RIAD - PHASE -
KHAMMAM DISTRICT
PACKAGE NO: AP
VOLUME - I
Total No. of
Name of the
Habitations
Unconnected habitations Package No.
Block
benefited
Superintending.Engineer
PR Circle Khammam
PRADHAN MANTRI GRAM SADAK YOJANA (PMGSY)
Roads Proposed in PMGSY for Rural Connectivity (Pavement Layers) Format-2a
District KHAMMAM Block : CHARLA
Rs. in Lakhs
Name of
Places/Villages Details of Thickness & Cost for pavement Layers Total
Connected by road New
Facility Propose Cost of
constructi Existing Surfacing any
Sl.N accesse d Road Payment
on/upgrad Surface CC
Preparation
o. d (Use Length one (Sum of
Subgrade
ation (use Type Cleaning Gravel road/Re
A/B/C/D) (Km) Prime Tack Road (10) to
From To N/U) Details & Earthwork Shoulde WBM2 WBM3 vetment Seal
Coat coat furniture OGPC (21)
Grubbing rs to Coat
slopes
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
WBM/Eart Thickness 200/
1 R&B Road Puligundala U D 8.360 (mm) -- 450-600 170 75 75 20
hen 230
Cost (Rs.) 1.70 29.01 33.32 19.96 28.23 34.79 6.95 2.44 1.78 11.67 33.76 13.76 217.37
Facilities
Road Embankment
Sl. Road accessed WBM Layer Bituminous Layer
Name of the road connecting Total Land Road (Formation)
No. Length (Use Total
to Truck/T Width Width
A/B/C/D) Motorised
ractor (m) (m)
Height Width Width Thicknes Thicknes
Type Width (m)
(m) (m) (m) s (mm) s (mm)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Whether
Primary New Work Associated proposed
Other new Whether
Through Age of under Habitations served with
Sl No Package PCI subsidery includes
Route the road upgradatio in populations
to ATR
Habitations served with ( ATR) n(U)/Rene package
No
populations wal ( R ) (Y/N)
1 2 3 4 5 6 7 8 9 10 11
1 AP L026 Peddabandirevu(550) 1 14 Yrs U Y Peddabandirevu(550)
Mulkanapally(215) Mulkanapally(215)
Puligundala(282) Puligundala(282)
Bakkachintalapadu(90) Bakkachintalapadu(90)
Kondavai(90) Kondavai(90)
Prepared By:
Signature : Technical Scrutiny Done By :
Name : Sri R.Venkateswara Rao. Signature:
Designation: AEE , P.R , Charla (M) Name:
Signature : Signature:
Checked By:
Signature :
Scrutinized By:
Signature :
Name : Sri M.A Khadeer
Designation: Superintending Engineer P.R.Circle Khammam
PRADHAN MANTHRI GRAM SADAK YOJANA (PMGSY)
CHECK SLIP FOR P.I.U S.T.A. PROFORMA - C
To be filled by PIU
(Individual road works)
2 Package.No. AP
5 Estimate Cost Rs: 282.34 Lakhs Cost per Km Rs. : 33.77 Lakhs
Pavement : 215.59
Total : 222.54
If the Proposed road is a new Connctivity is the road a part of Corenet work Yes
RR MDR SH NH
c) Indicate the nature of road to which the proposed road leads
If the Proposal is for up gradation is the road a part of the Corenet work YES
PCI Value 1
It is Certified that there are no other unconnected habitation s in the District YES
a) Whether the proposed road has the disered carriageway width raod way .
7 width road way width and Road land width (RLW) YES
In the Built in the open
b) Indicate the actual widths of the following for the proposed road up area (m) area(m)
4.75
4.5mts
4.00 Mts
0 12 26 30 0 24 21 71 21
Chainage 0/0to1/0 1/0to2/0 2/0to3/0 3/0to4/0 4/0to5/0 5/0to6/0 6/0to7/0 7/0to8/0 8/0to9/0
CBR(%)
11 Cost Details
b) Pavement Components
Description of Layer Thickness (MM) Cost (Rs.)
Earth work Widening 29.01
Sub Grade Preparation (GSB) 100.00 33.32
Grade - II 75.00 28.23
Grade - III 75.00 34.79
Primer Coat/Tack coat 9.39
OGPC 20.00 33.76
Seal coat 6.00 13.76
Shoulders 170.00 19.96
12 CD works No.of Existing CD works Do they require any improvement 6 Nos Rs 7.20 Lakhs
If yes Cost of improvement No.of proposed CD works
Cost of Proposed CD works 18 Nos Rs. 50.82 Lakhs
Pacca Side Drains (If provided) Length 0.26 Cost: 6.95 Lakhs
In Case of Hills roads, the formation and cutting may befilled against Earth wrok and sub grade proparation
To be filled by S.T.A.
# KM / HM Stones Yes / No
# Guard Stones ( Where necessary ) Yes / No
Certified that the Design and Estimation for the proposed Road work are based on the data and SSR
are provided by Engineers. The Proposal after final correction is entered on the OMMS. The Proposal
Signature Signature
Name Name
PRADHAN MANTHRI GRAM SADAK YOJANA (PMGSY)
CHECK SLIP FOR P.I.U S.T.A. PROFORMA - C
To be filled by PIU
(Individual road works)
INDEX MAP
Name of the work :: Providing B.T. to Road from Lingapuram to G.P Pally
M.P. Charla
Km 4/0
km 3/660
G.P Pally 3/480 - Road dam of 30 mts length (Prop)
(km3/540 to 3/660)
3/240- Road dam of 16 mts length(Prop)
3/090- 1Vx600 mm dia., HP culvert (Prop)
Veerapuram
Km 3/0
(km 2/760 to 2/970)
Mogallapally
(km 1/040 to 1/840)
Km 1/0 Thimmirigudem
(Anand Colony)
V
1/750 - 1V x 2.5 mts slab culvert (Ex)
R
Gompally 0540 - Road dam of 23 mts length (Ex)
(km 0/0 to 0/20)
M
Lingapuram
Km 0/0
&
CHARLA
HQRS
B
K C
O M
H
km 0/000 to 1/040 WBM surface
P
km 1/040 to 1/840 B.T surface
A
km1/840 to 2/970 WBM surface
L
km 2/970 to 3/660 Gravel/WBM surface
L
Y
Mandal Head Quarter
Market Yard
Hospital
ZPHigh Schoor
Jr.College
PRADHAN MANTHRI GRAM SADAK YOJANA (PMGSY)
CHECK SLIP FOR P.I.U S.T.A. PROFORMA - C
To be filled by PIU
(Individual road works)
Km
n
a(m)
PRADHAN MANTHRI GRAM SADAK YOJANA (PMGSY)
CHECK SLIP FOR P.I.U S.T.A. PROFORMA - C
To be filled by PIU
(Individual road works)
PRADHAN MANTHRI GRAM SADAK YOJANA (PMGSY)
CHECK SLIP FOR P.I.U S.T.A. PROFORMA - C
To be filled by PIU
(Individual road works)
Lakhs
Lakhs
PRADHAN MANTHRI GRAM SADAK YOJANA (PMGSY)
CHECK SLIP FOR P.I.U S.T.A. PROFORMA - C
To be filled by PIU
(Individual road works)
PRADHAN MANTHRI GRAM SADAK YOJANA (PMGSY)
CHECK SLIP FOR P.I.U S.T.A. PROFORMA - C
To be filled by PIU
(Individual road works)
PRADHAN MANTHRI GRAM SADAK YOJANA (PMGSY)
CHECK SLIP FOR P.I.U S.T.A. PROFORMA - C
To be filled by PIU
(Individual road works)
INDEX MAP
Km 4/0
km 3/660
G.P Pally 3/480 - Road dam of 30 mts length (Prop)
(km3/540 to 3/660)
3/240- Road dam of 16 mts length(Prop)
3/090- 1Vx600 mm dia., HP culvert (Prop)
Veerapuram
Km 3/0
(km 2/760 to 2/970)
Mogallapally
(km 1/040 to 1/840)
Km 1/0 Thimmirigudem
(Anand Colony)
V
1/750 - 1V x 2.5 mts slab culvert (Ex)
R
Gompally 0540 - Road dam of 23 mts length (Ex)
(km 0/0 to 0/20)
M
Lingapuram
Km 0/0
&
CHARLA
HQRS
B
K C
O M
H
km 0/000 to 1/040 WBM surface
P
km 1/040 to 1/840 B.T surface
A
km1/840 to 2/970 WBM surface
L
km 2/970 to 3/660 Gravel/WBM surface
L
Y
Mandal Head Quarter
Market Yard
Hospital
ZPHigh Schoor
Jr.College
PRADHAN MANTHRI GRAM SADAK YOJANA (PMGSY)
CHECK SLIP FOR P.I.U S.T.A. PROFORMA - C
To be filled by PIU
(Individual road works)
PRADHAN MANTHRI GRAM SADAK YOJANA (PMGSY)
CHECK SLIP FOR P.I.U S.T.A. PROFORMA - C
To be filled by PIU
(Individual road works)
PRADHAN MANTHRI GRAM SADAK YOJANA (PMGSY)
CHECK SLIP FOR P.I.U S.T.A. PROFORMA - C
To be filled by PIU
(Individual road works)
PRADHAN MANTHRI GRAM SADAK YOJANA (PMGSY)
CHECK SLIP FOR P.I.U S.T.A. PROFORMA - C
To be filled by PIU
(Individual road works)
PRADHAN MANTHRI GRAM SADAK YOJANA (PMGSY)
CHECK SLIP FOR P.I.U S.T.A. PROFORMA - C
To be filled by PIU
(Individual road works)
PRADHAN MANTHRI GRAM SADAK YOJANA (PMGSY)
CHECK SLIP FOR P.I.U S.T.A. PROFORMA - C
To be filled by PIU
(Individual road works)
NDEX MAP
PRADHAN MANTHRI GRAM SADAK YOJANA (PMGSY)
CHECK SLIP FOR P.I.U S.T.A. PROFORMA - C
To be filled by PIU
(Individual road works)
FIELD DATA SHEET FOR TRAFFIC CENSUS (BOTH DIRECTIONS)
Vehicle class
Remarks -
Season: Post
Cars, Jeeps, Motorised Light Commercial Agricultural Tractors Animal
Hour Trucks Buses Cycle Harvest /
Vans, Three Two Vehicles / Trailers Cycles Drawn
Rickshaws Mansoon,
wheelers wheelers vehicles Weather
Laden Unladen Laden Unladen Laden Unladen Laden Unladen
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
From: 8.00 Hrs
10 13 0 0 0 0 6 0 0 0 12 0 8 0
To 14.00 Hrs
From: 14.00 Hrs
11 15 0 0 0 0 5 0 0 0 10 0 10 0
To 20.00 Hrs
From: 20.00 Hrs
3 4 0 0 0 0 0 0 0 0 0 0 0 0
To 2.00 Hrs
From: 2.00 Hrs
5 5 0 0 0 0 0 0 0 0 5 0 5 0
To 8.00 Hrs
Day Total: 29 37 0 0 0 0 11 0 0 0 27 0 23 0
Record traffic volume by tally marks (four vertical strokes followed by a diagonal stroke for the 5th vehicle
Vehicle class
Remarks -
Season: Post
Cars, Jeeps, Motorised Light Commercial Agricultural Tractors Animal
Hour Trucks Buses Cycle Harvest /
Vans, Three Two Vehicles / Trailers Cycles Drawn
Rickshaws Mansoon,
wheelers wheelers vehicles Weather
Laden Unladen Laden Unladen Laden Unladen Laden Unladen
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
From: 8.00 Hrs
9 8 0 0 0 0 12 0 0 0 9 0 6 0
To 14.00 Hrs
From: 14.00 Hrs
8 10 0 0 0 0 1 1 0 0 8 0 10 0
To 20.00 Hrs
From: 20.00 Hrs
4 2 0 0 0 0 0 0 0 0 0 0 0 0
To 2.00 Hrs
From: 2.00 Hrs
5 6 0 0 0 0 1 1 0 0 2 0 4 0
To 8.00 Hrs
Day Total: 26 26 0 0 0 0 14 2 0 0 19 0 20 0
Record traffic volume by tally marks (four vertical strokes followed by a diagonal stroke for the 5th vehicle
Vehicle class
Remarks -
Season: Post
Cars, Jeeps, Motorised Light Commercial Agricultural Tractors Animal
Hour Trucks Buses Cycle Harvest /
Vans, Three Two Vehicles / Trailers Cycles Drawn
Rickshaws Mansoon,
wheelers wheelers vehicles Weather
Laden Unladen Laden Unladen Laden Unladen Laden Unladen
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
From: 8.00 Hrs
8 9 0 0 0 0 9 0 0 0 12 0 7 0
To 14.00 Hrs
From: 14.00 Hrs
8 9 0 0 0 0 1 0 0 0 8 0 9 0
To 20.00 Hrs
From: 20.00 Hrs
3 2 0 0 0 0 0 0 0 0 0 0 0 0
To 2.00 Hrs
From: 2.00 Hrs
5 6 0 0 0 0 0 2 0 0 6 0 3 0
To 8.00 Hrs
Day Total: 24 26 0 0 0 0 10 2 0 0 26 0 19 0
Record traffic volume by tally marks (four vertical strokes followed by a diagonal stroke for the 5th vehicle
Vehicle class
Total 79 89 0 0 35 0 72 0 62 337
Average daily Traffic 26.00 30.00 0.00 0.00 12.00 0.00 24.00 0.00 21.00 112.00
4.0 Horse
PCU Factor 1 0.5 1.5 3 1.5 3 0.5 2 Drawn 6.0 for --
Bullock drawn
From km 2/850
7/060toto6/0
13/500
Existing surface : : W.B.M/Earthen
Type of soils : : B.C.Soils.
C.B.R. Percentage as per the test result : : 3.65%
Computation of design traffic : : A=P(1+r)^n+x
Where A=No of commercial vehicles per day for design
P=No of commercial vehicles per dayat last count for design
r =Annuval growth rate of commertial traffic.
N=No of years between last count and year of completion of construction.
9/0
Paddy
6/8 to 7/0 Proposed Road dam of 40 mts
6/0
Mulkalapally 5/8 to 6/0 Proposed 1V x 0.60 mts Pipe culvert
(km 5/840) 5/6 to 5/8 Proposed Road dam of 30 mts
(215) 5/4 to 5/6 Proposed Road dam of 30 mts
5/2 to 5/4 Proposed 1V x 0.60 mts pipe culvert
5/0 to 5/2 Proposed Road dam of 16 mts
5/0
4/0
Peddabandirevu 2/0
(1/5 to2/2) 1/8 to 2/0 Existing 3V x 6.00 mts slab culvert of 27 mts
Existing C.C
(550) 1/6 to 1/8 Existing 1V x 0.60 mts pipe culvert
km 1/5 to 1/760
Page 37 INDXMAP-CD
1/4 to 1/6 Existing 1V x 0.30 mts pipe culvert
1/2 to 1/4 Proposed 1V x 0.60 mts pipe culvert
1/0
0/8 to 1/0 Existing Road dam of 34 mts.
Existing
0/6 to 0/8 Existing 1V x 0.60 mts pipe culvertWBM
km 0/0 to 1/6
0/4 to 0/6 Existing 1V x 0.60 mts pipe culvert
0/2 to 0/4 Existing 1 V x 045 mts pipe culvert
0/0 to 0/2 Proposed Road dam of 30 mts length.
0/0
INDEX
Existing
Land
Reaches formatio
width
n width
Km 0/0 to 1/0 4.80 9 to 12
Km 1/0 to 2/0 4.00 9 to 12
Km 2/0 to 3/0 4.20 12 to 14
Km 3/0 to 4/0 4.20 12 to 14
Km 4/0 to 5/0 - 12 to 14
Km 5/0 to 6/0 - 12 to 14
Km 6/0 to 7/0 - 12 to 14
Km 7/0 to 8/0 - 9 to 12
Km 8/0 to 9/0 - 9 to 12
Page 38 INDXMAP-CD
PRADHAN MANTRI GRAM SADAK YOJANA
DISTRICT : KHAMMAM
INDEX
VOLUME - I
1 Executive Summary
2 Format F1 to F9
3 Chapter - 1 - Introduction
4 Chapter - 2 - Alignment
14 Chapter - 12 - Specifications
17 Chapter - 15 - Estimate
7.50M
1:2 1:2
0.75 m
4.0 M
10.7
0m
a
7.50M
1:1,5 1:1,5
0.90m
4.0 M
0.45m
10.70m
1
: Prop. Gravel Berm 170mm thick
2 Prop. B.T. 20mm thick
PROPOSED B.T. Prop. WBM 75mm thick each
7.50M
1:2 1:2
0.75m
4.0 mts
0.45m
EXISTING EARTHWORK
10.70m
PROPOSED GRAVEL
0/0 1/0km km 2/0 3/0 4/0 5/0 6/0 7/0 8/0 8/360
km3/880
1/5 1/760
3/880
Mulkalapally Puligundala
Existing WBM Earthen surface
Pedda bandirevu
Existing C.C Existing WBM
EXISTING C.C
EXISTING B.T PROPOSED B.T. 20mm thick
EXISTING WBM PROPOSED WBM
EXISTING GRAVEL SUB BASE PROPOSED GRAVEL SUB BASE
CHARLA
MANDAL
HQRS
KM 54/0
V
P
G R
O M
D
A
V
A
R
I
TALIPERU VAGU
R
I
V
E S.N.Puram
R km 43/0 R
&
B
Km
parnasala 34/0
Konduvai
B km 8/860
C
M
km 0/0 Bakkachintala
padu
Puligundala
Seethanagaram
km 32/0 Mulkalapally
Peddabandirevu
CHARLA
MANDAL
HQRS
KM 54/0
V
* P
G R
O M
D
A
V
A
R
I
TALIPERU VAGU
R
I
V
E S.N.Puram
R km 43/0 R
&
B
Km
parnasala 34/0
Konduvai
B km 8/860
C
M
Bakkachintala
km 0/0 padu
Puligundala
Seethanagaram
km 32/0 Mulkalapally
Peddabandirevu
km 48,50
km 6,50
Charla
Mandal
HQRS
TALIPERU VAGU
Metal
34/0 HBG
Parnasala
CHARLA km 7.50
Gravel
km 4.50
km6.50
Sand
quarry
BCM
km 48.50
0/0
KTGDM
Banjar Bhadrachalam
Metal M/C
Chintoor
Name of work : C/O of Road dam of 30 mts length on R/F R&B Road to Puligundala of Charla Mandal.
100.00
99.50
99.00
98.50
R.L.
98.00
97.50
97.00
-35 -30 -25 -20 -15 -10 -5 0 5 10 15 20 25 30 35 40 45
Chainage
Hydraulic Data
Difference
Mean Wetter Wetted
Chainage G.L. H.F.L. between H.F.L. Length
Difference area Perimeter
& G.L.
Discharge at OFL:
Difference
Mean Wetter Wetted
Chainage G.L. H.F.L. between H.F.L. Length
Difference area Perimeter
& G.L.
= 7x 4046.86 sqm
Q= 0.31 cumecs
A= 0.26 sqmts
Hence O.K
Where H= Height of the Body wall from the sill level. = 1.6 mts
D= Internal diametre of the RCC NP3 class pipe. = 0.6 mts
n= No. of vents provided. = 1 no
L= 2x1.60+(1x0.60)+(1-1)0.60/2+0.60
= 4.4 mts
As per site conditions provide 6.0 mts length of the body wall.
Name of work : C/O of Road dam of 30 mts length on R/F R&B Road to Puligundala of Charla
Mandal.
= 11 x 4046.86 sqm
Q= 0.49 cumecs
A= 0.41 sqmts
Hence O.K
Where H= Height of the Body wall from the sill level. = 1.6 mts
D= Internal diametre of the RCC NP3 class pipe. = 0.6 mts
n= No. of vents provided. = 1 no
L= 2x1.60+(2x0.60)+(2-1)0.60/2+0.60
= 5.3 mts
Reference to
Sl. Amount in
MORD Description Unit
No. Specifications Rs.
1 2 3 4 5 6
1 Clearind and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees
of girth up to 300mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and
stacking of serviceable material to be used or auctioned upto a lead of 1000m including disposal of top organic
soil not exceeding 150 mm in thickness as per technical specification clause 201-1 of MORD.
1 sqm 2.90
2 Construction and widening of existing embankment with approved materails deposited at site materail obtained
from roadway cutting including breaking clods, ramming, spreading, sectioning, grading, compacting with 8-10
Tonnes power roller to OMC compaction including to a top width of 7.50M and raising to required height
including seigniorage charges complete etc., as per the requirement of Table 300-1 and 300-2 as per technical
specification clause 301.5 of MORD.
1 cum 81.05
3 Earth work excavation and depositing on the bank for widening of existing embankment using cutted earth
material with carting in all soils upto soft disintegrated rock and stone matrix with in a radius of 5 M including
breaking clods, benching, ramming and sectioning the embankment and formation to a top width of 7.50 m upto
95% proctors density etc. complete including seigniorage charges for raising and widening the embankment
using machinery as per SS 20A and technical specification APDSS 302 & 303 with a least lead of 500 m (carted
earth)
1 cum 112.75
4 Construction of granular sub base by providing well graded meterial (i.e Stone aggregates of 9.5 mm to 4.75 mm
size Gravel of 66% and sand of size < 2.6mm @ 34% )having soaked CBR not less than 15% and Plasticity Index
< 6 and stacking at site to the departmentel gauge for pre measurements and mixing them and spreading the
same with motor grader in uniform layers of loose thickness of not more than 225mm including mixing by mix in
place method with rotavator to OMC and compacting with three wheeled power roller of 8 to 10 Tonnes capacity
to achieve the desired density, complete as per IRC technical specification clause 402 of MORD.
Page 60 of 173
FORMAT 7
Reference to
Sl. Amount in
MORD Description Unit
No. Specifications Rs.
1 cum 389.15
5 Construction of Granualar shoulder by providing well graded meterial (i.e 66% gravel and 34% sand) having
soaked CBR not less than 15% and Plasticity Index < 6 and stacking at site to the departmentel gauge for pre
measurements and mixing them and spreading the same with motor grader in uniform layers of loose thickness
of not more than 225mm including mixing by mix in place method with rotavator to OMC and compacting with
three wheeled power roller of 8 to 10 Tonnes capacity to achieve the desired density, complete as per IRC
technical specification clause 402 of MORD.
1 cum 389.15
6 Providing, Water Bound Macadam base for a compacted thickness of 75mm using Grade-II HBG crushed stone
aggregates (63 mm to 45 mm size), screenings and binder confirming to table 400-8 of MORD "Standard
Specifications for the rural roads) including cost, seigniorage and conveyance of all materials, spreading in
uniform thickness, hand packing, rolling with static power roller of 8-10 tons in stages to proper grade and
camber, applying and brooming requisite type of screening binding materials to fill up the interstices of coarse
aggregate, watering and compacting to the required density or finished item of work as directed by the
Engineer-in-Charge as per MORD clause No.405
1 cum 1258.75
7 Providing, Water Bound Macadam base for a compacted thickness of 75mm using Grade-III HBG crushed stone
aggregates ( 53 mm to 22.40 mm size), screenings and binder confirming to table 400-8 of MORD "Standard
Specifications for rural roads) including cost, seigniorage and conveyance of all materials, spreading in uniform
thickness, hand packing, rolling with static power roller of 8-10 tons in stages to proper grade and camber,
applying and brooming requisite type of screening binding materials to fill up the interstices of coarse
aggregate, watering and compacting to the required density or finished item of work as directed by the
Engineer-in-Charge as per MORD clause No.405
1550.90
8 Providing and applying Prime Coat with butimen emulsion (Medium Setting- SS-1) on prepared surface of
granular base incliding cleaning of road surface and spraying primer at the rate of 0.85Kg/Sqm using
mechanical means as clause 502 of MORD.
1 sqm 23.25
Page 61 of 173
FORMAT 7
Reference to
Sl. Amount in
MORD Description Unit
No. Specifications Rs.
9 Providing and applying Tack Coat with butimen emulsion (Rapid Setting- RS-1) using emulsion distributor @
0.275 kg per sqm on prepared surface incliding cleaning of road surface and spraying primer at the rate of
0.275Kg/Sqm using mechanical means as clause 503 of MORD.
1 sqm 8.15
10 Providing and laying Open Graded Premix Carpet (OGPC) surfacing material of 20 mm thick composed of 13.20
mm to 5.60 mm size machine crushed hard blasted granite chips using bitumen of 60/70 grade at the rate of
14.60 kgs per 10 sqm area of road surface over tack coat to required line, level, grade to serve as wearing
course on previously prepared base including mixing in a Hot Mix Plant of 30/40 TPH, laying with mechanical
paver finisher and rolloing with three wheeled 8-10 Tonnes capacity power roller and finishing to required level
and grades including cost and conveyance of all materials from approved sources, seigniorage, labour charges
and hire and operational charges of power road roller and all other machinery, tools and plants, providing
barricading for diversion of traffic, erecting red flags other incidental and operational charges etc., complete for
finished item of work as per clause 508 of MORD.
1 sqm 112.90
11 Providing and laying bituminous liquid seal coat (Type A) comprising of a layer of bitumuneous binder followed
by a cover of stone chipping of grading as defined in table 500.16 of MOST at 0.09 cum/10sqm of chips to be laid
simultaneously along with the bitumunous course using 9.80 kgs of bitumen 60/70 grade for 10 sqm and rolling
with power roller including of required line, level, grade to serve as wearing course on previously prepared
surface and finishing to rquired level and grades including cost and conveyance of all materials from approved
sources and stacking at site to departmental gauge for premeasurements, seigniorage, labour charges and hire
and operational charges of power road roller 8 to 10 tonnes capacity and all other machinery, tools and plants,
providing barricading for diversion of traffic, erecting red flags other incidental and operational charges etc.,
complete for finished item of work as per technical specification clause 510 of MORD.
1 sqm 46.00
12 Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and
technical specifications Clause 802, 803, 1202 & 1203
I. P.C.C grade M 10
(i) Nominal mix 1:3:6
Unit = cum
1 cum 2,914.78
Page 62 of 173
FORMAT 7
Reference to
Sl. Amount in
MORD Description Unit
No. Specifications Rs.
13 Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of
granular material in single row including fixing collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete and masonry works in head walls and parapets
Clause 1106.
15 Earth work excavation and depositing on bank with an initial lead of 10 M and lift of 2 M in ordinary
gravel soils, BC soils including seigniorage charges etc. complete for foundations
1 cum 58.83
19 Providing and laying Reinforced Cement Concrete in Super Structure as per Drawing and technical Specification
Clauses 800 ,1205.4 &1205.50
RCC M30
1 cum 4,304.57
16 Supplying, fitting, and placing HYSD bar reinforcement in superstucture complete as per drawing and technical
specifications Clauses 1002,1010 and 1202.
Unit = cum
a) Material
f) 1 M.T 42,597.53
17 Providing and Laying Cement Concrete wearing Course M30 Grade excluding reinforcement complete as per
drawing and technical specifications Clauses 800 and 1206.30.
Unit = Cum
a)
Page 63 of 173
FORMAT 7
Reference to
Sl. Amount in
MORD Description Unit
No. Specifications Rs.
1 cum 6,803.08
18 Providing and Laying Boulder apron for bed protection with stone boulders of minimum size and weight as per
table 1300.10 no fragment weighing not less than 25kg laid dry complete as per drawing and technical
specification Clause 1301.
1 cum 577.91
19 Filling in between body walls with gravel including cost,conveyance and seignorage of all materials to site etc.,
complete as per Clause 710.1.4 of IRC:78 and as per drawing and technical specifications for finished item of
work.
1 cum 247.91
./cum
20 Sand filling in foundation including cost, seignorage and conveyance of all materials to site and watering and
tamping etc., complete. For finished item of work .
1 cum 257.93
./cum
Superintending Engineer
PR Circle - Khammam
Page 64 of 173
Data Sheet
RATE ANALYSIS
By Machanical Means
Out put = 1 Hectare
a) Labour
Mate day 0.16 160.00 25.60
Mazdoor (un-skilled) day 4.00 130.00 520.00
b) Machinery
Dozer D-50 with attachment or suitable hour 10.00 2400.00 24000.00
machinery for removal of trees & stumps
Page 65 of 173
Data Sheet
Excavation in all soils upto SDR& stone cum 100.00 13.00 1300.00
matrix with machinary with in a raidus of
5 mts Basic rate as per SS20B as per
G.O Ms. No 10 dt:25.11.2002.
Page 66 of 173
Data Sheet
c) Material
Well graded granular sub-base material
as per table 400.2
Cost of materials
9.5 mm to 4.75 mm @ 66% (Gravel) cum 255.00 68.00 17340.00
2.36 mm below @ 34% (Sand) cum 129.00 73.00 9417.00
Sub-Total 50921.00
Conveyence
9.5 mm to 4.75 mm @ 66% (Gravel) cum 255.00 124.50 31747.50
2.36 mm below @ 34% (Sand) cum 129.00 135.90 17531.10
Grand Total 100199.60
d) Over head charges & Contractors profit @ 16.50% on (a+b+c) 16532.93
Rate for 300 cum 116732.53
Rate per cum = (a+b+c+d)/300 389.15
Page 67 of 173
Data Sheet
Tractor with rotavator @ 25 cum per hour hour 12.00 300.00 3600.00
c) Material
Well graded granular sub-base material
as per table 400.2
Cost of materials
9.5 mm to 4.75 mm @ 66% (Gravel) cum 255.00 68.00 17340.00
2.36 mm below @ 34% (sand) cum 129.00 73.00 9417.00
Sub-Total 50921.00
Conveyence
9.5 mm to 4.75 mm @ 66% (Gravel) cum 255.00 124.50 31747.50
2.36 mm below @ 34% (sand) cum 129.00 135.90 17531.10
Grand Total 100199.60
d) Over head charges & Contractors profit @ 16.50% on (a+b+c) 16532.93
Rate for 300 cum 116732.53
Rate per cum = (a+b+c+d)/300 389.15
6 Providing, Water Bound Macadam base for a compacted thickness of
75mm using Grade-II HBG crushed stone aggregates (63 mm to 45 mm
size), screenings and binder confirming to table 400-8 of MORD "Standard
Specifications for the rural roads) including cost, seigniorage and
conveyance of all materials, spreading in uniform thickness, hand
packing, rolling with static power roller of 8-10 tons in stages to proper
grade and camber, applying and brooming requisite type of screening
binding materials to fill up the interstices of coarse aggregate, watering
and compacting to the required density or finished item of work as
directed by the Engineer-in-Charge as per MORD clause No.405
By manual Means
Taking out put = 360 cum
a) Labour
Mate day 10.08 160.00 1612.80
Mazdoor (Skilled) day 2.00 130.00 260.00
Mazdoor (Un-Skilled) day 250.00 130.00 32500.00
b) Machinery
Three wheeled 80-100 kN power roller @ hour 45.00 470.00 21150.00
8 cum per hour
Water tanker 6kl capacity hour 24.00 300.00 7200.00
c) Material
Cost of materials
63 mm to 45 mm size HBG aggregates cum 435.60 365.00 158994.00
@ 0.91 cum per 10 sqm for compacted
thickness of 75 mm. (avg of 60-63mm,
50-55mm & 40-45mm size)
Page 68 of 173
Data Sheet
Conveyence
63 mm to 45 mm size HBG aggregates cum 435.60 154.40 67256.64
@ 0.91 cum per 10 sqm for compacted
thickness of 75 mm. (avg of 60-63mm,
50-55mm & 40-45mm size)
By manual Means
Taking out put = 360 cum
a) Labour
Mate day 10.08 160.00 1612.80
Mazdoor (Skilled) day 2.00 130.00 260.00
Mazdoor (Un-Skilled) day 250.00 130.00 32500.00
b) Machinery 0.00
Three wheeled 80-100 kN power roller @ hour 45.00 470.00 21150.00
8 cum per hour
Water tanker 6kl capacity hour 24.00 300.00 7200.00
c) Material 0.00
Cost of materials 0.00
53 mm to 22.4 mm size HBG aggregates cum 435.60 563.53 245475.12
@ 0.91 cum per 10 sqm for compacted
thickness of 75 mm. (avg of 50-55mm,
40-45mm & 22.4mm size)
Page 69 of 173
Data Sheet
9 Providing and applying Tack Coat with butimen emulsion (Rapid Setting-
RS-1) using emulsion distributor @ 0.275 kg per sqm on prepared surface
incliding cleaning of road surface and spraying primer at the rate of
0.275Kg/Sqm using mechanical means as clause 503 of MORD.
Page 70 of 173
Data Sheet
Hydraulic broom @ 1250 sqm per hour hour 1.40 250.00 350.00
Air compressor 210 cfm hour 1.40 320.00 448.00
Bitumen emulsion pressure ditributor @ hour 1.00 600.00 600.00
1750 sqm per hour
c) Materials
Cost of materials
Bitumen emulsion (RS-1) @ 0.275 kg per MT 0.48 21047.94 10103.01
sqm
Sub-Total 11637.41
Conveyence
Bitumen emulsion (RS-1) @ 0.275 kg per MT 0.48 1170.00 561.60
sqm
Grand Total 12199.01
d) Over head charges & Contractors profit @ 16.50% on (a+b+c) 2012.84
Rate for 1750 sqm 14211.85
Rate per sqm = (a+b+c+d+e)/1750 8.15
10 Providing and laying Open Graded Premix Carpet (OGPC) surfacing
material of 20 mm thick composed of 13.20 mm to 5.60 mm size machine
crushed hard blasted granite chips using bitumen of 60/70 grade at the
rate of 14.60 kgs per 10 sqm area of road surface over tack coat to
required line, level, grade to serve as wearing course on previously
prepared base including mixing in a Hot Mix Plant of 30/40 TPH, laying
with mechanical paver finisher and rolloing with three wheeled 8-10
Tonnes capacity power roller and finishing to required level and grades
including cost and conveyance of all materials from approved sources,
seigniorage, labour charges and hire and operational charges of power
road roller and all other machinery, tools and plants, providing
barricading for diversion of traffic, erecting red flags other incidental and
operational charges etc., complete for finished item of work as per clause
508 of MORD.
By Mechanical Means
Taking out put = 4000 Sqm
a) Labour
Mate day 0.52 160.00 83.20
Mazdoor (un-skilled) day 10.00 130.00 1300.00
Mazddor (skilled) day 3.00 130.00 390.00
b) Machinery
HMP 40 TPH hour 6.00 13500.00 81000.00
Electric generator set 125 KVA hour 6.00 950.00 5700.00
Front end loader 1cum bucket capacity hour 6.00 1150.00 6900.00
Page 71 of 173
Data Sheet
By Mechanical Means
Taking out put = 7500 Sqm
a) Labour
Mate day 0.24 160.00 38.40
Mazdoor (un-skilled) day 6.00 130.00 780.00
b) Machinery 0.00
Hydraulic self propelled chips spreader hour 6.00 1800.00 10800.00
Front end loader 1cum bucket capacity hour 6.00 1042.00 6252.00
Page 72 of 173
Data Sheet
Conveyance
Crushed stone chipping of 6.7 mm size cum 67.50 352.60 23800.50
100% passing through 11.2mm seive and
retained on 2.36 mm sieve applied @
0.09 cum per 10 sqm.
Bitumen 60/70 grade @ 9.80 kgs per 10 MT 7.35 1170.00 8599.50
sqm.
Grand total 295839.90
d) Over head charges & Contractors profit @ 16.50% on (a+b+c) 48813.58
Rate for 7500 sqm 344653.48
Rate per sqm = (a+b+c+d+e)/7500 46.00
I. P.C.C grade M 10
(i) Nominal mix 1:3:6
Unit = cum
a) Material
Cement t 0.250 4,380.00 1,095.00
Coarse sand cum 0.480 256.30 123.02
40 mm aggregate cum 0.576 576.80 332.24
20 mm aggregate cum 0.288 1,260.60 363.05
10 mm aggregate cum 0.096 985.60 94.62
b) Labour
Mate day 0.08 160.00 12.80
Mason (1st Class) day 0.10 180.00 18.00
Mazdoor (Unskilled) day 1.63 130.00 211.90
Bhisti day 0.27 130.00 35.10
c) Machinery
Mechnical concrete mixer 0.4/0.28 cum hour 0.40 300.00 120.00
capacity fitted with water measuring
device and preferably also with load cell.
d) Formwork @ 4% on cost of material, 96.23
labour and machinery (a+b+c)
e) Over head charges & Contractors profit @ 16.50% on (a+b+c) 412.82
Rate per cum = a+b+c+d+e+f 2,914.78
13 Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row
Providing and laying reinforced cement concrete pipe NP3
for culverts on first class bedding of granular material in
single row including fixing collar with cement mortar 1:2 but
excluding excavation, protection works, backfilling,
concrete and masonry works in head walls and parapets
Clause 1106.
Page 73 of 173
Data Sheet
Page 74 of 173
Data Sheet
Unit = Cum
a) Material
Cement t 0.43 4,380.00 1,883.40
Sand cum 0.45 256.30 115.34
20 mm aggregate cum 0.54 1,260.60 680.72
10 mm aggregate cum 0.36 985.60 354.82
b) Labour
Mate day 0.08 160.00 12.80
Mason (1st Class) day 0.12 180.00 21.60
Mazdoor (Unskilled) day 1.73 130.00 224.90
Bhisti day 0.27 130.00 35.10
c) Machinery
Concrete mixer 0.4/0.28 cum capacity hour 0.40 300.00 120.00
e) Overheads @ 16.5% on (a+b+c+d+e) 431.08
Rate per cum = a+b+c+d+e+f 3,879.76
Page 75 of 173
Data Sheet
18 Providing and Laying Boulder apron for bed protection with stone
boulders of minimum size and weight as per table 1300.10 no fragment
weighing not less than 25kg laid dry complete as per drawing and
technical specification Clause 1301.
Unit = Cum
a) Materail
Stone/ boulder (25kg minimum) Cum 1.20 274.30 329.16
Stone Spalls Cum 0.20
b) Labour
Mate day 0.04 160.00 6.40
Mason( 1st class) day 0.35 180.00 63.00
Mazdoor (Un skilled) day 0.75 130.00 97.50
d) Contractor’s profit @ 16.5% on (a+b+c) 81.85
Rate per cum = (a+b+c+d) 577.91
Gravel
Basic Rate of Quarry site Cum 1.00 68.00 68.00
Conveyance charges of gravel Cum 1.00 124.50 124.50
Spreading charges including watering Cum 1.00 20.30 20.30
and rolling with HRR to irrespective
thickness of layer
212.80
Over head charges & Contractors profit 35.11
@ 16.50%
247.91
247.91
./cum
Page 76 of 173
Data Sheet
Superintending Engineer
PR Circle - Khammam
Page 77 of 173
PRADHANA MANTRI GRAM SADAK YOJANA
GEOMETRIC DESIGN OF HORIZONTAL CURVES
Lc = II Rc
180
Ts = Rc Tan
Ts = Tangent length.
Apex = Rc -Rc
Cos
F = e+f =7+15=22%.
For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of
I.R.C.-SP-20-2002
For the Plain terrain Ruling minimum radius as per Table 2.15 of IRC -SP-20-2002
Rc = 60
Ts = Rc Tan /2
= 60 x Tan 53 /2
= 29.9 Mtrs
Page 78 of 173
PRADHANA MANTRI GRAM SADAK YOJANA
GEOMETRIC DESIGN OF HORIZONTAL CURVES
180
180
But it is the existing road , length of the curve available at site is only 15.00 mts.
For Lc = 15 mts.
3.14 x 3.14 x 53
V = R x 127 (e+f)
For single lane Radius of the curve 21 to 60 mtrs = 0.60 mts exta widening is required.
Extra widening should be provided only on the inside of the curve due to plain circular curve
F = e+f =7+15=22%.
V = (127 X Rc X F/100)^0.5
= 40.944
For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-73-
1980
225 x Rc 225x60
Hence provide Maxium Super Elevation of 7% as per clause 9.3. of I.R.C.73-1980 in plain and Rolling
Terrain.
F = e+f =7+15=22%.
For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-SP-20-
2002
R ruling = V^2 / 127(e+f) = ( 40 x 40 )/ 127 / 57.27 Mtrs
0.22=
For the Plain terrain Ruling minimum radius as per Table 2.15 of IRC -SP-20-2002
Rc = 60
Ts = Rc Tan /2
= 60 x Tan 22 /2
= 11.66 Mtrs
Lc = II Rc
180
180
But it is the existing road , length of the curve available at site is only 13.00 mts.
3.14 x 3.14 x 22
e = V^2 40 x 40 = 0.21
For single lane Radius of the curve 21 to 60 mtrs = 0.60 mts exta widening is required.
Extra widening should be provided only on the inside of the curve due to plain circular curve
F = e+f =7+15=22%.
V = (127 Rc F/100)^0.5
= 40.944
For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-73-
1980
Rate of attaining super Elevation is 1 in 150.
225 Rc 225 x 60
Hence provide Maxium Super Elevation of 7% as per clause 9.3. Of I.R.C.73-1980 in plain and Rolling
Terrain.
Page 81 of 173
PRADHANA MANTRI GRAM SADAK YOJANA
GEOMETRIC DESIGN OF HORIZONTAL CURVES
F = e+f =7+15=22%.
For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-SP-20-
2002
R ruling = V^2 / 127(e+f) = ( 40 x 40 )/ 127 / 57.27 Mtrs
0.22=
For the Plain terrain Ruling minimum radius as per Table 2.15 of IRC -SP-20-2002
Rc = 60
Ts = Rc Tan /2
= 60x Tan 44 /2
= 24.24 Mtrs
Lc = II x Rcx
180
180
Cos /2 Cos 44 /2
= 4.71 Mtrs
For single lane Radius of the curve 21 to 60 mtrs = 0.60 mts exta widening is required.
Extra widening should be provided only on the inside of the curve due to plain circular curve
F = e+F =5+15=20%.
F = V^2
127 R
V = (127 Rc F/100)^0.5
= 40.944
For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-73-
1980
Rate of attaining super Elevation is 1 in 150.
225 Rc 225 x 60
Page 82 of 173
PRADHANA MANTRI GRAM SADAK YOJANA
GEOMETRIC DESIGN OF HORIZONTAL CURVES
F = e+f =7+15=22%.
For the village roads Rolling Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-SP-
20-2002
R ruling = V^2 / 127(e+f) = ( 40 x 40 )/ 127 / 57.27 Mtrs
0.22=
For the Plain terrain Ruling minimum radius as per Table 2.15 of IRC -SP-20-2002
Rc = 60
Ts = Rcx Tan /2
= 60 x Tan 51 /2
= 28.61 Mtrs
Lc = II x Rc x
180
180
But it is the existing road , length of the curve available at site is only 43.00 mts.
3.14 x 3.14 x 51
e = V^2 40 x 40 = 0.15
Page 83 of 173
PRADHANA MANTRI GRAM SADAK YOJANA
GEOMETRIC DESIGN OF HORIZONTAL CURVES
V = √ R x 127 (e+f)
For single lane Radius of the curve 21 to 60 mtrs = 0.60 mts exta widening is required.
Extra widening should be provided only on the inside of the curve due to plain circular curve
F = e+f =7+15=22%.
V = (127 Rc F/100)^0.5
= 40.944
For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-73-
1980
Rate of attaining super Elevation is 1 in 150.
225 Rc 225 x 60
Hence provide Maxium Super Elevation of 7% as per clause 9.3. Of I.R.C.73-1980 in plain and Rolling
Terrain.
Rate of attain of Superelevation is 1 in 150.
Page 84 of 173
PRADHANA MANTRI GRAM SADAK YOJANA
GEOMETRIC DESIGN OF HORIZONTAL CURVES
Rc = 60
Ts = Rc xTan /2
= 60x Tan 30 / 2
= 16.07 Mtrs
Lc = IIx Rc x
180
180
Apex = Rc -Rc = 60 - 60
Cos /2 Cos 30 / 2
= 2.16 Mtrs
For single lane Radius of the curve 21 to 60 mtrs = 0.60 mts exta widening is required.
Extra widening should be provided only on the inside of the curve due to plain circular curve
F = e+f =7+15=22%.
V = (127 Rc F/100)^0.5
= 40.944
For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-73-
1980
Rate of attaining super Elevation is 1 in 150.
225 Rc 225 x 60
Hence provide Maxium Super Elevation of 7% as per clause 9.3. Of I.R.C.73-1980 in plain and Rolling
Terrain.
Rate of attain of Superelevation is 1 in 150.
Page 85 of 173
PRADHANA MANTRI GRAM SADAK YOJANA
GEOMETRIC DESIGN OF HORIZONTAL CURVES
F = e+f =7+15=22%.
For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-SP-20-
2002
R ruling = V ^ 2 / 127 (e+f) = ( 40 x 40 )/ 127 / 57.27 Mtrs
0.22=
For the Plain terrain Ruling minimum radius as per Table 2.15 of IRC -SP-20-2002
Rc = 60
Ts = Rcx Tan /2
= 10.04 Mtrs
Lc = II x Rc x
180
180
Cos /2 Cos 19 / 2
= 0.83 Mtrs
Extra widening should be provided only on the inside of the curve due to plain circular curve
F = e+F =5+15=20%.
Page 86 of 173
PRADHANA MANTRI GRAM SADAK YOJANA
GEOMETRIC DESIGN OF HORIZONTAL CURVES
= 40.944
For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-73-
1980
Rate of attaining super Elevation is 1 in 150.
225 Rc 225 x 60
Hence provide Maxium Super Elevation of 7% as per clause 9.3. Of I.R.C.73-1980 in plain and Rolling
Terrain.
Rate of attain of Superelevation is 1 in 150.
F = e+f =7+15=22%.
For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-SP-20-
2002
R ruling = V^2 / 127(e+f) = ( 40 x 40 )/ 127 / 57.27 Mtrs
0.22=
For the Plain terrain Ruling minimum radius as per Table 2.15 of IRC -SP-20-2002
=60 Mtrs For the village roads.
Rc = 60
Ts = Rc Tan /2
= 60 x Tan 70/2
= 42.01 Mtrs
Lc = II Rc
180
= 22/7x 60 x 70 = 73.300 Mtrs
180
But it is the existing road , length of the curve available at site is only 20.00 mts.
Page 87 of 173
PRADHANA MANTRI GRAM SADAK YOJANA
GEOMETRIC DESIGN OF HORIZONTAL CURVES
V = √ R x 127 (e+f)
For single lane Radius of the curve 21 to 60 mtrs = 0.60 mts exta widening is required.
Extra widening should be provided only on the inside of the curve due to plain circular curve
F = e+f =7+15=22%.
V = (127 Rc F/100)^0.5
= 40.944
For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-73-
1980
Rate of attaining super Elevation is 1 in 150.
225 Rc 225 x 60
Hence provide Maxium Super Elevation of 7% as per clause 9.3. Of I.R.C.73-1980 in plain and Rolling
Terrain.
Rate of attain of Superelevation is 1 in 150.
F = e+f =7+15=22%.
For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-SP-20-
2002
Page 88 of 173
PRADHANA MANTRI GRAM SADAK YOJANA
GEOMETRIC DESIGN OF HORIZONTAL CURVES
Rc = 60
Ts = Rc Tan /2
= 60x Tan 19 /2
= 10.04 Mtrs
Lc = II Rc
180
180
Cos /2 Cos 19 /2
= 0.83 Mtrs
For single lane Radius of the curve 21 to 60 mtrs = 0.60 mts exta widening is required.
Extra widening should be provided only on the inside of the curve due to plain circular curve
F = e+f =7+15=22%.
V = (127 Rc F/100)^0.5
= 40.944
For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-73-
1980
Rate of attaining super Elevation is 1 in 150.
225 Rc 225 x 60
Hence provide Maxium Super Elevation of 7% as per clause 9.3. Of I.R.C.73-1980 in plain and Rolling
Terrain.
Rate of attain of Superelevation is 1 in 150.
Page 89 of 173
PRADHANA MANTRI GRAM SADAK YOJANA
GEOMETRIC DESIGN OF HORIZONTAL CURVES
F = e+f =7+15=22%.
For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-SP-20-
2002
R ruling = V^2 / 127(e+f) = ( 40 x 40 )/ 127 / 57.27 Mtrs
0.22=
For the Plain terrain Ruling minimum radius as per Table 2.15 of IRC -SP-20-2002
Rc = 60
Ts = Rc Tan /2
= 12.2 Mtrs
Lc = II x Rcx
180
180
Cos /2 Cos 23 /2
= 1.22 Mtrs
For single lane Radius of the curve 21 to 60 mtrs = 0.60 mts exta widening is required.
Extra widening should be provided only on the inside of the curve due to plain circular curve
F = e+F =5+15=20%.
F = V
127 R
V = (127 Rc F/100)^0.5
= 40.944
For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-73-
1980
Rate of attaining super Elevation is 1 in 150.
225 Rc 225 x 60
Hence provide Maxium Super Elevation of 7% as per clause 9.3. Of I.R.C.73-1980 in plain and Rolling
Terrain.
Rate of attain of Superelevation is 1 in 150.
Page 90 of 173
PRADHANA MANTRI GRAM SADAK YOJANA
GEOMETRIC DESIGN OF HORIZONTAL CURVES
F = e+f =7+15=22%.
For the village roads Rolling Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-SP-
20-2002
R ruling = V^2 / 127(e+f) = ( 40 x 40 )/ 127 / 57.27 Mtrs
0.22=
For the Plain terrain Ruling minimum radius as per Table 2.15 of IRC -SP-20-2002
Rc = 60
Ts = Rcx Tan /2
= 60 x Tan 21/2
= 11.12 Mtrs
Lc = II x Rc x
180
= 22/7x 60 x 21 = 21.990 Mtrs
180
= 1.02 Mtrs
For single lane Radius of the curve 21 to 60 mtrs = 0.60 mts exta widening is required.
Extra widening should be provided only on the inside of the curve due to plain circular curve
F = e+f =5+15=20%.
F = ( V )^2
127 Rc
V = (127 Rc F/100)^0.5
Page 91 of 173
PRADHANA MANTRI GRAM SADAK YOJANA
GEOMETRIC DESIGN OF HORIZONTAL CURVES
F = e+f =7+15=22%.
For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-SP-20-
2002
R ruling = V^2/127(e+f)= ( 40 x 40 )/ 127 / 57.27 Mtrs
0.22=
For the Plain terrain Ruling minimum radius as per Table 2.15 of IRC -SP-20-2002
Rc = 60
Ts = Rc xTan /2
= 60x Tan 19 / 2
= 10.04 Mtrs
Lc = IIx Rc x
180
180
Apex = Rc -Rc = 60 - 60
Cos /2 Cos 19 / 2
= 0.83 Mtrs
For single lane Radius of the curve 21 to 60 mtrs = 0.60 mts exta widening is required.
Extra widening should be provided only on the inside of the curve due to plain circular curve
Page 92 of 173
PRADHANA MANTRI GRAM SADAK YOJANA
GEOMETRIC DESIGN OF HORIZONTAL CURVES
F = e+f =7+15=22%.
V = (127 Rc F/100)^0.5
= 40.944
For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-73-
1980
Rate of attaining super Elevation is 1 in 150.
225 Rc 225 x 60
Hence provide Maxium Super Elevation of 7% as per clause 9.3. Of I.R.C.73-1980 in plain and Rolling
Terrain.
Rate of attain of Superelevation is 1 in 150.
2/3 e = 2/3x7 = 4.667
Rc = 60
Ts = Rcx Tan /2
= 7.89 Mtrs
Lc = II x Rc x
180
180
Page 93 of 173
PRADHANA MANTRI GRAM SADAK YOJANA
GEOMETRIC DESIGN OF HORIZONTAL CURVES
= 0.51 Mtrs
Extra widening should be provided only on the inside of the curve due to plain circular curve
F = e+F =5+15=20%.
V = (127 Rc F/100)^0.5
= 40.944
For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-73-
1980
Rate of attaining super Elevation is 1 in 150.
225 Rc 225 x 60
Hence provide Maxium Super Elevation of 7% as per clause 9.3. Of I.R.C.73-1980 in plain and Rolling
Terrain.
Rate of attain of Superelevation is 1 in 150.
F = e+f =7+15=22%.
For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-SP-20-
2002
R ruling = V ^ 2 / 127 (e+f) = ( 40 x 40 )/ 127 / 57.27 Mtrs
0.22=
For the Plain terrain Ruling minimum radius as per Table 2.15 of IRC -SP-20-2002
Rc = 60
Ts = Rcx Tan /2
= 60x Tan 37 /2
= 20.07 Mtrs
Lc = II x Rc x
Page 94 of 173
PRADHANA MANTRI GRAM SADAK YOJANA
GEOMETRIC DESIGN OF HORIZONTAL CURVES
180
Cos /2 Cos 37 / 2
= 3.26 Mtrs
Extra widening should be provided only on the inside of the curve due to plain circular curve
F = e+F =5+15=20%.
V = (127 Rc F/100)^0.5
= 40.944
For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-73-
1980
Rate of attaining super Elevation is 1 in 150.
225 Rc 225 x 60
Hence provide Maxium Super Elevation of 7% as per clause 9.3. Of I.R.C.73-1980 in plain and Rolling
Terrain.
Rate of attain of Superelevation is 1 in 150.
F = e+f =7+15=22%.
For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-SP-20-
2002
R ruling = V ^ 2 / 127 (e+f) = ( 40 x 40 )/ 127 / 57.27 Mtrs
0.22=
For the Plain terrain Ruling minimum radius as per Table 2.15 of IRC -SP-20-2002
Rc = 60
Page 95 of 173
PRADHANA MANTRI GRAM SADAK YOJANA
GEOMETRIC DESIGN OF HORIZONTAL CURVES
= 35.34 Mtrs
Lc = II x Rc x
180
180
But it is the existing road , length of the curve available at site is only 40.00 mts.
3.14 x 3.14 x 61
V = √ R x 127 (e+f)
For single lane Radius of the curve 21 to 60 mtrs = 0.60 mts exta widening is required.
Extra widening should be provided only on the inside of the curve due to plain circular curve
F = e+f =7+15=22%.
V = (127 Rc F/100)^0.5
= 40.944
For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-73-
1980
Rate of attaining super Elevation is 1 in 150.
Page 96 of 173
PRADHANA MANTRI GRAM SADAK YOJANA
GEOMETRIC DESIGN OF HORIZONTAL CURVES
225 Rc 225 x 60
Hence provide Maxium Super Elevation of 7% as per clause 9.3. Of I.R.C.73-1980 in plain and Rolling
Terrain.
Rate of attain of Superelevation is 1 in 150.
F = e+f =7+15=22%.
For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-SP-20-
2002
R ruling = V ^ 2 / 127 (e+f) = ( 40 x 40 )/ 127 / 57.27 Mtrs
0.22=
For the Plain terrain Ruling minimum radius as per Table 2.15 of IRC -SP-20-2002
Rc = 60
Ts = Rcx Tan /2
= 24.85 Mtrs
Lc = II x Rc x
180
180
But it is the existing road , length of the curve available at site is only 25 mts.
For Lc = mts.
3.14 x 3.14 x 45
e = V^2 40 x 40 = 0.22
Page 97 of 173
PRADHANA MANTRI GRAM SADAK YOJANA
GEOMETRIC DESIGN OF HORIZONTAL CURVES
For single lane Radius of the curve 21 to 60 mtrs = 0.60 mts exta widening is required.
Extra widening should be provided only on the inside of the curve due to plain circular curve
F = e+f =7+15=22%.
V = (127 Rc F/100)^0.5
= 40.944
For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-73-
1980
Rate of attaining super Elevation is 1 in 150.
225 Rc 225 x 60
Hence provide Maxium Super Elevation of 7% as per clause 9.3. Of I.R.C.73-1980 in plain and Rolling
Terrain.
Rate of attain of Superelevation is 1 in 150.
F = e+f =7+15=22%.
For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-SP-20-
2002
R ruling = V ^ 2 / 127 (e+f) = ( 40 x 40 )/ 127 / 57.27 Mtrs
0.22=
For the Plain terrain Ruling minimum radius as per Table 2.15 of IRC -SP-20-2002
Page 98 of 173
PRADHANA MANTRI GRAM SADAK YOJANA
GEOMETRIC DESIGN OF HORIZONTAL CURVES
Ts = Rcx Tan /2
= 23.63 Mtrs
Lc = II x Rc x
180
180
Cos /2 Cos /2
= Mtrs
Extra widening should be provided only on the inside of the curve due to plain circular curve
F = e+F =5+15=20%.
V = (127 Rc F/100)^0.5
= 40.944
For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-73-
1980
Rate of attaining super Elevation is 1 in 150.
225 Rc 225 x 60
Hence provide Maxium Super Elevation of 7% as per clause 9.3. Of I.R.C.73-1980 in plain and Rolling
Terrain.
Rate of attain of Superelevation is 1 in 150.
F = e+f =7+15=22%.
Page 99 of 173
PRADHANA MANTRI GRAM SADAK YOJANA
GEOMETRIC DESIGN OF HORIZONTAL CURVES
For the Plain terrain Ruling minimum radius as per Table 2.15 of IRC -SP-20-2002
Rc = 60
Ts = Rcx Tan /2
= 12.2 Mtrs
Lc = II x Rc x
180
180
Cos /2 Cos /2
= 1.22 Mtrs
Extra widening should be provided only on the inside of the curve due to plain circular curve
F = e+F =5+15=20%.
V = (127 Rc F/100)^0.5
= 40.944
For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-73-
1980
Rate of attaining super Elevation is 1 in 150.
225 Rc 225 x 60
Hence provide Maxium Super Elevation of 7% as per clause 9.3. Of I.R.C.73-1980 in plain and Rolling
Terrain.
Rate of attain of Superelevation is 1 in 150.
F = e+f =7+15=22%.
For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-SP-20-
2002
R ruling = V ^ 2 / 127 (e+f) = ( 40 x 40 )/ 127 / 57.27 Mtrs
0.22=
For the Plain terrain Ruling minimum radius as per Table 2.15 of IRC -SP-20-2002
Rc = 60
Ts = Rcx Tan /2
= 40.47 Mtrs
Lc = II x Rc x
180
180
But it is the existing road , length of the curve available at site is only 28.00 mts.
For Lc = 28 mts.
3.14 x 3.14 x 68
e = V^2 40 x 40 = 0.30
V = √ R x 127 (e+f)
For single lane Radius of the curve 21 to 60 mtrs = 0.60 mts exta widening is required.
Extra widening should be provided only on the inside of the curve due to plain circular curve
F = e+f =7+15=22%.
V = (127 Rc F/100)^0.5
= 40.944
For the village roads Plain Terrain minimum design speed is 40 K.M.P.H. as per table No-2 of I.R.C.-73-
1980
Rate of attaining super Elevation is 1 in 150.
Superintending Engineer
PR Circle - Khammam
Sl.
Description of Item Amount in Rs
No.
1 Providing B.T on road in Km 0/000 to km 8/360 21559416.00
TOTAL 28056800.00
ABSTRACT ESTIMATE
Sl.
Description Unit Quantity Rate Amount
No
1 2 3 4 5 6
1 Clearind and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs,
saplings and trees of girth up to 300mm, removal of stumps of such trees cut earlier and disposal
of unserviceable materials and stacking of serviceable material to be used or auctioned upto a
lead of 1000m including disposal of top organic soil not exceeding 150 mm in thickness as per
technical specification clause 201-1 of MORD.
1 Sqm 58520.00 2.90 169708.00
sqm ./sqm
2 Construction and widening of existing embankment with approved materails deposited at site
materail obtained from roadway cutting including breaking clods, ramming, spreading, sectioning,
grading, compacting with 8-10 Tonnes power roller to OMC compaction including to a top width
of 7.50M and raising to required height including seigniorage charges complete etc., as per the
requirement of Table 300-1 and 300-2 as per technical specification clause 301.5 of MORD.
ABSTRACT ESTIMATE
Sl.
Description Unit Quantity Rate Amount
No
1 2 3 4 5 6
1 cum 10143.55 112.75 1143685.00
cum /1cum
4 Picking old metalled surface 50-100 mm metal and sectioning ,labour charges etc., complete.
ABSTRACT ESTIMATE
Sl.
Description Unit Quantity Rate Amount
No
1 2 3 4 5 6
7 Construction of Granualar shoulder by providing well graded meterial (i.e 66% gravel and 34%
sand) having soaked CBR not less than 15% and Plasticity Index < 6 and stacking at site to the
departmentel gauge for pre measurements and mixing them and spreading the same with motor
grader in uniform layers of loose thickness of not more than 225mm including mixing by mix in
place method with rotavator to OMC and compacting with three wheeled power roller of 8 to 10
Tonnes capacity to achieve the desired density, complete as per IRC technical specification
clause 402 of MORD.
ABSTRACT ESTIMATE
Sl.
Description Unit Quantity Rate Amount
No
1 2 3 4 5 6
11 Providing and applying Prime Coat with butimen emulsion (Medium Setting- SS-1) on prepared
surface of granular base incliding cleaning of road surface and spraying primer at the rate of
0.85Kg/Sqm using mechanical means as clause 502 of MORD.
1 sqm 29905.27 23.25 695298.00
sqm ./sqm
12 Providing and applying Tack Coat with butimen emulsion (Rapid Setting- RS-1) using emulsion
distributor @ 0.275 kg per sqm on prepared surface incliding cleaning of road surface and
spraying primer at the rate of 0.275Kg/Sqm using mechanical means as clause 503 of MORD.
ABSTRACT ESTIMATE
Sl.
Description Unit Quantity Rate Amount
No
1 2 3 4 5 6
14 Providing and laying bituminous liquid seal coat (Type A) comprising of a layer of bitumuneous
binder followed by a cover of stone chipping of grading as defined in table 500.16 of MOST at
0.09 cum/10sqm of chips to be laid simultaneously along with the bitumunous course using 9.80
kgs of bitumen 60/70 grade for 10 sqm and rolling with power roller including of required line,
level, grade to serve as wearing course on previously prepared surface and finishing to rquired
level and grades including cost and conveyance of all materials from approved sources and
stacking at site to departmental gauge for premeasurements, seigniorage, labour charges and
hire and operational charges of power road roller 8 to 10 tonnes capacity and all other machinery,
tools and plants, providing barricading for diversion of traffic, erecting red flags other incidental
and operational charges etc., complete for finished item of work as per technical specification
clause 510 of MORD.
18 Sub-Estimate - 3 (C/O Road dam for 16 mts length) 2 No 310000.00 Each 620000.00
(at km 3/0-3/2, 4/8-5/0,)
PRADHAN MANTHRI GRAM SADAK YOJANA
COST ESTIMATE FOR ROAD WORK
Name of the work: R/F R&B Road to Puligundala of Charla (M) FORMAT:6
ABSTRACT ESTIMATE
Sl.
Description Unit Quantity Rate Amount
No
1 2 3 4 5 6
19 Sub-Estimate - 4 (C/O Road dam for 30 mts length) 5 No 527000.00 Each 2635000.00
(at km 0/0-0/2, 5/4-5/6, 5/6-5/8, 7/8-8/0,8/2-8/4 )
20 Sub-Estimate- 5 (C/O Road dam for 40 mts length ) 1 No 685384.00 Each 685384.00
(at km 6/2-6/4 )
24 KM & HM stones and other infrastructure @ Rs. 10000.00 /km 8.36 10000.00 83600.00
kms /1kg
ABSTRACT ESTIMATE
Sl.
Description Unit Quantity Rate Amount
No
1 2 3 4 5 6
Superintending Engineer
PR - Circle - Khammam
PRADHANA MANTRI GRAM SADAK YOJANA
COST ESTIMATE FOR ROAD WORK
Deatailed Estimate
S. Measurements
Description of item Unit No Qty
No L B D
1 2 3 4 5 6 7 8 9
1 Clearind and grubbing road land including uprooting wild vegetation, grass, bushes,
shrubs, saplings and trees of girth up to 300mm, removal of stumps of such trees cut earlier
and disposal of unserviceable materials and stacking of serviceable material to be used or
auctioned upto a lead of 1000m including disposal of top organic soil not exceeding 150
mm in thickness as per technical specification clause 201-1 of MORD.
Km 0/0 to 8/360 1 sqm 2 8360.00 2.50 - 41800.00
Deduct for 40% voids 16720.00
58520.00
sqm
3 Earth work excavation and depositing on the bank for widening of existing
embankment using cutted earth material with carting in all soils upto soft disintegrated
rock and stone matrix with in a radius of 5 M including breaking clods, benching, ramming
and sectioning the embankment and formation to a top width of 7.50 m upto 95% proctors
density etc. complete including seigniorage charges for raising and widening the
embankment using machinery as per SS 20A and technical specification APDSS 302 & 303
with a least lead of 1000 m (carted earth)
Deatailed Estimate
S. Measurements
Description of item Unit No Qty
No L B D
1 2 3 4 5 6 7 8 9
4 Picking old metalled surface 50-100 mm metal and sectioning ,labour charges etc.,
complete.
km 0/0 to 3/880 1 sqm 1 3800.00 3.75 - 14250.00
Deduct CD works
0/0 to 0/2 Road dam 1 sqm 1 30.00 3.75 - -112.50
0/8 to 1/0 Road dam 1 sqm 1 34.00 3.75 - -127.50
1/5 to 1/760 CC Road 1 sqm 1 260.00 3.75 - -975.00
1/8 to 2/0 Slab culvert 1 sqm 1 27.00 3.75 - -101.25
2/0 to 2/2 Slab culvert 1 sqm 1 1.00 3.75 - -3.75
2/6 to 2/8 Road dam 1 sqm 1 30.00 3.75 - -112.50
3/0 to 3/2 Road dam 1 sqm 1 16.00 3.75 - -60.00
12757.50
sqm
5 Construction of granular sub base by providing well graded meterial (i.e Stone
aggregates of 9.5 mm to 4.75 mm size Gravel of 66% and sand of size < 2.6mm @
34% )having soaked CBR not less than 15% and Plasticity Index < 6 and stacking at
site to the departmentel gauge for pre measurements and mixing them and spreading the
same with motor grader in uniform layers of loose thickness of not more than 225mm
including mixing by mix in place method with rotavator to OMC and compacting with three
wheeled power roller of 8 to 10 Tonnes capacity to achieve the desired density, complete as
per IRC technical specification clause 402 of MORD.
1st layer 150 mm compact thickness.
Deatailed Estimate
S. Measurements
Description of item Unit No Qty
No L B D
1 2 3 4 5 6 7 8 9
8/2 to 8/4 Road dam 1 cum 1 30.00 4.00 0.150 -18.00
Curves:
For curve -9 at Km 3/910 1 Cum 1 24.08 0.60 0.150 2.17
1 Cum 2 6.56 (0.4+0.6)/2 0.150 0.98
1 Cum 2 13.13 (0+0.4)/2 0.150 0.79
For curve -10 at Km 4/330 1 Cum 1 21.99 0.60 0.150 1.98
1 Cum 2 6.56 (0.4+0.6)/2 0.150 0.98
1 Cum 2 13.13 (0+0.4)/2 0.150 0.79
For curve -11 at Km 5/960 1 Cum 1 19.89 0.60 0.150 1.79
1 Cum 2 6.56 (0.4+0.6)/2 0.150 0.98
1 Cum 2 13.13 (0+0.4)/2 0.150 0.79
For curve -12 at Km 6/050 1 Cum 1 15.70 0.60 0.150 1.41
1 Cum 2 6.56 (0.4+0.6)/2 0.150 0.98
1 Cum 2 13.13 (0+0.4)/2 0.150 0.79
For curve -13 at Km 6/620 1 Cum 1 38.74 0.60 0.150 3.49
1 Cum 2 6.56 (0.4+0.6)/2 0.150 0.98
1 Cum 2 13.13 (0+0.4)/2 0.150 0.79
For curve -14 at Km 6/710 1 Cum 1 40.00 0.60 0.150 3.60
1 Cum 2 6.56 (0.4+0.6)/2 0.150 0.98
1 Cum 2 13.13 (0+0.4)/2 0.150 0.79
For curve -15 at Km 6/800 1 Cum 1 25.00 0.60 0.150 2.25
1 Cum 2 6.56 (0.4+0.6)/2 0.150 0.98
1 Cum 2 13.13 (0+0.4)/2 0.150 0.79
For curve -16 at Km 7/040 1 Cum 1 45.02 0.60 0.150 4.05
1 Cum 2 6.56 (0.4+0.6)/2 0.150 0.98
1 Cum 2 13.13 (0+0.4)/2 0.150 0.79
For curve -17 at Km 7/250 1 Cum 1 24.18 0.60 0.150 2.18
1 Cum 2 6.56 (0.4+0.6)/2 0.150 0.98
Deatailed Estimate
S. Measurements
Description of item Unit No Qty
No L B D
1 2 3 4 5 6 7 8 9
1 Cum 2 13.13 (0+0.4)/2 0.150 0.79
For curve -18 at Km 7/820 1 Cum 1 28.00 0.60 0.150 2.52
1 Cum 2 6.56 (0.4+0.6)/2 0.150 0.98
5312.76
cum
6 Construction of granular sub base by providing well graded meterial (i.e Stone
aggregates of 9.5 mm to 4.75 mm size Gravel of 66% and sand of size < 2.6mm @
34% )having soaked CBR not less than 15% and Plasticity Index < 6 and stacking at
site to the departmentel gauge for pre measurements and mixing them and spreading the
same with motor grader in uniform layers of loose thickness of not more than 225mm
including mixing by mix in place method with rotavator to OMC and compacting with three
wheeled power roller of 8 to 10 Tonnes capacity to achieve the desired density, complete as
per IRC technical specification clause 402 of MORD.
2nd layer 100 mm compacted thickness.
Deatailed Estimate
S. Measurements
Description of item Unit No Qty
No L B D
1 2 3 4 5 6 7 8 9
6/2 to 6/4 Road dam 1 cum 1 40.00 4.00 0.100 -16.00
7/8 to 8/0 Road dam 1 cum 1 30.00 4.00 0.100 -12.00
8/2 to 8/4 Road dam 1 cum 1 30.00 4.00 0.100 -12.00
Curves:
For curve -1 at Km 0/440 1 Cum 1 12.00 0.60 0.100 0.72
1 Cum 2 6.56 (0.4+0.6)/2 0.100 0.66
1 Cum 2 13.13 (0+0.4)/2 0.100 0.53
For curve -2 at Km 0/890 1 Cum 1 15.00 0.60 0.100 0.90
1 Cum 2 6.56 (0.4+0.6)/2 0.100 0.66
1 Cum 2 13.13 (0+0.4)/2 0.100 0.53
For curve -3 at Km 1/190 1 Cum 1 46.07 0.60 0.100 2.76
1 Cum 2 6.56 (0.4+0.6)/2 0.100 0.66
1 Cum 2 13.13 (0+0.4)/2 0.100 0.53
For curve -4 at Km 1/370 1 Cum 1 53.40 0.60 0.100 3.20
1 Cum 2 6.56 (0.4+0.6)/2 0.100 0.66
1 Cum 2 13.13 (0+0.4)/2 0.100 0.53
For curve -5 at Km 1/820 1 Cum 1 31.41 0.60 0.100 1.88
1 Cum 2 6.56 (0.4+0.6)/2 0.100 0.66
1 Cum 2 13.13 (0+0.4)/2 0.100 0.53
For curve -6 at Km 2/360 1 Cum 1 19.89 0.60 0.100 1.19
1 Cum 2 6.56 (0.4+0.6)/2 0.100 0.66
1 Cum 2 13.13 (0+0.4)/2 0.100 0.53
For curve -7 at Km 3/370 1 Cum 1 20.00 0.60 0.100 1.20
1 Cum 2 6.56 (0.4+0.6)/2 0.100 0.66
1 Cum 2 13.13 (0+0.4)/2 0.100 0.53
For curve -8 at Km 3/550 1 Cum 1 19.89 0.60 0.100 1.19
1 Cum 2 6.56 (0.4+0.6)/2 0.100 0.66
1 Cum 2 13.13 (0+0.4)/2 0.100 0.53
Deatailed Estimate
S. Measurements
Description of item Unit No Qty
No L B D
1 2 3 4 5 6 7 8 9
For curve -9 at Km 3/910 1 Cum 1 24.08 0.60 0.100 1.44
1 Cum 2 6.56 (0.4+0.6)/2 0.100 0.66
1 Cum 2 13.13 (0+0.4)/2 0.100 0.53
For curve -10 at Km 4/330 1 Cum 1 21.99 0.60 0.100 1.32
1 Cum 2 6.56 (0.4+0.6)/2 0.100 0.66
1 Cum 2 13.13 (0+0.4)/2 0.100 0.53
For curve -11 at Km 5/960 1 Cum 1 19.89 0.60 0.100 1.19
1 Cum 2 6.56 (0.4+0.6)/2 0.100 0.66
1 Cum 2 13.13 (0+0.4)/2 0.100 0.53
For curve -12 at Km 6/050 1 Cum 1 15.70 0.60 0.100 0.94
1 Cum 2 6.56 (0.4+0.6)/2 0.100 0.66
1 Cum 2 13.13 (0+0.4)/2 0.100 0.53
For curve -13 at Km 6/620 1 Cum 1 38.74 0.60 0.100 2.32
1 Cum 2 6.56 (0.4+0.6)/2 0.100 0.66
1 Cum 2 13.13 (0+0.4)/2 0.100 0.53
For curve -14 at Km 6/710 1 Cum 1 40.00 0.60 0.100 2.40
1 Cum 2 6.56 (0.4+0.6)/2 0.100 0.66
1 Cum 2 13.13 (0+0.4)/2 0.100 0.53
For curve -15 at Km 7/800 1 Cum 1 25.00 0.60 0.100 1.50
1 Cum 2 6.56 (0.4+0.6)/2 0.100 0.66
1 Cum 2 13.13 (0+0.4)/2 0.100 0.53
For curve -16 at Km 7/040 1 Cum 1 45.02 0.60 0.100 2.70
1 Cum 2 6.56 (0.4+0.6)/2 0.100 0.66
1 Cum 2 13.13 (0+0.4)/2 0.100 0.53
For curve -17 at Km 7/250 1 Cum 1 24.18 0.60 0.100 1.45
1 Cum 2 6.56 (0.4+0.6)/2 0.100 0.66
1 Cum 2 13.13 (0+0.4)/2 0.100 0.53
For curve -18 at Km 7/820 1 Cum 1 28.00 0.60 0.100 1.68
Deatailed Estimate
S. Measurements
Description of item Unit No Qty
No L B D
1 2 3 4 5 6 7 8 9
1 Cum 2 6.56 (0.4+0.6)/2 0.100 0.66
1 Cum 2 13.13 (0+0.4)/2 0.100 0.53
3191.68
cum
7 Construction of Granualar shoulder by providing well graded meterial (i.e 66% gravel
and 34% sand) having soaked CBR not less than 15% and Plasticity Index < 6 and
stacking at site to the departmentel gauge for pre measurements and mixing them and
spreading the same with motor grader in uniform layers of loose thickness of not more
than 225mm including mixing by mix in place method with rotavator to OMC and
compacting with three wheeled power roller of 8 to 10 Tonnes capacity to achieve the
desired density, complete as per IRC technical specification clause 402 of MORD.
Deatailed Estimate
S. Measurements
Description of item Unit No Qty
No L B D
1 2 3 4 5 6 7 8 9
cum
Grade - II Metal
8 Providing, Water Bound Macadam base for a compacted thickness of 75mm using
Grade-II HBG crushed stone aggregates (63 mm to 45 mm size), screenings and
binder confirming to table 400-8 of MORD "Standard Specifications for the rural
roads) including cost, seigniorage and conveyance of all materials, spreading in uniform
thickness, hand packing, rolling with static power roller of 8-10 tons in stages to proper
grade and camber, applying and brooming requisite type of screening binding materials to
fill up the interstices of coarse aggregate, watering and compacting to the required density
or finished item of work as directed by the Engineer-in-Charge as per MORD clause No.405
Deatailed Estimate
S. Measurements
Description of item Unit No Qty
No L B D
1 2 3 4 5 6 7 8 9
For curve -1 at Km 0/440 1 Cum 1 12.00 0.60 0.075 0.54
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
For curve -2 at Km 0/890 1 Cum 1 15.00 0.60 0.075 0.68
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
For curve -3 at Km 1/190 1 Cum 1 46.07 0.60 0.075 2.07
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
For curve -4 at Km 1/370 1 Cum 1 53.40 0.60 0.075 2.40
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
For curve -5 at Km 1/820 1 Cum 1 31.41 0.60 0.075 1.41
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
For curve -6 at Km 2/360 1 Cum 1 19.89 0.60 0.075 0.90
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
For curve -7 at Km 3/370 1 Cum 1 20.00 0.60 0.075 0.90
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
For curve -8 at Km 3/550 1 Cum 1 19.89 0.60 0.075 0.90
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
For curve -9 at Km 3/910 1 Cum 1 24.08 0.60 0.075 1.08
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
For curve -10 at Km 4/330 1 Cum 1 21.99 0.60 0.075 0.99
Deatailed Estimate
S. Measurements
Description of item Unit No Qty
No L B D
1 2 3 4 5 6 7 8 9
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
For curve -11 at Km 5/960 1 Cum 1 19.89 0.60 0.075 0.90
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
For curve -12 at Km 6/050 1 Cum 1 15.70 0.60 0.075 0.71
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
For curve -13 at Km 6/620 1 Cum 1 38.74 0.60 0.075 1.74
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
For curve -14 at Km 6/710 1 Cum 1 40.00 0.60 0.075 1.80
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
For curve -15 at Km 7/800 1 Cum 1 25.00 0.60 0.075 1.13
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
For curve -16 at Km 7/040 1 Cum 1 45.02 0.60 0.075 2.03
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
For curve -17 at Km 7/250 1 Cum 1 24.18 0.60 0.075 1.09
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
For curve -18 at Km 7/820 1 Cum 1 28.00 0.60 0.075 1.26
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
2242.90
cum
Deatailed Estimate
S. Measurements
Description of item Unit No Qty
No L B D
1 2 3 4 5 6 7 8 9
Deatailed Estimate
S. Measurements
Description of item Unit No Qty
No L B D
1 2 3 4 5 6 7 8 9
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
For curve -2 at Km 0/890 1 Cum 1 15.00 0.60 0.075 0.68
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
For curve -3 at Km 1/190 1 Cum 1 46.07 0.60 0.075 2.07
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
For curve -4 at Km 1/370 1 Cum 1 53.40 0.60 0.075 2.40
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
For curve -5 at Km 1/820 1 Cum 1 31.41 0.60 0.075 1.41
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
For curve -6 at Km 2/360 1 Cum 1 19.89 0.60 0.075 0.90
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
For curve -7 at Km 3/370 1 Cum 1 20.00 0.60 0.075 0.90
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
For curve -8 at Km 3/550 1 Cum 1 19.89 0.60 0.075 0.90
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
For curve -9 at Km 3/910 1 Cum 1 24.08 0.60 0.075 1.08
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
For curve -10 at Km 4/330 1 Cum 1 21.99 0.60 0.075 0.99
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
Deatailed Estimate
S. Measurements
Description of item Unit No Qty
No L B D
1 2 3 4 5 6 7 8 9
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
For curve -11 at Km 5/960 1 Cum 1 19.89 0.60 0.075 0.90
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
For curve -12 at Km 6/050 1 Cum 1 15.70 0.60 0.075 0.71
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
For curve -13 at Km 6/620 1 Cum 1 38.74 0.60 0.075 1.74
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
For curve -14 at Km 6/710 1 Cum 1 40.00 0.60 0.075 1.80
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
For curve -15 at Km 7/800 1 Cum 1 25.00 0.60 0.075 1.13
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
For curve -16 at Km 7/040 1 Cum 1 45.02 0.60 0.075 2.03
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
For curve -17 at Km 7/250 1 Cum 1 24.18 0.60 0.075 1.09
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
For curve -18 at Km 7/820 1 Cum 1 28.00 0.60 0.075 1.26
1 Cum 2 6.56 (0.4+0.6)/2 0.075 0.49
1 Cum 2 13.13 (0+0.4)/2 0.075 0.39
2242.90
cum
Deatailed Estimate
S. Measurements
Description of item Unit No Qty
No L B D
1 2 3 4 5 6 7 8 9
10
Providing and applying Prime Coat with butimen emulsion (Medium Setting- SS-1) on
prepared surface of granular base incliding cleaning of road surface and spraying primer at
the rate of 0.85Kg/Sqm using mechanical means as clause 502 of MORD.
Deatailed Estimate
S. Measurements
Description of item Unit No Qty
No L B D
1 2 3 4 5 6 7 8 9
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -4 at Km 1/370 1 sqm 1 53.40 0.60 - 32.04
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -5 at Km 1/820 1 sqm 1 31.41 0.60 - 18.85
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -6 at Km 2/360 1 sqm 1 19.89 0.60 - 11.93
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -7 at Km 3/370 1 sqm 1 20.00 0.60 - 12.00
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -8 at Km 3/550 1 sqm 1 19.89 0.60 - 11.93
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -9 at Km 3/910 1 sqm 1 24.08 0.60 - 14.45
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -10 at Km 4/330 1 sqm 1 21.99 0.60 - 13.19
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -11 at Km 5/960 1 sqm 1 19.89 0.60 - 11.93
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -12 at Km 6/050 1 sqm 1 15.70 0.60 - 9.42
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
Deatailed Estimate
S. Measurements
Description of item Unit No Qty
No L B D
1 2 3 4 5 6 7 8 9
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -13 at Km 6/620 1 sqm 1 38.74 0.60 - 23.24
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -14 at Km 6/710 1 sqm 1 40.00 0.60 - 24.00
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -15 at Km 7/800 1 sqm 1 25.00 0.60 - 15.00
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -16 at Km 7/040 1 sqm 1 45.02 0.60 - 27.01
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -17 at Km 7/250 1 sqm 1 24.18 0.60 - 14.51
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -18 at Km 7/820 1 sqm 1 28.00 0.60 - 16.80
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
29905.27
cum
11
Providing and applying Tack Coat with butimen emulsion (Rapid Setting- RS-1) using
emulsion distributor @ 0.275 kg per sqm on prepared surface incliding cleaning of road
surface and spraying primer at the rate of 0.275Kg/Sqm using mechanical means as clause
503 of MORD.
Deatailed Estimate
S. Measurements
Description of item Unit No Qty
No L B D
1 2 3 4 5 6 7 8 9
Deduct CD works
0/0 to 0/2 Road dam 1 sqm 1 30.00 3.75 - -112.50
0/8 to 1/0 Road dam 1 sqm 1 34.00 3.75 - -127.50
1/5 to 1/760 CC Road 1 sqm 1 260.00 3.75 - -975.00
1/8 to 2/0 Slab culvert 1 sqm 1 27.00 3.75 - -101.25
2/0 to 2/2 Slab culvert 1 sqm 1 1.00 3.75 - -3.75
2/6 to 2/8 Road dam 1 sqm 1 30.00 3.75 - -112.50
3/0 to 3/2 Road dam 1 sqm 1 16.00 3.75 - -60.00
4/8 to 5/0 Road dam 1 sqm 1 16.00 3.75 - -60.00
5/4 to 5/6 Road dam 1 sqm 1 30.00 3.75 - -112.50
5/6 to 5/8 Road dam 1 sqm 1 30.00 3.75 - -112.50
6/2 to 6/4 Road dam 1 sqm 1 40.00 3.75 - -150.00
7/8 to 8/0 Road dam 1 sqm 1 30.00 3.75 - -112.50
8/2 to 8/4 Road dam 1 sqm 1 30.00 3.75 - -112.50
Curves:
For curve -1 at Km 0/440 1 sqm 1 12.00 0.60 - 7.20
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -2 at Km 0/890 1 sqm 1 15.00 0.60 - 9.00
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -3 at Km 1/190 1 sqm 1 46.07 0.60 - 27.64
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -4 at Km 1/370 1 sqm 1 53.40 0.60 - 32.04
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -5 at Km 1/820 1 sqm 1 31.41 0.60 - 18.85
Deatailed Estimate
S. Measurements
Description of item Unit No Qty
No L B D
1 2 3 4 5 6 7 8 9
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -6 at Km 2/360 1 sqm 1 19.89 0.60 - 11.93
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -7 at Km 3/370 1 sqm 1 20.00 0.60 - 12.00
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -8 at Km 3/550 1 sqm 1 19.89 0.60 - 11.93
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -9 at Km 3/910 1 sqm 1 24.08 0.60 - 14.45
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -10 at Km 4/330 1 sqm 1 21.99 0.60 - 13.19
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -11 at Km 5/960 1 sqm 1 19.89 0.60 - 11.93
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -12 at Km 6/050 1 sqm 1 15.70 0.60 - 9.42
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -13 at Km 6/620 1 sqm 1 38.74 0.60 - 23.24
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -14 at Km 6/710 1 sqm 1 40.00 0.60 - 24.00
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
Deatailed Estimate
S. Measurements
Description of item Unit No Qty
No L B D
1 2 3 4 5 6 7 8 9
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -15 at Km 7/800 1 sqm 1 25.00 0.60 - 15.00
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -16 at Km 7/040 1 sqm 1 45.02 0.60 - 27.01
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -17 at Km 7/250 1 sqm 1 24.18 0.60 - 14.51
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -18 at Km 7/820 1 sqm 1 28.00 0.60 - 16.80
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
29905.27
cum
12
Providing and laying Open Graded Premix Carpet (OGPC) surfacing material of 20 mm
thick composed of 13.20 mm to 5.60 mm size machine crushed hard blasted granite
chips using bitumen of 60/70 grade at the rate of 14.60 kgs per 10 sqm area of road
surface over tack coat to required line, level, grade to serve as wearing course on
previously prepared base including mixing in a Hot Mix Plant of 30/40 TPH, laying with
mechanical paver finisher and rolloing with three wheeled 8-10 Tonnes capacity power
roller and finishing to required level and grades including cost and conveyance of all
materials from approved sources, seigniorage, labour charges and hire and operational
charges of power road roller and all other machinery, tools and plants, providing barricading
for diversion of traffic, erecting red flags other incidental and operational charges etc.,
complete for finished item of work as per clause 508 of MORD.
Deatailed Estimate
S. Measurements
Description of item Unit No Qty
No L B D
1 2 3 4 5 6 7 8 9
Deduct CD works
0/0 to 0/2 Road dam 1 sqm 1 30.00 3.75 - -112.50
0/8 to 1/0 Road dam 1 sqm 1 34.00 3.75 - -127.50
1/5 to 1/760 CC Road 1 sqm 1 260.00 3.75 - -975.00
1/8 to 2/0 Slab culvert 1 sqm 1 27.00 3.75 - -101.25
2/0 to 2/2 Slab culvert 1 sqm 1 1.00 3.75 - -3.75
2/6 to 2/8 Road dam 1 sqm 1 30.00 3.75 - -112.50
3/0 to 3/2 Road dam 1 sqm 1 16.00 3.75 - -60.00
4/8 to 5/0 Road dam 1 sqm 1 16.00 3.75 - -60.00
5/4 to 5/6 Road dam 1 sqm 1 30.00 3.75 - -112.50
5/6 to 5/8 Road dam 1 sqm 1 30.00 3.75 - -112.50
6/2 to 6/4 Road dam 1 sqm 1 40.00 3.75 - -150.00
7/8 to 8/0 Road dam 1 sqm 1 30.00 3.75 - -112.50
8/2 to 8/4 Road dam 1 sqm 1 30.00 3.75 - -112.50
Curves:
For curve -1 at Km 0/440 1 sqm 1 12.00 0.60 - 7.20
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -2 at Km 0/890 1 sqm 1 15.00 0.60 - 9.00
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -3 at Km 1/190 1 sqm 1 46.07 0.60 - 27.64
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -4 at Km 1/370 1 sqm 1 53.40 0.60 - 32.04
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -5 at Km 1/820 1 sqm 1 31.41 0.60 - 18.85
Deatailed Estimate
S. Measurements
Description of item Unit No Qty
No L B D
1 2 3 4 5 6 7 8 9
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -6 at Km 2/360 1 sqm 1 19.89 0.60 - 11.93
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -7 at Km 3/370 1 sqm 1 20.00 0.60 - 12.00
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -8 at Km 3/550 1 sqm 1 19.89 0.60 - 11.93
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -9 at Km 3/910 1 sqm 1 24.08 0.60 - 14.45
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -10 at Km 4/330 1 sqm 1 21.99 0.60 - 13.19
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -11 at Km 5/960 1 sqm 1 19.89 0.60 - 11.93
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -12 at Km 6/050 1 sqm 1 15.70 0.60 - 9.42
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -13 at Km 6/620 1 sqm 1 38.74 0.60 - 23.24
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -14 at Km 6/710 1 sqm 1 40.00 0.60 - 24.00
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
Deatailed Estimate
S. Measurements
Description of item Unit No Qty
No L B D
1 2 3 4 5 6 7 8 9
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -15 at Km 7/800 1 sqm 1 25.00 0.60 - 15.00
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -16 at Km 7/040 1 sqm 1 45.02 0.60 - 27.01
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -17 at Km 7/250 1 sqm 1 24.18 0.60 - 14.51
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -18 at Km 7/820 1 sqm 1 28.00 0.60 - 16.80
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
29905.27
cum
13
Providing and laying bituminous liquid seal coat (Type A) comprising of a layer of
bitumuneous binder followed by a cover of stone chipping of grading as defined in table
500.16 of MOST at 0.09 cum/10sqm of chips to be laid simultaneously along with the
bitumunous course using 9.80 kgs of bitumen 60/70 grade for 10 sqm and rolling with
power roller including of required line, level, grade to serve as wearing course on previously
prepared surface and finishing to rquired level and grades including cost and conveyance of
all materials from approved sources and stacking at site to departmental gauge for
premeasurements, seigniorage, labour charges and hire and operational charges of power
road roller 8 to 10 tonnes capacity and all other machinery, tools and plants, providing
barricading for diversion of traffic, erecting red flags other incidental and operational
charges etc., complete for finished item of work as per technical specification clause 510 of
MORD.
Deatailed Estimate
S. Measurements
Description of item Unit No Qty
No L B D
1 2 3 4 5 6 7 8 9
Deduct CD works
0/0 to 0/2 Road dam 1 sqm 1 30.00 3.75 - -112.50
0/8 to 1/0 Road dam 1 sqm 1 34.00 3.75 - -127.50
1/5 to 1/760 CC Road 1 sqm 1 260.00 3.75 - -975.00
1/8 to 2/0 Slab culvert 1 sqm 1 27.00 3.75 - -101.25
2/0 to 2/2 Slab culvert 1 sqm 1 1.00 3.75 - -3.75
2/6 to 2/8 Road dam 1 sqm 1 30.00 3.75 - -112.50
3/0 to 3/2 Road dam 1 sqm 1 16.00 3.75 - -60.00
4/8 to 5/0 Road dam 1 sqm 1 16.00 3.75 - -60.00
5/4 to 5/6 Road dam 1 sqm 1 30.00 3.75 - -112.50
5/6 to 5/8 Road dam 1 sqm 1 30.00 3.75 - -112.50
6/2 to 6/4 Road dam 1 sqm 1 40.00 3.75 - -150.00
7/8 to 8/0 Road dam 1 sqm 1 30.00 3.75 - -112.50
8/2 to 8/4 Road dam 1 sqm 1 30.00 3.75 - -112.50
Curves:
For curve -1 at Km 0/440 1 sqm 1 12.00 0.60 - 7.20
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -2 at Km 0/890 1 sqm 1 15.00 0.60 - 9.00
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -3 at Km 1/190 1 sqm 1 46.07 0.60 - 27.64
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -4 at Km 1/370 1 sqm 1 53.40 0.60 - 32.04
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -5 at Km 1/820 1 sqm 1 31.41 0.60 - 18.85
Deatailed Estimate
S. Measurements
Description of item Unit No Qty
No L B D
1 2 3 4 5 6 7 8 9
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -6 at Km 2/360 1 sqm 1 19.89 0.60 - 11.93
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -7 at Km 3/370 1 sqm 1 20.00 0.60 - 12.00
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -8 at Km 3/550 1 sqm 1 19.89 0.60 - 11.93
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -9 at Km 3/910 1 sqm 1 24.08 0.60 - 14.45
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -10 at Km 4/330 1 sqm 1 21.99 0.60 - 13.19
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -11 at Km 5/960 1 sqm 1 19.89 0.60 - 11.93
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -12 at Km 6/050 1 sqm 1 15.70 0.60 - 9.42
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -13 at Km 6/620 1 sqm 1 38.74 0.60 - 23.24
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -14 at Km 6/710 1 sqm 1 40.00 0.60 - 24.00
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
Deatailed Estimate
S. Measurements
Description of item Unit No Qty
No L B D
1 2 3 4 5 6 7 8 9
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -15 at Km 7/800 1 sqm 1 25.00 0.60 - 15.00
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -16 at Km 7/040 1 sqm 1 45.02 0.60 - 27.01
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -17 at Km 7/250 1 sqm 1 24.18 0.60 - 14.51
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
For curve -18 at Km 7/820 1 sqm 1 28.00 0.60 - 16.80
1 sqm 2 6.56 (0.4+0.6)/2 - 6.56
1 sqm 2 13.13 (0+0.4)/2 - 5.25
29905.27
cum
14 Providing and Laying Boulder apron for bed protection with stone boulders of minimum size
and weight as per table 1300.10 no fragment weighing not less than 25kg laid dry complete
as per drawing and technical specification Clause 1301.
For M.I tank at km 6/200 to 6/560
Toe wall at U/S 1 cum 1 360.00 0.60 0.600 129.60
Toe wall at D/S 1 cum 1 360.00 0.60 0.450 97.20
Side slopes U/S 1 cum 1 360.00 8.30 0.300 896.40
Side slopes D/S 1 cum 1 360.00 8.30 0.300 896.40
2019.60
cum
Deatailed Estimate
S. Measurements
Description of item Unit No Qty
No L B D
1 2 3 4 5 6 7 8 9
Superintending Engineer
PR - Circle - Khammam
Construction of 600 mm dia 1V culvert on R/F R&B Road to Puligundala of Charla Mandal.
1 Earth work excavation and depositing on bank with intial lead of 10M and
lift 2m in OG soils for foundation including seinorage etc., complete.
Total: 105000.00
Superintending Engineer
PR Circle - Khammam
0.83
0.6
8.8
0.00
SUB ESTIMATE - 2
Construction of 600 mm dia 2V pipe culvert on R/F R&B Road to Puligundala of Charla Mandal.
1 Earth work excavation and depositing on bank with intial lead of 10M and
lift 2m in OG soils for foundation including seinorage etc., complete.
Under pipe portion 1x1 6.00 2.10 0.2 2.52 2887.95 7278.00
cum ./Cum
Total: 151000.00
Superintending Engineer
PR Circle - Khammam
0.83
0.6
8.8
0.00
SUB ESTIMATE - 3
Construction of Road damof 16 mts length on R/F R&B Road to Puligundala of Charla Mandal.
1 Earth work excavation and depositing on bank with intial lead of 10M and lift
2m in OG soils for foundation including seinorage etc., complete.
Long walls
Level portion 1x2 8.00 1.20 1.500 28.80
Approaches 2x2 4.00 1.20 1.500 28.80
Short walls
At middle 1x2 5.30 0.90 1.200 11.45
At ends 1x2 5.30 0.90 1.200 11.45
U/S & D/S apron 1x2 8.00 1.05 0.225 3.78
U/S & D/S toe wall 1x2 8.00 0.45 0.600 4.32
88.60 58.83 5212.00
cum ./Cum
2 Filling sand in foundation trench including watering and tamping including
c/c of all and l/c etc., complete.
Long walls
Level portion 1x2 8.00 1.20 0.3 5.76
Approaches 2x2 4.00 1.2 0.3 5.76
11.52 257.93 2971.00
cum ./Cum
3 Providing concrete for plain/reinforced concrete in open
foundations complete as per drawings and technical
specifications Clause 802, 803, 1202 & 1203
Long walls
Level portion 1x2 8.00 1.20 0.150 2.88
Approaches 2x2 4.00 1.20 0.150 2.88
Short walls
At middle 1x2 5.30 0.90 0.150 1.43
At ends 1x2 5.30 0.90 0.150 1.43
8.62 2914.78 25131.00
cum ./Cum
4 Providing concrete for plain/reinforced concrete in open
foundations complete as per drawings and technical
specifications Clause 802, 803, 1202 & 1203
Long walls
Level portion 1x2 8.00 (0.9+0.45)/2 1.050 11.34
Approaches 2x2 4.00 (0.9+0.45)/2 (1.05+1.30)/2 12.69
Short walls
At middle 1x2 (6.00+5.70)/2 (0.75+0.45)/2 1.050 7.37
At ends 1x2 (6.00+5.70)/2 (0.75+0.45)/2 1.300 9.13
40.53 2887.95 117040.00
cum ./Cum
Level portion 1x1 8.00 7.50 0.150 9.00
Approaches 1x2 4.00 7.50 0.150 9.00
18.00 2887.95 51983.00
cum ./Cum
5 Providing Rough stone dry packing using SS stone of 300 mm thick
including cost ,seignorage charges and conveyance of materials to site and
including labour charges for packing the stones for revetment etc.,
complete.for finished item of work.
In between walls
Level poriton 1x1 8.00 6.60 0.23 11.88
Approaches 1x2 4.00 6.60 0.23 11.88
U/S & D/S apron 1x2 8.00 1.05 0.33 5.46
U/S & D/S Toe wall 1x2 8.00 0.45 0.600 4.32
33.54 577.91 19383.00
cum 1 Cum
6 VCC (1:1.5:3) 20mm guage metal including cost of conveyance of all
materials and labour charges etc., complete curing segnorage charges for
finished item of work for Wearing coat.
Wearing coat
Level portion 1x1 8.00 7.50 0.100 6.00
Approches 1x2 4.00 7.50 0.100 6.00
12.00 7232.89 86795.00
cum 1 Cum
5.85 0.600
5.85 0.600
0.00
SUB ESTIMATE - 4
Construction of Road dam of 30 mts length on R/F R&B Road to Puligundala of Charla Mandal.
1 Earth work excavation and depositing on bank with intial lead of 10M and lift
2m in OG soils for foundation including seinorage etc., complete.
Long walls
Level portion 1x2 10.00 1.20 1.500 36.00
Approaches 2x2 10.00 1.20 1.500 72.00
Short walls
At middle 1x2 5.30 0.90 1.200 11.45
At ends 1x2 5.30 0.90 1.200 11.45
U/S & D/S apron 1x2 10.00 1.05 0.225 4.73
U/S & D/S toe wall 1x2 10.00 0.45 0.600 5.40
141.02 58.83 8297.00
cum ./Cum
2 Filling sand in foundation trench including watering and tamping including
c/c of all and l/c etc., complete.
Long walls
Level portion 1x2 10.00 1.20 0.3 7.20
Approaches 2x2 10.00 1.2 0.3 14.40
21.60 257.93 5571.00
cum ./Cum
3 Providing concrete for plain/reinforced concrete in open
foundations complete as per drawings and technical
specifications Clause 802, 803, 1202 & 1203
Long walls
Level portion 1x2 10.00 1.20 0.150 3.60
Approaches 2x2 10.00 1.20 0.150 7.20
Short walls
At middle 1x2 5.30 0.90 0.150 1.43
At ends 1x2 5.30 0.90 0.150 1.43
13.66 2914.78 39822.00
cum ./Cum
4 Providing concrete for plain/reinforced concrete in open
foundations complete as per drawings and technical
specifications Clause 802, 803, 1202 & 1203
Long walls
Level portion 1x2 10.00 (0.9+0.45)/2 1.050 14.18
Approaches 2x2 10.00 (0.9+0.45)/2 (1.05+1.30)/2 31.73
Short walls
At middle 1x2 (6.00+5.70)/2 (0.75+0.45)/2 1.050 7.37
At ends 1x2 (6.00+5.70)/2 (0.75+0.45)/2 1.300 9.13
62.40 2887.95 180199.00
cum ./Cum
Level portion 1x1 10.00 7.50 0.150 11.25
Approaches 1x2 10.00 7.50 0.150 22.50
33.75 2887.95 97468.00
cum ./Cum
5 Providing Rough stone dry packing using SS stone of 300 mm thick
including cost ,seignorage charges and conveyance of materials to site and
including labour charges for packing the stones for revetment etc.,
complete.for finished item of work.
In between walls
Level poriton 1x1 10.00 6.60 0.23 14.85
Approaches 1x2 10.00 6.60 0.23 29.70
U/S & D/S apron 1x2 10.00 1.05 0.33 6.83
U/S & D/S Toe wall 1x2 10.00 0.45 0.600 5.40
56.78 577.91 32811.00
cum 1 Cum
6 VCC (1:1.5:3) 20mm guage metal including cost of conveyance of all
materials and labour charges etc., complete curing segnorage charges for
finished item of work for Wearing coat.
Wearing coat
Level portion 1x1 10.00 7.50 0.100 7.50
Approches 1x2 10.00 7.50 0.100 15.00
22.50 7232.89 162740.00
cum 1 Cum
5.85 0.600
5.85 0.600
0.00
SUB ESTIMATE - 5
Construction of Road dam of 40 mts length on R/F R&B Road to Puligundala of Charla Mandal.
1 Earth work excavation and depositing on bank with intial lead of 10M and lift
2m in OG soils for foundation including seinorage etc., complete.
Long walls
Level portion 1x2 20.00 1.20 1.500 72.00
Approaches 2x2 10.00 1.20 1.500 72.00
Short walls
At middle 1x2 5.30 0.90 1.200 11.45
At ends 1x2 5.30 0.90 1.200 11.45
U/S & D/S apron 1x2 20.00 1.05 0.225 9.45
U/S & D/S toe wall 1x2 20.00 0.45 0.600 10.80
187.15 58.83 11010.00
cum ./Cum
2 Filling sand in foundation trench including watering and tamping including
c/c of all and l/c etc., complete.
Long walls
Level portion 1x2 20.00 1.20 0.3 14.40
Approaches 2x2 10.00 1.2 0.3 14.40
28.80 257.93 7428.00
cum ./Cum
3 Providing concrete for plain/reinforced concrete in open
foundations complete as per drawings and technical
specifications Clause 802, 803, 1202 & 1203
Long walls
Level portion 1x2 20.00 1.20 0.150 7.20
Approaches 2x2 10.00 1.20 0.150 7.20
Short walls
At middle 1x2 5.30 0.90 0.150 1.43
At ends 1x2 5.30 0.90 0.150 1.43
17.26 2914.78 50315.00
cum ./Cum
4 Providing concrete for plain/reinforced concrete in open
foundations complete as per drawings and technical
specifications Clause 802, 803, 1202 & 1203
Long walls
Level portion 1x2 20.00 (0.9+0.45)/2 1.050 28.35
Approaches 2x2 10.00 (0.9+0.45)/2 (1.05+1.30)/2 31.73
Short walls
At middle 1x2 (6.00+5.70)/2 (0.75+0.45)/2 1.050 7.37
At ends 1x2 (6.00+5.70)/2 (0.75+0.45)/2 1.300 9.13
76.57 2887.95 221136.00
cum ./Cum
Level portion 1x1 20.00 7.50 0.150 22.50
Approaches 1x2 10.00 7.50 0.150 22.50
45.00 2887.95 129958.00
cum ./Cum
5 Providing Rough stone dry packing using SS stone of 300 mm thick
including cost ,seignorage charges and conveyance of materials to site and
including labour charges for packing the stones for revetment etc.,
complete.for finished item of work.
In between walls
Level poriton 1x1 20.00 6.60 0.23 29.70
Approaches 1x2 10.00 6.60 0.23 29.70
U/S & D/S apron 1x2 20.00 1.05 0.33 13.65
U/S & D/S Toe wall 1x2 20.00 0.45 0.600 10.80
83.85 577.91 48458.00
cum 1 Cum
6 VCC (1:1.5:3) 20mm guage metal including cost of conveyance of all
materials and labour charges etc., complete curing segnorage charges for
finished item of work for Wearing coat.
Wearing coat
Level portion 1x1 20.00 7.50 0.100 15.00
Approches 1x2 10.00 7.50 0.100 15.00
30.00 7232.89 216987.00
cum 1 Cum
5.85 0.600
5.85 0.600
0.00
SUB ESTIMATE - 6
MEASUREMENTS
Sl NO Description of Item No QTY RATE AMOUNT
L B D
P.C.C grade M 10
Nominal mix (1:3:6)
P.C.C. grade M 15
Nominal mix (1:3:6)
Road side
Km 1/600 to 1/900 1x2 300.00 (0.20+0.30)/2 0.600 90.00
Other side
Km 1/600 to 1/900 1x2 300.00 (0.20+0.30)/2 0.600 90.00
180.00 2887.95 519830.00
cum ./Cum
Total: 695000.00
Superintending Engineer
PR Circle - Khammam
0.00
SUB ESTIMATE - 7
Providing Wearing Coat to Existing Road dam at km 0/540 on R/F Lingapuram to G.P Pally of Charla Mandal.
Wearing coat
At 0/8 to 1/0
Level portion 1x1 20.00 7.50 0.200 30.00
Ramp portion 1x2 7.00 7.50 0.200 21.00
At 2/6 to 2/8
Vent portion 1x1 30.00 7.50 0.200 45.00
96.00 7232.89 694358.00
cum 1 Cum
B) Pipe culverts:
Total: 720000.00
Superintending Engineer
PR Circle - Khammam
0.00
Name of the work :- R/F R&B Road to Puligundala of Charla Mandal.
LEAD CHARGES
Sl. Average Total Rate Per
Particulars Lead Charges Ded. Stacking Net Cost of lead
No. Lead Cum
1 2 3 4 5 6 7
1 60-63 mm size HBG metal (IRC&MOST) 12.00 162.00 7.60 154.40 154.40
2 50 - 55 mm size HBG metal (IRC&MOST) 12.00 162.00 7.60 154.40 154.40
3 40-45 mm size HBG metal (IRC&MOST) 12.00 162.00 7.60 154.40 154.40
4 22.40 mm size HBG metal (IRC&MOST) 53.00 360.20 7.60 352.60 352.60
5 13.22 mm size HBG metal (IRC&MOST) 53.00 360.20 7.60 352.60 352.60
6 11.20 mm size HBG metal (IRC&MOST) 53.00 360.20 7.60 352.60 352.60
7 5-7 mm size HBG metal (IRC&MORTH) 53.00 360.20 7.60 352.60 352.60
8 2.36 mm down and Stone Dust 53.00 360.20 7.60 352.60 352.60
9 Gravel 9.00 129.10 4.60 124.50 124.50
10 Sand for blindage 11.00 140.50 4.60 135.90 135.90
11 Bitumen 390.00 1170.00 1170.00 1170.00
12 Emulsion (SS - 1) 390.00 1170.00 1170.00 1170.00
13 Emulsion (RS - 1) 390.00 1170.00 1170.00 1170.00
14 40 mm size HBG metal (SS 5) 12.00 162.00 15.20 146.80 146.80
15 20 mm size HBG metal (SS 5) 53.00 360.20 15.20 345.00 345.00
16 12 mm size HBG metal (SS 5) 53.00 360.20 15.20 345.00 345.00
17 10 mm size HBG metal (SS 5) 53.00 360.20 15.20 345.00 345.00
18 Sand for Mortar 11.00 140.50 9.20 131.30 131.30
19 RCC 600mm dia spigot pipe 66.00 187.31 187.31
20 Rough stone 300mm size 12.00 162.00 15.20 146.80 146.80
21 Earth 0.25 44.80 4.60 40.20 40.20
1
Stacking for metal and Stone 7.60
Stacking for earth, Sand and gravel 4.60
Superintending Engineer
PR Circle - Khammam
2
Name of the work :- R/F R&B Road to Puligundala of Charla Mandal.
COST OF MATERIALS
Machine Seignior-
Sl. Ded. Blasting Total Rate Per
Particulars Initial Rate Final IR crushing age
No. Stacking charges Cum
charges charges
1 2 3 4 5 6 7 8 9
1 60-63 mm size HBG metal (IRC&MOST) 275.00 275.00 0.00 0.00 45.00 320.00
2 50 - 55 mm size HBG metal (IRC&MOST) 300.00 300.00 0.00 0.00 45.00 345.00
3 40-45 mm size HBG metal (IRC&MOST) 385.00 385.00 0.00 0.00 45.00 430.00
4 22.40 mm size HBG metal (IRC&MOST) 650.00 650.00 60.00 160.60 45.00 915.60
5 13.22 mm size HBG metal (IRC&MOST) 530.00 530.00 60.00 130.60 45.00 765.60
6 11.20 mm size HBG metal (IRC&MOST) 430.00 430.00 60.00 105.60 45.00 640.60
7 5-7 mm size HBG metal (IRC&MORTH) 330.00 330.00 60.00 80.60 45.00 515.60
8 2.36 mm down and Stone Dust 180.00 180.00 45.00 225.00
9 Gravel 48.00 48.00 20.00 68.00
10 Sand for blindage 37.00 37.00 36.00 73.00
11 Bitumen 26638.98 26638.98
12 Emulsion (MS - 1) 21280.90 21280.90
13 Emulsion (RS - 1) 21047.94 21047.94
14 40 mm size HBG metal (SS 5) 385.00 385.00 0.00 45.00 430.00
15 20 mm size HBG metal (SS 5) 650.00 650.00 60.00 160.60 45.00 915.60
16 12 mm size HBG metal (SS 5) 530.00 530.00 60.00 130.60 45.00 765.60
17 10 mm size HBG metal (SS 5) 430.00 430.00 60.00 105.60 45.00 640.60
18 Sand for Mortar 89.00 89.00 36.00 125.00
19 RCC 600mm dia spigot pipe 1809.53 1809.53 1809.53
20 Rough stone 300mm size 82.50 82.50 0.00 45.00 127.50
21 Cement 4380.00 4380.00
22 Steel 33000.00 33000.00