1. INTRODUCTION: The purpose of work will achieve in site such; installation of pipes, fixing to define how the fixing, testing .etc. . OPERATION: Material Usage : For pipes C!C pressure pipes "#$ which will check %& consultant in our warehouse as per approved 'aterial su%'ittal. For fitting solvent (oints or welded. )nstallation : A.*upport+rods ,s spec. the distance %etween -./0'' pipes 0.1'2 , -./3'' pipes 0.42 , -.5/'' pipes 0.42 , -.60'' ,#'2 for hanger. 7ods will %e M8.
9alvani:ed steel support shall %e used for cold + hot water pipes fixed %& rods +anchors on ceiling. )f the pipes running %eside the wall used angle support. *pecial support shall %e used in shaft. Two piece single cla'ps with ru%%er lining will %e used for do'estic water as per approved shop drawing + 'aterial su%'ittal. For insulated hot water use wooden saddle surround the pipes then fix %& cla'p.
*.P+,e- a. Making sure if area read& to install our pipes-clean,safe,no o%struction2 .. ,pproved 'aterial will %e in our store %efore starting the work at enough period. /. *tud& approved shop drawings and 'aking co'parison %etween it and site. '. Fix the rod as the route of pipe then cut the pipes %& grinder to actual distance needs in working area.
e. *olvent (oints will use to connect the pipes and fitting-el%ow, tee,.,etc.2 $. ,s approved ).;. shop drawing ;we can deter'ine exact location of wash %asin,w.c.,%idet,..etc.Make sa'ple in our warehouse or in site for t&pical %athroo's and directl& install in which area read&. C.E01+,2e&t-34a54e-6,12,-7
<ot, cold and circulation lines entering the flat provide %& valve station. The content of that station is: gate valve, water 'eter and dou%le regulating valve. ,fter co'pletion the 'ounting inside %uilding and test all pipes; we can proceed pu'p installation in second %ase'ent as per approved shop drawing. =ater pu'p test will %e used for test pipes -'anual2. Central water heater install on roof interface with pressure vessel and expansion tank as approved shop drawing. D. )ate8 Te-t
=hen co'pleted installation of each flat, Test will take place to 'ake sure if The (oints leak. ressure test shall %e #.3 ti'es working pressure. Test fails if leakage is o%served or if pressure drop exceeds 3> of test pressure. =ater 'aintain in pipes under pressure 50 'inutes as'entioned in ?* ite' no. 3.5.#./ -cop& attached2. ;o'estic water test co'pl& with ?* *tandards C 56/, art /.
,fter 'aking sure: =e will su%'it 7F), for inspect the route of pipes including )C@ and TA*T CA7T)F)C,TA as per attached.
)nsulation of hot water pipes start after successful testing %& approved 'aterial ,nd as details approved shop drawing.