GOVERNMENT OF ANDHRA PRADESH

PANCHAYAT RAJ ENGINEERING DEPARTMENT

PRADHAN MANTRI GRAM SADAK YOJANA

RIAD - PHASE -

KHAMMAM DISTRICT

PACKAGE NO: AP

VOLUME - I

Sl.No Name of the work Estimated cost in Lakhs


1 2 3
R/F R&B Road to Puligundala
1 282.34
of Charla (M)

Estimated Cost : Rs 282.34 Lakhs.


PRADHAN MANTRI GRAM SADAK YOJANA Format-1
SUMMARY SHEET

Total No. of
Name of the
Habitations
Unconnected habitations Package No.
Block
benefited

>1000 500-1000 250-500 <250 District


1 2 3 4 5 6 7
Charla 5 0 0 1 2 KHAMMAM

No. of New Villages


Estimated Cost
Connected
Total
No. of New
No. of Length of
Type of Work CD CD
Roads Road Pavement
Structures Structure
(Km) from Total SC/ST
from Total (5+6)
Format- Villages Villages
Format-
2A
2B
U 1 8.360 19 217.37 64.97 282.34 5 5

Asst.Executive Engineer Dy.Exe.Engineer Executive Engineer


PR-Charla PRSD-Venkatapuram PR Divn-Bhadrachalam

Superintending.Engineer
PR Circle Khammam
PRADHAN MANTRI GRAM SADAK YOJANA (PMGSY)
Roads Proposed in PMGSY for Rural Connectivity (Pavement Layers) Format-2a
District KHAMMAM Block : CHARLA
Rs. in Lakhs
Name of
Places/Villages Details of Thickness & Cost for pavement Layers Total
Connected by road New
Facility Propose Cost of
constructi Existing Surfacing any
Sl.N accesse d Road Payment
on/upgrad Surface CC

Preparation
o. d (Use Length one (Sum of

Subgrade
ation (use Type Cleaning Gravel road/Re
A/B/C/D) (Km) Prime Tack Road (10) to
From To N/U) Details & Earthwork Shoulde WBM2 WBM3 vetment Seal
Coat coat furniture OGPC (21)
Grubbing rs to Coat
slopes
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
WBM/Eart Thickness 200/
1 R&B Road Puligundala U D 8.360 (mm) -- 450-600 170 75 75 20
hen 230
Cost (Rs.) 1.70 29.01 33.32 19.96 28.23 34.79 6.95 2.44 1.78 11.67 33.76 13.76 217.37

Asst.Executive Engineer Dy.Exe.Engineer Executive Engineer Superintending Engineer


PR-Charla PRSD-Venkatapuram PR Divn-Bhadrachalam PR Circle - Khammam
PRADHAN MANTRI GRAM SADAK YOJANA (PMGSY)
ROADS PROPOSED IN PMGSY FOR RURAL CONNECTIVITY (CROSS DRAINAGE STRUCTURES) Format-2b
District KHAMMAM BLOCK: MANUGURU
(Rs. in Lakhs.)
Existing CD Structure by Type Details of Proposed CD Structure by Type
New
Proposed
Construct
Sl. Road Box/Arch Minor Total
Name of the Road ion/Upgra Hume Pipe Hume Pipe Total Cost of
No. Length Culvert/Pave Minor Bridge Side Drain Bridge/Paved Total Cost of Cost of
dation Culvert Culvert Pavement from
(KM) d Dips Details Dips Proposed CD the Road
(Use N/U) Format-F5
Structures (18 + 19)
No. Dia No. Length No. Length No. Dia No. Length No. Length
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

R/F R&B Road to 30+34= 27.0+1.0=


1 U 8.36 5 600 2 2 - 10 600 1 260 8 222.00 64.97 217.37 282.34
Puligundala 64 28.00

Asst.Executive Engineer Dy.Exe.Engineer Executive Engineer Superintending Engineer


PR-Charla PRSD-Venkatapuram PR Divn-Bhadrachalam PR Circle - Khammam
PRADHAN MANTRI GRAM SADAK YOJANA (PMGSY) Format- 4
DETAILS OF EXISTING ROADS (FOR UPGRADATION)
Block:CHARLA
MANUGURU District: KHAMMAM District: KHAMMAM.
Traffic per day Existing Road Details

Facilities
Road Embankment
Sl. Road accessed WBM Layer Bituminous Layer
Name of the road connecting Total Land Road (Formation)
No. Length (Use Total
to Truck/T Width Width
A/B/C/D) Motorised
ractor (m) (m)
Height Width Width Thicknes Thicknes
Type Width (m)
(m) (m) (m) s (mm) s (mm)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

R/F R&B Road to


1 8.360 Puligundala D 71 12 9 to 12 4.20 0.45/0.60 5.00 3.75 50 mm - - -
Puligundala

Asst.Executive Engineer Dy.Exe.Engineer Executive Engineer Superintending Engineer


PR-Charla PRSD-Venkatapuram PR Division-Bhadrachalam PR Circle - Khammam
PRADHAN MANTRI GRAM SADAK YOJANA Format-4a
SUMMARY SHEET

Whether
Primary New Work Associated proposed
Other new Whether
Through Age of under Habitations served with
Sl No Package PCI subsidery includes
Route the road upgradatio in populations
to ATR
Habitations served with ( ATR) n(U)/Rene package
No
populations wal ( R ) (Y/N)
1 2 3 4 5 6 7 8 9 10 11
1 AP L026 Peddabandirevu(550) 1 14 Yrs U Y Peddabandirevu(550)

Mulkanapally(215) Mulkanapally(215)

Puligundala(282) Puligundala(282)

Bakkachintalapadu(90) Bakkachintalapadu(90)

Kondavai(90) Kondavai(90)

Asst.Executive Engineer Dy.Exe.Engineer Executive Engineer Superintending Engineer


PR-Charla PRSD-Venkatapuram PR Divn-Bhadrachalam PR Circle - Khammam
PRADHAN MANTHRI GRAM SADAK YOJANA
PROFORMA - B
(Package Summary)

Name of the Road Type of Cost of


Sl. Proposed No.of CD Cost of CD Total Estimate Average Cost
Name of the Block Proposal Pavement
No. Length in Km works works Rs. Cost Rs. per Km Rs.
From To *N/U Rs,
1 2 3 4 5 6 7 8 9 10 11

1 Charla R&B Road Puligundala U 8.360 217.37 18 64.97 282.34 33.77

Total Estimate Cost of the Package: Rs. 282.34 Lakhs 26

* N - New Connectivity U - Upgradetion Total Rs. 282.34 Lakhs

Prepared By:
Signature : Technical Scrutiny Done By :
Name : Sri R.Venkateswara Rao. Signature:
Designation: AEE , P.R , Charla (M) Name:

Checked By: Co ordinator: STA :

Signature : Signature:

Name : Sri A.Rambabu Name:

Designation: Dy.Executive Engineer, P.R.Sub-Division, Venkatapuram

Checked By:
Signature :

Name : Sri G.Kondal Reddy


Designation: Executive Engineer, P.R.Division-Bhadrachalam

Scrutinized By:
Signature :
Name : Sri M.A Khadeer
Designation: Superintending Engineer P.R.Circle Khammam
PRADHAN MANTHRI GRAM SADAK YOJANA (PMGSY)
CHECK SLIP FOR P.I.U S.T.A. PROFORMA - C
To be filled by PIU
(Individual road works)

1 Location: Puligundala State: Andhra Pradesh District: Khammam Block: Charla

2 Package.No. AP

3 Name of the Road: From R&B Road to: Puligundala

4 Length( In Km): Total : 8.36 Km In Build up area1.30


: 1.86 Km In Open area: 7.060

5 Estimate Cost Rs: 282.34 Lakhs Cost per Km Rs. : 33.77 Lakhs

Pavement : 215.59

Drianage work : 6.95

Total : 222.54

6 Type of Proposal:- New Connectivity / Upgradetion : Upgradetion

If the Proposed road is a new Connctivity is the road a part of Corenet work Yes

If Yes Through/ Link Route Number L 026

Name of the Unconnected habitation(s) ( to be cross checked with CN-6) :

Population sub served by the Proposed road : 1227


Does the Proposed Road lead up to the Habitation for which it is supposed to provide
connectivity ( In other words are you sure that he road is not being made partially?) YES

Does the Proposed road connect the unconnected Habitation to

a). Another Habitation having all - weather road


(a) (b)
b). Directely to an all Weather road

RR MDR SH NH
c) Indicate the nature of road to which the proposed road leads

If the Proposal is for up gradation is the road a part of the Corenet work YES

It is Associated Through Route or Not

PCI Value 1

Age of the Road 14 Years

It is Certified that there are no other unconnected habitation s in the District YES
a) Whether the proposed road has the disered carriageway width raod way .
7 width road way width and Road land width (RLW) YES
In the Built in the open
b) Indicate the actual widths of the following for the proposed road up area (m) area(m)

a) Carriageway 3.75 3.75

b) Roadway 7.50 7.50

c) Road Land width 9.00 12.00


PRADHAN MANTHRI GRAM SADAK YOJANA (PMGSY)
CHECK SLIP FOR P.I.U S.T.A. PROFORMA - C
To be filled by PIU
(Individual road works)

CROSS SECTION DETAILS

A Cross Section of the existing road showing different component layers:

4.75
4.5mts

4.00 Mts

B. Cross Section of the proposed road showing different component layers:

Km 3/880 to Km 8/360 Km 0/00 to Km 3/880

7.50 mts 7.50 mts


1.875m 3.75 Mts 1.875m 1.875m 3.75 Mts 1.875m

4.0 mts 4.0 mts

8 Base year Traffice Value

Bus/ Agr Cars Three Cycle Cycles Bullock Motorised Non


Truck Trailor/ /Vans/ wheelers Ricksha Carts Motorised
tractors Jeeps w

0 12 26 30 0 24 21 71 21

9 Growth Rate Adopted (%): 6% Projected Traffic : 22 CVPD


10 Sub _Grade CBR
PRADHAN MANTHRI GRAM SADAK YOJANA (PMGSY)
CHECK SLIP FOR P.I.U S.T.A. PROFORMA - C
To be filled by PIU
(Individual road works)

Chainage 0/0to1/0 1/0to2/0 2/0to3/0 3/0to4/0 4/0to5/0 5/0to6/0 6/0to7/0 7/0to8/0 8/0to9/0
CBR(%)

11 Cost Details

a) Clearing and grubbing Cost for Rs. 1.70

b) Pavement Components
Description of Layer Thickness (MM) Cost (Rs.)
Earth work Widening 29.01
Sub Grade Preparation (GSB) 100.00 33.32
Grade - II 75.00 28.23
Grade - III 75.00 34.79
Primer Coat/Tack coat 9.39
OGPC 20.00 33.76
Seal coat 6.00 13.76
Shoulders 170.00 19.96

Protection works: 11.67

12 CD works No.of Existing CD works Do they require any improvement 6 Nos Rs 7.20 Lakhs
If yes Cost of improvement No.of proposed CD works
Cost of Proposed CD works 18 Nos Rs. 50.82 Lakhs

13 Protection works: Length in Km 0.36 km Cost: Rs. 11.67 Lakhs

Pacca Side Drains (If provided) Length 0.26 Cost: 6.95 Lakhs

Road Logo :Other Road Furniture Cost: Rs. 1.78 Lakhs

1 Five Years Routine maintenance: year Cost in Lakhs % of Const cost


I 0.42 3.00
II 2.09 17.00
III 2.09 17.00
IV 3.76 30.00
V 4.18 33.00
Total 12.54 100.00

In Case of Hills roads, the formation and cutting may befilled against Earth wrok and sub grade proparation

14 Whether the road has Geometrics as per Rural Road


YES
Mamual (RRM)
Whether road works / Protection works are provided as
YES
per RRM
Whether the cost estimates are as per standard data
YES
analysis and SSR
PRADHAN MANTHRI GRAM SADAK YOJANA (PMGSY)
CHECK SLIP FOR P.I.U S.T.A. PROFORMA - C
To be filled by PIU
(Individual road works)

field that information provided is true

Prepared By Checked By Checked By Scrutinized By:


Assistant Exe Dy.Executive Executive Engineer, Superintending
Engineer, Engineer, Engineer,
P.R. P.R. P.R.Bhadrachalam P.R.Khammam
Charla Venkatapuram

To be filled by S.T.A.

Name of the STA: NIT Warangal.

15 Is the proposed road entered on the OMMS Yes / No

16 If the proposals is for new connectivity


* Have you satisfied yourself that the proposed Road is a part of Yes / No
the Core New work
* Is the unconnected habitation(s) part of list of unconnected Yes / No
Habitations as per CN - VI
* Does the Proposal ensure full connectivity of target Hatibation Yes / No

a. If No. the name of the unconnection habitations upto


which it is conntected
b. In such unconnected Habitation eligible under PMGSY Yes / No

17 Are you satisfied with the following

* Engineering Serveys Yes / No


* Soil / Material investigation Yes / No
* Traffic surveys / Estimation Yes / No

* Hydraulic Studies Yes / No

18 In case Trafic is projected beyond 45 CVPD

Are you satisfied with the reason Yes / No

19 In case if sub grade CBR is Less than 3%

Has soils stabilisation etc been proposed Yes / No


20 In the Design of the following elements as per Rural Roads Manual

# Aligmnent & Geometric Yes / No


# Pavement Design Yes / No
#CD works and Protection Measures Yes / No
#Side Drains Yes / No
# Integration for Cross and Langitudinal Drainages Yes / No
21 Does the Estimation conform to Standard rate Analysis and SSR Yes / No

22 Does the Proposal have provision for


# PMGSY Logo Sign Boards Yes / No
PRADHAN MANTHRI GRAM SADAK YOJANA (PMGSY)
CHECK SLIP FOR P.I.U S.T.A. PROFORMA - C
To be filled by PIU
(Individual road works)

# KM / HM Stones Yes / No
# Guard Stones ( Where necessary ) Yes / No

# Traffic Sign Boards ( As Necessary ) Yes / No


20 Specific remarks if any by STA

Certified that the Design and Estimation for the proposed Road work are based on the data and SSR

are provided by Engineers. The Proposal after final correction is entered on the OMMS. The Proposal

may be considered for clearance

Technical Scrutiny: Coordinator

Done By: S.T.A.

Signature Signature

Name Name
PRADHAN MANTHRI GRAM SADAK YOJANA (PMGSY)
CHECK SLIP FOR P.I.U S.T.A. PROFORMA - C
To be filled by PIU
(Individual road works)

INDEX MAP

Name of the work :: Providing B.T. to Road from Lingapuram to G.P Pally

M.P. Charla

Km 4/0
km 3/660
G.P Pally 3/480 - Road dam of 30 mts length (Prop)
(km3/540 to 3/660)
3/240- Road dam of 16 mts length(Prop)
3/090- 1Vx600 mm dia., HP culvert (Prop)
Veerapuram
Km 3/0
(km 2/760 to 2/970)

2/770 - 1 Vx 600 mm dia., HP cuvlert(Prop)

Kothuru 2/530 - 1Vx2.5 mts slab cuvlert (EX)


(km 1/840 to 2/430)
Km 2/0

1/470 - 1 V x 4 mts slab culvert (EX)

1/010 -1 V x 600 mm dia HP culvert (Ex)

Mogallapally
(km 1/040 to 1/840)
Km 1/0 Thimmirigudem

(Anand Colony)

V
1/750 - 1V x 2.5 mts slab culvert (Ex)

R
Gompally 0540 - Road dam of 23 mts length (Ex)
(km 0/0 to 0/20)
M

0/430 - 1V x 600 mm dia HP culvert (Ex)


PRADHAN MANTHRI GRAM SADAK YOJANA (PMGSY)
CHECK SLIP FOR P.I.U S.T.A. PROFORMA - C
To be filled by PIU
(Individual road works)

Lingapuram
Km 0/0

&
CHARLA
HQRS
B

WAY TO PWD ROAD ( BCM O


TO VPRM)

K C

O M

H
km 0/000 to 1/040 WBM surface
P
km 1/040 to 1/840 B.T surface
A
km1/840 to 2/970 WBM surface
L
km 2/970 to 3/660 Gravel/WBM surface
L

Y
Mandal Head Quarter

Market Yard

Hospital

ZPHigh Schoor

Jr.College
PRADHAN MANTHRI GRAM SADAK YOJANA (PMGSY)
CHECK SLIP FOR P.I.U S.T.A. PROFORMA - C
To be filled by PIU
(Individual road works)

Km

n
a(m)
PRADHAN MANTHRI GRAM SADAK YOJANA (PMGSY)
CHECK SLIP FOR P.I.U S.T.A. PROFORMA - C
To be filled by PIU
(Individual road works)
PRADHAN MANTHRI GRAM SADAK YOJANA (PMGSY)
CHECK SLIP FOR P.I.U S.T.A. PROFORMA - C
To be filled by PIU
(Individual road works)

Lakhs

Lakhs
PRADHAN MANTHRI GRAM SADAK YOJANA (PMGSY)
CHECK SLIP FOR P.I.U S.T.A. PROFORMA - C
To be filled by PIU
(Individual road works)
PRADHAN MANTHRI GRAM SADAK YOJANA (PMGSY)
CHECK SLIP FOR P.I.U S.T.A. PROFORMA - C
To be filled by PIU
(Individual road works)
PRADHAN MANTHRI GRAM SADAK YOJANA (PMGSY)
CHECK SLIP FOR P.I.U S.T.A. PROFORMA - C
To be filled by PIU
(Individual road works)

INDEX MAP

Km 4/0
km 3/660
G.P Pally 3/480 - Road dam of 30 mts length (Prop)
(km3/540 to 3/660)
3/240- Road dam of 16 mts length(Prop)
3/090- 1Vx600 mm dia., HP culvert (Prop)
Veerapuram
Km 3/0
(km 2/760 to 2/970)

2/770 - 1 Vx 600 mm dia., HP cuvlert(Prop)

Kothuru 2/530 - 1Vx2.5 mts slab cuvlert (EX)


(km 1/840 to 2/430)
Km 2/0

1/470 - 1 V x 4 mts slab culvert (EX)

1/010 -1 V x 600 mm dia HP culvert (Ex)

Mogallapally
(km 1/040 to 1/840)
Km 1/0 Thimmirigudem

(Anand Colony)

V
1/750 - 1V x 2.5 mts slab culvert (Ex)

R
Gompally 0540 - Road dam of 23 mts length (Ex)
(km 0/0 to 0/20)
M

0/430 - 1V x 600 mm dia HP culvert (Ex)


PRADHAN MANTHRI GRAM SADAK YOJANA (PMGSY)
CHECK SLIP FOR P.I.U S.T.A. PROFORMA - C
To be filled by PIU
(Individual road works)

Lingapuram
Km 0/0

&
CHARLA
HQRS
B

WAY TO PWD ROAD ( BCM O


TO VPRM)

K C

O M

H
km 0/000 to 1/040 WBM surface
P
km 1/040 to 1/840 B.T surface
A
km1/840 to 2/970 WBM surface
L
km 2/970 to 3/660 Gravel/WBM surface
L

Y
Mandal Head Quarter

Market Yard

Hospital

ZPHigh Schoor

Jr.College
PRADHAN MANTHRI GRAM SADAK YOJANA (PMGSY)
CHECK SLIP FOR P.I.U S.T.A. PROFORMA - C
To be filled by PIU
(Individual road works)
PRADHAN MANTHRI GRAM SADAK YOJANA (PMGSY)
CHECK SLIP FOR P.I.U S.T.A. PROFORMA - C
To be filled by PIU
(Individual road works)
PRADHAN MANTHRI GRAM SADAK YOJANA (PMGSY)
CHECK SLIP FOR P.I.U S.T.A. PROFORMA - C
To be filled by PIU
(Individual road works)
PRADHAN MANTHRI GRAM SADAK YOJANA (PMGSY)
CHECK SLIP FOR P.I.U S.T.A. PROFORMA - C
To be filled by PIU
(Individual road works)
PRADHAN MANTHRI GRAM SADAK YOJANA (PMGSY)
CHECK SLIP FOR P.I.U S.T.A. PROFORMA - C
To be filled by PIU
(Individual road works)
PRADHAN MANTHRI GRAM SADAK YOJANA (PMGSY)
CHECK SLIP FOR P.I.U S.T.A. PROFORMA - C
To be filled by PIU
(Individual road works)

NDEX MAP
PRADHAN MANTHRI GRAM SADAK YOJANA (PMGSY)
CHECK SLIP FOR P.I.U S.T.A. PROFORMA - C
To be filled by PIU
(Individual road works)
FIELD DATA SHEET FOR TRAFFIC CENSUS (BOTH DIRECTIONS)

Name of the Road R&B Road to Puligundala


Location of Road Pedda Bandirevu
District : Khammam Date: 05-02-2008 Day - 1
State : Andhra Pradesh

Vehicle class
Remarks -
Season: Post
Cars, Jeeps, Motorised Light Commercial Agricultural Tractors Animal
Hour Trucks Buses Cycle Harvest /
Vans, Three Two Vehicles / Trailers Cycles Drawn
Rickshaws Mansoon,
wheelers wheelers vehicles Weather
Laden Unladen Laden Unladen Laden Unladen Laden Unladen
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
From: 8.00 Hrs
10 13 0 0 0 0 6 0 0 0 12 0 8 0
To 14.00 Hrs
From: 14.00 Hrs
11 15 0 0 0 0 5 0 0 0 10 0 10 0
To 20.00 Hrs
From: 20.00 Hrs
3 4 0 0 0 0 0 0 0 0 0 0 0 0
To 2.00 Hrs
From: 2.00 Hrs
5 5 0 0 0 0 0 0 0 0 5 0 5 0
To 8.00 Hrs

Day Total: 29 37 0 0 0 0 11 0 0 0 27 0 23 0

Record traffic volume by tally marks (four vertical strokes followed by a diagonal stroke for the 5th vehicle

Asst.Executive Engineer Dy.Exe.Engineer Executive Engineer Superintending Engineer


PR-Charla PRSD-Venkatapuram PR Divn-Bhadrachalam PR Circle Khammam
FIELD DATA SHEET FOR TRAFFIC CENSUS (BOTH DIRECTIONS)

Name of the Road R&B Road to Puligundala


Location of Road Pedda Bandirevu
District : Khammam Date: 06-02-2008
State : Andhra Pradesh

Vehicle class
Remarks -
Season: Post
Cars, Jeeps, Motorised Light Commercial Agricultural Tractors Animal
Hour Trucks Buses Cycle Harvest /
Vans, Three Two Vehicles / Trailers Cycles Drawn
Rickshaws Mansoon,
wheelers wheelers vehicles Weather
Laden Unladen Laden Unladen Laden Unladen Laden Unladen
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
From: 8.00 Hrs
9 8 0 0 0 0 12 0 0 0 9 0 6 0
To 14.00 Hrs
From: 14.00 Hrs
8 10 0 0 0 0 1 1 0 0 8 0 10 0
To 20.00 Hrs
From: 20.00 Hrs
4 2 0 0 0 0 0 0 0 0 0 0 0 0
To 2.00 Hrs
From: 2.00 Hrs
5 6 0 0 0 0 1 1 0 0 2 0 4 0
To 8.00 Hrs

Day Total: 26 26 0 0 0 0 14 2 0 0 19 0 20 0

Record traffic volume by tally marks (four vertical strokes followed by a diagonal stroke for the 5th vehicle

Asst.Executive Engineer Dy.Exe.Engineer Executive Engineer Superintending Engineer


PR-Charla PRSD-Venkatapuram PR Divn-Bhadrachalam PR Circle Khammam
FIELD DATA SHEET FOR TRAFFIC CENSUS (BOTH DIRECTIONS)

Name of the Road R&B Road to Puligundala


Location of Road Pedda Bandirevu
District : Khammam Date: 07-02-2008
State : Andhra Pradesh

Vehicle class
Remarks -
Season: Post
Cars, Jeeps, Motorised Light Commercial Agricultural Tractors Animal
Hour Trucks Buses Cycle Harvest /
Vans, Three Two Vehicles / Trailers Cycles Drawn
Rickshaws Mansoon,
wheelers wheelers vehicles Weather
Laden Unladen Laden Unladen Laden Unladen Laden Unladen
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
From: 8.00 Hrs
8 9 0 0 0 0 9 0 0 0 12 0 7 0
To 14.00 Hrs
From: 14.00 Hrs
8 9 0 0 0 0 1 0 0 0 8 0 9 0
To 20.00 Hrs
From: 20.00 Hrs
3 2 0 0 0 0 0 0 0 0 0 0 0 0
To 2.00 Hrs
From: 2.00 Hrs
5 6 0 0 0 0 0 2 0 0 6 0 3 0
To 8.00 Hrs

Day Total: 24 26 0 0 0 0 10 2 0 0 26 0 19 0

Record traffic volume by tally marks (four vertical strokes followed by a diagonal stroke for the 5th vehicle

Asst.Executive Engineer Dy.Exe.Engineer Executive Engineer Superintending Engineer


PR-Charla PRSD-Venkatapuram PR Divn-Bhadrachalam PR Circle Khammam
SUMMARY OF 3 - DAY COUNT

Name of the Road R&B Road to Puligundala


Location of Road Pedda Bandirevu
District : Khammam
State : Andhra Pradesh

Vehicle class

Hour Cars, Jeeps, Motorised Light Agricultural Total


Cycle Animal Drawn
Vans, Three Two Commercial Trucks Tractors / Buses Cycles
Rickshaws vehicles
wheelers wheelers Vehicles Trailers
1 2 3 4 5 6 7 8 9 10 11
Day 1 ( Date ) 29 37 0 0 11 0 27 0 23 127

Day 2 ( Date ) 26 26 0 0 14 0 19 0 20 105

Day 3 ( Date ) 24 26 0 0 10 0 26 0 19 105

Total 79 89 0 0 35 0 72 0 62 337

Average daily Traffic 26.00 30.00 0.00 0.00 12.00 0.00 24.00 0.00 21.00 112.00

4.0 Horse
PCU Factor 1 0.5 1.5 3 1.5 3 0.5 2 Drawn 6.0 for --
Bullock drawn

Average daily Traffic


26.00 15.00 0.00 0.00 18.00 0.00 12.00 0.00 126.00 71.00
PCUs

Seasonality Factor used:


Expected AADT 12 PCU
22 CVPD

Asst.Executive Engineer Dy.Exe.Engineer Executive Engineer Superintending Engineer


PR-Charla PRSD-Venkatapuram PR Divn-Bhadrachalam PR Circle Khammam
FLEXIBLE PAVEMENT DESIGN

Name of the work :: R/F R&B Road to Puligundala of Charla (M)

From km 2/850
7/060toto6/0
13/500
Existing surface : : W.B.M/Earthen
Type of soils : : B.C.Soils.
C.B.R. Percentage as per the test result : : 3.65%
Computation of design traffic : : A=P(1+r)^n+x
Where A=No of commercial vehicles per day for design
P=No of commercial vehicles per dayat last count for design
r =Annuval growth rate of commertial traffic.
N=No of years between last count and year of completion of construction.

Cars, Jeeps, Vans, Three wheelers : 26.00

Motorised Two wheelers : 30.00


Light Commercial Vehicles : 0.00
Trucks : 0.00
Agricultural Tractors / Trailers : 12.00
Buses : 0.00
Cycles : 24.00
Cycle Rickshaws : 0
Animal Drawn vehicles : 21.00
116
Commercial wehicles which exceeds 3T/Day at last count : 12 nos
Design for ten years
:P(1+r)^n+x
= P (1+.06)^(n +x)
= 12 (1+.06)^10
= 12 1.791
= 21.49 or say 22 CVPD
From fig 5.10 CBR curves
0/000 - 1/500 &
Chainage 3/880 - 8/360
1/760 - 3/880

Existing surface WBM/Gravel Earth /cart track


Designed pavement thickness :: 380 MM 380 MM

Deduct existing pavement :: 100 MM Gravel -


50 MM WBM -

Proposed pavement thickness :: 230 MM 380 MM

practically revised upwards from


230/380 mm to 250/400 mm 250 MM 400 MM

There fore provide Sub-Base :: 100 MM 150+100 MM

Base Course :: 150 MM 150 MM

Base Course WBM Grade -II :: 75 MM

Base Course WBM Grade -III :: 75 MM

Surfacing B.T. :: 20 MM MM thick OGPMC Hot-Mix Process +Seal coat

Typical section : : Enclosed

Asst.Exe.Engineer Dy. Exe.Engineer Executive Engineer Superintending Engineer


PR-Charla (M) P.R.S.D.Venkatapuram P.R.Divn.Bhadrachalam P.R.Circle , Khammam
1.7908
STRIP LS PLAN

Name of work : R/F R&B Road to Puligundala of Charla Mandal.

9/0

Puligundala 8/2 to 8/4 Proposed Road dam 30 mts length


(7/8 to 8/4) 8/0 to 8/2 Proposed 1V x 0.60 mts pipe culvert
(282) 8/0
7/8 to 8/0 Proposed Road dam of 30 mts
7/4 to 7/6 Proposed 2V x 0.60 mts pipe cuvlert
7/4 to 7/6 Proposed 1V x 0.60 mts pipe cuvlert
7/0 to 7/2 Proposed 1V x 0.60 mts pipe cuvlert
7/0 to 7/2 Proposed 1V x 0.60 mts pipe cuvlert
7/0 Existing Earthen surface km
3/880to8/360

Paddy
6/8 to 7/0 Proposed Road dam of 40 mts

6/0
Mulkalapally 5/8 to 6/0 Proposed 1V x 0.60 mts Pipe culvert
(km 5/840) 5/6 to 5/8 Proposed Road dam of 30 mts
(215) 5/4 to 5/6 Proposed Road dam of 30 mts
5/2 to 5/4 Proposed 1V x 0.60 mts pipe culvert
5/0 to 5/2 Proposed Road dam of 16 mts
5/0

4/2 to 4/4 Proposed 2V x0.60 mts pipe culvert

4/0

3/0 to 3/2 Proposed Road dam 16 mts


3/0
Existing WBM
km 1/760 to 3/880

2/6 to 2/8 Existing Road dam 30 mts.


2/0 to 2/2 Existing 1V x 1.00 mts slab culvert

Peddabandirevu 2/0
(1/5 to2/2) 1/8 to 2/0 Existing 3V x 6.00 mts slab culvert of 27 mts
Existing C.C
(550) 1/6 to 1/8 Existing 1V x 0.60 mts pipe culvert
km 1/5 to 1/760

Page 37 INDXMAP-CD
1/4 to 1/6 Existing 1V x 0.30 mts pipe culvert
1/2 to 1/4 Proposed 1V x 0.60 mts pipe culvert
1/0
0/8 to 1/0 Existing Road dam of 34 mts.
Existing
0/6 to 0/8 Existing 1V x 0.60 mts pipe culvertWBM
km 0/0 to 1/6
0/4 to 0/6 Existing 1V x 0.60 mts pipe culvert
0/2 to 0/4 Existing 1 V x 045 mts pipe culvert
0/0 to 0/2 Proposed Road dam of 30 mts length.
0/0

Charla R&B Road Bhadrachalam

INDEX
Existing
Land
Reaches formatio
width
n width
Km 0/0 to 1/0 4.80 9 to 12
Km 1/0 to 2/0 4.00 9 to 12
Km 2/0 to 3/0 4.20 12 to 14
Km 3/0 to 4/0 4.20 12 to 14
Km 4/0 to 5/0 - 12 to 14
Km 5/0 to 6/0 - 12 to 14
Km 6/0 to 7/0 - 12 to 14
Km 7/0 to 8/0 - 9 to 12
Km 8/0 to 9/0 - 9 to 12

Asst.Exe.Engineer Dy.Exe.Engineer Eexecutive Engineer Superintending Engineer


PR-Charla PR-Venkatapuram PR-Bhadrachalam PR Circle - Khammam

Page 38 INDXMAP-CD
PRADHAN MANTRI GRAM SADAK YOJANA

DISTRICT : KHAMMAM

INDEX

VOLUME - I

1 Executive Summary

2 Format F1 to F9

3 Chapter - 1 - Introduction

4 Chapter - 2 - Alignment

5 Chapter - 3 - Land Acquisition

6 Chapter - 4 - Topography Survey

7 Chapter - 5 - Geometric Design Standard

8 Chapter - 6 - Soil and Material Survey

9 Chapter - 7 - Traffic Survey

10 Chapter - 8 - Pavement Design

11 Chapter - 9 - Hydrological Surveys

12 Chapter - 10 - Design and Cross Drianage Structure

& integration of Drainage System

13 Chapter - 11 - Protective Works

14 Chapter - 12 - Specifications

15 Chapter - 13 - Environmental Issues & Mitigation measures

16 Chapter - 14 - Analysis of Rates

17 Chapter - 15 - Estimate

18 Chapter - 16 - Construction programme

19 Chapter - 17 - Undertaking for Future maintenance


TYPICAL CROSS-SECTION
Name of work :- R/F R&B Road to Puligundala of Charla Mandal
From km 0/0 to 1/500 & 1/760 to 3/880

7.50M

1.875 3.75M 1.875

1:2 1:2

0.75 m
4.0 M

EXISTING EARTHWORK 0.45 m

10.7
0m
a

Prop. Gravel Shoulder 170mm thick


Prop. B.T. 20mm thick
PROPOSED B.T. Prop.Gr II & III WBM 75mm thick each
PROPOSED WBM Proposed GSB 100mm thcik
EXISTING WBM Existing WBM 50 mm thick
EXISTING GRAVEL Existing Gravel sub base 80 mm thick.
PROPOSED GRAVEL
PROPOSED GRAVEL SHOULDERS

Executive Engineer Supdt. Engineer


Asst.Exe.Engineer Dy.Exe.Engineer PR Circle -Khammam
PR Divn - Bhadrachalam
PR-Charla PRSD-Venkatapuram
Executive Engineer
Asst.Exe.Engineer Dy.Exe.Engineer
PR Divn - Bhadrachalam
PR-Charla PRSD-Venkatapuram
TYPICAL CROSS-SECTION
Name of work :- R/F R&B Road to Puligundala of Charla Mandal
From km 3/880 to 8/360

7.50M

1.00 3.75M 1.00

1:1,5 1:1,5

0.90m
4.0 M
0.45m

10.70m

1
: Prop. Gravel Berm 170mm thick
2 Prop. B.T. 20mm thick
PROPOSED B.T. Prop. WBM 75mm thick each

PROPOSED WBM Proposed WBM 100mm thcik

PROPOSED GRAVEL Proposed Gravel sub base 150mm thick

PROPOSED EARTH WORK

PROPOSED GRAVEL BERMS


PROPOSED EMBANKMENT

Dy.Exe.Engineer Executive Engineer Supdt. Engineer


Asst.Exe.Engineer PR Circle -Khammam
PRSD-Venkatapuram PR Divn - Bhadrachalam
PR-Charla
TYPICAL CROSS-SECTION
Name of work :- R/F R&B Road to Puligundala of Charla Mandal
From km 1/500 to 1/760

7.50M

1.00 3.75M 1.00

1:2 1:2

0.75m
4.0 mts
0.45m
EXISTING EARTHWORK

10.70m

EXISTING C.C Prop. Gravel Berm 170mm thick


Prop. B.T. 20mm thick
PROPOSED B.T. Prop. WBM 75mm thick each

EXISTING WBM EXST WBM 50mm thcik

PROPOSED WBM EXST. Gravel sub base 80mm thick

EXISTING GRAVEL EXST. CC Road of 200 mm thick

PROPOSED GRAVEL

PROPOSED GRAVEL BERMS

Asst.Exe.Engineer Dy.Exe.Engineer Executive Engineer Supdt. Engineer


PR-Charla PRSD-Venkatapuram PR Divn - Bhadrachalam PR Circle -Khammam
Asst.Exe.Engineer Dy.Exe.Engineer Executive Engineer Supdt. Engineer
PR-Charla PRSD-Venkatapuram PR Divn - Bhadrachalam PR Circle -Khammam
TYPICAL LONGITUDINAL SECTION

Name of the work: R/F R&B Road to Puligundala of Charla Mandal.

0/0 1/0km km 2/0 3/0 4/0 5/0 6/0 7/0 8/0 8/360
km3/880
1/5 1/760
3/880

Mulkalapally Puligundala
Existing WBM Earthen surface
Pedda bandirevu
Existing C.C Existing WBM

EXISTING C.C
EXISTING B.T PROPOSED B.T. 20mm thick
EXISTING WBM PROPOSED WBM
EXISTING GRAVEL SUB BASE PROPOSED GRAVEL SUB BASE

Asst.Exe.Engineer Superintending Engineer


Dy.Exe.Engineer Eexecutive Engineer PR Circle - Khammam
PR-Charla
PR-Venkatapuram PR-Bhadrachalam
KEY MAP
Name of the work: R/F R&B Road Seethanagaram to Puligundala of Charla Mandal

CHARLA
MANDAL
HQRS
KM 54/0

V
P
G R
O M
D
A
V
A
R
I
TALIPERU VAGU

R
I
V
E S.N.Puram
R km 43/0 R
&
B
Km
parnasala 34/0

Konduvai

B km 8/860
C
M
km 0/0 Bakkachintala
padu
Puligundala
Seethanagaram
km 32/0 Mulkalapally
Peddabandirevu

Sl.No. Item Symbol


Dummugudem 1 Mandal HQR
Mandal
2 Hospital
Bhadrachalam km0/0 3 Jr.College
4 Z.P.H.S
5 Marketing centres
6 Proposed Road

Asst.Exe.Engineer Dy.Exe.Engineer Eexecutive Engineer Superintending Engineer


PR-Charla PR-Venkatapuram PR-Bhadrachalam PR Circle - Khammam
Asst.Exe.Engineer Dy.Exe.Engineer Eexecutive Engineer Superintending Engineer
PR-Charla PR-Venkatapuram PR-Bhadrachalam PR Circle - Khammam
INDEX MAP NOT TO SCALE
Name of the work: R/F R&B Road Seethanagaram to Puligundala of Charla Mandal

CHARLA
MANDAL
HQRS
KM 54/0

V
* P
G R
O M
D
A
V
A
R
I
TALIPERU VAGU

R
I
V
E S.N.Puram
R km 43/0 R
&
B
Km
parnasala 34/0

Konduvai

B km 8/860
C
M
Bakkachintala
km 0/0 padu
Puligundala
Seethanagaram
km 32/0 Mulkalapally
Peddabandirevu

Sl.No. Item Symbol


Dummugudem 1 Mandal HQR
Mandal
2 Hospital
Bhadrachalam km0/0 3 Jr.College
4 Z.P.H.S
5 Marketing centres
6 Proposed Road

Asst.Exe.Engineer Dy.Exe.Engineer Eexecutive Engineer Superintending Engineer


PR-Charla PR-Venkatapuram PR-Bhadrachalam PR Circle - Khammam
Asst.Exe.Engineer Dy.Exe.Engineer Eexecutive Engineer Superintending Engineer
PR-Charla PR-Venkatapuram PR-Bhadrachalam PR Circle - Khammam
QUARRY CHART
Name of the work: R/F R&B Road Seethanagarma to Puligundala of Charla Mandal.

Sand Metal HBG Metal M/C Gravel


9/0 MR 14.50 15.50 56.50 12.50
CT 0.00 0.00 0.00 0.00
WM 0.50 0.50 0.50 0.50
Total 15.00 16.00 57.00 13.00
8/0 MR 13.50 14.50 55.50 11.50
CT 0.00 0.00 0.00 0.00
WM 0.50 0.50 0.50 0.50
Total 14.00 15.00 56.00 12.00
7/0 MR 12.50 13.50 54.50 10.50
CT 0.00 0.00 0.00 0.00
WM 0.50 0.50 0.50 0.50
Total 13.00 14.00 55.00 11.00
6/0 MR 11.50 12.50 53.50 9.50
CT 0.00 0.00 0.00 0.00
WM 0.50 0.50 0.50 0.50
Total 12.00 13.00 54.00 10.00
5/0 MR 10.50 11.50 52.50 8.50
CT 0.00 0.00 0.00 0.00
WM 0.50 0.50 0.50 0.50
Total 11.00 12.00 53.00 9.00
4/0 MR 9.50 10.50 51.50 7.50
CT 0.00 0.00 0.00 0.00
WM 0.50 0.50 0.50 0.50
Total 10.00 11.00 52.00 8.00
3/0 MR 8.50 9.50 50.50 6.50
CT 0.00 0.00 0.00 0.00
WM 0.50 0.50 0.50 0.50
Total 9.00 10.00 51.00 7.00
2/0 MR 7.50 8.50 49.50 5.50
CT 0.00 0.00 0.00 0.00
Metal HBG
Gravel WM 0.50 0.50 0.50 0.50
Local
quarry 1/0 Total 8.00 9.00 50.00 6.00
MR 6.50 7.50 48.50 4.50
CT 0.50 0.50 0.50 0.50
WM 0.00 0.00 0.00 0.00
km 4,5
km 7,5 0/0 Total 7.00 8.00 49.00 5.00

CHARLA R&B ROAD BHADRACHALAM

km 48,50
km 6,50

Sand quarry Metal


Seetha Vagu M/C
Banjara

Asst.Exe.Engineer Dy.Exe.Engineer Eexecutive Engineer Superintending Engineer


PR-Charla PR-Venkatapuram PR-Bhadrachalam PR Circle - Khammam
Asst.Exe.Engineer Dy.Exe.Engineer Eexecutive Engineer Superintending Engineer
PR-Charla PR-Venkatapuram PR-Bhadrachalam PR Circle - Khammam
QUARRY MAP

Name of the work: R/F R&B Road to Puligundala of Charla Mandal.

Charla
Mandal
HQRS

TALIPERU VAGU

Metal
34/0 HBG
Parnasala

CHARLA km 7.50

Gravel

km 4.50

Seethanagaram km0/0 Puligundala


km 32/0 km9/0
GODAVARI RIVER

km6.50

Sand
quarry
BCM

km 48.50

0/0

KTGDM

Banjar Bhadrachalam

Metal M/C
Chintoor

Asst.Exe.Engineer Dy.Exe.Engineer Eexecutive Engineer Superintending Engineer


PR-Charla PR-Venkatapuram PR-Bhadrachalam PR Circle - Khammam
Asst.Exe.Engineer Dy.Exe.Engineer Eexecutive Engineer Superintending Engineer
PR-Charla PR-Venkatapuram PR-Bhadrachalam PR Circle - Khammam
DISCHARGE CALCULATIONS

Name of work : C/O of Road dam of 30 mts length on R/F R&B Road to Puligundala of Charla Mandal.

100.00

99.50

99.00

98.50
R.L.

98.00

97.50

97.00
-35 -30 -25 -20 -15 -10 -5 0 5 10 15 20 25 30 35 40 45
Chainage

Hydraulic Data

Bed Level = 98.20


O.F.L./RTL = 98.70 Height of HFL 0.80 mts
H.F.L. = 99.00 Height of OFL 0.50 mts
Bed width = 30.00 mts

Discharge calculation: Discharge at HFL:

Difference
Mean Wetter Wetted
Chainage G.L. H.F.L. between H.F.L. Length
Difference area Perimeter
& G.L.

25 98.200 99.00 0.80 - - - -


10 98.100 99.00 0.90 0.85 15 12.75 15
5 98.200 99.00 0.80 0.85 5 4.25 5
0 98.200 99.00 0.80 0.80 5 4.00 5
5 98.200 99.00 0.80 0.80 5 4.00 5
10 98.285 99.00 0.72 0.76 5 3.79 5
15 98.260 99.00 0.74 0.73 5 3.64 5
20 98.200 99.00 0.80 0.77 5 3.85 5
25 98.200 99.00 0.80 0.80 5 4.00 5
30 99.000 99.00 0.00 0.40 5 2.00 5
42.28 55.00

Discharge at OFL:
Difference
Mean Wetter Wetted
Chainage G.L. H.F.L. between H.F.L. Length
Difference area Perimeter
& G.L.

25 98.200 99.00 0.80 - - - -


10 98.100 99.00 0.90 0.85 15 12.75 15
5 98.200 99.00 0.80 0.85 5 4.25 5
0 98.200 99.00 0.80 0.80 5 4.00 5
5 98.200 99.00 0.80 0.80 5 4.00 5
10 98.285 99.00 0.72 0.76 5 3.79 5
15 98.260 99.00 0.74 0.73 5 3.64 5
20 98.200 99.00 0.80 0.77 5 3.85 5
25 98.200 99.00 0.80 0.80 5 4.00 5
30 99.000 99.00 0.00 0.40 5 2.00 5
17.28 25.00

Calculation of scour depth :

Hydraulic mean depth : R = Wetted area / Wetted Perimeter


= 42.28 / 55.00
= 0.77 mts

Velocity = ( R2/3 x S1/2 ) / 0.045 = ( 1.122/3 x0.00671/2 ) / 0.045

V = (1.07 x0.0816 ) / 0.045 = 1.940 m/sec.

Discharge ( Q ) = A x V = 42.28 x1.94 = 82.01 m3 / sec

Maximum Discharge Qmax ) = 1.30 x Q


= 1.30 x 82.01 = 106.62 m3 / sec

Normal scour depth = 0.4723 ( Q / f )1/3


Where f is silt factor, taken f = 1.0
Normal scour depth = 0.473 x ( 106.62 / 1.00 )1/3 = 2.243 mts

Maximum scour depth = 2 times the normal scour depth


= 2 x 2.243 = 4.486 mts from H.F.L.

R.L. foundation = H.F.L. - Depth


= 99.00 - 3.213 = 94.514

Depth of foundation below sill level = Bed level - R.L. of foundation


=98.20 -94.514
3.69 mts

Asst.Exe.Engineer Dy.Exe.Engineer Executive Engineer Supdt. Engineer


PR-Charla PRSD-Venkatapuram PR Divn - Bhadrachalam PR Circle -Khammam
Asst.Exe.Engineer Dy.Exe.Engineer Executive Engineer Supdt. Engineer
PR-Charla PRSD-Venkatapuram PR Divn - Bhadrachalam PR Circle -Khammam
HYDRAULIC PARTICULARS

1 V 600 MM DIA PIPE CULVERT


Name of work : C/O of Road dam of 30 mts length on R/F R&B Road to Puligundala of Charla
Mandal.

Catchment area = 7 Acres

= 7x 4046.86 sqm

= 28328.02 or say 0.03 sq.km

Maximum discharge Q= CM^3/4


(As per Dicken's formula)
Where C= Constatn depends upon the intensity of rainfall
C = 11
M = Area of catchment in sq.km

Q= 0.31 cumecs

Assumed velocity of flow = 1.2 m/sec

Area of the vent way = Discharge /Velocity

A= 0.26 sqmts

Provide 1 V of 600 mm dia., RCC NP3 class pipe D= 0.6 mts

Area of ventage provide A = 0.28 sqm > 0.26 sqm

Hence O.K

Length of the body wall L = 2H+(nD+(n-1)D/2)+0.60

Where H= Height of the Body wall from the sill level. = 1.6 mts
D= Internal diametre of the RCC NP3 class pipe. = 0.6 mts
n= No. of vents provided. = 1 no

L= 2x1.60+(1x0.60)+(1-1)0.60/2+0.60
= 4.4 mts

As per site conditions provide 6.0 mts length of the body wall.

Executive Engineer Supdt. Engineer


Asst.Exe.Engineer Dy.Exe.Engineer
PR Divn - PR Circle -Khammam
PR-Charla PRSD-Venkatapuram
Bhadrachalam
HYDRAULIC PARTICULARS

2 V 600 MM DIA PIPE CULVERT

Name of work : C/O of Road dam of 30 mts length on R/F R&B Road to Puligundala of Charla
Mandal.

Catchment area = 11 Acres

= 11 x 4046.86 sqm

= 44515.46 or say 0.04 sq.km

Maximum discharge Q= CM^3/4


(As per Dicken's formula)
Where C= Constatn depends upon the intensity of rainfall
C = 11
M = Area of catchment in sq.km

Q= 0.49 cumecs

Assumed velocity of flow = 1.2 m/sec

Area of the vent way = Discharge /Velocity

A= 0.41 sqmts

Provide 2 V of 600 mm dia., RCC NP3 class pipe D= 0.6 mts

Area of ventage provide A = 0.57 sqm > 0.41 sqm

Hence O.K

Length of the body wall L = 2H+(nD+(n-1)D/2)+0.60

Where H= Height of the Body wall from the sill level. = 1.6 mts
D= Internal diametre of the RCC NP3 class pipe. = 0.6 mts
n= No. of vents provided. = 1 no

L= 2x1.60+(2x0.60)+(2-1)0.60/2+0.60
= 5.3 mts

As per site conditions provide 8.00 mts length body walls.

Executive Engineer Supdt. Engineer


Asst.Exe.Engineer Dy.Exe.Engineer
PR Divn - PR Circle -Khammam
PR-Charla PRSD-Venkatapuram
Bhadrachalam
Asst.Exe.Engineer Dy.Exe.Engineer Executive Engineer
PR-Charla PRSD-Venkatapuram PR Divn -
Bhadrachalam
FORMAT
RATE 7
ANALYSIS

Name of the work :- R/F R&B Road to Puligundala of Charla Mandal.

Reference to
Sl. Amount in
MORD Description Unit
No. Specifications Rs.

1 2 3 4 5 6
1 Clearind and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees
of girth up to 300mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and
stacking of serviceable material to be used or auctioned upto a lead of 1000m including disposal of top organic
soil not exceeding 150 mm in thickness as per technical specification clause 201-1 of MORD.

1 sqm 2.90

2 Construction and widening of existing embankment with approved materails deposited at site materail obtained
from roadway cutting including breaking clods, ramming, spreading, sectioning, grading, compacting with 8-10
Tonnes power roller to OMC compaction including to a top width of 7.50M and raising to required height
including seigniorage charges complete etc., as per the requirement of Table 300-1 and 300-2 as per technical
specification clause 301.5 of MORD.

1 cum 81.05

3 Earth work excavation and depositing on the bank for widening of existing embankment using cutted earth
material with carting in all soils upto soft disintegrated rock and stone matrix with in a radius of 5 M including
breaking clods, benching, ramming and sectioning the embankment and formation to a top width of 7.50 m upto
95% proctors density etc. complete including seigniorage charges for raising and widening the embankment
using machinery as per SS 20A and technical specification APDSS 302 & 303 with a least lead of 500 m (carted
earth)

1 cum 112.75

4 Construction of granular sub base by providing well graded meterial (i.e Stone aggregates of 9.5 mm to 4.75 mm
size Gravel of 66% and sand of size < 2.6mm @ 34% )having soaked CBR not less than 15% and Plasticity Index
< 6 and stacking at site to the departmentel gauge for pre measurements and mixing them and spreading the
same with motor grader in uniform layers of loose thickness of not more than 225mm including mixing by mix in
place method with rotavator to OMC and compacting with three wheeled power roller of 8 to 10 Tonnes capacity
to achieve the desired density, complete as per IRC technical specification clause 402 of MORD.

Page 60 of 173
FORMAT 7
Reference to
Sl. Amount in
MORD Description Unit
No. Specifications Rs.

1 cum 389.15

5 Construction of Granualar shoulder by providing well graded meterial (i.e 66% gravel and 34% sand) having
soaked CBR not less than 15% and Plasticity Index < 6 and stacking at site to the departmentel gauge for pre
measurements and mixing them and spreading the same with motor grader in uniform layers of loose thickness
of not more than 225mm including mixing by mix in place method with rotavator to OMC and compacting with
three wheeled power roller of 8 to 10 Tonnes capacity to achieve the desired density, complete as per IRC
technical specification clause 402 of MORD.

1 cum 389.15
6 Providing, Water Bound Macadam base for a compacted thickness of 75mm using Grade-II HBG crushed stone
aggregates (63 mm to 45 mm size), screenings and binder confirming to table 400-8 of MORD "Standard
Specifications for the rural roads) including cost, seigniorage and conveyance of all materials, spreading in
uniform thickness, hand packing, rolling with static power roller of 8-10 tons in stages to proper grade and
camber, applying and brooming requisite type of screening binding materials to fill up the interstices of coarse
aggregate, watering and compacting to the required density or finished item of work as directed by the
Engineer-in-Charge as per MORD clause No.405

1 cum 1258.75

7 Providing, Water Bound Macadam base for a compacted thickness of 75mm using Grade-III HBG crushed stone
aggregates ( 53 mm to 22.40 mm size), screenings and binder confirming to table 400-8 of MORD "Standard
Specifications for rural roads) including cost, seigniorage and conveyance of all materials, spreading in uniform
thickness, hand packing, rolling with static power roller of 8-10 tons in stages to proper grade and camber,
applying and brooming requisite type of screening binding materials to fill up the interstices of coarse
aggregate, watering and compacting to the required density or finished item of work as directed by the
Engineer-in-Charge as per MORD clause No.405

1550.90

8 Providing and applying Prime Coat with butimen emulsion (Medium Setting- SS-1) on prepared surface of
granular base incliding cleaning of road surface and spraying primer at the rate of 0.85Kg/Sqm using
mechanical means as clause 502 of MORD.

1 sqm 23.25

Page 61 of 173
FORMAT 7
Reference to
Sl. Amount in
MORD Description Unit
No. Specifications Rs.

9 Providing and applying Tack Coat with butimen emulsion (Rapid Setting- RS-1) using emulsion distributor @
0.275 kg per sqm on prepared surface incliding cleaning of road surface and spraying primer at the rate of
0.275Kg/Sqm using mechanical means as clause 503 of MORD.

1 sqm 8.15
10 Providing and laying Open Graded Premix Carpet (OGPC) surfacing material of 20 mm thick composed of 13.20
mm to 5.60 mm size machine crushed hard blasted granite chips using bitumen of 60/70 grade at the rate of
14.60 kgs per 10 sqm area of road surface over tack coat to required line, level, grade to serve as wearing
course on previously prepared base including mixing in a Hot Mix Plant of 30/40 TPH, laying with mechanical
paver finisher and rolloing with three wheeled 8-10 Tonnes capacity power roller and finishing to required level
and grades including cost and conveyance of all materials from approved sources, seigniorage, labour charges
and hire and operational charges of power road roller and all other machinery, tools and plants, providing
barricading for diversion of traffic, erecting red flags other incidental and operational charges etc., complete for
finished item of work as per clause 508 of MORD.

1 sqm 112.90

11 Providing and laying bituminous liquid seal coat (Type A) comprising of a layer of bitumuneous binder followed
by a cover of stone chipping of grading as defined in table 500.16 of MOST at 0.09 cum/10sqm of chips to be laid
simultaneously along with the bitumunous course using 9.80 kgs of bitumen 60/70 grade for 10 sqm and rolling
with power roller including of required line, level, grade to serve as wearing course on previously prepared
surface and finishing to rquired level and grades including cost and conveyance of all materials from approved
sources and stacking at site to departmental gauge for premeasurements, seigniorage, labour charges and hire
and operational charges of power road roller 8 to 10 tonnes capacity and all other machinery, tools and plants,
providing barricading for diversion of traffic, erecting red flags other incidental and operational charges etc.,
complete for finished item of work as per technical specification clause 510 of MORD.

1 sqm 46.00

12 Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and
technical specifications Clause 802, 803, 1202 & 1203
I. P.C.C grade M 10
(i) Nominal mix 1:3:6
Unit = cum
1 cum 2,914.78

Page 62 of 173
FORMAT 7
Reference to
Sl. Amount in
MORD Description Unit
No. Specifications Rs.

13 Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of
granular material in single row including fixing collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete and masonry works in head walls and parapets
Clause 1106.

(B) 600 mm dia


1 Each 2,342.10

14 II. P.C.C grade M 15


1 cum 2,887.95

15 Earth work excavation and depositing on bank with an initial lead of 10 M and lift of 2 M in ordinary
gravel soils, BC soils including seigniorage charges etc. complete for foundations

1 cum 58.83

19 Providing and laying Reinforced Cement Concrete in Super Structure as per Drawing and technical Specification
Clauses 800 ,1205.4 &1205.50

RCC M30
1 cum 4,304.57

16 Supplying, fitting, and placing HYSD bar reinforcement in superstucture complete as per drawing and technical
specifications Clauses 1002,1010 and 1202.
Unit = cum
a) Material
f) 1 M.T 42,597.53

17 Providing and Laying Cement Concrete wearing Course M30 Grade excluding reinforcement complete as per
drawing and technical specifications Clauses 800 and 1206.30.
Unit = Cum
a)

Page 63 of 173
FORMAT 7
Reference to
Sl. Amount in
MORD Description Unit
No. Specifications Rs.

1 cum 6,803.08

18 Providing and Laying Boulder apron for bed protection with stone boulders of minimum size and weight as per
table 1300.10 no fragment weighing not less than 25kg laid dry complete as per drawing and technical
specification Clause 1301.

1 cum 577.91

19 Filling in between body walls with gravel including cost,conveyance and seignorage of all materials to site etc.,
complete as per Clause 710.1.4 of IRC:78 and as per drawing and technical specifications for finished item of
work.
1 cum 247.91
./cum

20 Sand filling in foundation including cost, seignorage and conveyance of all materials to site and watering and
tamping etc., complete. For finished item of work .

1 cum 257.93
./cum

Asst.Executive Engineer Deputy Executive Engineer Executive Engineer


PR-Charla PRSD-Venkatapuram PR Divn-Bhadrachalam

Superintending Engineer
PR Circle - Khammam

Page 64 of 173
Data Sheet

RATE ANALYSIS

Name of the work :- R/F R&B Road to Puligundala of Charla Mandal.

S.No. Description of item Unit Qry Rate Amount

1 Clearind and grubbing road land including uprooting wild vegetation,


grass, bushes, shrubs, saplings and trees of girth up to 300mm, removal
of stumps of such trees cut earlier and disposal of unserviceable
materials and stacking of serviceable material to be used or auctioned
upto a lead of 1000m including disposal of top organic soil not exceeding
150 mm in thickness as per technical specification clause 201-1 of MORD.

By Machanical Means
Out put = 1 Hectare
a) Labour
Mate day 0.16 160.00 25.60
Mazdoor (un-skilled) day 4.00 130.00 520.00
b) Machinery
Dozer D-50 with attachment or suitable hour 10.00 2400.00 24000.00
machinery for removal of trees & stumps

Tractor with trolley hour 1.00 300.00 300.00


Total 24845.60
c) Over head charges & Contractors profit @ 16.50% on (a+b+c) 4099.52
Rate for hectare 28945.12
Rate per 1 Sqm = (a+b+c+d)/10116.81 2.90

2 Construction and widening of existing embankment with approved


materails deposited at site materail obtained from roadway cutting
including breaking clods, ramming, spreading, sectioning, grading,
compacting with 8-10 Tonnes power roller to OMC compaction including
to a top width of 7.50M and raising to required height including
seigniorage charges complete etc., as per the requirement of Table 300-1
and 300-2 as per technical specification clause 301.5 of MORD.

Taking Out put = 100 Cum


a) Labour
Mate day 0.02 160.00 3.20
Mazdoor day 0.50 130.00 65.00
b) Machinery
Dozer D-50 for spreading @ 200 cum per hour 0.50 2400.00 1200.00
hour
Tractor with rotavator @ 25 cum per hour hour 4.00 300.00 1200.00

Water tanker 6kl capacity hour 2.00 300.00 600.00


Power road roller 80 - 100KN capacity hour 1.25 470.00 587.50
c) Material

Page 65 of 173
Data Sheet

S.No. Description of item Unit Qry Rate Amount

Excavation in all soils upto SDR& stone cum 100.00 13.00 1300.00
matrix with machinary with in a raidus of
5 mts Basic rate as per SS20B as per
G.O Ms. No 10 dt:25.11.2002.

Seignorage Charges for earth cum 100.00 20.00 2000.00


Total 6955.70
d) Over head charges & Contractors profit @ 16.50% on (a+b+c) 1147.69
Rate for 100 cum 8103.39
Rate per cum = (a+b+c+d)/100 81.05

3 Earth work excavation and depositing on the bank for widening of


existing embankment using cutted earth material with carting in all soils
upto soft disintegrated rock and stone matrix with in a radius of 5 M
including breaking clods, benching, ramming and sectioning the
embankment and formation to a top width of 7.50 m upto 95% proctors
density etc. complete including seigniorage charges for raising and
widening the embankment using machinery as per SS 20A and technical
specification APDSS 302 & 303 with a least lead of 500 m (carted earth)

Taking Out put = 100 Cum


a) Labour
Mate day 0.04 160.00 6.40
Mazdoor day 1.00 130.00 130.00
b) Machinery
Dozer D-50 for spreading @ 200 cum per hour 0.50 2400.00 1200.00
hour
Motor grader for grading @ 200 cum per hour 0.50 2260.00 1130.00
hour
Water tanker 6kl capacity hour 2.00 300.00 600.00
Power road roller 80 - 100KN capacity hour 1.25 470.00 587.50
c) Material
Lead upto 250 mts cum 100.00 40.20 4020.00
Seignorage Charges for earth cum 100.00 20.00 2000.00
Total 9673.90
d) Over head charges & Contractors profit @ 16.50% on (a+b+c) 1596.19
Rate for 100 cum 11270.09
Rate per cum = (a+b+c+d)/100 112.75

4 Construction of granular sub base by providing well graded meterial (i.e


Stone aggregates of 9.5 mm to 4.75 mm size Gravel of 66% and sand of
size < 2.6mm @ 34% )having soaked CBR not less than 15% and Plasticity
Index < 6 and stacking at site to the departmentel gauge for pre
measurements and mixing them and spreading the same with motor
grader in uniform layers of loose thickness of not more than 225mm
including mixing by mix in place method with rotavator to OMC and
compacting with three wheeled power roller of 8 to 10 Tonnes capacity to
achieve the desired density, complete as per IRC technical specification
clause 402 of MORD.

Page 66 of 173
Data Sheet

S.No. Description of item Unit Qry Rate Amount

Taking out put = 300 cum


a) Labour
Mate day 0.40 160.00 64.00
Mazdoor (Skilled) day 2.00 130.00 260.00
Mazdoor (Un-Skilled) day 8.00 130.00 1040.00
b) Machinery
Three wheeled 80-100 kN power roller @ hour 30.00 470.00 14100.00
10 cum per hour
Water tanker 6kl capacity hour 5.00 300.00 1500.00
Tractor with grader @ 25 cum per hour hour 12.00 300.00 3600.00
Tractor with rotavator @ 25 cum per hour hour 12.00 300.00 3600.00

c) Material
Well graded granular sub-base material
as per table 400.2
Cost of materials
9.5 mm to 4.75 mm @ 66% (Gravel) cum 255.00 68.00 17340.00
2.36 mm below @ 34% (Sand) cum 129.00 73.00 9417.00
Sub-Total 50921.00
Conveyence
9.5 mm to 4.75 mm @ 66% (Gravel) cum 255.00 124.50 31747.50
2.36 mm below @ 34% (Sand) cum 129.00 135.90 17531.10
Grand Total 100199.60
d) Over head charges & Contractors profit @ 16.50% on (a+b+c) 16532.93
Rate for 300 cum 116732.53
Rate per cum = (a+b+c+d)/300 389.15

5 Construction of Granualar shoulder by providing well graded meterial (i.e


66% gravel and 34% sand) having soaked CBR not less than 15% and
Plasticity Index < 6 and stacking at site to the departmentel gauge for pre
measurements and mixing them and spreading the same with motor
grader in uniform layers of loose thickness of not more than 225mm
including mixing by mix in place method with rotavator to OMC and
compacting with three wheeled power roller of 8 to 10 Tonnes capacity to
achieve the desired density, complete as per IRC technical specification
clause 402 of MORD.

Taking out put = 300 cum


a) Labour
Mate day 0.40 160.00 64.00
Mazdoor (Skilled) day 2.00 130.00 260.00
Mazdoor (Un-Skilled) day 8.00 130.00 1040.00
b) Machinery

Three wheeled 80-100 kN power roller @ hour 30.00 470.00 14100.00


10 cum per hour

Water tanker 6kl capacity hour 5.00 300.00 1500.00


Tractor with grader @ 25 cum per hour hour 12.00 300.00 3600.00

Page 67 of 173
Data Sheet

S.No. Description of item Unit Qry Rate Amount

Tractor with rotavator @ 25 cum per hour hour 12.00 300.00 3600.00

c) Material
Well graded granular sub-base material
as per table 400.2
Cost of materials
9.5 mm to 4.75 mm @ 66% (Gravel) cum 255.00 68.00 17340.00
2.36 mm below @ 34% (sand) cum 129.00 73.00 9417.00
Sub-Total 50921.00
Conveyence
9.5 mm to 4.75 mm @ 66% (Gravel) cum 255.00 124.50 31747.50
2.36 mm below @ 34% (sand) cum 129.00 135.90 17531.10
Grand Total 100199.60
d) Over head charges & Contractors profit @ 16.50% on (a+b+c) 16532.93
Rate for 300 cum 116732.53
Rate per cum = (a+b+c+d)/300 389.15
6 Providing, Water Bound Macadam base for a compacted thickness of
75mm using Grade-II HBG crushed stone aggregates (63 mm to 45 mm
size), screenings and binder confirming to table 400-8 of MORD "Standard
Specifications for the rural roads) including cost, seigniorage and
conveyance of all materials, spreading in uniform thickness, hand
packing, rolling with static power roller of 8-10 tons in stages to proper
grade and camber, applying and brooming requisite type of screening
binding materials to fill up the interstices of coarse aggregate, watering
and compacting to the required density or finished item of work as
directed by the Engineer-in-Charge as per MORD clause No.405

By manual Means
Taking out put = 360 cum
a) Labour
Mate day 10.08 160.00 1612.80
Mazdoor (Skilled) day 2.00 130.00 260.00
Mazdoor (Un-Skilled) day 250.00 130.00 32500.00
b) Machinery
Three wheeled 80-100 kN power roller @ hour 45.00 470.00 21150.00
8 cum per hour
Water tanker 6kl capacity hour 24.00 300.00 7200.00
c) Material
Cost of materials
63 mm to 45 mm size HBG aggregates cum 435.60 365.00 158994.00
@ 0.91 cum per 10 sqm for compacted
thickness of 75 mm. (avg of 60-63mm,
50-55mm & 40-45mm size)

Type - B Screenings of 11.20 mm size cum 96.01 515.60 49502.76


HBG @ 0.20 cum per 10 sqm.
Binding material @ 0.06 cum per 10 sqm cum 28.80 225.00 6480.00
(Stone dust)
Sub-Total 277699.56

Page 68 of 173
Data Sheet

S.No. Description of item Unit Qry Rate Amount

Conveyence
63 mm to 45 mm size HBG aggregates cum 435.60 154.40 67256.64
@ 0.91 cum per 10 sqm for compacted
thickness of 75 mm. (avg of 60-63mm,
50-55mm & 40-45mm size)

Type - B Screenings of 11.20 mm size cum 96.01 352.60 33853.13


HBG @ 0.20 cum per 10 sqm.
Binding material @ 0.06 cum per 10 sqm cum 28.80 352.60 10154.88
(Stone dust)
Grand Total 388964.21
d) Over head charges & Contractors profit @ 16.50% on (a+b+c) 64179.09
Rate for 360 cum 453143.30
Rate per cum = (a+b+c+d)/360 1258.75

7 Providing, Water Bound Macadam base for a compacted thickness of


75mm using Grade-III HBG crushed stone aggregates ( 53 mm to 22.40
mm size), screenings and binder confirming to table 400-8 of MORD
"Standard Specifications for rural roads) including cost, seigniorage and
conveyance of all materials, spreading in uniform thickness, hand
packing, rolling with static power roller of 8-10 tons in stages to proper
grade and camber, applying and brooming requisite type of screening
binding materials to fill up the interstices of coarse aggregate, watering
and compacting to the required density or finished item of work as
directed by the Engineer-in-Charge as per MORD clause No.405

By manual Means
Taking out put = 360 cum
a) Labour
Mate day 10.08 160.00 1612.80
Mazdoor (Skilled) day 2.00 130.00 260.00
Mazdoor (Un-Skilled) day 250.00 130.00 32500.00
b) Machinery 0.00
Three wheeled 80-100 kN power roller @ hour 45.00 470.00 21150.00
8 cum per hour
Water tanker 6kl capacity hour 24.00 300.00 7200.00
c) Material 0.00
Cost of materials 0.00
53 mm to 22.4 mm size HBG aggregates cum 435.60 563.53 245475.12
@ 0.91 cum per 10 sqm for compacted
thickness of 75 mm. (avg of 50-55mm,
40-45mm & 22.4mm size)

Type - B Screenings of 11.20 mm size cum 86.40 515.60 44547.84


HBG @ 0.18 cum per 10 sqm.
Sub-Total 352745.76
Conveyence

Page 69 of 173
Data Sheet

S.No. Description of item Unit Qry Rate Amount

53 mm to 22.4 mm size HBG aggregates cum 435.60 220.47 96035.28


@ 0.91 cum per 10 sqm for compacted
thickness of 75 mm. (avg of 50-55mm,
40-45mm & 22.4mm size)

Type - B Screenings of 11.20 mm size cum 86.40 352.60 30464.64


HBG @ 0.18 cum per 10 sqm.
Grand Total 479245.68
d) Over head charges & Contractors profit @ 16.50% on (a+b+c) 79075.54
Rate for 360 cum 558321.22
Rate per cum = (a+b+c+d+e)/360 1550.90

8 Providing and applying Prime Coat with butimen emulsion (Medium


Setting- SS-1) on prepared surface of granular base incliding cleaning of
road surface and spraying primer at the rate of 0.85Kg/Sqm using
mechanical means as clause 502 of MORD.
Taking out put = 1750 Sqm
a) Labour Charges
Mate day 0.04 160.00 6.40
Mazdoor (un-skilled) day 1.00 130.00 130.00
b) Machinery
Hydraulic broom @ 1250 sqm per hour hour 1.40 250.00 350.00
Air compressor 210 cfm hour 1.40 320.00 448.00
Bitumen emulsion pressure ditributor @ hour 1.00 600.00 600.00
1750 sqm per hour
Water tanker 6 kL capacity per trip hour 0.50 300.00 150.00
c) Materials
Cost of materials
Bitumen emulsion (MS-1) @ 0.85 kg per MT 1.48 21280.90 31495.73
sqm
Sub-Total 33180.13
Conveyence
Bitumen emulsion (MS-1) @ 0.85 kg per MT 1.48 1170.00 1731.60
sqm
Grand Total 34911.73
d) Over head charges & Contractors profit @ 16.50% on (a+b+c) 5760.44
Rate for 1750 sqm 40672.17
Rate per sqm = (a+b+c+d+e)/1750 23.25

9 Providing and applying Tack Coat with butimen emulsion (Rapid Setting-
RS-1) using emulsion distributor @ 0.275 kg per sqm on prepared surface
incliding cleaning of road surface and spraying primer at the rate of
0.275Kg/Sqm using mechanical means as clause 503 of MORD.

Taking out put = 1750 Sqm


a) Labour Charges
Mate day 0.04 160.00 6.40
Mazdoor (un-skilled) day 1.00 130.00 130.00
b) Machinery

Page 70 of 173
Data Sheet

S.No. Description of item Unit Qry Rate Amount

Hydraulic broom @ 1250 sqm per hour hour 1.40 250.00 350.00
Air compressor 210 cfm hour 1.40 320.00 448.00
Bitumen emulsion pressure ditributor @ hour 1.00 600.00 600.00
1750 sqm per hour
c) Materials
Cost of materials
Bitumen emulsion (RS-1) @ 0.275 kg per MT 0.48 21047.94 10103.01
sqm
Sub-Total 11637.41
Conveyence
Bitumen emulsion (RS-1) @ 0.275 kg per MT 0.48 1170.00 561.60
sqm
Grand Total 12199.01
d) Over head charges & Contractors profit @ 16.50% on (a+b+c) 2012.84
Rate for 1750 sqm 14211.85
Rate per sqm = (a+b+c+d+e)/1750 8.15
10 Providing and laying Open Graded Premix Carpet (OGPC) surfacing
material of 20 mm thick composed of 13.20 mm to 5.60 mm size machine
crushed hard blasted granite chips using bitumen of 60/70 grade at the
rate of 14.60 kgs per 10 sqm area of road surface over tack coat to
required line, level, grade to serve as wearing course on previously
prepared base including mixing in a Hot Mix Plant of 30/40 TPH, laying
with mechanical paver finisher and rolloing with three wheeled 8-10
Tonnes capacity power roller and finishing to required level and grades
including cost and conveyance of all materials from approved sources,
seigniorage, labour charges and hire and operational charges of power
road roller and all other machinery, tools and plants, providing
barricading for diversion of traffic, erecting red flags other incidental and
operational charges etc., complete for finished item of work as per clause
508 of MORD.

By Mechanical Means
Taking out put = 4000 Sqm
a) Labour
Mate day 0.52 160.00 83.20
Mazdoor (un-skilled) day 10.00 130.00 1300.00
Mazddor (skilled) day 3.00 130.00 390.00
b) Machinery
HMP 40 TPH hour 6.00 13500.00 81000.00
Electric generator set 125 KVA hour 6.00 950.00 5700.00
Front end loader 1cum bucket capacity hour 6.00 1150.00 6900.00

Tipper 5.5 cum 10t capacity hour 3.64 500.00 1820.00


Paver finisher hour 6.00 2200.00 13200.00
Three wheel 80-100 kN static roller hour 16.00 470.00 7520.00
c) Materials
Cost of materials
Crushed stone chips of 13.2mm to cum 108.00 640.60 69184.80
5.6mm size @ 0.27 cum per 10 sqm.

Page 71 of 173
Data Sheet

S.No. Description of item Unit Qry Rate Amount

Bitumen 60/70 grade @ 14.60 Kg per 10 MT 5.84 26638.98 155571.64


sqm
Sub-Total 342669.64
Conveyence
Crushed stone chips of 13.2mm to cum 108.00 352.60 38080.80
5.6mm size @ 0.27 cum per 10 sqm.
Bitumen 60/70 grade @ 14.60 Kg per 10 MT 5.84 1170.00 6832.80
sqm
Grand Total 387583.24
d) Over head charges & Contractors profit @ 16.50% on (a+b+c) 63951.23
Rate for 4000 sqm 451534.47
Rate per sqm = (a+b+c+d+e)/4000 112.90

11 Providing and laying bituminous liquid seal coat (Type A) comprising of a


layer of bitumuneous binder followed by a cover of stone chipping of
grading as defined in table 500.16 of MOST at 0.09 cum/10sqm of chips to
be laid simultaneously along with the bitumunous course using 9.80 kgs
of bitumen 60/70 grade for 10 sqm and rolling with power roller including
of required line, level, grade to serve as wearing course on previously
prepared surface and finishing to rquired level and grades including cost
and conveyance of all materials from approved sources and stacking at
site to departmental gauge for premeasurements, seigniorage, labour
charges and hire and operational charges of power road roller 8 to 10
tonnes capacity and all other machinery, tools and plants, providing
barricading for diversion of traffic, erecting red flags other incidental and
operational charges etc., complete for finished item of work as per
technical specification clause 510 of MORD.

By Mechanical Means
Taking out put = 7500 Sqm
a) Labour
Mate day 0.24 160.00 38.40
Mazdoor (un-skilled) day 6.00 130.00 780.00
b) Machinery 0.00
Hydraulic self propelled chips spreader hour 6.00 1800.00 10800.00
Front end loader 1cum bucket capacity hour 6.00 1042.00 6252.00

Tipper 5.5 cum 10t capacity hour 6.00 500.00 3000.00


Bitumen pressure distributer hour 6.00 820.00 4920.00
Three wheel 80-100 kN static roller hour 15.00 470.00 7050.00
c) Materials
Cost of materials
Crushed stone chipping of 6.7 mm size cum 67.50 515.60 34803.00
100% passing through 11.2mm seive and
retained on 2.36 mm sieve applied @
0.09 cum per 10 sqm.
Bitumen 60/70 grade @ 9.80 kgs per 10 MT 7.35 26638.98 195796.50
sqm.
Sub-Total 263439.90

Page 72 of 173
Data Sheet

S.No. Description of item Unit Qry Rate Amount

Conveyance
Crushed stone chipping of 6.7 mm size cum 67.50 352.60 23800.50
100% passing through 11.2mm seive and
retained on 2.36 mm sieve applied @
0.09 cum per 10 sqm.
Bitumen 60/70 grade @ 9.80 kgs per 10 MT 7.35 1170.00 8599.50
sqm.
Grand total 295839.90
d) Over head charges & Contractors profit @ 16.50% on (a+b+c) 48813.58
Rate for 7500 sqm 344653.48
Rate per sqm = (a+b+c+d+e)/7500 46.00

12 Providing concrete for plain/reinforced concrete in open


foundations complete as per drawings and technical
specifications Clause 802, 803, 1202 & 1203

I. P.C.C grade M 10
(i) Nominal mix 1:3:6
Unit = cum
a) Material
Cement t 0.250 4,380.00 1,095.00
Coarse sand cum 0.480 256.30 123.02
40 mm aggregate cum 0.576 576.80 332.24
20 mm aggregate cum 0.288 1,260.60 363.05
10 mm aggregate cum 0.096 985.60 94.62
b) Labour
Mate day 0.08 160.00 12.80
Mason (1st Class) day 0.10 180.00 18.00
Mazdoor (Unskilled) day 1.63 130.00 211.90
Bhisti day 0.27 130.00 35.10
c) Machinery
Mechnical concrete mixer 0.4/0.28 cum hour 0.40 300.00 120.00
capacity fitted with water measuring
device and preferably also with load cell.
d) Formwork @ 4% on cost of material, 96.23
labour and machinery (a+b+c)
e) Over head charges & Contractors profit @ 16.50% on (a+b+c) 412.82
Rate per cum = a+b+c+d+e+f 2,914.78

13 Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row
Providing and laying reinforced cement concrete pipe NP3
for culverts on first class bedding of granular material in
single row including fixing collar with cement mortar 1:2 but
excluding excavation, protection works, backfilling,
concrete and masonry works in head walls and parapets
Clause 1106.

(B) 600 mm dia


a) Labour

Page 73 of 173
Data Sheet

S.No. Description of item Unit Qry Rate Amount

Mate day 0.05 160.00 8.00


Mason (1st Class) day 0.15 180.00 27.00
Mazdoor (Unskilled) day 1.20 130.00 156.00
191.00
Deduct 20% for 600 mm dia., pipes 33.86
Net labour 157.14
b) Material
Sand at site cum 0.024 125.00 3.00
Cement at site t 0.018 4,380.00 78.84
RCC pipe NP3 concrete pipe including m 7.50 1,809.53 13,571.48
collar at site
c) Conveyance:
Sand cum 0.024 131.30 3.15
RCC pipe NP3 concrete pipe including m 7.50 187.31 1,404.83
collar at site
Total 15,218.43
d) Overheads & Contractors profit charges @ 16.5% (a+b) 2,347.34
Cost for 7.5 m = a+b+c+d 17,565.77
Rate per m = (a+b+c+d)/7.5 2,342.10

14 II. P.C.C grade M 15


(i) Nominal mix (1:2.5:5)
Unit = cum
a) Material
Cement t 0.275 4,380.00 1,204.50
Coarse sand cum 0.48 256.30 123.02
40 mm aggregate cum 0.48 576.80 276.86
20 mm aggregate cum 0.24 1,260.60 302.54
10 mm aggregate cum 0.08 985.60 78.85
b) Labour
Mate day 0.08 160.00 12.80
Mason (1st Class0 day 0.10 180.00 18.00
Mazdoor (Unskilled) day 1.63 130.00 211.90
Bhisti day 0.27 130.00 35.10
c) Machinery
Concrete mixer 0.4/0.28 cum capacity hour 0.40 300.00 120.00
d) Formwork @ 4% on cost of material, 95.34
labour and machinery (a+b+c)

e) Overheads & Contractors profit charges @ 16.5% on (a+b+c+d) 409.02


Rate per cum = a+b+c+d+e+f 2,887.95

15 Earth work excavation and depositing on bank with an initial


lead of 10 M and lift of 2 M in ordinary gravel soils, BC soils
including seigniorage charges etc. complete for foundations

Initial rate as per SSR cum 1.00 30.50 30.50


Add: Seigniorage cum 1.00 20.00 20.00

Page 74 of 173
Data Sheet

S.No. Description of item Unit Qry Rate Amount

Overheads & Contractors profit charges @ 16.5% on (a+b+c+d) 8.33


Rate per cum = a+b+c+d+e+f 58.83

16 Supplying, fitting, and placing HYSD bar reinforcement in superstucture


complete as per drawing and technical specifications Clauses 1002,1010
and 1202.
Unit = cum
a) Material
HYSD bars including 5 per cent for laps t 1.05 33000.00 34,650.00
and wastage
Binding Wire Kg 8.00 33000.00 264.00

b) Labour for cutting, bending, tying and placing in Position


Mate day 0.44 160.00 70.40
Blacksmith day 3.00 180.00 540.00
Mazdoor (Unskilled) day 8.00 130.00 1,040.00
c) Overheads @ 16.5% on (a+b+c+d) 6,033.13
f) Rate per cum = a+b+c+d+e+f 42,597.53

17 Providing and Laying Cement Concrete wearing Course M30 Grade


excluding reinforcement complete as per drawing and technical
specifications Clauses 800 and 1206.30.

Unit = Cum
a) Material
Cement t 0.43 4,380.00 1,883.40
Sand cum 0.45 256.30 115.34
20 mm aggregate cum 0.54 1,260.60 680.72
10 mm aggregate cum 0.36 985.60 354.82
b) Labour
Mate day 0.08 160.00 12.80
Mason (1st Class) day 0.12 180.00 21.60
Mazdoor (Unskilled) day 1.73 130.00 224.90
Bhisti day 0.27 130.00 35.10
c) Machinery
Concrete mixer 0.4/0.28 cum capacity hour 0.40 300.00 120.00
e) Overheads @ 16.5% on (a+b+c+d+e) 431.08
Rate per cum = a+b+c+d+e+f 3,879.76

HYSD Bar Reinforcement t 0.08 42,597.53 3,194.81

b) Form work at 3% of cost of Concrete 116.39


c) Mazdoor for Cleaning deck slab concrete
concrete surface day 0.15 130.00 20.28
d) Overheads on 20% on © 4.06
e) Contractors profit 16.5% 17.59
Rate per Cum 7,232.89

Page 75 of 173
Data Sheet

S.No. Description of item Unit Qry Rate Amount

18 Providing and Laying Boulder apron for bed protection with stone
boulders of minimum size and weight as per table 1300.10 no fragment
weighing not less than 25kg laid dry complete as per drawing and
technical specification Clause 1301.

Unit = Cum
a) Materail
Stone/ boulder (25kg minimum) Cum 1.20 274.30 329.16
Stone Spalls Cum 0.20
b) Labour
Mate day 0.04 160.00 6.40
Mason( 1st class) day 0.35 180.00 63.00
Mazdoor (Un skilled) day 0.75 130.00 97.50
d) Contractor’s profit @ 16.5% on (a+b+c) 81.85
Rate per cum = (a+b+c+d) 577.91

19 Filling in between body walls with gravel including cost,conveyance and


seignorage of all materials to site etc., complete as per Clause 710.1.4 of
IRC:78 and as per drawing and technical specifications for finished item
of work.

Gravel
Basic Rate of Quarry site Cum 1.00 68.00 68.00
Conveyance charges of gravel Cum 1.00 124.50 124.50
Spreading charges including watering Cum 1.00 20.30 20.30
and rolling with HRR to irrespective
thickness of layer
212.80
Over head charges & Contractors profit 35.11
@ 16.50%
247.91
247.91
./cum

20 Sand filling in foundation including cost, seignorage and conveyance of


all materials to site and watering and tamping etc., complete. For finished
item of work .

Cost of sand Cum 1.00 73.00 73.00


Conveyance of sand Cum 1.00 135.90 135.90
Labour charges for filling sand Cum 1.00 12.50 12.50
Total 221.40
Over head charges & Constractors profit 36.53
@ 16.50%
257.93
257.93
./cum

Page 76 of 173
Data Sheet

S.No. Description of item Unit Qry Rate Amount

Asst.Executive Engineer Deputy Executive Engineer Executive Engineer


PR-Charla PRSD-Venkatapuram PR Divn-Bhadrachalam

Superintending Engineer
PR Circle - Khammam

Page 77 of 173
PRADHANA MANTRI GRAM SADAK YOJANA
GEOMETRIC DESIGN OF HORIZONTAL CURVES

Name of the work ::R/F R&B Road to Puligundala of Charla (M)

Lc = II Rc

180

Lc = Length of the curve.

Rc = Radius of the curve

= Interior angle of curve

Ts = Rc Tan

Ts = Tangent length.

Rc = Radius of the curve

Apex = Rc -Rc

Cos

For Plain Terrain

Ruling design speed =50 K.M.PH.

Minimum design speed = 40 K.M.PH.

Radius of the curve.

Ruling minimum radous = 60 Mts.

Absolute minimum radius = 45 Mts.

Design of simple circular curve

For curve -1 at Km 0/440


Interior angle of curve = 53

F = e+f =7+15=22%.
For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of
I.R.C.-SP-20-2002

R ruling = V^2 / 127(e+f) = ( 40 x 40 )/ 127 / 57.27 Mtrs


0.22=

For the Plain terrain Ruling minimum radius as per Table 2.15 of IRC -SP-20-2002

=60 Mtrs For the village roads.

Rc = 60

Ts = Rc Tan /2

= 60 x Tan 53 /2

= 29.9 Mtrs

Page 78 of 173
PRADHANA MANTRI GRAM SADAK YOJANA
GEOMETRIC DESIGN OF HORIZONTAL CURVES

Name of the work ::R/F R&B Road to Puligundala of Charla (M)


Lc = II Rc

180

= 22/7x 60 x 53 = 55.500 Mtrs

180

But it is the existing road , length of the curve available at site is only 15.00 mts.

For Lc = 15 mts.

Rc = 180 x Lc 180 x 15 = 16.22 mts

3.14 x 3.14 x 53

e = V^2 40 x 40 = 0.44 mts

225 x Rc 225 x 16.22

But maximum Super elevation is limited to 7% = 0.07

V = R x 127 (e+f)

= √16.22x127x(0.075+.15)Kmph 21.28 kmph

Velocity is limited to 20 kmph

Check for lateral skid:

e+f > V^2/127 x R (0.075+0.15)


Due to lack of > 20 x 20
curve length,
0.22 > 0.19 speed is limited to 127x16.22
20 kmph by
providing speed
Hence O.K break at curves.

Extra widening as per table-18 of IRC 73-1980

For single lane Radius of the curve 21 to 60 mtrs = 0.60 mts exta widening is required.

Extra widening should be provided only on the inside of the curve due to plain circular curve

as per clause 9.6.5 of I.R.C. 73-1980.


2/3 of super elevation and extra widening should be provided on the straight section before starting of the
circular curve and balance on 1/3 on the curve portion as per clause 9.3.3.of I.R.C. 73-1980.

F = e+f =7+15=22%.

V = (127 X Rc X F/100)^0.5

= 40.944
For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-73-
1980

Rate of attaining super Elevation is 1 in 150.


Page 79 of 173
PRADHANA MANTRI GRAM SADAK YOJANA
GEOMETRIC DESIGN OF HORIZONTAL CURVES

Name of the work ::R/F R&B Road to Puligundala of Charla (M)


e = V^2 x100 = ( 40.00)^2x100 = 11.85

225 x Rc 225x60
Hence provide Maxium Super Elevation of 7% as per clause 9.3. of I.R.C.73-1980 in plain and Rolling
Terrain.

Rate of attain of Superelevation is 1 in 150.

2/3 e = 2/3x7 = 4.667

1/3 e = 1/3 x7 = 2.333

(7x3.75/2) / 100 x 150 x 2/3 = 13.13 Mtrs

(7x3.75/2) / 100 x 150 x 1/3 = 6.56 Mtrs

(2.5 x3.75/2) / 100 x 150 = 7.031 Mtrs

For curve -2 at Km 0/890


Interior angle of curve = 22

F = e+f =7+15=22%.
For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-SP-20-
2002
R ruling = V^2 / 127(e+f) = ( 40 x 40 )/ 127 / 57.27 Mtrs
0.22=
For the Plain terrain Ruling minimum radius as per Table 2.15 of IRC -SP-20-2002

=60 Mtrs For the village roads.

Rc = 60

Ts = Rc Tan /2

= 60 x Tan 22 /2

= 11.66 Mtrs

Lc = II Rc

180

= 22/7x 60 x 22 = 23.030 Mtrs

180

But it is the existing road , length of the curve available at site is only 13.00 mts.

For Lc = 13.00 mts.

Rc = 180 x Lc 180 x 13 = 33.87

3.14 x 3.14 x 22

e = V^2 40 x 40 = 0.21

225 x Rc 225 x 33.87


Page 80 of 173
PRADHANA MANTRI GRAM SADAK YOJANA
GEOMETRIC DESIGN OF HORIZONTAL CURVES

Name of the work ::R/F R&B Road to Puligundala of Charla (M)

But maximum Super elevation is limited to 7% = 0.07

V = √ R x 127 (e+f) R x 127 (e+f)

= √33.87 x 127 (0.07+0.15)


= 30.76

Velocity is limited to 30 kmph

Check for lateral skid:

e+f > V^2/127 x R (0.075+0.15) > 30 x 30

0.22 > 0.21 127x 33.87

Hence O.K Due to lack of curve length speed is limited to 30 kmph.

Extra widening as per table-18 of IRC 73-1980

For single lane Radius of the curve 21 to 60 mtrs = 0.60 mts exta widening is required.

Extra widening should be provided only on the inside of the curve due to plain circular curve

as per clause 9.6.5 of I.R.C. 73-1980.


2/3 of super elevation and extra widening should be provided on the straight section before starting of the
circular curve and balance on 1/3 on the curve portion as per clause 9.3.3.of I.R.C. 73-1980.

F = e+f =7+15=22%.

V = (127 Rc F/100)^0.5

= 40.944
For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-73-
1980
Rate of attaining super Elevation is 1 in 150.

e = V^2 x100 = (40.00)^2x100 = 11.85

225 Rc 225 x 60

Hence provide Maxium Super Elevation of 7% as per clause 9.3. Of I.R.C.73-1980 in plain and Rolling
Terrain.

Rate of attain of Superelevation is 1 in 150.

2/3 e = 2/3x7 = 4.667

1/3 e = 1/3 x7 = 2.333

(7x3.75/2) / 100 x 150 x 2/3 = 13.125 Mtrs

(7x3.75/2) / 100 x 150 x 1/3 = 6.563 Mtrs

(2.5 x3.75/2) / 100 x 150 = 7.031 Mtrs

Page 81 of 173
PRADHANA MANTRI GRAM SADAK YOJANA
GEOMETRIC DESIGN OF HORIZONTAL CURVES

Name of the work ::R/F R&B Road to Puligundala of Charla (M)


For curve - 3 at Km 1/190
Interior angle of curve = 44

F = e+f =7+15=22%.
For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-SP-20-
2002
R ruling = V^2 / 127(e+f) = ( 40 x 40 )/ 127 / 57.27 Mtrs
0.22=
For the Plain terrain Ruling minimum radius as per Table 2.15 of IRC -SP-20-2002

=60 Mtrs For the village roads.

Rc = 60

Ts = Rc Tan /2

= 60x Tan 44 /2

= 24.24 Mtrs

Lc = II x Rcx

180

= 22/7x 60 x 44 = 46.070 Mtrs

180

Apex = Rc -Rc = 60 -60

Cos /2 Cos 44 /2

= 4.71 Mtrs

Extra widening as per table-18 of IRC 73-1980

For single lane Radius of the curve 21 to 60 mtrs = 0.60 mts exta widening is required.

Extra widening should be provided only on the inside of the curve due to plain circular curve

as per clause 9.6.5 of I.R.C. 73-1980.


2/3 of super elevation and extra widening should be provided on the straight section before starting of the
circular curve and balance on 1/3 on the curve portion as per clause 9.3.3.of I.R.C. 73-1980.

F = e+F =5+15=20%.

F = V^2

127 R

V = (127 Rc F/100)^0.5

= 40.944
For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-73-
1980
Rate of attaining super Elevation is 1 in 150.

e = V^2 x100 = (40.00)^2x100 = 11.85

225 Rc 225 x 60
Page 82 of 173
PRADHANA MANTRI GRAM SADAK YOJANA
GEOMETRIC DESIGN OF HORIZONTAL CURVES

Name of the work ::R/F R&B Road to Puligundala of Charla (M)


Hence provide Maxium Super Elevation of 7% as per clause 9.3. Of I.R.C.73-1980 in plain and Rolling
Terrain.
Rate of attain of Superelevation is 1 in 150.

2/3 e = 2/3x7 = 4.667

1/3 e = 1/3 x7 = 2.333

(7x3.75/2) / 100 x 150 x 2/3 = 13.125

(7x3.75/2) / 100 x 150 x 1/3 = 6.563

(2.5 x3.75/2) / 100 x 150 = 7.031

For curve - 4 at Km 1/370


Interior angle of curve = 51

F = e+f =7+15=22%.
For the village roads Rolling Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-SP-
20-2002
R ruling = V^2 / 127(e+f) = ( 40 x 40 )/ 127 / 57.27 Mtrs
0.22=
For the Plain terrain Ruling minimum radius as per Table 2.15 of IRC -SP-20-2002

=60 Mtrs For the village roads.

Rc = 60

Ts = Rcx Tan /2

= 60 x Tan 51 /2

= 28.61 Mtrs

Lc = II x Rc x

180

= 22/7x 60 x 51 = 53.400 Mtrs

180

But it is the existing road , length of the curve available at site is only 43.00 mts.

For Lc = 43.00 mts.

Rc = 180 x Lc 180 x 43 = 48.33 mts

3.14 x 3.14 x 51

e = V^2 40 x 40 = 0.15

225 x Rc 225 x 48.33

Page 83 of 173
PRADHANA MANTRI GRAM SADAK YOJANA
GEOMETRIC DESIGN OF HORIZONTAL CURVES

Name of the work ::R/F R&B Road to Puligundala of Charla (M)


But maximum Super elevation is limited to 7% = 0.07

V = √ R x 127 (e+f)

= √ 48.33 x 127 (0.07+0.15)


= 36.74 kmph

Velocity is limited to 35 kmph

Check for lateral skid:

e+f > V^2/127 x R (0.075+0.15) > 35 x 35

0.22 > 0.2 127x 48.33

Hence O.K Due to lack of curve length speed is limited.

Extra widening as per table-18 of IRC 73-1980

For single lane Radius of the curve 21 to 60 mtrs = 0.60 mts exta widening is required.

Extra widening should be provided only on the inside of the curve due to plain circular curve

as per clause 9.6.5 of I.R.C. 73-1980.


2/3 of super elevation and extra widening should be provided on the straight section before starting of the
circular curve and balance on 1/3 on the curve portion as per clause 9.3.3.of I.R.C. 73-1980.

F = e+f =7+15=22%.

V = (127 Rc F/100)^0.5

= 40.944
For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-73-
1980
Rate of attaining super Elevation is 1 in 150.

e = V^2 x100 = (40.00)^2x100 = 11.85

225 Rc 225 x 60
Hence provide Maxium Super Elevation of 7% as per clause 9.3. Of I.R.C.73-1980 in plain and Rolling
Terrain.
Rate of attain of Superelevation is 1 in 150.

2/3 e = 2/3x7 = 4.667

1/3 e = 1/3 x7 = 2.333

(7x3.75/2) / 100 x 150 x 2/3 = 13.125 Mtrs

(7x3.75/2) / 100 x 150 x 1/3 = 6.563 Mtrs

(2.5 x3.75/2) / 100 x 150 = 7.031 Mtrs

For curve - 5 at Km 1/820


Interior angle of curve = 30

Page 84 of 173
PRADHANA MANTRI GRAM SADAK YOJANA
GEOMETRIC DESIGN OF HORIZONTAL CURVES

Name of the work ::R/F R&B Road to Puligundala of Charla (M)


F = e+f =7+15=22%.
For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-SP-20-
2002
R ruling = V^2/127(e+f)= ( 40 x 40 )/ 127 / 57.27 Mtrs
0.22=
For the Plain terrain Ruling minimum radius as per Table 2.15 of IRC -SP-20-2002

=60 Mtrs For the village roads.

Rc = 60

Ts = Rc xTan /2

= 60x Tan 30 / 2

= 16.07 Mtrs

Lc = IIx Rc x

180

= 22/7x 60 x 30 = 31.410 Mtrs

180

Apex = Rc -Rc = 60 - 60

Cos /2 Cos 30 / 2

= 2.16 Mtrs

Extra widening as per table-18 of IRC 73-1980

For single lane Radius of the curve 21 to 60 mtrs = 0.60 mts exta widening is required.

Extra widening should be provided only on the inside of the curve due to plain circular curve

as per clause 9.6.5 of I.R.C. 73-1980.


2/3 of super elevation and extra widening should be provided on the straight section before starting of the
circular curve and balance on 1/3 on the curve portion as per clause 9.3.3.of I.R.C. 73-1980.

F = e+f =7+15=22%.

V = (127 Rc F/100)^0.5

= 40.944
For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-73-
1980
Rate of attaining super Elevation is 1 in 150.

e = V^2 x100 = (40.00)^2x100 = 15.8

225 Rc 225 x 60
Hence provide Maxium Super Elevation of 7% as per clause 9.3. Of I.R.C.73-1980 in plain and Rolling
Terrain.
Rate of attain of Superelevation is 1 in 150.

Page 85 of 173
PRADHANA MANTRI GRAM SADAK YOJANA
GEOMETRIC DESIGN OF HORIZONTAL CURVES

Name of the work ::R/F R&B Road to Puligundala of Charla (M)


2/3 e = 2/3x7 = 4.667

1/3 e = 1/3 x7 = 2.333

(7x3.75/2) / 100 x 150 x 2/3 = 13.125 Mtrs

(7x3.75/2) / 100 x 150 x 1/3 = 6.563 Mtrs

(2.5 x3.75/2) / 100 x 150 = 7.031 Mtrs

For curve - 6 at Km 2/360


Interior angle of curve = 19

F = e+f =7+15=22%.
For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-SP-20-
2002
R ruling = V ^ 2 / 127 (e+f) = ( 40 x 40 )/ 127 / 57.27 Mtrs
0.22=
For the Plain terrain Ruling minimum radius as per Table 2.15 of IRC -SP-20-2002

=60 Mtrs For the village roads.

Rc = 60

Ts = Rcx Tan /2

= 60x Tan 19/2

= 10.04 Mtrs

Lc = II x Rc x

180

= 22/7x 60 x 19 = 19.890 Mtrs

180

Apex = Rc -Rc = 60 -60

Cos /2 Cos 19 / 2

= 0.83 Mtrs

Extra widening as per table-18 of IRC 73-1980

For Single lane Radius of the curve 21 to 60 mtrs = 0.60 mts.of

Extra widening should be provided only on the inside of the curve due to plain circular curve

as per clause 9.6.5 of I.R.C. 73-1980.


2/3 of super elevation and extra widening should be provided on the straight section before starting of the
circular curve and balance on 1/3 on the curve portion as per clause 9.3.3.of I.R.C. 73-1980.

F = e+F =5+15=20%.

Page 86 of 173
PRADHANA MANTRI GRAM SADAK YOJANA
GEOMETRIC DESIGN OF HORIZONTAL CURVES

Name of the work ::R/F R&B Road to Puligundala of Charla (M)


V = (127 Rc F/100)^0.5

= 40.944
For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-73-
1980
Rate of attaining super Elevation is 1 in 150.

e = V^2 x100 = (40.00)^2x100 = 11.85

225 Rc 225 x 60
Hence provide Maxium Super Elevation of 7% as per clause 9.3. Of I.R.C.73-1980 in plain and Rolling
Terrain.
Rate of attain of Superelevation is 1 in 150.

2/3 e = 2/3x7 = 4.667

1/3 e = 1/3 x7 = 2.333

(7x3.75/2) / 100 x 150 x 2/3 = 13.125 Mtrs

(7x3.75/2) / 100 x 150 x 1/3 = 6.563 Mtrs

(2.5 x3.75/2) / 100 x 150 = 7.031 Mtrs

For curve -7 at Km 3/370


Interior angle of curve = 70

F = e+f =7+15=22%.
For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-SP-20-
2002
R ruling = V^2 / 127(e+f) = ( 40 x 40 )/ 127 / 57.27 Mtrs
0.22=
For the Plain terrain Ruling minimum radius as per Table 2.15 of IRC -SP-20-2002
=60 Mtrs For the village roads.
Rc = 60
Ts = Rc Tan /2
= 60 x Tan 70/2
= 42.01 Mtrs

Lc = II Rc

180
= 22/7x 60 x 70 = 73.300 Mtrs
180
But it is the existing road , length of the curve available at site is only 20.00 mts.

For Lc = 20.00 mts.

Rc = 180 x Lc 180 x 20 = 16.37 mts


3.14 x 3.14 x 70

e = V^2 40 x 40 = 0.43 mts

Page 87 of 173
PRADHANA MANTRI GRAM SADAK YOJANA
GEOMETRIC DESIGN OF HORIZONTAL CURVES

Name of the work ::R/F R&B Road to Puligundala of Charla (M)


225 x Rc 225 x 16.37

But maximum Super elevation is limited to 7% = 0.07

V = √ R x 127 (e+f)

= √ 16.37 x 127 (0.07+0.15)


= 21.38 kmph

Velocity is limited to 20 kmph

Check for lateral skid:

e+f > V^2/127 x R (0.075+0.15) > 20 x 200

0.22 > 0.19 127x 16.37

Hence O.K Speed is limited to 20 kmph

Extra widening as per table-18 of IRC 73-1980

For single lane Radius of the curve 21 to 60 mtrs = 0.60 mts exta widening is required.

Extra widening should be provided only on the inside of the curve due to plain circular curve

as per clause 9.6.5 of I.R.C. 73-1980.


2/3 of super elevation and extra widening should be provided on the straight section before starting of the
circular curve and balance on 1/3 on the curve portion as per clause 9.3.3.of I.R.C. 73-1980.

F = e+f =7+15=22%.

V = (127 Rc F/100)^0.5

= 40.944
For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-73-
1980
Rate of attaining super Elevation is 1 in 150.

e = V^2 x100 = (40.00)^2x100 = 11.85

225 Rc 225 x 60
Hence provide Maxium Super Elevation of 7% as per clause 9.3. Of I.R.C.73-1980 in plain and Rolling
Terrain.
Rate of attain of Superelevation is 1 in 150.

2/3 e = 2/3x7 = 4.667

1/3 e = 1/3 x7 = 2.333

(7x3.75/2) / 100 x 150 x 2/3 = 13.125 Mtrs

(7x3.75/2) / 100 x 150 x 1/3 = 6.563 Mtrs

(2.5 x3.75/2) / 100 x 150 = 7.031 Mtrs

For curve -8 at Km 3/550


Interior angle of curve = 19

F = e+f =7+15=22%.
For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-SP-20-
2002

Page 88 of 173
PRADHANA MANTRI GRAM SADAK YOJANA
GEOMETRIC DESIGN OF HORIZONTAL CURVES

Name of the work ::R/F R&B Road to Puligundala of Charla (M)


R ruling = V^2 / 127(e+f) = ( 40 x 40 )/ 127 / 57.27 Mtrs
0.22=
For the Plain terrain Ruling minimum radius as per Table 2.15 of IRC -SP-20-2002

=60 Mtrs For the village roads.

Rc = 60

Ts = Rc Tan /2

= 60x Tan 19 /2

= 10.04 Mtrs

Lc = II Rc

180

= 22/7x 60 x 19 = 19.890 Mtrs

180

Apex = Rc -Rc = 60 -60

Cos /2 Cos 19 /2

= 0.83 Mtrs

Extra widening as per table-18 of IRC 73-1980

For single lane Radius of the curve 21 to 60 mtrs = 0.60 mts exta widening is required.

Extra widening should be provided only on the inside of the curve due to plain circular curve

as per clause 9.6.5 of I.R.C. 73-1980.


2/3 of super elevation and extra widening should be provided on the straight section before starting of the
circular curve and balance on 1/3 on the curve portion as per clause 9.3.3.of I.R.C. 73-1980.

F = e+f =7+15=22%.

V = (127 Rc F/100)^0.5

= 40.944
For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-73-
1980
Rate of attaining super Elevation is 1 in 150.

e = V^2 x100 = (40.00)^2x100 = 11.85

225 Rc 225 x 60
Hence provide Maxium Super Elevation of 7% as per clause 9.3. Of I.R.C.73-1980 in plain and Rolling
Terrain.
Rate of attain of Superelevation is 1 in 150.

2/3 e = 2/3x7 = 4.667

1/3 e = 1/3 x7 = 2.333

(7x3.75/2) / 100 x 150 x 2/3 = 13.125 Mtrs

(7x3.75/2) / 100 x 150 x 1/3 = 6.563 Mtrs

(2.5 x3.75/2) / 100 x 150 = 7.031 Mtrs

Page 89 of 173
PRADHANA MANTRI GRAM SADAK YOJANA
GEOMETRIC DESIGN OF HORIZONTAL CURVES

Name of the work ::R/F R&B Road to Puligundala of Charla (M)


For curve - 9 at Km 3/910
Interior angle of curve = 23

F = e+f =7+15=22%.
For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-SP-20-
2002
R ruling = V^2 / 127(e+f) = ( 40 x 40 )/ 127 / 57.27 Mtrs
0.22=
For the Plain terrain Ruling minimum radius as per Table 2.15 of IRC -SP-20-2002

=60 Mtrs For the village roads.

Rc = 60

Ts = Rc Tan /2

= 60x Tan 23/2

= 12.2 Mtrs

Lc = II x Rcx

180

= 22/7x 60 x 23 = 24.080 Mtrs

180

Apex = Rc -Rc = 60 -60

Cos /2 Cos 23 /2

= 1.22 Mtrs

Extra widening as per table-18 of IRC 73-1980

For single lane Radius of the curve 21 to 60 mtrs = 0.60 mts exta widening is required.

Extra widening should be provided only on the inside of the curve due to plain circular curve

as per clause 9.6.5 of I.R.C. 73-1980.


2/3 of super elevation and extra widening should be provided on the straight section before starting of the
circular curve and balance on 1/3 on the curve portion as per clause 9.3.3.of I.R.C. 73-1980.

F = e+F =5+15=20%.

F = V

127 R

V = (127 Rc F/100)^0.5

= 40.944
For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-73-
1980
Rate of attaining super Elevation is 1 in 150.

e = V^2 x100 = (40.00)^2x100 = 11.85

225 Rc 225 x 60
Hence provide Maxium Super Elevation of 7% as per clause 9.3. Of I.R.C.73-1980 in plain and Rolling
Terrain.
Rate of attain of Superelevation is 1 in 150.

Page 90 of 173
PRADHANA MANTRI GRAM SADAK YOJANA
GEOMETRIC DESIGN OF HORIZONTAL CURVES

Name of the work ::R/F R&B Road to Puligundala of Charla (M)


2/3 e = 2/3x7 = 4.667

1/3 e = 1/3 x7 = 2.333

(7x3.75/2) / 100 x 150 x 2/3 = 13.125

(7x3.75/2) / 100 x 150 x 1/3 = 6.563

(2.5 x3.75/2) / 100 x 150 = 7.031

For curve - 10 at Km 4/330


Interior angle of curve = 21

F = e+f =7+15=22%.
For the village roads Rolling Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-SP-
20-2002
R ruling = V^2 / 127(e+f) = ( 40 x 40 )/ 127 / 57.27 Mtrs
0.22=
For the Plain terrain Ruling minimum radius as per Table 2.15 of IRC -SP-20-2002

=60 Mtrs For the village roads.

Rc = 60

Ts = Rcx Tan /2

= 60 x Tan 21/2

= 11.12 Mtrs

Lc = II x Rc x

180
= 22/7x 60 x 21 = 21.990 Mtrs

180

Apex = Rc -Rc = 60 -60

Cos /2 Cos 21.99 /2

= 1.02 Mtrs

Extra widening as per table-18 of IRC 73-1980

For single lane Radius of the curve 21 to 60 mtrs = 0.60 mts exta widening is required.

Extra widening should be provided only on the inside of the curve due to plain circular curve

as per clause 9.6.5 of I.R.C. 73-1980.


2/3 of super elevation and extra widening should be provided on the straight section before starting of the
circular curve and balance on 1/3 on the curve portion as per clause 9.3.3.of I.R.C. 73-1980.

F = e+f =5+15=20%.

F = ( V )^2

127 Rc

V = (127 Rc F/100)^0.5

Page 91 of 173
PRADHANA MANTRI GRAM SADAK YOJANA
GEOMETRIC DESIGN OF HORIZONTAL CURVES

Name of the work ::R/F R&B Road to Puligundala of Charla (M)


= 40.944
For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-73-
1980
Rate of attaining super Elevation is 1 in 150.

e = V^2 x100 = (40.00)^2x100 = 11.85

225 Rc 225 x60


Hence provide Maxium Super Elevation of 7% as per clause 9.3. Of I.R.C.73-1980 in plain and Rolling
Terrain.
Rate of attain of Superelevation is 1 in 150.

2/3 e = 2/3x7 = 4.667

1/3 e = 1/3 x7 = 2.333

(7x3.75/2) / 100 x 150 x 2/3 = 13.125 Mtrs

(7x3.75/2) / 100 x 150 x 1/3 = 6.563 Mtrs

(2.5 x3.75/2) / 100 x 150 = 7.031 Mtrs

For curve - 11 at Km 5/960


Interior angle of curve = 19

F = e+f =7+15=22%.
For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-SP-20-
2002
R ruling = V^2/127(e+f)= ( 40 x 40 )/ 127 / 57.27 Mtrs
0.22=
For the Plain terrain Ruling minimum radius as per Table 2.15 of IRC -SP-20-2002

=60 Mtrs For the village roads.

Rc = 60

Ts = Rc xTan /2

= 60x Tan 19 / 2

= 10.04 Mtrs

Lc = IIx Rc x

180

= 22/7x 60 x 19 = 19.890 Mtrs

180

Apex = Rc -Rc = 60 - 60

Cos /2 Cos 19 / 2

= 0.83 Mtrs

Extra widening as per table-18 of IRC 73-1980

For single lane Radius of the curve 21 to 60 mtrs = 0.60 mts exta widening is required.

Extra widening should be provided only on the inside of the curve due to plain circular curve

Page 92 of 173
PRADHANA MANTRI GRAM SADAK YOJANA
GEOMETRIC DESIGN OF HORIZONTAL CURVES

Name of the work ::R/F R&B Road to Puligundala of Charla (M)


as per clause 9.6.5 of I.R.C. 73-1980.
2/3 of super elevation and extra widening should be provided on the straight section before starting of the
circular curve and balance on 1/3 on the curve portion as per clause 9.3.3.of I.R.C. 73-1980.

F = e+f =7+15=22%.

V = (127 Rc F/100)^0.5

= 40.944
For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-73-
1980
Rate of attaining super Elevation is 1 in 150.

e = V^2 x100 = (40.00)^2x100 = 15.8

225 Rc 225 x 60
Hence provide Maxium Super Elevation of 7% as per clause 9.3. Of I.R.C.73-1980 in plain and Rolling
Terrain.
Rate of attain of Superelevation is 1 in 150.
2/3 e = 2/3x7 = 4.667

1/3 e = 1/3 x7 = 2.333

(7x3.75/2) / 100 x 150 x 2/3 = 13.125 Mtrs

(7x3.75/2) / 100 x 150 x 1/3 = 6.563 Mtrs

(2.5 x3.75/2) / 100 x 150 = 7.031 Mtrs

For curve -12 at Km 6/050


Interior angle of curve = 15
F = e+f =7+15=22%.
For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-SP-20-
2002
R ruling = V ^ 2 / 127 (e+f) = ( 40 x 40 )/ 127 / 57.27 Mtrs
0.22=
For the Plain terrain Ruling minimum radius as per Table 2.15 of IRC -SP-20-2002

=60 Mtrs For the village roads.

Rc = 60

Ts = Rcx Tan /2

= 60x Tan 15/2

= 7.89 Mtrs

Lc = II x Rc x

180

= 22/7x 60 x 15 = 15.700 Mtrs

180

Apex = Rc -Rc = 60 -60

Page 93 of 173
PRADHANA MANTRI GRAM SADAK YOJANA
GEOMETRIC DESIGN OF HORIZONTAL CURVES

Name of the work ::R/F R&B Road to Puligundala of Charla (M)


Cos /2 Cos 15 / 2

= 0.51 Mtrs

Extra widening as per table-18 of IRC 73-1980

For Single lane Radius of the curve 21 to 60 mtrs = 0.60 mts.of

Extra widening should be provided only on the inside of the curve due to plain circular curve

as per clause 9.6.5 of I.R.C. 73-1980.


2/3 of super elevation and extra widening should be provided on the straight section before starting of the
circular curve and balance on 1/3 on the curve portion as per clause 9.3.3.of I.R.C. 73-1980.

F = e+F =5+15=20%.

V = (127 Rc F/100)^0.5

= 40.944
For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-73-
1980
Rate of attaining super Elevation is 1 in 150.

e = V^2 x100 = (40.00)^2x100 = 11.85

225 Rc 225 x 60
Hence provide Maxium Super Elevation of 7% as per clause 9.3. Of I.R.C.73-1980 in plain and Rolling
Terrain.
Rate of attain of Superelevation is 1 in 150.

2/3 e = 2/3x7 = 4.667

1/3 e = 1/3 x7 = 2.333

(7x3.75/2) / 100 x 150 x 2/3 = 13.125 Mtrs

(7x3.75/2) / 100 x 150 x 1/3 = 6.563 Mtrs


(2.5 x3.75/2) / 100 x 150 = 7.031 Mtrs

For curve -13 at Km 6/620


Interior angle of curve = 37

F = e+f =7+15=22%.
For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-SP-20-
2002
R ruling = V ^ 2 / 127 (e+f) = ( 40 x 40 )/ 127 / 57.27 Mtrs
0.22=
For the Plain terrain Ruling minimum radius as per Table 2.15 of IRC -SP-20-2002

=60 Mtrs For the village roads.

Rc = 60

Ts = Rcx Tan /2

= 60x Tan 37 /2

= 20.07 Mtrs

Lc = II x Rc x

Page 94 of 173
PRADHANA MANTRI GRAM SADAK YOJANA
GEOMETRIC DESIGN OF HORIZONTAL CURVES

Name of the work ::R/F R&B Road to Puligundala of Charla (M)


180

= 22/7x 60 x 37 = 37.740 Mtrs

180

Apex = Rc -Rc = 60 -60

Cos /2 Cos 37 / 2

= 3.26 Mtrs

Extra widening as per table-18 of IRC 73-1980

For Single lane Radius of the curve 21 to 60 mtrs = 0.60 mts.of

Extra widening should be provided only on the inside of the curve due to plain circular curve

as per clause 9.6.5 of I.R.C. 73-1980.


2/3 of super elevation and extra widening should be provided on the straight section before starting of the
circular curve and balance on 1/3 on the curve portion as per clause 9.3.3.of I.R.C. 73-1980.

F = e+F =5+15=20%.

V = (127 Rc F/100)^0.5

= 40.944
For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-73-
1980
Rate of attaining super Elevation is 1 in 150.

e = V^2 x100 = (40.00)^2x100 = 11.85

225 Rc 225 x 60
Hence provide Maxium Super Elevation of 7% as per clause 9.3. Of I.R.C.73-1980 in plain and Rolling
Terrain.
Rate of attain of Superelevation is 1 in 150.

2/3 e = 2/3x7 = 4.667

1/3 e = 1/3 x7 = 2.333

(7x3.75/2) / 100 x 150 x 2/3 = 13.125 Mtrs

(7x3.75/2) / 100 x 150 x 1/3 = 6.563 Mtrs

(2.5 x3.75/2) / 100 x 150 = 7.031 Mtrs

For curve -14 at Km 6/710


Interior angle of curve = 61

F = e+f =7+15=22%.
For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-SP-20-
2002
R ruling = V ^ 2 / 127 (e+f) = ( 40 x 40 )/ 127 / 57.27 Mtrs
0.22=

For the Plain terrain Ruling minimum radius as per Table 2.15 of IRC -SP-20-2002

=60 Mtrs For the village roads.

Rc = 60

Page 95 of 173
PRADHANA MANTRI GRAM SADAK YOJANA
GEOMETRIC DESIGN OF HORIZONTAL CURVES

Name of the work ::R/F R&B Road to Puligundala of Charla (M)


Ts = Rcx Tan /2

= 60x Tan 61/2

= 35.34 Mtrs

Lc = II x Rc x

180

= 22/7x 60 x 61 = 63.870 Mtrs

180

But it is the existing road , length of the curve available at site is only 40.00 mts.

For Lc = 40.00 mts.

Rc = 180 x Lc 180 x 40 = 37.5 mts

3.14 x 3.14 x 61

e = V^2 40 x 40 = 0.19 mts

225 x Rc 225 x 37.50

But maximum Super elevation is limited to 7% = 0.07

V = √ R x 127 (e+f)

= √ 37.50 x 127 (0.07+0.15)


= 32.36 kmph

Velocity is limited to = 30 kmph

Check for lateral skid:

e+f > V^2/127 x R (0.075+0.15) > 30 x 30

0.22 > 0.19 127x 37.50

Hence O.K Speed is limited to 30 kmph due to lack of curve length.

Extra widening as per table-18 of IRC 73-1980

For single lane Radius of the curve 21 to 60 mtrs = 0.60 mts exta widening is required.

Extra widening should be provided only on the inside of the curve due to plain circular curve

as per clause 9.6.5 of I.R.C. 73-1980.


2/3 of super elevation and extra widening should be provided on the straight section before starting of the
circular curve and balance on 1/3 on the curve portion as per clause 9.3.3.of I.R.C. 73-1980.

F = e+f =7+15=22%.

V = (127 Rc F/100)^0.5

= 40.944
For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-73-
1980
Rate of attaining super Elevation is 1 in 150.

Page 96 of 173
PRADHANA MANTRI GRAM SADAK YOJANA
GEOMETRIC DESIGN OF HORIZONTAL CURVES

Name of the work ::R/F R&B Road to Puligundala of Charla (M)


e = V^2 x100 = (40.00)^2x100 = 11.85

225 Rc 225 x 60
Hence provide Maxium Super Elevation of 7% as per clause 9.3. Of I.R.C.73-1980 in plain and Rolling
Terrain.
Rate of attain of Superelevation is 1 in 150.

2/3 e = 2/3x7 = 4.667

1/3 e = 1/3 x7 = 2.333

(7x3.75/2) / 100 x 150 x 2/3 = 13.125 Mtrs

(7x3.75/2) / 100 x 150 x 1/3 = 6.563 Mtrs

(2.5 x3.75/2) / 100 x 150 = 7.031 Mtrs

For curve -15 at Km 6/800


Interior angle of curve = 45

F = e+f =7+15=22%.
For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-SP-20-
2002
R ruling = V ^ 2 / 127 (e+f) = ( 40 x 40 )/ 127 / 57.27 Mtrs
0.22=

For the Plain terrain Ruling minimum radius as per Table 2.15 of IRC -SP-20-2002

=60 Mtrs For the village roads.

Rc = 60

Ts = Rcx Tan /2

= 60x Tan 45/2

= 24.85 Mtrs

Lc = II x Rc x

180

= 22/7x 60 x 45 = 47.120 Mtrs

180

But it is the existing road , length of the curve available at site is only 25 mts.

For Lc = mts.

Rc = 180 x Lc 180 x 25 = 31.84 mts

3.14 x 3.14 x 45

e = V^2 40 x 40 = 0.22

225 x Rc 225 x 31.84

But maximum Super elevation is limited to 7% = 0.07

Page 97 of 173
PRADHANA MANTRI GRAM SADAK YOJANA
GEOMETRIC DESIGN OF HORIZONTAL CURVES

Name of the work ::R/F R&B Road to Puligundala of Charla (M)


V = √ R x 127 (e+f)

= √ 31.84 x 127 (0.07+0.15)


= 29.82 kmph

Velocity is limited to = 25 kmph

Check for lateral skid:

e+f > V^2/127 x R (0.075+0.15) > 25 x 25

0.22 > 0.15 127x 31.84

Hence O.K Speed is limited to 25 kmph

Extra widening as per table-18 of IRC 73-1980

For single lane Radius of the curve 21 to 60 mtrs = 0.60 mts exta widening is required.

Extra widening should be provided only on the inside of the curve due to plain circular curve

as per clause 9.6.5 of I.R.C. 73-1980.


2/3 of super elevation and extra widening should be provided on the straight section before starting of the
circular curve and balance on 1/3 on the curve portion as per clause 9.3.3.of I.R.C. 73-1980.

F = e+f =7+15=22%.

V = (127 Rc F/100)^0.5

= 40.944
For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-73-
1980
Rate of attaining super Elevation is 1 in 150.

e = V^2 x100 = (40.00)^2x100 = 11.85

225 Rc 225 x 60
Hence provide Maxium Super Elevation of 7% as per clause 9.3. Of I.R.C.73-1980 in plain and Rolling
Terrain.
Rate of attain of Superelevation is 1 in 150.

2/3 e = 2/3x7 = 4.667

1/3 e = 1/3 x7 = 2.333

(7x3.75/2) / 100 x 150 x 2/3 = 13.125 Mtrs

(7x3.75/2) / 100 x 150 x 1/3 = 6.563 Mtrs

(2.5 x3.75/2) / 100 x 150 = 7.031 Mtrs

For curve -16 at Km 7/040


Interior angle of curve = 43

F = e+f =7+15=22%.
For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-SP-20-
2002
R ruling = V ^ 2 / 127 (e+f) = ( 40 x 40 )/ 127 / 57.27 Mtrs
0.22=
For the Plain terrain Ruling minimum radius as per Table 2.15 of IRC -SP-20-2002

=60 Mtrs For the village roads.

Page 98 of 173
PRADHANA MANTRI GRAM SADAK YOJANA
GEOMETRIC DESIGN OF HORIZONTAL CURVES

Name of the work ::R/F R&B Road to Puligundala of Charla (M)


Rc = 60

Ts = Rcx Tan /2

= 60x Tan 43/2

= 23.63 Mtrs

Lc = II x Rc x

180

= 22/7x 60 x 43 = 45.020 Mtrs

180

Apex = Rc -Rc = 60 -60

Cos /2 Cos /2

= Mtrs

Extra widening as per table-18 of IRC 73-1980

For Single lane Radius of the curve 21 to 60 mtrs = 0.60 mts.of

Extra widening should be provided only on the inside of the curve due to plain circular curve

as per clause 9.6.5 of I.R.C. 73-1980.


2/3 of super elevation and extra widening should be provided on the straight section before starting of the
circular curve and balance on 1/3 on the curve portion as per clause 9.3.3.of I.R.C. 73-1980.

F = e+F =5+15=20%.

V = (127 Rc F/100)^0.5

= 40.944
For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-73-
1980
Rate of attaining super Elevation is 1 in 150.

e = V^2 x100 = (40.00)^2x100 = 11.85

225 Rc 225 x 60
Hence provide Maxium Super Elevation of 7% as per clause 9.3. Of I.R.C.73-1980 in plain and Rolling
Terrain.
Rate of attain of Superelevation is 1 in 150.

2/3 e = 2/3x7 = 4.667

1/3 e = 1/3 x7 = 2.333

(7x3.75/2) / 100 x 150 x 2/3 = 13.125 Mtrs

(7x3.75/2) / 100 x 150 x 1/3 = 6.563 Mtrs

(2.5 x3.75/2) / 100 x 150 = 7.031 Mtrs

For curve -17 at Km 7/250


Interior angle of curve = 23

F = e+f =7+15=22%.

Page 99 of 173
PRADHANA MANTRI GRAM SADAK YOJANA
GEOMETRIC DESIGN OF HORIZONTAL CURVES

Name of the work ::R/F R&B Road to Puligundala of Charla (M)


For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-SP-20-
2002
R ruling = V ^ 2 / 127 (e+f) = ( 40 x 40 )/ 127 / 57.27 Mtrs
0.22=

For the Plain terrain Ruling minimum radius as per Table 2.15 of IRC -SP-20-2002

=60 Mtrs For the village roads.

Rc = 60

Ts = Rcx Tan /2

= 60x Tan 23/2

= 12.2 Mtrs

Lc = II x Rc x

180

= 22/7x 60 x 23 = 24.080 Mtrs

180

Apex = Rc -Rc = 60 -60

Cos /2 Cos /2

= 1.22 Mtrs

Extra widening as per table-18 of IRC 73-1980

For Single lane Radius of the curve 21 to 60 mtrs = 0.60 mts.of

Extra widening should be provided only on the inside of the curve due to plain circular curve

as per clause 9.6.5 of I.R.C. 73-1980.


2/3 of super elevation and extra widening should be provided on the straight section before starting of the
circular curve and balance on 1/3 on the curve portion as per clause 9.3.3.of I.R.C. 73-1980.

F = e+F =5+15=20%.

V = (127 Rc F/100)^0.5

= 40.944
For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-73-
1980
Rate of attaining super Elevation is 1 in 150.

e = V^2 x100 = (40.00)^2x100 = 11.85

225 Rc 225 x 60
Hence provide Maxium Super Elevation of 7% as per clause 9.3. Of I.R.C.73-1980 in plain and Rolling
Terrain.
Rate of attain of Superelevation is 1 in 150.

2/3 e = 2/3x7 = 4.667

1/3 e = 1/3 x7 = 2.333

(7x3.75/2) / 100 x 150 x 2/3 = 13.125 Mtrs

(7x3.75/2) / 100 x 150 x 1/3 = 6.563 Mtrs

Page 100 of 173


PRADHANA MANTRI GRAM SADAK YOJANA
GEOMETRIC DESIGN OF HORIZONTAL CURVES

Name of the work ::R/F R&B Road to Puligundala of Charla (M)


(2.5 x3.75/2) / 100 x 150 = 7.031 Mtrs

For curve -18 at Km 7/820


Interior angle of curve = 68

F = e+f =7+15=22%.
For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-SP-20-
2002
R ruling = V ^ 2 / 127 (e+f) = ( 40 x 40 )/ 127 / 57.27 Mtrs
0.22=

For the Plain terrain Ruling minimum radius as per Table 2.15 of IRC -SP-20-2002

=60 Mtrs For the village roads.

Rc = 60

Ts = Rcx Tan /2

= 60x Tan 68/2

= 40.47 Mtrs

Lc = II x Rc x

180

= 22/7x 60 x 68 = 71.200 Mtrs

180

But it is the existing road , length of the curve available at site is only 28.00 mts.

For Lc = 28 mts.

Rc = 180 x Lc 180 x 28 = 23.6 mts

3.14 x 3.14 x 68

e = V^2 40 x 40 = 0.30

225 x Rc 225 x 23.60

But maximum Super elevation is limited to 7% = 0.07

V = √ R x 127 (e+f)

= √ 23.60 x 127 (0.07+0.15)


= 25.67 kmph

Velocity is limited to = 25 kmph

Check for lateral skid:

e+f > V^2/127 x R (0.075+0.15) > 25 x 25

0.22 > 0.2 127x 23.60

Hence O.K Speed is limited to 25 kmph

Page 101 of 173


PRADHANA MANTRI GRAM SADAK YOJANA
GEOMETRIC DESIGN OF HORIZONTAL CURVES

Name of the work ::R/F R&B Road to Puligundala of Charla (M)


Extra widening as per table-18 of IRC 73-1980

For single lane Radius of the curve 21 to 60 mtrs = 0.60 mts exta widening is required.

Extra widening should be provided only on the inside of the curve due to plain circular curve

as per clause 9.6.5 of I.R.C. 73-1980.


2/3 of super elevation and extra widening should be provided on the straight section before starting of the
circular curve and balance on 1/3 on the curve portion as per clause 9.3.3.of I.R.C. 73-1980.

F = e+f =7+15=22%.

V = (127 Rc F/100)^0.5

= 40.944
For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-73-
1980
Rate of attaining super Elevation is 1 in 150.

e = V^2 x100 = (40.00)^2x100 = 11.85


225 Rc 225 x 60
Hence provide Maxium Super Elevation of 7% as per clause 9.3. Of I.R.C.73-1980 in plain and Rolling
Terrain.

Rate of attain of Superelevation is 1 in 150.

2/3 e = 2/3x7 = 4.667

1/3 e = 1/3 x7 = 2.333

(7x3.75/2) / 100 x 150 x 2/3 = 13.125 Mtrs

(7x3.75/2) / 100 x 150 x 1/3 = 6.563 Mtrs

(2.5 x3.75/2) / 100 x 150 = 7.031 Mtrs

Asst.Executive Engineer Deputy Executive Engineer Executive Engineer


PR-Charla PRSD-Venkatapuram PR Divn-Bhadrachalam

Superintending Engineer
PR Circle - Khammam

Page 102 of 173


GENERAL ABSTRACT

Name of the work : R/F R&B Road to Pulugundala of Charla (M)

Sl.
Description of Item Amount in Rs
No.
1 Providing B.T on road in Km 0/000 to km 8/360 21559416.00

2 Construction of pipe culvert of 1V x 600 mm dia., (Sub estimate -1) 840000.00

3 Construction of pipe culvert of 2V x 600 mm dia., (Sub estimate -2) 302000.00

4 Construction of Road dam fo 16mts length (Sub estimate-3) 620000.00

5 Construction of Road dam of 30 mts length (Sub estimate-4) 2635000.00

6 Construction of Road dam of 40 mts length (Sub estimate-5) 685384.00

7 Constrction of side drain for village portion (Sub estimate-6) 695000.00

8 Repairs to existing Road dam of 40 mts length (Sub estimate-7) 720000.00

TOTAL 28056800.00

7 Cost of preparation of DPRs @ Rs. 10000 / km 83600.00

8 KM & HM stones and other infrastructure @ 10000/km 83600.00

9 Inauguration & laying foundation stones 10000.00


Total Part -A 28234000.00
Part - B
10 Maintenance of BT Road Per Km for 5 Years Rs.150000 1254000.00
11 BT Renewal Coat per Km at Rupees 5.00 Lakhs at the end of 5th Year 4180000.00
Total Part -B 5434000.00
GRAND TOTAL ( PART A+B) 33668000.00

Asst.Executive Engineer Deputy Executive Engineer


PR-Charla PRSD-Venkatapuram

Executive Engineer Superintending Engineer


PR Divn-Bhadrachalam PR - Circle - Khammam
PRADHAN MANTHRI GRAM SADAK YOJANA
COST ESTIMATE FOR ROAD WORK
Name of the work: R/F R&B Road to Puligundala of Charla (M) FORMAT:6

ABSTRACT ESTIMATE

Sl.
Description Unit Quantity Rate Amount
No
1 2 3 4 5 6
1 Clearind and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs,
saplings and trees of girth up to 300mm, removal of stumps of such trees cut earlier and disposal
of unserviceable materials and stacking of serviceable material to be used or auctioned upto a
lead of 1000m including disposal of top organic soil not exceeding 150 mm in thickness as per
technical specification clause 201-1 of MORD.
1 Sqm 58520.00 2.90 169708.00
sqm ./sqm
2 Construction and widening of existing embankment with approved materails deposited at site
materail obtained from roadway cutting including breaking clods, ramming, spreading, sectioning,
grading, compacting with 8-10 Tonnes power roller to OMC compaction including to a top width
of 7.50M and raising to required height including seigniorage charges complete etc., as per the
requirement of Table 300-1 and 300-2 as per technical specification clause 301.5 of MORD.

Using Side Earth 1 cum 21686.90 81.05 1757724.00


cum /1cum
3 Earth work excavation and depositing on the bank for widening of existing embankment using
cutted earth material with carting in all soils upto soft disintegrated rock and stone matrix with in a
radius of 5 M including breaking clods, benching, ramming and sectioning the embankment and
formation to a top width of 7.50 m upto 95% proctors density etc. complete including seigniorage
charges for raising and widening the embankment using machinery as per SS 20A and technical
specification APDSS 302 & 303 with a least lead of 1000 m (carted earth)
PRADHAN MANTHRI GRAM SADAK YOJANA
COST ESTIMATE FOR ROAD WORK
Name of the work: R/F R&B Road to Puligundala of Charla (M) FORMAT:6

ABSTRACT ESTIMATE

Sl.
Description Unit Quantity Rate Amount
No
1 2 3 4 5 6
1 cum 10143.55 112.75 1143685.00
cum /1cum
4 Picking old metalled surface 50-100 mm metal and sectioning ,labour charges etc., complete.

1 Cum 12757.50 17.50 22326.00


sqm /10 sqm
5 Construction of granular sub base by providing well graded meterial (i.e Stone aggregates of 9.5
mm to 4.75 mm size Gravel of 66% and sand of size < 2.6mm @ 34% )having soaked CBR not
less than 15% and Plasticity Index < 6 and stacking at site to the departmentel gauge for pre
measurements and mixing them and spreading the same with motor grader in uniform layers of
loose thickness of not more than 225mm including mixing by mix in place method with rotavator to
OMC and compacting with three wheeled power roller of 8 to 10 Tonnes capacity to achieve the
desired density, complete as per IRC technical specification clause 402 of MORD.
1st layer 150 mm compact thickness.

1 Cum 5312.76 389.15 2067462.00


cum /1cum
6 Construction of granular sub base by providing well graded meterial (i.e Stone aggregates of 9.5
mm to 4.75 mm size Gravel of 66% and sand of size < 2.6mm @ 34% )having soaked CBR not
less than 15% and Plasticity Index < 6 and stacking at site to the departmentel gauge for pre
measurements and mixing them and spreading the same with motor grader in uniform layers of
loose thickness of not more than 225mm including mixing by mix in place method with rotavator to
OMC and compacting with three wheeled power roller of 8 to 10 Tonnes capacity to achieve the
desired density, complete as per IRC technical specification clause 402 of MORD.
2nd layer 100 mm compacted thickness.

1 Cum 3191.68 389.15 1242041.00


cum /1cum
PRADHAN MANTHRI GRAM SADAK YOJANA
COST ESTIMATE FOR ROAD WORK
Name of the work: R/F R&B Road to Puligundala of Charla (M) FORMAT:6

ABSTRACT ESTIMATE

Sl.
Description Unit Quantity Rate Amount
No
1 2 3 4 5 6
7 Construction of Granualar shoulder by providing well graded meterial (i.e 66% gravel and 34%
sand) having soaked CBR not less than 15% and Plasticity Index < 6 and stacking at site to the
departmentel gauge for pre measurements and mixing them and spreading the same with motor
grader in uniform layers of loose thickness of not more than 225mm including mixing by mix in
place method with rotavator to OMC and compacting with three wheeled power roller of 8 to 10
Tonnes capacity to achieve the desired density, complete as per IRC technical specification
clause 402 of MORD.

1 CUM 5129.33 389.15 1996077.00


cum /1cum
8 Providing, Water Bound Macadam base for a compacted thickness of 75mm using Grade-II HBG
crushed stone aggregates (63 mm to 45 mm size), screenings and binder confirming to table 400-
8 of MORD "Standard Specifications for the rural roads) including cost, seigniorage and
conveyance of all materials, spreading in uniform thickness, hand packing, rolling with static
power roller of 8-10 tons in stages to proper grade and camber, applying and brooming requisite
type of screening binding materials to fill up the interstices of coarse aggregate, watering and
compacting to the required density or finished item of work as directed by the Engineer-in-Charge
as per MORD clause No.405

1 sqm 2242.90 1258.75 2823245.00


sqm ./sqm
10 Providing, Water Bound Macadam base for a compacted thickness of 75mm using Grade-III HBG
crushed stone aggregates ( 53 mm to 22.40 mm size), screenings and binder confirming to table
400-8 of MORD "Standard Specifications for rural roads) including cost, seigniorage and
conveyance of all materials, spreading in uniform thickness, hand packing, rolling with static
power roller of 8-10 tons in stages to proper grade and camber, applying and brooming requisite
type of screening binding materials to fill up the interstices of coarse aggregate, watering and
compacting to the required density or finished item of work as directed by the Engineer-in-Charge
as per MORD clause No.405

1 sqm 2242.90 1550.90 3478506.00


sqm ./sqm
PRADHAN MANTHRI GRAM SADAK YOJANA
COST ESTIMATE FOR ROAD WORK
Name of the work: R/F R&B Road to Puligundala of Charla (M) FORMAT:6

ABSTRACT ESTIMATE

Sl.
Description Unit Quantity Rate Amount
No
1 2 3 4 5 6
11 Providing and applying Prime Coat with butimen emulsion (Medium Setting- SS-1) on prepared
surface of granular base incliding cleaning of road surface and spraying primer at the rate of
0.85Kg/Sqm using mechanical means as clause 502 of MORD.
1 sqm 29905.27 23.25 695298.00
sqm ./sqm
12 Providing and applying Tack Coat with butimen emulsion (Rapid Setting- RS-1) using emulsion
distributor @ 0.275 kg per sqm on prepared surface incliding cleaning of road surface and
spraying primer at the rate of 0.275Kg/Sqm using mechanical means as clause 503 of MORD.

1 sqm 29905.27 8.15 243728.00


sqm ./sqm
13 Providing and laying Open Graded Premix Carpet (OGPC) surfacing material of 20 mm thick
composed of 13.20 mm to 5.60 mm size machine crushed hard blasted granite chips using
bitumen of 60/70 grade at the rate of 14.60 kgs per 10 sqm area of road surface over tack coat to
required line, level, grade to serve as wearing course on previously prepared base including
mixing in a Hot Mix Plant of 30/40 TPH, laying with mechanical paver finisher and rolloing with
three wheeled 8-10 Tonnes capacity power roller and finishing to required level and grades
including cost and conveyance of all materials from approved sources, seigniorage, labour
charges and hire and operational charges of power road roller and all other machinery, tools and
plants, providing barricading for diversion of traffic, erecting red flags other incidental and
operational charges etc., complete for finished item of work as per clause 508 of MORD.

1 sqm 29905.27 112.90 3376305.00


sqm ./sqm
PRADHAN MANTHRI GRAM SADAK YOJANA
COST ESTIMATE FOR ROAD WORK
Name of the work: R/F R&B Road to Puligundala of Charla (M) FORMAT:6

ABSTRACT ESTIMATE

Sl.
Description Unit Quantity Rate Amount
No
1 2 3 4 5 6
14 Providing and laying bituminous liquid seal coat (Type A) comprising of a layer of bitumuneous
binder followed by a cover of stone chipping of grading as defined in table 500.16 of MOST at
0.09 cum/10sqm of chips to be laid simultaneously along with the bitumunous course using 9.80
kgs of bitumen 60/70 grade for 10 sqm and rolling with power roller including of required line,
level, grade to serve as wearing course on previously prepared surface and finishing to rquired
level and grades including cost and conveyance of all materials from approved sources and
stacking at site to departmental gauge for premeasurements, seigniorage, labour charges and
hire and operational charges of power road roller 8 to 10 tonnes capacity and all other machinery,
tools and plants, providing barricading for diversion of traffic, erecting red flags other incidental
and operational charges etc., complete for finished item of work as per technical specification
clause 510 of MORD.

1 sqm 29905.27 46.00 1375643.00


sqm ./sqm
15 Providing and Laying Boulder apron for bed protection with stone boulders of minimum size and
weight as per table 1300.10 no fragment weighing not less than 25kg laid dry complete as per
drawing and technical specification Clause 1301.
1 Cum 2019.60 577.91 1167147.00
cum ./cum
21558895.00

16 Sub-Estimate - 1 (C/O 1v x 600 mm dia., pipe culverts ) 8 No 105000.00 Each 840000.00


(at km 1/2-1/4, 5/2-5/4, 6/0-6/2, 6/6-6/8, 7/0-7/2, 7/2-7/4, 7/4-7/6,8/0-8/2 )

17 Sub-Estimate - 2 (C/O 2v x 600 mm dia., pipe culverts ) 2 No 151000.00 Each 302000.00


(at km 4/4-4/6, 7/6-7/8)

18 Sub-Estimate - 3 (C/O Road dam for 16 mts length) 2 No 310000.00 Each 620000.00
(at km 3/0-3/2, 4/8-5/0,)
PRADHAN MANTHRI GRAM SADAK YOJANA
COST ESTIMATE FOR ROAD WORK
Name of the work: R/F R&B Road to Puligundala of Charla (M) FORMAT:6

ABSTRACT ESTIMATE

Sl.
Description Unit Quantity Rate Amount
No
1 2 3 4 5 6

19 Sub-Estimate - 4 (C/O Road dam for 30 mts length) 5 No 527000.00 Each 2635000.00
(at km 0/0-0/2, 5/4-5/6, 5/6-5/8, 7/8-8/0,8/2-8/4 )

20 Sub-Estimate- 5 (C/O Road dam for 40 mts length ) 1 No 685384.00 Each 685384.00
(at km 6/2-6/4 )

21 Sub-Estimate - 6 (C/O side drain at village portion ) 1 No 695000.00 Each 695000.00

22 Sub-Estimate - 7 (Repairs to existing CD works ) 1 No 720000.00 Each 720000.00


(at km 0/4-0/6, 0/8-1/0, 0/8-1/0, 1/4-1/6, 1/6-1/8, 2/6-2/8 )
6497384.00

23 Cost of preparation of DPRs @ Rs. 10000.00 /km 8.36 10000.00 83600.00


kms /1kg

24 KM & HM stones and other infrastructure @ Rs. 10000.00 /km 8.36 10000.00 83600.00
kms /1kg

25 Inauguration and laying foundation stones 10000.00

26 Add: LS for other unforeseen items 521.00

TOTAL Rs. 28234000.00


PRADHAN MANTHRI GRAM SADAK YOJANA
COST ESTIMATE FOR ROAD WORK
Name of the work: R/F R&B Road to Puligundala of Charla (M) FORMAT:6

ABSTRACT ESTIMATE

Sl.
Description Unit Quantity Rate Amount
No
1 2 3 4 5 6

Asst.Exe.Engineer Deputy Executive Engineer Executive Engineer


PR-Charla PRSD-Venkatapuram PR Divn-Bhadrachalam

Superintending Engineer
PR - Circle - Khammam
PRADHANA MANTRI GRAM SADAK YOJANA
COST ESTIMATE FOR ROAD WORK

Deatailed Estimate

Name of work : R/F R&B Road to Puligundala of Charla Mandal.

S. Measurements
Description of item Unit No Qty
No L B D
1 2 3 4 5 6 7 8 9

1 Clearind and grubbing road land including uprooting wild vegetation, grass, bushes,
shrubs, saplings and trees of girth up to 300mm, removal of stumps of such trees cut earlier
and disposal of unserviceable materials and stacking of serviceable material to be used or
auctioned upto a lead of 1000m including disposal of top organic soil not exceeding 150
mm in thickness as per technical specification clause 201-1 of MORD.
Km 0/0 to 8/360 1 sqm 2 8360.00 2.50 - 41800.00
Deduct for 40% voids 16720.00
58520.00
sqm

2 Construction and widening of existing embankment with approved materails


deposited at site materail obtained from roadway cutting including breaking clods,
ramming, spreading, sectioning, grading, compacting with 8-10 Tonnes power roller to
OMC compaction including to a top width of 7.50M and raising to required height including
seigniorage charges complete etc., as per the requirement of Table 300-1 and 300-2 as per
technical specification clause 301.5 of MORD.

For widening and raising as per calculation sheet - - - - 21686.90


(0/0 to 1/5 , 1/760 to 6/200 , 6/560 to 8/360 ) cum

3 Earth work excavation and depositing on the bank for widening of existing
embankment using cutted earth material with carting in all soils upto soft disintegrated
rock and stone matrix with in a radius of 5 M including breaking clods, benching, ramming
and sectioning the embankment and formation to a top width of 7.50 m upto 95% proctors
density etc. complete including seigniorage charges for raising and widening the
embankment using machinery as per SS 20A and technical specification APDSS 302 & 303
with a least lead of 1000 m (carted earth)

For widening and raising as per calculation sheet. - - - - 10143.55


( 1/500 to 1/760 , 6/200 to 6/560 ) cum

Page 112 of 173


PRADHANA MANTRI GRAM SADAK YOJANA
COST ESTIMATE FOR ROAD WORK

Deatailed Estimate

Name of work : R/F R&B Road to Puligundala of Charla Mandal.

S. Measurements
Description of item Unit No Qty
No L B D
1 2 3 4 5 6 7 8 9
4 Picking old metalled surface 50-100 mm metal and sectioning ,labour charges etc.,
complete.
km 0/0 to 3/880 1 sqm 1 3800.00 3.75 - 14250.00
Deduct CD works
0/0 to 0/2 Road dam 1 sqm 1 30.00 3.75 - -112.50
0/8 to 1/0 Road dam 1 sqm 1 34.00 3.75 - -127.50
1/5 to 1/760 CC Road 1 sqm 1 260.00 3.75 - -975.00
1/8 to 2/0 Slab culvert 1 sqm 1 27.00 3.75 - -101.25
2/0 to 2/2 Slab culvert 1 sqm 1 1.00 3.75 - -3.75
2/6 to 2/8 Road dam 1 sqm 1 30.00 3.75 - -112.50
3/0 to 3/2 Road dam 1 sqm 1 16.00 3.75 - -60.00
12757.50
sqm
5 Construction of granular sub base by providing well graded meterial (i.e Stone
aggregates of 9.5 mm to 4.75 mm size Gravel of 66% and sand of size < 2.6mm @
34% )having soaked CBR not less than 15% and Plasticity Index < 6 and stacking at
site to the departmentel gauge for pre measurements and mixing them and spreading the
same with motor grader in uniform layers of loose thickness of not more than 225mm
including mixing by mix in place method with rotavator to OMC and compacting with three
wheeled power roller of 8 to 10 Tonnes capacity to achieve the desired density, complete as
per IRC technical specification clause 402 of MORD.
1st layer 150 mm compact thickness.

Km 3/880 to 8/360 1 cum 1 4480.00 4.00 0.150 5376.00


Deduct CD works
4/8 to 5/0 Road dam 1 cum 1 16.00 4.00 0.150 -9.60
5/4 to 5/6 Road dam 1 cum 1 30.00 4.00 0.150 -18.00
5/6 to 5/8 Road dam 1 cum 1 30.00 4.00 0.150 -18.00
6/2 to 6/4 Road dam 1 cum 1 40.00 4.00 0.150 -24.00
7/8 to 8/0 Road dam 1 cum 1 30.00 4.00 0.150 -18.00

Page 113 of 173


PRADHANA MANTRI GRAM SADAK YOJANA
COST ESTIMATE FOR ROAD WORK

Deatailed Estimate

Name of work : R/F R&B Road to Puligundala of Charla Mandal.

S. Measurements
Description of item Unit No Qty
No L B D
1 2 3 4 5 6 7 8 9
8/2 to 8/4 Road dam 1 cum 1 30.00 4.00 0.150 -18.00
Curves:
For curve -9 at Km 3/910 1 Cum 1 24.08 0.60 0.150 2.17
1 Cum 2 6.56 (0.4+0.6)/2 0.150 0.98
1 Cum 2 13.13 (0+0.4)/2 0.150 0.79
For curve -10 at Km 4/330 1 Cum 1 21.99 0.60 0.150 1.98
1 Cum 2 6.56 (0.4+0.6)/2 0.150 0.98
1 Cum 2 13.13 (0+0.4)/2 0.150 0.79
For curve -11 at Km 5/960 1 Cum 1 19.89 0.60 0.150 1.79
1 Cum 2 6.56 (0.4+0.6)/2 0.150 0.98
1 Cum 2 13.13 (0+0.4)/2 0.150 0.79
For curve -12 at Km 6/050 1 Cum 1 15.70 0.60 0.150 1.41
1 Cum 2 6.56 (0.4+0.6)/2 0.150 0.98
1 Cum 2 13.13 (0+0.4)/2 0.150 0.79
For curve -13 at Km 6/620 1 Cum 1 38.74 0.60 0.150 3.49
1 Cum 2 6.56 (0.4+0.6)/2 0.150 0.98
1 Cum 2 13.13 (0+0.4)/2 0.150 0.79
For curve -14 at Km 6/710 1 Cum 1 40.00 0.60 0.150 3.60
1 Cum 2 6.56 (0.4+0.6)/2 0.150 0.98
1 Cum 2 13.13 (0+0.4)/2 0.150 0.79
For curve -15 at Km 6/800 1 Cum 1 25.00 0.60 0.150 2.25
1 Cum 2 6.56 (0.4+0.6)/2 0.150 0.98
1 Cum 2 13.13 (0+0.4)/2 0.150 0.79
For curve -16 at Km 7/040 1 Cum 1 45.02 0.60 0.150 4.05
1 Cum 2 6.56 (0.4+0.6)/2 0.150 0.98
1 Cum 2 13.13 (0+0.4)/2 0.150 0.79
For curve -17 at Km 7/250 1 Cum 1 24.18 0.60 0.150 2.18
1 Cum 2 6.56 (0.4+0.6)/2 0.150 0.98

Page 114 of 173


PRADHANA MANTRI GRAM SADAK YOJANA
COST ESTIMATE FOR ROAD WORK

Deatailed Estimate

Name of work : R/F R&B Road to Puligundala of Charla Mandal.

S. Measurements
Description of item Unit No Qty
No L B D
1 2 3 4 5 6 7 8 9
1 Cum 2 13.13 (0+0.4)/2 0.150 0.79
For curve -18 at Km 7/820 1 Cum 1 28.00 0.60 0.150 2.52
1 Cum 2 6.56 (0.4+0.6)/2 0.150 0.98
5312.76
cum

6 Construction of granular sub base by providing well graded meterial (i.e Stone
aggregates of 9.5 mm to 4.75 mm size Gravel of 66% and sand of size < 2.6mm @
34% )having soaked CBR not less than 15% and Plasticity Index < 6 and stacking at
site to the departmentel gauge for pre measurements and mixing them and spreading the
same with motor grader in uniform layers of loose thickness of not more than 225mm
including mixing by mix in place method with rotavator to OMC and compacting with three
wheeled power roller of 8 to 10 Tonnes capacity to achieve the desired density, complete as
per IRC technical specification clause 402 of MORD.
2nd layer 100 mm compacted thickness.

km 0/0 to 3/880 1 cum 1 3880.00 4.00 0.100 1552.00


Km 3/880 to 8/360 1 cum 1 4480.00 4.00 0.100 1792.00
km 1/500 to 1/760 CC road widening 1 cum 2 260.00 0.50 0.100 26.00
Deduct CD works
0/0 to 0/2 Road dam 1 cum 1 30.00 4.00 0.100 -12.00
0/8 to 1/0 Road dam 1 cum 1 34.00 4.00 0.100 -13.60
1/5 to 1/760 CC Road 1 cum 1 260.00 4.00 0.100 -104.00
1/8 to 2/0 Slab culvert 1 cum 1 27.00 4.00 0.100 -10.80
2/0 to 2/2 Slab culvert 1 cum 1 1.00 4.00 0.100 -0.40
2/6 to 2/8 Road dam 1 cum 1 30.00 4.00 0.100 -12.00
3/0 to 3/2 Road dam 1 cum 1 16.00 4.00 0.100 -6.40
4/8 to 5/0 Road dam 1 cum 1 16.00 4.00 0.100 -6.40
5/4 to 5/6 Road dam 1 cum 1 30.00 4.00 0.100 -12.00
5/6 to 5/8 Road dam 1 cum 1 30.00 4.00 0.100 -12.00

Page 115 of 173


PRADHANA MANTRI GRAM SADAK YOJANA
COST ESTIMATE FOR ROAD WORK

Deatailed Estimate

Name of work : R/F R&B Road to Puligundala of Charla Mandal.

S. Measurements
Description of item Unit No Qty
No L B D
1 2 3 4 5 6 7 8 9
6/2 to 6/4 Road dam 1 cum 1 40.00 4.00 0.100 -16.00
7/8 to 8/0 Road dam 1 cum 1 30.00 4.00 0.100 -12.00
8/2 to 8/4 Road dam 1 cum 1 30.00 4.00 0.100 -12.00
Curves:
For curve -1 at Km 0/440 1 Cum 1 12.00 0.60 0.100 0.72
1 Cum 2 6.56 (0.4+0.6)/2 0.100 0.66
1 Cum 2 13.13 (0+0.4)/2 0.100 0.53
For curve -2 at Km 0/890 1 Cum 1 15.00 0.60 0.100 0.90
1 Cum 2 6.56 (0.4+0.6)/2 0.100 0.66
1 Cum 2 13.13 (0+0.4)/2 0.100 0.53
For curve -3 at Km 1/190 1 Cum 1 46.07 0.60 0.100 2.76
1 Cum 2 6.56 (0.4+0.6)/2 0.100 0.66
1 Cum 2 13.13 (0+0.4)/2 0.100 0.53
For curve -4 at Km 1/370 1 Cum 1 53.40 0.60 0.100 3.20
1 Cum 2 6.56 (0.4+0.6)/2 0.100 0.66
1 Cum 2 13.13 (0+0.4)/2 0.100 0.53
For curve -5 at Km 1/820 1 Cum 1 31.41 0.60 0.100 1.88
1 Cum 2 6.56 (0.4+0.6)/2 0.100 0.66
1 Cum 2 13.13 (0+0.4)/2 0.100 0.53
For curve -6 at Km 2/360 1 Cum 1 19.89 0.60 0.100 1.19
1 Cum 2 6.56 (0.4+0.6)/2 0.100 0.66
1 Cum 2 13.13 (0+0.4)/2 0.100 0.53
For curve -7 at Km 3/370 1 Cum 1 20.00 0.60 0.100 1.20
1 Cum 2 6.56 (0.4+0.6)/2 0.100 0.66
1 Cum 2 13.13 (0+0.4)/2 0.100 0.53
For curve -8 at Km 3/550 1 Cum 1 19.89 0.60 0.100 1.19
1 Cum 2 6.56 (0.4+0.6)/2 0.100 0.66
1 Cum 2 13.13 (0+0.4)/2 0.100 0.53

Page 116 of 173


PRADHANA MANTRI GRAM SADAK YOJANA
COST ESTIMATE FOR ROAD WORK

Deatailed Estimate

Name of work : R/F R&B Road to Puligundala of Charla Mandal.

S. Measurements
Description of item Unit No Qty
No L B D
1 2 3 4 5 6 7 8 9
For curve -9 at Km 3/910 1 Cum 1 24.08 0.60 0.100 1.44
1 Cum 2 6.56 (0.4+0.6)/2 0.100 0.66
1 Cum 2 13.13 (0+0.4)/2 0.100 0.53
For curve -10 at Km 4/330 1 Cum 1 21.99 0.60 0.100 1.32
1 Cum 2 6.56 (0.4+0.6)/2 0.100 0.66
1 Cum 2 13.13 (0+0.4)/2 0.100 0.53
For curve -11 at Km 5/960 1 Cum 1 19.89 0.60 0.100 1.19
1 Cum 2 6.56 (0.4+0.6)/2 0.100 0.66
1 Cum 2 13.13 (0+0.4)/2 0.100 0.53
For curve -12 at Km 6/050 1 Cum 1 15.70 0.60 0.100 0.94
1 Cum 2 6.56 (0.4+0.6)/2 0.100 0.66
1 Cum 2 13.13 (0+0.4)/2 0.100 0.53
For curve -13 at Km 6/620 1 Cum 1 38.74 0.60 0.100 2.32
1 Cum 2 6.56 (0.4+0.6)/2 0.100 0.66
1 Cum 2 13.13 (0+0.4)/2 0.100 0.53
For curve -14 at Km 6/710 1 Cum 1 40.00 0.60 0.100 2.40
1 Cum 2 6.56 (0.4+0.6)/2 0.100 0.66
1 Cum 2 13.13 (0+0.4)/2 0.100 0.53
For curve -15 at Km 7/800 1 Cum 1 25.00 0.60 0.100 1.50
1 Cum 2 6.56 (0.4+0.6)/2 0.100 0.66
1 Cum 2 13.13 (0+0.4)/2 0.100 0.53
For curve -16 at Km 7/040 1 Cum 1 45.02 0.60 0.100 2.70
1 Cum 2 6.56 (0.4+0.6)/2 0.100 0.66
1 Cum 2 13.13 (0+0.4)/2 0.100 0.53
For curve -17 at Km 7/250 1 Cum 1 24.18 0.60 0.100 1.45
1 Cum 2 6.56 (0.4+0.6)/2 0.100 0.66
1 Cum 2 13.13 (0+0.4)/2 0.100 0.53
For curve -18 at Km 7/820 1 Cum 1 28.00 0.60 0.100 1.68

Page 117 of 173


PRADHANA MANTRI GRAM SADAK YOJANA
COST ESTIMATE FOR ROAD WORK

Deatailed Estimate

Name of work : R/F R&B Road to Puligundala of Charla Mandal.

S. Measurements
Description of item Unit No Qty
No L B D
1 2 3 4 5 6 7 8 9
1 Cum 2 6.56 (0.4+0.6)/2 0.100 0.66
1 Cum 2 13.13 (0+0.4)/2 0.100 0.53
3191.68
cum

7 Construction of Granualar shoulder by providing well graded meterial (i.e 66% gravel
and 34% sand) having soaked CBR not less than 15% and Plasticity Index < 6 and
stacking at site to the departmentel gauge for pre measurements and mixing them and
spreading the same with motor grader in uniform layers of loose thickness of not more
than 225mm including mixing by mix in place method with rotavator to OMC and
compacting with three wheeled power roller of 8 to 10 Tonnes capacity to achieve the
desired density, complete as per IRC technical specification clause 402 of MORD.

km 0/0 to 3/880 1 cum 2 3880.00 1.875 0.17 2473.50


Km 3/880 to 8/360 1 cum 2 4480.00 1.875 0.17 2856.00
Deduct CD works
0/0 to 0/2 Road dam 1 cum 2 30.00 1.875 0.170 -19.13
0/8 to 1/0 Road dam 1 cum 2 34.00 1.875 0.170 -21.68
1/8 to 2/0 Slab culvert 1 cum 2 27.00 1.875 0.170 -17.21
2/0 to 2/2 Slab culvert 1 cum 2 1.00 1.875 0.170 -0.64
2/6 to 2/8 Road dam 1 cum 2 30.00 1.875 0.170 -19.13
3/0 to 3/2 Road dam 1 cum 2 16.00 1.875 0.170 -10.20
4/8 to 5/0 Road dam 1 cum 2 16.00 1.875 0.170 -10.20
5/4 to 5/6 Road dam 1 cum 2 30.00 1.875 0.170 -19.13
5/6 to 5/8 Road dam 1 cum 2 30.00 1.875 0.170 -19.13
6/2 to 6/4 Road dam 1 cum 2 40.00 1.875 0.170 -25.50
7/8 to 8/0 Road dam 1 cum 2 30.00 1.875 0.170 -19.13
8/2 to 8/4 Road dam 1 cum 2 30.00 1.875 0.170 -19.13
5129.33

Page 118 of 173


PRADHANA MANTRI GRAM SADAK YOJANA
COST ESTIMATE FOR ROAD WORK

Deatailed Estimate

Name of work : R/F R&B Road to Puligundala of Charla Mandal.

S. Measurements
Description of item Unit No Qty
No L B D
1 2 3 4 5 6 7 8 9
cum

Grade - II Metal
8 Providing, Water Bound Macadam base for a compacted thickness of 75mm using
Grade-II HBG crushed stone aggregates (63 mm to 45 mm size), screenings and
binder confirming to table 400-8 of MORD "Standard Specifications for the rural
roads) including cost, seigniorage and conveyance of all materials, spreading in uniform
thickness, hand packing, rolling with static power roller of 8-10 tons in stages to proper
grade and camber, applying and brooming requisite type of screening binding materials to
fill up the interstices of coarse aggregate, watering and compacting to the required density
or finished item of work as directed by the Engineer-in-Charge as per MORD clause No.405

Km 0/0 to 8/360 1 cum 1 8360.00 3.75 0.075 2351.25


km 1/500 to 1/760 1 cum 1 260.00 0.75 0.075 14.63
Deduct CD works
0/0 to 0/2 Road dam 1 cum 1 30.00 3.75 0.075 -8.44
0/8 to 1/0 Road dam 1 cum 1 34.00 3.75 0.075 -9.56
1/5 to 1/760 CC Road 1 cum 1 260.00 3.75 0.075 -73.13
1/8 to 2/0 Slab culvert 1 cum 1 27.00 3.75 0.075 -7.59
2/0 to 2/2 Slab culvert 1 cum 1 1.00 3.75 0.075 -0.28
2/6 to 2/8 Road dam 1 cum 1 30.00 3.75 0.075 -8.44
3/0 to 3/2 Road dam 1 cum 1 16.00 3.75 0.075 -4.50
4/8 to 5/0 Road dam 1 cum 1 16.00 3.75 0.075 -4.50
5/4 to 5/6 Road dam 1 cum 1 30.00 3.75 0.075 -8.44
5/6 to 5/8 Road dam 1 cum 1 30.00 3.75 0.075 -8.44
6/2 to 6/4 Road dam 1 cum 1 40.00 3.75 0.075 -11.25
7/8 to 8/0 Road dam 1 cum 1 30.00 3.75 0.075 -8.44
8/2 to 8/4 Road dam 1 cum 1 30.00 3.75 0.075 -8.44
Curves:

Page 119 of 173


PRADHANA MANTRI GRAM SADAK YOJANA
COST ESTIMATE FOR ROAD WORK

Deatailed Estimate

Name of work : R/F R&B Road to Puligundala of Charla Mandal.

S. Measurements
Description of item Unit No Qty
No L B D
1 2 3 4 5 6 7 8 9
For curve -1 at Km 0/440 1 Cum 1 12.00 0.60 0.075 0.54
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
For curve -2 at Km 0/890 1 Cum 1 15.00 0.60 0.075 0.68
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
For curve -3 at Km 1/190 1 Cum 1 46.07 0.60 0.075 2.07
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
For curve -4 at Km 1/370 1 Cum 1 53.40 0.60 0.075 2.40
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
For curve -5 at Km 1/820 1 Cum 1 31.41 0.60 0.075 1.41
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
For curve -6 at Km 2/360 1 Cum 1 19.89 0.60 0.075 0.90
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
For curve -7 at Km 3/370 1 Cum 1 20.00 0.60 0.075 0.90
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
For curve -8 at Km 3/550 1 Cum 1 19.89 0.60 0.075 0.90
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
For curve -9 at Km 3/910 1 Cum 1 24.08 0.60 0.075 1.08
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
For curve -10 at Km 4/330 1 Cum 1 21.99 0.60 0.075 0.99

Page 120 of 173


PRADHANA MANTRI GRAM SADAK YOJANA
COST ESTIMATE FOR ROAD WORK

Deatailed Estimate

Name of work : R/F R&B Road to Puligundala of Charla Mandal.

S. Measurements
Description of item Unit No Qty
No L B D
1 2 3 4 5 6 7 8 9
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
For curve -11 at Km 5/960 1 Cum 1 19.89 0.60 0.075 0.90
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
For curve -12 at Km 6/050 1 Cum 1 15.70 0.60 0.075 0.71
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
For curve -13 at Km 6/620 1 Cum 1 38.74 0.60 0.075 1.74
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
For curve -14 at Km 6/710 1 Cum 1 40.00 0.60 0.075 1.80
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
For curve -15 at Km 7/800 1 Cum 1 25.00 0.60 0.075 1.13
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
For curve -16 at Km 7/040 1 Cum 1 45.02 0.60 0.075 2.03
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
For curve -17 at Km 7/250 1 Cum 1 24.18 0.60 0.075 1.09
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
For curve -18 at Km 7/820 1 Cum 1 28.00 0.60 0.075 1.26
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
2242.90
cum

Page 121 of 173


PRADHANA MANTRI GRAM SADAK YOJANA
COST ESTIMATE FOR ROAD WORK

Deatailed Estimate

Name of work : R/F R&B Road to Puligundala of Charla Mandal.

S. Measurements
Description of item Unit No Qty
No L B D
1 2 3 4 5 6 7 8 9

Grade - III Metal


9 Providing, Water Bound Macadam base for a compacted thickness of 75mm using
Grade-III HBG crushed stone aggregates ( 53 mm to 22.40 mm size), screenings and
binder confirming to table 400-8 of MORD "Standard Specifications for rural roads)
including cost, seigniorage and conveyance of all materials, spreading in uniform thickness,
hand packing, rolling with static power roller of 8-10 tons in stages to proper grade and
camber, applying and brooming requisite type of screening binding materials to fill up the
interstices of coarse aggregate, watering and compacting to the required density or finished
item of work as directed by the Engineer-in-Charge as per MORD clause No.405

Km 0/0 to 8/360 1 cum 1 8360.00 3.75 0.075 2351.25


km 1/500 to 1/760 1 cum 1 260.00 0.75 0.075 14.63
Deduct CD works
0/0 to 0/2 Road dam 1 cum 1 30.00 3.75 0.075 -8.44
0/8 to 1/0 Road dam 1 cum 1 34.00 3.75 0.075 -9.56
1/5 to 1/760 CC Road 1 cum 1 260.00 3.75 0.075 -73.13
1/8 to 2/0 Slab culvert 1 cum 1 27.00 3.75 0.075 -7.59
2/0 to 2/2 Slab culvert 1 cum 1 1.00 3.75 0.075 -0.28
2/6 to 2/8 Road dam 1 cum 1 30.00 3.75 0.075 -8.44
3/0 to 3/2 Road dam 1 cum 1 16.00 3.75 0.075 -4.50
4/8 to 5/0 Road dam 1 cum 1 16.00 3.75 0.075 -4.50
5/4 to 5/6 Road dam 1 cum 1 30.00 3.75 0.075 -8.44
5/6 to 5/8 Road dam 1 cum 1 30.00 3.75 0.075 -8.44
6/2 to 6/4 Road dam 1 cum 1 40.00 3.75 0.075 -11.25
7/8 to 8/0 Road dam 1 cum 1 30.00 3.75 0.075 -8.44
8/2 to 8/4 Road dam 1 cum 1 30.00 3.75 0.075 -8.44
Curves:
For curve -1 at Km 0/440 1 Cum 1 12.00 0.60 0.075 0.54

Page 122 of 173


PRADHANA MANTRI GRAM SADAK YOJANA
COST ESTIMATE FOR ROAD WORK

Deatailed Estimate

Name of work : R/F R&B Road to Puligundala of Charla Mandal.

S. Measurements
Description of item Unit No Qty
No L B D
1 2 3 4 5 6 7 8 9
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
For curve -2 at Km 0/890 1 Cum 1 15.00 0.60 0.075 0.68
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
For curve -3 at Km 1/190 1 Cum 1 46.07 0.60 0.075 2.07
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
For curve -4 at Km 1/370 1 Cum 1 53.40 0.60 0.075 2.40
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
For curve -5 at Km 1/820 1 Cum 1 31.41 0.60 0.075 1.41
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
For curve -6 at Km 2/360 1 Cum 1 19.89 0.60 0.075 0.90
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
For curve -7 at Km 3/370 1 Cum 1 20.00 0.60 0.075 0.90
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
For curve -8 at Km 3/550 1 Cum 1 19.89 0.60 0.075 0.90
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
For curve -9 at Km 3/910 1 Cum 1 24.08 0.60 0.075 1.08
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
For curve -10 at Km 4/330 1 Cum 1 21.99 0.60 0.075 0.99
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49

Page 123 of 173


PRADHANA MANTRI GRAM SADAK YOJANA
COST ESTIMATE FOR ROAD WORK

Deatailed Estimate

Name of work : R/F R&B Road to Puligundala of Charla Mandal.

S. Measurements
Description of item Unit No Qty
No L B D
1 2 3 4 5 6 7 8 9
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
For curve -11 at Km 5/960 1 Cum 1 19.89 0.60 0.075 0.90
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
For curve -12 at Km 6/050 1 Cum 1 15.70 0.60 0.075 0.71
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
For curve -13 at Km 6/620 1 Cum 1 38.74 0.60 0.075 1.74
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
For curve -14 at Km 6/710 1 Cum 1 40.00 0.60 0.075 1.80
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
For curve -15 at Km 7/800 1 Cum 1 25.00 0.60 0.075 1.13
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
For curve -16 at Km 7/040 1 Cum 1 45.02 0.60 0.075 2.03
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
For curve -17 at Km 7/250 1 Cum 1 24.18 0.60 0.075 1.09
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
For curve -18 at Km 7/820 1 Cum 1 28.00 0.60 0.075 1.26
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
2242.90
cum

Page 124 of 173


PRADHANA MANTRI GRAM SADAK YOJANA
COST ESTIMATE FOR ROAD WORK

Deatailed Estimate

Name of work : R/F R&B Road to Puligundala of Charla Mandal.

S. Measurements
Description of item Unit No Qty
No L B D
1 2 3 4 5 6 7 8 9
10
Providing and applying Prime Coat with butimen emulsion (Medium Setting- SS-1) on
prepared surface of granular base incliding cleaning of road surface and spraying primer at
the rate of 0.85Kg/Sqm using mechanical means as clause 502 of MORD.

Km 0/0 to 8/360 1 sqm 1 8360.00 3.75 - 31350.00


km 1/500 to 1/760 1 sqm 1 260.00 0.75 - 195.00
Deduct CD works
0/0 to 0/2 Road dam 1 sqm 1 30.00 3.75 - -112.50
0/8 to 1/0 Road dam 1 sqm 1 34.00 3.75 - -127.50
1/5 to 1/760 CC Road 1 sqm 1 260.00 3.75 - -975.00
1/8 to 2/0 Slab culvert 1 sqm 1 27.00 3.75 - -101.25
2/0 to 2/2 Slab culvert 1 sqm 1 1.00 3.75 - -3.75
2/6 to 2/8 Road dam 1 sqm 1 30.00 3.75 - -112.50
3/0 to 3/2 Road dam 1 sqm 1 16.00 3.75 - -60.00
4/8 to 5/0 Road dam 1 sqm 1 16.00 3.75 - -60.00
5/4 to 5/6 Road dam 1 sqm 1 30.00 3.75 - -112.50
5/6 to 5/8 Road dam 1 sqm 1 30.00 3.75 - -112.50
6/2 to 6/4 Road dam 1 sqm 1 40.00 3.75 - -150.00
7/8 to 8/0 Road dam 1 sqm 1 30.00 3.75 - -112.50
8/2 to 8/4 Road dam 1 sqm 1 30.00 3.75 - -112.50
Curves:
For curve -1 at Km 0/440 1 sqm 1 12.00 0.60 - 7.20
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -2 at Km 0/890 1 sqm 1 15.00 0.60 - 9.00
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -3 at Km 1/190 1 sqm 1 46.07 0.60 - 27.64

Page 125 of 173


PRADHANA MANTRI GRAM SADAK YOJANA
COST ESTIMATE FOR ROAD WORK

Deatailed Estimate

Name of work : R/F R&B Road to Puligundala of Charla Mandal.

S. Measurements
Description of item Unit No Qty
No L B D
1 2 3 4 5 6 7 8 9
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -4 at Km 1/370 1 sqm 1 53.40 0.60 - 32.04
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -5 at Km 1/820 1 sqm 1 31.41 0.60 - 18.85
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -6 at Km 2/360 1 sqm 1 19.89 0.60 - 11.93
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -7 at Km 3/370 1 sqm 1 20.00 0.60 - 12.00
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -8 at Km 3/550 1 sqm 1 19.89 0.60 - 11.93
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -9 at Km 3/910 1 sqm 1 24.08 0.60 - 14.45
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -10 at Km 4/330 1 sqm 1 21.99 0.60 - 13.19
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -11 at Km 5/960 1 sqm 1 19.89 0.60 - 11.93
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -12 at Km 6/050 1 sqm 1 15.70 0.60 - 9.42
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56

Page 126 of 173


PRADHANA MANTRI GRAM SADAK YOJANA
COST ESTIMATE FOR ROAD WORK

Deatailed Estimate

Name of work : R/F R&B Road to Puligundala of Charla Mandal.

S. Measurements
Description of item Unit No Qty
No L B D
1 2 3 4 5 6 7 8 9
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -13 at Km 6/620 1 sqm 1 38.74 0.60 - 23.24
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -14 at Km 6/710 1 sqm 1 40.00 0.60 - 24.00
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -15 at Km 7/800 1 sqm 1 25.00 0.60 - 15.00
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -16 at Km 7/040 1 sqm 1 45.02 0.60 - 27.01
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -17 at Km 7/250 1 sqm 1 24.18 0.60 - 14.51
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -18 at Km 7/820 1 sqm 1 28.00 0.60 - 16.80
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
29905.27
cum

11
Providing and applying Tack Coat with butimen emulsion (Rapid Setting- RS-1) using
emulsion distributor @ 0.275 kg per sqm on prepared surface incliding cleaning of road
surface and spraying primer at the rate of 0.275Kg/Sqm using mechanical means as clause
503 of MORD.

Km 0/0 to 8/360 1 sqm 1 8360.00 3.75 - 31350.00


km 1/500 to 1/760 1 sqm 1 260.00 0.75 - 195.00

Page 127 of 173


PRADHANA MANTRI GRAM SADAK YOJANA
COST ESTIMATE FOR ROAD WORK

Deatailed Estimate

Name of work : R/F R&B Road to Puligundala of Charla Mandal.

S. Measurements
Description of item Unit No Qty
No L B D
1 2 3 4 5 6 7 8 9
Deduct CD works
0/0 to 0/2 Road dam 1 sqm 1 30.00 3.75 - -112.50
0/8 to 1/0 Road dam 1 sqm 1 34.00 3.75 - -127.50
1/5 to 1/760 CC Road 1 sqm 1 260.00 3.75 - -975.00
1/8 to 2/0 Slab culvert 1 sqm 1 27.00 3.75 - -101.25
2/0 to 2/2 Slab culvert 1 sqm 1 1.00 3.75 - -3.75
2/6 to 2/8 Road dam 1 sqm 1 30.00 3.75 - -112.50
3/0 to 3/2 Road dam 1 sqm 1 16.00 3.75 - -60.00
4/8 to 5/0 Road dam 1 sqm 1 16.00 3.75 - -60.00
5/4 to 5/6 Road dam 1 sqm 1 30.00 3.75 - -112.50
5/6 to 5/8 Road dam 1 sqm 1 30.00 3.75 - -112.50
6/2 to 6/4 Road dam 1 sqm 1 40.00 3.75 - -150.00
7/8 to 8/0 Road dam 1 sqm 1 30.00 3.75 - -112.50
8/2 to 8/4 Road dam 1 sqm 1 30.00 3.75 - -112.50
Curves:
For curve -1 at Km 0/440 1 sqm 1 12.00 0.60 - 7.20
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -2 at Km 0/890 1 sqm 1 15.00 0.60 - 9.00
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -3 at Km 1/190 1 sqm 1 46.07 0.60 - 27.64
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -4 at Km 1/370 1 sqm 1 53.40 0.60 - 32.04
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -5 at Km 1/820 1 sqm 1 31.41 0.60 - 18.85

Page 128 of 173


PRADHANA MANTRI GRAM SADAK YOJANA
COST ESTIMATE FOR ROAD WORK

Deatailed Estimate

Name of work : R/F R&B Road to Puligundala of Charla Mandal.

S. Measurements
Description of item Unit No Qty
No L B D
1 2 3 4 5 6 7 8 9
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -6 at Km 2/360 1 sqm 1 19.89 0.60 - 11.93
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -7 at Km 3/370 1 sqm 1 20.00 0.60 - 12.00
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -8 at Km 3/550 1 sqm 1 19.89 0.60 - 11.93
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -9 at Km 3/910 1 sqm 1 24.08 0.60 - 14.45
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -10 at Km 4/330 1 sqm 1 21.99 0.60 - 13.19
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -11 at Km 5/960 1 sqm 1 19.89 0.60 - 11.93
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -12 at Km 6/050 1 sqm 1 15.70 0.60 - 9.42
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -13 at Km 6/620 1 sqm 1 38.74 0.60 - 23.24
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -14 at Km 6/710 1 sqm 1 40.00 0.60 - 24.00
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56

Page 129 of 173


PRADHANA MANTRI GRAM SADAK YOJANA
COST ESTIMATE FOR ROAD WORK

Deatailed Estimate

Name of work : R/F R&B Road to Puligundala of Charla Mandal.

S. Measurements
Description of item Unit No Qty
No L B D
1 2 3 4 5 6 7 8 9
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -15 at Km 7/800 1 sqm 1 25.00 0.60 - 15.00
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -16 at Km 7/040 1 sqm 1 45.02 0.60 - 27.01
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -17 at Km 7/250 1 sqm 1 24.18 0.60 - 14.51
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -18 at Km 7/820 1 sqm 1 28.00 0.60 - 16.80
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
29905.27
cum

12
Providing and laying Open Graded Premix Carpet (OGPC) surfacing material of 20 mm
thick composed of 13.20 mm to 5.60 mm size machine crushed hard blasted granite
chips using bitumen of 60/70 grade at the rate of 14.60 kgs per 10 sqm area of road
surface over tack coat to required line, level, grade to serve as wearing course on
previously prepared base including mixing in a Hot Mix Plant of 30/40 TPH, laying with
mechanical paver finisher and rolloing with three wheeled 8-10 Tonnes capacity power
roller and finishing to required level and grades including cost and conveyance of all
materials from approved sources, seigniorage, labour charges and hire and operational
charges of power road roller and all other machinery, tools and plants, providing barricading
for diversion of traffic, erecting red flags other incidental and operational charges etc.,
complete for finished item of work as per clause 508 of MORD.

Km 0/0 to 8/360 1 sqm 1 8360.00 3.75 - 31350.00


km 1/500 to 1/760 1 sqm 1 260.00 0.75 - 195.00

Page 130 of 173


PRADHANA MANTRI GRAM SADAK YOJANA
COST ESTIMATE FOR ROAD WORK

Deatailed Estimate

Name of work : R/F R&B Road to Puligundala of Charla Mandal.

S. Measurements
Description of item Unit No Qty
No L B D
1 2 3 4 5 6 7 8 9
Deduct CD works
0/0 to 0/2 Road dam 1 sqm 1 30.00 3.75 - -112.50
0/8 to 1/0 Road dam 1 sqm 1 34.00 3.75 - -127.50
1/5 to 1/760 CC Road 1 sqm 1 260.00 3.75 - -975.00
1/8 to 2/0 Slab culvert 1 sqm 1 27.00 3.75 - -101.25
2/0 to 2/2 Slab culvert 1 sqm 1 1.00 3.75 - -3.75
2/6 to 2/8 Road dam 1 sqm 1 30.00 3.75 - -112.50
3/0 to 3/2 Road dam 1 sqm 1 16.00 3.75 - -60.00
4/8 to 5/0 Road dam 1 sqm 1 16.00 3.75 - -60.00
5/4 to 5/6 Road dam 1 sqm 1 30.00 3.75 - -112.50
5/6 to 5/8 Road dam 1 sqm 1 30.00 3.75 - -112.50
6/2 to 6/4 Road dam 1 sqm 1 40.00 3.75 - -150.00
7/8 to 8/0 Road dam 1 sqm 1 30.00 3.75 - -112.50
8/2 to 8/4 Road dam 1 sqm 1 30.00 3.75 - -112.50
Curves:
For curve -1 at Km 0/440 1 sqm 1 12.00 0.60 - 7.20
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -2 at Km 0/890 1 sqm 1 15.00 0.60 - 9.00
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -3 at Km 1/190 1 sqm 1 46.07 0.60 - 27.64
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -4 at Km 1/370 1 sqm 1 53.40 0.60 - 32.04
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -5 at Km 1/820 1 sqm 1 31.41 0.60 - 18.85

Page 131 of 173


PRADHANA MANTRI GRAM SADAK YOJANA
COST ESTIMATE FOR ROAD WORK

Deatailed Estimate

Name of work : R/F R&B Road to Puligundala of Charla Mandal.

S. Measurements
Description of item Unit No Qty
No L B D
1 2 3 4 5 6 7 8 9
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -6 at Km 2/360 1 sqm 1 19.89 0.60 - 11.93
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -7 at Km 3/370 1 sqm 1 20.00 0.60 - 12.00
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -8 at Km 3/550 1 sqm 1 19.89 0.60 - 11.93
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -9 at Km 3/910 1 sqm 1 24.08 0.60 - 14.45
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -10 at Km 4/330 1 sqm 1 21.99 0.60 - 13.19
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -11 at Km 5/960 1 sqm 1 19.89 0.60 - 11.93
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -12 at Km 6/050 1 sqm 1 15.70 0.60 - 9.42
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -13 at Km 6/620 1 sqm 1 38.74 0.60 - 23.24
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -14 at Km 6/710 1 sqm 1 40.00 0.60 - 24.00
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56

Page 132 of 173


PRADHANA MANTRI GRAM SADAK YOJANA
COST ESTIMATE FOR ROAD WORK

Deatailed Estimate

Name of work : R/F R&B Road to Puligundala of Charla Mandal.

S. Measurements
Description of item Unit No Qty
No L B D
1 2 3 4 5 6 7 8 9
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -15 at Km 7/800 1 sqm 1 25.00 0.60 - 15.00
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -16 at Km 7/040 1 sqm 1 45.02 0.60 - 27.01
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -17 at Km 7/250 1 sqm 1 24.18 0.60 - 14.51
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -18 at Km 7/820 1 sqm 1 28.00 0.60 - 16.80
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
29905.27
cum

13
Providing and laying bituminous liquid seal coat (Type A) comprising of a layer of
bitumuneous binder followed by a cover of stone chipping of grading as defined in table
500.16 of MOST at 0.09 cum/10sqm of chips to be laid simultaneously along with the
bitumunous course using 9.80 kgs of bitumen 60/70 grade for 10 sqm and rolling with
power roller including of required line, level, grade to serve as wearing course on previously
prepared surface and finishing to rquired level and grades including cost and conveyance of
all materials from approved sources and stacking at site to departmental gauge for
premeasurements, seigniorage, labour charges and hire and operational charges of power
road roller 8 to 10 tonnes capacity and all other machinery, tools and plants, providing
barricading for diversion of traffic, erecting red flags other incidental and operational
charges etc., complete for finished item of work as per technical specification clause 510 of
MORD.

Km 0/0 to 8/360 1 sqm 1 8360.00 3.75 - 31350.00


km 1/500 to 1/760 1 sqm 1 260.00 0.75 - 195.00

Page 133 of 173


PRADHANA MANTRI GRAM SADAK YOJANA
COST ESTIMATE FOR ROAD WORK

Deatailed Estimate

Name of work : R/F R&B Road to Puligundala of Charla Mandal.

S. Measurements
Description of item Unit No Qty
No L B D
1 2 3 4 5 6 7 8 9
Deduct CD works
0/0 to 0/2 Road dam 1 sqm 1 30.00 3.75 - -112.50
0/8 to 1/0 Road dam 1 sqm 1 34.00 3.75 - -127.50
1/5 to 1/760 CC Road 1 sqm 1 260.00 3.75 - -975.00
1/8 to 2/0 Slab culvert 1 sqm 1 27.00 3.75 - -101.25
2/0 to 2/2 Slab culvert 1 sqm 1 1.00 3.75 - -3.75
2/6 to 2/8 Road dam 1 sqm 1 30.00 3.75 - -112.50
3/0 to 3/2 Road dam 1 sqm 1 16.00 3.75 - -60.00
4/8 to 5/0 Road dam 1 sqm 1 16.00 3.75 - -60.00
5/4 to 5/6 Road dam 1 sqm 1 30.00 3.75 - -112.50
5/6 to 5/8 Road dam 1 sqm 1 30.00 3.75 - -112.50
6/2 to 6/4 Road dam 1 sqm 1 40.00 3.75 - -150.00
7/8 to 8/0 Road dam 1 sqm 1 30.00 3.75 - -112.50
8/2 to 8/4 Road dam 1 sqm 1 30.00 3.75 - -112.50
Curves:
For curve -1 at Km 0/440 1 sqm 1 12.00 0.60 - 7.20
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -2 at Km 0/890 1 sqm 1 15.00 0.60 - 9.00
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -3 at Km 1/190 1 sqm 1 46.07 0.60 - 27.64
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -4 at Km 1/370 1 sqm 1 53.40 0.60 - 32.04
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -5 at Km 1/820 1 sqm 1 31.41 0.60 - 18.85

Page 134 of 173


PRADHANA MANTRI GRAM SADAK YOJANA
COST ESTIMATE FOR ROAD WORK

Deatailed Estimate

Name of work : R/F R&B Road to Puligundala of Charla Mandal.

S. Measurements
Description of item Unit No Qty
No L B D
1 2 3 4 5 6 7 8 9
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -6 at Km 2/360 1 sqm 1 19.89 0.60 - 11.93
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -7 at Km 3/370 1 sqm 1 20.00 0.60 - 12.00
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -8 at Km 3/550 1 sqm 1 19.89 0.60 - 11.93
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -9 at Km 3/910 1 sqm 1 24.08 0.60 - 14.45
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -10 at Km 4/330 1 sqm 1 21.99 0.60 - 13.19
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -11 at Km 5/960 1 sqm 1 19.89 0.60 - 11.93
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -12 at Km 6/050 1 sqm 1 15.70 0.60 - 9.42
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -13 at Km 6/620 1 sqm 1 38.74 0.60 - 23.24
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -14 at Km 6/710 1 sqm 1 40.00 0.60 - 24.00
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56

Page 135 of 173


PRADHANA MANTRI GRAM SADAK YOJANA
COST ESTIMATE FOR ROAD WORK

Deatailed Estimate

Name of work : R/F R&B Road to Puligundala of Charla Mandal.

S. Measurements
Description of item Unit No Qty
No L B D
1 2 3 4 5 6 7 8 9
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -15 at Km 7/800 1 sqm 1 25.00 0.60 - 15.00
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -16 at Km 7/040 1 sqm 1 45.02 0.60 - 27.01
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -17 at Km 7/250 1 sqm 1 24.18 0.60 - 14.51
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -18 at Km 7/820 1 sqm 1 28.00 0.60 - 16.80
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
29905.27
cum
14 Providing and Laying Boulder apron for bed protection with stone boulders of minimum size
and weight as per table 1300.10 no fragment weighing not less than 25kg laid dry complete
as per drawing and technical specification Clause 1301.
For M.I tank at km 6/200 to 6/560
Toe wall at U/S 1 cum 1 360.00 0.60 0.600 129.60
Toe wall at D/S 1 cum 1 360.00 0.60 0.450 97.20
Side slopes U/S 1 cum 1 360.00 8.30 0.300 896.40
Side slopes D/S 1 cum 1 360.00 8.30 0.300 896.40
2019.60
cum

Page 136 of 173


PRADHANA MANTRI GRAM SADAK YOJANA
COST ESTIMATE FOR ROAD WORK

Deatailed Estimate

Name of work : R/F R&B Road to Puligundala of Charla Mandal.

S. Measurements
Description of item Unit No Qty
No L B D
1 2 3 4 5 6 7 8 9

Asst.Exe.Engineer Deputy Executive Engineer Executive Engineer


PR-Charla PRSD-Venkatapuram PR Divn-Bhadrachalam

Superintending Engineer
PR - Circle - Khammam

Page 137 of 173


SUB ESTIMATE - 1

Construction of 600 mm dia 1V culvert on R/F R&B Road to Puligundala of Charla Mandal.

Amount of Estimate: Rs. 105000.00


MEASUREMENTS
SL.NO Description of Item No QTY RATE AMOUNT
L B D

1 Earth work excavation and depositing on bank with intial lead of 10M and
lift 2m in OG soils for foundation including seinorage etc., complete.

Body walls 1x2 6.00 1.20 1.50 21.60


Under pipe portion 1x1 5.40 1.20 0.20 1.30
22.90 58.83 1347.00
cum ./Cum

2 Filling sand in foundation trench including watering and tamping including


c/c of all and l/c etc., complete.

Body walls 1x2 6.00 1.20 0.30 4.32 257.93 1114.00


cum ./Cum

3 Providing concrete for plain/reinforced concrete in open


foundations complete as per drawings and technical
specifications Clause 802, 803, 1202 & 1203

P.C.C grade M 10 Nominal mix (1:3:6)


Body walls Levelling course 1x2 6.00 1.20 0.30 4.32
4.32 2914.78 12592.00
cum ./Cum
PCC grade M15 : Bedding for pipe: Type A(Concrete cradle ) Bedding:
Nominal mix (1:2.5:5)
Under pipe portion 1x1 6.00 1.20 0.20 1.44 2887.95 4159.00
cum ./Cum

4 Providing concrete for plain/reinforced concrete in open


foundations complete as per drawings and technical
specifications Clause 802, 803, 1202 & 1203

Nominal mix (1:3:6)


Body walls upto sill level 1x2 6.00 (0.90+0.75)/2 0.90 8.91
Body walls above sill level 1x2 6.00 (0.75+0.45)/2 1.20 8.64
Parapets 1x2 3.00 0.30 0.45 0.81
Deduct pipes portion 1x2 (π/4) x 0.70 x 0.70 (0.75+0.58)/2 -0.51
17.85 2887.95 51547.00
cum 1 Cum
5 Providing and laying reinforced cement concrete pipe NP3 for culverts on
first class bedding of granular material in single row including fixing collar
with cement mortar 1:2 but excluding excavation, protection works,
backfilling, concrete and masonry works in head walls and parapets Clause
1106.

600 mm dia., RCC NP3 1x1 7.50 -- -- 7.50 2342.10 17566.00


RM /1RM

6 Filling in between body walls with gravel including cost,conveyance and


seignorage of all materials to site etc., complete as per Clause 710.1.4 of
IRC:78 and as per drawing and technical specifications for finished item of
work.

In between body walls 1x1 6.00 (8.5+9.10)/2 1.20 63.36


Deduct pipe portion 1x1 6.00 (π/4) x 0.70 x 0.70 -3.27
60.09 247.91 14897.00
cum 1 Cum

7 LS Provision for other unforeseen items 1778.00

Total: 105000.00

Asst.Executive Engineer Deputy Executive Engineer Executive Engineer


PR-Charla PRSD-Venkatapuarm PR Divn-Bhadrachalam

Superintending Engineer
PR Circle - Khammam
0.83
0.6
8.8

0.00
SUB ESTIMATE - 2

Construction of 600 mm dia 2V pipe culvert on R/F R&B Road to Puligundala of Charla Mandal.

Amount of Estimate: Rs. 151000.00


MEASUREMENTS
SL.NO Description of Item No QTY RATE AMOUNT
L B D

1 Earth work excavation and depositing on bank with intial lead of 10M and
lift 2m in OG soils for foundation including seinorage etc., complete.

Body walls 1x2 8.00 1.20 1.5 28.80


Under pipe portion 1x1 5.40 2.10 0.2 2.27
31.07 58.83 1828.00
cum ./Cum

2 Filling sand in foundation trench including watering and tamping including


c/c of all and l/c etc., complete.

Body walls 1x2 8.00 1.20 0.3 5.76 257.93 1486.00


cum ./Cum

3 Providing concrete for plain/reinforced concrete in open


foundations complete as per drawings and technical
specifications Clause 802, 803, 1202 & 1203

P.C.C grade M 10 Nominal mix (1:3:6)

Body walls Levelling course 1x2 8.00 1.20 0.3 5.76


5.76 2914.78 16789.00
cum ./Cum
PCC grade M15 : Bedding for pipe: Type A(Concrete cradle ) Bedding:
Nominal mix (1:2.5:5)

Under pipe portion 1x1 6.00 2.10 0.2 2.52 2887.95 7278.00
cum ./Cum

4 Providing concrete for plain/reinforced concrete in open


foundations complete as per drawings and technical
specifications Clause 802, 803, 1202 & 1203

Nominal mix (1:3:6)


Body walls upto sill level 1x2 8.00 (0.90+0.75)/2 0.90 11.88
Body walls above sill level 1x2 8.00 (0.75+0.45)/2 1.20 11.52
Parapets 1x2 4.00 0.30 0.45 1.08
Deduct pipes portion 2x2 (π/4) x 0.70 x 0.70 (0.75+0.58)/2 -1.01
23.47 2887.95 67780.00
cum 1 Cum
5 Providing and Laying Reinforced Cement Concrete pipe NP3 for culverts on
1st class bedding of granular material in single row including fixing collar
with Cement Mortar (1:2) but excluding excavation, protection works,
backfilling, concrete and masonry works in head walls and parapets clause
1106.

600 mm dia., RCC NP3 1x2 7.50 -- -- 15.00 2342.10 35132.00


RM /1RM

6 Filling in between body walls with gravel including cost,conveyance and


seignorage of all materials to site etc., complete as per Clause 710.1.4 of
IRC:78 and as per drawing and technical specifications for finished item of
work.

In between body walls 1x1 8.00 (8.5+9.10)/2 1.2 84.48


Deduct pipe portion 1x2 6.00 (π/4) x 0.70 x 0.70 -6.54
77.94 247.91 19322.00
cum 1 Cum

7 LS Provision for other unforeseen items 1385.00

Total: 151000.00

Asst.Executive Engineer Deputy Executive Engineer Executive Engineer


PR-Charla PRSD-Venkatapuarm PR Divn-Bhadrachalam

Superintending Engineer
PR Circle - Khammam
0.83
0.6
8.8

0.00
SUB ESTIMATE - 3

Construction of Road damof 16 mts length on R/F R&B Road to Puligundala of Charla Mandal.

Amount of Estimate: Rs. 310000.00


MEASUREMENTS
SL.NO Description of Item No QTY RATE AMOUNT
L B D

1 Earth work excavation and depositing on bank with intial lead of 10M and lift
2m in OG soils for foundation including seinorage etc., complete.

Long walls
Level portion 1x2 8.00 1.20 1.500 28.80
Approaches 2x2 4.00 1.20 1.500 28.80
Short walls
At middle 1x2 5.30 0.90 1.200 11.45
At ends 1x2 5.30 0.90 1.200 11.45
U/S & D/S apron 1x2 8.00 1.05 0.225 3.78
U/S & D/S toe wall 1x2 8.00 0.45 0.600 4.32
88.60 58.83 5212.00
cum ./Cum
2 Filling sand in foundation trench including watering and tamping including
c/c of all and l/c etc., complete.
Long walls
Level portion 1x2 8.00 1.20 0.3 5.76
Approaches 2x2 4.00 1.2 0.3 5.76
11.52 257.93 2971.00
cum ./Cum
3 Providing concrete for plain/reinforced concrete in open
foundations complete as per drawings and technical
specifications Clause 802, 803, 1202 & 1203

P.C.C grade M 10 Nominal mix (1:3:6)

Long walls
Level portion 1x2 8.00 1.20 0.150 2.88
Approaches 2x2 4.00 1.20 0.150 2.88
Short walls
At middle 1x2 5.30 0.90 0.150 1.43
At ends 1x2 5.30 0.90 0.150 1.43
8.62 2914.78 25131.00
cum ./Cum
4 Providing concrete for plain/reinforced concrete in open
foundations complete as per drawings and technical
specifications Clause 802, 803, 1202 & 1203

PCC M 15 Nominal mix (1:3:6)

Long walls
Level portion 1x2 8.00 (0.9+0.45)/2 1.050 11.34
Approaches 2x2 4.00 (0.9+0.45)/2 (1.05+1.30)/2 12.69
Short walls
At middle 1x2 (6.00+5.70)/2 (0.75+0.45)/2 1.050 7.37
At ends 1x2 (6.00+5.70)/2 (0.75+0.45)/2 1.300 9.13
40.53 2887.95 117040.00
cum ./Cum
Level portion 1x1 8.00 7.50 0.150 9.00
Approaches 1x2 4.00 7.50 0.150 9.00
18.00 2887.95 51983.00
cum ./Cum
5 Providing Rough stone dry packing using SS stone of 300 mm thick
including cost ,seignorage charges and conveyance of materials to site and
including labour charges for packing the stones for revetment etc.,
complete.for finished item of work.
In between walls
Level poriton 1x1 8.00 6.60 0.23 11.88
Approaches 1x2 4.00 6.60 0.23 11.88
U/S & D/S apron 1x2 8.00 1.05 0.33 5.46
U/S & D/S Toe wall 1x2 8.00 0.45 0.600 4.32
33.54 577.91 19383.00
cum 1 Cum
6 VCC (1:1.5:3) 20mm guage metal including cost of conveyance of all
materials and labour charges etc., complete curing segnorage charges for
finished item of work for Wearing coat.
Wearing coat
Level portion 1x1 8.00 7.50 0.100 6.00
Approches 1x2 4.00 7.50 0.100 6.00
12.00 7232.89 86795.00
cum 1 Cum

7 LS Provision for other unforeseen items 1485.00


Total: 310000.00

Asst.Executive Engineer Deputy Executive Engineer Executive Engineer


PR-Charla PRSD-Venkatapuarm PR Divn-Bhadrachalam
Superintending Engineer
PR Circle - Khammam
0.68
0.68 1.175

5.85 0.600
5.85 0.600

0.00
SUB ESTIMATE - 4

Construction of Road dam of 30 mts length on R/F R&B Road to Puligundala of Charla Mandal.

Amount of Estimate: Rs. 527000.00


MEASUREMENTS
SL.NO Description of Item No QTY RATE AMOUNT
L B D

1 Earth work excavation and depositing on bank with intial lead of 10M and lift
2m in OG soils for foundation including seinorage etc., complete.

Long walls
Level portion 1x2 10.00 1.20 1.500 36.00
Approaches 2x2 10.00 1.20 1.500 72.00
Short walls
At middle 1x2 5.30 0.90 1.200 11.45
At ends 1x2 5.30 0.90 1.200 11.45
U/S & D/S apron 1x2 10.00 1.05 0.225 4.73
U/S & D/S toe wall 1x2 10.00 0.45 0.600 5.40
141.02 58.83 8297.00
cum ./Cum
2 Filling sand in foundation trench including watering and tamping including
c/c of all and l/c etc., complete.
Long walls
Level portion 1x2 10.00 1.20 0.3 7.20
Approaches 2x2 10.00 1.2 0.3 14.40
21.60 257.93 5571.00
cum ./Cum
3 Providing concrete for plain/reinforced concrete in open
foundations complete as per drawings and technical
specifications Clause 802, 803, 1202 & 1203

P.C.C grade M 10 Nominal mix (1:3:6)

Long walls
Level portion 1x2 10.00 1.20 0.150 3.60
Approaches 2x2 10.00 1.20 0.150 7.20
Short walls
At middle 1x2 5.30 0.90 0.150 1.43
At ends 1x2 5.30 0.90 0.150 1.43
13.66 2914.78 39822.00
cum ./Cum
4 Providing concrete for plain/reinforced concrete in open
foundations complete as per drawings and technical
specifications Clause 802, 803, 1202 & 1203

PCC M 15 Nominal mix (1:3:6)

Long walls
Level portion 1x2 10.00 (0.9+0.45)/2 1.050 14.18
Approaches 2x2 10.00 (0.9+0.45)/2 (1.05+1.30)/2 31.73
Short walls
At middle 1x2 (6.00+5.70)/2 (0.75+0.45)/2 1.050 7.37
At ends 1x2 (6.00+5.70)/2 (0.75+0.45)/2 1.300 9.13
62.40 2887.95 180199.00
cum ./Cum
Level portion 1x1 10.00 7.50 0.150 11.25
Approaches 1x2 10.00 7.50 0.150 22.50
33.75 2887.95 97468.00
cum ./Cum
5 Providing Rough stone dry packing using SS stone of 300 mm thick
including cost ,seignorage charges and conveyance of materials to site and
including labour charges for packing the stones for revetment etc.,
complete.for finished item of work.
In between walls
Level poriton 1x1 10.00 6.60 0.23 14.85
Approaches 1x2 10.00 6.60 0.23 29.70
U/S & D/S apron 1x2 10.00 1.05 0.33 6.83
U/S & D/S Toe wall 1x2 10.00 0.45 0.600 5.40
56.78 577.91 32811.00
cum 1 Cum
6 VCC (1:1.5:3) 20mm guage metal including cost of conveyance of all
materials and labour charges etc., complete curing segnorage charges for
finished item of work for Wearing coat.
Wearing coat
Level portion 1x1 10.00 7.50 0.100 7.50
Approches 1x2 10.00 7.50 0.100 15.00
22.50 7232.89 162740.00
cum 1 Cum

7 LS Provision for other unforeseen items 92.00


Total: 527000.00

Asst.Executive Engineer Deputy Executive Engineer Executive Engineer


PR-Charla PRSD-Venkatapuarm PR Divn-Bhadrachalam
Superintending Engineer
PR Circle - Khammam
0.68
0.68 1.175

5.85 0.600
5.85 0.600

0.00
SUB ESTIMATE - 5

Construction of Road dam of 40 mts length on R/F R&B Road to Puligundala of Charla Mandal.

Amount of Estimate: Rs. 685384.00


MEASUREMENTS
SL.NO Description of Item No QTY RATE AMOUNT
L B D

1 Earth work excavation and depositing on bank with intial lead of 10M and lift
2m in OG soils for foundation including seinorage etc., complete.

Long walls
Level portion 1x2 20.00 1.20 1.500 72.00
Approaches 2x2 10.00 1.20 1.500 72.00
Short walls
At middle 1x2 5.30 0.90 1.200 11.45
At ends 1x2 5.30 0.90 1.200 11.45
U/S & D/S apron 1x2 20.00 1.05 0.225 9.45
U/S & D/S toe wall 1x2 20.00 0.45 0.600 10.80
187.15 58.83 11010.00
cum ./Cum
2 Filling sand in foundation trench including watering and tamping including
c/c of all and l/c etc., complete.
Long walls
Level portion 1x2 20.00 1.20 0.3 14.40
Approaches 2x2 10.00 1.2 0.3 14.40
28.80 257.93 7428.00
cum ./Cum
3 Providing concrete for plain/reinforced concrete in open
foundations complete as per drawings and technical
specifications Clause 802, 803, 1202 & 1203

P.C.C grade M 10 Nominal mix (1:3:6)

Long walls
Level portion 1x2 20.00 1.20 0.150 7.20
Approaches 2x2 10.00 1.20 0.150 7.20
Short walls
At middle 1x2 5.30 0.90 0.150 1.43
At ends 1x2 5.30 0.90 0.150 1.43
17.26 2914.78 50315.00
cum ./Cum
4 Providing concrete for plain/reinforced concrete in open
foundations complete as per drawings and technical
specifications Clause 802, 803, 1202 & 1203

PCC M 15 Nominal mix (1:3:6)

Long walls
Level portion 1x2 20.00 (0.9+0.45)/2 1.050 28.35
Approaches 2x2 10.00 (0.9+0.45)/2 (1.05+1.30)/2 31.73
Short walls
At middle 1x2 (6.00+5.70)/2 (0.75+0.45)/2 1.050 7.37
At ends 1x2 (6.00+5.70)/2 (0.75+0.45)/2 1.300 9.13
76.57 2887.95 221136.00
cum ./Cum
Level portion 1x1 20.00 7.50 0.150 22.50
Approaches 1x2 10.00 7.50 0.150 22.50
45.00 2887.95 129958.00
cum ./Cum
5 Providing Rough stone dry packing using SS stone of 300 mm thick
including cost ,seignorage charges and conveyance of materials to site and
including labour charges for packing the stones for revetment etc.,
complete.for finished item of work.
In between walls
Level poriton 1x1 20.00 6.60 0.23 29.70
Approaches 1x2 10.00 6.60 0.23 29.70
U/S & D/S apron 1x2 20.00 1.05 0.33 13.65
U/S & D/S Toe wall 1x2 20.00 0.45 0.600 10.80
83.85 577.91 48458.00
cum 1 Cum
6 VCC (1:1.5:3) 20mm guage metal including cost of conveyance of all
materials and labour charges etc., complete curing segnorage charges for
finished item of work for Wearing coat.
Wearing coat
Level portion 1x1 20.00 7.50 0.100 15.00
Approches 1x2 10.00 7.50 0.100 15.00
30.00 7232.89 216987.00
cum 1 Cum

7 LS Provision for other unforeseen items 92.00


Total: 685384.00

Asst.Executive Engineer Deputy Executive Engineer Executive Engineer


PR-Charla PRSD-Venkatapuarm PR Divn-Bhadrachalam
Superintending Engineer
PR Circle - Khammam
0.68
0.68 1.175

5.85 0.600
5.85 0.600

0.00
SUB ESTIMATE - 6

Constuction of Side drain on R/F R&B Road to Puligundala of Charla Mandal.

Amount of Estimate: Rs. 695000.00

MEASUREMENTS
Sl NO Description of Item No QTY RATE AMOUNT
L B D

1 Earthwork in excavation for structures as per drawing and technical


specifications Clause 305.1 including setting out, construction of shoring
and bracing, removal of stumps and other deleterious material and disposal
upto a lead of 50 m, dressing of sides and bottom and backfilling in
trenches with excavated suitable material.

Km 1/600 to 1/900 1x2 300.00 1.20 0.75 270.00


270.00 58.83 15885.00
cum ./Cum
2 Providing concrete for plain/reinforced concrete in open
foundations complete as per drawings and technical
specifications Clause 802, 803, 1202 & 1203

P.C.C grade M 10
Nominal mix (1:3:6)

Km 1/600 to 1/900 1x2 300.00 1.20 0.15 54.00


54.00 2914.78 157398.00
cum ./Cum

3 Providing concrete for plain/reinforced concrete in open


foundations complete as per drawings and technical
specifications Clause 802, 803, 1202 & 1203

P.C.C. grade M 15
Nominal mix (1:3:6)
Road side
Km 1/600 to 1/900 1x2 300.00 (0.20+0.30)/2 0.600 90.00
Other side
Km 1/600 to 1/900 1x2 300.00 (0.20+0.30)/2 0.600 90.00
180.00 2887.95 519830.00
cum ./Cum

4 LS Provision for other unforeseen items 1887.00

Total: 695000.00

Asst.Executive Engineer Deputy Executive Engineer Executive Engineer


PR-Charla PRSD-Venkatapuram PR Divn-Bhadrachalam

Superintending Engineer
PR Circle - Khammam
0.00
SUB ESTIMATE - 7

Providing Wearing Coat to Existing Road dam at km 0/540 on R/F Lingapuram to G.P Pally of Charla Mandal.

Amount of Estimate: Rs. 720000.00


MEASUREMENTS
SL.NO Description of Item No QTY RATE AMOUNT
L B D
A) Road dams:

1 VCC (1:1.5:3) 20mm guage metal including cost of conveyance of all


materials and labour charges etc., complete curing segnorage charges
for finished item of work for Wearing coat.

Wearing coat
At 0/8 to 1/0
Level portion 1x1 20.00 7.50 0.200 30.00
Ramp portion 1x2 7.00 7.50 0.200 21.00
At 2/6 to 2/8
Vent portion 1x1 30.00 7.50 0.200 45.00
96.00 7232.89 694358.00
cum 1 Cum
B) Pipe culverts:

2) Providing concrete for plain/reinforced concrete in open foundations


complete as per drawings and technical specifications Clause 802, 803,
1202 & 1203
Nominal mix (1:3:6)
At 0/4 to 0/6
Body walls raising upto R.T.L 1x2 6.00 0.45 0.30 1.62
Parapet wall 1x2 3.00 0.30 0.30 0.54
At 0/8 to 1/0
Body walls raising upto R.T.L 1x2 6.00 0.45 0.30 1.62
Parapet wall 1x2 3.00 0.30 0.30 0.54
At 1/4 to 1/6
Body walls raising upto R.T.L 1x2 6.00 0.45 0.30 1.62
Parapet wall 1x2 3.00 0.30 0.30 0.54
At 1/6 to 1/8
Body walls raising upto R.T.L 1x2 6.00 0.45 0.30 1.62
Parapet wall 1x2 3.00 0.30 0.30 0.54
8.64 2887.95 24952.00
cum 1 Cum

2 LS Provision for other unforeseen items 690.00

Total: 720000.00

Asst.Executive Engineer Deputy Executive Engineer Executive Engineer


PR-Charla PRSD-Venkatapuarm PR Divn-Bhadrachalam

Superintending Engineer
PR Circle - Khammam
0.00
Name of the work :- R/F R&B Road to Puligundala of Charla Mandal.
LEAD CHARGES
Sl. Average Total Rate Per
Particulars Lead Charges Ded. Stacking Net Cost of lead
No. Lead Cum

1 2 3 4 5 6 7
1 60-63 mm size HBG metal (IRC&MOST) 12.00 162.00 7.60 154.40 154.40
2 50 - 55 mm size HBG metal (IRC&MOST) 12.00 162.00 7.60 154.40 154.40
3 40-45 mm size HBG metal (IRC&MOST) 12.00 162.00 7.60 154.40 154.40
4 22.40 mm size HBG metal (IRC&MOST) 53.00 360.20 7.60 352.60 352.60
5 13.22 mm size HBG metal (IRC&MOST) 53.00 360.20 7.60 352.60 352.60
6 11.20 mm size HBG metal (IRC&MOST) 53.00 360.20 7.60 352.60 352.60
7 5-7 mm size HBG metal (IRC&MORTH) 53.00 360.20 7.60 352.60 352.60
8 2.36 mm down and Stone Dust 53.00 360.20 7.60 352.60 352.60
9 Gravel 9.00 129.10 4.60 124.50 124.50
10 Sand for blindage 11.00 140.50 4.60 135.90 135.90
11 Bitumen 390.00 1170.00 1170.00 1170.00
12 Emulsion (SS - 1) 390.00 1170.00 1170.00 1170.00
13 Emulsion (RS - 1) 390.00 1170.00 1170.00 1170.00
14 40 mm size HBG metal (SS 5) 12.00 162.00 15.20 146.80 146.80
15 20 mm size HBG metal (SS 5) 53.00 360.20 15.20 345.00 345.00
16 12 mm size HBG metal (SS 5) 53.00 360.20 15.20 345.00 345.00
17 10 mm size HBG metal (SS 5) 53.00 360.20 15.20 345.00 345.00
18 Sand for Mortar 11.00 140.50 9.20 131.30 131.30
19 RCC 600mm dia spigot pipe 66.00 187.31 187.31
20 Rough stone 300mm size 12.00 162.00 15.20 146.80 146.80
21 Earth 0.25 44.80 4.60 40.20 40.20

1
Stacking for metal and Stone 7.60
Stacking for earth, Sand and gravel 4.60

Loading and Unloading for metal & Stone 11.10 7.60


Loading and Unloading forearth,Sand and gravel 8.70 7.20

Asst.Executive Engineer Deputy Executive Engineer Executive Engineer


PR-Charla PRSD-Venkatapuram PR Divn-Bhadrachalam

Superintending Engineer
PR Circle - Khammam

2
Name of the work :- R/F R&B Road to Puligundala of Charla Mandal.
COST OF MATERIALS
Machine Seignior-
Sl. Ded. Blasting Total Rate Per
Particulars Initial Rate Final IR crushing age
No. Stacking charges Cum
charges charges
1 2 3 4 5 6 7 8 9
1 60-63 mm size HBG metal (IRC&MOST) 275.00 275.00 0.00 0.00 45.00 320.00
2 50 - 55 mm size HBG metal (IRC&MOST) 300.00 300.00 0.00 0.00 45.00 345.00
3 40-45 mm size HBG metal (IRC&MOST) 385.00 385.00 0.00 0.00 45.00 430.00
4 22.40 mm size HBG metal (IRC&MOST) 650.00 650.00 60.00 160.60 45.00 915.60
5 13.22 mm size HBG metal (IRC&MOST) 530.00 530.00 60.00 130.60 45.00 765.60
6 11.20 mm size HBG metal (IRC&MOST) 430.00 430.00 60.00 105.60 45.00 640.60
7 5-7 mm size HBG metal (IRC&MORTH) 330.00 330.00 60.00 80.60 45.00 515.60
8 2.36 mm down and Stone Dust 180.00 180.00 45.00 225.00
9 Gravel 48.00 48.00 20.00 68.00
10 Sand for blindage 37.00 37.00 36.00 73.00
11 Bitumen 26638.98 26638.98
12 Emulsion (MS - 1) 21280.90 21280.90
13 Emulsion (RS - 1) 21047.94 21047.94
14 40 mm size HBG metal (SS 5) 385.00 385.00 0.00 45.00 430.00
15 20 mm size HBG metal (SS 5) 650.00 650.00 60.00 160.60 45.00 915.60
16 12 mm size HBG metal (SS 5) 530.00 530.00 60.00 130.60 45.00 765.60
17 10 mm size HBG metal (SS 5) 430.00 430.00 60.00 105.60 45.00 640.60
18 Sand for Mortar 89.00 89.00 36.00 125.00
19 RCC 600mm dia spigot pipe 1809.53 1809.53 1809.53
20 Rough stone 300mm size 82.50 82.50 0.00 45.00 127.50
21 Cement 4380.00 4380.00
22 Steel 33000.00 33000.00

Asst.Executive Engineer Deputy Executive Engineer Executive Engineer


PR-Charla PRSD-Venkatapuram PR Divn-Bhadrachalam
Superintending Engineer
PR Circle - Khammam