1. INTRODUCTION:
The purpose of work will achieve in site such; installation of pipes, fixing to define how the
fixing, testing .etc.
. OPERATION:
Material Usage : For pipes C!C pressure pipes "#$ which will check %&
consultant in our warehouse as per approved 'aterial su%'ittal.
For fitting solvent (oints or welded.
)nstallation : A.*upport+rods
,s spec. the distance %etween -./0'' pipes 0.1'2 , -./3'' pipes 0.42 , -.5/''
pipes 0.42 , -.60'' ,#'2 for hanger. 7ods will %e M8.

9alvani:ed steel support shall %e used for cold + hot water pipes fixed %&
rods +anchors on ceiling. )f the pipes running %eside the wall used angle support.
*pecial support shall %e used in shaft.
Two piece single cla'ps with ru%%er lining will %e used for do'estic water as per
approved shop drawing + 'aterial su%'ittal.
For insulated hot water use wooden saddle surround the pipes then fix %& cla'p.

*.P+,e-
a. Making sure if area read& to install our pipes-clean,safe,no o%struction2
.. ,pproved 'aterial will %e in our store %efore starting the work at enough period.
/. *tud& approved shop drawings and 'aking co'parison %etween it and site.
'. Fix the rod as the route of pipe then cut the pipes %& grinder to actual distance
needs in working area.

e. *olvent (oints will use to connect the pipes and fitting-el%ow, tee,.,etc.2
$. ,s approved ).;. shop drawing ;we can deter'ine exact location of wash
%asin,w.c.,%idet,..etc.Make sa'ple in our warehouse or in site for t&pical %athroo's
and directl& install in which area read&.
C.E01+,2e&t-34a54e-6,12,-7

<ot, cold and circulation lines entering the flat provide %& valve station. The content
of that station is: gate valve, water 'eter and dou%le regulating valve.
,fter co'pletion the 'ounting inside %uilding and test all pipes; we can proceed
pu'p installation in second %ase'ent as per approved shop drawing.
=ater pu'p test will %e used for test pipes -'anual2.
Central water heater install on roof interface with pressure vessel and expansion tank
as approved shop drawing.
D. )ate8 Te-t

=hen co'pleted installation of each flat, Test will take place to 'ake sure if The
(oints leak. ressure test shall %e #.3 ti'es working pressure.
Test fails if leakage is o%served or if pressure drop exceeds 3> of test pressure.
=ater 'aintain in pipes under pressure 50 'inutes as'entioned in ?* ite' no. 3.5.#./
-cop& attached2.
;o'estic water test co'pl& with ?* *tandards C 56/, art /.

,fter 'aking sure: =e will su%'it 7F), for inspect the route of pipes including
)C@ and TA*T CA7T)F)C,TA as per attached.

)nsulation of hot water pipes start after successful testing %& approved 'aterial
,nd as details approved shop drawing.


E.Re$e8e&/e D#/12e&t-

,pproved shop drawing.
,pproved 'aterial su%'ittal



%.Sa$et9
*afet& precautions will %e followed in site during the installation.

Carr&ing 'aterial fro' store to work area will %e taken care and after 'ake
sure area is read& and clean.