This presentation by Pyeong Jun Yoo, Highway Research Division, Korea Institute of Construction
Technology reviews and discuss issues in implementing road asset management in the Republic of Korea.
This presentation by Pyeong Jun Yoo, Highway Research Division, Korea Institute of Construction
Technology reviews and discuss issues in implementing road asset management in the Republic of Korea.
This presentation by Pyeong Jun Yoo, Highway Research Division, Korea Institute of Construction
Technology reviews and discuss issues in implementing road asset management in the Republic of Korea.
Road Asset Management Training Workshop (18-19 September 2014, Manila)
Pyeong Jun Yoo, PhD
Research Fellow, Pavement Research Division Korea Institute of Civil Engineering and Building Technology (www.kict.re.kr, pjyoo@kict.re.kr) Pavement Management System in Korea Road Asset Management Training Workshop (18-19 September 2014, Manila) Definitions - PMS "Pavement management SYSTEM is a set of defined procedures for collecting, analyzing, maintaining, and reporting pavement data, to assist the decision makers in finding optimum strategies for maintaining pavements in serviceable condition over a given period of time for the least cost." 2 Road Asset Management Training Workshop (18-19 September 2014, Manila) PMS Overview A PMS is designed to PROVIDE OBJECTIVE INFORMATION AND USEFUL DATA FOR ANALYSIS so that road managers can make more consistent, cost-effective, and defensible decisions related to the preservation of a pavement network. While a PMS cannot make final decisions, it can provide the basis for an informed understanding of the possible consequences of ALTERNATIVE DECISIONS. A PMS does NOT make decisions, Managers DO! 3 Road Asset Management Training Workshop (18-19 September 2014, Manila) PMS Levels Network Level: Birds Eye View of Network Pavements as a whole Statewide Pavement Condition Summary Budget Estimate Performance Prediction Project Level: Assist Designers in Constructing, Maintaining, or Rehabilitating a Section of Roadway Preventive Maintenance Resurfacing or Reconstruction Treatment Options for a Project 4 Road Asset Management Training Workshop (18-19 September 2014, Manila) Reliable PMS Systematic PMS Leads to Evaluate Pavement Conditions Objectively Apply MR&R Method Timely and Appropriately Allocate MR&R Budgets Efficiently Enhance Structural Integrity of Pavements 5 Road Asset Management Training Workshop (18-19 September 2014, Manila) National Highway PMS in Korea Road Asset Management Training Workshop (18-19 September 2014, Manila) National Highway MS in Korea Pavement MS Bridge MS Cut-Slope MS Highway MS 7 Road Asset Management Training Workshop (18-19 September 2014, Manila) PMS Applications in Korea 1986 : Introduction to National Highways 1996 : Application to National Expressways 2002 : Introduction to Major Airports 2002 : Introduction to Seoul Metro City 2008~ : Expansion to Small Cities
8 Road Asset Management Training Workshop (18-19 September 2014, Manila) National Highway Management System Design Construction Completion Maintenance PQMS RSIS PDMS RMIS RSMS 9 Road Asset Management Training Workshop (18-19 September 2014, Manila) Korea System Components Detail Survey Repair Method Selection Economic Analysis Specification Field Survey Budgeting Section Classification Priority Level Deterioration Type and Severity Level Prompt Survey, NHPCI Network Level Project Level Evaluation Results Feed Back Calibration Model Research Level 10 Road Asset Management Training Workshop (18-19 September 2014, Manila) National Highway PMS PMS D/B Pavement Condition Evaluation PES (Pavement Evaluation Surveyor) HWD (Heavy Weight Deflectometer) PFT (Pavement Friction Tester) GPR (Ground Penetration Radar) Decision-Making System Korea Decision-Making Support System HDM-4 (Reference) 11 Road Asset Management Training Workshop (18-19 September 2014, Manila) Governing Organization for PMS Road Bureau -National Highway Planning and Construction Division KICT - Pavement Research Division Ministry of Land, Infrastructure and Transport Budgeting Decision Makers Policy Makers 19 Regional Offices Performer Survey, Analysis and Research 12 Road Asset Management Training Workshop (18-19 September 2014, Manila) National Highway Management System Route Status Selection Survey Section Survey (1 st Survey) Detail Survey (2 nd Survey) Decision Repair Method Decision Priorities Repair Section 1 st Survey 2 nd Survey PES ARAN GPR PFT HWD Budget Roughness Request (1time/year) Request Investigation Maintenance Achievement Emergency Repair Review Method Request(at any time) Pavement Status Survey Regional Offices (19) [ Any Time ] [ Common ] 13 Road Asset Management Training Workshop (18-19 September 2014, Manila) National Highway PMS Operation 14 Road Asset Management Training Workshop (18-19 September 2014, Manila) Survey Sections National Highways Total Length : 13,747 km 99% Paved Roads, 90% Asphalt Pavements General Survey Sections Length : 3,000~5,000 km (2-lane) Based on PMS D/B and Requests Inspection : Surface Distress (ARAN, PES) Detailed Survey Sections Length : 1,500~2,500 km (2-lane) Based on General Survey Results Inspection : Structural Capacity (FWD, GPR, PFT)
15 Road Asset Management Training Workshop (18-19 September 2014, Manila) General Survey Object : Pavement Surface Condition Evaluation Equipment 1986 : VIZIROAD (Semi-auto) 1999 : ARAN (Automatic Road Analyzer) 2008 : PES (Pavement Evaluation Surveyor) Pavement Condition Crack Rut Depth IRI 16 16 Road Asset Management Training Workshop (18-19 September 2014, Manila) Detailed Survey Object : Pavement Structural Condition Evaluation Sections : Except Excellent Rated Sections from General Survey Equipment FWD : Structural Capacity GPR : Pavement Layer Thickness, Void PFT : Surface Friction 17 17 Road Asset Management Training Workshop (18-19 September 2014, Manila) Pavement Condition Evaluation Pavement Condition Index Visual Index (VI) : Crack Rate + Rut Depth Quality Index (Q) : VI + Surface Deflection (FWD)
18 18 Road Asset Management Training Workshop (18-19 September 2014, Manila) Surface Condition Evaluation National Highway Pavement Condition Index (NHPCI) Crack Rate (%)
IRI (m/km)
Rut Depth (mm) 19 Road Asset Management Training Workshop (18-19 September 2014, Manila) Pavement Condition Evaluation VI Rate Used for Homogeneous Analysis Based on Surface Distresses (Crack and Rut Depth)
20 Crack(%)
Rut Depth (mm) Low (<5) Medium (5~15) High (>15) Low(<12) VI1 VI2 VI3 Medium(12~20) VI3 VI4 VI5 High(>20) VI5 VI6 VI7 20 Road Asset Management Training Workshop (18-19 September 2014, Manila) Pavement Condition Evaluation Q Grade Overall Pavement Condition Evaluation Based on VI and Maximum Surface Deflection in FWD (D 0 ) D 0 (mm) VI Rate I II III VI1 Q1 Q2 Q7 VI2~VI3 Q3 Q5 Q8 VI4~VI7 Q4 Q6 Q9 0.50 0.85 21 Road Asset Management Training Workshop (18-19 September 2014, Manila) National Highway PMS Operation Survey Plan & Basic Data Collection Survey Section Selection General Pavement Survey (ARAN, PES) Detailed Section Selection Based on VI (1~7) Detailed Pavement Survey (FWD, GPR, PFT) Pavement Evaluation MR&R Decision Based on QG (1~9) Traffic Information Prioritized Section > 15 mm rut, > 30% crack No priority analysis General Section Priority analysis based on HDM-4
On-site Due-diligence Final MR&R and Section Decision 22 Road Asset Management Training Workshop (18-19 September 2014, Manila) Decision Tree Distress Analysis RD > 15mm Crack > 30% No Microsurfacing Slurry Seal Crack > 20% No 5AC(HMA) Mill+5AC(HMA) HDM-4 Crack : 2~7% Crack : 7~10% Yes Final Decision RD > 25mm ESAL 3000 Mill+5AC(PMA) Fatigue > 40% Yes No Yes No Yes No Mill+5AC(HMA) Grid+5AC(HMA) 5AC(PMA) Priority Repair Sections Yes Yes Recycling 23 Road Asset Management Training Workshop (18-19 September 2014, Manila) Priority Analysis HDM-4 (Highway Development and Management) Economic Analysis Tool by World Bank Timing and Priority Decision Based on NPV(Net Present Value)
Current Condition - Crack, Rut, IRI - Traffic, Deflection - Layer Thickness HDM- - Performance Prediction HDM- -Economic Analysis MR&R Alternatives NPV - Priority Decision 24 Road Asset Management Training Workshop (18-19 September 2014, Manila) PMS Effects on PM Annual MR&R Budget : 75.2% Reduction (1991~2011) Pavement Service Life : 44.2% Increase (2001~2008) 0 3 6 9 12 0 2,000 4,000 6,000 8,000 1990 1995 2000 2005 2010 2015 P a v e m e n t
s e r v i c e
l i f e
( y e a r ) A n u u a l
M R & R
c o s t
p e r
l a n e
( $ / k m ) year Cost Service life 75.2% reduction in unit MR&R cost (1991~2011) 44.2% increase in service life (2001~2008) 25 Road Asset Management Training Workshop (18-19 September 2014, Manila) Difficulties in HDM-4 Too Many Input Parameters -> N.G. for Pavements Not Consistent to Korea Regulations for Transportation Facilities -> Not Easy to Use Black Box in Model -> Not Possible to Modify Complicate Usage, but Lower Reliability! Need to Develop Our Own System 26 Road Asset Management Training Workshop (18-19 September 2014, Manila) Upgrading NHPMS Korea Decision-Making System (KoPMS) GIS Based PDMS (Pavement Database Management System) Available Tech-Transfer to DMCs!! 27 Road Asset Management Training Workshop (18-19 September 2014, Manila) Major Features MR&R Various Methods, Benefit-Cost Pavement Performance Model Timing, No. Applications, Agent Cost Vehicle Velocity Model Vehicle Types and Environments Life Cycle Cost Analysis Government Standards Network/Project Level Analysis Model Project : Long-term performance Network : Annual Priority(NPV, B/C) Budgets for the Next 3 Years 1987 2005 2005 1987 28 Road Asset Management Training Workshop (18-19 September 2014, Manila) Items Agency Cost + User Cost (VOC, Delay, Noise) Based on NPV and B/C Multiple MR&R Strategies Considering Repair Delay (Budget Limitation) P a v e m e n t
C o n d i t i o n
Without Repair Economic Analysis Model Cut + 5AC(PMA) Cut + 5AC(HMA) 5AC(HMA) Year After Repair A(2013) B(2014) C(2015) Poor Good 29 Road Asset Management Training Workshop (18-19 September 2014, Manila) Example : Project Level (10 YRS) Pavement Distresses (Crack, Rutting, IRI) Deterioration Prediction with/out Repair Cost-Delay Analysis Applications of the New System Crack Rutting IRI Year 30 Road Asset Management Training Workshop (18-19 September 2014, Manila) National Highway Management System 31 Road Asset Management Training Workshop (18-19 September 2014, Manila) National Highway Management System E-W Routes : 24 S-N Routes : 27 32 Route Status Selection Survey Section Survey (1 st Survey) Detail Survey (2 nd Survey) Decision Repair Method Decision Priorities 1 st Survey 2 nd Survey PES ARAN GPR PFT HWD Road Asset Management Training Workshop (18-19 September 2014, Manila) National Highway Management System _ Start and end point of Road Traffic control point Road structure change point Administrative boundary Speed / Lane change point IC/JC Road Intersection General Roads Flyovers / Underground Roadway One-way Seperated road 33 Road Asset Management Training Workshop (18-19 September 2014, Manila) National Highway Management System register or change of route directly Edit Link : separate / merge link Edit Node: event registration, editing of the link attribute Show attribute information of the selected route Change of route attribute information Move and delete Route Show the attribute information of the selected node Changing the attribute information of node Move and delete node 34 Road Asset Management Training Workshop (18-19 September 2014, Manila) National Highway Management System Traffic DB Trafiic Axle Weight (7 species) Traffic volume of 12 species of point-by- point Automatic conversion of traffic Route Data Data linkage 35 Road Asset Management Training Workshop (18-19 September 2014, Manila) National Highway Management System Weather station Station Agency
Temperature Rainfall Amounts Snowfall Amounts
36 Road Asset Management Training Workshop (18-19 September 2014, Manila) National Highway Management System Enter the start and end points on the basis of the event. Start and end points are automatically selected to the corresponding position on the map. Input reason of survey 37 Road Asset Management Training Workshop (18-19 September 2014, Manila) National Highway Management System search by Year, Agency, Route, Direction, and final Repair Method 38 Road Asset Management Training Workshop (18-19 September 2014, Manila) National Highway Management System Search by Year, Agency, Route, direction, final repair method Select the section / display of detailed information 39 Road Asset Management Training Workshop (18-19 September 2014, Manila) National Highway Management System Show the location of points of the section and the detailed survey-results on the map Viziroad Data ARAN Data PES Data 40 Road Asset Management Training Workshop (18-19 September 2014, Manila) National Highway Management System Original Information Maintenance Information Search by distance (15/30/45/60 Km) Detail Information Tunnel Boundary Bridge Intersection JC IC Junction Point Icon for each Events Regional Agency Information 41/41 Road Asset Management Training Workshop (18-19 September 2014, Manila) Thanks for Your Attention!! Q&A?