum RFP for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium cum Sports
Complex in Lucknow

RFQ cum RFP Volume I- Instruction to Bidder Page 50

SN Particulars as per the Audited
Balance Sheet
Year 3 Year 2 Year 1 TOTAL
1 Profit After Tax (PAT)
2 Depreciation
3 Other non-cash expenditure
4 Subscribed and Paid up Equity
5 Reserves
6 Revaluation reserves
7 Miscellaneous expenditure not
written off

8 Deferred Revenue Expenditure
9 Deficit in Profit & Loss Account
10 Net Cash Accruals = (1+2+3)
11 Net Worth = (4+5-6-7-8-9)



(Signature of Authorised Signatory)


Company seal & stamp


Signature , Name, Address and Membership No. of Chartered Accountant

RFQ cum RFP for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium cum Sports
Complex in Lucknow

RFQ cum RFP Volume I- Instruction to Bidder Page 51

APPENDIX 8
FORMAT FOR ANTI-COLLUSION CERTIFICATE
[To be submitted on the letter heads of the bidders separately]
Anti-Collusion Certificate

Date: ------------
The Executive Director,
Awas Bandhu, Uttar Pradesh,
Housing & Urban Planning Department,
Government Of Uttar Pradesh
Ist Floor, Janpath Market, Lucknow-226001 India

International Level Cricket Stadium cum Sports Complex on Design, Build, Finance, Operate and
Transfer (DBFOT) basis

Sir,

We hereby certify and confirm that in the preparation and submission of this Bid, we have not acted in
concert or in collusion with any other Bidder or other person(s) and also not done any act, deed or thing
which is or could be regarded as anti-competitive, restrictive or monopolistic trade practice.

We further confirm that we have not offered nor will offer any illegal gratification in cash or kind to any person
or agency in connection with the instant Bid.

Dated this ______________ Day of ________________, 200_

Name of the Bidder
Signature of the Authorised Person

Note:
To be submitted by each Member in case of Consortium.

RFQ cum RFP for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium cum Sports
Complex in Lucknow

RFQ cum RFP Volume I- Instruction to Bidder Page 52

APPENDIX 9A
FORMAT FOR PROJECT UNDERTAKING
[To be submitted on the letter heads of the bidders separately]

The Executive Director,
Awas Bandhu, Uttar Pradesh,
Housing & Urban Planning Department,
Government Of Uttar Pradesh
Ist Floor, Janpath Market, Lucknow-226001 India

International Level Cricket Stadium cum Sports Complex on Design,Build, Finance, Operate and Transfer
(DBFOT) basis

Sir,

We have read and understood the Bid Document in respect of the captioned project provided to us by the
Executive Director, Awas Bandhu, Uttar Pradesh, Housing & Urban Planning Department, Government Of Uttar
Pradesh

We hereby agree and undertake as under:

(a) Notwithstanding any qualifications or conditions, whether implied or otherwise, contained in our Bid we
hereby represent and confirm that our Bid is unqualified and unconditional in all respects.

(b) We are not barred by the Government of India or the Government of Uttar Pradesh or their
Departments or Agencies from participating in any projects (DBFOT or otherwise).

Dated this ___________________ Day of _______________, .

Name of the Bidder
_________________________________
Signature of the Authorised Person

Company seal & stamp

RFQ cum RFP for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium cum Sports
Complex in Lucknow

RFQ cum RFP Volume I- Instruction to Bidder Page 53

APPENDIX 9B
FORMAT FOR PROJECT UNDERTAKING
[In case of Consortium]
[To be submitted on the letter heads of the bidders separately]

The Executive Director,
Awas Bandhu, Uttar Pradesh,
Housing & Urban Planning Department,
Government Of Uttar Pradesh
Ist Floor, Janpath Market, Lucknow-226001 India

International Level Cricket Stadium cum Sports Complex on Design,Build, Finance, Operate and Transfer
(DBFOT) basis

Sir,

We have read and understood the Bid Document in respect of the captioned project provided to us by the
Executive Director, Awas Bandhu, Uttar Pradesh, Housing & Urban Planning Department, Government Of Uttar
Pradesh

We hereby agree and undertake to be an exclusive member of the consortium and not a member of any
other consortium nor an independent Bidder, bidding for this project and has submitted only one (1)
Application in response to this RFQ CUM RFP


Dated this ___________________ Day of _______________, .

Name of the Bidder
_________________________________
Signature of the Authorised Person


Company seal & stamp

RFQ cum RFP for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium cum Sports
Complex in Lucknow

RFQ cum RFP Volume I- Instruction to Bidder Page 54



APPENDIX 10

FORMAT FOR MEMORANDUM OF UNDERSTANDING (MOU)
(On Non judicial stamp paper of Rs 100/- or such appropriate document duly attested by notary public)

This Memorandum of Understanding (MOU) entered into this _____day of _______ 2009 at ______ Between
_______________ (hereinafter referred as________) and having office at _______, India Party of the First
Part

And ________(hereinafter referred as__________) and having office at ____________, India Party of the
Second Part

The parties are individually referred to as Party and collectively as Parties.

WHEREAS Awas Bandhu, Uttar Pradesh, Housing & Urban Planning Department, Government Of Uttar
Pradesh, (ABUP) has invited RFQ cum RFP from entities interested in International Level Cricket Stadium cum
Sports Complex Project.

AND WHEREAS the Parties have had discussions for formation of a Consortium for bidding for the said Project
and have reached an understanding on the following points with respect to the Parties rights and obligations
towards each other and their working relationship.

IT IS HEREBY AS MUTUAL UNDERSTANDING OF THE PARTIES AGREED AND DECLARED AS
FOLLOWS:

1. That the Parties will form a Special Purpose Vehicle (SPV) with the shareholding commitments
expressly stated. The said SPV shall not undertake any other business during the Concession Period,
to domicile the Project prior to the start of implementation of the Project.

2. That the equity share holding of the Parties in the issued and paid up capital of the SPV shall not be
less than as Specified Under Evaluation Criteria Mentioned in RFQ CUM RFP Document during the
Concession Period.

3. That M/s____________, and M/s____________, who are Members of the Consortium commit to hold the
following equity stake in the SPV which are in line with the requirements of Clause 9 of Evaluation
criteria of this RFQ cum RFP document at all times during the Lease Period

Name of Member Type of Member

% of shareholding
1. M/s.

2. M/s.


4. that any dilution in the equity holding by the Parties in the SPV shall be as per the provisions of the
Concession Agreement that will be executed on award of the Project to us.

RFQ cum RFP for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium cum Sports
Complex in Lucknow

RFQ cum RFP Volume I- Instruction to Bidder Page 55

5. However the parties undertake that there shall be no change in respect of the lead member in case of a
consortium till the execution of the concession agreement.

6. That the Parties shall carry out all responsibilities as Concessionaire in terms of the Concession
Agreement.

7. That the roles and the responsibilities of each Party at each stage of the Bidding shall be as follows:

Name of Member Type of Member

Role & Responsibility
1. M/s.

2. M/s.


8. That the Parties shall be jointly and severally liable for the execution of the Project in accordance with the
terms of the Concession agreement to be executed on award of the Project.

9. That the Parties affirm that they shall implement the Project in good faith and shall take all necessary
steps to see the Project through expeditiously. They shall not negotiate with any other party for this
Project.

10. That this MOU shall be governed in accordance with the laws of India and courts in Lucknow shall have
exclusive jurisdiction to adjudicate disputes arising from the terms herein.

In witness whereof the Parties affirm that the information provided is accurate and true and have caused this
MOU to be duly executed on the date and year above mentioned.

Witness:

1. First Party
2. Second Party
Company seal & stamp
RFQ cum RFP for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium cum Sports
Complex in Lucknow

RFQ cum RFP Volume I- Instruction to Bidder Page 56


APPENDIX-11




This page is intentionally left blank











RFQ cum RFP for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium cum Sports
Complex in Lucknow

RFQ cum RFP Volume I- Instruction to Bidder Page 57

APPENDIX-12 Consultancy and Success Fee Commitment to Darashaw & Co Pvt Ltd

The Executive Director,
Awas Bandhu, Uttar Pradesh,
Housing & Urban Planning Department,
Government of Uttar Pradesh
Ist Floor, Janpath Market, Lucknow-226001
Uttar Pradesh

Sub: Commitment to pay the Success Fee and Consultancy Fee to Darashaw & Co Pvt Ltd


Sir,

We ___________( the Member), /[ our consortium consisting of the following members ( the Member)]



1 [Lead party]
2 [ ]
3 [ ]


Have /[Has] submitted our/ [its] Bid for the development of International Level Cricket Stadium cum Sports
Complex on Design Build Finance Operate and Transfer basis in Lucknow.

We hereby write to inform you that if the Single Entity / Consortium is selected as the successful bidder for
implementing the project, the Concessionaire shall pay Darashaw & Co Pvt Ltd a Success fee at the rate of 1%
of the cost of the project (clause 5.3). The Demand Draft in favour of Darashaw & Co Pvt Ltd for the said fee
shall be handed over to Awas Bandhu UP before the signing of the Concession Agreement.

The Consultancy Fee of Rs. 1,00,000/- (Rupees One Lakh only) paid by Awas Bandhu to the Consultants will be
reimbursed to Awas Bandhu, UP within 2 weeks of receipt of invoice from Awas Bandhu, UP.


SIGNATURE _____________

NAME _____________

DESIGNATION _____________

COMPANY SEAL COMPANY ______________

DATE _______________
RFQ cum RFP for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium cum Sports
Complex in Lucknow

RFQ cum RFP Volume I-Instruction to Bidders Page 58

APPENDIX-13 Format of Letter of Acceptance

(The Letter of Acceptance is to be submitted by EACH Consortium Member of the Bidding Consortium)

Date:
Place:

The Executive Director,
Awas Bandhu, Uttar Pradesh,
Housing & Urban Planning Department,
Government of Uttar Pradesh
Ist Floor, Janpath Market, Lucknow-226001
Uttar Pradesh

Sub: Proposal for selection of Successful Bidder to Design, Build, Finance, Operate and Transfer International
level Cricket Stadium cum Sports Complex in Lucknow


Dear Sir,

This has reference to the Proposal being submitted by (name of the Lead Consortium Member of the Bidding
Consortium), as Lead Consortium Member of the Bidding Consortium comprising (mention name(s) of the
Consortium Members) in respect of selection of Successful Bidder to Design, Build, Finance, Operate and
Transfer International Level Cricket Stadium cum Sports Complex in Lucknow in response to the RFQ cum RFP
Document issued by Awas Bandhu, UP dated.

We hereby confirm the following:

(a) We (name of the Consortium Members furnishing the Letter of Acceptance), have examined in detail
and have understood and satisfied ourselves regarding the contents including in respect of the
following:
a. The RFQ cum RFP Document issued by Awas Bandhu, UP;
b. All subsequent communication between Awas Bandhu, UP and the Bidder, represented by
(Mention name of the Lead Consortium Member)
c. The Proposal being submitted by (name of the Lead Consortium Member)

(b) We agree to abide by the terms and conditions of the RFP Document and the Proposal being submitted
by the Lead Consortium Member in respect of the Project.

(c) We also reaffirm that (name of the Lead Consortium Member) continues to be the Lead Consortium
Member and that (please give name, designation and address of authorized representative and
signatory here) designated as the authorized representative and signatory of the Lead Consortium
Member of the Bidding Consortium is the authorized representative and signatory in respect of all
matters concerning our Proposal for this Project and contractual commitments thereof.


Thanking You,

Yours Sincerely,


For and on behalf of : (name of the Bidding Company / Lead Consortium Member and the Company Seal)
RFQ cum RFP for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium cum Sports
Complex in Lucknow

RFQ cum RFP Volume I- Instruction to Bidder Page 59


Signature : (Authorised Representative & Signatory)

Name of the Person :

Designation :


















RFQ cum RFP for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium cum Sports
Complex in Lucknow

RFQ cum RFP Volume I- Instruction to Bidder Page 60

APPENDIX-14 Format of Letter of Commitment

(The Letter of Commitment is to be submitted by EACH Promoter(s) and/or Associate(s) and/or Subsidiary (ies)
of the Bidding Company / Consortium Members of the Bidding Consortium whose strength have to be credited
for)

Date:
Place:

The Executive Director,
Awas Bandhu, Uttar Pradesh,
Housing & Urban Planning Department,
Government of Uttar Pradesh
Ist Floor, Janpath Market, Lucknow-226001
Uttar Pradesh

Sub: Proposal for selection of Successful Bidder to Design, Build, Finance, Operate and Transfer International
Level Cricket Stadium cum Sports Complex in Lucknow

Dear Sir,

This has reference to the Proposal being submitted by (name of the Lead Consortium Member of the Bidding
Consortium), as Lead Consortium Member of the Bidding Consortium comprising (mention name(s) of the
Consortium Members) in respect of selection of Successful Bidder to Design, Build, Finance, Operate and
Transfer International Level Cricket Stadium cum Sports Complex in Lucknow in response to the Request for
Proposal (RFP) Document issued by Awas Bandhu, UP dated.

We hereby confirm the following:

1. We (name of the Promoter/Affiliate/Subsidiary), have examined in detail and have understood and
satisfied ourselves regarding the contents including in respect of the following:
a. The RFP Document issued by Awas Bandhu, UP;
b. All subsequent communication between Awas Bandhu, UP and the Bidder, represented by (name
of the Bidding Company or of the Lead Consortium Member in case of a Bidding Consortium);
c. The Financial Proposal being submitted by (name of the Bidding Company or of the Lead
Consortium Member in case of a Bidding Consortium)

2. We agree to abide by the terms and conditions of the RFQ cum RFP Document and the Proposal being
submitted by the Bidding Company / Lead Consortium Member in respect of the Project.

3. We also reaffirm that (please give name, designation and address of authorized representative and
signatory here) designated as the authorized representative and signatory of the Bidding Company /
Lead Consortium Member of the Bidding Consortium is the authorized representative and signatory in
respect of all matters concerning our Proposal for this Project and contractual commitments thereof.


Thanking You,

Yours Sincerely,


For and on behalf of : (name of the Bidding Company / Lead Consortium Member and the Company Seal)
RFQ cum RFP for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium cum Sports
Complex in Lucknow

RFQ cum RFP Volume I- Instruction to Bidder Page 61


Signature : (Authorised Representative & Signatory)

Name of the Person :

Designation :









RFQ cum RFP for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium cum Sports
Complex in Lucknow

RFQ cum RFP Volume I- Instruction to Bidder Page 62

APPENDIX-15 Financial Proposal (Format for Information Submission)

(To be provided on the letterhead of the Bidder)

Date:
Place:

The Executive Director,
Awas Bandhu, Uttar Pradesh,
Housing & Urban Planning Department,
Government of Uttar Pradesh
Ist Floor, Janpath Market, Lucknow-226001
Uttar Pradesh

Dear Sir,

Sub: Proposal for selection of Successful Bidder to Design, Build, Finance, Operate and Transfer International
Level Cricket Stadium cum Sports Complex in Lucknow

1. We the undersigned Bidder, submit the following as our Financial Proposal in response to the RFQ cum
RFP issued by Awas Bandhu, UP.

Our Financial quote shall be _____________Acres (___________Acres in Words) being the land area
on 90 years lease which shall be given by LDA to the bidder for Design, Build, Finance, Operate and
Transfer International Level Cricket Stadium cum Sports Complex in Lucknow

2. We confirm that the Financial Proposal conforms to all the terms and conditions stipulated in the Request for
Proposal Document.
3. We confirm that our Financial Proposal is FINAL in all respects and contains NO conditions.
4. We confirm that in the event of more than one Responsive Bidders quoting the same lumpsum value, Awas
Bandhu, UP shall break the tie by way of draw between such Bidders.
5. We confirm that, the information submitted in our Financial Proposal is complete and is correct to the best of
our knowledge and understanding. We would be solely responsible for any errors or omissions in our
Proposal.
6. We confirm that we have studied the provisions of relevant Indian laws and regulations required to enable us
to prepare this Financial Proposal and as required to design, build, finance, operate and transfer the Project,
in the event that we are finally selected.

Thanking You,

Yours Sincerely,


For and on behalf of : (name of the Bidding Company / Lead Consortium Member and the Company Seal)

Signature : (Authorised Representative & Signatory)

Name of the Person :

Designation :
RFQ cum RFP for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium cum Sports
Complex in Lucknow

RFQ cum RFP Volume I- Instruction to Bidder Page 63

APPENDIX-16 Proforma for Bank Guarantee for Performance Security Lucknow Development
Authority

[To be issued by SBI or any Nationalised Bank or Indian Scheduled Commercial Bank whose Net Worth
is not less than INR 300 crores as on 31
st
March 2008]

From:
[Name and Address of Bank/ Financial Institution]


The Vice Chairman,
Lucknow Development Authority,
Pradhikaran Bhavan,
Vipin Khand, Gomti Nagar
Uttar Pradesh


1. In consideration of the Governor of Uttar Pradesh represented by ________________ (hereinafter
called the Government) having agreed to exempt __________________ (hereinafter
called the said Bidder(s)) from the demand, under the terms and condition of an Agreement, dated
_________made between ____________________and Lucknow Development Authority for Design, Build,
Operate and Transfer International Level Cricket Stadium cum Sports Complex in Lucknow (hereinafter called
the said Agreement), of performance security for the due fulfilment by the said Developer(s)of the terms and
conditions contained in the said Agreement , on production of a bank guarantee for Rs. (Rupees
only).

We, _____________________ (hereinafter referred to as the Bank) at the request of
______________/ Bidder(s)/ do hereby undertake to pay to the Government an amount not exceeding Rs.
/- against any loss or damage caused to or suffered or would be caused to or suffered by the Government by
reason of any breach by the said Developer(s)of any of the terms or conditions contained in the said Agreement.

2. We __________________________ (indicate the name of bank) do hereby undertake to pay the
amounts due and payable under this guarantee without any demur, merely on a demand from the Government
stating that the amount claimed is due by way of loss or damage caused to or would be caused to or suffered by
the Government by reason of breach by the said Bidder(s) of any of the terms or conditions contained in the said
agreement or by reason of the Bidder(s) failure to perform the said Agreement. Any such demand made or the
bank shall be conclusive as regards the amount due and payable by the Bank under this guarantee. However,
our liability under this guarantee shall be restricted to an amount not exceeding Rs. /-.

3. We undertake to pay to the Government any money so demanded notwithstanding any dispute or
disputes raised by the Bidder(s) in any suit or proceeding pending before any court or Tribunal relating to our
liability under this present being absolute and unequivocal, unless otherwise directed by such Court or Tribunal.

The payment so made by us under this bond shall be a valid discharge of our liability for payment there
under and the Bidder(s) supplier (s) shall have no claim against us for making such payment.

RFQ cum RFP for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium cum Sports
Complex in Lucknow

RFQ cum RFP Volume I- Instruction to Bidder Page 64

4. We __________________________________ (Indicate the name of bank) further agree that the
guarantee herein contained shall remain in full force and effect during the period that would be taken for the
performance of the said Agreement and that it shall continue to be enforceable till all the dues of the Government
under or by virtue of the said Agreement have been fully paid and its claims satisfied or discharged or till Govt
certifies that the terms and conditions of the said Agreement, have been fully and properly carried out by the said
Bidder(s)and accordingly discharges this guarantee, however not exceeding six months beyond the date of
expiry of the Concession Period. Unless a demand or claim under this guarantee is made on us in writing on or
before the date of expiry of we shall be discharged from all liability under this guarantee thereafter.

5. We _____________________ (indicate the name of Bank) further agree with the Government that
the Government shall have the fullest liberty without our consent and without affecting in any manner our
obligations hereunder to vary any of the terms and conditions of the said Agreement or to extend time of
performance by the said Bidder(s)from time to time or to postpone for any time or from time to time any of the
powers exercisable by the Government against the said Bidder(s) and to forbear or enforce any of the terms and
conditions relating in the said agreement and we shall not be relieved from our liability by reason of any such
variation or extension being granted to the said Bidder(s)or for any forbearance act or commission on the part of
the Government or any indulgence by the Government to the said Bidder(s)or by any such matter or thing
whatsoever which under the law relating to sureties would, but for this provision, have effect of so relieving us.

6. This guarantee will not be discharged due to the change in the constitution of the Bank or the
Bidder(s)/ Supplier(s).

7. We, __________________________ lastly undertake not to revoke this guarantee during (indicate
the name of bank) its currency except with the previous consent of the Government in writing.


SEAL OF [BANK/FINANCIAL INSTITUTION] ..

NAME OF [BANK/FINANCIAL INSTITUTION] ..

SIGNATURE ..

NAME ..

TITLE ..

DATE ..
RFQ cum RFP for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium cum Sports
Complex in Lucknow

RFQ cum RFP Volume I- Instruction to Bidder Page 65

Exhibit 1 Principles of the Memorandum of Understanding to be executed between the
Members of a Consortium

In case of a Bidding Consortium, the principles according to which the Memorandum of Understanding (MoU)
shall be executed between/among the Consortium Members, are stated below:

1. The MoU should clearly specify the roles and responsibilities of each of the Consortium Members, along
with their proposed equity contribution. It is expected that the individual members have role definitions
not conflicting with those of the other Consortium Members.

2. The MoU should clearly designate one of the Consortium Members as the Lead Consortium Member.

3. The Lead Consortium Member shall be responsible for:
a. Tying up finances for the Project
b. Liasoning with the lending institutions and mobilizing debt resources for the Project.
c. Ensuring the individual and collective commitment of each of the Consortium members in
honouring the Developers obligations towards LDA. The Lead Consortium Member would be
responsible for the overall execution of the Project. All Consortium Members shall be jointly and
severally responsible for the same.

4. The MoU shall be duly signed by each of the Consortium Members

5. The MoU should be executed an appropriate stamp paper

6. The MoU should be specific to this Project

7. The MoU should be valid for a minimum period of twelve months from the Last Date for submission of
the Request for Proposal. The validity period of the MoU should be extendible on the original terms, if
required by LDA.

MoU should clearly specify that in case of award of the project each consortium member will invest at least 11%
equity for project.
RFQ cum RFP for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium cum Sports
Complex in Lucknow

RFQ cum RFP Volume I- Instruction to Bidder Page 66


CHECKLIST FOR PROPOSAL SUBMISSION

Bidder(s) are requested to organize their Proposals as per the following checklist:

ENVELOPE A
(a) Original Power of Attorney authorizing Authorised Representative & Signatory to act on behalf of the
Bidding Company / Bidding Consortium on all matters relating to the Project as per the format
specified in Appendix 1A
(b) Original Power of Attorney authorizing Lead Consortium Member to act on behalf of the Bidding
Consortium on all matters relating to the Project as per the format specified in Appendix 1B
(c) Details of the Bidder in Appendix 2
(d) Letter of Application as per format in Appendix 3
(e) Information Related to Experience in Appendix 4 (BRS1& BRS2)
(f) Establishing Financial Capability of the Bidder as per format in Appendix 5 (BRS 3 & BRS 4)
(g) Guidelines for providing information related to Financial Capability in Appendix 7
(h) Anti-collusion certificate in Appendix 8
(i) Project Undertaking as per format in Appendix 9 A and 9B
(j) Memorandum of Understanding executed between the Consortium Members on the principles as
stated in Exhibit 1
(k) MOU as per format as stated in Appendix 10
(l) Consultancy and Success Fee Commitment to Darashaw & Co Pvt Limited as per format stated in
Appendix 12
(m) Letter of Acceptance as per format stated in Appendix 13
(n) Letter of Commitment as per format in Appendix 14
(o) A Demand Draft towards Earnest Money Deposit

ENVELOPE B
(a) Financial Proposal as per format specified in Appendix 15


RFQ cum RFP for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium cum Sports
Complex in Lucknow

RFQ cum RFP Volume I- Instruction to Bidder Page 67

Annexure A - PROJECT SITE

Location Map






RFQ cum RFP for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium cum Sports
Complex in Lucknow

RFQ cum RFP Volume I- Instruction to Bidder Page 68

Annexure B - Technical Schedule


The following specifications and standards cover only some of the minimum requirements for the development.
The developer shall design, finance, construct, maintain and operate the proposed Cricket Stadium and Sports
Complex strictly conforming to the relevant Indian Standards, the best Industry practices and internationally
acceptable norms. Whether the requirements are explicitly stated or not in the RFP documents, the bidders must
note that Government of UP envisages a world class facility in all respects and expects a truly international
quality and standards from the selected developer as the binding contractual obligation.

The size of the cricket pitch dimensions shall confirm with international cricket pitch size
The stadium should be equipped with proper lighting arrangement in order to conduct night cricket
matches
The stadium should be designed for a minimum seating capacity of 50,000 people
In seating areas, super elevation of at least 15 cm shall be given in order to maintain spectator line of
sight.
All the spectator area shall be provided with roofing
In order to prevent overcrowding and to ensure fast evacuation during any untimely disaster, the
seating areas shall be divided into groups or blocks. Each block should have its own entry and exit
points and should be separated from the other by fences.
For every 750 seats, at least 1 escape route (i.e. stairway, ramp, or flat surface) with minimum width
of 1 mt shall be provided.
An AC viewing gallery shall be provided with a seating capacity of at least 250 viewers
There should be at least one royal box with movable furniture for guests of honour.
The stadium should have first aid treatment area consisting of at least 2 treatment and recovery
rooms of 15 sq. mt each, 2 store rooms of 2 sq. mt and two toilets with ventilation per each recovery
room.
The toilet facility provided shall be minimum 1 WC per 100 visitors. Out of the total toilets, 40% shall
be toilets for women, 20% for men and 40% urinals.
For emergency services like Police and fire brigade minimum area of 50 sq. mt should be
demarcated.

Sports Complex

Sports Complex shall have facility and necessary infrastructure for at least 5 different types of games
that shall include badminton, basket ball\ valley ball, lawn tennis and shooting training.
It should have the seating capacity for 600 viewers
An Olympic size (25 x 50 mt) swimming pool shall be provided within the sports complex
RFQ cum RFP for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium cum Sports
Complex in Lucknow

RFQ cum RFP Volume I- Instruction to Bidder Page 69

Ancillary facilities required for the sports complex shall include changing rooms, shower cabins,
toilets, Instructors room, equipment room, first aid room and a care takers room
The sports complex shall include indoor sports facilities like table tennis, squash, snooker, etc.
Optional facilities like club house or a gymnasium can be built for commercial purpose and for the use
of general public with an annual fee or membership.
Optional facilities like Sports academy can be run within the sports complex and it shall have the
facility for teaching students and also shall have necessary staff strength for each discipline.

The developer shall obtain necessary approval/affiliations from competent authority to conduct National and
International level matches in the stadium within 2 years of commencement of operation.





















Draft Concession Agreement for Design, Build, Finance, Operation and Transfer International Level Cricket Stadium and Sport Complex in
Lucknow




VOLUME II


Draft Concession Agreement

Between

Lucknow Development Authority

And

____________________________





Request for Proposal Volume II
1
Draft Concession Agreement for Design, Build, Finance, Operation and Transfer International Level Cricket Stadium and Sport Complex in
Lucknow




Index
Article 1. Definitions and Interpretation 6
1.1. Definitions 6
1.2. Interpretation 9
1.3. Measurements and Arithmetic Conventions 11
1.4. Priority of Agreements and Errors/Discrepancies 12
Article 2. Scope of the Project 13
2.1. Scope of the Project 13
Article 3. Consideration of the Contract 14
3.1. The Consideration 14
Article 4. Conditions Precedent to the Agreement 17
4.1. Conditions Precedent 17
4.2. Compliance Certificate 17
4.3. Non-Fulfillment of the Conditions Precedent 17
Article 5. Obligations of the Concessionaire 19
5.1. Obligations of the Concessionaire 19
5.2. Obligations relating to Other Agreements 20
5.3. Obligations relating to Change in Ownership 20
Article 6. Obligations of the Concessioning Authority 22
6.1. Obligations of the Concessioning Authority 22
Article 7. Representations and Warranties 23
7.1. Representations and Warranties of the Concessionaire 23
7.2. Representations and Warranties of the Concessioning Authority 24
7.3. Disclosure 25
Article 8. Disclaimer 26
8.1. Disclaimer 26
Article 9. Performance Security 27
9.1. Performance Security 27
9.2. Appropriation of Performance Security 27
9.3. Release of Performance Security 27
Article 10. Access on Project Site 28
10.1. Project Site 28
10.2. Others 28
Article 11. Construction on the Project Site 29
11.1. Obligations prior to the commencement of any work 29
11.2. Project Start and Completion date 29
11.3. Completion Certificate 29
Article 12. Force Majeure 30
12.1. Force Majeure 30
12.2. Force Majeure Events 30
12.3. Duty to Report Force Majeure Event 30
12.4. Effect of Force Majeure Event 30
12.5. Allocation of Costs Arising out of Force Majeure 31
12.6. Dispute Resolution 31
Article 13. Termination 32
13.1. Termination for Concessionaire Default 32
Request for Proposal Volume II
2
Draft Concession Agreement for Design, Build, Finance, Operation and Transfer International Level Cricket Stadium and Sport Complex in
Lucknow




13.2. Procedure to issue Termination Notice 33
13.3. Effect of Termination 33
13.4. Other Rights and Obligations of the Concessioning Authority 33
Article 14. Liability and Indemnity 35
14.1. General indemnity 35
14.2. Liability of Concessioning Authority 35
14.3. Indemnity by the Concessionaire 35
14.4. No consequential claims 36
14.5. Survival on Termination 36
Article 15. Dispute Resolution 37
15.1. Dispute resolution 37
15.2. Conciliation 37
15.3. Arbitration 37
Article 16. Miscellaneous 39
16.1. Governing Law and Jurisdiction 39
16.2. Waiver of Immunity 39
16.3. Delayed Payments 39
16.4. Waiver 39
16.5. Liability for Inspection of Documents 40
16.6. Exclusion of Implied Warranties etc. 40
16.7. Survival 40
16.8. Entire Agreement 40
16.9. Severability 40
16.10. No partnership 41
16.11. Third Parties 41
16.12. Successors and Assigns 41
16.13. Notices 41
16.14. Language 42
16.15. Counterparts 42
16.16. Validity 42
Schedule 1. Project Site i
Schedule 2. Technical Schedule ii


Request for Proposal Volume II
3
Draft Concession Agreement for Design, Build, Finance, Operation and Transfer International Level Cricket Stadium and Sport Complex in
Lucknow




CONCESSION AGREEMENT

This AGREEMENT is entered into on this the [ ] day of [ ] (Month), 2009 at Lucknow

BETWEEN

1. Lucknow Development Authority established under the Uttar Pradesh Urban Planning
and Development Act 1973, having its registered office at Pradhikaran Bhavan, Vipin
Khand, Gomti Nagar, Lucknow, Uttar Pradesh (hereinafter referred to as Concessioning
Authority which expression shall unless repugnant to the subject or the context include
its successors) of One Part;

AND

2. ______________, a company incorporated under the Companies Act, 1956, and having
its registered office at _________________________ (hereinafter referred to as the
Concessionaire which expression shall unless repugnant to the subject or the context
include its successors) of the Other Part.


WHEREAS:

A. The Government of Uttar Pradesh has established Lucknow Development Authority under
the Uttar Pradesh Urban Planning and Development Act 1973(hereinafter called the
Act), for the development and planning of Lucknow.

B. As a part of the development of Lucknow, there is a need of an there is a need of an
International level Cricket Stadium and Sports Complex in Lucknow.

C. Lucknow Development Authority is the rightful Lessor of the land situated in Lucknow,
Uttar Pradesh, India as marked in Schedule 1 (hereinafter referred to as the said land),
admeasuring approximately 18 acres, on which it is proposed to develop a on which it is
proposed to develop a International level Cricket Stadium and Sports Complex in
Lucknow.

D. Concessioning Authority through Awas Bandhu,UP had invited proposals for the selection
of a Concessionaire through the competitive route on the basis of Design, Build, Finance
Operate and Transfer the Project, from bidders, including the Consortium comprising of
_____________ as the Lead Member/Company by issuing the Request for Qualification
(RFQ) document dated 6
th
September 2008 containing inter-alia the minimum
qualification for a bidder and by subsequently issuing the Request for Proposal (RFP)
document dated 5
th
December 2008 containing the technical and commercial parameters
of the Project and the terms and conditions for the implementation of the Project.

E. On evaluation of the submitted proposals, Awas Bandhu, UP accepted the proposal of the
Consortium/Company and issued Letter of Intent (LOI) dated __________ to the
Consortium/Company specifying interalia the obligation of the Parties to create a Special
Purpose Vehicle for implementing the Project [ Applicable in case of Consortium]
Request for Proposal Volume II
4
Draft Concession Agreement for Design, Build, Finance, Operation and Transfer International Level Cricket Stadium and Sport Complex in
Lucknow





Pursuant to the issuance of LOI vide letter no. ___________ dated ________, the
Consortium have incorporated and constituted ______________ as the Special Purpose
Vehicle created for the sole purpose of implementation the Project which is
Concessionaire.

F. The Concessionaire is desirous of developing the Project, in accordance with all approved
plans and has the necessary capability for completion of the project and has offered his
services and has made payment of 1% of the project cost and taxes as applicable to M/s
Darashaw & Company Pvt. Ltd.



NOW THEREFORE IN CONSIDERATION OF THE FOREGOING AND THE RESPECTIVE COVENANTS
AND AGREEMENTS SET FORTH IN THIS CONCESSION AGREEMENT, THE SUFFICIENCY AND
ADEQUACY OF WHICH IS HEREBY ACKNOWLEDGED, AND INTENDING TO BE LEGALLY BOUND
THE CONCESSIONING AUTHORITY AND THE CONCESSIONAIRE (HEREINAFTER REFERRED TO
AS PARTIES AND INDIVIDUALLY AS PARTY) HEREBY AGREE AND THIS AGREEMENT
WITNESSTH AS FOLLOWS:
Request for Proposal Volume II
5
Draft Concession Agreement for Design, Build, Finance, Operation and Transfer International Level Cricket Stadium and Sport Complex in
Lucknow





Article 1. Definitions and Interpretation
1.1. Definitions
The words and expressions defined in this Agreement shall, unless repugnant to the
context or meaning thereof, have the meaning ascribed thereto herein, and the words
and expressions defined in the Schedules and used therein shall have the meaning
ascribed thereto in the Schedules;

Accounting Year means the financial year commencing from the first day of April of
any calendar year and ending on the thirty-first day of March of the next calendar year;
Affected Party shall have the meaning set forth in Clause 12.1;
Agreement or Concession Agreement means this Agreement, the Schedules
hereto and any amendments thereto made in accordance with the provisions contained
in this Agreement;
Agreement Date means the date of execution of this Agreement;
Applicable Laws means all laws, brought into force and effect by GOI or the State
Government including rules, regulations and notifications made there under, and
judgments, decrees, injunctions, writs and orders of any court of record, applicable to this
Agreement and the exercise, performance and discharge of the respective rights and
obligations of the Parties hereunder, as may be in force and effect during the subsistence
of this Agreement;
Applicable Permits means all clearances, licenses, permits, authorisations, no
objection certificates, consents, approvals and exemptions required to be obtained or
maintained by the Concessionaire under Applicable Laws during the subsistence of this
Agreement;
Approvals means all approvals, permissions, authorisations, consents and
notifications from any Governmental Authority, regulatory or departmental authority
including, but not limited to the approvals of the Lucknow Development Authority,
Secretariat for Industrial Assistance, Reserve Bank of India and any other regulatory
authority, as may be applicable.
Arbitration Act means the Arbitration and Conciliation Act, 1996 and shall include
modifications to or any re-enactment thereof, as in force from time to time;
Bank Guarantee means an irrevocable and unconditional bank guarantee payable on
demand issued by a bank in favour of Concessioning Authority and furnished by the
Concessionaire to Concessioning Authority for guaranteeing the due performance of the
obligations of the Concessionaire under this Agreement. Here Bank means any Indian
Nationalized Bank or any Indian Scheduled Commercial Bank whose net worth is not
less than Rs.500 million as on 31
st
March 2008.
Bid means the documents in their entirety comprised in the bid submitted by the
Concessionaire in response to the RFQ/RFP in accordance with the provisions thereof;
Request for Proposal Volume II
6
Draft Concession Agreement for Design, Build, Finance, Operation and Transfer International Level Cricket Stadium and Sport Complex in
Lucknow




Business Day means a day on which banks are generally open for business in the city
of Lucknow in India;
Change in Ownership means a transfer of the direct and/or indirect legal or beneficial
ownership of any shares, or securities convertible into shares, that causes the change in
management structure of the bidder company according to the opinion of the
Concessioning Authority;
Conditions Precedent shall have the meaning set forth in Clause 4.1;
Construction Period means maximum period of 24 months from the Effective Date,
after which commercial operations must start;
Consortium means the group of entities that have jointly submitted the proposal for
the Project.
Consortium Member means each entity in the Consortium shall be referred to as a
Consortium Member.
Damages shall have the meaning set forth in Sub-clause (t) of Clause 1.2;
Developmental and Operations Standard(s) means the minimum parameters and
standards to be achieved by the Concessionaire in the construction, development and
operations of the Project in accordance with internationally sound engineering practices,
National Building Code and Applicable Law and / or as determined by the relevant
Governmental Authority;
Dispute shall have the meaning set forth in Clause 15.1.1;
Dispute Resolution Procedure means the procedure for resolution of Disputes set
forth in Article 15;
Effective Date means the date on which all the conditions Precedent are satisfied or
waived as per Article 4 in writing by both the Parties.
Financial Commitment means the legally binding undertaking of the Concessionaire
to mobilize the financial requirements of the project, for ensuring the completion of the
project;
Force Majeure or Force Majeure Event shall have the meaning set forth in as per
Clause 12;
GOI means the Government of India;
Good Industry Practice means the practices, methods, techniques, designs,
standards, skills, diligence, efficiency, reliability and prudence which are generally and
reasonably expected from a reasonably skilled and experienced operator engaged in the
same type of undertaking as envisaged under this Agreement and which would be
expected to result in the performance of its obligations by the Concessionaire in
accordance with this Agreement, Applicable Laws and Applicable Permits in reliable,
safe, economical and efficient manner;
Government Instrumentality means any department, division or sub-division of the
Government of India or the State Government and includes any commission, board,
authority, agency or municipal and other local authority or statutory body including
Panchayat under the control of the Government of India or the State Government, as the
Request for Proposal Volume II
7
Draft Concession Agreement for Design, Build, Finance, Operation and Transfer International Level Cricket Stadium and Sport Complex in
Lucknow




case may be, and having jurisdiction over all or any part of Lucknow or the performance
of all or any of the services or obligations of the Concessionaire under or pursuant to this
Agreement;
Indemnified Party means the Party entitled to the benefit of an indemnity pursuant to
Article 14;
Indemnifying Party means the Party obligated to indemnify the other Party pursuant
to Article 14;
Lenders shall mean the banks, financial institutions, international credit agencies that
extend or agree to extend a credit facility to the Concessionaire in relation to the Project;
Parties means the parties to this Agreement collectively and Party shall mean any
of the parties to this Agreement individually;
Performance Security shall have the meaning set forth in Clause 9.1;
Project shall mean Design, Build, Finance, Operate and Transfer Cricket Stadium
of 50000 sitting capacity, Car parking for minimum 2500 Equivalent Car Space, Sports
Complex shall have facility and necessary infrastructure for at least 5 different types of
games that shall include badminton, basket ball\ valley ball, lawn tennis and shooting
training, an Olympic size (25 x 50 mt) swimming pool shall be provided within the sports
complex ,the sports complex shall have the seating capacity for 600 viewers, Support
facilities and on site infrastructure like internal road network, lamp posts within the plot,
fire fighting system, security cabins, landscaping and other services required for the
entire facility, along with 50 acres Site earmarked for the purpose in accordance with
the provisions of this Agreement at the end of the concession period;(more specifically
as mentioned in Article 2 of this agreement)
Project Completion Date shall mean the date on which the Concessioning Authority
has issued the Project Completion Certificate after completion of the Project and shall
have the meaning set forth in Clause 11.2;
Project Completion Certificate shall mean the Project Completion Certificate issued
by the Concessioning Authority certifying completion of Project by the Concessionaire;
Rs. or Rupees refers to the lawful currency of the Republic of India;
Security Interest means any existing or future mortgage, charge (whether fixed or
floating), pledge, lien, hypothecation, assignment, security interest or other
encumbrances of any kind securing or conferring any priority of payment in respect of
any obligation of any Person and includes without limitation any right granted by a
transaction which, in legal terms, is not the granting of security but which has an
economic or financial effect similar to the granting of security in each case under any
Applicable Law.
Site means the Project site measuring 50 acres as given in Schedule 1 of this
Agreement given on lease for a period of 35 years. The Project shall mean the same as
defined in this Agreement.
Request for Proposal Volume II
8
Draft Concession Agreement for Design, Build, Finance, Operation and Transfer International Level Cricket Stadium and Sport Complex in
Lucknow




Standards of Reasonable and Prudent Concessionaire means the standards,
practices, methods and procedures expected from a person seeking in good faith to
perform its contractual obligations and in so doing and in the general conduct of its
undertaking exercising that degree of skill, diligence, prudence and foresight which would
reasonably and ordinarily be expected from a skilled and experienced Person engaged in
the same type of undertaking under the same or similar circumstances and conditions
including the conditions as contemplated by the Basic Documents.
Taxation or Tax means all forms of taxation whether direct or indirect and whether
levied by reference to income, profits, gains, net wealth, asset values, turnover, added
value or other reference and statutory, governmental, state, provincial, local
governmental or municipal impositions, duties, contributions, rates and levies (including
without limitation social security contributions and any other payroll taxes), whenever and
wherever imposed (whether imposed by way of withholding or deduction for or on
account of tax or otherwise) and in respect of any person and all penalties, charges,
costs and interest relating to it;
Third Party Agreements means all Agreements entered into between the
Concessionaire and third Persons, including, but not limited to other Agreements with
Concessionaire and vendors of any goods or services to the Concessionaire.
Termination means the expiry of the Concession period or termination of this
Agreement;
Termination Notice means the communication issued in accordance with this
Agreement by one Party to the other Party terminating this Agreement;
1.2. Interpretation
1.2.1. In this Agreement, unless the context otherwise requires,
(a) references to any legislation or any provision thereof shall include amendment or re-
enactment or consolidation of such legislation or any provision thereof so far as such
amendment or re-enactment or consolidation applies or is capable of applying to any
transaction entered into hereunder;
(b) references to laws of India or Indian law or regulation having the force of law shall
include the laws, acts, ordinances, rules, regulations, bye laws or notifications which
have the force of law in the territory of India and as from time to time may be
amended, modified, supplemented, extended or re-enacted;
(c) references to a person and words denoting a natural person shall be construed as a
reference to any individual, firm, company, corporation, society, trust, government,
state or agency of a state or any association or partnership (whether or not having
separate legal personality) of two or more of the above and shall include successors
and assigns subject to the provisions of this Agreement;
(d) the table of contents, headings or sub-headings in this Agreement are for
convenience of reference only and shall not be used in, and shall not affect, the
construction or interpretation of this Agreement;
Request for Proposal Volume II
9
Draft Concession Agreement for Design, Build, Finance, Operation and Transfer International Level Cricket Stadium and Sport Complex in
Lucknow




(e) the words include and including are to be construed without limitation and shall be
deemed to be followed by without limitation or but not limited to whether or not they
are followed by such phrases;
(f) references to construction include, unless the context otherwise requires,
investigation, design, developing, engineering, procurement, delivery, transportation,
installation, processing, fabrication, testing, commissioning and other activities that
are to be completed on or before Project Completion Date as per the scope of work
as defined under Article 2, and construct shall be construed accordingly;
(g) any reference to any period of time shall mean a reference to that according to Indian
Standard Time;
(h) any reference to day shall mean a reference to a calendar day;
(i) any reference to month shall mean a reference to a calendar month as per the
Gregorian calendar;
(j) references to any date, period or Milestone shall mean and include such date, period
or Milestone as may be extended pursuant to this Agreement;
(k) any reference to any period commencing from a specified day or date and till or
until a specified day or date shall include both such days or dates; provided that if
the last day of any period computed under this Agreement is not a business day, then
the period shall run until the end of the next business day;
(l) the words importing singular shall include plural and vice versa;
(m) references to any gender shall include the other and the neutral gender;
(n) lakh or lac means a hundred thousand (100,000) and crore means ten million
(10,000,000);
(o) references to the winding-up, merger, amalgamation, takeover,
dissolution, insolvency, or reorganization of a company or corporation shall be
construed so as to include any equivalent or analogous proceedings under the law of
the jurisdiction in which such company or corporation is incorporated or any
jurisdiction in which such company or corporation carries on business including the
seeking of liquidation, winding-up, reorganization, dissolution, arrangement,
protection, change in management or relief of debtors;
(p) any reference, at any time, to any Agreement, deed, instrument, license or document
of any description shall be construed as reference to that Agreement, deed,
instrument, license or other document as amended, varied, supplemented, modified
or suspended at the time of such reference; provided that this Sub-clause shall not
operate so as to increase liabilities or obligations of the Concessioning Authority
hereunder or pursuant hereto in any manner whatsoever;
(q) any Agreement, consent, approval, authorization, notice, communication, information
or report required under or pursuant to this Agreement from or by any Party shall be
valid and effective only if it is in writing under the hand of a duly authorized
representative of such Party, as the case may be, in this behalf and not otherwise;
Request for Proposal Volume II
10
Draft Concession Agreement for Design, Build, Finance, Operation and Transfer International Level Cricket Stadium and Sport Complex in
Lucknow




(r) the Schedules and Recitals to this Agreement form an integral part of this Agreement
and will be in full force and effect as though they were expressly set out in the body of
this Agreement;
(s) references to Recitals, Articles, Clauses, Sub-clauses or Schedules in this Agreement
shall, except where the context otherwise requires, mean references to Recitals,
Articles, Clauses, Sub-clauses and Schedules of or to this Agreement, and references
to a Paragraph shall, subject to any contrary indication, be construed as a reference
to a Paragraph of this Agreement or of the Schedule in which such reference
appears; and
(t) the damages payable by either Party to the other of them, as set forth in this
Agreement, whether on per diem basis or otherwise, are mutually agreed genuine
pre-estimated loss and damage likely to be suffered and incurred by the Party
entitled to receive the same and are not by way of penalty (the Damages).
(u) any reference to Build shall mean Construct and vice-versa unless the context
otherwise requires
(v) any reference to Operate/Operations shall mean Operate and Transfer/ Operations &
Maintenance unless the context otherwise requires
1.2.2. Unless expressly provided otherwise in this Agreement, any documentation required to be
provided or furnished by the Concessionaire to the Concessioning Authority and/or the agency or
person appointed by the Concessioning Authority shall be provided free of cost and in two copies,
and if the Concessioning Authority and/or the person appointed by the Concessioning Authority is
required to return any such documentation with their comments and/or approval, they shall be
entitled to retain one copy thereof.
1.2.3. the rule of construction, if any, that a contract should be interpreted against the parties responsible
for the drafting and preparation thereof, shall not apply.
1.2.4. any word or expression used in this Agreement shall, unless otherwise defined or construed in this
Agreement, bear its ordinary English meaning.
1.3. Measurements and Arithmetic Conventions
All measurements and calculations shall be in the metric system and calculations done to
2 (two) decimal places, with the third digit of 5 (five) or above being rounded up and
below 5 (five) being rounded down.
Request for Proposal Volume II
11
Draft Concession Agreement for Design, Build, Finance, Operation and Transfer International Level Cricket Stadium and Sport Complex in
Lucknow




1.4. Priority of Agreements and Errors/Discrepancies
1.4.1. This Agreement, and all other Agreements and documents forming part of this Agreement are to
be taken as mutually explanatory and, unless otherwise expressly provided elsewhere in this
Agreement, the priority of this Agreement and other documents and agreements forming part
hereof shall, in the event of any conflict between them, be in the following order:
(a) this Agreement;
(b) RFP Document
(c) all other agreements and documents forming part hereof;
i.e. the agreement at (a) above shall prevail over the agreements and documents at
(b) and (c) above and (b) shall prevail over all documents in (c) above.
1.4.2. In case of ambiguities or discrepancies within this Agreement, the following shall apply:
(a) between two or more Clauses of this Agreement, the provisions of a specific
Clause relevant to the issue under consideration shall prevail over those in
other Clauses;
(b) between the Clauses of this agreement and the Schedules, the Clauses shall
prevail and between Schedules and Annexes, the Schedules shall prevail;
(c) between the written description on the Drawings and the Specifications and
Standards, the latter shall prevail;
(d) between the dimension scaled from the Drawing and its specific written
dimension, the latter shall prevail; and
(e) between any value written in numerals and that in words, the latter shall prevail.
Request for Proposal Volume II
12

Draft Concession Agreement for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium and Sport Complex in
Lucknow



Request for Proposal Volume II Page 13
Article 2. Scope of the Project
2.1. Scope of the Project
The Concessionaire shall Design, Build, Finance and Operate the Project on the 50 acre Site earmarked for
the purpose given on lease over the concession period of 35 years, after which the Project along with the
land shall be transferred to the Concessioning Authority. The maximum allowable FAR is 0.025 as per the
prevailing Development Control Regulations of LDA.

The Concessionaire shall construct following facilities and get all the approvals for commercial operations
within 24 months from the Effective Date:
A. Minimum Development Obligations
The stadium should be designed for a minimum seating capacity of 50,000 people
Car Parking for minimum 2500 ECS for above essential facilities should be provided
Sports Complex shall have facility and necessary infrastructure for at least 5 different types of games that
shall include badminton, basket ball\ valley ball, lawn tennis and shooting training.
An Olympic size (25 x 50 mt) swimming pool shall be provided within the sports complex
The sports complex should have the seating capacity for 600 viewers
Support facilities and on site infrastructure like internal road network, lamp posts within the plot, fire fighting
system, security cabins, landscaping and other services required for the entire facility.

All the facilities are to be developed as per the minimum quality standards set out for the purpose in the technical
schedule appended as Annexure B with this document.

While undertaking development of the Project, the Successful Bidder shall adhere to latest amended National Building
Code of India, other relevant IS Codes and practices, Development Control Regulations, FAR Limits, statutory
requirements, laws of land, the principles of good industry practices and any other norms as applicable from time to
time.

The successful bidder shall be responsible for all the clearances as may be required for the development and
operations of the project. The project shall be ready for operation after taking all the clearance(s) within 24 months of
the effective date.


Draft Concession Agreement for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium and Sport Complex in
Lucknow



Request for Proposal Volume II Page 14
Article 3. Consideration of the Contract
3.1. The Consideration
3.1.1. Subject to and in accordance with the provisions of this Agreement, the Applicable Laws, rules and
regulations and the Applicable Permits, the Concessioning Authority shall give to the Concessionaire:

-------------------Acres being the total land area to be given by the Concessioning Authority to the
Concessionaire on 90 years lease period adjacent to the Project site.

The land shall be given on lease to the Concessionaire on completion of the following milestone:

Serial
Number
Minimum Development Obligation
(Milestone)
Percentage of land out of -----
acres to be given on 90 years
lease to the Concessionaire
1. Stadium with minimum seating capacity of
50,000 people
50%
2. Sports Complex with seating capacity for
600 viewers with at least 5 different types of
games that shall include badminton, basket
ball\ valley ball, lawn tennis and shooting
training.
30%
3. An Olympic size (25 x 50 mt) swimming pool
shall be provided within the sports complex
10%
4 Car Parking for minimum 2500 ECS for
above essential facilities should be provided.
Support facilities and on site infrastructure
like internal road network, lamp posts within
the plot, fire fighting system, security cabins,
landscaping and other services required for
the entire facility.
10%

The Concessioning Authority shall assure the conversion of land usage for commercial purpose before
the handover of the land. The conversion charges shall be borne by the Concessioning Authority. The
maximum allowable FAR is 2.5 as per the prevailing Development Control Regulations of LDA. The
Concessioning Authority or its authorized representative shall satisfy himself of the successful
completion of each of the Milestone given above and then the Concessioning Authority shall provide
peaceful possession of the land adjacent to the Project Site within 15 days of the completion of the each
of Milestone as provided in the table above. The 90 years of lease period for the land shall start from the
date of the handover of the land to the Concessionaire by the Concessioning Authority. Each time a
separate lease deed shall be executed at the time of handover of the land to the Concessionaire.


Draft Concession Agreement for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium and Sport Complex in
Lucknow



Request for Proposal Volume II Page 15
3.1.2. Subject to and in accordance with the provisions of this Agreement, the Consideration hereby given by
Concessionaire, the Concessionaire shall be entitled to Construct and operate the Project on the land area
given on Concession period of 35 year, subject to :
(a) performing and fulfilling all of the Concessionaires obligations under and in accordance with this
Agreement; and
(b) bear and pay all costs, expenses and charges in connection with or incidental to the performance of the
obligations of the Concessionaire under this Agreement; and
(c) At the end of the concession period, the entire construction made by the Concessionaire till that date on
the Project site as part of the scope of work shall get transferred without any consideration to the
Concessioning Authority.
3.1.3. In consideration of the mutual covenants and other good and valuable consideration expressed herein, the
Concessionaire hereby accepts the Consideration to be given and agrees to construct and operate the
Project on land given for 35 year Concession period as per the scope of work given in Article 2 and minimum
specifications mentioned in the technical schedules and to perform/discharge all of its obligations in
accordance with the provisions hereof.

3.1.4. The Concessionaire shall pay to the Concessioning Authority a yearly token lease rental of Rs 1/- (Rupees
One Only) per acre of land (on 50 acres earmarked for International Level Cricket Stadium cum Sports
complex) for the entire concession period of 35 years.


Draft Concession Agreement for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium and Sport Complex in
Lucknow



Request for Proposal Volume II Page 16



Draft Concession Agreement for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium and Sport Complex in
Lucknow



Request for Proposal Volume II Page 17
Article 4. Conditions Precedent to the Agreement
4.1. Conditions Precedent
4.1.1. The respective rights and obligations of the Parties under this Agreement shall be subject to the satisfaction
in full of the conditions precedent specified in this Clause 4.1 (the Conditions Precedent).
4.1.2. The Concessionaire may, upon providing the Performance Security to the Concessioning Authority in
accordance with Article 9, by notice require the Concessioning Authority to satisfy the Conditions Precedent
set forth in this Clause 4.1.2 within a period of 30 (thirty) days of the notice, and the obligations of the
Concessioning Authority hereunder shall be deemed to have been performed when the Concessioning
Authority shall have procured for the Concessionaire the peaceful possession of the Site as demarcated
under Schedule 1;
4.1.3. Concessionaire shall satisfy the Conditions Precedent at any time within 30 (thirty) days from the date the
Concessioning Authority has given the Letter of Intent for the appointment of the Concessionaire and all the
Conditions Precedent shall be deemed to have been fulfilled when the Concessionaire shall have
(a) provided Performance Security to the Concessioning Authority; and
(b) Delivered to the Concessioning Authority a legal opinion from the legal counsel of the
Concessionaire with respect to the authority of the Concessionaire to enter into this
Agreement and the enforceability of the provisions thereof
(c) The members of the Consortium must form a Special Purpose Vehicle (SPV) and submit an
MoU for the purpose of Special Purpose Vehicle.
4.2. Compliance Certificate
Upon compliance with the Conditions Precedent, each Party shall forthwith issue a Compliance
Certificate pursuant to which the obligations of the Parties under this Agreement shall commence.
4.3. Non-Fulfillment of the Conditions Precedent
4.3.1. In the event of failure by any Party to procure compliance with any of the Conditions Precedent as per the
provisions of this Article 4 and the other Party have not waived any of the conditions (partially or absolutely),
the Agreement shall cease to have any effect as of that date.
4.3.2. In the event of the Agreement not coming into effect on account of the Concessionaire not fulfilling the
Conditions Precedent then the Concessionaire shall forfeit the Earnest Money Deposit and the Performance
Security.



Draft Concession Agreement for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium and Sport Complex in
Lucknow



Request for Proposal Volume II Page 18
4.3.3. In the event of the Agreement not coming into effect on account of the Concessioning Authority not fulfilling
any of the Conditions Precedent then the Earnest Money Deposit and the Performance Security shall be
returned to the Concessionaire.
4.3.4. Notwithstanding anything contained in this clause, the Parties may mutually decide to extend the time period
for the fulfillment of the Conditions Precedent.





Draft Concession Agreement for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium and Sport Complex in
Lucknow



Request for Proposal Volume II Page 19
Article 5. Obligations of the Concessionaire

5.1. Obligations of the Concessionaire
5.1.1. Subject to and on the terms and conditions of this Agreement, the Concessionaire shall at its cost and
expense procure finance for and undertake the Project scope of work as mentioned in Article 2 and observe,
fulfill, comply with and perform all its obligations set out in this Agreement or arising hereunder.
5.1.2. The Concessionaire shall comply with all Applicable Laws in the performance of its obligations under this
Agreement.
5.1.3. Without prejudice to Clauses 5.1.1 and 5.1.2 above, the Concessionaire shall discharge its obligations as per
the National Building Code, Development Control Rules, the principles of good industry practice and as a
reasonable and prudent person, statutory requirements, laws of the land and any other norms, which are
applicable from time to time.
5.1.4. The Concessionaire shall get prior approval of the Concessioning Authority in case there is any change in the
facilities defined under the Project during the concession period.
5.1.5. The Stadium as mentioned in Article 2 shall be used for the purpose of sports activities only. Any other
usages of the Stadium shall not be permitted during the concession period without prior approval of the
Concessioning Authority.
5.1.6. On the ---------- acres of land given as Consideration to the Concessionaire as given in Article 3 of this
Agreement, the Concessionaire shall not create any third party rights, shall not give the said land on lease
and any other encumbrances till the Concessionaire obtains Completion Certificate for the Project from the
Concessioning Authority.
5.1.7. Without prejudice to Clauses 5.1.1 and 5.1.2 above the Concessionaire shall, at its own cost and expense
observe, undertake, comply with and perform, in addition to and not in derogation of, its obligations
elsewhere set out in this Agreement, the following:
(a) make, or cause to be made, necessary applications to the relevant Governmental Agencies
with such particulars and details, as may be required for obtaining all Applicable Permits
and obtain such Applicable Permits in conformity with the Applicable Laws;
(b) procure, as required, the appropriate proprietary rights, licences, agreements and
permissions for materials, methods, processes and systems used or incorporated into
development and operations of the Project;
(c) not to damage any other infrastructure or any other utility developed by the Concessioning
Authority or any other utilities developed and maintained by any other authority or person
and in case of any such damage to undertake the repair and also to pay for any losses that
is incurred by the Concessioning Authority or any authority or any other person, as the case
may be.


Draft Concession Agreement for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium and Sport Complex in
Lucknow



Request for Proposal Volume II Page 20
(d) ensure and procure that the Concessionaire shall comply with all Applicable Permits and
Applicable Laws in the performance by them of any of the Concessionaires obligations
under this Agreement;
(e) not to do or omit to do any act, deed or thing which may in any manner be violative of any of
the provisions of this Agreement;
(f) not to create any third party rights, except for the purpose of borrowing from banks, on the
land given on Concession for 35 years. But also to ensure that Government of
UP/Concessioning Authority are not adversely affected in any way;
(g) shall make payment towards the Concessioning Authority as per provisions of this
Agreement;
(h) Procure at its own costs, expenses and risk all services necessary for the construction and
operations of the Project including without limitation electricity, water, materials and labour;
(i) shall ensure reservation in matters of employment as per applicable Government of UP
policies
(j) shall complete construction of the Project and get necessary approvals for commercial
operations within a period of 24 months from the Effective Date; and
(k) transfer the Project site on the date of termination of Concession to the Concessioning
Authority.
5.2. Obligations relating to Other Agreements
5.2.1. It is expressly agreed that the Concessionaire shall, at all times, be responsible and liable for all its
obligations under this Agreement notwithstanding anything contained in any other agreement, and no default
under any agreement shall excuse the Concessionaire from its obligations or liability hereunder.
5.2.2. The Concessionaire may undertake development of Project by itself or through one or more
contractors possessing requisite technical, financial and managerial expertise/capability; but in
either case, the Concessionaire shall remain solely responsible to meet the scope of work as
mentioned under Article 2.1.
5.3. Obligations relating to Change in Ownership

The Concessionaire shall not undertake or permit any Change in Ownership, except with the prior written
approval of the Concessioning Authority as per the provisions of this Article 5.3.
5.3.1. No change in Consortium Members shall be allowed till the completion of the Project or a minimum
of 3 years from the date of signing of the Concession Agreement (whichever is later). However, the
Lead Consortium Member shall not be allowed to be changed over the entire Concession Period
and shall continue to hold 51% stake in the Consortium till the end of Concession Period.



Draft Concession Agreement for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium and Sport Complex in
Lucknow



Request for Proposal Volume II Page 21
5.3.2. Each Consortium Member shall invest minimum 11% stake in SPV. None of the Consortium Member
shall be allowed to dilute its stake till the completion of the Project or a minimum of 3 years from the
date of signing of the Concession Agreement (whichever is later).
5.3.3. Lead Consortium Member shall invest minimum 51% stake in the SPV. Lead Consortium Member
shall not be allowed to dilute its stake to a level below 51% upto the end of Concession Period.
However, in case the Lead Consortium Member holds more than 51% stake in the Consortium, it
may be allowed to dilute its stake in a manner such that it does not fall to a level below 51% only if it
is equal and better replacement but yet it will be under the discretion of the Concessioning Authority
and such dilution in stake shall not be allowed till the completion of the Project or a minimum of 3
years from the date of signing of the Concession Agreement whichever is later. This holds for the
single entity bidder also and hence no bidder who has 100% equity in the Project can dilute it to a
level below 51% upto the end of the Concession Period. Remaining stake can be diluted as per the
provisions of Clause 5.3.3.



Draft Concession Agreement for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium and Sport Complex in
Lucknow



Request for Proposal Volume II Page 22
Article 6. Obligations of the Concessioning Authority
6.1. Obligations of the Concessioning Authority
6.1.1. The Concessioning Authority shall, at its own cost and expense, undertake, comply with and perform all its
obligations set out in this Agreement or arising hereunder.
6.1.2. The Concessioning Authority agrees to provide support to the Concessionaire and undertakes to observe,
comply with and perform, subject to and in accordance with the provisions of this Agreement and the
Applicable Laws, the following:
(a) upon written request from the Concessionaire, and subject to the Concessionaire complying
with Applicable Laws, provide all reasonable support and assistance to the Concessionaire
in procuring Applicable Permits required from any Government Instrumentality for
implementation and operation of the Project;
(b) upon written request from the Concessionaire, assist the Concessionaire in obtaining
access to all necessary infrastructure facilities and utilities, including water at rates and on
terms no less favourable to the Concessionaire than those generally available to
commercial customers receiving substantially equivalent services;
(c) extend the assistance of its good offices on a reasonable effort basis to assist the
Concessionaire in the provision of electricity;
(d) procure that no barriers are erected or placed on the Project site or the way towards the
Project site by the Concessioning Authority, by any Government Instrumentality or persons
claiming through or under it, except for reasons of Emergency or national security, law;
(e) assist the Concessionaire in procuring Police assistance for regulation of movement of any
person on the Project site, removal of trespassers and for security of the material, labour
and machinery;
(f) not to do or omit to do any act, deed or thing which may in any manner be violative of any of
the provisions of this Agreement; and
(g) support, cooperate with and facilitate the Concessionaire in the implementation of the
Project.


Draft Concession Agreement for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium and Sport Complex in
Lucknow



Request for Proposal Volume II Page 23

Article 7. Representations and Warranties
7.1. Representations and Warranties of the Concessionaire
The Concessionaire represents and warrants to the Concessioning Authority that:
(a) it is duly organized and validly existing under the laws of India, and has full power and
authority to execute and perform its obligations under this Agreement and to carry out the
transactions contemplated hereby;
(b) it has taken all necessary corporate and other actions under Applicable Laws to authorize
the execution and delivery of this Agreement and to validly exercise its rights and perform
its obligations under this Agreement;
(c) it has the financial standing and capacity to undertake the Project in accordance with the
terms of this Agreement;
(d) this Agreement constitutes its legal, valid and binding obligation, enforceable against it in
accordance with the terms hereof, and its obligations under this Agreement will be legally
valid, binding and enforceable obligations against it in accordance with the terms hereof;
(e) it is subject to the laws of India, and hereby expressly and irrevocably waives any immunity
in any jurisdiction in respect of this Agreement or matters arising there under including any
obligation, liability or responsibility hereunder;
(f) the information furnished in the Bid and as updated on or before the date of this Agreement
is true and accurate in all respects as on the date of this Agreement;
(g) the execution, delivery and performance of this Agreement will not conflict with, result in the
breach of, constitute a default under, or accelerate performance required by any of the
terms of its Memorandum and Articles of Association or any Applicable Laws or any
covenant, contract, agreement, arrangement, understanding, decree or order to which it is a
party or by which it or any of its properties or assets is bound or affected;
(h) there are no actions, suits, proceedings, or investigations pending or, to its knowledge,
threatened against it at law or in equity before any court or before any other judicial, quasi-
judicial or other authority, the outcome of which may result in the breach of this Agreement
or which individually or in the aggregate may result in any material impairment of its ability
to perform any of its obligations under this Agreement;
(i) it has no knowledge of any violation or default with respect to any order, writ, injunction or
decree of any court or any legally binding order of any Government Instrumentality which
may result in any material adverse effect on its ability to perform its obligations under this
Agreement and no fact or circumstance exists which may give rise to such proceedings that
would adversely affect the performance of its obligations under this Agreement;
(j) it has complied with Applicable Laws in all material respects and has not been subject to
any fines, penalties, injunctive relief or any other civil or criminal liabilities which in the
aggregate have or may have a material adverse effect on its ability to perform its obligations
under this Agreement;
(k) the existing Lead Consortium Members hold not less than 51% (fifty one percent) of its
issued and paid up Equity and together with the existing consortium member hold not less
than 100% as on the date of this Agreement and the respective holding of each Consortium


Draft Concession Agreement for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium and Sport Complex in
Lucknow



Request for Proposal Volume II Page 24
Member conforms to the representation made by the Consortium and accepted by the
Concessioning Authority as part of the Bid and that no member of the Consortium shall hold
less than 11% (eleven per cent) of such as per the provisions of Article 5.3;
(l) no order has been made and no resolution has been passed for the winding up of the
Concessionaire or for a provisional liquidator to be appointed in respect of the
Concessionaire and no petition has been presented and no meeting has been convened for
the purpose of winding up the Concessionaire. No receiver has been appointed in respect of
the Concessionaire or all or any of its assets. The Concessionaire is not insolvent or unable
to pay its debts as they fall due.
(m) no representation or warranty by it contained herein or in any other document furnished by it
to the Concessioning Authority or to any Government Instrumentality in relation to
Applicable Permits contains or will contain any untrue statement of material fact or omits or
will omit to state a material fact necessary to make such representation or warranty not
misleading; and
(n) no sums, in cash or kind, have been paid or will be paid, by it or on its behalf, to any person
by way of fees, commission or otherwise for securing the grant of land or entering into this
Agreement or for influencing or attempting to influence any officer or employee of the
Concessioning Authority in connection therewith.
7.2. Representations and Warranties of the Concessioning Authority
The Concessioning Authority represents and warrants to the Concessionaire that:
(a) it has full power and authority to execute, deliver and perform its obligations under this
Agreement and to carry out the transactions contemplated herein and that it has taken all
actions necessary to execute this Agreement, exercise its rights and perform its obligations,
under this Agreement;
(b) it has taken all necessary action under the Applicable Laws to authorise the execution,
delivery and performance of this Agreement;
(c) it has the financial standing and capacity to perform its obligations under the Agreement;
(d) this Agreement constitutes a legal, valid and binding obligation enforceable against it in
accordance with the terms hereof;
(e) there are no actions, suits or proceedings pending or, to its knowledge, threatened against it
at law or in equity before any court or before any other judicial, quasi-judicial or other
authority, the outcome of which may result in the default or breach of this Agreement or
which individually or in the aggregate may result in any material impairment of its ability to
perform its obligations under this Agreement;
(f) it has no knowledge of any violation or default with respect to any order, writ, injunction or
any decree of any court or any legally binding order of any Government Instrumentality
which may result in any material adverse effect on the Concessionaires ability to perform its
obligations under this Agreement;
(g) it has complied with Applicable Laws in all material respects;
(h) it has not entered into any other Agreement, contract, transaction, arrangement or
understanding in relation to the same Project or part of the Project with any third party, or
the sale, Concession assignment, or other disposition in whole or in part in respect of the
said land other than the disclosed in this Agreement;


Draft Concession Agreement for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium and Sport Complex in
Lucknow



Request for Proposal Volume II Page 25
(i) all information provided by it in the Tender Notice and invitation to bid in connection with the
Project is, to the best of its knowledge and belief, true and accurate in all material respects;
(j) it has good and valid right for construction of the Project, and has power and authority to
give land on 35 years Concession to the Concessionaire; and
(k) upon the Concessionaire completing the Project as per this Agreement, and performing the
covenants herein, it shall not at any time during the 35 years Concession, interfere with
peaceful enjoyment of the land by the Concessionaire, except in accordance with the
provisions of this Agreement.
7.3. Disclosure
In the event that any occurrence or circumstance comes to the attention of either Party that renders
any of its aforesaid representations or warranties untrue or incorrect, such Party shall immediately
notify the other Party of the same. Such notification shall not have the effect of remedying any
breach of the representation or warranty that has been found to be untrue or incorrect nor shall it
adversely affect or waive any obligation of either Party under this Agreement.



Draft Concession Agreement for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium and Sport Complex in
Lucknow



Request for Proposal Volume II Page 26

Article 8. Disclaimer
8.1. Disclaimer
8.1.1. The Concessionaire acknowledges that prior to the execution of this Agreement, the Concessionaire has,
after a complete and careful examination, made an independent evaluation of the Tender Notice, Scope of
the services to be provided, Project site, Specifications and Standards set for providing quality of services,
local conditions, possible demand and all information provided by the Concessioning Authority, and has
determined to its satisfaction the accuracy or otherwise thereof and the nature and extent of difficulties, risks
and hazards as are likely to arise or may be faced by it in the course of performance of its obligations
hereunder. Save as provided in Clause 7.2, the Concessioning Authority makes no representation
whatsoever, express, implicit or otherwise, regarding the accuracy and/or completeness of the information
provided by it and the Concessionaire confirms that it shall have no claim whatsoever against the
Concessioning Authority in this regard.
8.1.2. The Concessionaire acknowledges and hereby accepts the risk of inadequacy, mistake or error in or relating
to any of the matters set forth in Clause 8.1.1 above and hereby acknowledges and agrees that the
Concessioning Authority shall not be liable for the same in any manner whatsoever to the Concessionaire or
any person claiming through or under this Agreement.


Draft Concession Agreement for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium and Sport Complex in
Lucknow



Request for Proposal Volume II Page 27

Article 9. Performance Security
9.1. Performance Security
The Concessionaire has submitted to the Concessioning Authority Performance Guarantee of Rs.
15, 65, 00,000 (Rupees Fifteen Crores Sixty Five Lakh Only) in the form of a Bank Guarantee in
favor of Lucknow Development Authority, payable at Lucknow; the details of which are given below:
The Performance Security shall be valid for a period of twelve months and shall be renewed every
year, at least 30 days prior to the last date. All charges, fees, costs and expenses related to the
Bank Guarantee shall be borne and paid by the Concessionaire. The Concessionaire undertakes
and warrants to Concessioning Authority that the bank guarantee furnished as above shall be
irrevocable and shall continue to be effective and enforceable six months beyond the period of six
months from the date of the expiry of the Concession Period.
9.2. Appropriation of Performance Security
Upon occurrence of a Concessionaire Default, the Concessioning Authority shall, without prejudice
to its other rights and remedies hereunder or in law, be entitled to invoke and appropriate the
relevant amounts from the Performance Security as Damages for such Concessionaire Default.
Upon such invocation and appropriation from the Performance Security, the Concessionaire shall,
within 15 (fifteen) days thereof, replenish, in case of partial appropriation, the Performance Security
to its original level, and in case of appropriation of the entire Performance Security provide a fresh
Performance Security, as the case may be, and the Concessionaire shall, within the time so
granted, replenish or furnish fresh Performance Security as aforesaid failing which the
Concessioning Authority shall be entitled to terminate this Agreement in accordance with Article 13.

9.3. Release of Performance Security
The Performance Security in the form of bank guarantee shall remain in force and effect beyond
the period of six months from the date of the expiry of the Concession Period. It shall be duly
discharged and released to the Concessionaire beyond the period of six months from the date of
expiry of the Concession Period and transfer of the Project along with the land to LDA.

The performance security in the form of bank guarantee shall be renewed every year till the end of
the Concession Period and transfer of the Project along with the land to LDA. If the Agreement is
terminated due to any event other than a Concessionaire Event of Default, the Performance
Security shall, subject to the Concessioning Authoritys right to receive or recover amounts, if any,
due from the Concessionaire under this Agreement, be duly discharged and released to the
Concessionaire.




Draft Concession Agreement for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium and Sport Complex in
Lucknow



Request for Proposal Volume II Page 28

Article 10. Access on Project Site
10.1. Project Site
The Project site shall comprise of the land as described in Schedule- 1 and which shall be given on
Concession by the Concessioning Authority to the Concessionaire for 35 years.
10.1.1. The Concessioning Authority on providing the performance security and signing this Agreement,
shall within 15 days, give on Concession to the Concessionaire, the Project site for 35 years for the Scope of
the Project as mentioned in Article 2.
10.1.2. It is being expressly agreed and understood that the Concessioning Authority shall have no liability
whatsoever in respect of survey and investigations carried out or work undertaken by the Concessionaire
pursuant hereto in the event of Termination or otherwise.
10.1.3. It is expressly agreed that the rights granted hereunder shall terminate automatically and forthwith,
without the need for any action to be taken by the Concessioning Authority to terminate the rights, upon the
Termination of this Agreement for any reason whatsoever.
10.1.4. It is expressly agreed that mining rights do not form part of the rights granted to the Concessionaire
under this Agreement and the Concessionaire hereby acknowledges that it shall not have any mining rights
or any interest in the underlying minerals on or under the area where cable have been laid. For the avoidance
of doubt, mining rights mean the right to mine any and all minerals or interest therein.

10.2. Others
10.2.1. Access to the Concessioning Authority and any person appointed as the Engineers / consultants
appointed by Concessioning Authority
The right of way granted for construction on the Project site shall always be subject to the right of access of
the person appointed by the Concessioning Authority for inspection, viewing and exercise of their rights
and performance of their obligations under this Agreement.
10.2.2. Special/temporary right of way
The Concessionaire shall bear all costs and charges for any special or temporary right of way
required by it in connection with access to the Project Site. The Concessionaire shall obtain at its
cost such facilities on or outside the Site as may be required by it for the purposes of the
Construction and the performance of its obligations under this Agreement.


Draft Concession Agreement for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium and Sport Complex in
Lucknow



Request for Proposal Volume II Page 29

Article 11. Construction on the Project Site
11.1. Obligations prior to the commencement of any work
Prior to commencement of any work, the Concessionaire shall:
(a) submit to the Concessioning Authority time schedule for completion;
(b) appoint its representative duly authorised to deal with the Concessioning Authority in
respect of all matters under or arising out of or relating to this Agreement;
(c) Undertake, do and perform all such acts, deeds and things as may be necessary or required
before commencement of any work under and in accordance with this Agreement, the
Applicable Laws and Applicable Permits; and
(d) Procure all such approvals/consents/permits as necessary as per applicable laws
11.2. Project Start and Completion date
11.2.1. On or after the Effective Date, the Concessionaire shall undertake construction of Project. The 24
th

Month from the Effective Date shall be the scheduled date for completion of the Project and the
Concessionaire agrees and undertakes that Project shall be completed on or before the Scheduled Date.
11.2.2. In the event that Project is not completed by the Scheduled Completion Date, unless the delay is on
account of reasons solely attributable to the Concessioning Authority or due to Force Majeure, the
Concessioning Authority shall encash 10% of the Performance Security amount per month, for a maximum
period of six months after which Concessioning Authority shall be entitled to terminate this Agreement. . The
Performance Security shall be replenished by the Concessionaire as soon the Performance Security is
encashed by the Concessioning Authority.
11.3. Completion Certificate
The Concessionaire after completion of the Project shall inform in writing to the Concessioning
Authority that it has completed the construction as per Project scope. The Concessioning Authority
shall issue the Completion Certificate, after which the Concessionaire can start the commercial
operations.




Draft Concession Agreement for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium and Sport Complex in
Lucknow



Request for Proposal Volume II Page 30

Article 12. Force Majeure
12.1. Force Majeure
As used in this Agreement, the expression Force Majeure or Force Majeure Event shall mean
occurrence in India of any or all of events, as defined in Clause 12.2, if it affects the performance by
the Party claiming the benefit of Force Majeure (the Affected Party) of its obligations under this
Agreement and which act or event (i) is beyond the reasonable control of the Affected Party, and (ii)
the Affected Party could not have prevented or overcome by exercise of due diligence and following
Good Industry Practice, and (iii) has Material Adverse Effect on the Affected Party.
12.2. Force Majeure Events
A Force Majeure Event shall mean one or more of the following acts or events:
(a) act of God, plague, lightning, earthquake, landslide, cyclone, flood, volcanic eruption,
radioactive contamination;
(b) an act of war (whether declared or undeclared), invasion, armed conflict or act of foreign
enemy)
(c) any failure of another service provider to the extent caused by any of the Force Majeure
Event mentioned above affecting the performance of the Agreement;
(d) any event or circumstances of a nature analogous to any of the foregoing;
12.3. Duty to Report Force Majeure Event
Upon occurrence of a Force Majeure Event, the Affected Party shall by notice report such
occurrence to the other Party forthwith. Any notice pursuant hereto shall include full particulars of:
(a) the nature and extent of each Force Majeure Event with evidence in support thereof;
(b) the estimated duration and the effect or probable effect which such Force Majeure Event is
having or will have on the Affected Partys performance of its obligations under this
Agreement;
(c) the measures which the Affected Party is taking or proposes to take for alleviating the
impact of such Force Majeure Event; and
(d) any other information relevant to the Affected Partys claim.
The Affected Party shall not be entitled to any relief under the Agreement for or in respect of a
Force Majeure Event unless it shall have notified the other Party of the occurrence of the Force
Majeure Event as soon as reasonably practicable, and in any event not later than 24 (twenty four)
hours after the Affected Party knew, or ought reasonably to have known, of its occurrence, and
shall have given particulars of the probable material effect that the Force Majeure Event is likely to
have on the performance of its obligations under this Agreement.
12.4. Effect of Force Majeure Event
Upon the occurrence of any Force Majeure Event the period set forth for the Project Completion
Date shall be extended by a period equal in length to the duration of the Force Majeure Event.



Draft Concession Agreement for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium and Sport Complex in
Lucknow



Request for Proposal Volume II Page 31
12.5. Allocation of Costs Arising out of Force Majeure
Upon occurrence of any Force Majeure Event, the Parties shall bear their respective costs and no
Party shall be required to pay to the other Party any costs thereof. Neither Party shall be liable in
any manner whatsoever to the other Party in respect of any loss, damage, cost, expense, claims,
demands and proceedings relating to or arising out of occurrence or existence of any Force
Majeure Event or exercise of any right pursuant hereto.
12.6. Dispute Resolution
In the event that the Parties are unable to agree in good faith about the occurrence or existence of
a Force Majeure Event, such Dispute shall be finally settled in accordance with the Dispute
Resolution Procedure as mentioned in Article 15; provided that the burden of proof as to the
occurrence or existence of such Force Majeure Event shall be upon the Party claiming relief and/or
excuse on account of such Force Majeure Event.



Draft Concession Agreement for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium and Sport Complex in
Lucknow



Request for Proposal Volume II Page 32

Article 13. Termination
13.1. Termination for Concessionaire Default
Save as otherwise provided in this Agreement, in the event that any of the defaults specified below
shall have occurred, and the Concessionaire fails to cure the default within the Cure Period set
forth below, or where no Cure Period is specified, then within a Cure Period of 15 (fifteen) days, the
Concessionaire shall be deemed to be in default of this Agreement (a Concessionaire Default),
unless the default has occurred solely as a result of any breach of this Agreement by the
Concessioning Authority or due to Force Majeure event. The defaults referred to herein shall
include:
(a) the Performance Security has been partially or fully invoked and appropriated by the
Concessioning Authority as per the Concession Agreement and the Concessionaire fails to
replenish or provide fresh Performance Security within a Cure Period of 15 (fifteen) days;
(b) the Concessionaire does not make payment to the Concessioning Authority and remains in
default for a period of more than 15 days from the due date of payment;
(c) the Concessionaire does not complete the Project as per the date mentioned in the
Agreement and continues to be in default for 180 (One Hundred and Eighty) days;
(d) the Concessionaire does not construct and operate any of the items mentioned in the scope
of work;
(e) the Concessionaire abandons or manifests intention to abandon the Project without prior
written consent of the Concessioning Authority;
(f) the Concessionaire has failed to make any payment towards damages to any user or any
utility within the period specified in this Agreement;
(g) the Concessionaire repudiates this Agreement or otherwise takes any action or evidences
or conveys an intention not to be bound by the Agreement;
(h) Change in management control of the Concessionaire Company which according to the
Concessioning Authority may have material adverse effect towards the completion of the
Project.
(i) the Concessionaire is adjudged bankrupt or insolvent, or if a trustee or receiver is appointed
for the Concessionaire or for the whole or material part of its assets at any time before the
Scheduled Project Completion Date;
(j) the Concessionaire has been, or is in the process of being liquidated, dissolved, wound-up,
amalgamated or reconstituted in a manner that would cause, in the reasonable opinion of
the Concessioning Authority, a Material Adverse Effect;
(k) a resolution for winding up of the Concessionaire is passed, or any petition for winding up of
the Concessionaire is admitted by a court of competent jurisdiction and a provisional
liquidator or receiver is appointed and such order has not been set aside within 90 (ninety)
days of the date thereof or the Concessionaire is ordered to be wound up by Court;
(l) the Concessionaire has failed to fulfill any obligation, for which failure Termination has been
specified in this Agreement; or


Draft Concession Agreement for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium and Sport Complex in
Lucknow



Request for Proposal Volume II Page 33
(m) the Concessionaire commits a material default in complying with any other provision of this
Agreement.
(n) On --------- acres of land given as Consideration to the Concessionaire as given in Article 3
of this Agreement, the Concessionaire create any third party rights; give the said land on
lease and any other encumbrances before the Concessionaire obtains Completion
Certificate for the Project from the Concessioning Authority.
13.2. Procedure to issue Termination Notice
Without prejudice to any other rights or remedies which the Concessioning Authority may have
under this Agreement, upon occurrence of a Concessionaire Default, the Concessioning Authority
shall be entitled to terminate this Agreement by issuing a Termination Notice to the Concessionaire;
provided that before issuing the Termination Notice, the Concessioning Authority shall by a notice
inform the Concessionaire of its intention to issue such Termination Notice and grant 15 (fifteen)
days to the Concessionaire to make a representation, and may after the expiry of such 15 (fifteen)
days, whether or not it is in receipt of such representation, issue the Termination Notice.
13.3. Effect of Termination
Upon Termination as per article 13.1, the Concessionaire hereby acknowledges that no
Termination Payment shall be due or payable by the Concessioning Authority. Concessionaire
acknowledges that within 10 days of termination, the Concessionaire vacates the Project site.
Concessionaire acknowledges that once the agreement is terminated the land allocated shall be
returned back to the Concessioning Authority. In such case, the lease deed will stand cancelled
ipso facto and land is returned back to the Concessioning Authority automatically. The entire
construction made by the Concessionaire till that date on the Project site as part of the scope of
work shall get transferred without any consideration to the Concessioning Authority. Concessioning
Authority at its own discretion may repay the consideration already paid by the Concessionaire after
adjusting for any direct or indirect losses that Concessioning Authority might have incurred due to
delay in completion of the Project. No liability with respect to the land or assets shall devolve on
Concessioning Authority.
13.4. Other Rights and Obligations of the Concessioning Authority
Upon Termination for any reason whatsoever, the Concessioning Authority shall:
(a) be deemed to have taken possession and control of the Project site and any construction
made on such site till the date of termination;
(b) take possession and control of all materials, stores, implements and construction on or
about the Project;
(c) be entitled to restrain the Concessionaire and any person claiming through or under the
Concessionaire from entering upon the Project Site or any part of the Project; and
(d) Invoke the Performance Security as part Damages.
In case termination is done by the Concessioning Authority not because of the default of the
Concessionaire, then in such condition the Concessioning Authority will pay for all the financial loses
incurred by the Concessionaire and the quantum of the financial losses will be decided by the
Arbitrator as per Clause 15.3.




Draft Concession Agreement for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium and Sport Complex in
Lucknow



Request for Proposal Volume II Page 34




Draft Concession Agreement for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium and Sport Complex in
Lucknow



Request for Proposal Volume II Page 35
Article 14. Liability and Indemnity

14.1. General indemnity
The Concessionaire will indemnify, defend, save and hold harmless the Concessioning Authority
and its officers, employees, agents and consultants against any and all suits, proceedings, actions,
demands and third party claims for any loss, damage, cost and expense of whatever kind and
nature arising out of any breach by the Concessionaire of any of its obligations under this
Agreement or any related Agreement, except to the extent that any such suits, proceedings,
actions, demands and claims have arisen due to any negligent act or omission, or breach of this
Agreement on the part of the Concessioning Authority indemnified persons.
14.2. Liability of Concessioning Authority
The Concessioning Authority will indemnify, defend, save and hold harmless the Concessionaire
against any and all suits, proceedings, actions, demands and third party claims for any loss,
damage, cost and expense of whatever kind and nature arising out of
(a) defect in title and/or the rights of the Concessioning Authority in the land given on
Concession to the Concessionaire
(b) breach by the Concessioning Authority of any of its obligations under this Agreement or any
related Agreement, which materially and adversely affect the performance by the
Concessionaire of its obligations under this Agreement, save and except that where any
such claim, suit, proceeding, action, and/or demand has arisen due to a negligent act or
omission, or breach of any of its obligations under any provision of this Agreement or any
related Agreement and/or breach of its statutory duty on the part of the Concessionaire, its
subsidiaries, affiliates, contractors, employees or agents and the same shall be the liability
of the Concessionaire.
14.3. Indemnity by the Concessionaire
Without limiting the generality of Clause 14.1, the Concessionaire shall fully indemnify, hold
harmless and defend the Concessioning Authority from and against any and all loss and/or
damages arising out of or with respect to:
(a) failure of the Concessionaire to comply with Applicable Laws and Applicable Permits;
(b) payment of taxes required to be made by the Concessionaire in respect of the income or
other taxes of the Concessionaires contractors, suppliers and representatives; or
(c) non-payment of amounts due as a result of materials or services furnished to the
Concessionaire or any of its contractors which are payable by the Concessionaire or any of
its contractors.
(d) Breach by the Concessionaire of any of the obligations under this Agreement.


Draft Concession Agreement for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium and Sport Complex in
Lucknow



Request for Proposal Volume II Page 36
14.4. No consequential claims
Notwithstanding anything to the contrary contained in this Article 14, the indemnities herein provided
shall not include any claim or recovery in respect of any cost, expense, loss or damage of an
indirect, incidental or consequential nature, including loss of profit, except as expressly provided in
this Agreement.
14.5. Survival on Termination
The provisions of this Article 14 shall survive Termination.


Draft Concession Agreement for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium and Sport Complex in
Lucknow



Request for Proposal Volume II Page 37

Article 15. Dispute Resolution
15.1. Dispute resolution
15.1.1. Any dispute, difference or controversy of whatever nature howsoever arising under or out of or in
relation to this Agreement (including its interpretation) between the Parties, and so notified in writing by either
Party to the other Party (the Dispute) shall, in the first instance, be attempted to be resolved amicably in
accordance with the conciliation procedure set forth in Clause 15.2.
15.1.2. The Parties agree to use their best efforts for resolving all Disputes arising under or in respect of this
Agreement promptly, equitably and in good faith, and further agree to provide each other with reasonable
access during normal business hours to all non-privileged records, information and data pertaining to any
Dispute.
15.2. Conciliation
In the event of any Dispute between the Parties, either Party may call upon the Vice Chairman of
the Concessioning Authority to mediate and assist the Parties in arriving at an amicable settlement
thereof. Failing mediation by the Vice Chairman of the Concessioning Authority within 7 (seven)
days from the date of reference to discuss and attempt to amicably resolve the Dispute , either
Party may require such Dispute to be referred to the Principle Secretary, Housing for amicable
settlement. If the Dispute is not resolved as evidenced by the signing of written terms of settlement
within 30 (thirty) days of the notice in writing referred to in Clause 15.1.1 or such longer period as
may be mutually agreed by the Parties, either Party may refer the Dispute to arbitration in
accordance with the provisions of Clause 15.3.
15.3. Arbitration
15.3.1. Any Dispute which is not resolved amicably by conciliation, as provided in Clause 15.2, shall be
decided by reference to Arbitral Tribunal appointed in accordance with Clause 15.3.2. Arbitration shall be
held in accordance with the provisions of Arbitration and Conciliation Act, 1996 .The venue of arbitration shall
be Lucknow, and the language of arbitration proceedings shall be English.
15.3.2. The Arbitral Tribunal shall consist of three arbitrators. Each Party shall appoint one arbitrator, and
the third arbitrator shall be appointed by the two arbitrators so appointed, and in the event of disagreement
between the two arbitrators, the appointment shall be made in accordance with the Arbitration and
Conciliation Act, 1996.

15.3.3. The arbitrators shall make a reasoned award (the Award). Any Award made in any arbitration held
pursuant to this Article 15 shall be final and binding on the Parties as from the date it is made, and the
Concessionaire and the Concessioning Authority agree and undertake to carry out such Award without delay.



Draft Concession Agreement for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium and Sport Complex in
Lucknow



Request for Proposal Volume II Page 38
15.3.4. The Concessionaire and the Concessioning Authority agree that an Award may be enforced against
the Concessionaire and/or the Concessioning Authority, as the case may be, and their respective assets
wherever situated.
15.3.5. This Agreement and the rights and obligations of the Parties shall remain in full force and effect,
pending the Award in any arbitration proceedings hereunder.




Draft Concession Agreement for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium and Sport Complex in
Lucknow



Request for Proposal Volume II Page 39

Article 16. Miscellaneous
16.1. Governing Law and Jurisdiction
This Agreement shall be construed and interpreted in accordance with and governed by the laws of
India, and the courts at Lucknow shall have jurisdiction over matters arising out of or relating to this
Agreement.
16.2. Waiver of Immunity
Each Party unconditionally and irrevocably:
(a) agrees that the execution, delivery and performance by it of this Agreement constitute
commercial acts done and performed for commercial purpose;
(b) agrees that, should any proceedings be brought against it or its assets, property or
revenues in any jurisdiction in relation to this Agreement or any transaction contemplated by
this Agreement, no immunity from such proceedings shall be claimed by or on behalf of the
Party with respect to its assets;
(c) waives any right of immunity which it or its assets, property or revenues now has, may
acquire in the future or which may be attributed to it in any jurisdiction; and
16.3. Delayed Payments
The Parties hereto agree that payments due from one Party to the other Party under the provisions
of this Agreement shall be made within the period set forth therein, and if no such period is
specified, within 15 (fifteen) days of receiving a demand along with the necessary particulars. In the
event of delay beyond such period, the defaulting Party shall pay penalty for the period of delay
calculated at a rate equal to 12% per annum, and recovery thereof shall be without prejudice to the
rights of the Parties under this Agreement including Termination thereof.
16.4. Waiver
16.4.1. Waiver, including partial or conditional waiver, by either Party of any default by the other Party in the
observance and performance of any provision of or obligations under this Agreement:-
(a) shall not operate or be construed as a waiver of any other or subsequent default hereof or
of other provisions or obligations under this Agreement;
(b) shall not be effective unless it is in writing and executed by a duly authorised representative
of the Party; and
(c) shall not affect the validity or enforceability of this Agreement in any manner.


Draft Concession Agreement for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium and Sport Complex in
Lucknow



Request for Proposal Volume II Page 40
16.4.2. Neither the failure by either Party to insist on any occasion upon the performance of the terms,
conditions and provisions of this Agreement or any obligation thereunder nor time or other indulgence
granted by a Party to the other Party shall be treated or deemed as waiver of such breach or acceptance of
any variation or the relinquishment of any such right hereunder.
16.5. Liability for Inspection of Documents
Except to the extent expressly provided in this Agreement:
(a) no review, comment or inspection by the Concessioning Authority of any document submitted by the
Concessionaire nor any observation or inspection of any document or operations conducted at the
Project Site hereunder shall relieve or absolve the Concessionaire from its obligations, duties and
liabilities under this Agreement, the Applicable Laws and Applicable Permits; and
(b) the Concessioning Authority shall not be liable to the Concessionaire by reason of any review,
comment, approval, observation or inspection referred to in Sub clause (a) above.
16.6. Exclusion of Implied Warranties etc.
This Agreement expressly excludes any warranty, condition or other undertaking implied at law or
by custom or otherwise arising out of any other Agreement between the Parties or any
representation by either Party not contained in a binding legal Agreement executed by both Parties.
16.7. Survival
16.7.1. Termination shall:
(a) not relieve the Concessionaire or the Concessioning Authority, as the case may be, of any
obligations hereunder which expressly or by implication survive Termination hereof; and
(b) except as otherwise provided in any provision of this Agreement expressly limiting the liability of
either Party, not relieve either Party of any obligations or liabilities for loss or damage to the other
Party arising out of or caused by acts or omissions of such Party prior to the effectiveness of such
Termination or arising out of such Termination.
16.7.2. All obligations surviving Termination shall only survive for a period of 5 (five) years following the date
of such Termination.
16.8. Entire Agreement
This Agreement and the Schedules together constitute a complete and exclusive statement of the
terms of the Agreement between the Parties on the subject hereof, and no amendment or
modification hereto shall be valid and effective unless such modification or amendment is agreed to
in writing by the Parties and duly executed by persons especially empowered in this behalf by the
respective Parties. All prior written or oral understandings, offers or other communications of every
kind pertaining to this Agreement are abrogated and withdrawn.
16.9. Severability
If for any reason whatever, any provision of this Agreement is or becomes invalid, illegal or
unenforceable or is declared by any court of competent jurisdiction or any other instrumentality to
be invalid, illegal or unenforceable, the validity, legality or enforceability of the remaining provisions


Draft Concession Agreement for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium and Sport Complex in
Lucknow



Request for Proposal Volume II Page 41
shall not be affected in any manner, and the Parties will negotiate in good faith with a view to
agreeing to one or more provisions which may be substituted for such invalid, unenforceable or
illegal provisions, as nearly as is practicable to such invalid, illegal or unenforceable provision.
Failure to agree upon any such provisions shall not be subject to the Dispute Resolution Procedure
set forth under this Agreement or otherwise.
16.10. No partnership
This Agreement shall not be interpreted or construed to create an association, joint venture or
partnership between the Parties, or to impose any partnership obligation or liability upon either
Party, and neither Party shall have any right, power or authority to enter into any Agreement or
undertaking for, or act on behalf of, or to act as or be an agent or representative of, or to otherwise
bind, the other Party.
16.11. Third Parties
This Agreement is intended solely for the benefit of the Parties, and nothing in this Agreement shall
be construed to create any duty to, standard of care with reference to, or any liability to, any person
not a Party to this Agreement, unless expressly provided in this Agreement.
16.12. Successors and Assigns
This Agreement shall be binding upon, and inure to the benefit of the Parties and their lawful
successors, as per the provisions of this Agreement.
16.13. Notices

Unless otherwise stated, all notices, approvals, instructions and other communications for the
purposes of this Agreement shall be given in writing and may be given by facsimile, by personal
delivery or by sending the same by prepaid registered mail addressed to the Party concerned at its
address stated in the title of this Agreement or the fax numbers set out below and/or any other
address subsequently notified to the other Parties for the purposes of this clause 16.14 and shall
be deemed to be effective (in the case of registered mail) 10 calendar days after posting, (in the
case of facsimile) two Business Days after receipt of a transmission report confirming dispatch or
(in the case of personal delivery) at the time of delivery.

If to Concessioning Authority:

Address : Lucknow Development authority
Pradhikaran Bhavan, Vipin Khand,
Gomti Nagar, Lucknow,
Uttar Pradesh
Tel: No. 0091-522-2302578
Fax No. 0091-522-2398386
Attention : Vice Chairman


If to the Concessionaire:

Address :


Draft Concession Agreement for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium and Sport Complex in
Lucknow



Telephone :
Fax :
Attention :

16.14. Language
All notices required to be given by one Party to the other Party and all other
communications, Documentation and proceedings which are in any way relevant to this
Agreement shall be in writing and in English or Hindi language.
16.15. Counterparts
This Agreement may be executed in two counterparts, each of which, when executed and
delivered, shall constitute an original of this Agreement.

16.16. Validity
This Agreement shall be valid for the entire concession period


IN WITNESS WHEREOF THE PARTIES HAVE EXECUTED AND DELIVERED
THIS AGREEMENT AS OF THE DAY, MONTH AND YEAR FIRST ABOVE
WRITTEN.
SIGNED, SEALED AND SIGNED, SEALED AND
DELIVERED DELIVERED
For and on behalf of For and on behalf of
Concessioning Authority (Lucknow Development CONCESSIONAIRE by:
Authority) by:

(Signature) (Signature)
(Name) (Name)
(Designation) (Designation)

In the presence of:
1.

2.


Request for Proposal Volume II Page 42

Draft Concession Agreement for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium and Sport
Complex in Lucknow


Schedule 1. Project Site




Site location




















i

Draft Concession Agreement for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium and Sport
Complex in Lucknow



Schedule 2. Technical Schedule

The following specifications and standards cover only some of the minimum requirements for the
development. The developer shall design, finance, construct, maintain and operate the proposed Cricket
Stadium and Sports Complex strictly conforming to the relevant Indian Standards, the best Industry
practices and internationally acceptable norms. Whether the requirements are explicitly stated or not in the
RFP documents, the bidders must note that Government of UP envisages a world class facility in all
respects and expects a truly international quality and standards from the selected developer as the binding
contractual obligation.

The size of the cricket pitch dimensions shall confirm with international cricket pitch size
The stadium should be equipped with proper lighting arrangement in order to conduct night
cricket matches
The stadium should be designed for a minimum seating capacity of 50,000 people
In seating areas, super elevation of at least 15 cm shall be given in order to maintain spectator
line of sight.
All the spectator area shall be provided with roofing
In order to prevent overcrowding and to ensure fast evacuation during any untimely disaster, the
seating areas shall be divided into groups or blocks. Each block should have its own entry and
exit points and should be separated from the other by fences.
For every 750 seats, at least 1 escape route (i.e. stairway, ramp, or flat surface) with minimum
width of 1 mt shall be provided.
An AC viewing gallery shall be provided with a seating capacity of at least 250 viewers
There should be at least one royal box with movable furniture for guests of honour.
The stadium should have first aid treatment area consisting of at least 2 treatment and recovery
rooms of 15 sq. mt each, 2 store rooms of 2 sq. mt and two toilets with ventilation per each
recovery room.
The toilet facility provided shall be minimum 1 WC per 100 visitors. Out of the total toilets, 40%
shall be toilets for women, 20% for men and 40% urinals.
For emergency services like Police and fire brigade minimum area of 50 sq. mt should be
demarcated.

Sports Complex

Sports Complex shall have facility and necessary infrastructure for at least 5 different types of
games that shall include badminton, basket ball\ valley ball, lawn tennis and shooting training.
It should have the seating capacity for 600 viewers
An Olympic size (25 x 50 mt) swimming pool shall be provided within the sports complex
Ancillary facilities required for the sports complex shall include changing rooms, shower cabins,
toilets, Instructors room, equipment room, first aid room and a care takers room
ii

Draft Concession Agreement for Design, Build, Finance, Operate and Transfer International Level Cricket Stadium and Sport
Complex in Lucknow


The sports complex shall include indoor sports facilities like table tennis, squash, snooker, etc.
Optional facilities like club house or a gymnasium can be built for commercial purpose and for
the use of general public with an annual fee or membership.

Optional facilities like Sports academy can be run within the sports complex and it shall have
the facility for teaching students and also shall have necessary staff strength for each discipline.

The developer shall obtain necessary approval/affiliations from competent authority to conduct National
and International level matches in the stadium within 2 years of commencement of operation.





iii


Pre Feasibility Report International Cricket Stadium cum Sports Complex



Disclaimer:
Neither Awas Bandhu, UP nor their employees or consultants make any
representation or warranty as to the accuracy, reliability or completeness of the
information in this Pre Feasibility report . Awas Bandhu, UP nor their employees
or consultants take any responsibility for any kind of investment done on the
basis of this report. This report is only for reference of the bidders.

Pre Feasibility Report International Cricket Stadium cum Sports Complex


Table of Content


1 Sports Infrastructure in India...................................................................... 1-1
1.1 Introduction 1-1
1.2 Types of Sports infra-facilities 1-4
1.3 PPP in Sports Infrastructure: Case Studies 1-5
2 Institutional Framework ................................................................................ 2-1
2.1 Hierarchy 2-1
2.2 Ministry of Youth affairs and Sports 2-2
2.3 Sports Authority of India 2-2
2.4 Indian Olympic Association 2-3
2.5 Sports Associations at state and local levels 2-3
3 Rationale of the project ................................................................................. 3-1
3.1 Present Status of sports facilities in state 3-1
3.2 Performance 3-2
3.3 Reasons for demand of a sports hub 3-3
4 Proposed Development .................................................................................. 4-1
4.1 Lucknow Sports hub fact sheet 4-1
4.2 Project Costing and Phasing 4-2
5 Financial Feasibility.......................................................................................... 5-1
5.1 Revenue Assumptions 5-1
5.2 Financial Viability 5-2
5.3 Projected P&L statement 5-2
5.4 Projected Balance Sheet 5-3
5.5 Projected Cash Flow Statement 5-3

Pre Feasibility Report International Cricket Stadium cum Sports Complex

1

1 Sports Infrastructure in India
1.1 Introduction
Considering the key role of sports in national life and for inculcating national
pride in the younger generation, the objective of broad basing, that is,
universalisation or mass participation in Sports assumes special significance. It
is imperative to ensure that the educational institutions, Schools and Colleges
in both rural and urban areas; the Panchayati Raj Institutions, Local Bodies,
the government machinery, the Sports Associations and Industrial
Undertakings, as also the various Youth and Sports Clubs.
Efforts will be made to promote and encourage womens participation
in sports. The Union and State Governments, as well as the Sports
Federations/Associations will endeavour to promote a sports culture for the
speedier development of Sports in the country.
As a nation we are proud of our ancient civilization. Our religious culture has
produced great scholars and seekers of salvation, enlistment the world over
look to India for advice in religious matters; matters related to the science,
technology and commerce. But sadly, we have never had what could be called
a sports culture. Not even in the Mahabharata days did we have a sports
culture. Archery, boxing and wrestling were used as war weapons. But no
contests were held even in these disciplines.
With the advent of modern sports and the Olympic movement, Indians did put
in serious effort in some sports. Dhyan Chand led the hockey crusade and
India ruled the roost for three decades winning seven gold medals. Milkha
Singh broke the world record in 400m at Rome in 1960 (but unfortunately
three others did the same, ahead of him). P.T. Usha showed the world that
Indian women are capable of competing with the best. Prakash Padukone beat
the world single-handedly winning the All-England and the world title in
badminton. But all these are stray cases of excellence and none of them are
products of sports culture. They are all self-made greats. India can at the most
claim to have a cricket culture, it has become just like religion. But the
prevailing Cricket Culture is not Sports Culture.
Pre Feasibility Report International Cricket Stadium cum Sports Complex

1

With a potential talent pool of 1.1billion people, India is realizing the
importance of competition in each sport and training athletes.
At present there are more than 54 Sports facilities (indoor, cricket, football,
hockey and multipurpose stadiums) in India which are capable of having a
large scale event in respective sports.
Pre Feasibility Report International Cricket Stadium cum Sports Complex

1

Table 1-1: Stadiums in India

Source: Online Database of World Stadiums.com

Pre Feasibility Report International Cricket Stadium cum Sports Complex

1

1.2 Types of Sports infra-facilities
There are various types of sports infrastructural facilities which are as
following:-
1.2.1 International Multipurpose Stadiums:
These stadiums are used for multiple events like
football, hockey, athletics etc. Size wise, these
facilities are the biggest ones as same is used
for multiple events simultaneously.
As India is hosting Common wealth games in
year 2010, a lot of new facilities are under
construction near by Delhi.
1.2.2 Cricket Stadiums:
These stadiums are meant for cricket in focus,
however can also be utilised for other cultural
and entertainment events of fairly large size.
Cricket being the most popular sport in India,
these sports facilities are the major part of
overall sports facilities.
1.2.3 Indoor Stadiums:
Certain sports activities like table tennis,
badminton, wrestling, weight lifting, squash,
volleyball, basketball etc. are played under roof
and thus indoor stadium is required.
Special floor is required for different sports
activities and thus indoor stadium is
1.2.4 Aquatic centre
Aquatic centres are used for water sports like
swimming, diving, water polo etc. It may be
completely indoor or semi-open
1.2.5 Other smaller facilities :
This red to be the entry point for international travellers and would be used for
dispersal of international traffic to the hinterland.
District Stadiums:
Pre Feasibility Report International Cricket Stadium cum Sports Complex

1

The government is keen to encourage the development sports in smaller towns
and cities. Many towns and cities have a sports area either an open stadium or
a playground with permanent seating facility available.
Indoor sports Complexes:
Many cities across the country have indoor sports complex with capacity of 100
or 150 people. These facilities cater to the regional population for various
indoor sports events.
1.3 PPP in Sports Infrastructure: Case Studies
Sports have always been treated as a responsibility of State (Government).
Private sector is involved in providing ancillary services like marketing,
broadcasting and branding and infrastructure maintenance and operations.
Public Private Partnership would be a new approach to develop world class
infrastructure in sports and only a few examples are available to study. Some
of the latest developments in sports infrastructure through PPP which are
worth considering are as following:-
1.3.1 Singapore Sports Hub

The Sports Hub will be Singapore's premier land and sea sports, entertainment
and lifestyle hub with integrated programming. A unique cluster development
of integrated world-class sports facilities within the city, it will play a critical
role in accelerating the development of sports industry, excellence and
participation and take sports to the next level in Singapore.
Located on a 35ha site in Kallang, the Sports Hub will include the following
facilities:
A new 55,000-capacity National Stadium with a retractable roof;
A 6,000-capacity indoor Aquatic Centre that meets world tournament
standards;
A 3,000-capacity multi-purpose arena which will be scalable and flexible
in layout;
41,000 sq m of commercial space
A Water Sports Centre
The existing 12,000-capacity Singapore Indoor Stadium; and
Supporting leisure and commercial developments
Pre Feasibility Report International Cricket Stadium cum Sports Complex

1


With its world-class facilities, the Sports Hub will be the Centre for Singapore's
elite athletes and high performance management as well as an ideal location
for sports and entertainment events, sports administration, and sports and
recreation businesses.
It will help to create a critical mass of international, regional and local sports
federations and associations, sports medicine and sports science service
providers, sports related training and education service providers, sports
companies' sales and marketing headquarters, and retail outlets.

Located within the city, the Sports
Hub is well connected to the Mass
Rapid Transit network, major
expressways and is only 15 minutes
from the Singapore Changi
International airport.

The Sports Hub is also located next to
the Marina Bay area and is poised to
ride on the wave of exciting
developments at Marina Bay like the
Marina Bay Sands Integrated Resort,
Marina Barrage, Singapore Flyer and
the floating platform at Marina Bay.
Pre Feasibility Report International Cricket Stadium cum Sports Complex

1

The Hub is the first and largest sports facilities infrastructure Public-Private-
Partnership (PPP) projects in the world. It is also Singapore's largest and
flagship PPP project of this nature.
The Singapore Government is fully committed to this project and is looking
forward to working with private sector partners to capitalise on its full
potential.
1.3.2 Satgadhi Sports Village

Sports City at Satgadhi Village in Bhopal, Madhya Pradesh on PPP Basis is a
project costing Rs. 500 crores. It would be one of the largest integrated sports
facility
Major highlights of the project (overall area 172 acres)
An Indicative area allotted within each sports activity are:
Cricket Stadium: 25 acres
Aquatic Centre: 5 acres
Indoor Stadium: 5 acres
Tennis Complex: 7.5 acres
Outdoor Sports Complex: 2.5 acres
9 hole golf course: 45 acres
Other fields like sports player housing, parking, ESS, infrastructure etc.:
10 acres
The remaining area is allotted for real estate development.
Pre Feasibility Report International Cricket Stadium cum Sports Complex

2

2 Institutional Framework
2.1 Hierarchy
Hierarchy of Sports Organizations in India

Source : Websites of SAI and Ministry of youth affairs and sports,
(Indicative Structure)
Ministry of youth affairs and Sports is the top most decision making agency to
promote sports in the country followed by Sports authority of India. Indian
Olympic association comes after SAI which takes care for sports operations
regarding Olympics. However National federations and association registered
with SAI, are also autonomous in there operations and arrange competition of
international level (like BCCI in case of cricket).State government also
promote sports in the respective states through infrastructure providing and
various schemes. Associations, clubs and federations of different sports
coordinate with registered national association and state government.
Pre Feasibility Report International Cricket Stadium cum Sports Complex

2

2.2 Ministry of Youth affairs and Sports
The Ministry of Youth Affairs & Sports was initially set up as the Department of
Sports in 1982 at the time of organisation of the IX Asian Games in New Delhi.
Its name was changed to the Department of Youth Affairs & Sports during
celebration of the International Youth Year, 1985. It became a Ministry on the
27th May, 2000. The specific subjects being dealt with by the Ministry are
contained in the Order of the Government of India (Allocation of Business)
Rules, 1961.
Sports promotion is primarily the responsibility of the various National Sports
Federations, which are autonomous. The role of the Government is to create
the infrastructure and promote capacity building for broadbasing sports as
well as for achieving excellence in various competitive events at the national
and international levels. The Ministrys schemes are geared towards achieving
these objectives.
The National Sports Policy was initially formulated in 1984. In order to broad-
base sports and to promote excellence, Government has formulated a New
National Sports Policy, 2001. The salient features of the New National Sports
Policy are as under:
1. Broad-basing of Sports and achievement of excellence;
2. Upgradation and development of infrastructure;
3. Support to the National Sports Federations and other appropriate bodies;
4. Strengthening of scientific and coaching support to sports;
5. Incentives to sports persons;
6. Enhanced participation of women, Scheduled Tribes and rural youth;
7. Involvement of the Corporate Sector in sports promotion; and
8. Promote sports mindedness among the public at large.
2.3 Sports Authority of India
The Sports Authority of India (SAI) was established by the Government of
India in January 1984 as a registered society primarily to ensure effective
maintenance and optimum utilisation of the various sports infrastructure that
were built in Delhi during Asiad, 1982. It is now the nodal agency in the
country for broad-basing sports and for training of sportspersons to achieve
excellence in national and international sports, the Society for National
Institute of Physical Education and Sports (SNIPES) was merged with SAI with
effect from 1 May 1987.
Pre Feasibility Report International Cricket Stadium cum Sports Complex

2

Subsequently Netaji Subhash National Institute of Sports (NSNIS), Patiala and
its allied centres at Bangalore, Kolkata and Gandhinagar and Lakshmibai
National Colleges of Physical Education at Thiruvananthapuram came under
Sports Authority of India (SAI). It has now six regional centres at Bangalore,
Gandhinagar, Kolkata, Chandigarh, Bhopal and Imphal. Sports infrastructure is
being created at Sonepat and the Northern Regional Centre would be shifted
from Chandigarh to Sonepat. SAI has one Centre which is at Guwahati. SAI
also operates a High Altitude Training Centre (HATC) at Shillaroo (H.P.). SAI
proposes to open more sub-centres in addition to its Regional Centres. These
are : (1) Sub-centre at Jabalpur (MP), Lucknow (UP), Nagercoil (Tamil Nadu)
and Hazaribagh (Jharkhand).
2.4 Indian Olympic Association
The Indian Olympic Association is responsible for the preparation and
participation of competitors in the Olympic Games as well as in Regional
events like Commonwealth and Asian Games. There is a separate federation at
national level in each game/sport which assists the Indian Olympic Association
and preparation of sportsmen.
A special feature of the Indian Olympic Association is that, in addition to the
national federation for each sport, there are State Olympic Associations in
various States in the country. The State bodies controlling the different sports
are affiliated to the national federations and to the State Olympic Associations.
The aim of the State Olympic Associations is to ensure the promotion of sports
in their respective States, in conjunction with the State bodies for the different
games and sports. The overall responsibility for participation in the Olympic
Games rests with the Indian Olympic Association
2.5 Sports Associations at state and local levels
Today State governments are playing a bigger role by concentrating on
providing better sports infrastructure facilities to players. More incentivization
to players has also shown good results empirically. For example State of
Andhra Pradesh has turn around the level of sports in state and coming to first
10 states in national games year after year. State of Maharashtra is hosting
Youth Commonwealth games 2008 in Pune.
Sports association at state and local level (district, city and towns) are the
bodies situated at grass-root levels, thus play the most crucial level. As these
bodies select the sportsmen at basic level.


Pre Feasibility Report International Cricket Stadium cum Sports Complex
3

3 Rationale of the project
The Consultant has carried out market analysis to study the requirement of an
international cricket stadium and sports complex.
3.1 Present Status of sports facilities in state
State of Uttar Pradesh is having the largest population in the country and
thus requirement of sports facilities are also large. Department of sports
works directly under State Government and works towards promoting
excellence in sports.
Uttar Pradesh holds State Games in Lucknow every year since 2005. The
five-day games featuring 14 Olympic events are held in as a run up
exercise to National Games. These games would be the selection games
to draw a strong team for the National Games. This is an excellent UP to
make its presence felt in the national and international sports arena.
Keeping in view the training and development for excellence in sports
training academies fully funded by public sector in state are as following
:-
Christian Physical training centre, Lucknow
Sports College, Lucknow (under SAI)
Sports academy in Gorakhopur.
Two international level sports infrastructure facilities in Uttar Pradesh are
as following:-



Pre Feasibility Report International Cricket Stadium cum Sports Complex
3


Various districts having a sports complex and open stadium for sports
facilities are as following :-

3.2 Performance
Government is well aware of importance of the sports and providing necessary
momentum through various schemes and incentives. Performance of states
sportspersons in various events in national games last year is as following:-




Pre Feasibility Report International Cricket Stadium cum Sports Complex
3

Tally of National Games 2007 (*Source : SAI)

3.3 Reasons for demand of a sports hub
3.3.1 Improving the performance in sports
A thoughtful look at medals tally gives us a strong probability of UP being in
top 5 states. As the number of gold medals won by state are equal to above
two rank holders and just two lesser than last member of top 5.
An international standard sports infrastructure facility at state capital would be
the right kind of impetus at the moment, analyzing the need of hour. A multi-
sports international standard stadium with at least 55000 would suffice the
requirement.
3.3.2 Hub for national and international level sports events
Luknow as a city is a capable candidate for hosting next national games in
2009 with existing and planned sports facilities.
Even state should look forward to bring international events to state. As big
international events affect the whole regional economy. For example Olympics
in china have been the most profitable Olympics games till now. With
increasing popularity of various Cricket and Hockey league matches (inter-
states), even commercial viability of sports infrastructure is not an issue.
3.3.3 Regional analysis
An analysis of whole northern India in terms of international sports
infrastructural facilities shows a clear demand for International standard multi
purpose stadium in state of Uttar Pradesh.
At present there is only one multi purpose stadium with 45000 capacity in
Kanpur (Green park Stadium)

Pre Feasibility Report International Cricket Stadium cum Sports Complex
3

All stadiums situated in Northern India with capacity more than 25000

In terms of commercial viability of sports infrastructure Cricket stadiums have
been found most profitable. A view of all cricket stadiums pan India are as
following:-

Hence an international multi purpose stadium which can also be used for
cricket will be a economically viable and socially required project.
Thus state of Uttar Pradesh being the largest in terms of population can also
deliver the largest number of excellent sports persons in times to come. And
an international standard sports infrastructural facility will also strengthen
Indias bid for 2020 Olympics.
Pre Feasibility Report International Cricket Stadium cum Sports Complex

4 4

4 Proposed Development

The Sports Hub will be LUCKNOW's premier land and sea sports, entertainment
and lifestyle hub with integrated programming. A unique cluster development
of integrated world-class sports facilities within the city, it will play a critical
role in accelerating the development of sports industry, excellence and
participation and take sports to the next level in LUCKNOW.
With its world-class facilities, the Sports Hub will be the Centre for States
athletes and high performance management as well as an ideal location for
sports and entertainment events, sports administration, and sports and
recreation businesses.
It will help to create a critical mass of international, regional and local sports
federations and associations, sports medicine and sports science service
providers, sports related training and education service providers, sports
companies' sales and marketing headquarters, and retail outlets.
4.1 Lucknow Sports hub fact sheet


Pre Feasibility Report International Cricket Stadium cum Sports Complex

4 4

The Cricket stadium cum Sports complex will have world class facilities to
conduct international events. The Cricket stadium shall be developed as per
the latest guidelines issued by ICC. The stadium will have the following
facilities:
International level Cricket Stadium : An international level cricket
stadium with seating capacity of at least 50,000 people. Stadium should
have flood light facilities available with other related facilities for players
and instruments required for maintenance.
Sports Complex shall have facility and necessary infrastructure for
atleast 5 different type games
Sports academy shall have the facility for teaching students and also
shall have necessary staff strength for each discipline.
The Project Site is located at Lucknow bypass, Amar Shaheed Peeth. The site
has an area of 116 acres and it is situated in between Sultanpur road and
Gomti river on Amar Shaheed Path. The site can also be approached through a
service road next to Amar Shaheed Path. For a Cricket Stadium and sports
complex with the facilities mentioned above the land requirement would be
about 50 acres.
4.2 Project Costing and Phasing
The project of this scope will cost about Rs. 130 Crores. The block cost
estimates for the different facilities and its phasing is presented below:
Particulars Area
Cost per
Unit
Unit
Cost
(Rs lac)
Cricket Stadium facilities
Pitch Playing area (Sq. Mt) radius 95
mt approx)
28339 6000 Rs./Sq.Mt 1700
Seating areas (40 mts width approx) 28888 12500 Rs./Sq.Mt 3611
Circulation area @20% 11445
Subtotal 68672

Parking for 2500 car parks 50000 5000 Rs./Sq.Mt 2500

Administration and other facilities
Administration 700 12000 Rs./Sq.Mt 84
Residential Quarters/ Accomodation
for players @ 75 Sq. Mt for 40 players
3000 12000 Rs./Sq.Mt 360
Restaurant 1500 15000 Rs./Sq.Mt 225
Fire Station 1000 12000 Rs./Sq.Mt 120
Pre Feasibility Report International Cricket Stadium cum Sports Complex

4 4

Particulars Area
Cost per
Unit
Unit
Cost
(Rs lac)
Treatment Recovery room 50
Emergency Service 200
Circulation area @20% 1040
Subtotal 7490

Other Competition halls along
with sport complex

Gymnasium + Olympic size swimming
pool+ sauna+ steam
5000 15000 Rs./Sq.Mt 750
Multi functional hall (quadruple hall) 3000 15000 Rs./Sq.Mt 450
Tennis court indoor 2640 15000 Rs./Sq.Mt 396
Ancillary faciliites (circulation
+changing rooms+toilets)
1200 15000 Rs./Sq.Mt 180
Squash courts, Table tennis, Billiards 2500 15000 Rs./Sq.Mt 375
Area for shooting sports 1000 12000 Rs./Sq.Mt 120
Seating area (capacity 600) 480 12000 Rs./Sq.Mt 58
Circulation area @ 20% 3164
Subtotal 18984

Tennis court Outdoors with seating
area
2640 12000 Rs./Sq.Mt 317

Sports Academy
Classrooms 11000 Rs./Sq.Mt 165
Lockers
Canteen
1500

any other ancillary facilities 500 11000 Rs./Sq.Mt 55
Circulation area @20% 400
Subtotal 2400

Parking for 200 cars 5000 2000 Rs./Sq.Mt 100

Other allied facilities @ 10% of the
total


Vehicle and equipment cost
Floodlights (no.s) 8 100
Rs.lakhs
per unit
800
Gymnasium Equipments (Lumpsum) 250 Rs.lakhs 250
Other Sports Equipments (Lumpsum) 200 Rs.lakhs 200
Vehicles (Lumpsum) 30 Rs.lakhs 30

Subtotal 12846

Design cost 321
Project Management cost 385
Contingency 642
Interest during construction 1065

Total Project Cost 15259

Pre Feasibility Report International Cricket Stadium cum Sports Complex

4 4

The project is assumed to be funded by a mix of debt and equity and debt
equity ratio of 1.5 is assumed. Grant portion has not been assumed.
Additional land parcel is assumed to be given to developer as viability gap
funding. The cost of development of land for commercial exploitation is
estimated to be Rs. 125 Cr. The cost land earmarked for commercial
development is estimated to cost Rs. 36 Cr. The overall project cost is Rs. 313
Cr.
Pre Feasibility Report International Cricket Stadium cum Sports Complex

6 5

5 Financial Feasibility
Sports Complexes are not financially viable and hence grants are provided by
the State Government, Central Government and major sports councils like
BCCI.
5.1 Revenue Assumptions
The revenue streams are from sale of tickets, food and beverage sales,
advertisements, leasing the stadium for other events and rentals for utilisation
of the facilities for training.
The revenue for the proposed stadium is as follows:
Revenue Streams Value
Revenue from sale fo tickets
No. of days matches are held 20
Average ticket price (Rs.) 400
Average attendance 35000
Total Revenue (Rs. Lakhs) 2800
Revenue accruing to stadium from the revenue from sale of
tickets (Rs. Lakhs)
700

Revenue from Advertisement and food stalls (Rs. Lakhs) 140

Revenue from the indoor sports facilities per month
Swimming Pool (Rs.) 75000
Tennis Court (Rs.) 50000
Gymnasium (Rs.) 75000
Others (Rs.) 30000

Other Events
Rental for the stadium for other events per day (Rs.) 500000
No. of days other events are held 25
Revenue from other events (Rs. Lakhs) 125

Revenue from leasing facilities for training per month (Rs.) 200000
The operating expenditure accounts for approximately 30% of the revenues of
the sports complex of which repairs and maintenance accounts for 15% of the
Pre Feasibility Report International Cricket Stadium cum Sports Complex

6 5

revenue, replacement of equipments account for 10% of the revenue and the
rest will account for salary costs.
5.2 Financial Viability
Financial projections are prepared for a 35 year period and the Internal Rate of
Return for the 35 year projection period is only 4%. The reason for the low
viability is the occupancy rates of the sports stadium. Hence, viability gap
funding in the form of land parcel for commercial development shall be
granted to the developer. For a project Internal Rate of Return of 14%, the Net
Present Value of returns from the commercial development of land parcel
should fetch about 79 Cr.
5.3 Projected P&L statement
Rs. Lakhs
P&L Statement Y3 Y4 Y5 Y6 Y7 Y8 Y9 Y10 Y11 Y12
Income
Sale of tickets 700.00 770.00 847.00 931.70 1024.87 1101.74 1184.37 1273.19 1368.68 1471.33
Advertisements and F&B 140.00 154.00 169.40 186.34 204.97 220.35 236.87 254.64 273.74 294.27
Indoor Sports facilities
Tennis 6.00 6.60 7.26 7.99 8.78 9.44 10.15 10.91 11.73 12.61
Swimming 9.00 9.90 10.89 11.98 13.18 14.17 15.23 16.37 17.60 18.92
Gymnasium 9.00 9.90 10.89 11.98 13.18 14.17 15.23 16.37 17.60 18.92
Others 3.60 3.96 4.36 4.79 5.27 5.67 6.09 6.55 7.04 7.57
Rentals from other events 125.00 137.50 151.25 166.38 183.01 196.74 211.49 227.36 244.41 262.74
Revenue from leasing of training
facilities
24.00 26.40 29.04 31.94 35.14
37.77 40.61 43.65 46.93 50.45
Total Revenue 1016.60 1118.26 1230.09 1353.09 1488.40 1600.03 1720.04 1849.04 1987.72 2136.80
Expenditure
Repairs and Maintenance cost 152.49 167.74 184.51 202.96 223.26 240.01 258.01 277.36 298.16 320.52
Replacement of Equipments 101.66 111.83 123.01 135.31 148.84 160.00 172.00 184.90 198.77 213.68
Staff Cost 50.83 55.91 61.50 67.65 74.42 80.00 86.00 92.45 99.39 106.84
Total expenditure 304.98 335.48 369.03 405.93 446.52 480.01 516.01 554.71 596.32 641.04
PBDIT 711.62 782.78 861.06 947.17 1041.88 1120.02 1204.03 1294.33 1391.40 1495.76
Depreciation 370.09 370.09 370.09 370.09 370.09 370.09 193.06 157.05 157.05 157.05
Interest 944.77 894.16 759.19 624.22 489.26 354.29 219.32 84.35 0.00
Miscellaneous expenses written
off
217.24 217.24 217.24 217.24 217.24 217.24 217.24 217.24 217.24 217.24
PBT -820.47 -698.70 -485.45 -264.38 -34.70 178.41 574.40 835.68 1017.11 1121.47
Tax 0.00 0.00 0.00 0.00 0.00 20.21 65.08 94.68 115.24 127.06
Profit After Tax -820.47 -698.70 -485.45 -264.38 -34.70 158.20 509.32 741.00 901.87 994.40









Pre Feasibility Report International Cricket Stadium cum Sports Complex

6 5

5.4 Projected Balance Sheet
Rs. Lakhs
Particulars Y1 Y2 Y3 Y4 Y5 Y6 Y7 Y8 Y9 Y10 Y11 Y12
Fixed Assets
Gross Block 2630 10949 10949 10949 10949 10949 10949 10949 10949 10949 10949 10949
Accumulated Depreciation 370 740 1110 1480 1850 2221 2414 2571 2728 2885
Net Block 2630 10949 10579 10209 9839 9469 9099 8729 8536 8379 8222 8065
Miscellaneous Expenses 688 2172 1955 1738 1521 1303 1086 869 652 434 217 0
Cash and Bank Balance 0 0 25 28 31 34 37 40 43 46 50 53
Total 3318 13122 12560 11975 11391 10806 10222 9638 9231 8860 8489 8118
Financed By
Equity 1327 5249 5249 5249 5249 5249 5249 5249 5249 5249 5249 5249
Reserves and Surplus -820 -1519 -2005 -2269 -2304 -2146 -1636 -895 7 1001
Debt 1991 7873 7873 6748 5624 4499 3374 2249 1125 0 0 0
Short Term Borrowing 259 1497 2523 3328 3903 4285 4493 4506 3233 1868
Total 3318 13122 12560 11975 11391 10806 10222 9638 9231 8860 8489 8118

5.5 Projected Cash Flow Statement
Rs. Lakhs
Cash Flow Statement Y1 Y2 Y3 Y4 Y5 Y6 Y7 Y8 Y9 Y10 Y11 Y12
Cash Inflow
PAT -820 -699 -485 -264 -35 158 509 741 902 994
Depreciation 370 370 370 370 370 370 193 157 157 157
Miscellaneous expenses 217 217 217 217 217 217 217 217 217 217
Increase in Equity 1327 3921
Increase in Debt 1991 5882
Increase in short term
borrowing
259 1239 1026 805 575 382 208 13 0 0
Cash Inflow 3318 9803 25 1127 1128 1128 1128 1128 1128 1128 1276 1369
Cash Outflow
Project Cost 3318 9803
Reduction in debt 0 1125 1125 1125 1125 1125 1125 1125
Reduction in short term
borrowing
0 0 0 0 0 0 0 1273 1365
Cash Outflow 3318 9803 0 1125 1125 1125 1125 1125 1125 1125 1273 1365
Intial cash Balance 0 0 0 25 28 31 34 37 40 43 46 50
Cash Inflow / Cash
Outflow
0 0 25 3 3 3 3 3 3 3 3 4
Ending Cash Balance 0 0 25 28 31 34 37 40 43 46 50 53